MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION Program Quality Assurance Services PROGRAM REVIEW CORRECTIVE ACTION PLAN All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Program Review Final Report dated June 6, 2012. Mandatory One-Year Compliance Date: 06/07/2013 Summary of Required Corrective Action Plans Little People’s School, Inc. CPR/Program Review Onsite Year: 2011-2012 Programs under review for the agency A - Learning Prep School Day Program Criterion # 8.8 8.8 Criterion Title IEP - Progress Reports 493 9.1(a) 9.1(a) 10.1 IEP - Progress Re 18 Behavior Management Student Separatio 19 Staffing for Instructional Groupings Age Range 21 Partially A Implemented A CAP Status In Process In Process Partially A Implemented A In Process In Process Partially Implemen Staffing for Instru 500 10.2 Applies To Partially Implemen Partially A Implemented A In Process In Process Partially Implemen 20 10.2 A - Learning Prep CPR Rating Student Separation Resulting from 495 10.1 15602 Age Range 501 Partially A Implemented A In Process In Process Partially Implemen MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 1 11.3 11.3 Educational Administrator Qualifications Partially A Implemented Educational Admi 504 A 11.4 In Process Partially Implemen 22 11.4 In Process Teachers (Special Education Teachers and Regular Education Teachers) Teachers (Specia 505 Partially A Implemented A In Process In Process Partially Implemen 23 11.5 11.5 506 11.6 11.6 24 11.9 15.1 15.1 16.7 Organizational St 26 Parental Involvem Partially A Implemented A In Process In Process Partially A Implemented A In Process In Process Partially A Implemented A In Process In Process Partially Implemen 27 Preventive Health Care 523 In Process Partially Implemen Parental Involvement and Parents' 514 In Process Partially Implemen Organizational Structure Advisory Group 16.7 Master Staff Ros 25 508 Partially A Implemented A Partially Implemen Master Staff Roster 507 11.9 Related Services Related Services Staff Preventive Health 28 Partially A Implemented A In Process In Process Partially Implemen PROGRAM REVIEW CORRECTIVE ACTION PLAN Corrective Action Plan Detail Little People’s School, Inc. CPR/Program Review Onsite Year: 2011-2012 PS Criterion #8.8 - IEP - Progress Reports Program Partially Implemented Review Rating Program Review Finding Mandatory One-Year Compliance Date 06/07/2013 Student records and interviews indicate that while progress reports provide a comprehensive course description, they do not specifically reflect progress made towards the benchmarks and goals for each student as required. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 2 * Indicates required field District/Agency Corrective Action Plan * Title/Role(s) of Responsible Person(s) * Expected Date of Completion Cynthia DeAngelis, Executive Director 11/30/2012 * Description LPS will ensure that progress reports will provide a comprehensive course description that specifically reflects progress made towards the benchmarks and goals for each student as required. LPS will conduct trainings on the appropriate reporting of student progress which will include how to specifically reflect progress towards the benchmarks and goals for each student. These trainings will be mandatory for all staff responsible for preparing progress reports. The first term progress reports will be reviewed by the supervisor to ensure the progress reports reflect progress made towards the benchmarks and goals for each student. Supervisors will provide additional training if necessary. * Evidence of Completion of Corrective Action LPS will submit the the sign in sheets for the Progress Report Training. LPS will submit to DESE a sampling of Progress Reports prepared by staff for the first term, that demonstrates compliance with progress reports that reflect student progress made towards the benchmarks and goals. * Description Progress Reports will be reviewed by supervisors before submission to ensure of Internal documentation compliance. Additional training will be provided to staff when necessary. Monitoring Process Complete Cynthia DeAngeli 11/30/2012 LPS w ill ensure th LPS w ill submit th Progress Reports On For PQA Use Only Corrective Action Plan Status Plan Status Date In Process 07/13/2012 Correction Status Not Corrected Basis for As requested LPS has submitted a plan to ensure that progress reports specifically address Status individual progress made toward the IEP goals and benchmarks for each student. Decision Furthermore, LPS has submitted a statement assuring the Department that it has committed to providing the necessary training to all staff members in order to ensure school wide compliance. Department Order of Corrective Action Progress Reports Required (Check all Due Dates that apply) Progress Report Due Date(s) 25 09/19/2012 09/19/2012 29 10/19/2012 10/19/2012 19 11/30/2012 11/30/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 