Topic Abbreviation definitions Acceptance of work Acronym definitions Admixtures used in hydraulic cement concrete Advertisement, Notice of Aggregate acceptance procedures certification, base course base material coarse crusher run fine handling & storing lightweight nonpolishing, penetration surface courses Aggregate material, maintenance of traffic Air pollution Allaying dust Alteration of character of work Alteration of quantities Aluminum alloy Anchor bolts installation procedures materials Anchorage assemblies, intermediate Anchors fabrication (Materials and Fabrication) Materials (Anchor Bolts) procedures see Bearing devices & anchors Archeological findings Arches, filled spandrel Arrows, electronic Asphalt concrete (SUPERPAVE) acceptance adjustment system aggregate handling (Handling and Storing Aggregates) Page Section 101 105.15 101 215.01 101.02 200.04 200.04 308.04, 309 208.01 203 205 202 200.05 206 200.06, 316.02(a), 404.02 314.03 512.04 107.14 (b)2 511 104.02 104.02 229 408.03(h) 226.02( c) 505.03 408 408.02 226.02(c ) 408.03 107.16(d) 401.04 512.03(c ) 211.08 211.09 211.02(b) 211.11 inspection plant job-mix formula materials mixture prepartion mixture payment adjustment system plant requirements (Asphalt Concrete Mixing Plant) plant production initial referee system storage system storing (Handling and storing Aggregates) testing tests types of mixtures (Asphalt Concrete Mixtures) Asphalt concrete curbs construction procedures materials Asphalt concrete pavement base density requirements, compacting equipment finishing materials mixture pavement samples pavement tolerances paving limitations, cold weather paving technician placement limitations placement procedures (Placing and Finishing) plant (Asphalt Concrete Mixing Plant) plant technician priming procedures samples sidewalks tolerances Asphalt material cement coating ability curb backup material 211.07 211.03 211.02 211.13 211.04 211.09 211.12 211.12 211.15 211.10 211.14 211.11 211.05 211.06 211.04 502.03 (2) 211.04 315.05(a) 315.05(d) 315.03 315.05(c ) 211.01 & 315.02 211.04 315.06 315.07 315.05 200.06(e) 315.04 315.05( c) 211.12 200.06 315.05 315.05 315.06 504 315.07 210 210.02(e) 210.02(b) 315.02(c ) cutback asphalt emulsion liquid asphalt material curing shipping storing used in hydraulic cement stabilization Attenuators, impact Authorities engineer inspector Award cancellation Award of contract Backfill culverts porous replacing undercut excavation storm drains structures Baled straw Bar chair supports Bar mats Barricades responsibility to public (Barricades and Warning Signs) Barrier delineators service, traffic silt sound walls steel median traffic barrier service see also Median barriers Base course Basements, demolition Batcher, certification of Beads, glass Bearing areas, bridge seat Bearing devices & anchors materials placement procedures Bearing pads Bearing piles Bearing plates 210.02( c) 210.02(f ) 210.02(b) 210.02(d) 210.03(a) 210.03(b) 307.06 512.03(g) 105.03(a) 105.03(b) 103.03 103.02 303.04(f) 303.04(f) 204.02(c ) 303.04(f) 302.04 401 303.03(d) 406.03 233.02(6) 105.14,,512.02(b), 512.03(o) 105.14 505.02(d), 512.03(f), 702 512.03(f) 303.03 519 505 512.03(f), 512.04 309 516.02(b) 200.06(d) 234 404.06 237.01 408.03 237 403 408.01 Bedding material drainage structures sidewalk Bidding bid consideration bid letting bidder disqualification bidder prequalification bids preparation combination or conditional proposals conditional irregular bids material proposal content proposal guaranty proposal quantities (Interpretation of Quantities in Proposal) public opening (Public Opening of Bids) Requirements (Bidding Requirements and Conditions) Submission of bid standard use of debarred suppliers withdrawal worksite/ proposal examination (Examination of Site of Work and Proposal) Bolts Bond requirements payment performance bid contract Borrow excavation Borrow pit materials (Local Material Sources (Pits and Quarries) Borrow, subgrade & shoulders Box culverts Breakaway support systems 237 302, 302.02, 302.03, 302.04 504.04(2) 102 103.01 102.12 102.08 102.01 102.05 102.02 102.02 102.06 102.02 102.07 102.03 102.12 102 102.09 102.05 102.05 102.10 102.04 226.02(g) 103.05 103.05 102.05, 102.06 103.05 303.02, 303.06(2) 106.03 305.02 302.01 700.04(f) Brick Bridge approach slabs asphalt overlay removal conduit systems construction over navigable waters deck construction deck grooving deck overlay (Repairs) deck repair (Widening, Repairing, and Reconstructing