Topic Page Section Abbreviation definitions

advertisement
Topic
Abbreviation definitions
Acceptance of work
Acronym definitions
Admixtures used in hydraulic
cement concrete
Advertisement, Notice of
Aggregate
acceptance procedures
certification,
base course
base material
coarse
crusher run
fine
handling & storing
lightweight
nonpolishing,
penetration surface courses
Aggregate material,
maintenance of traffic
Air pollution
Allaying dust
Alteration of character of work
Alteration of quantities
Aluminum alloy
Anchor bolts
installation procedures
materials
Anchorage assemblies,
intermediate
Anchors
fabrication (Materials and
Fabrication)
Materials (Anchor Bolts)
procedures
see Bearing devices &
anchors
Archeological findings
Arches, filled spandrel
Arrows, electronic
Asphalt concrete
(SUPERPAVE)
acceptance
adjustment system
aggregate
handling (Handling and
Storing Aggregates)
Page
Section
101
105.15
101
215.01
101.02
200.04
200.04
308.04, 309
208.01
203
205
202
200.05
206
200.06, 316.02(a),
404.02
314.03
512.04
107.14 (b)2
511
104.02
104.02
229
408.03(h)
226.02( c)
505.03
408
408.02
226.02(c )
408.03
107.16(d)
401.04
512.03(c )
211.08
211.09
211.02(b)
211.11
inspection plant
job-mix formula
materials
mixture prepartion
mixture
payment adjustment system
plant requirements (Asphalt
Concrete Mixing Plant)
plant
production initial
referee system
storage system
storing (Handling and storing
Aggregates)
testing
tests
types of mixtures (Asphalt
Concrete Mixtures)
Asphalt concrete curbs
construction procedures
materials
Asphalt concrete pavement
base
density requirements,
compacting
equipment
finishing
materials
mixture
pavement samples
pavement tolerances
paving limitations, cold
weather
paving technician
placement limitations
placement procedures
(Placing and Finishing)
plant (Asphalt Concrete
Mixing Plant)
plant technician
priming
procedures
samples
sidewalks
tolerances
Asphalt material
cement
coating ability
curb backup material
211.07
211.03
211.02
211.13
211.04
211.09
211.12
211.12
211.15
211.10
211.14
211.11
211.05
211.06
211.04
502.03 (2)
211.04
315.05(a)
315.05(d)
315.03
315.05(c )
211.01 & 315.02
211.04
315.06
315.07
315.05
200.06(e)
315.04
315.05( c)
211.12
200.06
315.05
315.05
315.06
504
315.07
210
210.02(e)
210.02(b)
315.02(c )
cutback asphalt
emulsion
liquid asphalt material
curing
shipping
storing
used in hydraulic cement
stabilization
Attenuators, impact
Authorities
engineer
inspector
Award cancellation
Award of contract
Backfill
culverts
porous
replacing undercut
excavation
storm drains
structures
Baled straw
Bar chair supports
Bar mats
Barricades
responsibility to public
(Barricades and Warning
Signs)
Barrier
delineators
service, traffic
silt
sound walls
steel median
traffic barrier service
see also Median barriers
Base course
Basements, demolition
Batcher, certification of
Beads, glass
Bearing areas, bridge seat
Bearing devices & anchors
materials
placement procedures
Bearing pads
Bearing piles
Bearing plates
210.02( c)
210.02(f )
210.02(b)
210.02(d)
210.03(a)
210.03(b)
307.06
512.03(g)
105.03(a)
105.03(b)
103.03
103.02
303.04(f)
303.04(f)
204.02(c )
303.04(f)
302.04
401
303.03(d)
406.03
233.02(6)
105.14,,512.02(b),
512.03(o)
105.14
505.02(d), 512.03(f),
702
512.03(f)
303.03
519
505
512.03(f), 512.04
309
516.02(b)
200.06(d)
234
404.06
237.01
408.03
237
403
408.01
Bedding material
drainage structures
sidewalk
Bidding
bid consideration
bid letting
bidder disqualification
bidder prequalification
bids preparation
combination or conditional
proposals
conditional
irregular bids
material
proposal content
proposal guaranty
proposal quantities
(Interpretation of Quantities
in Proposal)
public opening (Public
Opening of Bids)
Requirements (Bidding
Requirements and
Conditions)
Submission of bid
standard
use of debarred suppliers
withdrawal
worksite/ proposal
examination (Examination
of Site of Work and
Proposal)
Bolts
Bond requirements
payment
performance
bid
contract
Borrow excavation
Borrow pit materials (Local
Material Sources (Pits and
Quarries)
Borrow, subgrade & shoulders
Box culverts
Breakaway support systems
237
302, 302.02, 302.03,
302.04
504.04(2)
102
103.01
102.12
102.08
102.01
102.05
102.02
102.02
102.06
102.02
102.07
102.03
102.12
102
102.09
102.05
102.05
102.10
102.04
226.02(g)
103.05
103.05
102.05, 102.06
103.05
303.02, 303.06(2)
106.03
305.02
302.01
700.04(f)
Brick
Bridge
approach slabs
asphalt overlay removal
conduit systems
construction over navigable
waters
deck construction
deck grooving
deck overlay (Repairs)
