Green Energy Audit GENERAL DATA ON THE HEATING SYSTEM CL 5.0 Heat production system Outside the building Urban district heating District heating Centralised thermal power plant Inside the building Centralised thermal power plant Centralised with building substation Autonomous boilers Mixed production _____________ (kW) Total heat capacity Heat distribution system Heat transfer medium Distribution Outer diameter of the main pipe Quality of thermal insulation ____________ (mm) (DN) Inside plant room Good Average Poor Outside plant room Good Average Poor Outside Tunnel In ground Main F ____________ H ____________ Circuit __________ F ____________ H ____________ Circuit __________ F ____________ H ____________ Circuit __________ F ____________ H ____________ F= Flow rate - H = Total head Pipe installation Characteristics of the pumps Hot water High pressure hot water Air Single distribution circuit Independent distribution circuits (one for each zone) Other (specify) _____________________________________ Control and regulating system Type Centralised control Zone control YES NO Remote control Existing systems and equipment (*) Boilers Heat pumps Heat exchangers Biomass boilers CHP (Cogenerators) Solar Thermal systems Photo Voltaic solar systems Qty Qty Qty Qty Qty Qty Qty ___________________ ___________________ ___________________ ___________________ ___________________ ___________________ ___________________ (*) For each system or equipment item a checklist must be compiled Notes JOB Code Building Auditor Date Sheet ____ of ____