Existing Structures) drainage aprons & chutes expansion joints finishing concrete guardrail attachments joints latex concrete lighting systems median barriers opening to traffic seat bearing areas widening Bronze alloy Buildings demolition use by Contractor Bull nose barrier Bulletin boards and Posting Official Notices Burning Cable aerial barricades color coding conductor guardrail interconnect lighting conductor lighting systems loop detector lead in materials signal splicing Caissons, drilled in Calcium chloride Carrier rates, common 222.01 316.01, 316.06 412.03(c ) 419 107.20 404.04 404.07(f) 412.03(b) 412.01 502.01 404.05 404.07 505 404.03(g), 404.05 412.02(b) 419.01 410.03(c ) 404.03(m) 404.06 412.01 230 516 516.02(b) 505.04 107.14 107.16 700. 04(g) 505.03 700.04 700.04(g) 505.03, 505.04 700.04 700.04(1) 700.04(g) 703.02(c ) 238.02 700.04 700.04 401.03(d) 239 109.06 Casing pipe Casting frames & covers, drainage structures Castings Catch basin, masonry unit 520.02(c ) 302.04 Cement, hydraulic Cement, hydraulic stabilization types Cement-stabilized select borrow Central mix aggregate technician Certificates Certifications batcher 214 316.04 protective coating of metal in structures (General Surface Preparation and Application Standards) technician Channel preservation Channelizing devices Check dams, erosion control Cisterns Cited specs, material Claims damage responsibility disposition extension of time submission Class I & Class II backfill material Cleanup Clearing & grubbing area connecting substructure units Clearing & grubbing area connecting substructure units Clearing of parcels Closing wells Cofferdams Cold weather paving limitations Combining pipe of one size Combustibles, disposal of Common carrier rates Compaction, see Density Compensation for altered 224 223.02 214.01 307.01, 307.05 200.06(a) 107.02 200.06 411.04 200.06 401.03(a) 512.03(e) 303.06 303.04 106.06 107.13 105.19 105.19 105.19 291, 302, 305, 321 105.16 301 401.01 401.01 516.02(c ) 516.01 401.03 315.05 520.06 301.01 109.06 98 quantities Completion Date Completion, failure to on time Concrete corrugated metal bridge deck forms curing box curing materials cylinders encasement field technician foundations prestressed (Tolerances) slope protection steps testing see Asphalt concrete see Hydraulic cement Concrete pavement see Asphalt concrete pavement see Hydraulic cement concrete pavement Conductor cables Conduit systems bridges traffic control Construction joints hydraulic cement concrete over/or adjacent navigable waters safety & health standards signs surveying (Construction Stakes , Lines & Grades) Contract alteration award bond requirements calendar days cancellation of award concurrent (Cooperation Among Contractors) contract time (Determination and Extension of Contract Time Limit) default of 101.02, 108.06 404.02(d) 217.08(d) 220 217.08(d), 302.03(b), 404.03(j), 405.04 520.03(h) 200.06(f) 700.04(c ) 405.06(a) 415 504 217.08 700.04(g) 419 419.01 700.04(h) 404.03(g) 107.09 107.17 512.03(e) 105.13, 517 104.02 103.02 103.05 108.04(a) 103.03, 105.09 108.04 108.07 documents eliminated items execution & approval extension of contract time failure to execute failure to furnish fixed date liquidated damages Notice to Proceed provisions quantities ranking of elements subcontracting termination time limit Contract documents affidavits & documents ambiguity in bonds, contract contract hierarchy/coordination insurance, liability insurance, workers comp list progress schedule Contract Engineer Contract intent Contract requirements Contractor character of workers, work methods, & equipment cooperation among contractors cooperation critical materials failure to complete on time gratuities insurance limitation of operations liquidated damages notice to proceed progress schedule prosecution of work: responsibility for utility property & services separate contracts subcontracting suspension of work ordered 103.06 109.07 103.09 105.19, 108.04 103.07 103.07 108.04(b) 108.06 105.01 105.12 102.03, 104.02 105.12 105.06 108.08 108.04 103.06 103.06(c ) 102.03, 102.04 103.06(b) 103.05 105.12 103.06(f) 103.06(d) 103.06 103.06(e) ,102.05 104.01 103.05 105.05 105.09 105.07 106.12 108.06 105.04 107.19(c ) 108.02 108.06 105.01 108.03 108.01 107.09 105.09 105.06 108.05 by the engineer termination of responsibilities time limit determination time limit extension work responsibility Contractor companies Control centers, lighting systems Control strips, density Controllers, traffic