ROC800 MMI (13RAS023) Sales Training Update Laura Gonzalez Coriolis Interface Module-Agenda • Coriolis Interface Module • Features and Benefits • The Coriolis Interface Solution • Typical Applications • Installation and Setup • Compatibility • Conclusion CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 2 Coriolis Interface Module • Communicates directly with the core processor of Emerson Coriolis meters (with an Intrinsically Safe barrier) and transmitters • Automatically retrieves data for monitoring and control of – – – – Key Operating Data Calibration Information Diagnostics Information Can calculate flow based on MODBUS data no pulse transmitter required • Communicates with up to six Coriolis Meters in the ROC800 (up to four in the FB107) CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 3 Features and Benefits • Enables on line calibration using ROCLINK800 • Enables diagnostics with quick access to Coriolis data • With ROCLINK800 - control and monitor features such as: – Meter Zeroing – Smart Meter Verification (SMV) – Transient Bubble Remediation (TBR) – Transient Mist Remediation (TMR) *new* – Production Volume Reconciliation (PVR) calculations CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 4 *new* - Net oil The Coriolis Interface Solution Intrinsically Safe Barrier Coriolis Interface Module • Keep the pulse transmitter - Meet API Chapter 11 • Replace transmitter with IS barrier - Increase value to customer - Easier to maintain (only one config tool) - Reduce total cost of ownership - Make Allocation measurements CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 5 Typical Applications • Monitor well head separator performance • Monitor two phase separators with Gas and Liquid flow and percent water (Net Oil) calculations • Monitor three phase separators with Gas, Oil and Water outputs. • Measure flow from tanks and LACT skids for truck loading and unloading CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 6 Installation and Setup • The Application Guide Part D301753X012 describes the installation and set up procedure for the ROC800L and the FB107 • This is similar to the Guide used in the training for the FB107 • The new areas are – Adding of TMR and PVR to the Module – A modification to the setup for ROC800L Liquid Calcs – A modification for the setup for the gas meter in the ROC800L CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 7 Adding TMR and PVR • The following display shows the addition of a panel that defines the available options in the core processor – PVR – SMV – TBR – TMR This defines the options that are available in the Coriolis Meter being configured. The calibration display, the diagnostics display and smart meter verification display did not change CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 8 Coriolis Module Setup Display CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 9 TBR and TMR • Transient Bubble Remediation (TBR) – used to handle occasional gas bubbles or slugs of air in the process fluid. • Transient Mist Remediation (TMR) *new with this release* – used to handle occasional gas mist (water or oil) appearances in gas flow CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 10 TBR Display CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 11 TMR Display CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 12 The PVR Function • The PVR feature adds the ability to calculate the % water content in the Liquid being measured. • The data inputs required are: – The reference temperature – The Oil Base Density – The Water Base density • The Core processor then calculates the water cut, the various flow rates and flow totals. • This data is retrieved by the Coriolis Interface Module and is available for use in the Gas measurement and Liquid Measurement calculations CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 13 The PVR Display CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 14 Compatibility Version 1.10 of the Coriolis Interface module is compatible with the following: – ROC800 v3.61 – ROC800L v1.41 – ROC800L Liquid Calcs User Program v1.04.00 – FB107 v1.70 – FB107 Liquid Allocation Mgmt User Program v1.00 – ROCLink800 v2.41 – Micro Motion Coriolis meter models 700 (v3.2 or later) and 800 (v3.9 or later) – Micro Motion Transmitter models 1500, 1700, 2500, 2700 and 3700 CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 15 FAQs • Does the module write down to the core processor? – No, it does not. • Can the APM for ROC800 be used instead of the transmitter? – No it cannot. – For custody, a pulse for liquid is required but for gas MODBUS flow rates can be used to do the gas calculation. • Can we meet the AGA 1 second update standard? – A four meter run will meet 1 second updates for AGA but the 6 meter run will not as it takes about 2 Seconds to update the 6 meters. • Can the MODBUS registers be changed in the module? – The MODBUS registers used in the CIM are fixed and cannot be changed. CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 16 Conclusion: Measurement Challenges - Met Challenge Solution Integration of Coriolis meters with Emerson flow computers is complicated, and our competitors make it easy Coriolis Interface Module automatically links the MMI Coriolis with FB107 and ROC800 Customers may not know how Better monitoring of the separation effective their production systems and dump cycle process. (Beta are – How many dump cycles? test unit counted 2,000 + dump How much accumulation of what? cycles in a day) Remote solar powered installations require reduced power. CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 17 Eliminate the need for transmitters for reduced system power requirements (Allocation applications). Questions? • If you have any questions, please feel free to contact me at LauraGonzalez@Emerson.com. CIM Sales Training Update • Emerson Confidential • 7/2/15 • Slide 18