MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION Program Quality Assurance Services COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Charter School or District: Essex Agricultural Technical CPR Onsite Year: 2012-2013 Program Area: Special Education All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report dated 09/06/2013. Mandatory One-Year Compliance Date: 09/06/2014 Summary of Required Corrective Action Plans in this Report Criterion SE 14 Criterion Title Review and revision of IEPs CR 7 Information to be translated into languages other than English Use of physical restraint on any student enrolled in a publicly-funded education program CR 17A CPR Rating Partially Implemented Partially Implemented Partially Implemented COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 14 Review and revision of IEPs Partially Implemented Department CPR Findings: Student record review indicated that the district does not always convene the Team annually, on or before the IEP's anniversary date to review, revise, or develop an IEP or refer the student for a re-evaluation. Description of Corrective Action: The Special Education Administrator will provide training to the Special Education Liaisons and the Special Education Department Secretary regarding the regulation that on or before the IEP's anniversary date, a Team must be convened for the purpose of reviewing, revising or developing an IEP or to refer the student for re-evaluation. This will occur by 10/31/2013. Subsequent to the training and after some months have elapsed, an internal record review will be conducted by the Special Education Administrator to ensure compliance. The review will occur between 10/31/2013 and 01/15/2014 with the results being reported by 01/31/2014. Title/Role(s) of Responsible Persons: Expected Date of Special Education Administrator Completion: 01/31/2014 Evidence of Completion of the Corrective Action: Evidence of the training will include an agenda and an attendance sheet from the training. Evidence of the internal record review will include the number of records reviewed with student's initials noted, the number of reviewed records that are in compliance, the number of reviewed records that are out of compliance. Description of Internal Monitoring Procedures: The internal record review will include an examination of ten (10) student records. Student's initials will be noted, as will the number of reviewed records that are in compliance and the number of reviewed records that are out of compliance. If there are records that are out of compliance, the reasons for that will be stated and a root cause analysis will be performed. A response will then be formulated that addresses the cause that was discovered. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 14 Review and revision of IEPs Corrective Action Plan Status: Approved Status Date: 10/16/2013 Basis for Status Decision: Department Order of Corrective Action: Required Elements of Progress Report(s): Provide evidence of the staff training conducted regarding annual review of IEPs on or before the IEPs' anniversary date, including signed attendance sheets (with name and role), agenda and training materials. This progress report is due December 2, 2013. Conduct an internal record review, post training, for evidence that IEP Teams convene annual review meetings on or before the anniversary date of the current IEP. Please provide an analysis of this review to include the number of records reviewed and the number of records found to be non-compliant. For any records found to be non-compliant, please provide an analysis of the root cause(s) and any steps that the district has taken to remedy the non-compliance. This progress report is due March 31, 2014. *Please note MA Department of Elementary & Secondary Education, Program Quality Assurance Services Essex Agricultural Technical CPR Corrective Action Plan 2 that when monitoring, the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the record review; b) Date of the review; c) Name of the person(s) who conducted the review, their role(s), and their signatures. Progress Report Due Date(s): 12/02/2013 03/31/2014 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Essex Agricultural Technical CPR Corrective Action Plan 3 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 7 Information to be translated into languages other than Partially Implemented English Department CPR Findings: A review of documents indicated that the district has translated many of its important school documents and developed a system for determining which parents and guardians with limited English skills require translated material. However, interviews with school administrators indicate that the student handbook and code of conduct have not been translated for parents who require translations. Description of Corrective Action: The 2013-2014 Student Handbook front cover includes statements in both Spanish and Portuguese informing all parents/guardians who to contact for a translated handbook. Both the contact persons phone numbers and email addresses are present. The student handbook was disseminated to all students on their first academic day by a designated department and reviewed by their teacher. The procedure is then for students to bring the student handbook home and review it with their parents/guardians. Both student and parent/guardian are then required to sign the read receipt on the last page acknowledging that they have received and read a copy of the handbook. Students then bring in the read receipt to their academic teacher for a homework grade. Title/Role(s) of Responsible Persons: Expected Date of Completion: Title IX Coordinator 01/31/2014 Evidence of Completion of the Corrective Action: Statement included with the 2013-2014 Student Handbook in both Spanish and Portuguese informing all parents/guardians who to contact for a translated handbook. Receipt of student handbook signed by both parent/guardian and student acknowledging the receipt of the student handbook. Description of Internal Monitoring Procedures: The internal record review will include an updated record of what students have and have not turned in the homework assignment of the submission of the handbook read receipt. A record will be kept of who has contacted the school regarding receiving a translated copy. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: CR 7 Information to be translated into languages other than English Basis for Status Decision: Corrective Action Plan Status: Approved Status Date: 10/16/2013 Department Order of Corrective Action: Required Elements of Progress Report(s): Using the district's internal monitoring, please provide the number of requests for a translated handbook. Please also indicate the number of FLNE students/families among the group who did not submit the handbook read receipt. Submit this documentation by December 2, 2013. Progress Report Due Date(s): 12/02/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Essex Agricultural Technical CPR Corrective Action Plan 4 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 17A Use of physical restraint on any student enrolled in a Partially Implemented publicly-funded education program Department CPR Findings: Staff interviews and document review indicated that written procedures regarding implementation of physical restraint are not made available to parents. Description of Corrective Action: The 2013-2014 Student Handbook includes the physical restraint procedure for review by both students and parents/guardians on pages 29-30.The student handbook was disseminated to all students on their first academic day by a designated department and reviewed with them by their teacher. The procedure is then for students to bring the student handbook home and review it with their parents/guardians. Both student and parent/guardian are then required to sign the read receipt on the last page acknowledging that they have received and read a copy of the handbook. Students then bring in the read receipt to their academic teacher for a homework grade. Title/Role(s) of Responsible Persons: Expected Date of Title IX Coordinator Completion: 01/31/2014 Evidence of Completion of the Corrective Action: The 2013-2014 Student Handbook was disseminated to all students with the physical restraint procedure included. Receipt of student handbook signed by both parent/guardian and student acknowledging the receipt of the student handbook. Description of Internal Monitoring Procedures: The internal record review will include an updated record of what students have and have not turned in the homework assignment of the submission of the handbook read receipt. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: CR 17A Use of physical restraint on any student enrolled in a publicly-funded education program Basis for Status Decision: Corrective Action Plan Status: Approved Status Date: 10/16/2013 Department Order of Corrective Action: Required Elements of Progress Report(s): Provide a copy of or access to pages of 29-30 of the 2013-2014 Student Handbook by December 2, 2013. Progress Report Due Date(s): 12/02/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Essex Agricultural Technical CPR Corrective Action Plan 5 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW Charter School or District: Essex Agricultural and Technical High School Corrective Action Plan Forms Program Area: Career/Vocational Technical Education Prepared by: Joy White CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report to the school or district. Mandatory One-Year Compliance Date: September 2, 2014 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CVTE 14 Rating: Partially Implemented Department CPR Finding: A review of records and interviews indicate that there is an absence of a CORI policy related to the implementation of the Supervised Agricultural Experience (SAE). Narrative Description of Corrective Action: The district will require all employers an /or organizations that students doing SAE hours who are currently working with /or for to sign a form that states that the student will never work /be alone with anyone in the organization /business and will always be with 2 or more employees – if that will not be the case then we will have to do a CORI – We will design the letter and get it to all those students currently doing SAE hours with an organization/business. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Coop Coordinator and Corrective Action Activity: November 26, department chairs of vocational programs 2013 Evidence of Completion of the Corrective Action: The signed sheets from the employers /organizations and /or completed CORIs. Description of Internal Monitoring Procedures: We will maintain copies of the forms that the employers/organizations have signed. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CVTE-14 Status of Corrective Action: Approved Partially Approved MA Department of Elementary & Secondary Education, Program Quality Assurance Services Essex Agricultural Technical CPR Corrective Action Plan Disapproved 6 Basis for Partial Approval or Disapproval: N/A Department Order of Corrective Action: N/A Required Elements of Progress Report(s): The Department accepts the school’s corrective actions. Progress Report Due Date(s): No progress reporting is required. COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CVTE 20 Rating: Partially Implemented Department CPR Finding: A physical review of the facility indicates that not all instructional facilities and equipment used for career/vocational technical education meet current occupational standards. The Office for Career/Vocational Technical Education will send a Safety Survey Report, which includes details specific to each program, to Director-Principal White under separate cover. Narrative Description of Corrective Action: The Safety Survey Report Response Template for all safety was completed in March of 2013. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Farm/Facilities Manager Corrective Action Activity March 2013: Evidence of Completion of the Corrective Action: Letter sent to the district from the Safety Coordinator Dave Edmonds dated April 1, 2013 Description of Internal Monitoring Procedures: The Farm /Facilities manager is responsible for Monitoring all the entire facility daily CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CVTE-20 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: N/A Department Order of Corrective Action: N/A Required Elements of Progress Report(s): The Department accepts the school’s corrective actions. Progress Report Due Date(s): No progress reporting is required. COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CVTE 21 Rating: Partially Implemented MA Department of Elementary & Secondary Education, Program Quality Assurance Services Essex Agricultural Technical CPR Corrective Action Plan 7 Department CPR Finding: A physical review of the facility indicates that not all instructional facilities and equipment used for career/vocational technical education meet current occupational standards. The Office for Career/Vocational Technical Education will send a Safety Survey Report, which includes details specific to each program, to Director-Principal White under separate cover. Narrative Description of Corrective Action: Same as above – see CVTE 20 Title/Role of Person(s) Responsible for Implementation: Farm/Facilities Manager Expected Date of Completion for Each Corrective Action Activity: March 2013 Evidence of completion of the Corrective Action: Letter from Dave Edmonds dated April 1, 2013 Description of Internal Monitoring Procedures: over sight by the Farm /Facility Manager CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CVTE-21 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: N/A Department Order of Corrective Action: N/A Required Elements of Progress Report(s): The Department accepts the school’s corrective actions. Progress Report Due Date(s): No progress reporting is required. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Essex Agricultural Technical CPR Corrective Action Plan 8 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW Essex Agricultural Technical High School Corrective Action Plan Forms Program Area: English Learner Education Prepared by: Essex Agricultural & Technical High School CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 3- Initial Identification Rating: Partially Implemented Department CPR Finding: A review of documentation, student records, and staff interviews demonstrated that the district does not assess all incoming students whose home language is not English in the areas of reading, writing, speaking, and listening to identify students who may be English Language Learners. The district conducts a file review of these students’ records and a student interview to determine if an initial assessment in the four modalities is warranted. Narrative Description of Corrective Action: Using the Home Language survey sent to all incoming students the District will identify all students who have identified any language other than English on question 4, 5 or 7. These questions relate to language the child first learned and language spoken in the home. In addition to interviewing each student and conducting record reviews, we will assess language skills using the World class Instructional Design and Assessment Access Placement Test (W-APT). Our students will be tested in the first semester of the year; therefore will use the 6-8 grade assessment. Each test will be scored to determine ELL placement needs. Students who demonstrate a need for placement will receive letters to document the need and explain all options available to them in their native language. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Jennifer Skane, Assistant Corrective Action Activity: November 2013 Principal Evidence of Completion of the Corrective Action: Samples of Completed Score Sheets Description of Internal Monitoring Procedures: The District will continue to implement all policies as stated above. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Status of Corrective Action: Criterion: ELE 3- Initial Approved Partially Approved Disapproved Identification Basis for Partial Approval or Disapproval: The school identifies any student whose first language is not English (FLNE) by giving the Home Language Survey to all incoming freshmen. First semester ninth graders are assessed using the 6-8 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Essex Agricultural Technical CPR Corrective Action Plan 9 grades W-APT as recommended by WIDA. However, the district’s next steps do not clearly convey that students will receive sheltered content area instruction in English and English language instruction (ESL) appropriate for the students’ levels of English language proficiency prior to parent notification. Parents should be informed of the screening test results and the placement decisions no later than 30 days after the beginning of the school year or within two weeks if the student enrolls in the school district during the school year. However, the district’s obligation is to place students first, and then inform parents immediately thereafter. Unless the school has other English language programming, such as two-way bilingual classes or a transitional bi-lingual program, the district’s reference to “all options available” is potentially misleading. In addition, Ch. 71A does not require parent consent for program support. Department Order of Corrective Action: See required elements of progress report. Required Elements of Progress Report(s): Provide parent notification letters for students whose ACCESS proficiency level is Level 1 through Level 5. Provide the weekly schedule for each student whose English language proficiency level is between 1 (Entering) and 5 (Bridging), showing the amount of ESL support per week and the instructor’s name and ESL license number. This progress report is due May 30, 2014. Progress Report Due Date(s): May 30, 2014 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Essex Agricultural Technical CPR Corrective Action Plan 10