signals Convenience & safety, public Copper alloy Corps of Engineers permits Crack repair Crib walls Crushed gravel Crushed hydraulic cement concrete Culverts see Box culverts see Pipe Curb & gutter Curb-cut ramps Curing materials Cut, see Excavation Damages, liquidated Damp-proofing materials application procedures Damp-proofing & waterproofing materials Debarred supplier Default of contract Definitions abbreviations & acronyms terms Delineators materials installation procedures Delivery of bid Demolition of basements buildings pavement structures Density aggregate base course asphalt concrete pavement 108.10 108.04 108.04 108.09 109.08 705.03(e) 304.01 703.02 105.14 230 107.02 412.03(6) 506.04(c ) 203.02(b) 129 502.03 502.04 220 108.06 213 213.01 417.03 213 102.05 108.07 101.01 101.02 235.01, 702.02 702.04 102.09 516.02(b) 516.01 508.03 413.01 309.05 315.05(e) cement-stabilized courses control strips embankments hydraulic embankments lime-stabilized courses pipe backfill shoulders subbase courses subgrade Density control strip construction constructing equipment materials procedures Density requirements, aggregate base course Department furnished construction signs material Department railway-highway provisions Detectors, see traffic signals Determination of bearing pile capacities lengths Detours during construction temporary Direct tension indicators Directional island curbs Disinfecting water mains Dismantling existing structure Disposal areas contractor furnished handling inspection material, inorganic material, organic material, surplus material, unsuitable rock, excavated rootmat stockpile Disposal of material, bridge painting Disposal of structure & obstruction Disqualification of bidder 307.02 304 303.04(h) 303.04(j) 306.01 302.03 305.03(e) 306 308.01 304 304 304.03 303.06 304 309 512.03 106.11 403.07 403.07 403.04 105.14(a) 512.03 226.02(h) 502.04 520.05 413 106.04 106.03(c ) 106.09 106.01 106.04(c ) 106.04(c ) 106.04(b) 106.04(a) 106.06(f) 106.04(d) 106.06 525 33 102.08 Documents, contract Drainage aprons & chutes, bridge Drainage structures materials procedures Drawings Drop inlet silt trap Drop inlets Dry riprap Dumped riprap Dust, allaying Earth berms Earthwork construction procedures erosion & siltation control hydraulic materials shrinkage/swell slopes surplus material tolerances Easements Elastomeric expansion dams Elastomeric pads bridges materials sound barrier walls Electrical components Electrical service bridge lighting systems roadway traffic control temporary signalization traffic control devices Electronic arrows Eliminated items Embankments, see Earthwork Encasement pipe End sections installation procedures materials Endwalls Energy dissipators Engineer definition duties & authority (Authority of Engineer) Entrance gutter Environmental protection 103.06 589 302 302.02 302.03 105.10(c) 303.06 302.03(c ) 414 414.03(b) 511 303.03(a) 303 303.04 303.03 303.04(j) 303.02 303.06 303.05( b) 303.04(k) 303.05 107.04 568 408.03(f) 408.03(f) 237.02(a) 519, 519.02 238 419.01 700.01 512.03(h) 700.01, 512.03(c ) 109.07 520.06 302.03 302.02 302.03(c ) 502.04 101.02 105.03 502.04 107.16 air pollution erosion control forests noise pollution siltation control stipulations water pollution Epoxy mastic coating Epoxy-coated reinforcing steel Epoxy-mortar patching Epoxy-resin systems Equal Employment Opportunity Equipment aggregate base course asphalt concrete pavement character of constructing density control strips hydraulic cement concrete pavement hydraulic cement concrete mowing penetration surface courses rental retained in signal modifications seal coat stabilized open-graded material traffic signals warranties Eradication of exist. pavement markings pavement markings, pavement markings & markers Erosion & siltation control Escrow eVA Excavation borrow drilled-in caissons minor structure overhaul presplitting regular retaining walls rock 107.16(2) 107.16 105.14(c ) 107.16(3) 107.16(a) 107.16 107.16(b)1 231.03(e) 204, 462, 465 412.03(5) 243 107.14 309 315 108.07 327 316 217 608 314.03 109.05 705 312 358 703 106.01 622 704.03(b) 107.16(a), 303.03 103.05, 102.11 303.02 401.03(d) 303.04(d) 303.04 303.04(a) 303.04(a) 506, 303.04, slopes structure undercut within limits of curb/gutter/combination/med ian barrier see also Earthwork Expansion dams, elastomeric Explosives use (Alteration of Quantities or Character of Work) Extra work Fabric, geotextile drainage installation procedures, materials Falsework installation