LEED Green Associate Exam Practice Exam Question 1 Construction and demolition debris includes all but which of the following? A Concrete from a demolished building B Steel from a demolished building C Drywall D Rocks Question 2 What should be included in a construction waste management plan? A Asbestos removal B Where construction debris will be diverted C Erosion control D The percent of recycled materials Question 3 Show Answer Legend A project team discovers a new way to avoid the heat island effect. How does the LEED certification process reward this new concept? A Heat Island Effect is covered by LEED, so no additional points would be given B An innovative performance point would be awarded C An exemplary performance point would be awarded D An extra Heat Island Effect point would be awarded Question 4 Show Answer Legend Which of the following does not help achieve a water-efficient landscape? A Micro misters B Green roof C Planting with adaptive plants D Planting with native plants Question 5 Show Answer Legend Which of the following projects would not meet the minimum program requirements for certification? A A new building on an office campus located next door to an existing certified building B A modular classroom that can be moved to another location on the school property C A building project that is three stories high D A new laboratory building that will be located partially underground Question 6 Show Answer Legend The addition or increasing the use of graywater in a building can help with: A Reducing potable water use in faucets B Reducing stormwater runoff C Reducing potable water used by urinals D Reducing rainwater harvesting Question 7 Show Answer Legend What environmental issue is associated with refrigerants used in HVAC&R systems? A Damage to the Earth's ozone layer B Increased use of fossil fuels C Pollution of water bodies D Increased air pollution Question 8 What has the lowest priority in building design? Show Answer Legend A Building codes B Fire protection codes C Plumbing codes D LEED Rating System Question 9 Biomass is what type of material? Show Answer Legend A Landfill gas B Fly-ash C Plant material D Animal waste Question 10 What information is needed to calculate the SRI of a material? A Reflectance B Thickness of the material C Emissivity Show Answer Legend D Thermal gradient Question 11 What is the benefit of installing bicycle racks? Show Answer Legend A Reducing automobile use B Innovation in Design C Reducing heat islands D Communitiy connectivity Question 12 What site features are included in the landscape area? Show Answer Legend A The building B Paved bicycled path C Walkway made of recycled rubber tires D Area with invasive plants Question 13 How can regional priority credits be earned? Show Answer Legend A Addressing green measures or strategies that are more important to a climate or region B Using 100% native plants for the site's landscaping C Developing an educational or training system that addresses local building issues D Using materials that are located within 500 miles of the project site Question 14 Which vehicle is not considered an alternative-fuel vehicle? Show Answer Legend A Efficient gas-electric hybrid B Electric car C Natural gas powered car D Gas powered Honda that has achieved a Green Score of 40 Question 15 Show Answer Legend The use of native plants on the project site can most assist projects teams with what other sustainable intents? A Using sustainable materials B Construction waste management C Protecting existing local habitat D Reducing stormwater quantity Question 16 Show Answer Legend What helps minimize the space requirements of occupant recycling? A Installing can crushers B Having multiple bins for each recycled material C Locating the recycling bins in the basement of the building D Having onsite cardboard bailers Question 17 Show Answer Legend What important documents should be created for the purpose of selecting the design team? A Request for qualifications B Operations and maintenance manuals C Statement of work D Bidding documents Question 18 Show Answer Legend What resources are available to team members to find more information about other LEED projects? A USGBC's monthly magazine B LEED Online C USGBC Chapters D USGBC publications Question 19 What tool is used to determine the target certification level? Show Answer Legend A LEED Score Card B LEED Online C EPA's Target Finder D CIR Question 20 Show Answer Legend How many points are listed for prerequisites on the LEED Scorecard? A 1 B 2 C 0 D 18 Question 21 Show Answer Legend How can the site boundary differ from the LEED project boundary? A The site boundary is the property line while the LEED project boundary the portion