Risk Assessment Record: Laser Cutter Shawcross – Room GC4 / Interact Lab School of Engineering and Informatics J. Luis Berna 10.Nov.2015 Building manager: Position: Valid until / Due for review: Johnny Parish Laboratory Technician 10.Nov.2016 Laser Cutter Risks of fire, damage from laser light, fumes, noise and entalgement associated with operating a Laser Cutter Operator / Those in the vicinity Fire protection and cut out on machine – training – fire extinguishers nearby. Laser Light Operator / Those in the vicinity Exposure to fume generated by hot process Noise Operator / Those in the vicinity Entanglement in moving machinery Operator Operator / Those in the vicinity Equipment must never be left unattended when in use. 1. Machine completely enclosed in accordance with Class 2 regulations 2. interlocks on doors 3. Training given 4. Opening of electrical enclosures and maintenance will only be carried out by a competent laser service engineer with the equipment electrically isolated Local Exhaust Ventilation (LEV) attached to laser, so that all fume is removed. 1. Ear plug and ear defenders provided 2. Safety procedures displayed next to the equipment Completely enclosed – interlocks on all doors 1 3 3 1 2 2 1 1 1 1 1 1 1 1 1 Residual Risk Rating (RL x RS) Fire Further Risk Controls required (if Risk Rating is 5 or above) * Residual Severity (RS) Existing Risk Controls * Residual likelihood (RL) Who may be harmed? Risk Rating (LxS) * Hazards Identified Severity (S) * Acceptable Likelihood (L) * Location / Area: Dept/School: Assessor: Date of assessment: Summary of project or activity Overview of main risks involved: Overall Risk Rating: Responsible for implementing further Risk Control measures Due Date ** Date Completed * Risk Rating: This form assumes 1-5 scoring system for Likelihood & Severity, and 1-25 scoring for Risk Rating. (see Guidance Note on Risk Assessments (RAs) for more details) Within 1-25 Risk Rating scoring, Risk Rating score of 1-4 is considered Acceptable, 5-9 Adequate. Risk Rating of 10 and above indicates that further risk control measures must be introduced until the Residual Risk Rating has been reduced to at least below 10. ** Due Date records the date by which all the identified risk control measures need to be implemented. 2