procedures working drawings Fastening devices, to keep reinforcing bars in position Federal aid provisions Fence construction procedures materials Fertilizer application procedures materials Field office Fill procedures see also Embankment Filter cloth, see Fabric, geotextile Final Acceptance Final payment Fire hydrants Fires, forests Fixed Completion Date Fixed object attachments Flagger railway service Floors plank steel grid Flowable Fill Flumes, paved, Fly ash used in concrete used in lime stabilization 303.05(b) 401 303.04(c ) 502.04 421 107.11, 104.02, 109.05 303.03(e) 303.03 245.02 404.03, 407.06(e) 105.02 406.03 107.03 242, 507, 507.04 507.03 242.01 603.03 244.02 514 303.04 108.09(c) 109.10 520.03(k) 105.14(c ) 108.04(a) 505.04 107.19(a), 512.03(b) 107.19(a) 512.03(b) 418.04(n) 409 249, 509 502.03(c ) 241.02(a) 241.02(b) Force account work Forest fires Forgings, steel Forms concrete corrugated metal bridge deck prestressed deck panel removal Foundations retaining walls seals sound barrier walls structures traffic control devices Frames & covers installation procedures materials Furnishing & erecting precast structures Furnishing & placing backfill Furshing right of way Gabions Galvanized surfaces, painting Galvanizing Geosynthetics installation procedures materials Geotextile bedding bedding material drainage fabric drainage fabric, underdrains fabric fabric, erosion control Girders concrete steel Glass beads, for pavement marking Grades, lines, & stakes Grading operations Gratuities Gravel, crushed Grid floors, steel Group 1& 2 channelizing devices Grout/Grouted hydraulic cement material riprap rubble gutters, paved ditches, 109.05 107.16 225.02(a) 404.02(a) 404.03 (a) 1 404.03 (a) 2 404.03 (j) 506.02(b) 401.03 519 401.03(b) 520.03(q) 222.02(b) 302.03(b) 401.02(a) 107.04 610 411.07 233 303.03(e) 2 245.02 414.02(d) 504.02(g) 501.02(c) 245.03(a) 303.02(b) 404.03(c) 2 407 234 105.1 104.04(f) 108.06 203.02(b) 409 512.03(e) a.b. 218.02(a) 414 502.04 paved flumes, street connection pavement & bridge drainage aprons/chutes Grubbing Guaranty Forfeiture of proposal guaranty material proposal 301 103.04 ,106.03 102.07 Guardrail delineators installation procedures materials Guardrail & steel median barriers Gutters Handling, storing, & shipping materials epoxy-resin systems hydraulic cement concrete steel structures 221, 505 702.03(b) 505.03 221.02 505 Handrails Hauling public roads rate route size/weight limits Health standards Herbicides Materials spraying procedures High-mast luminaire assemblies Historic sites Holiday Hydraulic cement mortar & grout Hydraulic cement concrete acceptance admixtures batcher consolidation construction joint bonding construction joint exposure to tidal waters curing 504.03(c) 502.03(c) 106.08, 106.09 243.03 217.03(b) 407.05 105.14(a)(b) 109.06 105.14(k) 105.14 107.17 244.02 607.03 705.03(c) 107.16(d) 105.09 215 218.03(a),(c) 217 217.08 215 200.06(d) 404.03(c) 404.03(h) 404.03(i) 316.04(j), 403.03(b) 2, 404.03(k), 405.04 equipment finishing surfaces forms handling latex modified materials materials, measurement of mixing mixture classification mixture proportion placement limitations placement procedures pneumatic placement prestressed protection sidewalks silicone treatment storing tremie widen & repair Hydraulic cement concrete operations bridge deck construction bridge seat bearing areas expansion & fixed joints finishing conctete surfaces materials procedures Hydraulic cement concrete pavement cold weather protection consolidation curing depth dowels equipment finishing form removal forms grade preparation joints materials opening to traffic patching placement procedures reinforcing steel, placement slipforming straightedging test, beam 217.05 404.07 404.03(a), 405.05(a) 217.03 217.03(c) 217.02 217.04 217.09 217.06 217.07 217.1 404.03(c) 404.03(d) 405 404.03(l) 504.03(a)1 404.03(l)3 217.03(b) 401.03 412.02(b) 404.04 404.06 404.05 404.07 404.02(a) 404.03 316.04(j) 3 316.04(h) 316.04(j) 316.05 316.04(g) 5 316.03 316.04(h) 316.04(l) 316.03(a) 316.04(b) 316.04(g) 316.02 316.04(o) 509 316.04 316.04(c) 316.03(j) 316.04(h) 3 316.04(f) texturing tolerances Hydraulic cement concrete plant technician conformance with joint technician waterproofing Hydraulic cement stabilization field laboratory Hydroseeding Impact attenuators temporary permanent attenuator service Incidental concrete items materials procedures Incidental construction Inspection authority/duties of inspector failure to furnish materials