3 Add Due Date Required Elements of Progress Report(s) LPS must submit to the evidence that all staff who are responsible for writing progress reports have received training on the appropriate reporting of student progress. This documentation must include the name and job title of the person who conducted the training, the date of the training, the time of the training, the agenda of the training and the names and positions of all staff who participated in the training. For any staff who did not participate, LPS must list the names and positions of those staff members and describe how and when they will receive the training. Additionally, LPS must submit progress reports for 5 students from each level (Elementary, Middle and High School) that were issued to sending school districts, parents and other appropriate parties from the first quarter of the 2012/2013 school year. PQA Review Complete PS Criterion #9.1(a) - Student Separation Resulting from Behavior Management Program Review Rating Partially Implemented Mandatory One-Year Compliance Date 06/07/2013 Program Review Finding A review of documentation and interviews indicated that the policies and procedures for Behavior Management did not contain all of the required elements, specifically: guidelines for staff utilizing time-out space; identification of the person responsible for implementing such procedures; a means of documenting the use of time-out for an individual student, including length of time, reason for the intervention, who approved the procedure, and who monitored the time out; and a statement assuring the time-out room will not be locked and that any room or space used for the practice of separation must be physically safe and appropriate to the population served by the facility. * Indicates required field District/Agency Corrective Action Plan * Title/Role(s) of Responsible Person(s) Cynthia DeAngelis, Executive Director, Laura Carney, Dean of Students H * Expected Date of Completion 08/29/2012 * Description The revision of the policies and procedures for Behavior Management has taken place during a series of actions for revision by the Dean of Students. Before the revision was implemented there was a training for all staff with required elements including guidelines for staff utilizing time-out space; identification of the person responsible for implementing such procedures; a means of documenting the use of time-out for an individual student, including length of time, reason for the intervention, who approved the procedure, and who monitored the time out; and a statement assuring the time-out room will not be locked and that any room or space used for the practice of separation must be physically safe and appropriate to the population served by the facility. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 4 * Evidence of Completion of Corrective Action There will be additional training at the orientation for all staff on August 27th to ensure all staff understand the revised policy and procedures. The revised Policies and Procedures for Behavior Management will be submitted to the DESE with the Behavior Management Training agenda and sign in sheet. Upon approval of the revised Behavior Management Policy, LPS will send the revised policy to all parents and LEAs of currently enrolled students. The new policy will be inserted in the Policy and Procedure Manual. The new policy will also be added to the admissions packet so all new students' parents and LEAs will be aware of the Behavior Management Policy prior to admission to LPS. * Description of Internal Monitoring Process For internal monitoring the Executive Director will review the time out logs to ensure that the logs identify the names of the staff who approved/monitored the time out procedures. Tje Executive Director will provide feedback to the appropriate staff, when necessary. With this method LPS will be able to direct further training/monitoring to ensure on-going compliance. Complete Cynthia DeAngeli 08/29/2012 The revision of th There w ill be add For internal monit On For PQA Use Only Corrective Action Plan Status Plan Status Date In Process 07/13/2012 Correction Status Not Corrected Basis for LPS has submitted a statement that the behavior management policy has been updated to Status include all necessary elements that are outlined in criterion 9.1(a). Decision Department Order of Corrective Action Progress Reports Required (Check all Due Dates that apply) Progress Report Due Date(s) 25 09/19/2012 09/19/2012 29 10/19/2012 10/19/2012 19 11/30/2012 11/30/2012 Add Due Date Required Elements of Progress Report(s) LPS must submit a copy of the updated behavior management policy that includes all required elements. LPS must also submit evidence of staff training on the revised behavior management policy that includes the name and job title of the person who conducted the training, the date of the