of the site submitted for LEED The site boundary is the portion of the site submitted for LEED while the LEED project B boundary marks where the LEED project ends C They are exactly the same D They can be the same, but site boundary includes only the area submitted for LEED Question 22 What type of fixture can earn EPA's WaterSense label? Show Answer Legend A HET dual flush toilet B Kitchen sink faucets C Washing machine D Dishwasher Question 23 What does the Montreal Protocol ban? Show Answer Legend A CFCs B Coal-fired power plants C Mercury in light bulbs D Incandescent light bulbs Question 24 Show Answer Legend A project will include underground parking. This change can have a positive impact on what issue? A Community connectivity B Pedestrian access C Heat island effect D Parking capacity Question 25 Which items are considered pre-consumer recycled content? A Excavated soil B Wooden pallets used by a shipping company C Leftover drywall from a renovation Show Answer Legend D Magazine overruns Question 26 Show Answer Legend Which of the following strategies have earned innovation in design / operations in the past? A Implementing an educational outreach program B Implementing a green parking design C Using high volume fly ash in concrete D Using organic foods in a cafeteria Question 27 Which of the following is not a LEED Rating System? Show Answer Legend A LEED for Retail B LEED for Small Buildings C LEED for Neighborhood Development D LEED for Schools Question 28 What project issues are addressed by guidelines from SMACNA? Show Answer Legend A VOCs in materials B Refrigerant quantities C Carpet durability D Air quality issues from construction or renovation Question 29 What are attributes of native plants? Show Answer Legend A Require less pruning B Require less pesticides C Require less sunlight D Require less fertilizer Question 30 LEED Online can be used for all of the following except: A Managing public facing project details B Accessing online reference guides C Document compliance with LEED Credit Requirements Show Answer Legend D Submit technical inquiries regarding LEED Credits Question 31 Show Answer Legend How can the heat island effect on the roof of a building be reduced? A Covering the roof with high VOC materials B Installing a cistern on the roof C Painting the surface with dark colored coatings D Installing a green roof Question 32 What defines the density of a nonresidential building? Show Answer Legend A Floor Area / Acre of Buildable Land B Building Footprint / Acre of Buildable Land C Floor Area / 120,000 sq. ft. D Site Area / Acre of Buildable Land Question 33 What does ASHRAE 55-2004 specify? Show Answer Legend A Thermal comfort B Indoor air quality C Commuting surveys D Energy performance Question 34 Show Answer Legend How is the quantity of locally harvested and manufactured materials used on a project calculated? A By the amount of leftovers diverted from landfills B By the number of board feet C By the materials' proportion of cost D By the materials' average distance from the project site Question 35 Show Answer Legend What is the most common way to meet the requirements of off-site renewable energy? A Directly purchasing green power from local utility companies B Obtaining energy from a geothermal system C Purchasing RECs D Installing a rooftop photovoltaic array. Question 36 Show Answer Legend What is the minimum occupancy rate required for an Existing Buildings O&M project (Building Operations & Maintenance) to earn certification? A 75% of FTEs B 1 FTE C 80% of FTEs D Typical physical occupancy Question 37 What is the best type of site to develop on? Show Answer Legend A Nature preserve B Greenfield C Previously developed site D Wetland Question 38 Show Answer Legend A LEED AP on a project works exclusively on the HVAC system and does not serve as a principal participant. What statement is true regarding this scenario? A The project would earn a Regional Priority credit B The project would earn an Innovation in Design credit C The project would earn an Energy and Atmosphere credit D No Innovation in Design credit would be earned for having the LEED AP work on the project Question 39 Show Answer Legend On what should the priorities for the project design criteria be based? A Environmental guidelines B Carbon offsets C Value engineering D Project constraints Question 40 What must occur if a project includes a CFC phase-out plan? A The CFC-based refrigerants must be replaced with HCFCs B The project must implement green house gas emissions reporting Show Answer Legend C The annual leakage of CFC-based refrigerants must be reduced to 5% or less D The CFC-based refrigerants must be replaced with low ODP refrigerants Question 41 