Massachusetts Department of Elementary and Secondary Education 75 Pleasant Street, Malden, Massachusetts 02148-4096 Telephone: (781) 338-3700 TTY: N.E.T. Relay 1-800-439-2370 June 29, 2011 Craig L. Jurgensen Superintendent Westhampton Public Schools 19 Stage Road Westhampton, MA 01027 Re: Mid-cycle Report Dear Superintendent Jurgensen: Enclosed is the Department of Elementary and Secondary Education's Mid-cycle Report based on the onsite visit conducted in your district on May 27, 2011. During the MidCycle Review the Department monitored selected special education criteria to determine your district’s compliance with special education laws and regulations. The review consisted of information gathered from one or more of the following activities: interviews, review of student records, examination of documentation, and classroom observation(s). The Department determined that one or more of the criteria monitored in your district was “Partially Implemented” or “Not Implemented.” In all instances where noncompliance was found, the Department has prescribed corrective action for the district. This corrective action must be implemented as soon as possible, but in no case later than a year from the date of this report. You will find these requirements for corrective action included in the enclosed report, along with requirements for submitting progress reports using the enclosed form. Please provide the Department with your written assurance that all of the required corrective action will be implemented by your district within the timelines specified in the report. You must submit your statement of assurance to Darlene Lynch, Director, Program Quality Assurance Services, by July 19, 2011. Your staff's cooperation throughout this Mid-cycle Review is appreciated. If you have questions about this letter or the enclosed report, please do not hesitate to contact Marc 1 Oldenburg at 413-858-4591 x6. Sincerely, Marc Oldenburg, Mid-cycle Review Chairperson Program Quality Assurance Services Darlene A. Lynch, Director Program Quality Assurance Services cc: Mitchell D. Chester, Ed.D., Commissioner of Elementary and Secondary Education D. Beth Lopez, Supervisor, Program Quality Assurance Services Irene Ryan, School Committee Chairperson Laurie Farkus, Local Program Review Coordinator Encs: Mid-cycle Report Mid-cycle Progress Report Form 2 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION MID-CYCLE REPORT Westhampton Public Schools Dates of the Mid-cycle Review Onsite: May 27, 2011 Date of this Report: June 29, 2011 PLEASE NOTE THAT THIS REPORT IS IN TWO SECTIONS. Required Special Education Criteria Monitored in this Mid-cycle Review Current special education criteria available by scrolling down to the special education instrument at http://www.doe.mass.edu/pqa/review/cpr/default.html Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation SE 7 Transfer of parental rights at age of majority and student participation and consent at the age of majority Not Applicable Westhampton Public School District provides services to students in prekindergarten through 6th grade and does not provide services to students who are approaching the age of 18. Westhampton Public Schools Coordinated Program Review Mid-cycle Report June 29, 2011 Page 1 of 9 (b) Progress Report Due Date(s) and Required Elements Criterion SE 52A Registration of educational interpreters Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Document review and staff interview Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation Document review and staff interview indicated that there are no students enrolled in the district that are in need of interpreters at this time. The district does have an appropriate procedure in place if a need for educational interpreters arises. Westhampton Public Schools Coordinated Program Review Mid-cycle Report June 29, 2011 Page 2 of 9 (b) Progress Report Due Date(s) and Required Elements Additional Special Education Criteria Monitored in this Mid-cycle Review Current special education criteria available by scrolling down to the special education instrument at http://www.doe.mass.edu/pqa/review/cpr/default.html Criterion SE 2 Criterion Implemented Method(s) of Investigation Basis of Determination about Criterion Student record review and staff interview Student record review and staff interview indicated that all required and optional assessments contained the necessary elements including information on the history of the student’s progress in the general curriculum. Student record review and staff interview Student record review and staff interview indicated that the district is appropriately evaluating students suspected of having a specific learning disability (SLD). Written documentation Required and optional assessments SE 3 Special requirements for the determination of specific learning disability Criterion Partially Implemented (PI) or Not Implemented (NI) If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation Westhampton Public Schools Coordinated Program Review Mid-cycle Report June 29, 2011 Page 3 of 9 (b) Progress Report Due Date(s) and Required Elements Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation was found in the file of each student suspected of having SLD, including all current recommended SLD forms and the mandated Team Determination of Eligibility Form with the signature of each IEP Team member. SE 12 Student record review Student record review demonstrated that threeyear re-evaluations are completed within the required timeline. Student record review and staff interview Student record review and staff interview indicated that the IEP is consistently provided to parents immediately following the Team meeting. Staff interview and document review Staff interview and document review indicated that while the Frequency of reevaluation SE 18B Determination of placement; provision of IEP to parent SE29 Communications are Westhampton Public Schools Coordinated Program Review Mid-cycle Report June 29, 2011 Page 4 of 9 (b) Progress Report Due Date(s) and Required