training, the time of the training, the agenda of the training and the names and positions of all staff who participated in the training. For any staff who did not participate, LPS must list the names and positions of those staff members and describe how and when they will receive the training on the revised behavior management policies. LPS must also submit copies of all time out logs for each level (Elementary, Middle and High School) that includes all required elements listed in this criterion. PQA Review Complete MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 5 PS Criterion #10.1 - Staffing for Instructional Groupings Program Review Rating Partially Implemented Mandatory One-Year Compliance Date 06/07/2013 Program Review Finding Observations, documentation and interviews indicate that at the high school level some classes have up to 8 students with 1 Licensed Educator, exceeding the program's approved ratio of 6:1. * Indicates required field District/Agency Corrective Action Plan * Title/Role(s) of Responsible Person(s) * Expected Date of Completion Cynthia DeAngelis, Executive Director, Cynthia Manning, Principal 09/30/2012 * Description LPS will ensure that all classes will comply with the program's approved ratio of 6:1. All classrooms will have a maximum of 6 students to 1 Licensed Educator. * Evidence of LPS will submit the block schedules to DESE that will indicate the number of students per Completion of classroom demonstrating compliance of a maximum of 6 students to 1 Licensed Educator, Corrective per the DESE approved ratio of 6:1.. Action * Description The Executive Director will review and approve all block schedules prior to of Internal implementation to ensure the classroom assignments do not exceed the program's Monitoring approved ratio of 6 students to 1 Licensed Educator. Process Complete Cynthia DeAngeli 09/30/2012 LPS w ill ensure th LPS w ill submit th The Executive Dir On For PQA Use Only Corrective Action Plan Status Plan Status Date In Process 7/13/2012 Correction Status Not Corrected Basis for LPS submitted a statement noting that "all classes will comply with the program's Status approved ratio of 6:1. All classrooms will have a maximum of 6 students to 1 licensed Decision educator." Based on the current pending 2012 Reconstruction it is expected that LPS is implementing new ratios of 8:1 instead of 6:1. Department Order of Corrective Action Progress Reports Required (Check all Due Dates Progress Report Due Date(s) 25 09/19/2012 09/19/2012 29 10/19/2012 10/19/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 6 that apply) 19 11/30/2012 11/30/2012 Add Due Date Required Elements of Progress Report(s) LPS must submit copies of block schedules that indicate the number of students and licensed educators in all classrooms. LPS must also submit a listing of all students by grade level and classroom. Additionally, the Department will conduct an onsite visit to verify that a staff to student ratio of 8:1 is being maintained. PQA Review Complete PS Criterion #10.2 - Age Range Program Partially Implemented Review Rating Program Review Finding Mandatory One-Year Compliance Date 06/07/2013 A review of documentation indicates that there were instructional groupings of students who were beyond the 48 month age span requirement and the program had not requested a waiver by the Department in this regard. * Indicates required field District/Agency Corrective Action Plan * Title/Role(s) of Responsible Person(s) * Expected Date of Completion Cynthia DeAngelis, Executive Director, Cynthia Manning, Principal 09/30/2012 * Description LPS will ensure that all instructional groupings of students shall not differ by more than forty-eight months. * Evidence of Completion of Corrective Action LPS will ensure that all classroom assignments comply with the forty-eight month age span requirement. The block schedules will identify the birthdates of each student. LPS will submit the block schedules to DESE demonstrating classroom assignments comply with the 48 month age span requirement. * Description The Executive Director will review and approve all block schedules prior to of Internal implementation, to ensure the classroom assignments comply with the forty-eight month Monitoring age span requirement. Process Complete Cynthia DeAngeli 09/30/2012 LPS w ill ensure th LPS w ill ensure th The Executive Dir On For PQA Use Only Corrective Action Plan Status In Process Plan Status Date 07/13/2012 Correction Status Not Corrected Basis for Status LPS submitted a statement noting that "LPS will ensure that all instructional groupings Decision of students shall not differ by more than forty-eight months." MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 7 Department Order of Corrective Action Progress Reports Required (Check all Due Dates that apply) Progress Report Due Date(s) 25 09/19/2012 09/19/2012 29 10/19/2012 10/19/2012 19 11/30/2012 11/30/2012 