2012-Mar-03

advertisement
03/03/2012
Cuyamaca College
Engineering Club: Build Team Meeting
Agenda
I.
II.
III.
IV.
Administrative Announcements
Team Discussions
Group Picture
Next Meeting
I.
Administrative Announcements
1. Check website for updated information (cuyamaca.edu/engrclub)
2. Officially appoint Jeremy B. and Jeremy M. team leads
3. Project Update
a. FAA Regulations – Launch Site Requirements
b. Mt Carmel Launch
c. Landing projection models => Drive launch site selection
4. Professor Lehman
a. Grossmont Chemistry Professor
b. Experienced with amateur rockets
c. Helped with Mt. Carmel HS Balloon Launch
d. Brother is an Electrical Engineer
e. Requested donations from QualComm (MC: Radio & GPS), GoPro, &
Contour
f. Letting us use his Canon Camera with firmware installed
g. Researching Particle Collector design elements
II.
Team Discussions
1. Teams form up into groups
a. Discuss team projects
2. Team Specific Updates
a. Launch Site Selection Team
i. FAA regulations update
ii. Landing Projections => Drive Launch Site Selection
1. Determine if we can launch from Grossmont or Cuyamaca
iii. Set up computers
1. Show what Mt. Carmel HS did
2. Show models
b. Particle Collector Design Team
i. Enhance design with team feedback
ii. Develop parts list
03/03/2012
iii. Develop build schedule
iv. Determine deadlines
v. Coordinate with Micro-Controller Team
c. Micro-Controller Team
i. Pressure sensor status
ii. Feasibility projections
iii. Develop parts list
iv. Develop build schedule
v. Determine deadlines
3. Team Presentations
a. Launch Site Selection Team
b. Particle Collector Team
c. Micro-Controller Team
d. Misc. Project Items
i. Helium – Emilio
1. 65-75 ft3 required
2. WestGas Air
3. Request donation from welding shop on campus?
ii. Cold Temperature Electronics Testing - Jeremy M. & Kevin R.
1. SDSU cold freezer
2. Determine number of hand-warmers required
4. Integrate Timeline
5. Integrate Deadlines
III.
Group Picture
a. Take a group picture
IV.
Next Meeting
1. All meetings will be build team meetings until after balloon launch
2. Professor Lehman will be attending
a. Update on his inquiries
b. General Q&A
3. Manufacturing Engineer guest speaker 03/17/12 (build team meeting following)