MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW WALTHAM PUBLIC SCHOOLS Corrective Action Plan Forms Program Area: Special Education Prepared by: Waltham Public Schools/ Special Education Administration CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report to the school or district. Mandatory One-Year Compliance Date: November 9, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 3 Rating: Partially Implemented Specific requirements for determination of specific learning disability Department CPR Finding: Student record review demonstrated that elementary special education staff did not always complete all parts of the documentation required for making a determination of a specific learning disability; in some instances, not all parts of the required documentation were present; items were not checked off; evidence of RTI documentation was not attached; observational notes were not included. Narrative Description of Corrective Action: Based on internal review of the current procedural manual, a study group began work 6/2010 to address issues of concern. They reviewed and revised the existing procedural manual to meet areas of non-compliance. The revision should be completed by 1/2011. A complete review of Specific Learning Eligibility documentation and all required forms to be completed at trainings. 11/2/2010 Professional Development Day - Psychologist Training 10/28/2011 ETL meeting - SLD Training began. ETLs will have ongoing training in monthly meetings. 11/2/2010 Professional Development Day – OTs, S/Ls SACs, & ETLs, IEP Training w/Linda Gross 12/7/2010 ETL Training with Linda Gross on SLD Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: 1/15/2011 Elementary principals & ETLs. Evidence of Completion of the Corrective Action: Attendance Lists w/Agenda and materials for trainings. Ongoing training at Department meetings for the 2010-11 school year. Description of Internal Monitoring Procedures: Record review CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 3 Specific requirements for determination of specific learning disability Status of Corrective Action: Approved Partially Approved 1 Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Please provide evidence of the professional development activities initiated by the district, for example, staff attendance sheets, the meeting agenda, etc. This progress report is due March 28, 2011. Waltham Public Schools will provide the results of a record review from a sample of students at each grade level (minimum sample of three records for each grade level) to ensure school personnel are taking a student’s language dominance into consideration before conducting an evaluation to determine eligibility. Please indicate the total number of records reviewed and the number of records that demonstrated the consideration of a student’s language dominance and that consideration was documented appropriately in the student record. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): March 28, 2011 & May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 4 Reports of assessment Rating: Partially Implemented results Department CPR Finding: The student record review and staff interviews indicated that assessment reports are not always completed in time for review at the IEP team meeting. The student records demonstrated that assessment reports do not consistently contain the evaluators’ recommendations for specifically meeting the student’s needs. 2 Narrative Description of Corrective Action: Records will be reviewed and procedural manual will outline the process and procedures During the 2010 – 11 school year, ETL meetings will be utilized for ongoing monitoring of 30-day time lines. Development of a more organized list of re-evals and initial evals to be done on a month-to-month basis to ensure timelines are met. 11/02/2010 Psychologists recommendations training on professional development day. 12/9/2010 ETL meeting Initial & Re-Evaluation updates 12/7/2010 PDRT ETL’s recommendations to include recommendations training. 12/7/2010 ETL Training with Linda Gross on SLD Develop meeting time with all related service providers to stress recommendations of assessments 12/09/10 ETL and Psychologist staff meeting re: time lines SPED Department will develop ongoing meetings with psychologists and ETLs during the entire 201011 school year Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: 6/15/2011 ETLs, Psychologists and liaisons. Evidence of Completion of the Corrective Action: Attendance Lists w/Agenda and materials for trainings. Description of Internal Monitoring Procedures: Record Review and data collection from ETLs and psychologists. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 4 Reports of assessment results Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Waltham Public Schools will provide the results of a record review from a sample of students at each grade level (minimum sample of three records for each grade level) to ensure that assessment reports are completed in time for review at the IEP team meeting and assessment reports consistently contain the evaluators’ recommendations for specifically meeting the student’s needs. Please indicate the total number of records reviewed and the number of records that assessment reports are completed in time for IEP Team meetings and consistently contain the evaluators’ recommendations for specifically meeting the student’s needs. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). 3 Progress Report Due Date(s): May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 6 Determination of transition Rating: Partially Implemented services Department CPR Finding: The student record review indicated that students 14 years and older in in-district and out-of-district placements did not always have evidence of transition planning. Narrative Description of Corrective Action 11/02/2010 Professional Development Day, High School and Middle School staff, including Out Of District Coordinator transition planning for 14 yr. olds completed. All OOD contracts will have a transition planning section as part of new contracts. The OOD liaison will oversee all new contracts for OOD students. SPED Administration will develop a system of transition meetings for Middle School and High School staff to have some joint meetings during 2010-2011 school year to specifically address SE6 Middle & High School ETLs and Guidance Counselors will meet to organize transitional planning for gr. 8 students. Addendum to Middle & High School student Handbook Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: 1/15/2011 Principals, Guidance Department, ETLs and liaisons Evidence. of Completion of the Corrective Action: Attendance List w/Agenda and material for Copy of new contract. Description of Internal Monitoring Procedures: record review CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 6 Determination of transition services Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Please provide the attendance sheet for the professional development activities initiated by the district. This progress report is due March 28, 2011. Waltham Public Schools will provide the results of a record review from a sample of students at the middle school (students aged 14+), high school grade level and students in out-of-district placements at the middle school (students aged 14+) and high school level (minimum sample of three records for each grade level) to ensure that transition planning is consistently documented on the Transition Planning Form and updated annually. Please indicate the total number of records reviewed and the number of records that demonstrate consistent documentation of the Transition Planning Form and/or annual updating for students aged 14+ in district and outof-district middle and high schools. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. 4 Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): March 28, 2011 & May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 7 Transfer of parental rights Rating: Partially Implemented Department CPR Finding: The student record review determined that the district documents the discussion of the transfer of rights in the student IEP under “Additional Information” when the student is 17 years or older. However, the district did not maintain documentation of the educational decision maker for students who delegated decision-making upon the student reaching the age of majority. Narrative Description of Corrective Actions: Training for Guidance Counselors on transfer of parental rights and transition planning Review procedure with ETLs at monthly meetings and teachers on 17-18 year olds at High School level and OOD students. Review decision maker procedure if students choose to delegate continued decision-making to his/her parent and any legal court documentation needed by parent when parents legally keep decision-making. Enforce all documentation of decision-making. 11/2/2010 17-18 yr. old Transfer of Rights training part of the training for Middle School and High School staff All OOD contracts to now include SE 7 Transfer of parental rights. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Special Education Director, Action Activity: 1/30/2011 Assistant Principals, ETLs, Guidance Councilors & ETLS Evidence of Completion of the Corrective Action Attendance List w/Agenda and materials for the trainings. Description of Internal Monitoring Procedures: Record review and monthly meetings CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 7 Transfer of parental rights Status of Corrective Action: Approved Partially Approved 5 Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: In Progress Required Elements of Progress Report(s): Please review district policies for compliance with DESE administrative guidance (see http://www.doe.mass.edu/sped/advisories/11_1.html) and make revisions as required. Provide the DESE with a copy of the district’s Age of Majority policy and procedures by March 28, 2011. Provide training to appropriate special education staff members regarding changes in the district’s Transfer at Age of Majority policies and procedures. Provide evidence of training, including agendas, signed attendance sheets, and example of training materials by March 28, 2011. Following the training, provide the results of a record review from a sample of in-district and out-of-district high school students aged 17-22 years old (minimum sample of three records for in-district and out-of-district) for evidence that students and parents are informed of the transfer of decision-making rights when the student turns 17 years of age and for appropriate documentation in the student’s file once the student has attained the age of majority. Please indicate the total number of records reviewed and the number of records that demonstrate appropriate notification to parents and students when the students turn 17 years of age and for appropriate documentation in the students’ files upon the attainment of age of majority. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): March 28, 2011 & May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 8 IEP Team composition and Rating: Partially Implemented attendance Department CPR Finding: The review of student records indicated that the district does not consistently obtain the parent’s written permission to continue the IEP Team meeting without a required IEP Team member. Absent IEP Team members did not provide written input in lieu of their attendance. 6 Narrative Description of Corrective Action: Information contained in the procedural manual 11/2/2010 Professional Development Day Middle School & High School staff, ETLs and OOD coordinator had attendance training and training on the use of the proper form to get parent permission to continue Team meeting without a required IEP Team member. 12/07/2010 PDRT Training for elementary ETLs with Linda Gross Continued review at all ETL meetings (OOD coordinator attends all ETL meetings) 12/7/2010 ETL Training with Linda Gross on SLD Continue review of SE 8 at all staff meetings with teachers at all levels, PK – gr. 12 Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: 12/07/2010 Principals, ETLs & liaisons Evidence of Completion of the Corrective Action: Attendance List w/Agenda and materials for the trainings. Records retained in the SPED office Description of Internal Monitoring Procedures: record review and documentation on the IEP CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 8 IEP Team composition and attendance Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Please provide the attendance sheet for the professional development activities initiated by the district. This progress report is due March 28, 2011. Please note that IEP Team members are not required to obtain parental permission to leave meetings once they have provided their input. The Waltham Public Schools will provide the results of a record review from a sample of students from each school level (minimum sample of three records for in-district and out-of-district) for evidence that written parent permission and input from the absent IEP Team member are documented in the students’ records. Please indicate the total number of records reviewed and the number of records that demonstrate documentation of written parental acceptance and input from the required absent Team member. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade 7 level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): March 28, 2011 & May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Rating: Partially Implemented Criterion & Topic: SE 9 Timeline for determination of eligibility Department CPR Finding: The student record review demonstrated that the district does not always meet the 45-day timeline for determining eligibility and developing an IEP following the receipt of the parent’s written consent. According to staff interviews, initial evaluations are complicated by student mobility (entering and leaving the district) and translating documents. Additionally, special education staff indicated that the demand for psychological assessments created backlog, resulting in timeline issues. Narrative Description of Corrective Action: 10/06/2010 Meeting held with all Psychologists to review caseload and timelines 10/13/2010 Medicaid Psychologist hired SPED Department will take part in monthly meetings with Psychologists to review and update all caseloads and timelines A list was developed for psychologist staff of monthly reevaluations to be completed by anniversary dates on IEPs. 11/02/2010 Additional Training and updates on timelines was part of Professional Development Day Training Ongoing updates with Psychologists staff on meeting timelines and a more cooperative approach to meet all timelines. 12/7/2010 ETL Training with Linda Gross on SLD Develop meetings with ETLs and psychologists for the 2010-11 school year to update re-evals and initial eval timelines. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Action Implementation: Director of Special Activity: 12/07/2010 Education, Psychologists, ETLs, liaisons Evidence of Completion of the Corrective Action: review of caseloads, monitoring records for timelines Status of Corrective Action: Criterion: SE 9 Timeline for Approved Partially Approved Disapproved determination of eligibility Basis for Partial Approval or Disapproval: The district does not directly state that the root causes for noncompliance with timelines was evaluators’ excessive caseloads only, although it is implied by the proposed corrective actions. Did the district determine there was no merit to staff claims that student mobility and translating documents were additional reasons for not meeting the 45-day timeline? Department Order of Corrective Action: Please describe the district’s determinations whether student mobility and/or translating documents affected special education staff members’ ability to meet the 45-day eligibility and IEP development timeline. Required Elements of Progress Report(s): The Waltham Public Schools will provide the results of a record review from a sample of students for each school level (minimum three records per level), including both initial and re-evaluations, to document that IEP Team meetings for initial and re-evaluation meetings are held by 45 days from the receipt of signed parent consent of the assessments. 8 Please indicate the total number of records reviewed and the number of records that demonstrate IEP Team meetings for initial and re-evaluation meetings are held by 45 days from the receipt of signed parent consent of the assessments. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Rating: Partially Implemented Criterion & Topic: SE 9A Elements of the eligibility determination Department CPR Finding: The student record review indicated that when students are not found eligible for special education services, the district’s Notice of School District Refusal to Act (N2) does not provide information about the consideration of a 504 plan or next steps to support the students’ needs if the student does not have a disability. Narrative Description of Corrective Action: 9/24/2010 Meeting held with 504 Coordinator and SPED Administrators to review 504 procedures 10/14/20120 ETL Training on 504 procedures conducted by 504 Coordinator 12/07/2010 The N2 (Notice of School Districts Refusal to Act) will be part of training PDRT for all elementary and ETL staff. This item will also be ongoing at monthly ETL meetings. Develop ongoing meetings with the 504 coordinator during the 2010-11 school year to insure 504-SPED model for PK-Gr. 12 students 4/27/11 Seminar 504 and SPED administrator to attend (copy of seminar info and registrations) Procedures to be outlined in SPED manual Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: 1/15/2011 Principals, 504 Coordinator Evidence of Completion of the Corrective Action: Attendance List w/Agenda and materials for the trainings. Description of Internal Monitoring Procedures: 9 CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 9A Elements of the eligibility determination Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): The Waltham Public Schools will provide the results of a record review from a sample of students for each school level (minimum three records per level), including both initial and re-evaluations, to document that where Teams determine a finding of no eligibility, the district’s Notice of School District Refusal to Act (N2) provides information about next steps to support the needs of the student, whether a 504 plan or other forms of support in the general education classroom. Please indicate the total number of records reviewed and the number of records where the district’s Notice of School District Refusal to Act (N2) provided information about next steps to support the needs of the student, whether a 504 plan or other forms of support in the general education classroom. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011 Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 11 Independent educational Rating: Partially Implemented evaluations Department CPR Finding: The district’s documentation for independent evaluations consisted of a letter to parents that did not include the following: 1) a statement acknowledging that the unique circumstances of a child may justify an individual assessment rate higher than that normally allowed; 2) a reference to the federal law that enables parents to obtain an independent evaluation; 3) a description of the state and federal provisions entitling parents to an independent evaluation in an area not assessed by the district. An additional district document included a letter to district liaisons that contained an outdated reference to Ch. 766 (now Ch. 71B). 10 Narrative Description of Corrective Action: Independent Evaluation letter has been updated with all appropriate information and reference to 71B Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education Action Activity: 12/10/2010 & ETLs Evidence of Completion of the Corrective Action: copy of new letter Description of Internal Monitoring Procedures: maintained in student records CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 11 Independent educational evaluations Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Provide a copy of the district’s revised IEE letter by March 28, 2011. Progress Report Due Date(s): March 28, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 12 Frequency of re-evaluation Rating: Partially Implemented Department CPR Finding: The student record review indicated that in some instances, re-evaluations were not done every three years and there was no indication within the records that the parents and district agreed the reevaluation was unnecessary. Narrative Description of Corrective Action: The Special Education Department has developed a monthly re-evaluation list. ETLs and Psychologists will do monthly updates with Special Ed. to ensure all re-evals are completed. At monthly meetings, all staff will have this issue as ongoing part of the meetings. Updated trainings will be done to document if parent agrees re-eval is unnecessary. At all staff meetings, PK -12 SE-12 will be ongoing for 2010-11 school year. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education Action Activity: 1/13/2011 Principals, ETLs, liaisons Evidence of Completion of the Corrective Action: student records Description of Internal Monitoring Procedures: updates from Special Education at Administration meetings 11 CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 12 Frequency of reevaluation Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): The Waltham Public Schools will provide the results of a record review from a sample of students with three-year re-evaluations for each school level (minimum three records per level) re-evaluations to ensure that re-evaluations are done every three years unless the school district and parents agree otherwise. Please indicate the total number of records reviewed and the number of records where the re-evaluation was conducted within three years OR the district documented the agreement with the student’s parents that a threeyear re-evaluation was not necessary. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 13 Progress reports and Rating: Partially Implemented content Department CPR Finding: According to staff interviews, the district has a means to translate school documents; however, some student files requiring translations did not contain translated progress reports. The records of students who aged out of school did not contain a copy of the summary of academic achievement and performance. 12 Narrative Description of Corrective Action: Access to translator from the Parent Information Center A review of caseloads with ETLs and OOD coordinator to develop the number of students who require translations of progress reports. A review of students who age out of school will be conducted with sub separate programs and OOD coordinator to ensure summary of academic achievements and performance section is completed. Whenever appropriate, translations are to be provided. A form with the parent’s signature will determine this. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: immediately ETLs, Principals and liaisons Evidence of Completion of the Corrective Action: Completed forms in student folders and records Description of Internal Monitoring Procedures: review by OOD coordinator and ETLs CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 13 Progress reports and content Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): For translations of progress reporting, please see SE 29. The Waltham Public Schools will provide the results of a record review from a sample of aged-out students with both in-district and out-of-district (minimum three records per group) to ensure that a summary of academic achievements and performance is completed or in the process of being developed for the students in question. Please indicate the total number of records reviewed and the number of records where there was evidence of a completed summary of achievement or the summary was in progress. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): May 16, 2011 13 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 14 Review and revision of Rating: Partially Implemented IEPs Department CPR Finding: The student record review demonstrated that annual reviews of student IEPs do not always occur on or before the anniversary date of the previous IEP. The record review also indicated that amendments are occasionally used to change a student’s placement. Narrative Description of Corrective Action: An ongoing review of anniversary dates of IEPs for all staff will be part of staff meetings. ETLs, Psychologists and OOD Coordinator will also have monthly updates to ensure anniversary dates are met. A review of Amendment use will also be part of monthly meetings. 