cited specs plant samples tests work workers' comp certificate Insurance railroad workers' compensation Intake boxes Items,eliminated Jacked pipe Jacking & blocking of beams Joint sealer, preformed elastomeric, Joints, see Asphalt concrete pavement see Bridges see Construction joints see Hydraulic cement concrete pavement materials 316.04(h) 4 316.05 200.06(c) 200.02 212.02 200.06 213 307 307.03 603.03(d) 512.03(f) 247.02(f) 512.03(g) 502.02 502.03 **105.03(b) 103.07 106, 200 106.06 106.07 106.06 106.06 105.17 103.06(d) 107.19(c) 103.06(d), 107.19(c) 1 302.03(c) 109.07 302.03(a) 1 412.03(e) 420 212.02(c) Junction boxes drainage electrical traffic control devices Jute mesh Labor & wages Landscape, protection of Latex modified concrete Latex modifier Laws to be observed Legal relations certificates claims, damage responsibility contractor work, utility property/service responsibility Corps of Engineers permits environmental stipulations erosion & siltation laws observed licenses Nationwide Federal permits other restoration work performed by others Legal rights construct method approval construct on R.O.W. construction, beginning contractor's insurance contractor's property damage insurance policy copies Insurance, property damage legal rights, no waiver of liability, public insurance no waiver of patented devices, materials, & processes protection of property & landscape public official's personal liability railroad's insurance railroad's property damage railway -highway provisions Liability of public officials Licenses 302.01 238.01(f), 705.03(f) 700.05 244.02(k)1 107.13 107.08 412.03(b) 1 217.03(c) 107.01 107.02 107.12 108.09 107.02(a) 107.16, 107.16(a) 107.01 107.02(c) 107.02(b) 107.02(c) 107.10 107.19(b) 107.19(b) 107.19(e) 107.19(c) 107.19(c) 1 107.19(d) 107.19(c) 1 107.07 107.07 107.05 107.08 107.06 107.19(c) 2 107.19(c) 2 107.19 107.06 107.02 Light poles steel for Lighting systems bridge Lights, navigation Lime 700.01(i) 226.02(e) 705 409.04 422.03(c) 240 stabilization types seeding use in asphalt concrete Limestone Limitation of operations Lines, grades, & stakes, Liquid asphalt Liquidated damages Local material sources Lumber, structural Luminaire arms Mailboxes Maintaining traffic Maintenance during construction connections delays detours embankment, hydraulic entrances flagging grading operations haul route patching operations quantity alteration signs site condition difference structure & obstruction removal/disposal structures, failure to maintain structures, temp work suspension Major contract items Manhole, masonry unit Manholes drainage materials sanitary sewer Manipulation Marker, pavement 306 240.02 603.02(c) 211.02(i) 240.02 (c) 1,2 108.02 105.13 210.02(b) 108.06 105.15 236.02(a) 705.03 700.05 105.15(b) 512 105.14 105.14(e) 1 105.14(d) 105.14(a) 105.14(g) 105.14(e) 2 105.14(c) 105.14(f) 105.14(k) 105.14(h) 105.14 105.14(a) 104.03 105.15 105.15 105.14(i) 105.14(b) 104.02 222.02(b) 1 302.03(c) 302 520.03(p) 306.03 704 Marking, pavement glass beads for materials procedures Masonry units catch basin manhole Material acceptance control of critical delivery found on project furnished by Contractor furnished by Department handling local sources cited specs patented payment, on hand quality requirements rights & uses sampling source of supply storage testing unacceptable warranties Measurement Cubic Yard Lump Sum Weight Measurement & payment asphalt borrow compensation for altered quantities compensation concrete cubic yard eliminated items embankment equipment rental equipment excavation extra & force account work 246 234 704.02 704.03 222 222.02(b) 222.02(b) 200.04 106.01 108.04 106.02 106.05 106.03(c) 106.11 106.09 106.03 106.06 107.05 109.09 106.01 106.05 106.06, 200.03 106.01 106.08 106.06, 200.03 106.10 106.01 109.01(d) 3 109.01(d) 2 109.04 109.05(f) 109.01(d)1 109.01(b) 109.07 109.01(d)2 109.01(d)5 109.04(d) 109.01(d)2 109.05 final payment insurance items, excluded labor lump sum materials materials, inventory materials, other measurement & payment misc partial payment payment for material on hand payment plan quantities quantities measurement scope of payment specific items statements storage structural units tax timber weight Median barriers bridge concrete steel Median strips Milling, type A Mineral filler Mineralogical findings Minimum wage Minor structure excavation, drainage structures earthwork gabions Minority Business Enterprises (MBEs), use of Mobilization Modifying exist. misc. items Mortar