Show Answer Legend What is a way LEED encourages the purchase and use of low-emitting and fuelefficient vehicles? A Providing discounted parking passes, if parking fees exist B Setting up a carpool notification system C Implementing car share membership D Locating the project in a densely developed neighborhood Question 42 Show Answer Legend What amount of parking will encourage alternative transportation and maximize open space? A Enough for parking for FTE building occupants B The minimum amount required by any local code C 25% less parking spaces than the peak occupant demand D Enough parking to handle peak occupant demand Question 43 Show Answer Legend A Green Education program is widely known as an innovative strategy worthy of an ID point in the LEED rating systems. What characteristics does this program display that must be present in all innovative performance strategies? A Quantifiable B Unique C Rare D Comprehensive Question 44 What information can be entered in the LEED Score Card? Show Answer Legend A USGBC Member ID B Certification estimate C Points attempted for prerequisites D If the credit will be streamlined Question 45 What would be included in hard cost estimates? Show Answer Legend A Art B Carpet C Furniture D Fire sprinkler system Question 46 Show Answer Legend If local code permits, what types of water should be used for flushing toilets? A Dishwasher water B Stormwater C Well water D Graywater Question 47 When does a successful integrated project begin? Show Answer Legend A In the construction phase B At the project handover C In the pre-design phase D After occupancy Question 48 What will NOT help with water efficient landscaping? Show Answer Legend A Xeriscaping B Creating a sediment basin C Mulching around plants D Planting native plants Question 49 Show Answer Legend What design decisions would help reduce the quantity or improve the quality of stormwater runoff? A Adding a constructed wetland B Replacing all roads and hardscapes with impervious asphalt C Using drip lines for irrigation D Placing the building next to a park or other natural area Question 50 Show Answer Legend In an integrated design approach, when does the green building process end? A At the construction phase B At the bidding phase C At the design phase D At final occupancy Question 51 Show Answer Legend How long can a project team take after project completion to phase-out any CFCbased refrigerants? A 4 years B 2 years C 3 years D 5 years Question 52 What type of water has the highest quality? Show Answer Legend A Well water B Graywater C Stormwater D Non-potable water Question 53 What is the EPAct of 1992 used for? Show Answer Legend A To set the baseline water flow requirements of toilets and fixtures B To define ODP and GWP limits for refrigerants C To determine the baseline building energy performance for buildings 20,000 sq. ft. or less D To define the VOC content limits of certain building materials Question 54 What landscaping strategy will best eliminate the need for irrigation? Show Answer Legend A Drip irrigation B Micro-irrigation C Mulching D Xeriscaping Question 55 Show Answer Legend If a building has already earned LEED for New Construction certification, what additional certifications could the project earn? A Neighborhood Development B Operations & Maintenance C Core & Shell D Commercial Interiors Question 56 Which of the following is not a strategy to reduce construction waste? Show Answer Legend A Sell unused materials B Use salvaged materials C Recycle materials D Maximize the building footprint Question 57 What are the life cycle costing benefits of a vegetated roof? Show Answer Legend A Reduced heat islands B Longer product life C Reduction in storm water runoff D Lower maintenance costs Question 58 Show Answer Legend In many buildings the most significant savings associated with water efficiency result from: A Keeping contaminants at safe levels in reservoirs and aquifers B Reduced development costs C Reduced maintenance costs D Reduced energy costs Question 59 Show Answer Legend What types of green energy qualify as green power for LEED projects? A On-site renewable energy B Using no refrigerants C Energy reductions D Renewable energy certificates Question 60 What type of plants should be used on a green roof? Show Answer Legend A Plants with high watering needs B Tall plants that provide shade C Lightweight plants D Native plants Question 61 Show Answer Legend What organization publishes Ozone Depletion and Global Warming Potential scores? A USGBC B World Meteorological Organization C Montreal Protocol D United Nations Question 62 What would qualify as preferred parking for LEED? Show Answer Legend A Visitor drop-off areas B Delivery truck