Massachusetts Department of Elementary and Secondary Education 75 Pleasant Street, Malden, Massachusetts 02148-4096 Telephone: (781) 338-3700 TTY: N.E.T. Relay 1-800-439-2370 November 28, 2011 Dr. Sonia Pope, Charter School Leader Holyoke Community Charter School 2200 Northampton St. Holyoke, MA 01040-3430 Re: Mid-cycle Report Dear Dr. Pope: Enclosed is the Department of Elementary and Secondary Education's Mid-cycle Report based on the onsite visit conducted in your district in June 2011. During the Mid-Cycle Review the Department monitored selected special education criteria to determine your district’s compliance with special education laws and regulations. The review consisted of information gathered from one or more of the following activities: interviews, review of student records, examination of documentation, and classroom observation(s). The Department determined that one or more of the criteria monitored in your district was “Partially Implemented” or “Not Implemented.” In all instances where noncompliance was found, the Department has prescribed corrective action for the district. This corrective action must be implemented as soon as possible, but in no case later than a year from the date of this report. You will find these requirements for corrective action included in the enclosed report, along with requirements for submitting progress reports using the enclosed form. Please provide the Department with your written assurance that all of the required corrective action will be implemented by your district within the timelines specified in the report. You must submit your statement of assurance to Darlene Lynch, Director, Program Quality Assurance Services, by December 15, 2011. 1 Your staff's cooperation throughout this Mid-cycle Review is appreciated. If you have questions about this letter or the enclosed report, please do not hesitate to contact Joan Brinckerhoff at 781-338-3715. Sincerely, Joan Brinckerhoff, Ph.D., Mid-cycle Review Chairperson Program Quality Assurance Services Darlene A. Lynch, Director Program Quality Assurance Services cc: Mitchell D. Chester, Ed.D., Commissioner of Elementary and Secondary Education Elizabeth Y. Ahern, Ed. D., Supervisor, Program Quality Assurance Services Anne Darcy, Charter School Board of Trustees Chairperson Kristen O’Connor, Local Program Review Coordinator Encs: Mid-cycle Report Mid-cycle Progress Report Form 2 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION MID-CYCLE REPORT HOLYOKE COMMUNITY CHARTER SCHOOL Dates of the Mid-cycle Review Onsite: June 7-8, 2011 Date of this Report: November 28, 2011 PLEASE NOTE THAT THIS REPORT IS IN TWO SECTIONS. Required Special Education Criteria Monitored in this Mid-cycle Review Current special education criteria available by scrolling down to the special education instrument at http://www.doe.mass.edu/pqa/review/cpr/default.html Criterion SE 7 Transfer of parental rights at age of majority and student participation and consent at the age of majority Criterion Implemented Not Applicable Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation The charter school serves students in grades K-8. Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 1 of 21 (b) Progress Report Due Date(s) and Required Elements Criterion SE 52A Registration of educational interpreters Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Document Review Staff Interviews Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation The charter school does not currently have any students that require an educational interpreter; however procedures are in place to ensure that providers of interpreting services for students who are deaf or hard of hearing are registered with the Massachusetts Commission for the Deaf and Hard of Hearing. Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 2 of 21 (b) Progress Report Due Date(s) and Required Elements Additional Special Education Criteria Monitored in this Mid-cycle Review Current special education criteria available by scrolling down to the special education instrument at http://www.doe.mass.edu/pqa/review/cpr/default.html Criterion SE 1 Assessments are Appropriately Selected and Interpreted SE 2 Required and Optional Assessments Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) PI Method(s) of Investigation Basis of Determination about Criterion Student Records Student records demonstrated that assessments are appropriately selected and interpreted for students who are referred for evaluation. Staff Interviews Student record review indicated that required and optional assessments are not consistently completed, specifically Educational Assessment A and B, as part of the eligibility determination for students. Student Records If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation The charter school must conduct a root cause analysis related to completion of required and optional assessments to determine why assessments are not consistently completed. Once the analysis is complete the charter school must develop appropriate corrective action steps, which include the development of an oversight and tracking system to ensure compliance with the completion of required and optional assessments. The charter school must conduct an administrative review of student records for students who have undergone an initial or re-evaluation Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 3 of 21 (b) Progress Report Due Date(s) and Required Elements Submit a description of the changes in procedures or other strategies implemented by the charter school as a result of its analysis and any corresponding timelines to ensure that all consented-to assessments are completed. Please submit evidence that all staff responsible for Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation (b) Progress Report Due Date(s) and Required Elements subsequent to the charter school’s implementation of all corrective action activities to determine if the charter school is compliant with the requirements of this criterion. implementing these changes have been trained by January 31, 2012. *Please note when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). Also, please submit the description of the internal oversight and tracking system and identify the person(s) responsible for the oversight, including the date for the system’s implementation on or before January 31, 2012. Submit the results of the administrative review of student records. Indicate the number of records reviewed, the number found Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 4 of 21 Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation (b) Progress Report Due Date(s) and Required Elements to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the charter school to address any identified noncompliance. Please submit this to the Department on or before April 30, 2012. SE 3 Special Requirements for Determination of Specific Learning Disability Student Records Staff Interviews The charter school consistently implements all requirements for the determination of specific learning disability (SLD). Teams routinely complete the written determination by all Team members. Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 5 of 21 Criterion SE 4 Report of Assessment Results Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) PI Method(s) of Investigation Student Records Staff Interviews Basis of Determination about Criterion Student record review and interviews with staff members demonstrated that contracted related service providers (speech language and occupational therapy) do not define in detail and in educationally relevant and common terms the student’s needs or offer explicit means of meeting them. If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation Provide training to contracted evaluators on the required components of diagnostic impressions and educationally relevant information in assessment reports. Further, the charter school must develop an internal oversight and tracking system to ensure that assessment results contain all the required elements including educationally relevant information as well as explicit means of meeting the student’s needs. The charter school must conduct an administrative review of student records for students who have undergone an initial or re-evaluation subsequent to the charter school’s implementation of all corrective action activities to determine if the charter school is compliant with the requirements of this criterion. *Please note when conducting internal monitoring the district must maintain the following documentation and make it Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 6 of 21 (b) Progress Report Due Date(s) and Required Elements Submit evidence of training related to contracted assessment reports which will include but not be limited to a training agenda, attendance sheet and copies of the materials presented. Also please submit the description of the internal oversight and tracking system and identify the person(s) responsible for the oversight, including the date for the system’s implementation on or before January 31, 2012. Submit the results of the Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). SE 8 Team Composition and Attendance Student Records Staff Interviews Student record review and interviews with staff members demonstrated that IEP Teams routinely were attended by all required team members. Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 7 of 21 (b) Progress Report Due Date(s) and Required Elements administrative review of student records. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the charter school to address any identified noncompliance. Please submit this to the Department on or before April 30, 2012. Criterion SE 9 Timeline for Determination of Eligibility Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) PI Method(s) of Investigation Student Records Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation The student record review indicated that timelines for eligibility determination were not consistently met by the charter school. The charter school must conduct a root cause analysis related to timelines for determination of eligibility to determine why the timelines are not consistently met. Once the analysis is complete the charter school must develop appropriate corrective action steps, which include the development of an oversight and tracking system to ensure compliance with the required timelines. The charter school must conduct an administrative review of student records for students who have undergone an initial evaluation subsequent to the charter school’s implementation of all corrective action activities to determine if the charter school is compliant with the requirements of this criterion. *Please note when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 8 of 21 (b) Progress Report Due Date(s) and Required Elements Submit a description of the changes in procedures or other strategies implemented by the charter school as a result of its analysis and any associated timelines to ensure compliance with the 45-day timeline. Please submit evidence that all staff responsible for implementing these changes have been trained by January 31, 2012. Also, please submit the description of the internal oversight and tracking system and Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). (b) Progress Report Due Date(s) and Required Elements identify the person(s) responsible for the oversight, including the date for the system’s implementation on or before January 31, 2012. Submit the results of the administrative review of student records. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the charter school to address any identified Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 9 of 21 Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation (b) Progress Report Due Date(s) and Required Elements noncompliance. Please submit this to the Department on or before April 30, 2012. SE 9A Elements of Eligibility Determination Student Records Staff Interviews While the charter school does not consistently meet timelines for determining eligibility, they do ensure general education accommodations and services for ineligible students. When a student is determined to be no longer eligible or ineligible for special education, the student may be referred to the Section 504 coordinator if appropriate. In addition the charter school implements a response to intervention model and has extensive support for reading and other academics as well as replacement instruction. Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 10 of 21 Criterion Criterion Implemented SE 10 End of School Year Evaluations SE 11 Independent Educational Evaluation SE 12 Frequency of Reevaluation SE 13 Progress Reports Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Student Records Staff Interviews Document Review Staff Interviews PI Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation (b) Progress Report Due Date(s) and Required Elements Student records and staff interviews indicated that the charter school consistently ensures that Team meetings are scheduled up to14 days beyond the end of school to allow for provision of a proposed IEP or a written notice of the determination of no eligibility. Independent Educational Evaluations (IEE) are provided in accordance with state and federal regulations. Student Records The charter school provides for a reevaluation for each eligible student within three years. Student Records A review of student records indicated that the charter school does not consistently provide the parents of special needs students with reports on the student's The charter school must conduct a root cause analysis related to provision of progress reports during the 2010-2011 school year in order to determine why special education Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 11 of 21 Please submit a narrative description of the outcomes of the charter school’s Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion progress toward reaching the goals set in the IEP at least as often as parents are informed of the progress of non-disabled students. If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation staff members inconsistently completed student progress reports. Once the analysis is complete the charter school must develop appropriate corrective action steps, which include the development of an oversight and tracking system to ensure compliance with the provision of progress reports. The charter school must conduct an administrative review of student records for progress reports completed subsequent to the charter school’s implementation of all corrective action activities to determine if the charter school is compliant with the requirements of this criterion. *Please note when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 12 of 21 (b) Progress Report Due Date(s) and Required Elements analysis, the corresponding corrective actions and any associated timelines. Also, include a description of the tracking system and the person(s) responsible for the oversight. Please submit this to the Department on or before January 31, 2012. Submit the results of the administrative review of student records. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance Criterion SE 14 Review and revision of IEPs Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) PI Method(s) of Investigation Student Records Basis of Determination about Criterion Record review demonstrated that the charter school is not consistently holding Team Meetings before the anniversary date of the current IEP. The tracking system used by the district requires individual tracking for each student instead of an annual print out with dates for when the actual meetings were held. If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation signature(s). and a description of additional corrective actions taken by the charter school to address any identified noncompliance. Please submit this to the Department on or before April 30, 2012. The charter school must conduct a root cause analysis related to annual review and revision of student IEPs during the 2010-2011 school year in order to determine why Team Meetings are not consistently held on or before the anniversary date of the current IEP. Once the analysis is complete the charter school must develop appropriate corrective action steps, which include the development of an oversight and tracking system to ensure compliance with review and revision of IEPs. Please submit a narrative description of the outcomes of the charter school’s analysis, the corresponding corrective actions and the associated timelines. Also, include a description of the tracking system and the person(s) responsible for the oversight. Please submit this to the Department The charter school must conduct an administrative review of student Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 13 of 21 (b) Progress Report Due Date(s) and Required Elements Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation records for annual reviews completed subsequent to the charter school’s implementation of all corrective action activities to determine if the charter school is compliant with the requirements of this criterion. *Please note when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 14 of 21 (b) Progress Report Due Date(s) and Required Elements on or before January 31, 2012. Submit the results of the administrative review of student records. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the charter school to address any identified noncompliance. Please submit this to the Department on or before April 30, 2012. Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion SE 18A IEP Development Student Records Student record review demonstrated that IEPs address all required elements. SE 18B Determination of Placement; Provision of IEP to Parent Student Records Student record review and interviews with staff indicated that decisions regarding placement are based on the IEP and student needs. The charter school provides the parent with the IEP immediately. SE 19 Extended Evaluation Staff Interviews Student Records Staff Interviews SE 20 Least Restrictive Environment Student Records If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation Student record review and staff interviews demonstrated that extended evaluations are provided to obtain additional information in a specific area. If a partial IEP can be developed, it is completed. Extended evaluations are completed within eight weeks. Student record review demonstrated that the nonparticipation statements are individualized for all students. The charter school has extended Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 15 of 21 (b) Progress Report Due Date(s) and Required Elements Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation their inclusion model to include a “push in” option, which provides students with both academic and related service needs in the general education classroom setting. SE 22 IEP Implementation and Availability Staff Interviews Interviews indicated that the charter school operates a SABIS model, which includes Academic Quality Controllers that are responsible for overseeing all services in general education classrooms and facilitates the oversight of special education services. The special education administrator and the charter school director both routinely review services and spend large amounts of time