deck repair (Widening,
Repairing, and
Reconstructing Existing
Structures)
drainage aprons & chutes
expansion joints
finishing concrete
guardrail attachments
joints
latex concrete
lighting systems
median barriers
opening to traffic
seat bearing areas
widening
Bronze alloy
Buildings
demolition
use by Contractor
Bull nose barrier
Bulletin boards and Posting
Official Notices
Burning
Cable
aerial
barricades
color coding
conductor
guardrail
interconnect
lighting conductor
lighting systems
loop detector lead in
materials
signal
splicing
Caissons, drilled in
Calcium chloride
Carrier rates, common
222.01
316.01, 316.06
412.03(c )
419
107.20
404.04
404.07(f)
412.03(b)
412.01
502.01
404.05
404.07
505
404.03(g), 404.05
412.02(b)
419.01
410.03(c )
404.03(m)
404.06
412.01
230
516
516.02(b)
505.04
107.14
107.16
700. 04(g)
505.03
700.04
700.04(g)
505.03, 505.04
700.04
700.04(1)
700.04(g)
703.02(c )
238.02
700.04
700.04
401.03(d)
239
109.06
Casing pipe
Casting frames & covers,
drainage structures
Castings
Catch basin, masonry unit
520.02(c )
302.04
Cement, hydraulic
Cement, hydraulic stabilization
types
Cement-stabilized select
borrow
Central mix aggregate
technician
Certificates
Certifications
batcher
214
316.04
protective coating of metal in
structures (General Surface
Preparation and Application
Standards)
technician
Channel preservation
Channelizing devices
Check dams, erosion control
Cisterns
Cited specs, material
Claims
damage responsibility
disposition
extension of time
submission
Class I & Class II backfill
material
Cleanup
Clearing & grubbing
area connecting substructure
units
Clearing & grubbing area
connecting substructure units
Clearing of parcels
Closing wells
Cofferdams
Cold weather paving limitations
Combining pipe of one size
Combustibles, disposal of
Common carrier rates
Compaction, see Density
Compensation for altered
224
223.02
214.01
307.01, 307.05
200.06(a)
107.02
200.06
411.04
200.06
401.03(a)
512.03(e)
303.06
303.04
106.06
107.13
105.19
105.19
105.19
291, 302, 305, 321
105.16
301
401.01
401.01
516.02(c )
516.01
401.03
315.05
520.06
301.01
109.06
98
quantities
Completion Date
Completion, failure to on time
Concrete
corrugated metal bridge deck
forms
curing box
curing materials
cylinders
encasement
field technician
foundations
prestressed (Tolerances)
slope protection
steps
testing
see Asphalt concrete
see Hydraulic cement
Concrete pavement
see Asphalt concrete
pavement
see Hydraulic cement
concrete pavement
Conductor cables
Conduit systems
bridges
traffic control
Construction
joints hydraulic cement
concrete
over/or adjacent navigable
waters
safety & health standards
signs
surveying (Construction
Stakes , Lines & Grades)
Contract
alteration
award
bond requirements
calendar days
cancellation of award
concurrent (Cooperation
Among Contractors)
contract time (Determination
and Extension of Contract
Time Limit)
default of
101.02,
108.06
404.02(d)
217.08(d)
220
217.08(d), 302.03(b),
404.03(j), 405.04
520.03(h)
200.06(f)
700.04(c )
405.06(a)
415
504
217.08
700.04(g)
419
419.01
700.04(h)
404.03(g)
107.09
107.17
512.03(e)
105.13, 517
104.02
103.02
103.05
108.04(a)
103.03,
105.09
108.04
108.07
documents
eliminated items
execution & approval
extension of contract time
failure to execute
failure to furnish
fixed date
liquidated damages
Notice to Proceed
provisions
quantities
ranking of elements
subcontracting
termination
time limit
Contract documents
affidavits & documents
ambiguity in
bonds, contract
contract
hierarchy/coordination
insurance, liability
insurance, workers comp
list
progress schedule
Contract Engineer
Contract intent
Contract requirements
Contractor
character of workers, work
methods, & equipment
cooperation among
contractors
cooperation
critical materials
failure to complete on time
gratuities
insurance
limitation of operations
liquidated damages
notice to proceed
progress schedule
prosecution of work:
responsibility for utility
property & services
separate contracts
subcontracting
suspension of work ordered
103.06
109.07
103.09
105.19, 108.04
103.07
103.07
108.04(b)
108.06
105.01
105.12
102.03, 104.02
105.12
105.06
108.08
108.04
103.06
103.06(c )
102.03, 102.04
103.06(b)
103.05
105.12
103.06(f)
103.06(d)
103.06
103.06(e)
,102.05
104.01
103.05
105.05
105.09
105.07
106.12
108.06
105.04
107.19(c )
108.02
108.06
105.01
108.03
108.01
107.09
105.09
105.06
108.05
by the engineer
termination of
responsibilities
time limit determination
time limit extension
work responsibility
Contractor companies
Control centers, lighting
systems