parking C Bicycle parking D Providing discounted parking passes Question 63 What should potable water be used for? Show Answer Legend A Irrigation B Flushing toilets C Cooling towers D Drinking Question 64 What are attributes of open space? Show Answer Legend A Open space is vegetated B Open space is 100 ft. beyond the building perimeter C Open space is shaded D Open space is pervious E Open space has been previously developed Question 65 Show Answer Legend A vehicle must meet which requirement to be considered low-emitting and fuelefficient? A Green Label score of 40 or more B Green score of 40 or more C Green-e score of 40 or more D Green Seal score of 40 or more Question 66 Show Answer Legend Green power refers to electricity products that include significant proportions of electricity generated from energy resources that A Come from hydroelectric sources B Are environmentally preferable C Have zero emissions D Are greenhouse gas neutral Question 67 Show Answer Legend Why does the USGBC outline rules on use of its trademarks and logos? A USGBC wants to make sure it retains control over what is said about LEED B USGBC wants to make sure its message is spread accurately C USGBC wants to be able to charge a fee for logo use D USGBC wants customers to be directed to its website for clear information Question 68 What credit category is given the greatest weighting? Show Answer Legend A Sustainable Sites B Water Efficiency C Materials and Resources D Energy and Atmosphere Question 69 Show Answer Legend What strategy does the EPA rank highest as having the greatest impact on waste reduction? A Recycling B Source reduction C Reuse D Selecting sustainable materials Question 70 Show Answer Legend Some wood flooring recovered onsite from a renovation project was refurbished and reused onsite. What type of material is the wood flooring considered? A Virgin wood B Salvaged material C Regional/local material D Recycled content Question 71 Show Answer Legend A site described as accessible means the site meets the requirements of which standard? A AIA B GBCI C ADA D USGBC Question 72 Show Answer Legend What accounting methodology is used to evaluate the economic performance of a product or system over its useful life? A Cradle-to-cradle analysis B Life-cycle assessment C Life-cycle costing D Triple bottom line accounting Question 73 Show Answer Legend Who decides if wastewater from showers can be used for irrigation? A Project team B USGBC via the CIR process C Universal plumbing code D Local authorities with jurisdiction in the area Question 74 In sustainable building, what should a project's budget include? v Show Answer Legend A Lifecycle cost analysis B Project goals C Statement of work D Industry-related standards relevant to the project Question 75 Show Answer Legend With regards to refrigerants, what is a natural conflict between the prevention of ozone depletion and global warming? A Refrigerants contain ozone layer gases B Refrigerants that deplete the ozone layer are less efficient C Refrigerants that are neutral to the ozone layer are less efficient D Refrigerants contain global warming gases Question 76 What two terms mean the same thing? Show Answer Legend A SRI B Albedo C Solar reflectance D Emissivity E Heat island Question 77 Show Answer Legend If an HVAC engineer is a LEED AP and also a principle participant on a project, what type of credit can be earned?? A Platinum B Bonus C Innovation in Design D Quantifiable Question 78 Show Answer Legend Why should a project team aim to achieve more points than are required for the target certification level? A Achieving more points will increase the energy efficiency of the building B If some credits are denied, the project will still earn enough points for the target certification C To earn regional priority credits D In case extra points are achieved during the construction process, the next certification level can be achieved Question 79 Show Answer Legend What is the most commonly used energy code in the United States and includes information such as R-values for insulation? A International Energy Conservation Code B ENERGY STAR Rating C RESCHECK D HERS Question 80 If a refrigeration system is inefficient, what is the indirect impact? Show Answer Legend A Increased energy consumption B Decreased water use C Increased heat islands D Decreased green house gas emissions Question 81 Show Answer Legend A granite countertop taken from a demolition project and reused in a residence is what type of product? A Locally extracted B Locally manufactured C Locally recovered D Salvaged Question 82 Why choose a project site with a high development density? Show Answer Legend A The project site would be near a public rail