12/7/2010 Training will also include anniversary date and placement page training. SE 14 will also be part of all staff meetings PK – Gr. 12 during the 2010 – 11 school year. Training will take place on 1/26/2011 Title/Role of Person(s) Responsible for Implementation: Director of Special Education Expected Date of Completion for Each Corrective Action Activity: Evidence of Completion of the Corrective Action: Attendance List w/Agenda and materials for trainings. Bi-monthly psychologists & ETL meetings. Description of Internal Monitoring Procedures: Attendance, Agenda and sign in sheets CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 14 Review and revision of IEPs Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): The Waltham Public Schools will provide the results of a record review from a sample of students from each school level (minimum of three records per level) for evidence that the annual review occurred on or before the anniversary date of the IEP. Pull an additional set of student records from each school level for appropriate use of IEP amendments (not to extend date of IEP or change placement). Please indicate the total number of records reviewed and the number of records where there was evidence of 1) the annual review of the IEP occurred on or before the anniversary date of the last IEP; and 2) IEP amendments were appropriately used to make minor adjustments to the IEP (not to extend the date of the IEP or change the student’s placement). If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. 14 Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 15 Outreach by the School Rating: Partially Implemented District (Child Find) Department CPR Finding: The district’s documentation addressed only child find for pre-school students. According to staff interviews, the district serves a large number of students from homeless shelters and other relief agencies situated in the district and works with these agencies to serve the needs of the student population. However, the district did not demonstrate active child find in the community except for pre-school age students. Narrative Description of Corrective Action: Parent Information Center will be contacted to create a list of school age children residing in shelters The Special Education Department will research all other providers in the Waltham School District. The SPED Department will also explore the use of the Waltham Public Schools Website and the local community cable channel. Meeting has been held with the Attendance Officer to gain further information on outside agencies and facilities that service students beyond pre school age so that all facilities can be notified , also the public library will be contacted. Increased effort in all areas Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education Action Activity: immediately & Parent Information Center Evidence of Completion of the Corrective Action: enrollment numbers Description of Internal Monitoring Procedures: yearly review CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 15 Outreach by the School District (Child Find) Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Provide documentation to verify the district’s expanded Child Find activities for students beyond the age of pre-school. Include examples of newspaper articles, fliers and posting locations, letters to private schools located in Waltham and other materials by March 28, 2011. Progress Report Due Date(s): March 28, 2011 15 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 18A IEP development and Rating: Partially Implemented content Department CPR Finding: Student record review demonstrated that IEPs frequently did not have the Present Level of Education Performance for other educational needs (PLEP B) completed for students with age-related considerations or behavioral issues. Additionally, Project Reach high school students frequently did not have the goal attainment section completed on the IEP. Narrative Description of Corrective Action: Project Reach is no longer a component of the Waltham High School Program Procedural Manual will be updated 11/02/2010 Middle School & High School – PLEP B (Present level of Education Performance) as part of IEP training 12/07/2010 Elementary staff training in PLEP B SE 18A will be addressed during the 2010-11 school year. Further meetings of elementary grade 56 and middle school grade 89 will also address SE 18A Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: 12/07/2010 ETLs, SACs & liaisons Evidence of Completion of the Corrective Action: Trainings, Agendas and sign in sheets Description of Internal Monitoring Procedures: record review CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 18A IEP development and content Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Please provide copies of the training agenda and sign sheets verifying the completion of the training activities. This progress report is due March 28, 2011. The Waltham Public Schools will provide the results of a record review from a sample of students from each school level (minimum of three records per level) for evidence that Teams consistently complete the Present Level of Education Performance for other educational needs (PLEP B) for age-related and/or other considerations. Please indicate the total number of records reviewed and the number of records where the PLEP B is appropriately documented for age-related and other considerations (behavior, language needs, transition, etc.). If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 16 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): March 28, 2011 & May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 19 Extended evaluations Rating: Partially Implemented Department CPR Finding: Student record review demonstrated that school personnel did not always use the appropriate extended evaluation forms to document the additional evaluations. Narrative Description of Corrective Action: 11/02/2010 Middle & High School staff training 12/07/2010 PDRT Elementary staff training did address extended evaluation 1/2011 training with Linda Gross will include SE 19 as formal part of training Additional training for ETLs on 1/26/2011 Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: 1/26/2011 Principals, Assistant Principals, ETLs Evidence of Completion of the Corrective Action: Trainings, Agendas and sign in sheets Description of Internal Monitoring Procedures: record review CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 19 Extended evaluations Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Please provide copies of the training agenda and sign sheets verifying the completion of the training activities. This progress report is due March 28, 2011. The Waltham Public Schools will provide the results of a record review from a sample of students whose Teams elected to use the extended evaluation procedure (minimum of three records for each school level) for evidence that extended evaluations were documented using the required Extended Evaluation Form (EE-1 and EE-2). Please indicate the total number of records reviewed and the number of records where Teams used the Extended Evaluation Form to document their decision for requesting additional evaluations. If continued noncompliance 17 was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): March 28, 2011 & May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 22 IEP implementation and Rating: Partially Implemented availability Department CPR Finding: The record review and parent interviews indicated that in some cases high school students are required to independently access school adjustment counseling (SAC) services during their lunch periods, during physical education, or “as needed;” these services are not routinely scheduled to ensure that the student see the counselor. Other IEPs with SAC goals did not have accompanying services outlined in the service delivery grid of the IEP, particularly among the Project Reach students. According to parent interviews, if the high school students did not make use of these services independently, the service could be removed from the IEP without convening an IEP Team meeting or initiating any procedural safeguards. Narrative Description of Corrective Action: A complete review of SAC services will be part of monthly meetings with both SACs and ETls. A complete review of SAC services on the delivery grid and how to appropriately provide services will be reviewed with ETLs and SACs. High School ETL and SACs will meet quarterly Project Reach is no longer a program at Waltham High School. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: 1/19/2011 Principal, Waltham High School, ETLs &SACS Evidence of Completion of the Corrective Action: Review of student records Description of Internal Monitoring Procedures: sign in agendas and agenda notes CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 22 IEP implementation and availability Status of Corrective Action: Approved Partially Approved 18 Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): The Waltham Public Schools will provide the results of a record review from a sample of students whose programming includes School Adjustment Counseling (SAC) (minimum of three records for each school level) for evidence that SAC services are appropriately documented on the students’ IEPs. Please indicate the total number of records reviewed and the number of records where SAC services are appropriately documented on IEPs. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 24 Notice to parents Rating: Partially Implemented Department CPR Finding: According to parent interviews and the student record review, the district did not always respond to parental requests for evaluations within five days of the receipt of the parental request for an evaluation. Narrative Description of Corrective Action: A complete review of the 5-day timeline will be conducted with Special Education Staff and principals. As parental requests arrive in the Special Ed. office, the ETL will be faxed a copy which will be cc’d to the building principals ETLs will have SE 24 as part of meetings To be included in revised procedural manual Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: immediately Special Ed. office, & ETLs Evidence of Completion of the Corrective Action: monitoring student records, description of internal monitoring procedures, FAX transmittal confirmations and ETL notifications 19 Description of Internal Monitoring Procedures: monitoring student records CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 24 Notice to parents Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): The Waltham Public Schools will provide the results of a record review from a sample of student records (minimum three per school level) for evidence that parents are sent a consent to evaluate form within five (5) days of the request. Please indicate the total number of records reviewed and the number of records where the consent to evaluate form was sent out within five (5) days of the parents’ request. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 29 Communications in Rating: Partially Implemented English and primary language of home Department CPR Finding: Staff interviews indicated the district has the resources to translate documents. However, a review of student records indicated that special education documents were not always translated for parents who required translations. Narrative Description of Corrective Action: Development of a form to assess a parents translation needs The Special Education Department will conduct a review of all students and parents who need translation services. SPED department will also review all forms that need translation. The SPED staff will also develop how PIC staff can assist with translations. 20 Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Action Activity: immediately Education, Principals, Liaisons Evidence of Completion of the Corrective Action: feedback of forms Description of Internal Monitoring Procedures: Liaisons will provide forms from meetings for student records CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 29 Communications in Status of Corrective Action: Approved Partially Approved English and primary language of home Basis for Partial Approval or Disapproval: None Disapproved Department Order of Corrective Action: None Required Elements of Progress Report(s): Please provide a copy of the form used by the district to assess the translation needs of parents. This progress report is due March 28, 2011. The Waltham Public Schools will provide the results of a record review from a sample of student records (minimum three per school level) for evidence that special education documents are consistently translated when parents have requested translations. Additionally, the district should find the specific form developed to assess parents’ translation needs in each record. Please indicate the total number of records reviewed and the number of records where both the parent form for translation needs and consistently translated special education documents were in the student files. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): March 28, 2011 & May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 36 IEP implementation, accountability, and financial responsibility Department CPR Finding: See comments under SE 22 21 Rating: Partially Implemented Narrative Description of Corrective Action: A full review of SAC services of students with SAC services on the IEP. o How service is delivered. o How students access service. Review with staff, the correct way to get SAC services. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: 1/15/2011 Principals, ETLs and SACS Evidence of Completion of the Corrective Action: Student records Description of Internal Monitoring Procedures: sign in sheets & agendas CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 36 IEP implementation, Status of Corrective Action: Approved Partially Approved accountability, and financial responsibility Basis for Partial Approval or Disapproval: None Disapproved Department Order of Corrective Action: None Required Elements of Progress Report(s): See DESE comments for SE 22. Progress Report Due Date(s): May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 37 Procedures for approved Rating: Partially Implemented and unapproved out-of-district placements Department CPR Finding: The student record review demonstrated that monitoring plans are not contained in the student files as required by this criterion. 22 Narrative Description of Corrective Action: A full review of monitoring plans will be conducted with the OOD coordinator. This area will be addressed in all contracts with OOD schools Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education Action Activity: 12/15/2010 & OOD Liaison Evidence of Completion of the Corrective Action: Monitoring reports will be included in student records Description of Internal Monitoring Procedures: meeting notes and review of student records CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 37 Procedures for Status of Corrective Action: Approved Partially Approved approved and unapproved out-ofdistrict placements Basis for Partial Approval or Disapproval: None Disapproved Department Order of Corrective Action: None Required Elements of Progress Report(s): The Waltham Public Schools will provide the results of a record review from a sample of out-of-district student records (minimum three per school level) for evidence that the yearly monitoring plans are contained within the student files. Please indicate the total number of records reviewed and the number of records where yearly monitoring plans are found within the student files. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by May 16, 2011. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): May 16, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 40 Instructional grouping requirements for students aged five and older Rating: Partially Implemented 23 Department CPR Finding: The review of district documentation indicated that the following schools exceeded instructional grouping requirements for students with disabilities: 1) Kennedy Middle School, 7th and 8th grade math class for behavioral students has 21 students with one teacher and one paraprofessional; 2) Kennedy Middle School, 7th and 8th grade English class for behavioral students has 22 students with one teacher and one paraprofessional; 3) Kennedy Middle School, 6th grade Resource Room has 18 students and three (3) teachers; 4) Waltham High School, Life Skills class has 18 students and two (2) teachers; 5) Waltham High School, LAB history and science class (a substantially separate classroom) has 20 students with one teacher and one paraprofessional. Narrative Description of Corrective Action: A directive from the Superintendent has been issued to Kennedy Middle School regarding programs, which will be reviewed for compliance. Review with ETLs and specific building principals grouping and space issues o Kennedy Middle School 7 & 8 grade math class for behavior students (21 students, 1 teacher, 1 para) o Kennedy Middle School English class for behavior students (21 students, 1 teacher 1 para) o Kennedy Middle Schools 6th grade Resource Room (18 students 3 teachers does meet 8:1 ratio requirement) o Waltham High School LAB history and science classes (18 students 2 teachers) o Look at schedule and para for any flex to get numbers corrected Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Superintendent, Director of Action Activity: 6/15/2011 Special Education, Principals & Assistant Principals Evidence of Completion of the Corrective Action: 2011 – 12 FTE class sizes and assignments Description of Internal Monitoring Procedures: class list review with adjustments as needed CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 40 Instructional Status of Corrective Action: Approved Partially Approved Disapproved grouping requirements for students aged five and older Basis for Partial Approval or Disapproval: Please note that if instructional groups reach maximum size, the administrator of special education and the certified special educator providing services in an instructional group may decide to increase the size of instructional grouping by no more than two additional students, if those students have compatible instructional needs. In those instances, the district must provide written notification to the Department, and the parents of all other group members of the decision to increase the instructional group size and the reasons for such a decision. The increased size is only in effect for that school year and the district must endeavor to reduce the instructional groups size in subsequent years and must document its steps to reduce the instructional group size. Department Order of Corrective Action: If the district is unable to address current class sizes for any current instructional grouping that exceeds regulatory requirements, a notification of increase of class size waiver must be filed with the DESE. Please see attached document at http://www.doe.mass.edu/sped/28mr/28m1.doc. Required Elements of Progress Report(s): Provide the results of the district’s review with ETLs and building principals regarding special education programming and class sizes at the Kennedy Middle School (7th & 8th grade Math and English classes for behavior programming; 6th grade resource room grouping of 18 students) and Waltham High School (LAB history and science classes) to the ESE by March 28, 2011. Progress Report Due Date(s): March 28, 2011 24 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 43 Behavioral interventions Rating: Partially Implemented Department CPR Finding: Staff interviews indicated that the district conducts functional behavioral assessments as needed for students with behavioral issues. However, staff members also stated that there are inadequate behavioral supports for such students at all levels of the school district. Narrative Description of Corrective Action: The Special Education Department will conduct a full review of behavioral supports for students at all levels to determine what level of support is needed. o Input from principals where sub separate behavior programs are situated. o SAC and Guidance services along with teacher input needed to develop a more supportive network for this student population. Principals & Assistant Principals will inform Special Ed. Office as issues arise Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: immediately Principals & Assistant Principals Evidence of Completion of the Corrective Action: Meeting notes and presentation at administration meetings Description of Internal Monitoring Procedures: program liaison and principals will submit reports quarterly. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 43 Behavioral interventions Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Provide a detailed description of the results of the district’s review of behavioral supports for students at all school levels, including a description of next steps and a timeline for the district’s proposed outcomes to the DESE by March 28, 2011. Progress Report Due Date(s): March 28, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Rating: Partially Implemented Criterion & Topic: SE 46 Procedures for suspension of students with disabilities when suspensions exceed 10 consecutive school days Department CPR Finding: The district provided documentation on the discipline of students with disabilities, including documents provided to staff, parents and students. While the process of placing a student in an interim alternative educational setting (IAES) is described in one of the district’s documents, the student/parent handbook lacks a description of the procedures and the due process rights for students in circumstances involving drugs, weapons, controlled substances, or bodily assault. 25 Narrative Description of Corrective Action: A review of all handbooks section on Discipline and Special needs students o Elementary, o Middle School o High School. The use of the “Parents Notice of Procedural Safeguards” can be used to have the same consistent language in all handbooks. Procedural manual to review process Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: 3/15/2011 Principals, Assistant Principals & ETLs Evidence of Completion of the Corrective Action: New student handbooks Description of Internal Monitoring Procedures: review of all student handbooks CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 46 Procedures for suspension of students with disabilities when suspensions exceed 10 consecutive school days Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Provide a copy of the revised section(s) of the high school student handbook for inclusion of the due process rights and IAES for students with disabilities who have brought drugs, weapons, or controlled substances to school, or who have committed bodily assault. Provide this to the DESE by March 28, 2011. Progress Report Due Date(s): March 28, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 48 FAPE Rating: Partially Implemented Department CPR Finding: According to parent and staff interviews, some high school students with IEPs must leave physical education classes or lunch to make use of counseling services. Narrative Description of Corrective Action: A complete review of SAC caseloads and student schedules will be conducted. In some cases a “lunch bunch” counseling group may be an appropriate counseling alternative if parent and student agree and all is documented on student IEP Title/Role of Person(s) Responsible for Implementation: Director of Special Education, SACs, Housemasters Expected Date of Completion for Each Corrective Action Activity: immediately 26 Evidence of Completion of the Corrective Action: Documentation on students IEP Description of Internal Monitoring Procedures: review of records CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 48 FAPE Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Please note that a “lunch bunch” counseling/social group is acceptable as a regularly scheduled event; the finding for SE 48 was based on evidence that individual SAC counseling was available during the only free period available to high school students (lunch) or a non-academic class (gym). Please describe in detail how the district is implementing SAC services on currently consented-to IEPs with SAC goals/services while the review of adjustment counseling services and scheduling at the high school is underway. Provide this description to the DESE by March 28, 2011. Provide the results of the district’s review of SAC caseloads and student schedules at the high school, including a detailed description of next steps and a timeline for the outcomes of the review. Provide this to the DESE by March 28, 2011. Progress Report Due Date(s): March 28, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 49 Related services Rating: Partially Implemented Department CPR Finding: See SE 22. Narrative Description of Corrective Action: As stated in SE-22 A review of all SAC services will be done to determine better access to counseling services. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: 1/15/2010 SACS and Principals Evidence of Completion of the Corrective Action: sign in sheets and agendas Description of Internal Monitoring Procedures: review of student records 27 CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 49 Related services Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): See DESE comments for SE 22. Progress Report Due Date(s): March 28, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: SE 55 Special education facilities Rating: Partially Implemented and classrooms Department CPR Finding: Observations of school facilities demonstrated the following: 1) the Special Education Learning Center is labeled as such at the Plympton Elementary School; 2) the Life Skills classroom for students at the John F. Kennedy Middle School is located on a corridor that is not near other classrooms, isolating the special education students from their general education peers. Narrative Description of Corrective Action: Review with the principals at Plympton Elementary School and Kennedy Middle School. Discuss space and isolation issues referred to in coordinated program review along with the issue of signs used for classrooms. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Implementation: Director of Special Education, Action Activity: 6/15/2011 Facilities Director, Principals Evidence of Completion of the Corrective Action: realignment of classrooms Description of Internal Monitoring Procedures: site visits CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: SE 55 Special education facilities and classrooms Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Provide the results of the district’s review with the Plympton Elementary and Kennedy Middle Schools principals, including a detailed description of next steps and timeline for outcome by March 28, 2011. This corrective action may be corroborated with an onsite facilities check. Progress Report Due Date(s): March 28, 2011 28 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW WALTHAM PUBLIC SCHOOLS Corrective Action Plan Forms Program Area: Civil Rights Prepared by: Anne Marie Carr-Reardon CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report to the school or district. Mandatory One-Year Compliance Date: November 9, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 7 Information to be Rating: Partially Implemented translated into languages other than English Department CPR Finding: The district submitted documentation demonstrating that there is a process for staff members to request translations. Additionally, the district submitted multiple examples of key school materials translated into Spanish but not the other major languages of the district. According to submitted student rosters, several Portuguese- and French Creole-speaking families attend the district’s schools. There was no documentation provided by the district to verify that staff members make translated documents or information available for these students and families. Narrative Description of Corrective Action: The district has determined that its major language groups are Spanish and Haitian-Creole. All current school materials into Spanish will also be translated into Haitian-Creole. A document translator will be hired to translate the materials. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Responsible for Corrective Action Activity: Identify key Implementation: ELL Director materials to be translated: January 20111; Contract Haitian-Creole Translator Febrary 2011; Key materials translated into Haitian Creole, August 2011. Evidence of Completion of the Corrective Action: Copies of translated materials. Description of Internal Monitoring Procedures: : Principals and directors will review materials for translation and submit them to the Director of ELL for translation to meet the deadlines identified above but no later than June for September. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 7 Information to be Status of Corrective Action: Approved Partially Approved translated into languages other than English Basis for Partial Approval or Disapproval: None 29 Disapproved Department Order of Corrective Action: None Required Elements of Progress Report(s): Provide a sampling of documentation for the translated materials, including a selection of pages from the Waltham High School Handbook by March 28, 2011. Progress Report Due Date(s): March 28, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 8 Accessibility of extracurricular activities Department CPR Finding: See CR 7. Rating: Partially Implemented Narrative Description of Corrective Action: Information in Spanish and Haitian-Creole regarding intramural and interscholastic sports as well as extracurricular activities or clubs sponsored by the school will be sent home so as not to exclude students on the basis of race, sex, color, religion, national origin, sexual orientation, disability, or homelessness. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Principals and Directors Corrective Action Activity: Beginning in January 2011 all notices for the identified activities will be translated as needed. Evidence of Completion of the Corrective Action: Translated materials available and collected by department or school Description of Internal Monitoring Procedures: Principals and directors will review materials for translation and submit them to the Director of ELL for translation to meet the participation/tryout deadlines. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 8 Accessibility of extracurricular activities Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Provide a selection of translated materials for extracurricular activities in both Spanish and Haitian Creole to the DESE by March 28, 2011. Progress Report Due Date(s): March 28, 2011 30 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 10A Rating: Partially Implemented Department CPR Finding: Documentation submitted by the district demonstrated that the student/parent handbook lacks a description of the procedures and the due process rights for students in circumstances involving drugs, weapons, controlled substances, or bodily assault. The district’s handbook entry states only that these situations are handled on a case-by-case basis. Narrative Description of Corrective Action: Due process rights for students facing serious discipline charges will be stated in the Waltham High School student handbook with specific reference to circumstances involving drugs, weapons, controlled substances, or bodily assault. Title/Role of Person(s) Responsible for Implementation: High school principal Expected Date of Completion for Each Corrective Action Activity: January, 2011 Evidence of Completion of the Corrective Action: New language in the Waltham High School student handbook. Description of Internal Monitoring Procedures: The student handbook will be reviewed by the principals and housemasters prior to publication for the 2011-2012 school year for full compliance. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Status of Corrective Action: Criterion: CR 10A Student Approved Partially Approved Disapproved Handbooks & Codes of Conduct Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Provide the text on due process rights for students on IEPs and 504 plans as prepared for the WHS handbook to the DESE by March 28, 2011. Progress Report Due Date(s): March 28, 2011 31 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 13 Availability of information and academic counseling on general curricular and occupational/vocational opportunities Department CPR Finding: See CR 7. Rating: Partially Implemented Narrative Description of Corrective Action: These services are currently available in Spanish. The district will contract with an appropriate translator to assist with communicating in HaitianCreole the information needed in terms of academic counseling on general curricular and occupational/vocational opportunities. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: High School Principal; and the Corrective Action Activity: January 2011 Director of Student Support Services Evidence of Completion of the Corrective Action: Students who’s first language is Haitian-Creole and who lack fluency in English based on appropriate language assessments administered at the time of registration and monitored based on their MEPA and other language assessments by the Department for English Language Learners will be assigned to the Bilingual Counselor who will access the services of a translator to assist in the academic counseling process. Description of Internal Monitoring Procedures: Case loads will be monitored and information from the PIC and the Department for English Language Learners reviewed to ensure students with language learning needs are receiving counseling services in their currently dominant language. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 13 Availability of Status of Corrective Action: Approved Partially Approved information and academic counseling on general curricular and occupational/vocational opportunities Basis for Partial Approval or Disapproval: None Disapproved Department Order of Corrective Action: None Required Elements of Progress Report(s): Provide a selection of materials relevant to academic and occupational/vocational counseling in Spanish and Haitian Creole to the DESE by March 28, 2011. Provide the contact information for the counselors to the DESE by March 28, 2011. Progress Report Due Date(s): March 28, 2011 32 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 14 Counseling and Rating: Partially Implemented counseling materials Department CPR Finding: According to interviews and documentation, students who are Limited English Proficient (LEP) do not have the opportunity to receive counseling in languages other than English and Spanish. Narrative Description of Corrective Action: Limited English Proficient students particularly those who are Haitian-Creole will be offered counseling services and access to materials in through agencies within the district who contract with the district to provide such services. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director of Student Support Corrective Action Activity: Services; Director of Special Education; Director As needed beginning in January 2011 of ELL Evidence of Completion of the Corrective Action: A review of the records of students are LEP for indication of services in counseling and counseling materials as needed Description of Internal Monitoring Procedures: There will be a quarterly review of the student case load of the Bilingual Counselor to be sure students are receiving counseling services as needed. The Director of Student Services will monitor the process. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 14 Counseling and counseling materials Status of Corrective Action: Approved Partially Approved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): See DESE response to CR 13. Progress Report Due Date(s): March 28, 2011 33 Disapproved COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 16 Notice to students 16 or Rating: Partially Implemented over leaving school without a high school diploma Department CPR Finding: The district’s document does not state that the student and the parent or guardian may meet with a representative of the district within ten days from the date the notice was sent and the purpose of the meeting ( e.g., to discuss the reasons that the student is leaving school and alternative educational or other placements). The district submitted a second letter that addresses the students who may drop out of school, but neither letter satisfies the requirements. Finally, there was no evidence submitted to demonstrate that the district sends an annual written notice to the last known address of each student who attended the district’s high school within a two year period. Narrative Description of Corrective Action: A meeting will be held for the members of the high school administrative team. A letter will be created by the team that addresses the following issues: That the student and the parent or guardian may meet with a school representative within ten days from the date the notice was sent. The letter will indicate the following: The option for a meeting to discuss the student’s reasons for leaving school the meeting will include a discussion of options available to the student. In addition the mandatory letter for a two year minimum will include the following information: Opportunities to participate in publicly funded academic support programs to assist with acquiring their competency determination and; To encourage their participation in those programs In addition, a list of students who withdraw and do not return will be maintained by the house master of last record for those students. Annual notices will be send to the last address of record on file for those students by the housemaster for a period of 2 years after withdrawal. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: High School Principal and Corrective Action Activity: March, 2011 House Masters Evidence of Completion of the Corrective Action: Updated letter to parents/ guardians Written memo on the procedure for exit meetings Written memo on the procedure for written notice for a period of 2 years. Description of Internal Monitoring Procedures: Prior to each year’s graduation date or at the time of withdrawal the House Master will review the roster of students to verify addresses and review the student record folder for all communication regarding a students’ rights and opportunities for continued assistance in their education. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 16 Notice to students Status of Corrective Action: Approved Partially Approved 16 or over leaving school without a high school diploma Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None 34 Disapproved Required Elements of Progress Report(s): Provide a copy of the initial notification letter following 15 consecutive days of unexcused absences, the initial notification letter for students with disabilities following 15 consecutive days of unexcused absences, and the annual notification letter for students who have left school, to the DESE by March 28, 2011. Progress Report Due Date(s): March 28, 2011 35 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 17A Physical restraint Rating: Partially Implemented Department CPR Finding: The documentation reviewed determined that Fitzgerald Elementary School conducted its physical restraint training in January 2010 and not within one month of the beginning of school. The Kennedy Middle School provided its physical restraint training to staff in December 2009. Documentation was not provided for the Whittemore Elementary School, Plympton Elementary School, MacArthur Elementary School, McDevitt Middle School, or Waltham High School to demonstrate the district provided restraint training. Staff interviews indicated that every school had teachers with in-depth training in either crisis prevention or de-escalation. Staff interviews corroborated that a general staff training did not consistently occur in all schools within the first month of every school year. Narrative Description of Corrective Action: The need to provide physical restraint training to staff within one month of the beginning of the school year will be addressed at staff building meetings held within the month of September to meet the one month requirement. Staff will sign in and an agenda will be kept on file indicating the physical restraint training. This will be the responsibility of the principal and assistant principal or house master in each school. This training will be done by each school no later than the month of January 2011 for this academic year. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Principal, assistant principal Corrective Action Activity: January 2011 for this academic year and within the month of September building meeting going forward. Evidence of Completion of the Corrective Action: Sign in sheet and agenda retained in the principals office Description of Internal Monitoring Procedures: Administrators will develop a checklist of all required trainings and the projected date it will be done by and placed in their staff handbook. The superintendent will review the required list of trainings and support those charged with implementation with the necessary training in these areas. This will occur during the administrative meetings prior to the start of the academic year. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 17A Physical restraint Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Provide a copy of the principals’ checklist of all required trainings and the projected date(s) trainings will be completed to the DESE by March 28, 2011. Progress Report Due Date(s): March 28, 2011 36 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 18 Responsibilities of the Rating: Partially Implemented school principal Department CPR Finding: The district’s documentation indicated that students requiring home/hospital services must also request a 504 plan. The parent must first contact a school nurse, who will then initiate the request. This documentation includes a description of “Type A” situations (students absent less than 60 school days) and “Type B” situations (students absent more than 60 school days); a Type B situation requires a referral to special education in accordance with “Ch. 766” an outdated reference to the state’s special education laws (now Ch. 71B). Narrative Description of Corrective Action: The District is in compliance with DESE requirements for home/hospital services for students. Upon receipt of a primary care provider’s written order verifying that a student enrolled in the WPS District must remain at home, or in a hospital, the case management is originated by the school nurses. A tutor is located and assigned to work with the student. The building principal coordinates services and arranges with the teachers to provide class work. The building principal monitors the tutoring services, and course work. The building principal works with the Special Education Department, and the District Section 504 coordinator to meet student needs and fully implement the plan as required by law. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: District 504 Coordinator, Corrective Action Activity: March 2011 Principal, and Asst. Director of Special Education Evidence of Completion of the Corrective Action: Review of 504 plans for students requiring home/hospital services. Description of Internal Monitoring Procedures: Over the next three months the District will be conducting training and the development of guidelines for all staff CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 18 Responsibilities of the school principal Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Provide the above-referenced documentation that was not submitted with the initial CPR Civil Rights submission to the DESE by March 28, 2011. Progress Report Due Date(s): March 28, 2011 37 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 20 Staff training on Rating: Partially Implemented confidentiality of student records Department CPR Finding: There was no documentation verifying confidentiality training for staff at the Whittemore Elementary School, Plympton Elementary School, MacArthur Elementary School, and Waltham High School. Staff responses to interview questions were not consistent whether such training occurred. Narrative Description of Corrective Action: Yearly confidentiality training in the area the Family Educational Rights and Privacy Act as well as record confidentiality will be conducted by principals or their designee within the first two months of the school year during the staff building meeting. During this academic year the training if not already documented will be done no later than the end of February 2011. Staff will sign in and an agenda indicating the training will be maintained in the principal’s office. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Principal, Assistant Principal, Corrective Action Activity: No later than the or principal designee, Director of Student building meeting in February 2011 and Support Services within two months of the start of the academic year beginning with the 2011-2012 academic year. Evidence of Completion of the Corrective Action: Staff sign in sheet and dated agenda Description of Internal Monitoring Procedures: Administrators will develop a checklist of all required trainings and the projected date by which it will be completed and placed in their staff handbook. The superintendent will review the required list of trainings and support those charged with implementation with the necessary training in these areas. This will occur during the administrative meetings prior to the start of the academic year. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 20 Staff training on confidentiality of student records Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): See DESE response to CR 17A for principals’ checklists. Progress Report Due Date(s): March 28, 2011 38 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 21 Staff training regarding Rating: Partially Implemented civil rights responsibilities Department CPR Finding: The district submitted evidence of training on civil rights responsibilities for Stanley Elementary School, Northeast Elementary School, Whittemore Elementary School, Fitzgerald Elementary School, McDevitt Middle School, and Kennedy Middle School. There was no documentation for Plympton Elementary School, MacArthur Elementary School, and Waltham High School. Staff responses to interview questions were inconsistent and did not verify whether such training was annual. Narrative Description of Corrective Action: The required minimal annual training for all staff on civil rights responsibilities including the prevention of discrimination and harassment on the basis of students’ race, color, sex, religion, national origin and sexual orientation and the appropriate methods for responding to it in the school setting will occur within the first two months of the academic year. In the 2010-2011 academic year it will occur no later than in February 2011 at the monthly staff meeting. Staff will sign in and an agenda indicating the training will be maintained in the principal’s office. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Principal, Assistant Principal, Corrective Action Activity: No later than the or principal designee building meeting in February 2011 and within two months of the start of the academic year beginning with the 2011-2012 academic year. Evidence of Completion of the Corrective Action: Staff sign in sheet and dated agenda Description of Internal Monitoring Procedures: Administrators will develop a checklist of all required trainings and the projected date by which it will be completed and placed in their staff handbook. The superintendent will review the required list of trainings and support those charged with implementation with the necessary training in these areas. This will occur during the administrative meetings prior to the start of the academic year. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 21 Staff training regarding civil rights responsibilities Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): See DESE response to CR 17A for principals’ checklists. Progress Report Due Date(s): March 28, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 25 Institutional selfevaluation Rating: Partially Implemented 39 Department CPR Finding: The district provided documentation of recent evaluations done across a variety of programming areas; however, the district does not have a process to annually insure equal access to all programs for students regardless of race, color, sex, religion, national origin, limited English proficiency, sexual orientation, disability, or housing status. Narrative Description of Corrective Action: The district will ensure on an annual basis that students have equal access to all programs regardless of race, color, sex, religion, national origin, limited English proficiency, sexual orientation, disability, or housing status. Central Office, Programmatic and content directors will be responsible for reviewing with teachers, counselors, and principals the right of all students’ to equal access to all programs. Directors will report to the Superintendent’s Office any incident where this requirement has not been met. The district will also undertake a review of its data that could indicate areas of concern for full access. This would include but not be limited to an analysis of attendance and drop out data, four year graduation cohort rate; suspensions and incidents of violence reported to law enforcement, absences, special education referrals, MCAS and other assessments disaggregated by identified subgroups, as well as other data that principals or directors feel may inform the districts response to providing all students with the educational services needed to meet their future goals. This analysis will begin in April/May of 2011. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Superintendent and the Corrective Action Activity: There will be two Assistant Superintendent for Curriculum and phases to this for the 2010-2011 academic Instruction, Principals, and Directors year – first the Assistant Superintendent will review with programmatic and content directors in January 2011 the role they will have in insuring on an annual basis that all students have equal access to all programs; and during the course selection process at the high school and middle schools directors will review with guidance counselors the selection process and remind them of student rights. Students enrolling in the district will be informed at the Parent Information Center of their rights to equal access and participation. Elementary principals will contact the appropriate program director or superintendent if an issue of participation or equal access occurs. Any changes needed to allow student access based on the above identified categories will be implemented as needed. The analysis of data will begin in April/May 2011. With results reported to the administrative team as part of their summer working sessions. This will inform district action needed to provide full access. Evidence of Completion of the Corrective Action: The superintendent will have an agenda in January indicating equal access provisions on the agenda. A review of data will be conducted and finding reported and disseminated to the school committee. Description of Internal Monitoring Procedures: Once during the academic year the assistant superintendent will review and report to the superintendent the results of the review by directors of any issues related to student equal access. Principals and directors will work with central office personnel to review the data gathered and make recommendations for programmatic changes as needed to provide all students with a free and appropriate education. 