pneumatically applied Mortared riprap Mowing Mulch application procedures materials 109.10 109.05(b) 109.09(c) 109.05(a) 109.01(c) 109.05(c) 109.09(e) 109.09(b) 109 109.04(e) 109.08 109.09 109.08 109.02 109.01 109.03 109.01(d) 109.05(g) 109.09(d) 109.09(a) 109.05(b) 109.01(d)4 109.01(a) 410.03(c) 502.03(c)4 505 502.04 412.03(a) 201 107.16(d) 107.13(a) 302.04 303.04(d) 610.04 107.15 513.02 510 412.04 414.02(c) 608 603.03(e) 244.02(g) Nationwide federal permit Navigable waters construction over or adjacent to Navigation lights Newspaper boxes Noise pollution Notice of Advertisement of Intent to File Claim to Proceed posting official Nuclear gage Obscuring roadway Obstruction removal/disposal Office, field Offsetting existing pipe Open graded shoulder material Opening section of project to traffic Organic Compounds Material Outlet pipe Overhaul Overhead & bridge-mounted sign structures Overlay exist. panels, traffic sign Overruns Overseeding Paint Painting of metal, see Protective coating of metal timber structures Paleontological findings Parapets Parcel clearing Partial payment Patching bridges hydraulic cement concrete pavement Patents devices, materials, & processes Paved ditches & flumes 107.02(b) 107.20 422 105.15(b) 107.16(b)3 101.02 105.19 105.01 107.14 514.02(c) 508.02(b) 105.15 514 520.04(d) 209 105.14 107.16(b)2a 244, 106.04(b)3 501.03(b) 303.04 700.02(i) 701.03(d) 104.01(c) 603.03(d) 231 408.02(d) 418.02(e) 107.16(d) 410, 410.04 516.02 c( 109.08 412 509.02(a) 107.05 502.03(c) Pavement demolition planing see also Asphalt concrete pavement see also Hydraulic cement concrete pavement Pavement markers installation procedures materials Pavement markings eradicating installation procedures materials Pavement message markings construction Payment altered quantities bond escrow account final materials on hand partial scope withholding Pedestrian fences Performance bond Permits Pile bearing bearing capacity determination cast in place driving length determination loading tests materials order list penetration pile types points preboring procedures protection restrike retaining walls sheet splicing 508 515 512.03(k), 704.03(c) 235.02 512.03(j) 512.03(i) 246.02 704, 704.04 512.02(d), 512.04 109.08 109.04 103.05 109.08 109.10 109.09 109.08 109.03 109.08 103.05 107.02 403, 403.08 403.07 403.03(c) 403.06(d) 403.04 403.07(a) 402.02 403.05 403.06(e) 403.03 403.08 403.06(d) 6 403.06 403.03(d) 4 403.08 506 402 403.03(b)5 steel piles or pile shells timber tips tolerances Pilot vehicle Pipe combining pipe of one size elbows, reducers & tees extended pipelines not specified grate structural plate temp stream. relocation types of underdrains Pipe arch installation procedures materials structural plate Pipe culvert jacked methods, Pipe installation drainage underdrains water & sewer Pipe types Pipe spillouts Pit materials Placement limitations asphalt concrete pavement hydraulic cement concrete stabilized open-graded material Placing latex & silica fume hydraulic cement concrete Plan quantities earthwork Planing, flexible pavement ridgid pavement Plans specifications conformity with working drawings Plant inspection, material Planting care of plants establishment period 403.03(d) 403.02(a) 403.08 403.07 512.03(b) 232, 302.02(a), 302.04 520.06 302.02(c) 302.04 302.02(d) 302.02(d) 302.04 232.02(a) 501.03(b) 232 302.03 232 302.02(d) 302.03(a) 302.03(a) 1 302 501.03(b) 520 232.02 302.03(a)2f 106.03 315.04 217.10 313.06 412.03(b)1 109.02 303.06(c) 515.02 515.02 105.12 105.11 105.10 106.07 605 605.04 605.05 guarantee materials procedures Plants deleted by Engineer from Contract, planting Plants for roadside development materials planting Pneumatic placement of concrete Poles Pollution Posting official notices Posts fence guardrail sign Precast drainage structures structures, furnishing & erecting Pre-Construction Conference Preformed elastomeric joint sealer Prequalification of bidders Preservatives, wood Prestressed concrete concrete controls materials panels piles plant review procedures structural units Prestressing tendons Prime coat, asphalt Progress of work Progress schedule Property, protection of Proposal combination or conditional content examination of Forfeiture of guaranty 605.06 605.02 605.03 605.03(c) 605.03(i) 244 605 404.03(d) 700.02(i) 107.16(b) 107.14 507 505 700.02(i) 302.03(b) 302.03(b) 105.02 420 102.01 236.02(c) 405 405.04 405.02 405.07 405.02(a), 405.03 405.05 405.07 223.02(b) 311 108 108.03 107.08 102.02 102.04 103.04 guaranty