MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION Program Quality Assurance Services COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Charter School or District: Excel Academy Charter (District) CPR Onsite Year: 2010-2011 Program Area: Special Education All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report dated 09/08/2011. Mandatory One-Year Compliance Date: 09/08/2012 Summary of Required Corrective Action Plans in this Report Criterion SE 2 Criterion Title Required and optional assessments SE 8 IEP Team composition and attendance SE 9 SE 13 Timeline for determination of eligibility and provision of documentation to parent Progress Reports and content SE 18A IEP development and content SE 19 Extended evaluation SE 20 Least restrictive program selected CPR Rating Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Criterion SE 24 SE 26 SE 29 Criterion Title Notice to parent regarding proposal or refusal to initiate or change the identification, evaluation, or educational placement of the child or the provision of FAPE Parent participation in meetings SE 33 Communications are in English and primary language of home Involvement in the general curriculum SE 35 Assistive technology: specialized materials and equipment CPR Rating Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 2 Required and optional assessments Partially Implemented Department CPR Findings: The student record review determined that the district does not always complete educational assessments as part of a student’s initial evaluation. Please see SE 19 for additional information. Description of Corrective Action: 1. The Director of Special Education reiterates with Learning Specialists that educational assessments need to be conducted for all initial evaluations and re-evaluations. The educational assessments must be saved in the ?Student Info? file on the Student Support file on the Shared Drive, and a hard copy be placed in the student?s file, along with the other assessment reports. 2. The Director of Special Education will create a checklist of assessments, which includes the educational assessment, that need to be completed for all initial evaluations and reevaluations. The Director of Special Education will then conduct a training to ensure that all Learning Specialists are familiar with the checklist and able to conduct educational assessments completely and accurately. 3. Educational assessment information provided to general educators along with evaluation results. 4. The Director of Special Education will remind Learning Specialists to complete all required assessment forms for evaluations in monthly emails. Anticipated Results: All student records will include (a) assessments in the area related to the disability, (b) Educational Assessments, (c) teacher assessments, and (d) observations by a Learning Specialist. Title/Role(s) of responsible Persons: Expected Date of Director of Special Education and the Learning Specialists Completion: 09/23/2011 Evidence of Completion of the Corrective Action: 1. Department meeting agenda, training materials, attendance sheet 2. Soft copy of reminder e-mail Description of Internal Monitoring Procedures: 1. Learning Specialists will use checklist found on shared drive to ensure that all required assessments are complete for initial evaluations and re-evaluations. 2. The Director of Special Education will review student records for completion and accuracy once every semester and report to the Administrative Team. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 2 Required and optional assessments Corrective Action Plan Status: Approved Status Date: 09/16/2011 Basis for Partial Approval or Disapproval: The district has proposed a comprehensive plan of action to ensure that all initial evaluations and re-evaluations will include the required educational evaluations. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide evidence of the Learning Specialist trainings regarding requirement for educational assesments for all initial evaluations and re-evaluations; please include MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 3 agenda(s), signed attendance sheets, and examples of the training materials. Additionally, provide a copy of the newly developed checklist of assessments. Provide this documentation through the WBMS by October 31, 2011. Excel Academy will provide the results of a record review from a sample of students at each grade level (minimum of 3 per level) with initials and re-evaluations post-training for evidence that educational assessments were part of the evaluation process. Please indicate the total number of records reviewed and the number of records that demonstrated that Learning Specialists include educational assessments for all intial evaluations and re-evaluations. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district?s record review, including student?s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district's plan to remedy the non-compliance if applicable. Please provide the results of the student record review by January 16, 2012. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 10/31/2011 01/16/2012 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 4 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 8 IEP Team composition and attendance Partially Implemented Department CPR Findings: Student record review, parent surveys, and staff interviews demonstrated that when required staff members cannot attend the IEP meeting, the school does not use the excusal process with parents under any circumstance. General education teachers are not always present at IEP Team meetings. Additionally, a paraprofessional chairs IEP Team meetings. Description of Corrective Action: 1. In the Fall of 2011 an excusal process was created by the Learning Specialists to excuse Team members who are unable to attend the Team meeting. All Team members involved in the education of a student with an IEP at Excel Academy are asked for a written narrative describing a student?s strengths and weaknesses, concerns, and goals so that information can be included within the IEP. If a Team member is unable to attend a Team meeting, contact is made with the parent before the meeting begins to seek permission to excuse the staff member, which will be documented in our tracking communication page located in the student files on the shared drive. An excusal form is then used at the meeting to seek written consent from the parent. At that time, the written documentation that the staff member had previously provided is attached. All documentation is then included within the students? file. 2. Paraprofessionals will not be permitted to chair IEP meetings. IEP meetings will be chaired only by qualified individuals. Anticipated Results: 1. All required staff members, including all general education teachers, will attend IEP meetings. When necessary staff members are not able to attend, the school will properly implement the excusal process. 2. Team meetings will only be chaired by qualified professionals. Title/Role(s) of responsible Persons: Expected Date of The Director of Special Education and the Learning Specialists Completion: 10/21/2011 Evidence of Completion of the Corrective Action: 1. Attendance sheets with signatures and excusal forms attached for those not in attendance. 2. Certification, licensure, progress towards licensure of Learning Specialists documented and on file with human resources. Description of Internal Monitoring Procedures: 1. The Director of Special Education will review student records to ensure that all Team members were in attendance at Team meetings or excusal forms are present in student files for Team members not in attendance, and report to the Administrative Team. 2. The Administrative Team will document and ensure proper certification, licensure, or progress towards licensure of Learning Specialists. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 8 IEP Team composition and Status Date: 09/16/2011 attendance Basis for Partial Approval or Disapproval: The district has developed appropriate corrective actions to implement an excusal process MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 5 that meets regulatory requirements and has ensured that all individuals chairing Team meetings are qualified to do so. The district has also anticipated that general educations teachers will regularly attend IEP meetings. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide documentation of the Team excusal process, including any memoranda, forms, etc., used to ensure that required IEP Team members either consistently attend meetings or are appropriately excused in advance of the Team meeting. Provide the documentation verifying the proper certification, licensure, or progress towards licensure for the Learning Specialist who was not previously qualified to chair Team meetings. Provide this documentation through the WBMS by October 31, 2011. Excel Academy will provide the results of a record review from a sample of students at each grade level (minimum of 3 per level) to ensure that 1) general education teachers are consistently attending meetings; 2) parents are appropriately notified in advance of the day of the meeting to excuse a required Team member; 3) the signed excusal form is in the student record; and 4) the excused Team members' written feedback is in the student record. Please indicate the total number of records reviewed and the number of records that demonstrated that 1) general education teachers attended the IEP meeting; 2) parents were notified in advance of the meeting to excuse a required Team member; 3) the parents' signed excusal was in the file; 4) the excused Team members' written feedback was in the file. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district?s record review, including student?s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district's plan to remedy the non-compliance if applicable. Please provide the results of the student record review by January 16, 2012. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 10/31/2011 01/16/2012 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 6 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 9 Timeline for determination of eligibility and provision of Partially Implemented documentation to parent Department CPR Findings: The student record review and staff interviews determined that meetings are not always held within forty-five school working days after receipt of the parent’s written consent to an initial evaluation or a re-evaluation. Description of Corrective Action: 1. At a training on 10/14 Learning Specialists will be reminded that a meeting must be held within forty-five working days after receipt of a parent?s written consent to an initial evaluation or re-evaluation. 2. The Director of Special Education to send electronic reminder of IEP timeline to evaluators. 3. Learning Specialists to remind evaluators of report deadlines. Anticipated Results: 1. A meeting to determine the eligibility of student for Special Education services will always be held within forty-five school working days of receipt of a parent?s written consent to an initial evaluation or re-evaluation. 2. If found to be eligible, the Learning Specialist will also provide the parent with a proposed IEP and placement. If found to be ineligible, the Learning Specialist will provide a written explanation of the findings of no eligibility. Title/Role(s) of responsible Persons: Expected Date of The Director of Special Education Completion: 10/14/2011 Evidence of Completion of the Corrective Action: 1. Department meeting agenda, training materials, attendance sheet 2. Soft copy of reminder e-mail 3. Eligibility Team Meeting attendance sheets dated within forty-five school working days. Description of Internal Monitoring Procedures: The Director of Special Education will review student records once every semester to ensure that the appropriate timeline has been followed, and report to the Administrative Team. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 9 Timeline for determination of Status Date: 09/16/2011 eligibility and provision of documentation to parent Basis for Partial Approval or Disapproval: While the district's proposed actions are accepted, they do not pinpoint the reason why delays occurred in convening IEP Team meetings within 45 days of receipt of the parent's written consent to evaluate. Please ensure that the district addresses parent cancellation/rescheduling of meetings, as reschedulings at the parent's request does not constitute a delay in the timeline (although it may push the meeting beyond 45 days). However, the Learning Specialists must note the rescheduling in the second (or third, etc.) meeting notice. Additionally, cancellations because of school closure (weather-related) also do not constitute a delay, although again MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 7 the Meeting Invitation must note the reason for the rescheduling and the meeting must be reconvened promptly. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide documentation from the October 14, 2011 training on convening Team meetings within 45 days of a parent's signed consent to evaluate; provide a copy of the meeting agenda, training materials, attendance sheet and a copy of reminder e-mail. Provide this documentation through the WBMS by October 31, 2011. Excel Academy will provide the results of a record review from a sample of students at each grade level (minimum of 3 per level) with initial evaluations or re-evaluations scheduled post-training for compliance with convening the Team meeting within 45 days of receipt of signed consent (or fewer). Please indicate the total number of records reviewed and the number of records that demonstrated that 1) Team meetings were convened within 45 days of receipt of signed consent or fewer and/or 2) Team meetings delayed by parent rescheduling or school closures were appropriately documented in the second Meeting Invitation notice issued. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district?s record review, including student?s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district's plan to remedy the non-compliance if applicable. Please provide the results of the student record review by January 16, 2012. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 10/31/2011 01/16/2012 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 8 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 13 Progress Reports and content Partially Implemented Department CPR Findings: Please see comments for SE 29 regarding the translation of progress reports. Description of Corrective Action: 1. The school will use a highly qualified translation service to translate all notices, including progress reports. 2. Every year, the parents of special education students sign a ?Language Preference? form, which allows parents to indicate their preferred language for oral and written communication from the Special Education Department. Anticipated Results: Families will always receive communications in the preferred language indicated on the Language Preference Form. Title/Role(s) of responsible Persons: Expected Date of The Director of Special Education and the Learning Specialists Completion: 09/23/2011 Evidence of Completion of the Corrective Action: 1. Soft copies of correspondences with translation companies and translated documents. 2. Completed language preference form. Description of Internal Monitoring Procedures: The Director of Special Education will review student records once every semester to ensure a language preference form has been completed and that communication has occurred in the language indicated on the preference form. The Director will then report findings to the Administrative Team. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 13 Progress Reports and content Corrective Action Plan Status: Approved Status Date: 09/16/2011 Basis for Partial Approval or Disapproval: The district's proposed corrective action is acceptable. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide the following documentation: 1) the name/agency of the highly qualified translating agencies used by the district; (2) a copy of the blank Language Preference form. Provide this documentation through the WBMS by October 31, 2011. Excel Academy will provide the results of a record review from a sample of students at each grade level (minimum of 3 per level) for evidence that 1) the parents' language preference form is signed and in the student record; 2) all documents, including progress reports, are translated in the parents' preferred language. Please indicate the total number of records reviewed and the number of records that demonstrated that 1) the signed Language Preference form was in the student record; and 2) all documents, including progress reports, were translated in the parents' preferred language. If continued noncompliance was identified, please indicate the specific MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 9 corrective action taken to address the noncompliance. Provide a detailed summary of the district?s record review, including student?s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district's plan to remedy the non-compliance if applicable. Please provide the results of the student record review by January 16, 2012. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 10/31/2011 01/16/2012 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 10 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 18A IEP development and content Partially Implemented Department CPR Findings: Student record review demonstrated that the school’s IEP format does not include the Present Levels of Educational Performance B (PLEP B) page of the IEP. In addition, student records and staff interviews indicated that the IEP chairperson develops the IEP before the meeting to determine the initial eligibility of the student. Description of Corrective Action: 1. The Director of Special Education will review the IEP format and content with the Learning Specialists, specifically reviewing the difference between the Present Levels of Educational Performance sections A and B. The Director of Special Education will emphasize that this section must always be completed. 2. Learning Specialists will complete the ED 1 form with the Team to determine eligibility at the Team meeting before developing the IEP. Anticipated Results: 1. The IEPs created by Excel Academy will always include the Present Levels of Educational Performance B (PLEP B) page of the IEP. 2. The Team will complete the ED 1 form together at the Team Meeting to determine eligibility before an IEP is developed. Title/Role(s) of responsible Persons: Expected Date of The Director of Special Education and the Learning Specialists Completion: 10/14/2011 Evidence of Completion of the Corrective Action: 1. All IEPs created by Excel Academy will include a completed PLEP B page. 2. Team Meeting notes indicate that all Team members participated in the completion of the ED 1 form. Then, if determined to be eligible, Team Meeting notes indicate that all Team members participated in the development of the IEP. Description of Internal Monitoring Procedures: 1. The Director of Special Education will review student records once every semester to ensure that all sections of the IEP, including the PLEP B page, have been completed, and report to the Administrative Team. 2. The Director of Special Education will review student records once every semester to ensure that Team Meeting notes indicate that all Team members participated in the completion of the ED 1 form. Then, if determined to be eligible, Team Meeting notes indicate that all Team members participated in the development of the IEP, and report to the Administrative Team. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 18A IEP development and content Corrective Action Plan Status: Approved Status Date: 09/16/2011 Basis for Partial Approval or Disapproval: The district's proposed corrective actions for addresssing Present Levels of Education Performance (PLEP) A and B are accepted. Please note that simply stating "See PLEP A" on the PLEP B is not considering adequate. Unlike the PLEP A, which specifically addresses student needs in general curricular areas, the PLEP B addresses other educational needs, such as language needs, age-related MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 11 concerns, and behavior needs. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide documentation from the training with Learning Specialists on completing the PLEP A and PLEP B and on ensuring that the ED 1 is filled out with the entire IEP Team to determine eligibility. Provide this documentation through the WBMS by October 31, 2011. Excel Academy will provide the results of a record review from a sample of students at each grade level (minimum of 3 per level) to ensure that 1) both the PLEP A and PLEP B are appropriately completed, and 2) the ED 1 has been completed at the Team with the entire Team. Please indicate the total number of records reviewed and the number of records that demonstrated that 1) both the PLEP A and PLEP B are appropriately completed, and 2) the ED 1 has been completed at the Team with the entire Team. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district?s record review, including student?s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district's plan to remedy the non-compliance if applicable. Please provide the results of the student record review by January 16, 2012. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 10/31/2011 01/16/2012 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 12 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 19 Extended evaluation Partially Implemented Department CPR Findings: The student record review determined that the school initiated extended evaluations without convening an IEP Team meeting to consider the previous assessment results. Additionally, the record review and interviews demonstrated that following a finding of no eligibility, IEP Team chairs initiated an extended evaluation to include Educational Assessments and other assessments not provided during the initial evaluation process. Description of Corrective Action: 1. The Director of Special Education will conduct a training for Learning Specialists on the extended evaluation process. The Director of Special Education will clarify that the school will only initiate extended evaluations after the Team has met to consider the previous assessment results. 2. Learning Specialists will complete all required assessments during the evaluation period (See Excel Academy?s Corrective Action Plan for Criterion SE 2). Anticipated Results: 1. The school will only initiate extended evaluations after the IEP Team has met to consider the previous assessment results. 2. Learning Specialists will complete all required assessments during the evaluation period (See Excel Academy?s Corrective Action Plan for Criterion SE 2). Title/Role(s) of responsible Persons: Expected Date of The Director of Special Education and the Learning Specialists Completion: 10/21/2011 Evidence of Completion of the Corrective Action: 1. Department meeting agenda, training materials, attendance sheet. 2. Attendance sheets that indicate the Team has met prior to any extended evaluations. Description of Internal Monitoring Procedures: 1. The Director of Special Education will review student records to ensure that the Team has met prior to any extended evaluations and report to the Administrative Team. 2. The Director of Special Education will also review student records for completion and accuracy once every semester and report to the Administrative Team. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 19 Extended evaluation Corrective Action Plan Status: Approved Status Date: 09/16/2011 Basis for Partial Approval or Disapproval: Please note that extended evaluations are generally initiated during the initial or reevaluation Team meeting, once all consented-to assessments have been reviewed and the Team believes that additional information is necessary to develop an appropriate IEP. This decision is made with the Team and the parents. Required assessments such as the Educational Assessments A/B or observations for student suspected of having a learning disability must be included on the initial consent to evaluate form; extended evaluations are not for completing previous evaluations or for providing required assessments after the initial Team has met. When an extended evaluation is proposed during the Team meeting, the Team Chair should indicate that an extended evaluation was recommended on the Team summary notes and on the district's Notice of Proposed District Action (N1), and that consent was MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 13 initiated or obtained from the parent. The district has 40 days (approximately 8 weeks) to complete the additional assessments and reconvene the Team to consider the additional information. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide the meeting agenda, training materials, and attendance sheet for the training on extended evaluations to the ESE by October 31, 2011. Excel Academy will provide the results of a record review for all students who have had an extended evaluation POST training, to ensure that extended evaluations are 1) initiated during the Team meeting; 2) recommend additional assessments to provide additional information; and 3) are documented on the Team notes and N1. Please indicate the total number of records reviewed and the number of records that demonstrated that extended evaluations are 1) initiated during the Team meeting; 2) recommend assessments to provide additional information; and 3) are documented on the Team notes and N1. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district?s record review, including student?s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district's plan to remedy the non-compliance if applicable. Please provide the results of the student record review by January 16, 2012. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 10/31/2011 01/16/2012 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 14 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 20 Least restrictive program selected Partially Implemented Department CPR Findings: The student record review indicated that the non-participation justification statement in IEPs does not state why a student’s removal is critical to the student’s progress. Description of Corrective Action: The Director of Special Education will review the IEP format and content with the Learning Specialists, specifically reviewing the completion of the non-participation justification statements. The Director of Special Education will emphasize that Learning Specialists must explain why removal is critical to the student?s progress. Anticipated Results: All IEPs created by Excel Academy for students who require removal from the general education classroom will include a non-participation justification statement that explains why the student?s removal is essential to the student?s progress. Title/Role(s) of responsible Persons: Expected Date of The Director of Special Education and the Learning Specialists Completion: 10/14/2011 Evidence of Completion of the Corrective Action: 1. Department meeting agenda, training materials, attendance sheet 2. All IEPs created by Excel Academy for students who require removal from the general education classroom will include a non-participation justification statement that explains why the student?s removal is critical to the student?s progress. Description of Internal Monitoring Procedures: The Director of Special Education will review student records once every semester to ensure that all IEPs created by Excel Academy for students who require removal from the general education classroom will include a non-participation justification statement that explains why the student?s removal is critical to the student?s progress. The Director will report findings to the Administrative Team. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 20 Least restrictive program selected Corrective Action Plan Status: Approved Status Date: 09/16/2011 Basis for Partial Approval or Disapproval: Please note that while Excel Academy's IEP non-participation justification statements were comprehensive, they must also answer specifically why students removal from the general education setting is required to make progress. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide the meeting agenda, training materials, and attendance sheet for the training to Learning Specialists on non-participation justification statements to the DESE by October 31, 2011. Excel Academy will provide the results of a record review from a sample of students at each grade level (minimum of 3 per level) for evidence that non-participation justification statements answer why removal from the general education setting is critical to student progress. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 15 Please indicate the total number of records reviewed and the number of records that demonstrated that non-participation justification statements answer why removal from the general education setting is critical to student progress. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district?s record review, including student?s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district's plan to remedy the non-compliance if applicable. Please provide the results of the student record review by January 16, 2012. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 10/31/2011 01/16/2012 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 16 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 24 Notice to parent regarding proposal or refusal to initiate or Partially Implemented change the identification, evaluation, or educational placement of the child or the provision of FAPE Department CPR Findings: According to the student record review, when the school's Child Study Team recommends an evaluation, the consent to evaluate form is not consistently sent to parents within five days. Description of Corrective Action: 1. At a training on 10/14 the Director of Special Education will re-teach the Learning Specialists that when the Child Study Team (CST) refers a student for evaluation, the evaluation consent forms must be sent to families within five working days of the CST 2 meeting. 2. The Director of Special Education to send electronic reminder of evaluation timeline to Learning Specialists. Anticipated Results: When the Child Study Team (CST) refers a student for evaluation, the evaluation consent forms will be sent to families within five working days of the CST 2 meeting. Title/Role(s) of responsible Persons: Expected Date of The Director of Special Education Completion: 10/14/2011 Evidence of Completion of the Corrective Action: 1. Department meeting agenda, training materials, attendance sheet 2. Soft copy of reminder e-mail 3. Tracking Communication Forms indicate the evaluation consent form was sent within five working days. Description of Internal Monitoring Procedures: The Director of Special Education will review student records once every semester to ensure that the appropriate timeline has been followed, and report to the Administrative Team. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 24 Notice to parent regarding Status Date: 09/16/2011 proposal or refusal to initiate or change the identification, evaluation, or educational placement of the child or the provision of FAPE Basis for Partial Approval or Disapproval: The district's proposed corrective action is accepted. Department Order of Corrective Action: Required Elements of Progress Report(s): Please provide the meeting agenda, training materials, and attendance sheet for the training to Learning Specialists on ensuring that consent to evaluate forms are sent to parents within five days of the CST's recommendation to evaluate a student, to the DESE by October 31, 2011. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 17 Excel Academy will provide the results of a record review from a sample of students whose evaluation was recommended by the CST (minimum of 3 per level) for evidence that a consent to evaluate form was sent to parents within five days of the CST recommendation. Please indicate the total number of records reviewed and the number of records that demonstrated that a consent to evaluate form was sent to parents within five days of the CST recommendation. If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district?s record review, including student?s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district's plan to remedy the non-compliance if applicable. Please provide the results of the student record review by January 16, 2012. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 10/31/2011 01/16/2012 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 18 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 26 Parent participation in meetings Partially Implemented Department CPR Findings: According to student record review and staff interviews,  when parents are not in attendance at IEP Team meetings, there is no evidence in the file to demonstrate that the school made multiple attempts to include the parents at the IEP Team meeting. Description of Corrective Action: 1. At the 10/21 department meeting, the Director of Special Education will train Learning Specialists to ensure parents are included in IEP meetings. 2. Learning Specialists will do everything possible to schedule meeting dates and times that are convenient for parents. Learning Specialists will document these attempts in the Tracking Communication file found in the student?s folder on the Shared Drive. Anticipated Results: Excel Learning Specialists will do everything possible to set meeting dates and times that are convenient for parents. Parents will participate in all Team Meetings. Title/Role(s) of responsible Persons: Expected Date of The Director of Special Education and the Learning Specialists Completion: 10/21/2011 Evidence of Completion of the Corrective Action: 1. Department meeting agenda, training materials, attendance sheet 2. Tracking Communication page logs all attempts by Learning Specialists to involve parent in a Team meeting. 3. Excusal form has been completed if parent is unable to attend. Excusal form with parent input shared with Team during the meeting and kept in student?s file. Description of Internal Monitoring Procedures: The Director of Special Education will review student records once every semester to ensure that parents are involved in the Team Meetings and Learning Specialists have done everything possible to set meeting dates and times that are convenient for parents. Director will report findings to the Administrative team. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 26 Parent participation in meetings Corrective Action Plan Status: Approved Status Date: 09/16/2011 Basis for Partial Approval or Disapproval: Please note that an Excusal Form for parents is not necessary. However, the district should ensure that Learning Specialists have documented on the Meeting Invitation that Team meetings were rescheduled at least the number of times deemed appropriate by Excel Academy's special education administrator and that alternative forms of meeting are offered to ensure parental input in development of the IEP. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide documentation from the October 21, 2011 department meeting with Learning Specialists on ensuring the participation of parents in IEP meetings, including emphasizing use of phone conferencing as an alternative to delaying the meetings. Additionally, provide the guidelines given to Learning Specialists on how many times to re-schedule MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 19 before proceeding to develop the IEP without parent involvement. Both phone conferencing and proceeding without the parent should be documented in the IEP Team Summary and the N1 (Notice of Proposed District Action). Provide this documentation through the WBMS by October 31, 2011. Excel Academy will provide the results of a record review from a sample of students at each grade level (minimum of 3 per level) with initial evaluations or re-evaluations scheduled post-training for compliance with alternative forms of parent attendance or rescheduling Team meetings to include parents. Please indicate the total number of records reviewed and the number of records that demonstrated that 1) IEP development Teams were re-scheduled and successfully included parent participation; or 2) parents were included in IEP development during the Team meeting via phone conferencing in lieu of re-scheduling the meeting. Provide a detailed summary of the district's record review, including student?s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district's plan to remedy the non-compliance if applicable. Please provide the results of the student record review by January 16, 2012. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 10/31/2011 01/16/2012 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 20 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 29 Communications are in English and primary language of Partially Implemented home Department CPR Findings: The student record review determined that progress reports in student files are not translated into the parent’s primary language. Description of Corrective Action: 1. The school will use a highly qualified translation service to translate all notices, including progress reports. 2. Every year, the parents of special education students sign a ?Language Preference? form, which allows parents to indicate their preferred language for oral and written communication from the Special Education Department. Anticipated Results: Families will always receive communications in the preferred language indicated on the Language Preference Form. Title/Role(s) of responsible Persons: Expected Date of The Director of Special Education and the Learning Specialists Completion: 09/23/2011 Evidence of Completion of the Corrective Action: 1. Soft copies of correspondences with translation companies and translated documents. 2. Completed language preference form. Description of Internal Monitoring Procedures: The Director of Special Education will review student records once every semester to ensure a language preference form has been completed and that communication has occurred in the language indicated on the preference form. The Director will then report findings to the Administrative Team. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 29 Communications are in English and Status Date: 09/16/2011 primary language of home Basis for Partial Approval or Disapproval: See ESE comments under SE 13, Progress Reports and Content. Department Order of Corrective Action: Required Elements of Progress Report(s): See ESE requirements under SE 13, Progress Reports and Content. Progress Report Due Date(s): 10/31/2011 01/16/2012 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 21 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 33 Involvement in the general curriculum Partially Implemented Department CPR Findings: Please see SE 8. Description of Corrective Action: 1. In the Fall of 2011 an excusal process was created by the Learning Specialists to excuse Team members who are unable to attend the Team meeting. All Team members involved in the education of a student with an IEP at Excel Academy are asked for a written narrative describing a student?s strengths and weaknesses, concerns, and goals so that information can be included within the IEP. If a Team member is unable to attend a Team meeting, contact is made with the parent before the meeting begins to seek permission to excuse the staff member, which will be documented in our tracking communication page located in the student files on the shared drive. An excusal form is then used at the meeting to seek written consent from the parent. At that time, the written documentation that the staff member had previously provided is attached. All documentation is then included within the students? file. 2. Paraprofessionals will not be permitted to chair IEP meetings. IEP meetings will be chaired only by qualified individuals. Anticipated Results: 1. All required staff members, including all general education teachers, will attend IEP meetings. When necessary staff members are not able to attend, the school will properly implement the excusal process. 2. Team meetings will only be chaired by qualified professionals. Title/Role(s) of responsible Persons: Expected Date of The Director of Special Education and the Learning Specialists Completion: 10/21/2011 Evidence of Completion of the Corrective Action: 1. Attendance sheets with signatures and excusal forms attached for those not in attendance. 2. Certification, licensure, progress towards licensure of Learning Specialists documented and on file with human resources. Description of Internal Monitoring Procedures: 1. The Director of Special Education will review student records to ensure that all Team members were in attendance at Team meetings or excusal forms are present in student files for Team members not in attendance, and report to the Administrative Team. 2. The Administrative Team will document and ensure proper certification, licensure, or progress towards licensure of Learning Specialists. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 33 Involvement in the general Status Date: 09/16/2011 curriculum Basis for Partial Approval or Disapproval: See ESE comments for SE 8, Team Composition and Attendance. Department Order of Corrective Action: Required Elements of Progress Report(s): See ESE requirements for SE 8, Team Composition and Attendance. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 22 Progress Report Due Date(s): 10/31/2011 01/16/2012 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 23 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 35 Assistive technology: specialized materials and equipment Partially Implemented Department CPR Findings: According to parent surveys, IEP Teams do not consistently consider assistive technology needs for each eligible student when developing the IEP. Description of Corrective Action: The Director of Special Education retrains the Learning Specialists on the IEP format and content, specifically reviewing how Team members should discuss and consider assistive technology when developing a child?s IEP. Anticipated Results: The Team will discuss and consider whether or not a student requires assistive technology when developing a child?s IEP. Title/Role(s) of responsible Persons: Expected Date of The Director of Special Education and the Learning Specialists Completion: 09/23/2011 Evidence of Completion of the Corrective Action: 1. Department meeting agenda, training materials, attendance sheet 2. Team meeting notes (kept in student?s file) indicate that assistive technology needs were discussed and considered. Description of Internal Monitoring Procedures: The Director of Special Education will review student records once every semester to ensure assistive technology needs were discussed and considered during Team meeting. The Director will report findings to the Administrative Team. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 35 Assistive technology: specialized Status Date: 09/16/2011 materials and equipment Basis for Partial Approval or Disapproval: The district's proposed corrective actions are accepted. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide documentation of the training materials for consideration of assistive technology (AT) during the IEP development process and how to document that consideration on Team summary notes for Excel Academy's Learning Specialists. Provide this documentation through the WBMS by October 31, 2011. Excel Academy will provide the results of a record review from a sample of students at each grade level (minimum of 3 per level) to ensure that 1) assistive technology is considered during IEP development meetings; 2) the consideration of AT is documented on the Team summary notes. Please indicate the total number of records reviewed and the number of records that demonstrated 1) assistive technology is considered during IEP development meetings; 2) the consideration of AT is documented on the Team summary notes. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 24 If continued noncompliance was identified, please indicate the specific corrective action taken to address the noncompliance. Provide a detailed summary of the district?s record review, including student?s grade level; method of determination; and the results of the review. Include: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district's plan to remedy the non-compliance if applicable. Please provide the results of the student record review by January 16, 2012. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): 10/31/2011 01/16/2012 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 25 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW EXCEL ACADEMY CHARTER SCHOOL Corrective Action Plan Forms Program Area: English Learner Education Prepared by: Shannon Coyle, ELL Program Manager, Excel Academy Charter School CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report to the school or district. Mandatory One-Year Compliance Date: August 13, 2012 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 5 Program Placement and Rating: Partially Implemented Structure Department CPR Finding: Excel Academy Charter school is a low incident district that provides services to middle school children in grades 5 - 8. The district had four ELLs enrolled whose level of English proficiency spanned levels 3 to 5. No student was placed in levels 1-2. Since the onsite visit the number of ELLs has grown. The Department’s SIMS data base shows eight English language learners (ELLs) enrolled. The students’ English proficiency levels are as follows: one student is in level 3, three in level 4, and three in level 5. The district is using an ESL curriculum that is aligned with the English Language Proficiency Benchmarks and Outcomes (ELPBO). (See also letter sent with this draft report regarding phasing out the ELPBO). Content instruction is based on the appropriate Massachusetts Curriculum Framework; however, ELE students are not receiving sheltered content instruction as none of the teachers have completed all of the required categories of SEI professional development focused on the skills and knowledge for sheltering instruction, as described in the Commissioner’s Memorandum of June 2004. See also ELE 15 for additional comments. Because the majority of teachers have not completed the four required categories of SEI professional development focused on the skills and knowledge necessary for sheltering instruction, as described in the Commissioner’s Memorandum of June 2004, the Department concludes that the district does not yet have an ELE program that is consistent with Chapter 71A. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 26 Narrative Description of Corrective Action: (See also ELE 15) A meeting between the ELL Program Manager and Dean of Administration will be held to discuss long term plans to provide SEI training for all teachers including scheduling, budgeting, and contingency planning for yearly turnover of staff to be brought up to date. The ELL Program Manager will inform the Dean of the most recent information available from OLAAA concerning changes to the protocol for SEI trainings. The ELL program manager will create a chart identifying teachers that have been trained and in what category they are certified and need to be certified (this will be a permanent and living document and reflect the latest regulatory changes). The ELL team will send a member to OLAAA meetings concerning implementation of the upcoming RETELL Initiative (changes to the current SEI model regulations including teacher training) in order to better understand how teachers will need to be trained. Taking into consideration changes to the SEI training regulations, arrangements to fulfill the trainings required will be made by scheduling all necessary trainings with certified providers as they become available. Any dates that are scheduled for all-staff / in-school trainings will be written into the school year 2012-2013 calendar as PD (professional development) days. Any dates that are scheduled for out of school trainings for individuals or small groups of teachers will be allotted as PD hours for said teachers and appropriate substitutes will be arranged. A calendar of all trainings will be created and shared with affected teachers. A meeting of the ELL team and appropriate administrators will convene to discuss and design a protocol using the most recent information on implementation from OLAAA for expeditiously training newly hired teachers who do not have SEI training . Title/Role of Person(s) Responsible for Implementation: Katie Dankleff, Director of Network Operations Expected Date of Completion for Each Corrective Action Activity: - meeting between ELL Program Manager and Dean of Administration by March 22, 2012 - staff training history chart to be created by May 31, 2012 - schedule trainings of current staff by August 31, 2012 or as available according to new regulations from OLAAA - all current staff to complete trainings by February 21, 2013 or as is feasible according to new regulations from OLAAA - protocol for training new staff to be created by January 31, 2013 provided all new regulations and trainings have been determined by OLAAA MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 27 Evidence of Completion of the Corrective Action: - notes from ELL Program Manager and Dean of Administration meeting - notes from ELL team attendance at OLAAA meetings - documents listed above: teacher training chart, calendar of trainings, protocol for new hires - teacher training certifications used to update teacher training chart listed under above mentioned documents Description of Internal Monitoring Procedures: - review and approval of planning documents and training dates by the Dean of Administration and principal CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 5 Program Placement and Structure Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Not Applicable Department Order of Corrective Action: None Required Elements of Progress Report(s): Please provide the following to the Department by January 4, 2013. A new ESL/ELD curriculum, which should be aligned with all Massachusetts Curriculum Frameworks (e.g., English/Language Arts, mathematics, science, social studies) and the WIDA English language development standards. See http://www.wida.us/standards/eld.aspx. Evidence that all ELL students receive sufficient ESL instruction, consistent with the students’ levels of English proficiency and Department guidance (http://www.doe.mass.edu/mcas/mepa/2009/guidance.doc). Evidence that ELLs receive subject matter content that is based on the current Massachusetts Curriculum Frameworks in English/Language Arts, mathematics, science and social studies. Please provide the following by March 25, 2013: The district’s new ESL/ELD curriculum which should be aligned with all Massachusetts Curriculum Frameworks (e.g., English/Language Arts, mathematics, science, social studies) and the WIDA English language development standards. See http://www.wida.us/standards/eld.aspx. See also ELE 9. Progress Report Due Date(s): January 4, 2013 & March 25, 2013 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 28 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 6 Program Exit and Readiness Rating: Partially Implemented Department CPR Finding: The district uses appropriate re-designation criteria to exit students from the ELE program to the general education program. However, the district’s monitoring procedures of formerly limited English proficient students (FLEP) does not specify the length of time that students are monitored (the Department’s requirement is two years), nor does the district specify the type of support that is offered to the students during this two-year