in the classrooms. SE 24 Parental Notice Student Records A review of student records showed that parental notice forms consistently respond to the six federally required questions and indicate the function of the proposal or refusal to initiate or Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 16 of 21 (b) Progress Report Due Date(s) and Required Elements Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation change the identification, evaluation or educational placement of the student. SE 25 Parental Consent Student Records Student records demonstrated that parental consent is consistently documented for all evaluations and for IEPs and amendments. SE 25A Notice to Special Education Appeals Student Records Student records and staff interviews indicated that the charter school has not had a request for a hearing or a recent rejection of an IEP or finding of no eligibility, however procedures are in place to ensure compliance with this criterion. SE 26 Parent Participation in Meetings Staff Interviews Student Records Student records demonstrated that parent participation is consistently documented on the Team meeting attendance sheet. Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 17 of 21 (b) Progress Report Due Date(s) and Required Elements Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion SE 27 Content of Team Meeting Notice Student Records Student records indicated that the Team meeting notices for the charter school consistently state the purpose, time and location of the meeting as well as who will be in attendance. SE 32 Parent Advisory Council Document Review A review of documentation and interviews demonstrated that the charter school PAC has membership that is offered to all parents of students with disabilities and is open to other interested parties. The workshop on parent and student rights was provided on November 15, 2010. The PAC has established by-laws and receives support from the charter school for meetings and numerous additional workshops. Staff Interviews SE 33 Involvement in the General Education Curriculum Student Records If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation Student records showed that the charter school routinely documents the student’s participation in the general education curriculum in the Present Level of Performance A section of the IEP. Regular Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 18 of 21 (b) Progress Report Due Date(s) and Required Elements Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation education teachers are present at the IEP Team meetings. SE 34 Continuum of Alternative Services and Placements Document Review Staff Interviews A review of documentation and interviews indicated that the charter school has developed a strong continuum of placements for special education that include: full inclusion, consultation, resource room, partial inclusion and home-based instruction. In addition, related services are provided in the classroom and in pull out mode. The charter school also provides extensive reading support and replacement instruction. SE 36 IEP Implementation, Accountability and Fiscal Responsibility Document Review Staff Interviews A review of documentation and interviews with staff members showed that the charter school provides oversight for the implementation of the IEPs in a variety of ways: the supervision of special education staff by the special education administrator Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 19 of 21 (b) Progress Report Due Date(s) and Required Elements Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation and the Director of the charter school, use of the SABIS quality control model, as well as conducting a high frequency of assessments for mastery of instructional material. SE 40 Instructional Grouping Requirements Document Review A review of documentation indicated that the size and composition of instructional groups for special education students meet all of the requirements. SE 50 Administrator of Special Education Document Review The Special Education Administrator of a charter school is not required to have a special education administrator’s license. The charter school’s documentation demonstrated that the current administrator has the qualifications to perform the duties assigned. SE 54 Professional Development Document Review A review of documentation demonstrated that the charter school provided extensive evidence of training in inclusion, Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 20 of 21 (b) Progress Report Due Date(s) and Required Elements Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation differentiated instruction, state and federal laws and regulations and collaboration as well as for other numerous topics. SE 55 Special Education Facilities and Classrooms Onsite Review of Facilities An onsite review of the charter school building demonstrated that they no longer use the second floor mezzanine area for any services. The speech therapist has an assigned room for pull out services and does provide services within the general education classrooms. The occupational therapy services are provided in a small room with sufficient space for a small group and within the general education classrooms. Holyoke Community Charter School Coordinated Program Review Mid-cycle Report November 28, 2011 Page 21 of 21 (b) Progress Report Due Date(s) and Required Elements MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION MID-CYCLE REVIEW Charter School: HOLYOKE COMMUNITY CHARTER SCHOOL M I D – CY C L E P R O G R E S S R E P O R T Date Prepared: ____________________________________ Prepared by: __________________________________________________________________ (name and title) Criterion: _______________________ Topic: ________________________________________________________________________ For each criterion for which you prepare a progress report, please make a copy of this cover page, fill in the information requested above, and attach a complete description of the corrective action taken and any accompanying documentation. (Description of corrective action for each criterion and any accompanying documentation should include all of the “Progress Report Required Elements” for that criterion in the Mid-cycle Report.) Send the whole set of completed progress reports to: Darlene Lynch, Director Program Quality Assurance Services Massachusetts Department of Elementary and Secondary Education 75 Pleasant Street Malden, MA 02148-4906