40 CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 25 Institutional selfevaluation Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Provide evidence of the data analysis and any results reported to the administrative team to the DESE by May 16, 2011. Progress Report Due Date(s): May 16, 2011 41 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW WALTHAM PUBLIC SCHOOLS Corrective Action Plan Forms Program Area: English Learner Education Prepared by: Katherine Earley, Waltham Public Schools CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report to the school or district. Mandatory One-Year Compliance Date: November 9, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 5 Program placement and Rating: Partially Implemented structure Department CPR Finding: Sheltered English immersion (SEI) is a program model for limited English proficient (LEP) students composed of two parts—English as a second language (ESL) and sheltered content instruction. ESL is explicit, direct instruction about the English language, delivered to LEP students only and designed to promote the English language development of LEP students. Sheltered content instruction is an approach for teaching content to LEP students in strategic ways that make the subject matter concepts comprehensible while promoting the LEP students’ English language development. A review of district documents shows that the district has a fully completed ESL curriculum; however, the curriculum mapping process at all grade levels is not complete. Documentation indicates that, the number of hours of ESL instruction is inconsistent with recommended hours as outlined in the Department’s September 2009 guidance document: “Guidance on Using MEPA Results to Plan Sheltered English Immersion (SEI) Instruction and Make Reclassification Decisions for Limited English Proficient (LEP) Students," notably in grades 6-8. Content instruction is based on the appropriate Massachusetts Curriculum Framework; however, it is clear that LEP students do not receive sheltered content instruction as the majority of teachers have not completed all of the required categories of SEI professional development focused on the skills and knowledge necessary for sheltering instruction, as described in the Commissioner’s Memorandum of June 2004. At the middle and high school levels, fewer teachers have completed any of the category trainings than at the elementary level. 42 Narrative Description of Corrective Action: A district priority is to map the English as a second language curriculum, grades 1 through 12, by English proficiency level (beginner, intermediate, and transitioning proficiency levels). ESL Department meetings during the 2010-11 school year, grades 6-12 ,have focused entirely on mapping student learning outcomes at the various English proficiency levels. Work on mapping curriculum for elementary grades 1-5 began summer 2010 and will continue summer 2011 and school year 2011-12. Effective 2010-11, Grades 6-8 ESL instructional hours: students who’ve assessed as beginner and/or intermediate level ESL students and/or a MEPA of 1 or 2, are placed in instructional programming with ESL certified teachers, received 3 hours of direct ESL instruction per day, including content-based ESL delivered by the ESL certified instructors. Students at high intermediate and/or transitioning proficiency levels and/or a MEPA of 3 or 4, received 1 hour of direct ESL instruction per day delivered by a licensed ESL teacher. These students receive content instruction in the general curriculum content classrooms. Middle school, general curriculum teachers have been encouraged to enroll in the category training so as to increase district capacity of middle school teachers who have completed appropriate training. District training of teachers in category PD is offered and teachers are encouraged to enroll in the training. Focus for 2010-11 has been on the Category 4 pd piece. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director ELL ; Assistant Corrective Action Activity: Mapping grades Superintendent for Curriculum and Instruction 6-12, June 2011; Mapping Grades 1-5, June 2012; Increase hours of direct ESL instruction for middle school: completed 2010-11 school year. Middle school training category 2 training, completed June 2010. Continued offering and completion of Category 2 trainings to all district faculty, June 2011. Evidence of Completion of the Corrective Action: Mapping Grades 6-12, Department Meeting Agendas & Sample Map Progress to Date. (MAILED TO ESE labeled ELE 5 DOC 1 SAMPLE) Work-in-progress maps, elementary grades 1-5 samples (MAILED TO ESE labeled ELE 5 DOC 2 SAMPLE); Sample Middle School ESL teacher schedules 2010-11 (MAILED TO ESE labeled ELE 5 DOC 3 SAMPLE); Roster of teachers enrolled and completing Category trainings as of June 2010 (MAILED TO ESE labeled ELE 5 DOC 4 SAMPLE). Announcements of Category Training Opportunities 2010-11(MAILED TO ESE labeled ELE 5 DOC 5 SAMPLE). Description of Internal Monitoring Procedures: Director of ELL will oversee mapping during department meetings. Teachers will implement maps, as completed, during 2010-11 school year and edit, as needed. Assistant superintendent office will continue to keep a record of teachers enrolling in and completing Category training; these lists will be shared with building administration in order to better ensure ESL students assigned to teachers who have the appropriate skills and knowledge to work with ESL students. Annually, district will review lists of teachers who have taken part in category training and share the list with building principals. Annually, district will develop its professional development activities to include targeted category trainings 43 CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 5 Program placement and structure Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: As reported in the Department’s SIMS database Waltham is a high incidence district. The district has six (6) elementary schools, two (2) middle schools and a high school. As of the Spring 2011, the district enrolled over 400 hundred English language learners (ELLs). The James Fitzgerald Elementary has the highest number of ELLs (160) and the John F. Kennedy Middle has the second highest (74) whereas the number of ELLs enrolled in the other schools ranges from 21-38. The district’s plan to complete its Corrective Action Plan (CAP), related to the mapping of student learning outcomes at the various proficiency levels for grades 6 – 12, began in 2010-2011 school year. The mapping work for the elementary grades 1-5 began in summer 2010, will continue in summer 2011, and resume in 2011-12 school year. The district submitted samples of the curricula mapping work for the elementary grades (5 and 3) and for the middle school and high school, the district submitted four quarters of ESL 1/Beginner. In regard to the curricula work, it is important for the district to note that the ELPBO will be phased out in the coming months, and any curricula mapping that the district is developing for ELLs must be able to stand alone or be adaptable. Regardless of changes that may take place at the Department level, the district’s curricula mapping work must continue while keeping this caveat in mind. Concerning the provision of sufficient hours of ESL instruction to ELLs in middle school, the district submitted samples of ESL teachers’ schedules as evidence of compliance. The Department must point out that while the middle school is now providing sufficient hour of ESL instruction to ELLs, the district must continue to monitor the schools to ensure that they meet the recommended hours of ESL instruction for all ELLs. See ELE 15 for comments on Professional Development Requirements. In addition to the district’s internal monitoring procedures noted in this Corrective Action, the district must specify how ELLs will be provided with sheltered content while general and content area teachers increase their qualifications in all four (4) categories of SEI. The district must specify what steps will be taken to insure that ELLs receive appropriate hours of ESL instruction district wide. Department Order of Corrective Action: Please provide evidence of the following: Progress with curriculum mapping work Sample schedules from each school in the district supporting adequate hours of ESL/ELD instruction See ELE 15 for comments on Professional Development Requirements District findings of biannual monitoring activity. Include names of staff responsible for monitoring each element in the criterion, summary of findings, and actions taken to remedy any area of non-compliance. 44 Required Elements of Progress Report(s): Provide status updates on the following by September 21, 2011 1) Progress with curriculum mapping work 2) Spreadsheet with sample schedule of ELLs (e.g. one per grade level, per school) showing that ELLs are receiving adequate hours of ESL instruction at the corresponding English proficiency level. 3) Biannual monitoring activity to include how the district will ensure: 1) completion of curricula mapping in elementary, middle, and high school grades (keeping in mind the caveat specified by the Department above); 2) delivery of recommended ESL/ELD instruction hours to all ELLs in the district, not just the middle school; 3) sheltering of content to all ELLs by SEI trained teachers; 4) continued tracking of the four (4) SEI categories completed by general education and content area teachers, per school across the district. Submit updates for all criterion work listed above by December 12, 2011. Progress Report Due Date(s): September 21, 2011 & December 12, 2011 45 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 8 Declining entry to a Rating: Partially Implemented program Department CPR Finding: According to documentation and interviews, among staff members in the district’s schools with opted-out students in their classrooms, most have not been sufficiently trained in Sheltered English Immersion (SEI) category training; alternatively, opted-out students do not receive English as a Second Language (ESL) support. The district has developed a record of opted-out students’ MEPA and MELA-O scores to track how well these students are attaining proficiency in English. Narrative Description of Corrective Action: General curriculum teachers continue to be encouraged to enroll in the category training to increase district percentage of teachers who have completed appropriate training. District training of teachers in categories 1-4 is offered and teachers are encouraged to enroll in the training. An area of special area will be teachers in the content areas of English, science, mathematics, and social studies. Title/Role of Person(s) Director of ELL, Content Expected Date of Completion for Each Directors, Principals, and the Assistant Corrective Action Activity: Category 2, Superintendent for Curriculum and Instruction secondary level offered to and completed June 2010; Category 2, elementary level offered and completed January 2011; Category 4, secondary level, offered and completed December 2010; Category 4, elementary level, offered and completed January 2011. Category 2, secondary & elementary level, to be offered 2011, Category 4, elementary & secondary, to be offered, June 2011; Evidence of Completion of the Corrective Action: Teacher enrollment roster (refer to ELE 5, Doc. 4, mailed to ESE); Announcements of Category Training Opportunities 2010-11 (refer to ELE 5, DOC 5, mailed to ESE). Description of Internal Monitoring Procedures: Director of ELL, as well as superintendent’s office, will keep a record of teacher completion of each category training. Principals will be informed of teachers who have competed training to ensure appropriately placement of ESL students for instructional purposes. Annually, district will review lists of teachers who have taken part in category training and share the list with building principals. Annually, district will develop its professional development activities to include targeted category trainings CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 8 Declining entry to a program Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Please provide a list of opted out students, identified by initials only, each student’s teacher(s), and the number of categories of training attained by the teacher(s). If the opted-out student is placed in a class where the teacher is not trained in at least three (3) SEI categories (1, 2 and 4), then please indicate the student’s ESL instructor and number of minutes/hours of direct English instruction the student is receiving. Provide this information by October 1, 2011. Progress Report Due Date(s): September 21, 2011 46 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 10 Parent notification Rating: Partially Implemented Department CPR Finding: The district submitted multiple versions of the parent notification letter; one included all elements required for a Title III district, while others did not. The notification letter most frequently found in the student files did not include the child’s level of English proficiency (states only that the student is an LEP student) and the specific exit requirements Narrative Description of Corrective Action: The ELL office has revised parent notification letter to include all elements required under Title III Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director ELL; Principal or Corrective Action Activity: June 2010 designee Evidence of Completion of the Corrective Action: Sample Parent Notification Letter English, Spanish, & Haitian-Creole (MAILED TO ESE labeled ELE 10 DOC 1 SAMPLE) Description of Internal Monitoring Procedures: Student files will be periodically checked by principals or their designee to ensure appropriate documentation is included in each child’s folder. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 10 Parent notification Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: The district’s parent notification letter requires a signature from the parent, including an option to opt-out of English Language programming. Department Order of Corrective Action: Revise the parent letter by omitting the required signature from the notification letter. Required Elements of Progress Report(s): Provide the revised parent letter in English and the main languages of the district. Provide the Frequently Asked Questions document as well, to ensure that parents are informed of their right to waive into another program. Progress Report Due Date(s): September 21, 2011 47 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 11 Equal access to academic Rating: Partially Implemented programs and services Department CPR Finding: According to staff interviews, ESL classes at the high school are weighted differently from other classes and do not contribute to a student’s GPA. In addition, please see ELE 5. Narrative Description of Corrective Action: Study group comprised of high school principal, housemasters and guidance staff will be convened to review how ESL classes are weighted and the impact on an ESL student’s GPA. Refer to ELE 5 re: Category training of Staff Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director of Student Support Corrective Action Activity: Services, High School Principal Convene Study Group January 2011; Monthly meetings January, Feb., Mar., 2011; Revision of procedure re: ESL classes, weighting and GPA, April 2011. Refer to ELE 5, Expected Date of Completion re: Category Training of Staff Evidence of Completion of the Corrective Action: ESL classes will be adjusted to contribute to a student’s GPA commencing 2011-12 school year. See ELE 5, Evidence of Completion re: Category Training of Staff. Description of Internal Monitoring Procedures: ESL class weight will be reflected in students overall GPA and transcript CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 11 Equal access to academic programs and services Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Please provide the revised procedures for weighing ESL classes. Progress Report Due Date(s): September 21, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 12 Equal Access to Rating: Partially Implemented Nonacademic and Extracurricular Programs Department CPR Finding: Document review and staff interviews indicated that LEP students from language groups other than Spanish do not receive translated materials about nonacademic and extracurricular activities nor was there evidence that the district provides access to translations regarding nonacademic and extracurricular activities, though there are LEP students from all language groups who participate in extracurricular activities. Narrative Description of Corrective Action: Approximately 22% of total enrollment at Waltham public schools are Spanish speakers. The next language group is Haitian-Creole at 3.5 %. Waltham will translate key extra curricular materials in both Spanish and Haitian-Creole. 48 Title/Role of Person(s) Responsible for Implementation: Principals and Directors Expected Date of Completion for Each Corrective Action Activity: ; Identify key extra curricular materials to be translated: January 2011; Submit the extra curricular materials to be translated into Spanish to the district translator and contract HaitianCreole Translator February 2011; Key extra curricular materials translated into Haitian Creole and Spanish, August 2011. Evidence of Completion of the Corrective Action: Identified, key extra curricular materials [i.e. handbook, information for sports, cultural events, programs, and activities] will be translated into Spanish & Haitian-Creole Description of Internal Monitoring Procedures: Principals will responsible for the translation of extra curricular materials in both Spanish & Haitian-Creole. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 12 Equal Access to Status of Corrective Action: Approved Partially Approved Disapproved Nonacademic and Extracurricular Programs Basis for Partial Approval or Disapproval: The district’s corrective action for CR 7, Information to be translated into languages other than English, states that principals and program directors would select materials for translation but the ELL Director would be responsible for having materials translated. Department Order of Corrective Action: Please clarify the district’s mechanism for ensuring that LEP students have equal access to non-academic and extracurricular activities in the Waltham Public Schools. Required Elements of Progress Report(s): Provide the clarification of the district’s translation policies and procedures for non-academic and extracurricular activities in the Waltham Public Schools. Progress Report Due Date(s): September 21, 2011 49 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 15 Professional Rating: Partially Implemented development requirements Department CPR Finding: Content instruction is based on the appropriate Massachusetts Curriculum Framework; however, it is clear that LEP students do not receive sheltered content instruction as the majority of teachers have not completed all of the required categories of SEI professional development focused on the skills and knowledge necessary for sheltering instruction, as described in the Commissioner’s Memorandum of June 2004. At the middle and high school levels, fewer teachers have completed the category trainings than at the elementary level. Narrative Description of Corrective Action: General curriculum teachers have been encouraged to enroll in the category training so as to increase district capacity of teachers who have completed appropriate training. District training of teachers in category PD is offered and teachers are encouraged to enroll in the training. Title/Role of Person(s) Director of ELL, Content Expected Date of Completion for Each Directors, Principals, and the Assistant Corrective Action Activity: Category 2, Superintendent for Curriculum and Instruction secondary level offered to and completed June 2010; Category 2, elementary level offered and completed January 2011; Category 4, secondary level, offered and completed December 2010; Category 4, elementary level, offered and completed January 2011. Category 2, secondary & elementary level, to be offered 2011, Category 4, elementary & secondary, to be offered, June 2011; Evidence of Completion of the Corrective Action: Teacher enrollment roster (refer to ELE 5, Doc. 4, mailed to ESE); Announcements of Category Training Opportunities 2010-11 (refer to ELE 5, DOC 5, mailed to ESE). Description of Internal Monitoring Procedures: Annually, district will review lists of teachers who have taken part in category training and share the list with principals and con tent area directors. Annually, district will develop its professional development activities to include targeted category trainings. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 15 Professional development requirements Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: See also ELE 5 for additional comments on Professional Development Requirements and monitoring activity. The district reports having held Category 2 Sheltered English Immersion (SEI) training for middle school teachers, and continuing with its effort to continued SEI PD training in various schools in the district, including category 4, which was one of the districts primary focus. The district submitted a spreadsheet listing teachers, district wide, who enrolled and completed Category trainings as of June 2010. Despite the spreadsheet submitted, it was difficult to obtain a precise picture of the data presented as totals across rows and columns were not included. Nevertheless, the Department noted that the district is making progress with its SEI PD training. Although, as of the document review date, there were still no teachers who had 50 completed all four SEI categories and there were still teachers who had not enrolled in any SEI PD training. Department Order of Corrective Action: Please submit evidence of the following: Names of teachers delivering ESL/ELD Placement of ELLs with general education and content area teachers who have received training in sheltering content See also ELE 5 for internal monitoring concerns. Required Elements of Progress Report(s): Please submit the following by: September 21, 2011 1) An update of SEI Category training spreadsheet already submitted to the Department. Please identify teachers per school who have completed all four (4) SEI PD training categories and date of completion as well as column totals (# of teachers per school who completed a given category) and row totals (# of categories completed by a given teacher). 2) A spreadsheet per school that shows placement of ELLs with general education and content area teachers who have completed training in sheltering content; (start with teachers who have fully completed all four (4) categories of SEI training and then those who have completed at other categories, specifying which ones). Include 3-5 students per grade, per school. Submit an update by December 12, 2011 3) See also ELE 5 for internal monitoring issues. Progress Report Due Date(s): September 21, 2011 & December 12, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 18 Records of LEP students Rating: Partially Implemented Department CPR Finding: Student records did not consistently contain copies of parent notification letters or logs of access. Narrative Description of Corrective Action: Principals will develop procedures for accessing student records. Such procedures will include consistent use of logs when accessing student records. Principals will ensure student records are kept up to date with regard to the filing of parent notification letters. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Principals Corrective Action Activity: Principals will develop procedures for accessing student records as well as timely filing of notices in student files. January 2011 Evidence of Completion of the Corrective Action: Procedures developed for accessing student files and the filing of parent notices in these student records. Description of Internal Monitoring Procedures: Review of student records indicate logs are being used and appropriate parent notifications are being filed. 51 CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 18 Records of LEP students Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Waltham Public Schools will provide the results of a record review from a sample of students at each school level (minimum sample of three records for each school level) to ensure that LEP student records contain a log of access and the appropriate parent notification letter (whether initial notification and/or annual notifications) in each record. Please indicate the total number of records reviewed and the number of records that contained a log of access and the appropriate parent notification letters. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district’s record review, including student’s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the noncompliance; and 4) The district’s plan to remedy the non-compliance if applicable. Please provide the results of the student record review by September 21, 2011 Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): September 21, 2011 52