period. Narrative Description of Corrective Action: The previously reviewed and approved (not cited in this corrective action plan) documentation for ELE 13 (follow up support) addresses the comments made above. All below listed activities are currently and have been performed for each FLEP student. All students declared FLEP are monitored for two years following their declaration or through their graduation from Excel Academy whichever comes first. If a student fails to progress or shows any sign of needing support, the ELL program manager and/or ESL teacher will provide it. Grades The ELL program manager monitors the progress of FLEP students in their core academic courses electronically via Excel’s grading portal. If any FLEP student’s grades slip below 70 in any core academic course, the ELL program manager and/or the ESL teacher will provide support in the form of daily meetings with the student to support class work. The ELL program manager also works with the core subject teacher to make accommodations appropriate to the FLEP student’s needs. Six Week Assessments The ELL program manager also receives reports from LEP students’ six week assessments in core subject courses. If an FLEP student scores substantially below his/her peers on any given assessment s/he will be assigned to the remedial reading program taught by the ELL program manager. Teacher observations Core subject teachers are made aware of students’ status as FLEP and report to the ELL program manager any significant weaknesses that occur. The ELL program manager and/or ESL teacher then make targeted supports to address the particular need of the student. Inclusion In their first year in the general education classroom after being declared FLEP, teachers have available to them an ESL teacher to provide inclusion support on a daily basis to aid in the FLEP students’ access to the lesson. Title/Role of Person(s) Responsible for Implementation: Katie Dankleff, Director of Network Operations Expected Date of Completion for Each Corrective Action Activity: current and ongoing MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 29 Evidence of Completion of the Corrective Action: - All FLEP student files contain an ELD (English Language Development) data sheet which records grades, 6-week assessment results, other testing data (MCAS, MEPA etc.) and any interventions implemented. - ELD data sheets are maintained for the two years following initial FLEP designation. - All teachers interacting with an FLEP student are informed of students’ FLEP status and given a brief biography at the beginning of the school year for two years as part of an annual presentation to all teachers given by ELL specialists and learning specialists to orient them with incoming students who are LEP, FLEP or have IEPs or 504 plans. Description of Internal Monitoring Procedures: - principal periodically checks FLEP student files for up to date data recordings - principal periodically questions ELL specialists for anecdotal data on FLEP student status during regular meeting times to ensure ELL specialists are knowledgeable CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 6 Program Exit and Readiness Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Not Applicable Department Order of Corrective Action: None Required Elements of Progress Report(s): Please provide to the Department a revised Program Exist and Readiness Form(s), including monitoring procedures by January 4, 2013. Progress Report Due Date(s): January 4, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 9 Instructional Grouping Rating: Partially Implemented Department CPR Finding: The district did not specify if ELE students are grouped for ESL instruction, and if they are, what criteria is used to determine group placement (e.g. level of English proficiency, grade level, or a mixture of both). Narrative Description of Corrective Action: Students are grouped for ESL instruction. A mixture of grade level and English proficiency is used to determine grouping. When students of the same level of English proficiency are in the same grade they are grouped. When students of variant grades are at the same level of English proficiency, they are grouped and attend ESL (English language development or ELD) instruction during a time of day that is mutually available across the grade levels so as not to interfere with content area instruction. The ELD classes that are mixed grade level are grade level appropriate to all in attendance through topic choice and differentiation. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 30 Title/Role of Person(s) Responsible for Implementation: Katie Dankleff, Director of Network Operations Evidence of Completion of the Corrective Action: - student schedules - ELL specialist schedules - ELD curriculum and lesson plans Description of Internal Monitoring Procedures: - observation of instruction by principal Expected Date of Completion for Each Corrective Action Activity: current and ongoing CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 9 Instructional Grouping Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Not Applicable Department Order of Corrective Action: None Required Elements of Progress Report(s): Please provide to the Department the following by January 4, 2013. A list of student placements for all ELLs. See also ELE 5. Progress Report Due Date(s): See ELE 5. COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 15 Professional Development Rating: Partially Implemented Requirements Department CPR Finding: To date, most teachers (21/22), including academic content area teachers, have completed category 4 (Fall 2009), except for one, and 17 out of 22 teachers have completed category 1(Fall 2010). Excepting one teacher who completed category 3, all others have not completed both categories 2 and 3 (see letter sent with this draft report, regarding change in requirements for category 3). See also ELE 5. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 31 Narrative Description of Corrective Action: (See also ELE 5) A meeting between ELL Program Manager and Dean of Administration will be held to discuss long term plans to provide SEI training for all teachers including scheduling, budgeting, and contingency planning for yearly turnover of staff to be brought up to date. The ELL Program Manager will inform the Dean of the most recent information available from OLAAA concerning changes to the protocol for SEI trainings. The ELL program manager will create a chart identifying teachers that have been trained and in what category they are certified and need to be certified (this will be a permanent and living document). The ELL team will send a member to OLAAA meetings concerning implementation of the upcoming RETELL Initiative (changes to the current SEI regulations) in order to better understand how teachers will need to be trained. Taking into consideration changes to the SEI training regulations, arrangements to fulfill the trainings required will be made by scheduling all necessary trainings with certified providers as they become available. Any dates that are scheduled for all-staff / in-school trainings will be written into the school year 2012-2013 calendar as PD (professional development) days. Any dates that are scheduled for out of school trainings for individuals or small groups of teachers will be allotted as PD hours for said teachers and appropriate substitutes will be arranged. A calendar of all trainings will be created and shared with affected teachers. A meeting of the ELL team and appropriate administrators will convene to discuss and design a protocol using the most recent information on implementation from OLAAA for expeditiously training newly hired teachers who do not have SEI training . Title/Role of Person(s) Responsible for Implementation: Katie Dankleff, Director of Network Operations Expected Date of Completion for Each Corrective Action Activity: - meeting between ELL Program Manager and Dean of Administration by March 22, 2012 - staff training history chart to be created by May 31, 2012 - schedule trainings of current staff by August 31, 2012 or as available according to new regulations from OLAAA - all current staff to complete trainings by February 21, 2013 or as is feasible according to new regulations from OLAAA - protocol for training new staff to be created by January 31, 2013 provided all new regulations and trainings have been determined by OLAAA MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 32 Evidence of Completion of the Corrective Action: - notes from ELL Program Manager and Dean of Administration meeting - notes from ELL team attendance at OLAAA meetings - documents listed above: teacher training chart, calendar of trainings, protocol for new hires teacher training certifications used to update teacher training chart listed under above mentioned documents Description of Internal Monitoring Procedures: - review and approval of planning documents and training dates by the Dean of Administration and principal CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 15 Professional Development Requirements Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Not Applicable. Department Order of Corrective Action: None. Required Elements of Progress Report(s): See ELE 5. Progress Report Due Date(s): See ELE 5. RDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 17 Program Evaluation Rating: Partially Implemented Department CPR Finding: The document review and interviews with ELE staff indicated that the school has not conducted a formal programmatic evaluation of ELE services. The ELE coordinator and teacher(s) are evaluated individually, which includes feedback about the effectiveness of the program and success of students in developing English language skills. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 33 Narrative Description of Corrective Action: The ELL Program manager will submit an initial proposal for a protocol for evaluating the program to the ELL team and principal. This is in addition to the reviewed ELE 17 referenced above - teacher and curricular evaluations that occur now will continue to occur on a regular basis. The team will develop a calendar for meetings to exchange feedback and design a final draft protocol and to designate tasks around accomplishing the program evaluation goals. The proposed protocol for program evaluation is as follows: With the following two goals in mind: 1. all students with LEP related language needs are serviced and 2. all LEP students participate meaningfully in the mainstream educational program ; we will evaluate in the following ways: 1. A bi-annual meeting of the ELL team to be convened to analyze the following data points collected by the team as it is available in a spreadsheet on the whole LEP population and formulate any program changes that help achieve to above listed goals based on the outcomes: - MCAS data comparing LEP population to whole class by subject and grade level, also individual scores looking for growth - MEPA alternative individual scores looking for growth over time - promotion, retention and graduation rates looking for LEP population to match the whole class - college preparatory high school program matriculation rate looking for LEP population to match the whole class - program exit rates looking at the percentage of all LEP students are exited, for how long on average students stay in the program, and that they remain exited 2. A quarterly meeting of the ELL team to be convened or individual teachers to analyze the following data points collected on individual students by the team and logged in the ELD (English language development) data sheet (a currently kept record of grades, assessment results, schedules and other interventions) and in student files and formulate changes in curriculum and/or student placement and/or other interventions: - grades looking for positive growth and/or maintenance of personal best and relative symmetry to class average - ELD progress reports (currently filled out by ELL specialists quarterly alongside report cards rating language acquisition progress in listening, speaking, reading and writing in English based on DESE published expectations of the student’s level) looking for positive growth - work samples looking for objective mastery in ELD class course of study 3. On a 6 week basis, individual ELL specialists will analyze 6 week assessment (content area tests currently given to all students) data collected (currently done) on individual students via ANet (testing company) and re-teach concepts where students deviate from the class average ELL team will commence with gathering and logging and analyzing data in order to evaluate the effectiveness of its program. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 34 Title/Role of Person(s) Responsible for Implementation: Katie Dankleff, Director of Network Operations Expected Date of Completion for Each Corrective Action Activity: - initial proposal submitted by April 30, 2012 - calendar of meetings to design a final protocol of evaluation by April 30, 2012 - final program evaluation design by June 21, 2012 - commencement of evaluation procedures August 27, 2012 Evidence of Completion of the Corrective Action: - written protocol approved by the team and principal - logged data on whole LEP population - logged data , progress reports and work samples of individual students - notes from analysis meetings Description of Internal Monitoring Procedures: - periodic review of evidential records by the principal - attendance at analysis meetings by the principal CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 17 Program Evaluation Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action : None Required Elements of Progress Report(s): Please submit the district’s most recent ELL program evaluation report by January 4, 2013. Progress Report Due Date(s): January 4, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 18 Records of LEP Students Rating: Partially Implemented Department CPR Finding: The student record review determined that student files lacked a signature cover sheet for documenting access to students’ information. Additionally, LAS score sheets with multiple student names and scoring results were found in individual student files. The record review also indicated that annual notification letters were not consistently in student files. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 35 Narrative Description of Corrective Action: The ELL program manager will send a memo to the whole ELL team to emphasize appropriate and necessary components of student files namely those cited above: - annual notification letter - LAS Links score reports - signature cover sheet The ELL team will designate tasks to rectify the above cited inconsistencies in student files, namely: - creation of a signature cover sheet for each student file - creation of a form for future LAS Links reporting Members of the ELL team will complete their designated compliance task as decided in the aforementioned meeting and update current student files. The ELL team will ensure annual updates to student files by carefully using both the signature cover sheet listed above and the currently utilized contents cover sheet in each student file which lists DESE requirements per ELE 18 – this cover sheet will be initialed by the teacher/administrator as they add a required document to the file for all LEP students and for the two years that follow FLEP student designation. Title/Role of Person(s) Responsible for Implementation: Katie Dankleff, Director of Operations Expected Date of Completion for Each Corrective Action Activity: - memo to be sent by April 31, 2012 - current files to be updated/corrected by May 31, 2012 and on an on-going basis Evidence of Completion of the Corrective Action: Wholly compliant student files Description of Internal Monitoring Procedures: The principal will periodically review LEP and FLEP files looking for the contents cover sheet to be complete where appropriate and to match documents found in the files. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 18 Records of ELE Students Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: None Department Order of Corrective Action: None Required Elements of Progress Report(s): Please submit the ELE staff memo that identifies the need to include annual notification letters, LAS Links score reports, and signature cover sheets in student files. Please submit this documentation to the DESE by January 4, 2013. Following implementation of the corrective actions outlined in the April 31, 2012 staff memo, the district will conduct and report the results of an internal review of student records. Report the number of ELL student records reviewed, the number that contained annual notification letters, LAS Links score reports, and signature cover sheets. For all records not in compliance provide the results of a root cause analysis of the non-compliance; and the specific corrective actions taken by the district to remedy any identified noncompliance. The results of this internal review are due March 25, 2013. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 36 *Please note that when monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s). Progress Report Due Date(s): January 4, 2013 & March 25, 2013 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Excel Academy Charter (District) CPR Corrective Action Plan 37