MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION Program Quality Assurance Services COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Charter School or District: Easton CPR Onsite Year: 2009-2010 Program Area: Special Education All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report dated 10/04/2010. Mandatory One-Year Compliance Date: 10/03/2011 Summary of Required Corrective Action Plans in this Report Criterion SE 1 SE 2 SE 3 Criterion Title Assessments are appropriately selected and interpreted for students referred for evaluation Required and optional assessments SE 12 Special requirements for determination of specific learning disability Timeline for determination of eligibility and provision of documentation to parent Frequency of re-evaluation SE 14 Review and revision of IEPs SE 29 Communications are in English and primary language of home SE 9 CPR Rating Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Criterion SE 32 Criterion Title Parent advisory council for special education SE 37 SE 41 Procedures for approved and unapproved out-of-district placements Age span requirements SE 51 Appropriate special education teacher licensure SE 52 Appropriate certifications/licenses or other credentials -related service providers Special education facilities and classrooms SE 55 CPR Rating Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 1 Assessments are appropriately selected and interpreted for Partially Implemented students referred for evaluation Department CPR Findings: Review of records, documentation and staff interviews indicated that tests are not always provided and administered in the language and form most likely to yield accurate information on what the student knows and can do academically, developmentally and functionally. Description of Corrective Action: District will contact other agencies in addition to Legal Language Services for individuals who can administer tests in the language and form most likely to yield accurate information on what the student knows and can do academically, developmentally and functionally. Anticipated Results: Tests will be provided and administered in the langauge and form most likely to yield accurate information on what the student knows and can do academically, developmentally, and functionally. Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly Conte Completion: Administrator of Special Education 10/03/2011 Assistant Superintendent Evidence of Completion of the Corrective Action: This will be completed by 10/03/2011. Description of Internal Monitoring Procedures: Administrator of Special Education, Assistant Superintendent and Team Chairs will review student records to be sure that tests are provided and administered in the language and form most likely to yield accurate information on what the student knows and cand od academicallly, developmentally, and functionally. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 1 Assessments are appropriately Status Date: 11/12/2010 selected and interpreted for students referred for evaluation Basis for Partial Approval or Disapproval: The district proposed obtaining the services of an agency or individuals who can administer tests in a language and form that will yield accurate information on what the student knows and can do academically, developmentally, and functionally. The district also proposed conducting a review of student records to determine whether the tests were provided and administered in the language and form that will yield accurate information on what the student knows and can do academically, developmentally, and functionally. Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 provide a list of agencies and/or individuals the district has contracted MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 3 with to provide testing in the language and form most likely to yield accurate information on what the student knows and can do academically, developmentally, and functionally. By June 27, 2011 provide the results of the review of a random sample of student records to determine whether the test(s) were provided and administered in the language and form that will yield accurate information on what the student knows and can do academically, developmentally and functionally. Include the number of student records reviewed for students who are limited English proficient, the number of student records in compliance and for all records not in compliance indicate the root cause of the noncompliance along with specific corrective action taken with regard to each record. The district will maintain the following documentation and make it available to the Department upon request: list of student names and grade levels for the records reviewed, date of the review, name(s) of person(s) who conducted the review with roles and signatures. Progress Report Due Date(s): 03/31/2011 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 4 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 2 Required and optional assessments Partially Implemented Department CPR Findings: Review of records indicated that Educational Assessment A, including a history of the student s educational progress in the general curriculum, was not always completed. Description of Corrective Action: Special Education Director will provide training for all principals, guidance counselors, and Team Chairs regarding completion of Form A. Anticipated Results: Training will be provided at cabinet meeting for principals by February 1, 2011. Training will be provided for middle and high school guidance counselors at each building by February 1, 2011. Training will be provided for Team Chairs by February 1, 2011. Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly M. Conte Completion: Administrator of Special Education 02/01/2011 Evidence of Completion of the Corrective Action: Copy of agenda, materials and signature sheets. Description of Internal Monitoring Procedures: Random records check by Administrator of Special Education. Special education secretaries will check for Form A when completed IEP packet is sent to special education office prior to IEP packet sent to parents. Team chairs will check IEP packet prior to sending it to special education office. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 2 Required and optional assessments Status Date: 11/12/2010 Basis for Partial Approval or Disapproval: The district proposed providing training regarding the requirements for the completion of Form A. The district also indicated that it would conduct a review of a random sample of student records to determine whether the Form A had been completed and was on file. Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 provide a copy of the Training Agenda, date(s) the training was conducted and the sign-in sheet with staff person's title/role. By June 27, 2011 provide a report of the results of the review of a random sample of student records to determine whether the Form A was completed and filed since the training. Include the number of student records reviewed, the number in compliance, for all records not in compliance indicate the root cause along with the specific corrective action taken with regard to each file. The district will maintain the following documentation and make it available to the Department upon request: list of student names and grade levels for the records MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 5 reviewed, date of the review, name(s) of person(s) who conducted the review with roles and signatures. Progress Report Due Date(s): 03/31/2011 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 6 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 3 Special requirements for determination of specific learning Partially Implemented disability Department CPR Findings: Review of records indicated that the Team s written determination as to whether or not the student has a specific learning disability was not always signed by the parent. Description of Corrective Action: Special Education Director will provide staff training for all special education staff reviewing procedures for determination of specific learning disability. Anticipated Results: School district will remediate this noncompliance by February 1, 2011. Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly Conte Completion: Administrator of Special Education 02/01/2011 Evidence of Completion of the Corrective Action: Training sessions with special education staff. Training sessions will be documented by copies of agendas, training materials and participant attendance sheets. Description of Internal Monitoring Procedures: Randon record reviews by special education administrator and support staff in special education office. Team Chairperson will be sure to obtain parent signature on all specific learning disabiliy forms. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 3 Special requirements for Status Date: 11/12/2010 determination of specific learning disability Basis for Partial Approval or Disapproval: The district proposed providing training for all special education staff regarding the requirements and procedures for the determination of specific learning disabilities. The district also indicated that it would conduct a review of a random sample of student records to determine whether the requirements, including parent signature, have been completed and are on file. Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 provide a copy of the Training Agenda, date(s) the training was conducted and the sign-in sheet with staff person's title/role. By June 27, 2011 provide a report of the results of the review of a random sample of student records to determine whether all the requirements including parent signature have been completed and are on file. Include the number of students evaluated and suspected of having a SLD since the training, the number of records in compliance and for all records not in compliance indicate the root cause(s) of the noncompliance and provide the specific corrective action taken with regard to each file. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 7 The district will maintain the following documentation and make it available to the Department upon request: list of student names and grade levels for the records reviewed, date of the review, name(s) of person(s) who conducted the review with roles and signatures. Progress Report Due Date(s): 03/31/2011 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 8 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 9 Timeline for determination of eligibility and provision of Partially Implemented documentation to parent Department CPR Findings: A review of student records indicated that within 45 school working days after receipt of the parent s written consent to an initial evaluation or a re-evaluation, the district does not consistently determine whether the student is eligible for special education and provide either the proposed IEP and placement or written explanation of the finding of no eligibility to the parent. Description of Corrective Action: Special Education Director will have training sessions with Team Chairs and Special Education staff to review policy and timelines regarding 45 school working days following receipt of the parents written consent to an initial evaluation or reevaluation to determine eligibility, provide IEP, placement or findings of no eligibility. Anticipated Results: Training sessions will be completed by February 1, 2011. Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly Conte Completion: Administrator of Special Education 02/01/2011 Evidence of Completion of the Corrective Action: Training sessions will be documented with agendas, signature sheets, and materials. Description of Internal Monitoring Procedures: Tracking systems, record reviews by Administrator of Special Education and support staff. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 9 Timeline for determination of Status Date: 11/12/2010 eligibility and provision of documentation to parent Basis for Partial Approval or Disapproval: The district proposed providing training for Team chairpersons and special education staff to review the 45 school working day timeline requirements to determine eligibility, and to provide an IEP, placement or a finding of no eligibility after the receipt of the parent's written consent to an initial evaluation or re-evaluation. The district also indicated that a tracking system will be developed and that it would conduct a review of a random sample of student records to determine whether the timelines have been met. Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 provide a copy of the Training Agenda, date(s) the training was conducted and the sign-in sheet with staff person's title/role. Provide a copy of the tracking system developed by the district. By June 27, 2011 provide a report of the results of the review of a random sample of student records to determine whether the 45 school working days timeline has been met. Include the number of records in which a Team meeting was held since the training, the MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 9 number of records in compliance, and for all records not in compliance indicate the root cause(s) of the noncompliance and the specific corrective action taken with regard to each file. The district will maintain the following documentation and make it available to the Department upon request: list of student names and grade levels for the records reviewed, date of the review, name(s) of person(s) who conducted the review with roles and signatures. Progress Report Due Date(s): 03/31/2011 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 10 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 12 Frequency of re-evaluation Partially Implemented Department CPR Findings: Review of student records indicated that re-evaluations were not always completed every three years, as required. Description of Corrective Action: Special Education Director will provide training sessions for all special education staff regarding required three year reevaluations. Anticipated Results: Training will be completed by February 1, 2011. Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly Conte Completion: Administrator of Special Education 02/01/2011 Evidence of Completion of the Corrective Action: Training sessions with agendas, signature sheets and materials. Description of Internal Monitoring Procedures: Internal monitoring process will include: samplings, record reviews, tracking system. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 12 Frequency of re-evaluation - Corrective Action Plan Status: Approved Status Date: 11/12/2010 Basis for Partial Approval or Disapproval: The district proposed providing training for all special education staff regarding the requirement of the three year timeline for re-evaluations. The district also indicated that a tracking system will be developed and that it will conduct a review of a random sample of student records to determine whether the re-evaluations have been conducted every three years. Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 provide a copy of the Training Agenda, date(s) the training was conducted and the sign-in sheet with staff person's title/role. By June 27, 2011 provide a report of the results of the review of a random sample of student records to determine whether the three year re-evaluation timeline has been met. Include the number of student records reviewed in which a re-evaluation was conducted since the training, the number in compliance, the root cause(s) of any noncompliance and the specific corrective action taken for any records out of compliance. The district will maintain the following documentation and make it available to the Department upon request: list of student names and grade levels for the records reviewed, date of the review, name(s) of person(s) who conducted the review with roles and signatures. Progress Report Due Date(s): 03/31/2011; 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 11 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 14 Review and revision of IEPs Partially Implemented Department CPR Findings: Review of the student records indicated that a Team meeting was not always held on or before the anniversary date of the IEP. Description of Corrective Action: Special Education Administrator will provide training sessions for all special education staff regarding timelines for annual review meeting with a reminder that meetings must always be held on or before the anniversary date of the IEP. Anticipated Results: Training sessions will be completed by February 1, 2011, Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly Conte Completion: Administrator of Special Education 02/01/2011 Evidence of Completion of the Corrective Action: Training sessions with agendas, signatures, and materials. Description of Internal Monitoring Procedures: Tracking system, record review by Team Chairs, Administrator of Special Education, and special education office support staff. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 14 Review and revision of IEPs - Corrective Action Plan Status: Approved Status Date: 11/12/2010 Basis for Partial Approval or Disapproval: The district proposed providing training for all special education staff regarding the requirement for conducting the Annual Review on or before the anniversary date of the IEP. The district also indicated that a tracking system will be developed and that it will conduct a review of a random sample of student records to determine whether the timeline for Annual Reviews has been met Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 provide a copy of the Training Agenda, date(s) the training was conducted and the sign-in sheet with staff person's title/role. Provide a copy of the tracking system developed by the district. By June 27, 2011 provide a report of the results of the review of a random sample of student records to determine whether the Annual Review timeline has been met. Include the records of students who have had a Team meeting since the training, the number in compliance, the root cause(s) for any records not in compliance and the specific corrective action taken with regard to each record. The district will maintain the following documentation and make it available to the Department upon request: list of student names and grade levels for the records reviewed, date of the review, name(s) of person(s) who conducted the review with roles MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 12 and signatures. Progress Report Due Date(s): 03/31/2011 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 13 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 29 Communications are in English and primary language of Partially Implemented home Department CPR Findings: Review of documents and staff interviews indicated that when parents are limited English proficient, communication is not in both English and the primary language of the home. Interviews also indicated that the interpreters used in fulfilling the requirements of this criterion are not familiar with special education procedures, programs and services, since a sibling or the student themselves are at times depended upon to be interpreters at Team meetings or parent conferences. Description of Corrective Action: Administrator of Special Education will be sure that all special education staff provide communication in English and the primary language of the home to those parents who are limied English proficient. The district will seek interpreters who are familair with special education procedures, programs and services. The district does contract with Legal Language Services and interpreters areprovided for testing, Team meetings and parent conferences. Anticipated Results: This noncompliance will be remediated by October 3, 2011. Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly Conte Completion: Administrator of Special Education 10/03/2011 Evidence of Completion of the Corrective Action: Training sessions with signature sheets, agendas, information on language services. Description of Internal Monitoring Procedures: Random sampling of cases will be monitored by Administrator of Special Education and Team Chairs. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 29 Communications are in English and Status Date: 11/12/2010 primary language of home Basis for Partial Approval or Disapproval: The district proposed ensuring that communications will occur in both English and the primary language of the home by contracting with Legal Language Services and other individuals who are familiar with special education procedures, programs and services, and can act as interpreters for Team meetings, parent conferences and other services as required. The district proposed providing training for staff regarding information on language services. The district also proposed conducting a review of student records to determine whether qualified interpreters were used when required. Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 provide a list of agencies and/or individuals contacted and willing to provide interpreting services along with evidence that they are knowledgeable regarding MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 14 special education procedures, programs and services. Provide a copy of the training agenda, training date(s) and the sign-in sheet with staff role/title. By June 27, 2011 provide the results of the review of student records conducted to determine whether the interpreter services were provided when appropriate. Include the number of records reviewed, the number in compliance, the root cause(s) of any noncompliance and the specific corrective action taken with regard to each record. Where an interpreter was needed, provide a list of students (the first and last initials), the name of the interpreter, the qualifications, the language and type of service. The district will maintain the following documentation and make it available to the Department upon request: list of student names and grade levels for the records reviewed, date of the review, name(s) of person(s) who conducted the review with roles and signatures. Progress Report Due Date(s): 03/31/2011 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 15 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 32 Parent advisory council for special education Partially Implemented Department CPR Findings: Interviews indicated that the parent advisory council (PAC) is not involved in advising the district on matters that pertain to the education and safety of students with disabilities and that the PAC does not meet regularly with school officials in order to participate in the planning, development and evaluation of the district's special education programs. Description of Corrective Action: Pac will be involved in advising the district on matters that pertain to the education and safety of students with disabilities. Administrator of Special Education will be sure that PAC meets with school officials in order to participate in the planning, develipment and evaluation the district's special education program. Anticipated Results: Pac will be involved in advising the district on matters that pertain to the education and safety of students with disabilities and evaluating special education programs by October 3, 2011. Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly Conte Completion: Administrator of Special Education 10/03/2011 Evidence of Completion of the Corrective Action: Meeting notices, agendas, signatures and materials. Description of Internal Monitoring Procedures: Review meeting schedules of agenda of administrators. Contact head of Pac with information. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 32 Parent advisory council for special Status Date: 11/12/2010 education Basis for Partial Approval or Disapproval: The district proposed meetings with the PAC in order to ensure their involvement in advising the district in matters pertaining to the education and safety of students with disabilities as well as participating in the planning, development and evaluation of the district's special education programs. Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 and again by June 27, 2011 provide the documentation regarding the meetings that took place between the PAC and school officials regarding matters pertaining to the education and safety of students with disabilities as well as participating in the planning, development and evaluation of the district's special education programs. The documentation should include meeting notices, agenda(s), meeting notes, the date(s) of the meetings and sign-in sheet(s) with the participant's title/role. Progress Report Due Date(s): 03/31/2011; 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 16 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 37 Procedures for approved and unapproved out-of-district Partially Implemented placements Department CPR Findings: Record review and staff interviews indicated that the district does not have written contracts with collaborative programs for students placed in out-of-district day programs. Description of Corrective Action: District sent contracts (09/02/2010) to out-of-district collaborative day programs. They have been returned and signed. Anticipated Results: Contracts have been signed. Easton corrected this previously based on exit interview in April 2010. Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly Conte Completion: Administrator of Special Education 09/02/2010 Evidence of Completion of the Corrective Action: Signed contracts between Easton and all day collaborative programs. Description of Internal Monitoring Procedures: Administrator of Special Education sent contracts and followed-up with schools to be sure they were signed. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 37 Procedures for approved and Status Date: 11/12/2010 unapproved out-of-district placements Basis for Partial Approval or Disapproval: The district has sent contracts to out-of-district collaborative programs, which have been returned and signed. Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 submit the list of the out-of-district collaborative programs in which students are placed along with copies of the signed contracts. Progress Report Due Date(s): 03/31/2011 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 17 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 41 Age span requirements Partially Implemented Department CPR Findings: Interviews indicated that the substantially separate program at the high school combines two classrooms for two periods per day, which results in an age span grouping that exceeds 48 months. The age range of the students during those instructional periods was 14-21 and the district did not submit a written request for approval of a wider age range to the Department. Description of Corrective Action: Special Education Administrator will provide training for high school special education staff regarding age range of students and need for a waiver if at any time during an insruction period the age span of the students exceeds 48 months. Anticipated Results: Training sessions will be completed by February 1, 2011. Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly Conte Completion: Administrator of Special Education 02/01/2011 Evidence of Completion of the Corrective Action: Training sessions, agendas, signature sheets, and materials. Description of Internal Monitoring Procedures: Administrator of Special Education and Team Chairperson at high school will monitor teacher's schedule. Currently the age range of the students in the substantially separate program is 14-18. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 41 Age span requirements - Corrective Action Plan Status: Approved Status Date: 11/12/2010 Basis for Partial Approval or Disapproval: The district indicated that the current non-compliance of an age span that exceeds 48 months was corrected. The district also indicated that it will ensure that the age span does not exceed 48 months by reviewing each teacher's schedule. Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 submit an internal review of the daily schedule of the specific substantially separate high school classroom to ensure that the ages of the students do not exceed 48 months. Progress Report Due Date(s): 03/31/2011 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 18 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 51 Appropriate special education teacher licensure Partially Implemented Department CPR Findings: Review of documentation and staff interviews indicated that not all special education staff at the high school are appropriately licensed in special education or on an approved waiver. Description of Corrective Action: Administrator of Special Education has met with special education teacher to review steps for certification. Teacher is completing practicum. She has taken and passed all MTEL tests. She will complete her graduate degree in December 2010. Anticipated Results: The special education teacher will complete Masters Degree in special education and receive special education license in December. Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly Conte Completion: Administrator of Special Education 02/01/2011 Evidence of Completion of the Corrective Action: Copy of licensure card from DESE and transcript from graduate school. Description of Internal Monitoring Procedures: Administrator of Special Education will have check with teacher and request copies of these documents by December. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Partially SE 51 Appropriate special education Approved teacher licensure Status Date: 11/12/2010 Basis for Partial Approval or Disapproval: The district indicated that the teacher will complete her Master's Degree in December, however, in the interim, there was no evidence provided that indicated that the district has requested a waiver in order to cover the time period until the teacher obtains an ESE license. Department Order of Corrective Action: The district must provide evidence that the teacher has applied for and been granted an ESE waiver to cover the time period until she obtains an ESE license. Required Elements of Progress Report(s): By March 31, 2011 provide a copy of the ESE issued waiver. If the teacher has obtained an ESE license by that date, provide a copy of the license along with the ESE issued waiver. Progress Report Due Date(s): 03/31/2011 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 19 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 52 Appropriate certifications/licenses or other credentials -Partially Implemented related service providers Department CPR Findings: Review of documentation and staff interviews indicated that not all school psychologists are appropriately certified or licensed. Description of Corrective Action: Administrator of Special Education has met with school psychologist in regard to progress with license. Psychologist has taken required MTEL in June 2010. Psychologist and previous assistant superintendent have followed up with DESE with required forms to be completed to obtain licensure. Anticipated Results: School Psychologist should obtain proper licensure by June 2011. Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly Conte Completion: Administrator of Special Education 06/01/2011 Evidence of Completion of the Corrective Action: Copy of certification from DESE. Description of Internal Monitoring Procedures: Administrator of Special Education will monitor progress toward acquiring proper certification from DESE. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 52 Appropriate certifications/licenses Status Date: 11/12/2010 or other credentials -- related service providers Basis for Partial Approval or Disapproval: The district has indicated it has taken steps to ensure that the school psychologist obtains a license. The district indicated that the psychologist has taken the MTEL and that followup with ESE has occurred. The psychologist is in the process of obtaining an ESE license which should be issued by June of 2010. Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 provide a copy of the DESE certification/licensure. Progress Report Due Date(s): 03/31/2011 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 20 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 55 Special education facilities and classrooms Partially Implemented Department CPR Findings: Observations at the Center School, HH Richardson School, Easton Middle School and Oliver Ames High School indicated that some of the spaces used for classrooms or related services were identified with signs and other means that stigmatize students. Description of Corrective Action: Administrator of Special Education will provide training session for all principals, and special education staff in regards to removing signs that stigmatize students. Anticipated Results: Training will be completed by June 1, 2011. Title/Role(s) of responsible Persons: Expected Date of Dr. Beverly Conte Completion: Administrator of Special Education 06/01/2011 Evidence of Completion of the Corrective Action: All spaces used for classrooms or related services will remove any signs that stigmatize students. Description of Internal Monitoring Procedures: Administrator of Special Education and Principals will wall through four buildings mentioned to be sure that any signs stigmatizing students have been removed. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 55 Special education facilities and Status Date: 11/12/2010 classrooms Basis for Partial Approval or Disapproval: The district indicated that stigmatizing signs will be removed and that training regarding signage will be conducted. Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 provide a copy of the Training Agenda, date(s) the training was conducted and the sign-in sheet with staff person's title/role. Also, an onsite will be conducted by DESE staff. Progress Report Due Date(s): 03/31/2011 06/27/2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 21 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW Charter School or District: Easton Public School District Corrective Action Plan Forms Program Area: Civil Rights Prepared by: Cathy McLeod CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report to the school or district. Mandatory One-Year Compliance Date: October 3, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 7 Rating: Partially Implemented Information to be translated into languages other than English Department CPR Finding: Review of the documentation indicated that while there are no major languages spoken in the district, there is a population of limited English proficient parents/guardians who speak low-incidence languages. The district has not established a system of oral interpretation to assist parents/guardians with limited English skills who speak low incidence languages, and information is not provided in a manner in which parents understand. Narrative Description of Corrective Action: The district will establish a system of oral interpretation to assist parents/guardians with limited English skills by creating a list of interpreters in each of the low incidence languages for which there are students currently enrolled. When the home language survey suggests a second language, the building administrator will conduct an entry interview to assess if parents are in need of an interpreter. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Assistant Superintendent Corrective Action Activity: March 4th, 2011 Evidence of Completion of the Corrective Action: List of interpreters, Revised Initial Identification Procedures Description of Internal Monitoring Procedures: Annual update of the list of interpreters, Random follow up contact with newly identified ELL families. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 22 CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 7 Status of Corrective Action: X Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): Submit a copy of the revised policy and a copy of the memorandum to the building staff regarding the initial identification procedures, along with the steps staff must take to ensure that the needs of limited English proficient parents/guardians are met. Also submit a report of the number of parents/guardians identified through entry interviews and evidence that interpreters were provided. Progress Report Due Date(s): March 31, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 7B Rating: Partially Implemented Structured learning time Department CPR Finding: Review of documents and staff interviews indicated that not all 11th and 12th grade students participate in physical education since it is designated as an elective for these students. Narrative Description of Corrective Action: The district will explore scheduling options, develop a budget proposal, and make a recommendation to the school committee regarding the implementation of physical education in grades 11 and 12. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Superintendent Corrective Action Activity: March 4, 2011 OAHS Principal Evidence of Completion of the Corrective Action: Budget proposal and School Committee minutes Description of Internal Monitoring Procedures: Annual review OAHS schedule CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 7B Status of Corrective Action: X Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 provide a copy of the approved plan to provide physical education to all students in grades 11 and 12 and the steps taken thus far to implement the plan. Indicate the numbers of students in each grade who are currently not receiving physical education, if any. Progress Report Due Date(s): March 31, 2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 23 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 10A Rating: Partially Implemented Student handbooks and codes of conduct Department CPR Finding: Review of documentation indicated that the code of conduct for Easton Middle School does not include procedures for the discipline of students with Section 504 Accommodation Plans. Narrative Description of Corrective Action: The Easton Middle School code of conduct in the student handbook will be revised to include the procedures for the discipline of students with Section 504 Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: EMS Principal Corrective Action Activity: March 4, 2011 Evidence of Completion of the Corrective Action: EMS student handbook accessible online Description of Internal Monitoring Procedures: Review revised handbook CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 10A Status of Corrective Action: X Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): Provide a copy of the revised Easton Middle School Code of Conduct that includes the procedures for disciplining students with Section 504 Accommodation Plans. Also submit evidence that staff at Easton Middle School were trained on these procedures. Progress Report Due Date(s): March 31, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 16 Notice to students 16 or over leaving school without a high school diploma, certificate of attainment, or certificate of completion Rating: Partially Implemented MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 24 Department CPR Finding: Review of the notice to students 16 and over leaving school without a high school diploma, certificate of attainment or certificate of completion did not indicate that the student and the parent or guardian may meet with a representative of the district within ten days from the date the notice was sent. Interviews indicate that the notice is not sent within ten days from the student’s fifteenth consecutive absence. In addition, the district does not send notice annually and by first class mail to the last known address of former students who have not yet earned their competency determination and who have not transferred to another school. Narrative Description of Corrective Action: The notice to students 16 and over leaving school has already been revised to include a statement that the student and the parent or guardian may meet with a representative of the district within ten days from the date the notice was sent. The district will create a letter to send notice annually and by first class mail to the last known address of former students who have not yet earned their competency determination and who have not transferred to another school. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Assistant Superintendent, Corrective Action Activity: March 4, 2011 Assistant Principal and Director of Guidance, OAHS Evidence of Completion of the Corrective Action: Sample letters Description of Internal Monitoring Procedures: A procedure will be implemented whereby copies of the notice and follow up letter to students dropping out of school shall be forwarded to the office of the Assistant Superintendent. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 16 Status of Corrective Action: X Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 provide a copy of the revised letter to students 16 and over leaving school without a high school diploma, certificate of attainment or certificate of completion and a report of the students to whom the letter was sent (include the first and last initial of the student, grade and date the letter(s) was sent). Also provide a copy of the annual written notice to former students who have not yet earned their competency determination and who have not transferred to another school. Please ensure that this letter informs students of the availability of publicly funded post-high school academic support programs and encourages them to participate in those programs. Provide a report of the students to whom the annual letter was sent (include the first and last initial of the student, grade and date the letter(s) was sent). Progress Report Due Date(s): March 31, 2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 25 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CR 25 Rating: Partially Implemented Institutional self-evaluation Department CPR Finding: Staff interviews indicated that the district does not evaluate all aspects of its K-12 program annually to ensure that all students, regardless of race, color, sex, religion, national origin, limited English proficiency, sexual orientation, disability, or housing status, have equal access to all programs, including athletics and other extracurricular activities. Narrative Description of Corrective Action: As part of the school improvement planning process implemented by school councils in each building, the parent and/or student surveys will include questions related to equal access to all programs in our schools. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: School Council Co-Chairs, Corrective Action Activity: March 4, 2011 Director of System Operations, Assistant Superintendent Evidence of Completion of the Corrective Action: Survey Results Description of Internal Monitoring Procedures: Annual presentation of school improvement plans CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CR 25 Status of Corrective Action: X Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By March 31, 2011 provide a copy of the survey, a report of the results and any required corrective action that must be taken by the district. Progress Report Due Date(s): March 31, 2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 26 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW Charter School or District: Easton Public School District Corrective Action Plan Forms Program Area: English Learner Education Prepared by: Cathy McLeod CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report to the school or district. Mandatory One-Year Compliance Date: October 3, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 3 Rating: Partially Implemented Initial Identification Department CPR Finding: Review of documentation and interviews indicated that the home language survey is in English only. Review of student records indicated that not all records included initial identification assessments. Narrative Description of Corrective Action: When the home language survey suggests a second language, the building administrator will conduct an entry interview to assess if parents are in need of an interpreter. All ELL students will be assessed using several measures to include but not limited to MELA-O, MEPA, classroom observation and, where applicable, Pre LAS and MCAS. The results of these assessments will be maintained and filed at the Assistant Superintendent’s office. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Assistant Superintendent Corrective Action Activity: March 4, 2010 Evidence of Completion of the Corrective Action: Student roster with assessment results Description of Internal Monitoring Procedures: Data collection upon entry and Spring and Fall state tests. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 3 Status of Corrective Action: X Approved Partially Approved MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan Disapproved 27 Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By April 29, 2011 provide a report of the results of a review of a random sample of student records to ensure that the record includes the required initial identification assessments. Indicate the number of records reviewed, the number of records in compliance and steps taken to remedy any non-compliance. Progress Report Due Date(s): April 29, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 5 Rating: Partially Implemented Program Placement and Structure Department CPR Finding: Sheltered English immersion (SEI) is a program model for limited English proficient (LEP) students composed of two parts—English as a second language (ESL) and sheltered content instruction. ESL is explicit, direct instruction about the English language, delivered to LEP students only and designed to promote the English language development of LEP students. Sheltered content instruction is an approach for teaching content to LEP students in strategic ways that make the subject matter concepts comprehensible while promoting the LEP students’ English language development. A review of district documents shows that the district does not have an ESL curriculum based on the Massachusetts English Language Proficiency Benchmarks and Outcomes, even though the Massachusetts English Language Proficiency Benchmarks and Outcomes is used as a resource document. The number of hours of direct ESL instruction is not consistent with recommended hours as outlined in the Department’s September 2009 guidance document: “Guidance on Using MEPA Results to Plan Sheltered English Immersion (SEI) Instruction and Make Reclassification Decisions for Limited English Proficient (LEP) Students.” For example, beginners in grades K-2 receive only 2-3 hours per week. Content instruction is not based on the appropriate Massachusetts Curriculum Framework since most staff members have not completed all four Categories of training as described in the Commissioner’s Memorandum of June 2004; therefore the district has no qualified teachers to shelter content. No teachers in Easton have participated in Categories 3 or 4 at all. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 28 Narrative Description of Corrective Action: The district is in the process of developing and implementing a curriculum review cycle. A sub-committee will be established to develop an ESL curriculum. The district has been working with the ELL tutors to align individual assessment results with the guidance document described above in order to make decisions on hours of instruction. Additionally, as teacher training increases, we will have more opportunity to carefully place students in classrooms where teachers have been trained in ESL instructional techniques. We currently have 10 teachers who are trained at Level 3. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Assistant Superintendent Corrective Action Activity: June, 2011 Evidence of Completion of the Corrective Action: Curriculum documents and tutor schedules Description of Internal Monitoring Procedures: Teacher training schedule, schedules, data CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 5 Program Placement and Structure Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: See also ELE 15 The district is currently conducting a review of the curriculum, which may be adapted to develop an ESL Curriculum that is based on the Massachusetts English Language Proficiency Benchmarks and Outcomes (ELPBO) for English language learners (ELLs). The district is also in the process of reviewing individual assessments of ELLs to align hours of instruction in accordance with the “Guidance on Using MEPA Results to Plan Sheltered English Immersion (SEI) Instruction and Make Reclassification Decisions for Limited English Proficient Students (The Guidance).” The Guidance recommends minimum daily hours of direct ESL/ELD instructions for ELLs as follow: 2.5 hours to a full day for Level 1 and 2; daily minimum of 1-2 hours for Level 3, a 1/2/ hour per day or 2.5 hours weekly for Level 4 and Level 5. The district’s Sheltered English Instruction (SEI) professional development plan did not include training in category 4. Also, the district did not specify how content instruction will be provided to ELLs while the district increases the number of teachers who are trained in all four categories of SEI. In addition, the district’s internal monitoring procedures do not specifically address the following: Completion of an ESL curriculum that is based on the ELPBO and plans for its implementation. Ensuring that the hours of instruction received by ELLs follow the recommended guidelines. Documenting the four category trainings completed by content teachers in the district in order to ensure that content teachers instructing ELLs have been trained. Department Order of Corrective Action: Report on the progress and completion of the ESL curriculum. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 29 Develop a plan that ensures that ELLs placed with content area teachers are SEI trained. Develop a plan to include training in Category 4. Provide an internal monitoring plan that addresses continuous monitoring and compliance with the issues pointed out in the Corrective Action Plan (CAP). Required Elements of Progress Report(s): Provide a report on the progress of the ESL curriculum by April 29, 2011. Include names of persons responsible. Submit a completed ESL curriculum for all grades by a date to be determined following a review of the first set of progress reports. Provide the district’s plan for ensuring that ELLs are placed with content area teachers trained in SEI. Submit this by April 29, 2011. Submit evidence that ELLs have been placed with content area teachers trained in all four categories. Submit this by a date to be determined following a review of the first set of progress reports. Submit evidence of the implementation of the SEI category training plan. Include attendance sheets of content area teachers instructing ELLs that indicate grades/subjects taught, dates of training, and what categories of SEI training they have completed. Provide this evidence by April 29, 2011. Submit an update by a date to be determined following a review of the first set of progress reports. Provide a sample schedule of ELLs in all grades that shows that ELLs are receiving adequate number of hours of ESL instruction at each level. Provide this evidence by April 29, 2011. Submit evidence of the district’s implementation of its internal monitoring procedures for this criterion. Specifically, submit a most recent monitoring report that addresses completion of the ESL curriculum based on the ELPBO and other issues addressed by the CAP. Provide this monitoring report by April 29, 2011. Progress Report Due Date(s) First Progress Report: April 29, 2011 Second Progress Report: Date to be determined following a review of the first set of progress reports. COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 6 Rating: Partially Implemented Program Exit and Readiness Department CPR Finding: When a student is exited in Easton, the student is classified as “Non-ELL” instead of “FLEP” (Formerly limited English Proficient) as required, and the district does not appropriately code the student in SIMS as “FLEP”. Narrative Description of Corrective Action: A category for FLEP has been added to our internal monitoring system (X2). MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 30 Title/Role of Person(s) Responsible for Implementation: Assistant Superintendent Expected Date of Completion for Each Corrective Action Activity: January 14, 2011 Evidence of Completion of the Corrective Action: Spreadsheet and sample student records from X2 demonstrating the FLEP category Description of Internal Monitoring Procedures: Progress monitoring of student achievement and determining eligibility for program exit. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 6 Program Exit and Readiness Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): Submit the spreadsheet and sample student records from X2 demonstrating that the FLEP category has been added to the district’s internal monitoring system (X2) by April 29, 2011. Progress Report Due Date(s): April 29, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 7 Rating: Not Implemented Parent Involvement Department CPR Finding: Review of documents and staff interviews indicate that the district has not developed ways to include parents or guardians of LEP students in matters pertaining to their children’s education. Narrative Description of Corrective Action: During the follow up entry interview, building administrators will encourage participation on school councils and parent advisory councils. Follow up phone calls will take place from the chair of the parent advisory council. A discussion will take place with the building administration to generate other ideas to encourage the inclusion of parents or guardians of LEP students in matters pertaining to their children’s education. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Building administrator Corrective Action Activity: June 24, 2011 Evidence of Completion of the Corrective Action: Description of Internal Monitoring Procedures: CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 7 Status of Corrective Action: Approved X Partially Approved Disapproved Basis for Partial Approval or Disapproval: The district did not complete the Evidence of Completion of the Corrective Action or Description of Internal Monitoring Procedures sections of the CAP. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 31 Department Order of Corrective Action: Complete and submit the Evidence of Completion of the Corrective Action and Description of Internal Monitoring Procedures by April 29, 2011. Required Elements of Progress Report(s): Submit the description and documentation of outreach to families of LEP students regarding participation on school and parent advisory councils, as well as opportunities for parent-teacher communication. Progress Report Due Date(s): April 29, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 8 Rating: Not Implemented Declining Entry to a Program Department CPR Finding: Review of documents indicates that parents have not been informed of their right to decline entry to an English learner education program. Narrative Description of Corrective Action: When the home language survey suggests a second language, the building administrator will conduct an entry interview to assess if parents are in need of an interpreter and to inform them of their right to decline entry to an English learner education program. The parent notification letter was revised as a result of the CPR selfassessment and now contains the notice to parents informing them of their right to decline entry to an English Learner Education program. The letter will be sent each time a new student enrolls and is identified as an English Language Learner. The entry interview will serve to insure the parent understands the letter Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Building Administrator Corrective Action Activity: June 24, 2011 Evidence of Completion of the Corrective Action: Revised Parent Notification Letter. Description of Internal Monitoring Procedures: Review of documents at the beginning of the year and ongoing monitoring when home language surveys are submitted throughout the year CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 8 Status of Corrective Action: X Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By April 29, 2011 provide a copy of the revised letter. See also ELE 10. Progress Report Due Date(s): April 29, 2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 32 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 9 Rating: Partially Implemented Instructional Grouping Department CPR Finding: The district, on some occasions, inappropriately groups students by grade level instead of proficiency level for direct ESL instruction. Narrative Description of Corrective Action: Student data has been carefully reviewed and a spread sheet developed that is aligned with the DESE guidance on using MEPA results to plan sheltered English Immersion instruction. Instructional schedules have been developed that are aligned with these recommendations. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Assistant Superintendent Corrective Action Activity: January 14 Evidence of Completion of the Corrective Action: Data Spreadsheet Description of Internal Monitoring Procedures: The schedule of the ESL instructors will be reviewed to monitor student grouping by proficiency level. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 9 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: See also ELE 5. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide students’ sample schedules for all grade levels showing ELLs grouped in instructional settings that are in accordance with their English proficiency levels. Grade levels may be mixed and students spanning no more than 2-3 grade levels may be grouped together. However, factors such as maturity, literacy levels, cultural and personality factors must be taken into consideration. Progress Report Due Date(s): April 29, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 10 Rating: Partially Implemented Parental Notification Department CPR Finding: Review of student records indicates that the parent notification letters were not mailed annually and were not in the primary language of the home. Additionally, the parent notification letters did not include the following: the student’s level of English proficiency, program placement and/or the method of instruction used in the program, and the right to decline to enroll their child in the program. There were no progress reports in any of the ELE records reviewed. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 33 Narrative Description of Corrective Action: Parent notification letters will be mailed upon registration and following building administrators entry interview, which will determine the need to send a translated copy or provide a system of oral interpretation. Parent notification letters will include the student’s level of English proficiency, program placement and method of instruction used in the program, and the right to decline to enroll their child in the program. Progress monitoring will coincide with district reporting periods. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Assistant Superintendent Corrective Action Activity: June 24, 2011 Evidence of Completion of the Corrective Action: copy of notification letter and progress report Description of Internal Monitoring Procedures: Principals will be asked to send copies of parent notification letters to central office. ELL tutors will be expected to submit copies of any progress reports or report cards. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 10 Status of Corrective Action: X Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By April 29, 2011 provide a copy of the revised letter. A second set of progress reports will be due regarding the results of a review of a random sample of student records to ensure that the letter and required progress reports are in the student files. This set of progress reports will be due at a date to be determined following a review of the first set of progress reports. Progress Report Due Date(s): April 29, 2011 Second Progress Report: Date to be determined following a review of the first set of progress reports. COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 11 Rating: Partially Implemented Equal Access to Academic Programs and Services Department CPR Finding: Review of documentation and staff interviews indicated that information in notices, such as responsibilities and academic standards, provided to all students is not always provided in a language or mode of communication that LEP students understand. As staff members have not completed all four Categories of training, the district does not ensure that LEP students are taught to the same academic standards and curriculum as all students, or are provided the same opportunities to master such standards as other students. See also ELE 15. Narrative Description of Corrective Action: ELL tutors will be charged with the responsibility of insuring that LEP students understand information in notices, such as responsibilities and academic standards. When necessary, translators will be provided. The training plan is described in full under ELE 15. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 34 Title/Role of Person(s) Responsible for Implementation: Assistant Superintendent Expected Date of Completion for Each Corrective Action Activity: January 14, 2010 Evidence of Completion of the Corrective Action: SEI professional development plan and tutor logs describing checking in to monitor understanding of critical notices. Description of Internal Monitoring Procedures: ELL Professional development will become part of the district’s ongoing professional development plan. Survey parents and students regarding efforts to ensure understanding of notices, responsibilities and academic notices CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 11 Status of Corrective Action: X Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By April 29, 2011 provide copies of translated notices or any other documentation as evidence that ELE tutors have provided students with information in a language or mode of communication that they understand. See also ELE 5 and ELE 15. Progress Report Due Date(s): April 29, 2011 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 14 Rating: Partially Implemented Licensure Requirements Department CPR Finding: The district uses a licensed elementary teacher for ESL instruction at the elementary level instead of a licensed ESL teacher as required. Narrative Description of Corrective Action: The elementary teacher is in the process of completing the requirements for licensure and recently completed the Level 3 training. She is coached on a monthly basis by a certified teacher trainer. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Assistant Superintendent Corrective Action Activity: September 2011 Evidence of Completion of the Corrective Action: Certification Documents Description of Internal Monitoring Procedures: The teacher will be required to report monthly as to her progress. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 14 Licensure Requirements Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: The district reports that the elementary teacher providing ESL instruction is in the process of completing the requirements for an ESL license. In the interim the teacher is coached once a month by a certified teacher trainer. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 35 Department Order of Corrective Action: Required Elements of Progress Report(s): Submit teacher trainer credentials (license and/or certificate) by April 29, 2011. By a date to be determined following a review of the first set of progress reports, submit a copy of the ESL certification documents for the elementary teacher currently teaching ELLs. Progress Report Due Date(s): First Progress Report: April 29, 2011 Second Progress Report: Date to be determined following a review of the first set of progress reports COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 15 Rating: Partially Implemented Professional Development Requirements Department CPR Finding: Content instruction is not based on the appropriate Massachusetts Curriculum Framework since most staff members have not completed all four Categories of training as described in the Commissioner’s Memorandum of June 2004; therefore, the district has no qualified teachers to shelter content. No teachers in Easton have participated in Categories 3 or 4 at all. From the documentation submitted, the district does not have a clear and detailed SEI PD plan covering all four SEI PD Categories. Narrative Description of Corrective Action: A clear and detailed SEI PD plan has been developed and we are in the process of implementing the plan. A level 1 training was provided in September for 4 teachers from each building that were selected by the building principal based on their teaching assignment. A second level 1 training is planned for the winter. A level 2 training is currently being offered and 10 teachers are completing this course. A level 3 training was provided in October, 2010 for our two ELL tutors and two of our reading specialists who service struggling second language learners. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Assistant Superintendent Corrective Action Activity: January 14, 2011 Evidence of Completion of the Corrective Action: PD spreadsheet, PD fliers and certificates Description of Internal Monitoring Procedures: The Assistant Superintendent will work with building administrators to implement the SEI PD plan such that we are continuously improving our ELL content instruction. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 15 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: See ELE 5. MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 36 Department Order of Corrective Action: See ELE 5. Required Elements of Progress Report(s): See ELE 5. Progress Report Due Date(s): April 29, 2011 Second Progress Report: Date to be determined following a review of the first set of progress reports COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 18 Rating: Partially Implemented Records of LEP Students Department CPR Finding: Review of student records indicated that the LEP student records did not contain logs of access or progress reports. Narrative Description of Corrective Action: Logs of access and progress monitoring will be developed and placed in student files Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Assistant Superintendent Corrective Action Activity: June 24, 2011 Evidence of Completion of the Corrective Action: Copies of access logs and progress Description of Internal Monitoring Procedures: Student files will be screened in June, 2011 and annually after this date. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 18 Status of Corrective Action: X Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): By April 29, 2011 provide a report of the results of a review of a random sample of student records to ensure that the Log of Access and Progress Reports are in the student’s file. Submit the number of records reviewed, the number in compliance and actions taken to remedy any noncompliance. Progress Report Due Date(s): April 29, 2011 MA Department of Elementary & Secondary Education , Program Quality Assurance Services Easton CPR Corrective Action Plan 37