Add Due Date Required LPS must submit block schedules for all classrooms indicating the initials of students Elements of with corresponding birth dates. Progress Report(s) PQA Review Complete PS Criterion #11.3 - Educational Administrator Qualifications Program Partially Implemented Review Rating Program Review Finding Mandatory One-Year Compliance Date 06/07/2013 Documentation and staff interviews indicate that some of the job responsibilities of the Educational Administrator are being delegated to and implemented by staff who are not appropriately qualified to serve in this position. * Indicates required field District/Agency Corrective Action Plan * Title/Role(s) of Responsible Person(s) Director of Educational Team Facilitators, Eleanor Sullivan * Expected Date of Completion 09/30/2012 * Description LPS has three Educational Administrators for 262 students, titled Educational Team Facilitator. One Educational Team Facilitator will be designated as Director of Educational Team Facilitators to ensure consistency in supervision of the provision of special education services. The Director of Educational Team Facilitators will be a member of the Administrative Management Team. The Director of Educational Team Facilitators and the other two Educational Team Facilitators will supervise the provision of special education services in the program and ensure that the services specified in each student's IEP are delivered. * Evidence of Completion of Corrective Action The three Educational Administrators are appropriately qualified to serve in this position. Given the number of students and number of services specified in each student's IEP, the Educational Administrators may delegate the responsibility of review of the progress notes to Department Heads. Any delegation of the job responsibilities of the Educational Administrator will only be to staff that are appropriately qualified to serve in this position. The Department Heads or any other staff assigned responsibilities of the Educational Administrator will possess licensure as a special educational administrator or possess all of MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 8 the following: License as a special educator, a minimum of a master's degree in special education or a related field; and a minimum of one year of administrative experience. The Department Head job description will include the above qualifications. LPS will submit the Department Head job Descriptions, the names of the staff and the appropriate documentation to DESE demonstrating the staff assuming responsibilites of the Educational Administrator are qualified to serve in the position. * Description of Internal Monitoring Process The Executive Director will ensure that the delegation of the job responsibilities of the Educational Administrator will be to staff appropriately qualified to serve in this position by approving the staff prior to the delegation of the responsibilities. The Executive Director will require documentation indicating the staff have licensure as a special educational administrator or possess all of the following: License as a special educator, a minimum of a master's degree in special education or a related field; and a minimum of one year of administrative experience. Complete Director of Educa 09/30/2012 LPS has three Ed The three Educat The Executive Dir On For PQA Use Only Corrective Action Plan Status Plan Status Date In Process 07/13/2012 Correction Status Not Corrected Basis for LPS has submitted a plan to ensure that the job responsibilities of the Educational Status Administrator are only being implemented by staff members who are appropriately Decision qualified to serve in this position. Department Order of Corrective Action Progress Reports Required (Check all Due Dates that apply) Progress Report Due Date(s) 25 09/19/2012 09/19/2012 29 10/19/2012 10/19/2012 19 11/30/2012 11/30/2012 Add Due Date Required Elements of Progress Report(s) LPS must submit the names and qualifications of the designated Educational Administrator, as well as the names and job descriptions of all staff members who perform some or all job functions on behalf of the Educational Administrator. This information must be submitted by 9/19/2012. By 11/30/2012, LPS must submit copies of sign-in sheets for all IEP meetings that occur during the first quarter of the 2012/2013 school year, highlighting the person from LPS who served in the role of Educational Administrator. PQA Review Complete MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 9 PS Criterion #11.4 - Teachers (Special Education Teachers and Regular Education Teachers) Program Review Rating Partially Implemented Mandatory One-Year Compliance Date 06/07/2013 Program Review Finding Documentation, a review of staff records and interviews indicate that two teachers are not appropriately licensed or on approved waivers as required. * Indicates required field