Elements Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Parent advisory council for special education If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation (b) Progress Report Due Date(s) and Required Elements district does not currently have any students who are in need of translation services, the district does have a procedure in place and resources identified should this need arise. in English and primary language of home SE 32 Basis of Determination about Criterion PI Staff interview and document review Staff interview and document review indicated that while the district has made, and documented, ongoing efforts to encourage the establishment of a functioning PAC including providing an annual workshop within the district on the rights of students and their parents and guardians under the state and federal special education laws along with other opportunities for parents, there are no officers or bylaws in place at this time. The district must develop strategies to encourage the formation of a PAC. Westhampton Public Schools Coordinated Program Review Mid-cycle Report June 29, 2011 Page 5 of 9 By October 14, 2011: Provide a description of the newly developed strategies for encouraging the establishment of a PAC. By January 13, 2012: Provide a description of the results of the district’s efforts to establish a PAC. Include copies of: Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation (b) Progress Report Due Date(s) and Required Elements The PAC officer list; The PAC bylaws; School Committee agendas and minutes pertaining to consultation with the PAC; Agendas of PAC training sessions or meetings conducted by the district and documentation of other district efforts to support the PAC. SE 36 IEP implementation, accountability and financial responsibility Student record review and staff interview Student record review and staff interview indicated that the district oversees the full implementation of all IEPs. Westhampton Public Schools Coordinated Program Review Mid-cycle Report June 29, 2011 Page 6 of 9 Criterion SE 40 Criterion Implemented Method(s) of Investigation Basis of Determination about Criterion Staff interview and document review Staff interview and review of documentation indicated that there are no instructional groups that exceed the required number of students. Staff interview and document review Staff interview and review of documentation indicated that all age span requirements are within specified limits. Staff interview and document review Staff interview and review of documentation indicated that the district has had no suspensions this academic year. The district has procedures in place to record the number and duration of suspensions for all students. Instructional grouping requirements for students aged five and older SE 41 Age span requirements SE 44 Procedure for recording suspensions Criterion Partially Implemented (PI) or Not Implemented (NI) If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation Westhampton Public Schools Coordinated Program Review Mid-cycle Report June 29, 2011 Page 7 of 9 (b) Progress Report Due Date(s) and Required Elements Criterion SE 51 Criterion Implemented Method(s) of Investigation Basis of Determination about Criterion Staff interview and document review Staff interview and document review revealed that all special education staff are appropriately certified. Staff interview and document review Staff interview and document review revealed that OT, PT, Speech and Language, and the School Psychologist are all appropriately licensed. The School Adjustment Counselor is operating under a current waiver and expects to be licensed within the remainder of this academic year. Staff interview and observation A tour of the elementary school and a review of floor plans indicated that special education in the district is provided in Appropriate special education teacher licensure SE 52 Appropriate certifications/licenses or other credentials - related service provider SE 55 Special education facilities and classrooms Criterion Partially Implemented (PI) or Not Implemented (NI) If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation Westhampton Public Schools Coordinated Program Review Mid-cycle Report June 29, 2011 Page 8 of 9 (b) Progress Report Due Date(s) and Required Elements Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation classrooms and facilities that maximize the inclusion of such students into the life of the school; provide accessibility in order to fully implement each student’s IEP; are at least equal in all physical respects to the average standards of general facilities and classrooms; and are given the same priority in the allocation of instructional and other space in order to minimize the separation or stigmatization of eligible students. Westhampton Public Schools Coordinated Program Review Mid-cycle Report June 29, 2011 Page 9 of 9 (b) Progress Report Due Date(s) and Required Elements MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION MID-CYCLE REVIEW School District: Westhampton Public Schools M I D – CY C L E P R O G R E S S R E P O R T Date Prepared: ____________________________________ Prepared by: __________________________________________________________________ (name and title) Criterion: _______________________ Topic: ________________________________________________________________________ For each criterion for which you prepare a progress report, please make a copy of this cover page, fill in the information requested above, and attach a complete description of the corrective action taken and any accompanying documentation. (Description of corrective action for each criterion and any accompanying documentation should include all of the “Progress Report Required Elements” for that criterion in the Mid-cycle Report.) Send the whole set of completed progress reports to: Darlene Lynch, Director Program Quality Assurance Services Massachusetts Department of Elementary and Secondary Education 75 Pleasant Street Malden, MA 02148-4906 Rev. 12-10 Mid-cycle Report & Cover Letter with Mid-cycle PR Form 2011