Control strips, density
Controllers, traffic signals
Convenience & safety, public
Copper alloy
Corps of Engineers permits
Crack repair
Crib walls
Crushed gravel
Crushed hydraulic cement
concrete
Culverts
see Box culverts
see Pipe
Curb & gutter
Curb-cut ramps
Curing materials
Cut, see Excavation
Damages, liquidated
Damp-proofing
materials
application procedures
Damp-proofing &
waterproofing materials
Debarred supplier
Default of contract
Definitions
abbreviations & acronyms
terms
Delineators
materials
installation procedures
Delivery of bid
Demolition of
basements
buildings
pavement
structures
Density
aggregate base course
asphalt concrete pavement
108.10
108.04
108.04
108.09
109.08
705.03(e)
304.01
703.02
105.14
230
107.02
412.03(6)
506.04(c )
203.02(b)
129
502.03
502.04
220
108.06
213
213.01
417.03
213
102.05
108.07
101.01
101.02
235.01, 702.02
702.04
102.09
516.02(b)
516.01
508.03
413.01
309.05
315.05(e)
cement-stabilized courses
control strips
embankments
hydraulic embankments
lime-stabilized courses
pipe backfill
shoulders
subbase courses
subgrade
Density control strip
construction
constructing
equipment
materials
procedures
Density requirements,
aggregate base course
Department furnished
construction signs
material
Department railway-highway
provisions
Detectors, see traffic signals
Determination of bearing pile
capacities
lengths
Detours
during construction
temporary
Direct tension indicators
Directional island curbs
Disinfecting water mains
Dismantling existing structure
Disposal areas
contractor furnished
handling
inspection
material, inorganic
material, organic
material, surplus
material, unsuitable
rock, excavated
rootmat
stockpile
Disposal of material, bridge
painting
Disposal of structure &
obstruction
Disqualification of bidder
307.02
304
303.04(h)
303.04(j)
306.01
302.03
305.03(e)
306
308.01
304
304
304.03
303.06
304
309
512.03
106.11
403.07
403.07
403.04
105.14(a)
512.03
226.02(h)
502.04
520.05
413
106.04
106.03(c )
106.09
106.01
106.04(c )
106.04(c )
106.04(b)
106.04(a)
106.06(f)
106.04(d)
106.06
525
33
102.08
Documents, contract
Drainage aprons & chutes,
bridge
Drainage structures
materials
procedures
Drawings
Drop inlet silt trap
Drop inlets
Dry riprap
Dumped riprap
Dust, allaying
Earth berms
Earthwork
construction procedures
erosion & siltation control
hydraulic
materials
shrinkage/swell
slopes
surplus material
tolerances
Easements
Elastomeric expansion dams
Elastomeric pads
bridges
materials
sound barrier walls
Electrical components
Electrical service
bridge lighting systems
roadway traffic control
temporary signalization
traffic control devices
Electronic arrows
Eliminated items
Embankments, see Earthwork
Encasement pipe
End sections
installation procedures
materials
Endwalls
Energy dissipators
Engineer
definition
duties & authority
(Authority of Engineer)
Entrance gutter
Environmental protection
103.06
589
302
302.02
302.03
105.10(c)
303.06
302.03(c )
414
414.03(b)
511
303.03(a)
303
303.04
303.03
303.04(j)
303.02
303.06
303.05( b)
303.04(k)
303.05
107.04
568
408.03(f)
408.03(f)
237.02(a)
519, 519.02
238
419.01
700.01
512.03(h)
700.01,
512.03(c )
109.07
520.06
302.03
302.02
302.03(c )
502.04
101.02
105.03
502.04
107.16
air pollution
erosion control
forests
noise pollution
siltation control
stipulations
water pollution
Epoxy mastic coating
Epoxy-coated reinforcing steel
Epoxy-mortar patching
Epoxy-resin systems
Equal Employment
Opportunity
Equipment
aggregate base course
asphalt concrete pavement
character of
constructing density control
strips
hydraulic cement concrete
pavement
hydraulic cement concrete
mowing
penetration surface courses
rental
retained in signal
modifications
seal coat
stabilized open-graded
material
traffic signals
warranties
Eradication of
exist. pavement markings
pavement markings,
pavement markings &
markers
Erosion & siltation control
Escrow
eVA
Excavation
borrow
drilled-in caissons
minor structure
overhaul
presplitting
regular
retaining walls
rock
107.16(2)
107.16
105.14(c )
107.16(3)
107.16(a)
107.16
107.16(b)1
231.03(e)
204, 462, 465
412.03(5)
243
107.14
309
315
108.07
327
316
217
608
314.03
109.05
705
312
358
703
106.01
622
704.03(b)
107.16(a), 303.03
103.05,
102.11
303.02
401.03(d)
303.04(d)
303.04
303.04(a)
303.04(a)
506,
303.04,
slopes
structure
undercut
within limits of
curb/gutter/combination/med
ian barrier
see also Earthwork
Expansion dams, elastomeric
Explosives use
(Alteration of Quantities or
Character of Work) Extra work
Fabric, geotextile drainage
installation procedures,