quantities interpretation Value engineering Prosecution & progress of work Protection & restoration of property & landscape Protective coating of metal in structures certifications coating of new steel on structures environmental protection existing structures galvanized surfaces general surface preparation and application standards health and safety materials new structures Coating galvanized surfaces zone coating of existing structure Protective coverings, soil retention coverings Pruning Public convenience & safety officials personal liability use of roads, open/not open Quantities alteration compensation for altered measurement of plan proposal Quarry materials Railing Railway construction method approval on R.O.W. flagger/watchperson services railway-highway provisions Railway -highway provisions contractor's flagger insurance liability, public property damage railroad's 102.07 102.03 104.02 108 107.08 411 411.03 411.05 411.08 411.05 411.07 411.04 411.09 411.02 411.06 411.07 411.05 606 605.03(k)8 105.14 107.06 107.21 104.02 109.04 109.01 109.02 102.03 106.03 410 107 restoration of property & landscape warning signs watchperson Rank of contract elements Reconstruct existing structures manholes Recycled material asphalt pavement hydraulic cement concrete Reflective sheeting Regular excavation Reinforced concrete crib walls Reinforcing steel installation procedures materials Reinstalled pipe Relocating or modifying exist. misc. items Removal of & disposal of structures & obstructions asphalt concrete overlay unacceptable & unauthorized work portion of an existing structure Removing, resetting, relaying, adjusting, installing, modifying, reconstructing, or relocating existing items Repairing existing structures Reseeding Restoration property work performed by others Retainage Retaining walls, concrete Retroreflectors Reuse guardrail & terminal Right of way construction method approval on railway furnishing Right-of-way monuments installation procedures materials Riprap 107 105 107 105 412 302 211 203 247 303 506 406 223 223 302 510 105 412 105 413 510 412 603 107 109.08(c) 506 235 505 107 219 204,414 materials placement procedures Road edge delineators Roadside development construction materials Rootmat Route map Rubble gutter, grouted Safety & health standards during construction public Salt, (sodium chloride & calcium chloride) Samples, tests, cited material specs Sanitary provisions Sanitary sewer facilities Scales Scope of payment Seal coat Sediment basins Seed application procedures materials Seeding materials, erosion control Select material Selective tree removal, trimming, & cleanup Septic tanks Settlement boxes Settlement plates embankments Sewer brick, masonry unit Sewer, facilities, sanitary 702 601 101.02, 106.04(b)3 105 502 107 105 239 106 107 520 109 312 303 603 303 207 601 303 222 520 testing Sheet piles temporary Sheeting warranty requirements reflective Shop drawings, see Working drawings Shotcrete Shoulder material, open graded 402 247 105 412 209 materials procedures Shoulders Sidewalk Signal components Signal poles, traffic control devices Signalization, temporary Signals traffic traffic equipment traffic procedures see Traffic Signals Signs erection fabrication islands overlayment panels, posts sheeting, protecting storage structures temporary traffic transporting Silt barriers Siltation control Site condition difference Site of work examination Size limitations Slag aggregate use in hydraulic cement concrete Slides, removal Slope drains Slope protection Sod materials placement procedures Sodium chloride Soil retention coverings Soil stabilization mats installation procedures materials Sound barrier walls Source of supply Special provision copied notes 304 504 238 700 512 703 701 Special provisions Specialty items Specifications coordination with contract documents contract rank highway materials, conformance with, cited specs railroad supplemental Spraying, herbicide Spring boxes Stabilization 105 106 107 607 302 307 502 701 700 701 701 700 512 701 701 303 104 102 107 203 215 303 415 244 604 239 244 607 519 106 105 hydraulic cement lime materials procedures weather limitations Stabilized material acceptance equipment materials open-graded placing limitations procedures proportioning Stabilized open-graded material Stakeout Stakes, lines, & grades, Standard combination curb & gutter Standard drawings Standard retaining walls Steel forgings grid flooring grid floors median barriers piles reinforcement