District/Agency Corrective Action Plan * Title/Role(s) of Responsible Person(s) * Expected Date of Completion Executive Director, Cynthia DeAngelis, Program Director 09/30/2012 * Description LPS will ensure that all teachers are appropriately licensed or on approved waivers as required. * Evidence of Completion of Corrective Action For teachers/instructors/counselors providing special education services, such services shall be provided, designed or supervisor by a special educator. The counselors providing HSI are supervised by the Supervisor of Counseling and the curriculum is designed by a Special Education Teacher. The Program Director will supervise the elective instructors. The Program Director will be SPED certified or a special educator will design the curriculum for the electives. There will also be a tracking mechanism to ensure that all staff are appropriately licensed or on approved waivers. Evidence of the two teachers identified as not appropriately licensed or on an approved waiver or catorgorized will be sent to DESE to show compliance. LPS will submit the Teacher Roster to DESE and corresponding documentation. * Description of Internal Monitoring Process The internal monitoring of compliance with the appropriately licensed or on approved waivers of teachers is and willl be monitored by the Executive Director and discussed with the appropriate staff supervisors to ensure compliance. LPS will only hire Teachers that are appropriately licensed or on approved waivers. Complete Executive Directo 09/30/2012 LPS w ill ensure th For teachers/inst The internal monit On For PQA Use Only Corrective Action Plan Status In Process Plan Status Date 07/13/2012 Correction Status Not Corrected Basis for As requested LPS submitted information that stated "that all teachers are appropriately Status licensed or on approved waivers as required." Decision Department Order of Corrective Action The LPS statement "for teachers/instructors/counselors providing special education services, such services shall be provided, designed or supervised by a special educator" should be removed or amended to read "to the extent that teaching staff is providing special education services, such services shall be provided, designed or supervised by a special educator." Additionally, LPS must note that they will maintain an 8:1 student to licensed educator ratio that is in the process of being approved through Reconstruction. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 10 Progress Reports Required (Check all Due Dates that apply) Progress Report Due Date(s) 25 09/19/2012 09/19/2012 29 10/19/2012 10/19/2012 19 11/30/2012 11/30/2012 Add Due Date Required Elements of Progress Report(s) LPS must submit an updated Teacher Roster for all UFR 115's, Special Education Teachers and UFR 116's, Regular Education Teachers on the ESE required Teacher Roster Form that can be found in the Document Library in WBMS. On the Teacher Roster, LPS must also indicate the two staff who were not appropriately licensed or on approved waivers from the Program Review, as well as any Special Education or Regulation Education Teachers (UFR 115's or 116's) that have been hired since the Program Review. PQA Review Complete PS Criterion #11.5 - Related Services Staff Program Review Rating Partially Implemented Mandatory One-Year Compliance Date 06/07/2013 Program Review Finding A review of documentation and interviews indicate that not all Speech and Language Pathologists are appropriately licensed as required. * Indicates required field District/Agency Corrective Action Plan * Title/Role(s) of Responsible Person(s) * Expected Date of Completion Executive Director, Cynthia DeAngelis, Program Director 09/30/2012 * Description LPS will ensure all Speech and Language Pathologists will be appropriately licensed. * Evidence of Completion of Corrective Action LPS will submit to DESE all licenses, and or certifications, and or registrations of the Speech and Language Pathologists, demonstating they are appropriately licensed to provide Speech and Language services. LPS will only hire Speech and Language Pathologists that are appropriately licensed. LPS will submit the Related Services Roster and corresponding documentation. * Description The internal monitoring of compliance with the appropriately licensure for SPL is and will of Internal be monitored by the Executive Director. The Executive Director will approve the hiring of Monitoring all SPLs to ensure they are appropriately licensed. Process Complete Executive Directo 09/30/2012 LPS w ill ensure a LPS w ill submit to The internal monit On For PQA Use Only Corrective In Process Plan 07/13/2012 Correction MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan Not Corrected 11 Action Plan Status Status Date Status Basis for LPS stated that they "will ensure all Speech and Language Pathologists will be Status appropriately licensed." Decision Department