materials
Falsework
installation procedures
working drawings
Fastening devices, to keep
reinforcing bars in position
Federal aid provisions
Fence
construction procedures
materials
Fertilizer
application procedures
materials
Field office
Fill
procedures
see also Embankment
Filter cloth, see Fabric,
geotextile
Final Acceptance
Final payment
Fire hydrants
Fires, forests
Fixed Completion Date
Fixed object attachments
Flagger
railway
service
Floors
plank
steel grid
Flowable Fill
Flumes, paved,
Fly ash
used in concrete
used in lime stabilization
303.05(b)
401
303.04(c )
502.04
421
107.11,
104.02, 109.05
303.03(e)
303.03
245.02
404.03, 407.06(e)
105.02
406.03
107.03
242, 507, 507.04
507.03
242.01
603.03
244.02
514
303.04
108.09(c)
109.10
520.03(k)
105.14(c )
108.04(a)
505.04
107.19(a), 512.03(b)
107.19(a)
512.03(b)
418.04(n)
409
249, 509
502.03(c )
241.02(a)
241.02(b)
Force account work
Forest fires
Forgings, steel
Forms
concrete
corrugated metal bridge deck
prestressed deck panel
removal
Foundations
retaining walls
seals
sound barrier walls
structures
traffic control devices
Frames & covers
installation procedures
materials
Furnishing & erecting precast
structures
Furnishing & placing backfill
Furshing right of way
Gabions
Galvanized surfaces, painting
Galvanizing
Geosynthetics
installation procedures
materials
Geotextile bedding
bedding material
drainage fabric
drainage fabric, underdrains
fabric
fabric, erosion control
Girders
concrete
steel
Glass beads, for pavement
marking
Grades, lines, & stakes
Grading operations
Gratuities
Gravel, crushed
Grid floors, steel
Group 1& 2 channelizing
devices
Grout/Grouted
hydraulic cement material
riprap
rubble gutters, paved ditches,
109.05
107.16
225.02(a)
404.02(a)
404.03 (a) 1
404.03 (a) 2
404.03 (j)
506.02(b)
401.03
519
401.03(b)
520.03(q)
222.02(b)
302.03(b)
401.02(a)
107.04
610
411.07
233
303.03(e) 2
245.02
414.02(d)
504.02(g)
501.02(c)
245.03(a)
303.02(b)
404.03(c) 2
407
234
105.1
104.04(f)
108.06
203.02(b)
409
512.03(e) a.b.
218.02(a)
414
502.04
paved flumes, street
connection pavement &
bridge drainage
aprons/chutes
Grubbing
Guaranty
Forfeiture of proposal
guaranty
material
proposal
301
103.04
,106.03
102.07
Guardrail
delineators
installation procedures
materials
Guardrail & steel median
barriers
Gutters
Handling, storing, & shipping
materials
epoxy-resin systems
hydraulic cement concrete
steel structures
221, 505
702.03(b)
505.03
221.02
505
Handrails
Hauling
public roads
rate
route
size/weight limits
Health standards
Herbicides
Materials
spraying procedures
High-mast luminaire assemblies
Historic sites
Holiday
Hydraulic cement
mortar & grout
Hydraulic cement concrete
acceptance
admixtures
batcher
consolidation
construction joint bonding
construction joint exposure
to tidal waters
curing
504.03(c)
502.03(c)
106.08, 106.09
243.03
217.03(b)
407.05
105.14(a)(b)
109.06
105.14(k)
105.14
107.17
244.02
607.03
705.03(c)
107.16(d)
105.09
215
218.03(a),(c)
217
217.08
215
200.06(d)
404.03(c)
404.03(h)
404.03(i)
316.04(j), 403.03(b)
2, 404.03(k), 405.04
equipment
finishing surfaces
forms
handling
latex modified
materials
materials, measurement of
mixing
mixture classification
mixture proportion
placement limitations
placement procedures
pneumatic placement
prestressed
protection
sidewalks
silicone treatment
storing
tremie
widen & repair
Hydraulic cement concrete
operations
bridge deck construction
bridge seat bearing areas
expansion & fixed joints
finishing conctete surfaces
materials
procedures
Hydraulic cement concrete
pavement
cold weather protection
consolidation
curing
depth
dowels
equipment
finishing
form removal
forms
grade preparation
joints
materials
opening to traffic
patching
placement procedures
reinforcing steel, placement
slipforming
straightedging
test, beam
217.05
404.07
404.03(a), 405.05(a)
217.03
217.03(c)
217.02
217.04
217.09
217.06
217.07
217.1
404.03(c)
404.03(d)
405
404.03(l)
504.03(a)1
404.03(l)3
217.03(b)
401.03
412.02(b)
404.04
404.06
404.05
404.07
404.02(a)
404.03
316.04(j) 3
316.04(h)
316.04(j)
316.05
316.04(g) 5
316.03
316.04(h)
316.04(l)
316.03(a)
316.04(b)
316.04(g)
316.02
316.04(o)
509
316.04
316.04(c)
316.03(j)
316.04(h) 3
316.04(f)
texturing
tolerances
Hydraulic cement concrete
plant technician
conformance with
joint
technician
waterproofing
Hydraulic cement stabilization
field laboratory
Hydroseeding
Impact attenuators
temporary
permanent
attenuator service
Incidental concrete items
materials
procedures
Incidental construction
Inspection
authority/duties of inspector
