MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION Program Quality Assurance Services COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Charter School or District: Hill View Montessori Charter Public (District) CPR Onsite Year: 2011-2012 Program Area: Special Education All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report dated 03/14/2012. Mandatory One-Year Compliance Date: 03/14/2013 Summary of Required Corrective Action Plans in this Report Criterion SE 2 Criterion Title Required and optional assessments SE 11 SE 14 School district response to parental request for independent educational evaluation Review and revision of IEPs SE 18B Determination of placement; provision of IEP to parent SE 25 Parental consent SE 26 Parent participation in meetings SE 36 IEP implementation, accountability and financial responsibility CPR Rating Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Criterion CR 7 CR 10A Criterion Title Information to be translated into languages other than English Student handbooks and codes of conduct CR 10B Bullying Intervention and Prevention CR 24 Curriculum review CR 25 Institutional self-evaluation CPR Rating Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 2 Required and optional assessments Partially Implemented Department CPR Findings: Student records indicated that the district does not always complete all of the required assessments consented to by the parent. In some cases, parents consented to an observation of the student which was not always conducted by school personnel. Description of Corrective Action: Challenges with lack of program oversight and limited resources led to many errors within the assessment process at HVM. As a result, all assessments consented to be not always completed. Formal observations and Educational Assessments A and B were missing from student files. In one case, the consent for assessments was missing from the file. Training for staff and oversight of the deadlines will prevent future errors. Title/Role(s) of responsible Persons: Expected Date of Special Education Director Completion: Psychologist 06/30/2012 Evidence of Completion of the Corrective Action: The Special Education Director and the Psychologist (completes the testing) will meet with each Team Chairperson to review the criteria for proposing assessments in the area of suspected disability. All future consent forms will include all the appropriate assessments which will be completed within the required timeline. Select records from the CPR will be remedied by sending out a new Notice of Proposed Action to replace the missing assessments. With consent, these assessments will be completed and reviewed at a meeting. For the future, and evaluation monitoring checklist will be attached to all consent forms with places to record the proposed assessments, the dates of completion, and the required meeting date. Description of Internal Monitoring Procedures: Student records reviewed within the CPR will be corrected immediately. All consent forms will be reviewed by either the Special Education Director or Psychologist before being sent home as well as within the assessment process. All evaluations proposed between approval of the CAP and December 31, 2012 will be provided for review, including the monitoring checklist. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 2 Required and optional assessments Corrective Action Plan Status: Approved Status Date: 05/30/2012 Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action to ensure that consent forms include the necessary required assessments (and other assessments as appropriate) and verifies that these assessments are completed by the charter school. The Department also accepts that the district will correct all files identified in the CPR as having missing assessments. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of staff training, including attendance (with the name and role), agenda, and any training materials. This progress report is due October 29, 2012. Please provide evidence that missing assessment identified in the CPR have been MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 3 completed. This progress report is due October 29, 2012. Conduct a sample student record review of initial and re-evaluations after all other corrective actions have been implemented. HVM will report the results the review of files where consent was obtained and testing completed between September and November 2012. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be noncompliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due January 21, 2013. Progress Report Due Date(s): 10/29/2012 01/21/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 4 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 11 School district response to parental request for Partially Implemented independent educational evaluation Department CPR Findings: Student records indicated in some instances, the charter school did not propose assessments for the purposes of conducting an initial evaluation. Instead, parents sought an Independent Educational Evaluation (IEE) which the charter school used as the sole criterion for the purposes of determining eligibility. In addition, student records indicated that the district did not always reconvene the team within 10 days to consider the assessor's recommendations as part of the IEP Team process. Description of Corrective Action: Through review of past practices, it appears that some parents may have been encouraged to consider an IEE which was reviewed as the sole criterion for eligibility in the school setting. While HVM funded these evaluations, the school never completed its own evaluation. These practices have since been changed with the addition of a psychologist on staff and improved programmatic oversight. Protocols for proposing evaluation has been reviewed with the Team Chairpersons and all evaluation consent forms are reviewed by the Psychologist and/or the Special Education Director. Following a school evaluation, the need for an IEE will be determined by the Team and following state guidelines, including having parents submit financial information. All IEEs that are received will be date stamped to ensure that the meeting will be held within 10 school days. Title/Role(s) of responsible Persons: Expected Date of Special Education Director Completion: Psychologist 12/31/2012 Team Chairperson Evidence of Completion of the Corrective Action: HVM will propose all evaluations from the school district before an IEE would be considered. This will be evidenced in the student records with the appropriate consent forms. All proposed evaluations will be approved by the psychologist and/or the Special Education Director before being sent. The Team Chairperson for the assigned student will ensure that the meeting invitation will be sent within 10 days which will also be part of the student record. Description of Internal Monitoring Procedures: HVM will review all assessments completed in the last school year to determine whether the parents were satisfied with the evaluation. If not, the discussion of an IEE will be initiated. For each IEE that is completed at parent expense, the Team will be convened on time in order to consider the new findings. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Partially SE 11 School district response to Approved parental request for independent Status Date: 05/30/2012 educational evaluation Basis for Partial Approval or Disapproval: The district indicated it has added a school psychologist to its staff. However, it is not clear to the Department what procedures the district follows when an Independent Educational Evaluation (IEE) is sought by a parent and how the appropriate staff were MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 5 made aware of these procedures. Further, the district must ensure its IEE procedures are consistent with state and federal regulation under 603 CMR 28.04(5) and 34 CFR 300.502. Department Order of Corrective Action: Please develop the district's procedures for the receipt, tracking, and convening of IEP Teams to review Independent Educational Evaluations (IEEs). Please conduct a staff training regarding this criterion and the district's newly developed procedures. Please review Administrative Advisory SPED 2001-3 and SPED 2004-1 that can be found on the Department's website prior to the development of the district's procedures and staff training. Required Elements of Progress Report(s): Please provide the district's procedures and protocols regarding IEEs. Please provide evidence of a staff training, including attendance (with the name and role), agenda, and any materials presented. This progress report is due October 29, 2012. The district must conduct a review of student records after all other corrective actions have been implemented. HVM will report the results of a student record review of files where an IEE was proposed and/or completed between September and November 2012. Please provide an analysis of this review to include the number of records reviewed and the number of records found in compliance. For any records found non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due January 21, 2013. Progress Report Due Date(s): 10/29/2012 01/21/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 6 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 14 Review and revision of IEPs Partially Implemented Department CPR Findings: Student records indicated that in some cases, an IEP Team meeting was not held on or before the anniversary date of the IEP to review, revise, or develop a new IEP or refer the student for a re-evaluation, as appropriate. Description of Corrective Action: In the last year, HVM has struggled with the oversight and resources within its Special Education Department. Cuts to the teaching staff were made in the middle of the year, forcing an increase in some teacher's caseload. Due to these challenges, some IEPs were not reviewed before the anniversary date. Changes in staffing and improved oversight have already led to improvements in these findings. However, training will be provided to review all required deadlines, including the anniversary date. Title/Role(s) of responsible Persons: Expected Date of Special Education Director Completion: 12/31/2012 Evidence of Completion of the Corrective Action: All IEPs will be reviewed before its anniversary date. This will be verified through the creation of monitoring reports from the online student information program, SEMSTRACKER. Description of Internal Monitoring Procedures: Student records from approval of the CAP and December 31, 2012 will be reviewed to ensure all IEPs are reviewed by the TEAM before its anniversary date. Following this date, a random sampling of student records will be chosen to document the sustainability to the provided training. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 14 Review and revision of IEPs Corrective Action Plan Status: Partially Approved Status Date: 05/30/2012 Basis for Partial Approval or Disapproval: The Department accepts the district's corrective action regarding the increase in staff to ensure oversight and monitoring of annual and reevaluation IEP timelines, as well as staff training regarding this criterion. However, the district must provide a more detailed description of its proposed monitoring process and its use of SEMSTRACKER. Department Order of Corrective Action: Please develop and explain the district's monitoring and tracking system for all annual and reevaluation IEP timelines. Required Elements of Progress Report(s): Please provide a detailed description of the district's tracking and monitoring process regarding annual and re-evaluation IEP meetings. Please provide evidence of staff training; including attendance (with the name and role), agenda, and any training materials. This progress report is due October 29, 2012. The district must conduct a review of student records after all other corrective actions have been implemented. HVM will report the results of a student record review of files where annual and revaluation IEP Team Meetings were conducted between September and November 2012. Please provide an analysis of this review to include the number of MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 7 records reviewed and the number of records found in compliance. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due January 21, 2013. Progress Report Due Date(s): 10/29/2012 01/21/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 8 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 18B Determination of placement; provision of IEP to parent Partially Implemented Department CPR Findings: Student records indicated that the district does not always provide the parent with two copies of the IEP immediately following the development of the IEP. Description of Corrective Action: In review of student records, parents were not always provided with two copies of the IEP immediately following the IEP meeting. These practices were most likely the result of large case loads assigned to each Team Chairperson and/or lack of awareness of the regulations for provision of the IEP to parents. With a change of the Special Education Administrator, the Team Chairpersons have been informed that they are to provide the IEP to parents in 10 school days if there has been a draft provided or 3 school days if there is no draft. Regardless of whether a draft is provided, all parents are provided with the Service Delivery grid, meeting notes describing the goals, and the Team Determination of Placement. This practice has been in place since the fall of this school year and may be verified through a review of students records. Title/Role(s) of responsible Persons: Expected Date of Special Education Director Completion: Team Chairperson 12/31/2012 Evidence of Completion of the Corrective Action: The Team Chairpersons have completed training within this current school year, but additional training for new staff will occur in August 2012. All parents will be provided with two copies of the IEP, on time, which is verified with the date of the N1 and the signature of the Special Education Director. Description of Internal Monitoring Procedures: Adherence to the timelines and provision of the IEP may be verified through a random sampling of student records. Before the end of the calendar year, 10 student records will be chosen for review. The data gathered will be charted and provided to the DESE for review. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Partially SE 18B Determination of placement; Approved provision of IEP to parent Status Date: 05/30/2012 Basis for Partial Approval or Disapproval: The Department agrees that ongoing training regarding this criterion will help to ensure full compliance in future cases and approves the district's corrective action that it will conduct a training in August 2012 to specifically address this. However, the Department asks that the district develop a method to properly document that two copies of the IEP have been provided to the parent. Department Order of Corrective Action: Please provide evidence of a tracking system that accurately documents that all parents are provided two copies of the IEP immediately following the development of the IEP. Required Elements of Progress Report(s): Please provide evidence of the district's method for documenting that two copies of the IEP have been provided to the guardian(s) immediately following the development of the IEP. Please provide evidence of a staff training, including attendance (with the name and role), agenda, and any materials presented. This progress report is due October 29, 2012. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 9 The district must conduct a review of student records after all other corrective actions have been implemented. HVM will report the results of a student record review of files, in which IEPs were developed between September and November, 2012. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due January 21, 2013. Progress Report Due Date(s): 10/29/2012 01/21/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 10 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 25 Parental consent Partially Implemented Department CPR Findings: A review of student records determined that the district does not always obtain parental consent prior to conducting assessments. Description of Corrective Action: Challenges with lack of program oversight and limited resources led to many errors within the assessment process at HVM. As a result, there were some assessments completed without a consent form. In review of the selected file, the parents attended a meeting to review the testing which implies that consent was gained but the paperwork was misplaced. Starting this school year, the student records were moved into the office of the Special Education Director for decreased access by individuals and for improved oversight. Training for staff and time for filing will prevent future errors. Title/Role(s) of responsible Persons: Expected Date of Special Education Director Completion: Team Chairperson 12/31/2012 Evidence of Completion of the Corrective Action: The Special Education Director and the Psychologist (completes the testing) will meet with each Team Chairperson to review the criteria for proposing assessments in the area of suspected disability. All future assessments will not be initiated unless consent is gained. The Special Education Director and the Psychologist will approve the initiation of all evaluations to all assessors, including the date of approval. For immediate action, the missing N1 form will be created and provided to parents for delayed approval. A monitoring checklist will be added to all evaluations to ensure that all assessments are approved and completed within the appropriate timeframe. Description of Internal Monitoring Procedures: Student records reviewed within the CPR will be corrected immediately. All consent forms will be reviewed by either the Special Education Director or Psychologist before being sent home as well as within the assessment process. All evaluations proposed between approval of the CAP and December 21, 2012 will be provided for review, including the monitoring checklist. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 25 Parental consent Corrective Action Plan Status: Approved Status Date: 05/30/2012 Basis for Partial Approval or Disapproval: The Department accepts the district's proposed corrective action to ensure that all assessments are conducted only after consent is obtained from the student's parents and that these assessments are completed by the charter school. The Department also accepts the corrective action that the district will conduct training regarding this criterion. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of staff training, including attendance (with the name and role), agenda, and any training materials. This progress report is due October 29, 2012. The district must conduct a review of student records after all other corrective actions have been implemented. HVM will report the results of a student record review of files MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 11 where parental consent was obtained between September and November 2012. Please provide an analysis of this review to include the number of records reviewed and the number of records found in compliance. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due January 21, 2013. Progress Report Due Date(s): 10/29/2012 01/21/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 12 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 26 Parent participation in meetings Partially Implemented Department CPR Findings: A review of student records determined that the district does not always notify the parent in writing of the IEP Team meeting early enough to ensure that parents have an opportunity to attend. In some instances, IEP Team meeting notices were dated the day of the meeting or the day before the IEP meeting. Description of Corrective Action: The HVM staffs are committed to ensuring parent participation and call or email parents first to find a mutually agreed upon time, rather than sending out a date that may not be possible. As a result, some parents offer a date that within that week, or even the following day. In order to gain participation, the teachers will accept the date offered and had to send home meeting invitations in the backpack for verification. In addition, it is difficult to coordinate meetings with part-time related services staff which also leads to a delay in the meeting invitations due to waiting for a response from each professional. HVM will change these instances by requiring all meeting invitations to be distributed at least 5 - 10 days in advance and mailed to the home address. Team Chairpersons will be required to meet with the Special Education Director to participate in training in the importance of this criteria as well as to offer technical assistance. Title/Role(s) of responsible Persons: Expected Date of Special Education Director Completion: Team Chairperson 12/23/2012 Evidence of Completion of the Corrective Action: The Team Chairperson will be responsible for adhering to the deadline of a 5-10 day notification for a meeting. Description of Internal Monitoring Procedures: Review of student records to ensure that meeting invitations were distributed promptly with enough notice for parents to attend. Records will be selected at random and 10 records will be reviewed to determine whether the timelines are being adhered to. These records will be selected following approval of the CAP through December 2012. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 26 Parent participation in meetings Corrective Action Plan Status: Partially Approved Status Date: 05/30/2012 Basis for Partial Approval or Disapproval: While the regulation states that the district notifies parent(s) in writing of any Team meeting early enough to ensure that they have an opportunity to attend, the Department recommends a longer period of time than 5-10 days for planning IEP meetings in order to avoid scheduling conflicts and ensure parental participation. It is also not clear to the Department what procedures the district will follow to adhere to the deadline it has set. Department Order of Corrective Action: Please provide the district's procedures for sending and tracking IEP Team meeting invitations to parents. Required Elements of Progress Report(s): Please provide the district's procedures for sending and tracking IEP Team meeting invitations to parents. Please provide evidence of a staff training, including attendance (with the name and role), agenda, and any materials presented. This progress report is MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 13 due October 29, 2012. The district must conduct a review of student records after all other corrective actions have been implemented. HVM will report the results of a student record review of files where meeting invitations were sent between September and November 2012. Please provide an analysis of this review to include the number of records reviewed and the number of records found in compliance. For any records found non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due January 21, 2013. Progress Report Due Date(s): 10/29/2012 01/21/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 14 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 36 IEP implementation, accountability and financial Partially Implemented responsibility Department CPR Findings: Student records and documentation indicated that in circumstances where the charter school accessed the family's private insurance for the purposes of completing evaluations, the charter school did not obtain consent or inform the parent that the parent's refusal to permit the charter school to access their private insurance does not relieve the charter school of its responsibility to ensure that all required services are provided at no cost to the parents. Description of Corrective Action: Through review of past practices, it appears that some parents may have been encouraged to consider an IEE which was reviewed as the sole criterion for eligibility in the school setting. While HVM funded these evaluations, the school never completed its own evaluation. These practices have since been changed with the addition of a psychologist on staff and improved programmatic oversight. Protocols for proposing evaluation has been reviewed with the Team Chairpersons and all evaluation consent forms are reviewed by the Psychologist and/or the Special Education Director. Following a school evaluation, the need for an IEE will be determined by the Team and following state guidelines, including having parents submit financial information, as described in the Parent’s Notice of Procedural Safeguards. Additionally, when IEEs are deemed necessary, HVM will develop a signature form for parents who grant permission to access their insurance and HVM will pay the balance. Title/Role(s) of responsible Persons: Expected Date of Special Education Director Completion: 12/31/2012 Evidence of Completion of the Corrective Action: The new procedures and forms will be shared with the Special Education Team Chairpersons; they will be trained on the proper protocols. All templates and forms will be provided for review. If the protocols need to be used, then the documentation will be provided for review. Description of Internal Monitoring Procedures: HVM will review all assessments completed in the last school year to determine whether the parents were satisfied with the evaluation. If not, the discussion of an IEE will be imitated. All blank templates will be provided to the DESE for review. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Partially SE 36 IEP implementation, accountability Approved and financial responsibility Status Date: 05/30/2012 Basis for Partial Approval or Disapproval: The district indicated it has added a school psychologist to its staff and the Department accepts staff training as part of the corrective action for this criterion. However, it is not clear to the Department what protocols have been developed in determining both the need for an Independent Educational Evaluation (IEE) and the process for obtaining consent to access the parent's private insurance. Department Order of Corrective Action: Please provide the district's procedures for Independent Educational Evaluations (IEE) and MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 15 the process for obtaining consent to access a parent's private insurance. Required Elements of Progress Report(s): Please provide the district's procedures regarding IEEs and the process for obtaining consent when accessing the private insurance. Please provide evidence of a staff training, including attendance (with the name and role), agenda, and any materials presented. This progress report is due October 29, 2012. The district must conduct a review of student records after all other corrective actions have been implemented. HVM will report the results of a student record review of files where an IEE was requested and/or completed; please conduct a student record review to verify consent was obtained to access the parent(s) private insurance Please select a sample of records from September 2012 through November 2012. Please provide an analysis of this review to include the number of records reviewed and the number of records found in compliance. For any records found non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the noncompliance. This progress report is due January 21, 2013. Progress Report Due Date(s): 10/29/2012 01/21/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 16 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 7 Information to be translated into languages other than Partially Implemented English Department CPR Findings: Student records and staff interviews indicated that the district does not consistently provide information regarding academic and nonacademic programs to those families requiring translated materials. Additionally, staff interviews indicated that the district does not have a system to secure translations for those families who speak low- incidence languages. Furthermore, a review of documentation as well as staff interviews indicated that not all of the promotional and recruitment materials being disseminated to residents in the area served by the school are translated into the major languages spoken by residents with limited English skills. Description of Corrective Action: HVM has a small LEP population, but we have learned that all materials provided to current parents and the community needs to be translated into the dominant language of the city (Spanish). Prior to this review, we had only been translating documents for specific families who requested home communications in a language other than English. Recruitment material and materials distributed to the community will be translated into Spanish before distribution. HVM will also translate weekly communications into Spanish. We are currently using a text translator. There have been no written or followed procedures to secure translations for families who speak low-incidence languages. This will be remedied with a request to Catholic Charities. Title/Role(s) of responsible Persons: Expected Date of ELL Program Director Completion: Principal 12/31/2012 Evidence of Completion of the Corrective Action: HVM will provide examples of translated recruitment materials. We will also provide evidence of a written agreement with Catholic Charities. We have also utilized the Haverhill District Schools to access individuals to complete oral translations. HVM is also considering a translation software which will provide a better quality translation than the text translator. Description of Internal Monitoring Procedures: HVM will review all Home Language surveys to ensure that all communications are in a language which can be understood. A sampling of materials may be selected to show that translations are happening regularly and appropriately. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Partially CR 7 Information to be translated into Approved languages other than English Status Date: 05/30/2012 Basis for Partial Approval or Disapproval: The Department accepts the corrective action that the district will have recruitment documents and weekly communication translated in the major language of the community which is Spanish. The Department also accepts that the district will contract with Catholic Charities for translation services. However, it is not clear to the Department the procedures for the monitoring and tracking of Home Language Surveys for the purpose of identifying families who require translation services. Department Order of Corrective Action: MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 17 Please provide evidence that the district has developed a tracking and monitoring system for the purpose of identifying families who require translation services. Required Elements of Progress Report(s): Please provide a detailed narrative of the district's tracking and monitoring system, including responsible personnel, and any forms that are used. This progress report is due October 29, 2012. Please provide samples of translated recruitment materials. This progress report is due October 29, 2012. Please provide evidence that the district has secured the services of an agency that provides translation services. This progress report is due October 29, 2012. Conduct a sample student record review of files after all other corrective actions have been implemented where translation services were requested and provided between September and November 2012. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due January 21, 2013. Progress Report Due Date(s): 10/29/2012 01/21/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 18 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 10A Student handbooks and codes of conduct Partially Implemented Department CPR Findings: The document review identified that although the student handbook does contain a detailed student code of conduct, it does not contain the appropriate procedures for the discipline of students with Section 504 Accommodation Plans. Description of Corrective Action: The Student and Family Handbook do not contain appropriate procedures for the discipline of students with a Section 504 Accommodation Plan. The Code includes assurances for students with disabilities, but the language needs to be revised for 504 students and students currently being evaluated. This process will be completed with a study group comprised of teachers at all levels and administrators. The Board of Trustees will have to approve the changes. Title/Role(s) of responsible Persons: Expected Date of Principal Completion: Board of Trustees 09/30/2012 Evidence of Completion of the Corrective Action: The Code of Conduct will be revised, and it will be provided in amended form to the families, once approved by the Board of Trustees. This revised document will be provided in the new Student and Family Handbook to be distributed to parents and guardians no later than September 30, 2012. Description of Internal Monitoring Procedures: The revised Code of Conduct will be distributed to staff and adhered to by the school administrators. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved CR 10A Student handbooks and codes of Status Date: 05/30/2012 conduct Basis for Partial Approval or Disapproval: The Department accepts the district's corrective action in regards to discipline language for students on 504 Plans being added to the student handbook. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide a copy of the student handbook amendment that contains discipline language specific to those students who have 504 Plans. This progress report is due October 29, 2012. Progress Report Due Date(s): 10/29/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 19 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 10B Bullying Intervention and Prevention Partially Implemented Department CPR Findings: Although the student and parent handbook does include a description of the district's Bullying Plan, the plan does not articulate the obligations of the faculty in the event that a staff member identifies bullying. Description of Corrective Action: The Student and Family Handbook do not include the entire Bullying Prevention and Intervention Plan (BPIP). As such, the language about reporting was missing from the handbook. A "student friendly" description of bullying and the plan was not included either. Both of these elements will be revised with the consultation of teachers and the School Social Worker and presented to the Executive Director as an amendment to the current Students and Family Handbook. HVM is implementing the Steps to Respect program and will use the same language and vocabulary within the handbook. Title/Role(s) of responsible Persons: Expected Date of Principal Completion: School Social Worker 09/30/2012 Evidence of Completion of the Corrective Action: The amendment will be sent to parents explaining the required changes. The changes will then be included in the Student and Family Handbook distributed for the 2012-2013 school year. Description of Internal Monitoring Procedures: The Administration will seek feedback from the parents receiving the handbook to make sure the bullying plan and protocol are clear and well defined. Additionally, the School Social Worker completes an annual training for parents which can elicit this information. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved CR 10B Bullying Intervention and Status Date: 05/30/2012 Prevention Basis for Partial Approval or Disapproval: The Department accepts the district's corrective action in regards to amending and updating handbook language specific to the reporting of bullying incidents witnessed by school personnel. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide a copy of the amended sections of the handbook. Please provide evidence that school personnel were made aware of the amending language. Please include the agenda and signed attendance sheet (with the name and role of staff). This progress report is due October 29, 2012. Progress Report Due Date(s): 10/29/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 20 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 24 Curriculum review Partially Implemented Department CPR Findings: Staff interviews verified that the district does not have a formal process to ensure that teachers review all educational materials for simplistic and demeaning generalizations lacking intellectual merit, on the basis of race, color, sex, religion, national origin and sexual orientation. Description of Corrective Action: HVM has not implemented a formal process to ensure that educational materials are free from bias and demeaning generalizations. While curriculum is reviewed annually, this specificity has never been included. We are a Montessori Charter Public School, and curriculum materials are provided and reviewed by the training centers. We have newly purchased a Guided Reading program which should be free from bias and generalization via the publisher. However, all materials will be reviewed in each classroom and in each subject area. An ongoing curriculum alignment process will assist on the feasibility of this process. Title/Role(s) of responsible Persons: Expected Date of Principal Completion: 12/31/2012 Evidence of Completion of the Corrective Action: The review process will be outlined for teacher prior to implementation. Checklists will be provided to collect data. Teachers will review their curriculum in the last year through reflection and curriculum alignment. Any warranted changes will be reflected in teaching practices and the District Curriculum Accommodation Plan (DCAP). Description of Internal Monitoring Procedures: HVM will make available the staff checklists used for data collection. The DCAP will be presented as a draft document until approved by the Board of Trustees. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: CR 24 Curriculum review Corrective Action Plan Status: Approved Status Date: 05/30/2012 Basis for Partial Approval or Disapproval: The Department accepts the corrective action proposed by the district regarding this criterion, including the implementation of a checklist to track and monitor curriculum to ensure that it is free of any simplistic and demeaning generalizations. The Department also agrees that the district should conduct ongoing curriculum alignment and these updates will be included in the DCAP. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide a copy of the monitoring checklist as well as the results of the data collected. Please submit a copy of the DCAP (draft copy if not yet approved by Board of Trustees) and highlight any changes/updates that were made. Both of these documents are due October 29, 2012. Please provide evidence of staff training on the district's DCAP. Please include the agenda, training materials and staff sign-in sheet (with the name and role of staff). This progress report is due January 21, 2013. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 21 Progress Report Due Date(s): 10/29/2012 01/21/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 22 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 25 Institutional self-evaluation Partially Implemented Department CPR Findings: Staff interviews indicated that the district does not have procedures to evaluate its program annually to ensure that all students, regardless of race, color, sex, religion, national origin, limited English proficiency, sexual orientation, disability, or housing status, have equal access to all programs, including athletics and other extracurricular activities. Description of Corrective Action: HVM does not have consistent procedures to evaluate our program. We use parents surveys to assess the HVM program and its Special Education program, but this does not include elements of equity or equal access. In practice, we ensure that all communications to the home are in the preferred format (paper or electronic) and the language of the home. These procedures are not defined in writing. A revision of the District Accommodation Plan (DCAP) is required. A written procedure to evaluate programs will be created and implemented. Review of information already present in the Student and Family Handbook will aide this process. Title/Role(s) of responsible Persons: Expected Date of Principal Completion: 12/31/2012 Evidence of Completion of the Corrective Action: The curriculum review process will be initiated in June of this year so that changes to the DCAP will be made over the summer. There is a chance that information within the Student and Family Handbook will need to be updated before distribution to families. Description of Internal Monitoring Procedures: The written procedures will be shared as well as the updated DCAP and Student and Family Handbook. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: CR 25 Institutional self-evaluation Corrective Action Plan Status: Approved Status Date: 05/30/2012 Basis for Partial Approval or Disapproval: The Department accepts the corrective action proposed by the district regarding this criterion, including the creation of a written evaluation process to be added to the District Curriculum Accommodation Plan (DCAP). Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide evidence of a written evaluation process and include a copy of the update(s), highlighting where changes/updates were made. This progress report is due January 21, 2013. Progress Report Due Date(s): 01/21/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 23 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW Charter School or District: Hill View Montessori Charter School Corrective Action Plan Forms Program Area: English Learner Education CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report to the school or district. Mandatory One-Year Compliance Date: November 1, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 5 Program Placement and Structure Rating: Partially Implemented MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 24 Department CPR Finding: Hill View Montessori Charter School has a low incidence of English language learners (less than ten). According to documentation reviewed, ELE students are provided instruction in multiage classrooms (grades 1-3) and grades (4-6), except in Kindergarten where ESL instruction is provided in each classroom (Push-in method). The school submitted a curriculum and reported that it supplements it with additional resources. Documents also indicated and onsite interviews verified that the ESL teacher supplements the general education curriculum with ancillary resources she has created. Please note that the district’s SEI program will need to be strengthened in accord with the various elements required by the RETELL (Rethinking Equity and Teaching for English Language learners) initiative. Refer to the RETELL link at: http://www.doe.mass.edu/retell/ for additional information. Concerning hours of instruction, documentation and interviews indicated that English language learners are not provided with ESL instruction that is consistent with Department guidelines (Refer to http://www.doe.mass.edu/mcas/mepa/guidance.html - pg. 5). The school states that ELE students receive ESL services consistent with their level of English proficiency; however, documentation submitted did not include the student’s level of English proficiency. See ELE 15 for comments on SEI Professional Development training. In sum, the school has not developed an ESL curriculum, ELLs in the school may not be receiving direct hours of ESL instruction that are consistent with Department guidelines, and content area teachers instructing ELLs have not completed their training in any of the SEI Categories (See ELE 15). Consequently, the Department concludes that the school does not have an ELE program that is consistent with Chapter 71A. Narrative Description of Corrective Action: The District has procedures to ensure that suspected ELL students are tested in a timely manner as well as the tests that determine eligibility. Training for teachers and principal will be conducted in accordance with the DESE requirements. Documentation will be collected demonstrating that ELL students are receiving ESL services consistent with their level of English proficiency. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Principal or Coordinator of Corrective Action Activity: June 1, 2013 Special Education Evidence of Completion of the Corrective Action: The principal and technology coordinator will develop a data base system to collect ELL student data throughout the year. Testing and timeline data will be collected and sent to DESE. The district will develop a computerized spreadsheet which allows for information about ELL students. Data will include the date the student entered the district, the date they were tested and the results of the testing will be collected and recorded on a data sheet and will be submitted to the Building Principal and Coordinator of Special Education. A data spreadsheet will be sent to the DESE. Description of Internal Monitoring Procedures: The date of entrance of possible ELL students and the date they were tested will be submitted to the Technology Coordinator for input into the Data base. October 1st and March 1st of each year, the data will be reviewed by the principal and data coordinator to ensure that all timelines are being followed. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 25 CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 5 Program Placement and Structure Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: 1. Testing the students for the purpose of identification or progress monitoring cannot be a remedy for the noncompliance described in the Department’s CPR finding for ELE 5. 2. The district reports in its proposed CAP that documentation will be collected demonstrating that ELL students are receiving ESL services consistent with their level of English proficiency. The proposed corrective action is not detailed enough to address the concern identified in the CPR report regarding the ESL services. 3. Since the new regulations as they pertain to WIDA were passed prior to the on-site visit, the Department will be neither approving nor disapproving any curriculum documents/plans that were made for on-site visits conducted before the state’s adoption of the WIDA standards in June 2012. The Department will be communicating with all districts during the upcoming school year to provide them with further guidance on developing Department approved ESL/ELD curriculum. No further submission is required at this time. 4. The Department accepts the district’s plan under ELE 15 to ensure that all core academic teachers with ELLs and administrators that supervise core academic teachers of ELLs are endorsed. No further submission is required at this time. 1) Department Order of Corrective Action: Please provide a detailed plan that shows that the district is providing sufficient ESL instruction to all ELL students during the 2013-2014 school year based on the Department's Guidance on using MEPA Results to Plan Sheltered English Immersion (SEI) Instruction and make Reclassification Decisions for Limited English Proficient (LEP) Students from September 2009 found at http://www.doe.mass.edu/mcas/mepa/2009/guidance.doc 2) Please complete district information in the attached spreadsheet labeled ELL List for each ELL student in the district. Required Elements of Progress Report(s): See above. Progress Report Due Date(s): October 7, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 11Equal Access to Academic Rating: Partially Implemented Department CPR Finding: A review of documentation indicated the LEP students enrolled do not have content teachers who have received training in all four categories for sheltering content as required by the Department; therefore, LEP students do not have equal access to a full range of academic opportunities. Additionally, interviews indicated that the district does not provide the LEP students enrolled with credit for the ESL instruction they receive. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 26 Narrative Description of Corrective Action: At the K-8 level the district does ensure the ELL students are taught to the same academic standards as all other students. The district will need to collect documentation and submit it to the DESE. In addition, the district Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Principal or Coordinator of Corrective Action Activity: June 2013 Special Education Evidence of Completion of the Corrective Action: The district will complete a list of ELL students, their grade, and the programs and support services that they are presently receiving. Description of Internal Monitoring Procedures: The Principal and Coordinator of Special Education will examine the data collected and determine if ELL students have access to programs. The review of this data will be summarized and sent to the DESE. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 11Equal Access to Academic Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: The district did not propose a plan of corrective action addressing how it will ensure that LEP students will receive credit for the ESL instruction they receive. Department Order of Corrective Action: Develop a plan for ensuring that LEP students receive credit for the ESL instruction they receive. Required Elements of Progress Report(s): By October 7, 2013, the district will submit a plan on how it will ensure that LEP students receive course credit for ESL instruction. By December 20, 2013, the district will conduct an internal review and report the number of students who receive ESL instruction and the number of those students who received course credit. If any nocompliance is identified, the district will identify and report the root cause of the non-compliance, a plan of action to remedy it and the specific actions taken for each student file reviewed to ensure full compliance with this criterion. See ELE 5 & ELE 15 regarding district plan for staff training. *Please note that when monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): October 7, 2013; December 20, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 12 Equal Access to Extracurricular Rating: Partially Implemented MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 27 Department CPR Finding: Interviews indicated that not all information regarding nonacademic and extracurricular programs is provided to those families in their primary language. Additionally, student records and staff interviews indicated that the district does not consistently provide information regarding academic and nonacademic programs to those families requiring translated materials. Furthermore, staff interviews indicated that the district does not have a system to secure translations for those families who speak low- incidence languages. Moreover, a review of documentation as well as staff interviews indicated that not all of the promotional and recruitment materials being disseminated to residents in the area served by the school are translated into the major languages spoken by residents with limited English skills. Narrative Description of Corrective Action: The district has access to computer system that provides information to families of ELL student in their native language. Weekly school notes (Wednesday Notes) are emailed to all parents in the district. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Principal or Technology Corrective Action Activity: June 2013 Coordinator Evidence of Completion of the Corrective Action: Data will be collected (notices and information given to families of ELL students) regarding extracurricular activities and school events for a period of four months and submitted to the DESE. Description of Internal Monitoring Procedures: CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 12 Equal Access to Extracurricular Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): Submit copies of translated information pertaining to nonacademic and extracurricular programs, as well as the system used to secure translations for families that speak low-incidence languages. Also submit copies of translated promotional and recruitment materials. Submit the documents in English and in translation. Progress Report Due Date(s): October 7, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 15 Professional Development Rating: Partially Implemented MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 28 Department CPR Finding: The school’s plan for SEI professional development encompassed only one year of planning: 20112012; therefore, the school’s plan will need to be revised. The revisions must incorporate the upcoming SEI professional development changes as stipulated by the RETELL initiative. Please refer to the following link: http://www.doe.mass.edu/retell/ for additional information. Concerning content area teachers, the school reported several teachers who have completed one of the Sheltered English Immersion (SEI) category trainings and four teachers who have completed two or more of the SEI categories. However, documents and interviews indicated that ELLs do not receive instruction from teachers who have been trained in the four categories as required Narrative Description of Corrective Action: The district has provided staff with the opportunities for ELL training in all categories. The district is in the process of developing a list of teachers who have had category training and those who will be trained through the Department of Education RETELL training program that will take place in the near future. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Principal Corrective Action Activity: June 2013 Evidence of Completion of the Corrective Action: The principal will develop a list of staff that instruct ELL students and their level of training. A list of ELL students who are assigned trained teachers for all contents area subjects will be sent to the DESE. The principal will track ELL training and ensure that HVM has a trained general education teacher at each grade level and for each subject area (middle school). Description of Internal Monitoring Procedures: CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 15 Professional Development Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: The Department approves the corrective action as designed and requires no further progress reporting. Department Order of Corrective Action: N/A Required Elements of Progress Report(s): None required. Progress Report Due Date(s): N/A COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 17 Program Evaluation Rating: Not Implemented Department CPR Finding: Documentation submitted indicated that the district has not completed periodic evaluations of the quality and effectiveness of the ELE program. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 29 Narrative Description of Corrective Action: The district will develop a periodic evaluation system that informs HVM and DESE of the quality and effectiveness of the ELE program. Periodic review of ELL students academic progress, work samples, and teacher observations and written input will be developed and reported to the DESE at the end of the school year. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Principal and/or Coordinator Corrective Action Activity: June 2013 of Teaching and Learning Evidence of Completion of the Corrective Action: A report will be written and submitted to the DESE at the end of the each school year. Description of Internal Monitoring Procedures: Information on the progress of ELL students will be collected at the end of each term and reviewed by the principal and coordinator of teaching and learning. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 17 Program Evaluation Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By October 7, 2013, the district will submit a copy of its proposed ELE program evaluation tool that will be used to evaluate its ELE program. By December 20, 2013, the district will submit a copy of its ELE program evaluation. Progress Report Due Date(s): October 7, 2013; December 20, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 18 Student Records Rating: Partially Implemented Department CPR Finding: The review of student records indicated that some records were missing information regarding the student’s previous school experience, home languages surveys, and evidence of either initial or annual notifications to the parent Narrative Description of Corrective Action: The district has already made a decision to keep all ELL records in the special education office. All ELL files will need to be examined to determine what specific information has or has not been collected. Incomplete files need to be addresses. Copies of each ELL student’s MEPA report from the Spring of 2012 have been received at the special education office. Parent notification letters will be sent out in a timely fashion and copies will be kept on file. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 30 Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Principal and/or director of Corrective Action Activity: June 2013 special education Evidence of Completion of the Corrective Action: A report showing the results of the audited files will be sent to DESE Description of Internal Monitoring Procedures: Record review yearly on all ELL students CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 18 Student Records Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By October 7, 2013, the district will submit evidence (agenda, signed attendance sheets) indicating that training was conducted on the requirements of maintaining ELE student records. By December 20, 2013, after staff training has been conducted, the district will conduct an internal review of ELE student records for consistent evidence of student’s previous school experience (if applicable), home language surveys, and initial and/or annual notifications to the parent and will report: the number of records reviewed at each level and the number of records that contained all required documents. If any ongoing non-compliance is identified, report the root cause, a plan to remedy the ongoing non-compliance and the specific actions taken to ensure full compliance for each student record reviewed. *Please note that when monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): October 7, 2013; December 20, 2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Hill View Montessori Charter Public (District) CPR Corrective Action Plan 31