Order of Corrective Action Progress Reports Required (Check all Due Dates that apply) Progress Report Due Date(s) 25 09/19/2012 09/19/2012 29 10/19/2012 10/19/2012 19 11/30/2012 11/30/2012 Add Due Date Required Elements of Progress Report(s) LPS must submit a copy of the Related Services Roster for all Related Services Staff that can be found in the Document Library of WBMS. LPS must only submit copies of licenses and/or Massachusetts State Board of Registration certificates for those staff serving in the role of Speech and Language Pathologist, as well as any Related Services Staff who have been hired since the Program Review. PQA Review Complete PS Criterion #11.6 - Master Staff Roster Program Review Rating Partially Implemented Mandatory One-Year Compliance Date 06/07/2013 Program Review Finding Documentation and interviews indicate that the most recently approved staffing plan is not being accurately implemented due to the job titles and functions of certain positions not being appropriately categorized based on the Uniform Financial Report (UFR) definitions. * Indicates required field District/Agency Corrective Action Plan * Title/Role(s) of Responsible Person(s) Executive Director, Cynthia DeAngelis * Expected Date of Completion 11/30/2012 * Description LPS has revised the Master Staff Roster with the Organizational chart that will efficiently represent the approved DESE staffing plan. The revised Master Staff Roster accurately reflects job titles and functions appropriately categorized per the UFR definitions. Additionally, the lines of supervision are clearly delineated on the Organizational Chart and all staff understand the lines of supervision. * Evidence of At the orientation 08/27/2012 the revised Master Staff Roster and Organizational Chart Completion of will be presented to all staff. LPS will revise all job descriptions to incorporate the MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 12 Corrective organizational changes; title changes, responsibilities, supervisor, supervisees, UFR Action number and qualifications. All Staff will recieve a copy of their revised job descriptions. Supervisors will meet with staff individually to discuss the changes in their jobs. LPS will submit the Master Staff Roster, Organizational Chart and all revised Job Descriptions. LPS will revise all policies and procedures that are impacted by these changes. LPS will submit the revised policies and procedures to DESE for approval and then to parents and LEAs when necessary. * Description The internal monitoring of compliance with the assurance that the lines of supervision are of Internal clear is and will be monitored by the Executive Director. The Executive Director will work Monitoring with the CFO to ensure all positions are appropriately categorized per the UFR definitions. Process Complete Executive Directo 11/30/2012 LPS has revised At the orientation The internal monit On For PQA Use Only Corrective Action Plan Status Plan Status Date In Process 07/13/2012 Correction Status Not Corrected Basis for LPS has stated that the Master Staff Roster has been revised to reflect the approved DESE Status staffing plan. Additionally, LPS has stated that the "revised Master Staff Roster accurately Decision reflects job titles and functions appropriately categorized per UFR definitions." Department Order of Corrective Action Progress Reports Required (Check all Due Dates that apply) Progress Report Due Date(s) 25 09/19/2012 09/19/2012 29 10/19/2012 10/19/2012 19 11/30/2012 11/30/2012 Add Due Date Required LPS must submit a copy of the most recently approved Program Budget and an updated Elements of Master Staff Roster that corresponds to the 2012 Reconstruction. The Master Staff Roster Progress can be found in the Document Library of WBMS. Report(s) PQA Review Complete PS Criterion #11.9 - Organizational Structure Program Partially Implemented Mandatory One-Year Compliance Date MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 06/07/2013 13 Review Rating Program Review Finding A review of documentation and interviews shows that the organizational structure of the program does not provide for the effective and efficient operation of the school, supervision of school staff, and supervision of students as required. In particular, the lines of supervision are not clear or understood by most staff and staff who are not appropriately qualified to serve in certain positions supervise other staff. * Indicates required field District/Agency Corrective Action Plan * Title/Role(s) of Responsible Person(s) * Expected Date of Completion Executive Director, Cynthia DeAngelis 11/30/2012 * Description LPS has reorganized the program to demonstrate that its structure provides for the effective and efficient operation of the school, supervision of school staff and the supervision of students. * Evidence of Completion of Corrective Action The reorganization provides for