failure to furnish
materials
cited specs
plant
samples
tests
work
workers' comp certificate
Insurance
railroad
workers' compensation
Intake boxes
Items,eliminated
Jacked pipe
Jacking & blocking of beams
Joint sealer, preformed
elastomeric,
Joints,
see Asphalt concrete
pavement
see Bridges
see Construction joints
see Hydraulic cement
concrete pavement
materials
316.04(h) 4
316.05
200.06(c)
200.02
212.02
200.06
213
307
307.03
603.03(d)
512.03(f)
247.02(f)
512.03(g)
502.02
502.03
**105.03(b)
103.07
106, 200
106.06
106.07
106.06
106.06
105.17
103.06(d)
107.19(c)
103.06(d), 107.19(c)
1
302.03(c)
109.07
302.03(a) 1
412.03(e)
420
212.02(c)
Junction boxes
drainage
electrical
traffic control devices
Jute mesh
Labor & wages
Landscape, protection of
Latex modified concrete
Latex modifier
Laws to be observed
Legal relations
certificates
claims, damage
responsibility
contractor work, utility
property/service
responsibility
Corps of Engineers permits
environmental stipulations
erosion & siltation
laws observed
licenses
Nationwide Federal permits
other
restoration work performed
by others
Legal rights
construct method approval
construct on R.O.W.
construction, beginning
contractor's insurance
contractor's property damage
insurance policy copies
Insurance, property damage
legal rights, no waiver of
liability, public insurance
no waiver of
patented devices, materials,
& processes
protection of property &
landscape
public official's personal
liability
railroad's insurance
railroad's property damage
railway -highway provisions
Liability of public officials
Licenses
302.01
238.01(f), 705.03(f)
700.05
244.02(k)1
107.13
107.08
412.03(b) 1
217.03(c)
107.01
107.02
107.12
108.09
107.02(a)
107.16,
107.16(a)
107.01
107.02(c)
107.02(b)
107.02(c)
107.10
107.19(b)
107.19(b)
107.19(e)
107.19(c)
107.19(c) 1
107.19(d)
107.19(c) 1
107.07
107.07
107.05
107.08
107.06
107.19(c) 2
107.19(c) 2
107.19
107.06
107.02
Light poles
steel for
Lighting systems
bridge
Lights, navigation
Lime
700.01(i)
226.02(e)
705
409.04
422.03(c)
240
stabilization
types
seeding
use in asphalt concrete
Limestone
Limitation of operations
Lines, grades, & stakes,
Liquid asphalt
Liquidated damages
Local material sources
Lumber, structural
Luminaire
arms
Mailboxes
Maintaining traffic
Maintenance during
construction
connections
delays
detours
embankment, hydraulic
entrances
flagging
grading operations
haul route
patching operations
quantity alteration
signs
site condition difference
structure & obstruction
removal/disposal
structures, failure to maintain
structures, temp
work suspension
Major contract items
Manhole, masonry unit
Manholes
drainage
materials
sanitary sewer
Manipulation
Marker, pavement
306
240.02
603.02(c)
211.02(i)
240.02 (c) 1,2
108.02
105.13
210.02(b)
108.06
105.15
236.02(a)
705.03
700.05
105.15(b)
512
105.14
105.14(e) 1
105.14(d)
105.14(a)
105.14(g)
105.14(e) 2
105.14(c)
105.14(f)
105.14(k)
105.14(h)
105.14
105.14(a)
104.03
105.15
105.15
105.14(i)
105.14(b)
104.02
222.02(b) 1
302.03(c)
302
520.03(p)
306.03
704
Marking, pavement
glass beads for
materials
procedures
Masonry units
catch basin
manhole
Material
acceptance
control of
critical
delivery
found on project
furnished by Contractor
furnished by Department
handling
local sources
cited specs
patented
payment, on hand
quality requirements
rights & uses
sampling
source of supply
storage
testing
unacceptable
warranties
Measurement
Cubic Yard
Lump Sum
Weight
Measurement & payment
asphalt
borrow
compensation for altered
quantities
compensation
concrete
cubic yard
eliminated items
embankment
equipment rental
equipment
excavation
extra & force account work
246
234
704.02
704.03
222
222.02(b)
222.02(b)
200.04
106.01
108.04
106.02
106.05
106.03(c)
106.11
106.09
106.03
106.06
107.05
109.09
106.01
106.05
106.06, 200.03
106.01
106.08
106.06, 200.03
106.10
106.01
109.01(d) 3
109.01(d) 2
109.04
109.05(f)
109.01(d)1
109.01(b)
109.07
109.01(d)2
109.01(d)5
109.04(d)
109.01(d)2
109.05
final payment
insurance
items, excluded
labor
lump sum
materials
materials, inventory
materials, other
measurement & payment
misc
partial payment
payment for material on hand
payment
plan quantities
quantities measurement
scope of payment
specific items
statements
storage
structural units
tax
timber
weight
Median barriers
bridge
concrete
steel
Median strips
Milling, type A
Mineral filler
Mineralogical findings
Minimum wage
Minor structure excavation,
drainage structures
earthwork
gabions
Minority Business Enterprises
(MBEs), use of
Mobilization
Modifying exist. misc. items
