00 01 10 [ Project Title ] Table of Contents {Type NOT USED after the Division / Section Title where applicable versus deleting the Title} 00 00 00 PROCUREMENT AND CONTRACTING REQUIREMENTS INTRODUCTORY INFORMATION 00 01 01 Project Title Page 00 01 07 Seals Page 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets PROCUREMENT REQUIREMENTS 00 10 00 00 11 13 00 11 13.05 00 11 13.10 SOLICITATION Advertisement for Bids (Notice to Contractors) Advertisement for Bids (Notice to Contractors w/filed sub-bids) Notice To Contractors (abbreviated Ad.) 00 20 00 00 21 13 00 22 13 INSTRUCTIONS FOR PROCUREMENT Instructions to Bidders Supplementary Instructions to Bidders ( Used when a File Sub-Bid is required) 00 40 00 00 41 13 00 41 13.10 00 43 13 00 43 13.10 PROCUREMENT FORMS AND SUPPLEMENTS Bid Form Maine Construction Bid Depository Subcontractor Bid Form (When File Sub-Bid is required) Bid Security Form Subcontractor Bid Security Form (Used when a File Sub-Bid is required) CONTRACTING REQUIREMENTS 00 50 00 CONTRACTING FORMS AND SUPPLEMENTS 00 52 13 00 52 13.13 00 52 13.14 00 60 00 00 61 13.13 00 61 13.16 00 62 16 00 62 16.10 00 62 16.11 00 62 16.12 00 62 16.13 00 62 16.14 00 62 73 00 62 76 00 62 76.13 00 62 76.16 Agreement Form (For Construction Contract with AIA A201 Terms and Conditions) Standard Form of Agreement Between Owner and Construction Manager as Constructor – AIA A133-2009 AIA Document A133 – Exhibit A PROJECT FORMS Performance Bond Form Payment Bond Form Certificate of Insurance Form Certificate of Liability Insurance (ACORD) Commercial General Liability Coverage Form (ISO CG 00 01 12 04) Additional Insured – Owners, Lessees, or Contractors – Scheduled Person or Organization (ISO CG 20 10 07 04) Additional Insured – Owners, Lessees, or Contractors – Completed Operations (ISO CG 20 37 07 04) Designated Location(s) General Aggregate Limit (ISO CG 25 04 03 97) Schedule of Values Form Application for Payment Form Sales Tax Form Consent of Surety to Reduction of Retainage Form Page 1 of 3 UMS Form ver. 1.2 2/1/13 00 01 10 00 62 79 Stored Material Form 00 63 13 00 63 33 00 63 46 00 63 57 00 63 63 00 65 16 00 65 19 00 65 19.13 00 65 19.16 00 65 19.17 00 65 19.19 Request for Information Supplemental Instruction Form Construction Change Directive Form Change Order Request Form Change Order Form Certificate of Substantial Completion Form Certificate of Completion Form (Final) Affidavit of Payment of Debts and Claims Form Affidavit of Release of Liens Form Waiver of Lien Consent of Surety to Final Payment Form 00 70 00 00 72 00 00 73 00.01 00 73 00.03 00 73 00.11 00 73 00.21 00 73 00.22 00 73 00.61 00 73 46 00 73 46.10 CONDITIONS OF THE CONTRACT General Conditions of the Contract for Construction - AIA A201-2007 University of Maine System Supplementary Conditions to AIA A201 - 2007 University of Maine System Supplementary Conditions to AIA A133 – 2009 Schedule of Liquidated Damages Federally Funded Contract Supplementary Conditions American Recovery and Reinvestment Act Funded Contract Supplementary Conditions Asbestos Work Supplementary Conditions Wage Determination Schedule Wage Determination Schedule - Davis Bacon ( for Federally Funded Contract) Facility Construction Subgroup Division 01 General Requirements Division 02 Existing Conditions Division 03 Concrete Division 04 Masonry Division 05 Metals Division 06 Wood, Plastics & Composites Division 07 Thermal & Moisture Protection Division 08 Openings Division 09 Finishes Division 10 Specialties Division 11 thru Division 14 - Not Used Facility Services Subgroup Division 21 Fire Suppression Division 22 Plumbing Division 23 Heating, Ventilating, and Air Conditioning Division 24 Not Used Division 25 Integrated Automation – Not Used Division 26 Electrical Division 27 Communications Division 28 Electronic Safety and Security Page 2 of 3 UMS Form ver. 1.2 2/1/13 00 01 10 Division 29 Not Used Site and Infrastructure Subgroup Division 30 Not Used Division 31 Earthwork Division 32 Exterior Improvements Division 33 Utilities Division 34 Transportation Division 35 Waterway and Marine Construction Division 36 thru 39 – Not Used Process Equipment Subgroup Division 40 thru 49 - Not Used Page 3 of 3 UMS Form ver. 1.2 2/1/13