the effective and efficient operation of the school, supervision of school staff and supervision of students. The lines of supervision are clear and will be understood by all staff. The reorganization of the program will be presented to staff at the orientation 8/27/2012, including the Organizational Chart and revised job descriptions. LPS will also present any policies and procedures that were revised based on the reorganization of the program. LPS will submit to DESE, the new Organizational Chart, revised job descriptions, and the sign in sheet of the training on the reorganization, Master Staff Roster, Teacher Roster, Related Services Roster, staff roster identifying all direct care supervisors (criterion 11.10) * Description of Internal Monitoring Process The internal monitoring of compliance with the effective and efficiency of the school is and will be monitored by the Executive Director. The Executive Director will continue to review the organizational structure to ensure it provides for the effective and efficient operation of the school, supervision of school staff and supervision of students. Complete Executive Directo 11/30/2012 LPS has reorgani The reorganizatio The internal monit On For PQA Use Only Corrective Action Plan Status In Process Plan Status Date 07/13/2012 Correction Status Not Corrected Basis for LPS has submitted information stating that they have "reorganized the program to Status demonstrate that its structure provides for the effective and efficient operation of the Decision school, supervision of school staff, and the supervision of students." LPS also noted that "the reorganization of the program will be presented to staff at the orientation 8/27/2012". Department Order of Corrective Action MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 14 Progress Reports Required (Check all Due Dates that apply) Progress Report Due Date(s) 25 09/19/2012 09/19/2012 29 10/19/2012 10/19/2012 19 11/30/2012 11/30/2012 Add Due Date Required Elements of Progress Report(s) LPS must submit a copy of the new organizational chart that demonstrates the effective and efficient operation of the school, supervision of school staff and supervision of students. The organizational chart must include the program position titles for all staff. LPS must also submit revised job descriptions for all positions, highlighting any changes that have been made for all positions. Finally, LPS must submit evidence of staff training on the revised job descriptions and organizational structure that includes the name and job title of the person who conducted the training, the date of the training, the time of the training, the agenda of the training and the names and positions of all staff who participated in the training. For any staff who did not participate, LPS must list the names and positions of those staff members and describe how and when they will receive the training on the revised organizational structure and their updated job description. Additionally, the Department will conduct an onsite visit to verify lines of staff supervision are being implemented as represented by LPS. PQA Review Complete PS Criterion #15.1 - Parental Involvement and Parents' Advisory Group Program Review Rating Partially Implemented Mandatory One-Year Compliance Date 06/07/2013 Program Review Finding Documentation and interviews indicate that while the program has a Parent Council that organizes many social events and opportunities for student involvement, they do not have a Parent Advisory Group that advises the program on matters that pertain to the education, health and safety of the students as required. * Indicates required field District/Agency Corrective Action Plan * Title/Role(s) of Responsible Person(s) Executive Director, Cynthia DeAngelis, Gail O'Mara EMS Prin, Cynthia Man * Expected Date of Completion 09/30/2012 * Description LPS will establish a Parent Advisory Group that advises the program on matters that pertain to the education, health and safety of the students as required. The Principals are designated as the staff person to support the Parent's Advisory Group. * Evidence of Completion of Corrective Action The Principals will develop a written plan for involving parents and establish a Parents Adviory Group that shall advise the school on matters pertaining to education, health and safety of the students. LPS will submit to DESE, the Parent Advisory Group Manual that includes, the parent involvement plan that describes outreach to parents and steps to be taken to seek parental input on matters pertaining to student health, education and safety. LPS will also submit the job description of the Principals and copies of the schedules and MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 15 agendas for the meetings. * Description of Internal Monitoring Process The Executive Director will review and approve the parent involvement plan. The Executive Director