Mortar
pneumatically applied
Mortared riprap
Mowing
Mulch
application procedures
materials
109.10
109.05(b)
109.09(c)
109.05(a)
109.01(c)
109.05(c)
109.09(e)
109.09(b)
109
109.04(e)
109.08
109.09
109.08
109.02
109.01
109.03
109.01(d)
109.05(g)
109.09(d)
109.09(a)
109.05(b)
109.01(d)4
109.01(a)
410.03(c)
502.03(c)4
505
502.04
412.03(a)
201
107.16(d)
107.13(a)
302.04
303.04(d)
610.04
107.15
513.02
510
412.04
414.02(c)
608
603.03(e)
244.02(g)
Nationwide federal permit
Navigable waters
construction over or adjacent
to
Navigation lights
Newspaper boxes
Noise pollution
Notice
of Advertisement
of Intent to File Claim
to Proceed
posting official
Nuclear gage
Obscuring roadway
Obstruction removal/disposal
Office, field
Offsetting existing pipe
Open graded shoulder material
Opening section of project to
traffic
Organic
Compounds
Material
Outlet pipe
Overhaul
Overhead & bridge-mounted
sign structures
Overlay exist. panels, traffic
sign
Overruns
Overseeding
Paint
Painting
of metal, see Protective
coating of metal
timber structures
Paleontological findings
Parapets
Parcel clearing
Partial payment
Patching
bridges
hydraulic cement concrete
pavement
Patents devices, materials, &
processes
Paved ditches & flumes
107.02(b)
107.20
422
105.15(b)
107.16(b)3
101.02
105.19
105.01
107.14
514.02(c)
508.02(b)
105.15
514
520.04(d)
209
105.14
107.16(b)2a
244, 106.04(b)3
501.03(b)
303.04
700.02(i)
701.03(d)
104.01(c)
603.03(d)
231
408.02(d)
418.02(e)
107.16(d)
410, 410.04
516.02 c(
109.08
412
509.02(a)
107.05
502.03(c)
Pavement
demolition
planing
see also Asphalt concrete
pavement
see also Hydraulic cement
concrete pavement
Pavement markers
installation procedures
materials
Pavement markings
eradicating
installation procedures
materials
Pavement message markings
construction
Payment
altered quantities
bond
escrow account
final
materials on hand
partial
scope
withholding
Pedestrian fences
Performance bond
Permits
Pile
bearing
bearing capacity
determination
cast in place
driving
length determination
loading tests
materials
order list
penetration
pile types
points
preboring
procedures
protection
restrike
retaining walls
sheet
splicing
508
515
512.03(k), 704.03(c)
235.02
512.03(j)
512.03(i)
246.02
704, 704.04
512.02(d), 512.04
109.08
109.04
103.05
109.08
109.10
109.09
109.08
109.03
109.08
103.05
107.02
403, 403.08
403.07
403.03(c)
403.06(d)
403.04
403.07(a)
402.02
403.05
403.06(e)
403.03
403.08
403.06(d) 6
403.06
403.03(d) 4
403.08
506
402
403.03(b)5
steel piles or pile shells
timber
tips
tolerances
Pilot vehicle
Pipe
combining pipe of one size
elbows, reducers & tees
extended pipelines not
specified
grate
structural plate
temp stream. relocation
types of
underdrains
Pipe arch
installation procedures
materials
structural plate
Pipe culvert
jacked methods,
Pipe installation
drainage
underdrains
water & sewer
Pipe types
Pipe spillouts
Pit materials
Placement limitations
asphalt concrete pavement
hydraulic cement concrete
stabilized open-graded
material
Placing latex & silica fume
hydraulic cement concrete
Plan quantities
earthwork
Planing,
flexible pavement
ridgid pavement
Plans
specifications conformity
with
working drawings
Plant inspection, material
Planting
care of plants
establishment period
403.03(d)
403.02(a)
403.08
403.07
512.03(b)
232, 302.02(a), 302.04
520.06
302.02(c)
302.04
302.02(d)
302.02(d)
302.04
232.02(a)
501.03(b)
232
302.03
232
302.02(d)
302.03(a)
302.03(a) 1
302
501.03(b)
520
232.02
302.03(a)2f
106.03
315.04
217.10
313.06
412.03(b)1
109.02
303.06(c)
515.02
515.02
105.12
105.11
105.10
106.07
605
605.04
605.05
guarantee
materials
procedures
Plants
deleted by Engineer from
Contract,
planting
Plants for roadside
development
materials
planting
Pneumatic placement of
concrete
Poles
Pollution
Posting official notices
Posts
fence
guardrail
sign
Precast
drainage structures
structures, furnishing &
erecting
Pre-Construction Conference
Preformed elastomeric joint
sealer
Prequalification of bidders
Preservatives, wood
Prestressed concrete
concrete controls
materials
panels
piles
plant review
procedures
structural units
Prestressing tendons
Prime coat, asphalt
Progress of work
Progress schedule
Property, protection of
Proposal
combination or conditional
content
examination of
Forfeiture of guaranty
605.06
605.02
605.03
605.03(c)
605.03(i)
244
605
404.03(d)
700.02(i)
107.16(b)
107.14
507
505
700.02(i)
302.03(b)
302.03(b)
105.02
420
102.01
236.02(c)
405
405.04
405.02
405.07
405.02(a),
405.03
405.05
405.07
223.02(b)
311
108
108.03
107.08
102.02
102.04