line B The project would have access to public parking C The project would reduce sprawl D The project would have access to at least 10 basic services Question 83 Show Answer Legend What is a working fluid that flows through a machine that is designed to pump heat from a lower temperature to a higher temperature? A Graywater B Green power C Potable water D Refrigerants Question 84 Show Answer Legend A product made in part from cardboard boxes collected at curbside pickups or from an onsite comingled recycling area is an example of what material? A Recycled materials B Durable materials C Remanufactured materials D Salvaged materials Question 85 Show Answer Legend What are acceptable ways to reference LEED in product literature? A ABC Bamboo flooring complies with all requirements of MR Credit 6 Rapidly Renewable Materials under LEED ABC Bamboo flooring contributes to satisfying MR Credit 6 Rapidly Renewable Materials B under LEED C ABC Bamboo flooring complies with MR Credit 6 Rapidly Renewable Materials D ABC Bamboo flooring is a LEED product E ABC Bamboo flooring is LEED qualified product Question 86 Show Answer Legend LEED Minimum Project Requirements prohibit gerrymandering. What does this mean? A Making the project building area < 2% of the site area B Hiding project costs in ROI calculations C Defining the site area to exclude green space between campus projects D Adjusting a project boundary for the benefit of earning credits/prerequisites Question 87 What items would NOT be included in comingled recycling? Show Answer Legend A Cardboard B Plastic C Aluminum cans D Stone Question 88 What type of land is NOT considered previously developed? Show Answer Legend A Farmland B Tree mill C Site of an old drive-in theatre D Graded site that has grown over with grass Question 89 Show Answer Legend What attribute should recycled materials have in order to take advantage of synergies with regional materials? A Lower life-cycle costs B More durability C Remanufactured regionally D Low VOCs Question 90 Which projects would not be eligible for LEED certification? Show Answer Legend A An existing building project that phases out the use of CFC-based refrigerants no later than 5 years after the project is completed B A new building project that uses CFC-based refrigerants C An existing building project that reduces CFC-based refrigerants by 95% prior to submitting the LEED application and will continue to use this system for another 10 years D A new building project that uses no refrigerants E A new building project that uses hydrocarbons (HCs) as refrigerants Question 91 Show Answer Legend What standard might need to be consulted for increasing building energy performance? A ISO 14020 B SMACNA C Green-e D ASHRAE 90.1-2007 Question 92 What environmental issue occurs from stormwater runoff? Show Answer Legend A Heat islands B Blackwater C Sedimentation D Ozone depletion Question 93 What is not a credit category in LEED? Show Answer Legend A Sustainable Sites B Water Efficiency C Indoor Air Quality D Materials and Resources Show Answer Legend Question 94 If a mechanical engineer on a LEED project team needs guidance on whether a particular software package can be used to measure energy efficiency, how should the engineer proceed? A Submit a CIR to the project administrator B Submit a CIR to the LEED Steering Committee CSubmit a CIR using LEED Online D See if the credit is marked 'Anticipated' during the design phase review Question 95 Show Answer Legend What should be used during all project phases to verify the green building goals are being met? A LEED Score Card B Commissioning plan C Materials checklist D ID Credit Catalog Question 96 How can green power be purchased for use in LEED projects? Show Answer Legend A By purchasing any renewable energy source B By installing solar panels C By purchasing biofuel based power D By selecting a Green-e certified power provider Question 97 What best defines non-potable water? Show Answer Legend A Reclaimed water B Recycled water from a municipal supply C Water that is not treated to drinking water standards D Water obtained from rainwater harvesting Question 98 What environmental benefit does green power have? A Avoiding electricity blackouts B Reduced environmental regulation C Emission reductions Show Answer Legend D Stability of electrical prices Question 99 What does the global warming potential measure? Show Answer Legend A Lifespan of refrigerants B Chemical contribution to global warming C Harm done by refrigerants to the ozone layer D Embodied energy of a refrigerant Question 100 Show Answer Legend What types of old materials/items does LEED NOT suggest reusing on a project? A Flooring B Asphalt C Showerheads D Furniture