will review the agendas for the meetings and recieve written feedback form the Principals regarding the parental input on matters pertaining to student health, education and safety. Complete Executive Directo 09/30/2012 LPS w ill establish The Principals w i The Executive Dir On For PQA Use Only Corrective Action Plan Status Plan Status Date In Process 07/13/2012 Correction Status Not Corrected Basis for LPS submitted information stating that they have designated the principals as the staff Status members who will support the newly formed Parent Advisory Group. Additionally, LPS Decision stated that the Parent Advisory Group will advise "the program on matters that pertain to the education, health and safety of the students as required." Department Order of Corrective Action Progress Reports Required (Check all Due Dates that apply) Progress Report Due Date(s) 25 09/19/2012 09/19/2012 29 10/19/2012 10/19/2012 19 11/30/2012 11/30/2012 Add Due Date Required Elements of Progress Report(s) By 9/19/2012, LPS must submit their new policy on the creation of the Parent Advisory Group, as well as their plan for involving parents in matters that pertain to the education, health and safety of the students enrolled in the program. By 11/30/2012, LPS must submit the schedule for the 2012-2013 school year Parent Advisory Group meetings, and copies of any meeting agendas and sign-in sheets for meetings that have taken place, as well as the job descriptions for the Elementary/Middle School Principal and the High School Principal reflecting their responsibilities related to the Parent Advisory Group. PQA Review Complete PS Criterion #16.7 - Preventive Health Care Program Review Partially Implemented Rating Mandatory One-Year Compliance Date 06/07/2013 Program Review A review of student records indicates that the program does not maintain either evidence of dental Finding examinations or any efforts to obtain such documentation as required. * Indicates required field District/Agency Corrective Action Plan MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 16 * Title/Role(s) of Responsible Person(s) * Expected Date of Completion Supervisor of Nurse, Nancy Conroy 09/30/2012 * Description LPS will, in cooperation with the student's parents and or human services agency, which is responsible for payment, shall make provision for each student to receive an annual comprehensive dental examination. LPS will require parents to submit evidence of the annual dental exams before the start of each school year. * Evidence of Completion of Corrective Action The LPS has a form for Health History that must be filled out by the parents each year. On this form a statement has been added to include evidence from the parent of dental examination. If upon reciept of the Health History form there is no indication of a recent dental examination, LPS will send a letter to the parent and school district specifically requesting documentation of a dental examination, A copy of this letter will be kept in the students record. LPS will submit to DESE a copy of the Health History form and a sample letter that will be sent to parents and LEAs requesting documentation of dental examination. * Description The internal monitoring of compliance with the requirement of maintaining evidence of of Internal dental examinations and efforts to obtain such documentation will be by the School Nurse. Monitoring Process Complete Supervisor of Nu 09/30/2012 LPS w ill, in coope The LPS has a fo The internal monit On For PQA Use Only Corrective Action Plan Status Plan Status Date In Process 07/13/2012 Correction Status Not Corrected Basis for LPS has stated that they "will require parents to submit evidence of the annual dental Status exams before the start of each school year." Additionally, if there is no evidence of a recent Decision dental examination LPS stated that they "will send a letter to the parent and school district specifically requesting documentation of a dental examination" and keep a copy of the letter in the student's file. Department Order of Corrective Action Progress Reports Required (Check all Due Dates that apply) Progress Report Due Date(s) 25 09/19/2012 09/19/2012 29 10/19/2012 10/19/2012 19 11/30/2012 11/30/2012 Add Due Date MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 17 Required Elements of Progress Report(s) LPS must submit a copy of the health history form and a sample letter sent to parents and school districts requesting documentation of dental examination. In addition, LPS must conduct a self-assessment and report on the number of students whose dental examination information is outstanding at the time of submission to the Department, including next steps the program will take to obtain such information. PQA Review Complete MA Department of Elementary & Secondary Education, Program Quality Assurance Services Little People’s School, Inc. PR Corrective Action Plan 18