103.04
guaranty
quantities interpretation
Value engineering
Prosecution & progress of work
Protection & restoration of
property & landscape
Protective coating of metal in
structures
certifications
coating of new steel on
structures
environmental protection
existing structures
galvanized surfaces
general surface preparation
and application standards
health and safety
materials
new structures
Coating galvanized surfaces
zone coating of existing
structure
Protective coverings, soil
retention coverings
Pruning
Public
convenience & safety
officials personal liability
use of roads, open/not open
Quantities
alteration
compensation for altered
measurement of
plan
proposal
Quarry materials
Railing
Railway
construction method
approval on R.O.W.
flagger/watchperson services
railway-highway provisions
Railway -highway provisions
contractor's
flagger
insurance
liability, public
property damage
railroad's
102.07
102.03
104.02
108
107.08
411
411.03
411.05
411.08
411.05
411.07
411.04
411.09
411.02
411.06
411.07
411.05
606
605.03(k)8
105.14
107.06
107.21
104.02
109.04
109.01
109.02
102.03
106.03
410
107
restoration of property &
landscape
warning signs
watchperson
Rank of contract elements
Reconstruct
existing structures
manholes
Recycled material
asphalt pavement
hydraulic cement concrete
Reflective sheeting
Regular excavation
Reinforced concrete crib walls
Reinforcing steel
installation procedures
materials
Reinstalled pipe
Relocating or modifying exist.
misc. items
Removal of
& disposal of structures &
obstructions
asphalt concrete overlay
unacceptable & unauthorized
work
portion of an existing
structure
Removing, resetting, relaying,
adjusting, installing, modifying,
reconstructing, or relocating
existing items
Repairing existing structures
Reseeding
Restoration
property
work performed by others
Retainage
Retaining walls, concrete
Retroreflectors
Reuse guardrail & terminal
Right of way
construction method
approval on railway
furnishing
Right-of-way monuments
installation procedures
materials
Riprap
107
105
107
105
412
302
211
203
247
303
506
406
223
223
302
510
105
412
105
413
510
412
603
107
109.08(c)
506
235
505
107
219
204,414
materials
placement procedures
Road edge delineators
Roadside development
construction
materials
Rootmat
Route map
Rubble gutter, grouted
Safety & health standards
during construction
public
Salt, (sodium chloride &
calcium chloride)
Samples, tests, cited material
specs
Sanitary
provisions
Sanitary sewer
facilities
Scales
Scope of payment
Seal coat
Sediment basins
Seed
application procedures
materials
Seeding materials, erosion
control
Select material
Selective tree removal,
trimming, & cleanup
Septic tanks
Settlement boxes
Settlement plates
embankments
Sewer brick, masonry unit
Sewer, facilities, sanitary
702
601
101.02, 106.04(b)3
105
502
107
105
239
106
107
520
109
312
303
603
303
207
601
303
222
520
testing
Sheet piles
temporary
Sheeting
warranty requirements
reflective
Shop drawings, see Working
drawings
Shotcrete
Shoulder material, open graded
402
247
105
412
209
materials
procedures
Shoulders
Sidewalk
Signal components
Signal poles, traffic control
devices
Signalization, temporary
Signals
traffic
traffic equipment
traffic procedures
see Traffic Signals
Signs
erection
fabrication
islands
overlayment
panels,
posts
sheeting, protecting
storage
structures
temporary
traffic
transporting
Silt barriers
Siltation control
Site condition difference
Site of work examination
Size limitations
Slag
aggregate
use in hydraulic cement
concrete
Slides, removal
Slope drains
Slope protection
Sod
materials
placement procedures
Sodium chloride
Soil retention coverings
Soil stabilization mats
installation procedures
materials
Sound barrier walls
Source of supply
Special provision copied notes
304
504
238
700
512
703
701
Special provisions
Specialty items
Specifications
coordination with contract
documents
contract rank
highway
materials, conformance with,
cited specs
railroad
supplemental
Spraying, herbicide
Spring boxes
Stabilization
105
106
107
607
302
307
502
701
700
701
701
700
512
701
701
303
104
102
107
203
215
303
415
244
604
239
244
607
519
106
105
hydraulic cement
lime
materials
procedures
weather limitations
Stabilized material
acceptance
equipment
materials
open-graded
placing limitations
procedures
proportioning
Stabilized open-graded material
Stakeout
Stakes, lines, & grades,
Standard combination curb &
gutter
Standard drawings
Standard retaining walls
Steel
forgings
grid flooring
grid floors
median barriers
piles