reinforcing materials reinforcing procedures shafting structural Steel structures bolt holes bolt tension 306 307 313 105 502 105 506 226 225 227 505 228 223 406 225 226 407 erection of erection procedures expansion joints fabrication procedures falsework handling, storing, & shipping materials materials painting pedestals shear connectors straightening & curving structures, girders welding working drawings Steps Stone bedding Storage of materials Storm drains Structural plate Structural steel working drawings Structure excavation Structure, existing dismantling reconstructing removal/disposal repairing timber widening Structures Stud shear connectors Stumps Subbase acceptance grading material placement procedures Subcontracting Subgrade Subsurface data Suppliers, debarred Supply source/quality material requirements Surcharge Surface course, penetration aggregate cover material 407 408 407 504 204 106 302 232 226 407 401 413 412 411 412 418 412 401 226 601 208 308 105.06 305 102 106 303 314 equipment liquid asphalt materials procedures weather limitations Surplus material, disposal of Surveying, construction Suspension of work Tack coat Technicians certification & classification Temporary structures Termination of contract Termination of contractor responsibilities Terms, definitions Tests of material Timber disposition merchantable preservatives structures Time limit, contract Topsoil application procedures materials Traffic barrier service guardrail terminal Traffic control devices construction of delineators materials pavement markings & markers signs temporary working drawings see also Traffic signals Traffic opening project sections Traffic signals controllers & cabinets detectors, magnetic, inductive loop flashers signal heads testing & demonstration Traffic, maintaining materials 315 314 303 105 108 310 200 105 108 101 106 301 106.04(b) 236 418 108 602 512 700 702 704 701 512 700 703 105 703 512 procedures Trainees on construction projects Transplanting Tree cleanup herbicide planting, transplanting removal replacement selective cutting/disposal trimming/ pruning walls wells Truck mounted attenuator Unacceptable & unauthorized work Unacceptable material Undercut excavation Underdrains installation procedures materials outlet markers Underruns Unions Unsuitable material material, removal of Utilities adjustment Contractor's responsibility cooperation 512 518 Value engineering proposals Virginia Test Methods Wages Wall retaining sound barrier Warning lights Warning signs, responsibility to public Warranties reflective sheeting Watchperson, railway Water cement use gate lime use pollution 104 200 107 506 605 601 605 601 609 512 105 106 303 501 106 501 104 107 401 303 520 108 105 519 512 105 247 107 216 507 216 107 supply, protection of Water &sanitary sewer facilities disinfecting water mains materials procedures testing Water facilities disinfecting mains placement testing Watering, planting Waterproofing materials procedures Waterstops installation procedures materials Weather limitations hydraulic cement stabilization penetration surface courses prime coat seal coat stabilized open-graded material tack coat Weed killer (herbicides) materials spraying procedures Weight limitations Welded wire fabric Welder certification Welds reinforcing steel structural steel Wells Widen, repair, & reconstruct existing structures Wire mesh Withdrawal of bid Wood products Work alteration of character authority to begin calendar days conditions for default of contract examination of site 520 605 416 404 212 307 314 311 312 313 310 244 607 108 406 407 406 407 516 412 223 102 236 104 105 108 102 extra failure to complete on time fixed date force account gratuities inspection of limitation of operations liquidated damages materials, critical methods, character of notice to proceed progress schedule prosecution of provisions of removal of unacceptable & unauthorized responsibility, Contractor's subcontracting suspension suspension ordered by Engineer termination of contract termination of contractor responsibilities time limit, extension of contract Work, control of acceptance claims submission/disposition construction surveying construction D.T.M. final partial R.O.W. monumenting Work, scope of character of cleanup contract intent Workers' compensation insurance certificate character of Working drawings general steel structures traffic control devices 109 108 109 105 108 106 105 108 105 108 105 108 105 108 105 104 105 104 103 105 407 700