reinforcement
reinforcing materials
reinforcing procedures
shafting
structural
Steel structures
bolt holes
bolt tension
306
307
313
105
502
105
506
226
225
227
505
228
223
406
225
226
407
erection of
erection procedures
expansion joints
fabrication procedures
falsework
handling, storing, & shipping
materials
materials
painting
pedestals
shear connectors
straightening & curving
structures, girders
welding
working drawings
Steps
Stone
bedding
Storage of materials
Storm drains
Structural plate
Structural steel
working drawings
Structure excavation
Structure, existing
dismantling
reconstructing
removal/disposal
repairing
timber
widening
Structures
Stud shear connectors
Stumps
Subbase
acceptance
grading
material
placement procedures
Subcontracting
Subgrade
Subsurface data
Suppliers, debarred
Supply source/quality material
requirements
Surcharge
Surface course, penetration
aggregate
cover material
407
408
407
504
204
106
302
232
226
407
401
413
412
411
412
418
412
401
226
601
208
308
105.06
305
102
106
303
314
equipment
liquid asphalt
materials
procedures
weather limitations
Surplus material, disposal of
Surveying, construction
Suspension of work
Tack coat
Technicians certification &
classification
Temporary structures
Termination of contract
Termination of contractor
responsibilities
Terms, definitions
Tests of material
Timber
disposition
merchantable
preservatives
structures
Time limit, contract
Topsoil
application procedures
materials
Traffic barrier service
guardrail terminal
Traffic control devices
construction of
delineators
materials
pavement markings &
markers
signs
temporary
working drawings
see also Traffic signals
Traffic opening project sections
Traffic signals
controllers & cabinets
detectors, magnetic,
inductive loop
flashers
signal heads
testing & demonstration
Traffic, maintaining
materials
315
314
303
105
108
310
200
105
108
101
106
301
106.04(b)
236
418
108
602
512
700
702
704
701
512
700
703
105
703
512
procedures
Trainees on construction
projects
Transplanting
Tree
cleanup
herbicide
planting, transplanting
removal
replacement
selective cutting/disposal
trimming/ pruning
walls
wells
Truck mounted attenuator
Unacceptable & unauthorized
work
Unacceptable material
Undercut excavation
Underdrains
installation procedures
materials
outlet markers
Underruns
Unions
Unsuitable material
material, removal of
Utilities
adjustment
Contractor's responsibility
cooperation
512
518
Value engineering proposals
Virginia Test Methods
Wages
Wall
retaining
sound barrier
Warning lights
Warning signs, responsibility to
public
Warranties
reflective sheeting
Watchperson, railway
Water
cement use
gate
lime use
pollution
104
200
107
506
605
601
605
601
609
512
105
106
303
501
106
501
104
107
401
303
520
108
105
519
512
105
247
107
216
507
216
107
supply, protection of
Water &sanitary sewer facilities
disinfecting water mains
materials
procedures
testing
Water facilities
disinfecting mains
placement
testing
Watering, planting
Waterproofing
materials
procedures
Waterstops
installation procedures
materials
Weather limitations
hydraulic cement
stabilization
penetration surface courses
prime coat
seal coat
stabilized open-graded
material
tack coat
Weed killer (herbicides)
materials
spraying procedures
Weight limitations
Welded wire fabric
Welder certification
Welds
reinforcing steel
structural steel
Wells
Widen, repair, & reconstruct
existing structures
Wire mesh
Withdrawal of bid
Wood products
Work
alteration of character
authority to begin
calendar days
conditions for
default of contract
examination of site
520
605
416
404
212
307
314
311
312
313
310
244
607
108
406
407
406
407
516
412
223
102
236
104
105
108
102
extra
failure to complete on time
fixed date
force account
gratuities
inspection of
limitation of operations
liquidated damages
materials, critical
methods, character of
notice to proceed
progress schedule
prosecution of
provisions of
removal of unacceptable &
unauthorized
responsibility, Contractor's
subcontracting
suspension
suspension ordered by
Engineer
termination of contract
termination of contractor
responsibilities
time limit, extension of
contract
Work, control of
acceptance
claims
submission/disposition
construction surveying
construction
D.T.M.
final
partial
R.O.W. monumenting
Work, scope of
character of
cleanup
contract intent
Workers' compensation
insurance certificate
character of
Working drawings
general
steel structures
traffic control devices
109
108
109
105
108
106
105
108
105
108
105
108
105
108
105
104
105
104
103
105
407
700