Presentation (Lane): True-Up Cust Mtg Updated:2012-02-20 22:14 CS

advertisement
Westar Energy Transmission Operations:
An Update on Regional and Local
Transmission Activity
Presented to Attendees of Westar’s Transmission Formula Rate Meeting
June 22, 2010
Transmission Formula Rate True-Up Meeting
Today’s Agenda
Transmission Formula Rate
 The
Protocols of the Formula: How They Apply to You
 A Discussion of the June 15 True-Up Calculation
An Update on Regional and Local Transmission
Activity
Attachment AQ: New Delivery Point Addition
Procedures
2
The Many Facets of Transmission…
 The Current “Hot Topics” at the Southwest
Power Pool
 Full Speed Ahead: Westar’s Transmission
Construction Status
3
The Southwest Power Pool (SPP)

Hot Topic #1: Making the System Study Process
More Efficient
 New transmission service requests
 New delivery points

Attachment AQ: The New Delivery Point Addition Procedures
 New generation interconnections


Attachment V: The New Generation Interconnection
Procedures (GIP)
Which comes first, the wind or the wires?
4
Proposed Wind Projects in SPP
5
The Southwest Power Pool (SPP)
 Hot Topic #2: Cost Allocation…Who Pays for What?
Highway/By-way Rate
FERC just approved on June 17, effective June 19,
2010
Focuses on SPP Region as a whole
Allocation according to voltage
• > or = 300 kV is spread across entire region
• > 100 kV < 300 kV is 1/3 region, 2/3 zone
• < or = 100 kV is 100% to the zone
Zonal, Regional, Base Plan Funded, Economic…oh
my!
6
The Southwest Power Pool (SPP)
 Hot Topic #3: 765 kV…Truth or Myth?
Prairie Wind Transmission
 Joint
Venture between Westar and American Electric
Power (AEP)
 First project of focus has been: Wichita-Medicine Lodge
765 kV
SPP has approved double-circuit 345 kV so far
 PWT
is working with ITC to revise KCC settlement
agreement accordingly for 345 kV
 765 kV can still become a reality
• Integrated Transmission Plan (ITP) will be issued
January 2011
• Would be operated at 345 kV for indefinite period
7
Proposed 765 kV Projects
8
Construction Status Report

Westar is building more new transmission than ever



Transmission service, reliability, generator interconnections
Cost recovery via Transmission Formula Rate
Example: $200+ million vs. $10 million in earlier years

TransCanada, TransCanada, TransCanada

Other major projects:




Wichita-Reno 345 kV
Reno-Summit 345 kV
Rose Hill-Sooner 345 kV
Numerous other transmission projects…..
9
TransCanada is Coming!
• TransCanada will have six
pumping stations in Kansas.
• Five of those stations are in the
Westar Energy service area.
• Each station has at least two
and up to five 6500 hp motors.
• Estimated peak load at each
site will be 17-25 MW
•All locations expected to be online by the end of 2013
10
GOESSEL
Ci 1
rc 15
le .15
to
Ea
st
INMA
Sprin
e to
dridg
MounMARION
"S INMAN
MCPHERSON
RICE
MOUNDRIDGE
MEAV
"S S
")B "S)"+ "
"S"S
"DAVI "S")B)
S
FMON
"S KSIR
"S
345.19S
Circle to Davis
"S
"S"S
Burrton
"S
BURRTON
115.80
WALTON
GATZ
"SNORTH NEWTON
NEWT ")
MDAM
HARVEY
BURR
SOUTH HUTCHINSON
"S
69.74A
138.14
6
)"F
"S
HUTCHINSON
18PL
14LO
"S 11HL
3VAN ") "S "S CENA
2ELM
MIWI "S
"S
"
"S
HESS"S
Halstead to Moundridge
.1
"S
5
11
. 99
GOLD
HESSTON
BUHLER
BUHL")
RENO
43LO
CIRC
HECG
"SHEC
W
"S
MEDORA
")
5
11
"S
Stage 1:
Gordon
Evans Energy
Center to
Reno Sub
YOST
"S
SAVC
.
k Jct
115.02
MOUN
"S
e
g C re
115.55
M
cP
he
r
so
n
345 kV Projects: Wichita-Reno-Summit
to Hals
tead
ELBING
"")
S
"S
NEWTON
MUDC
69.49
"S
MC LAINE
"SHALSTEAD
HALS
")B
69.50
ANNELLY
"S
)"F
HAVE
")
HAVEN
PATTERSON
Emporia EC to Wichita 345
BUTLER
SEDGWICK
MAHA
"S
FURLEY
BENTLEY
MT. HOPE
345.15B
YODER
RENO
138.11
"S
SG12 Colwich to Halstead
WHITEWATER
CRPC
VALLEY CENTER
5
34
. 09
"S
"S
"S
COLWICH "
TVTH)B
138.12
MAIZE
")B "S
MASCCOLE
"S
"S
"
CSTV
7
³
WICHITA
"S
"S
"S
"S
)"F
BEL AIRE
COMO
"
"S
S
7
"S
PHIL
HDRO
³
11
"S
GREENWICH
RIPL
"S
BENT
138.09
"S
ST MARK (UNION)
"F
KECHI
PARK CITY
"S
LAKE
"S
345.10A
CHIS
WICH
GORD
GORD
ANDALE
69.35
"S GRNT
)"F
SEDGWICK
ANDOVER
"S
"S
"S
Energized
December
2009
345 kV Projects: Wichita-Reno-Summit
"S
EABI
WABI
WESTFALL
JUNIATA
"S
SOLOMON
LINCOLN
GLENDALE
NEW CAMBRIA
) "S
Hills
BAVARIA
0
BROOKVILLE
"S "S
SGAT
SALINA
SHIL
SMOK "S
EXID
"S "S
PHLP
"S
"S
SALINE
GEARY
"S
PDSO
")BNOVW
Abilene EC to Northview
NAVARRE
"S
WOODBINE
HOLLAND
SHADY BROOK
Morris County to Summit
"S
"SSUMM
Stage 2:
Reno Sub to
Summit Sub
WALG
KIPP
DICKINSON
LYONA
"S
345.07
115.32
230
.1
it to
Smok
y
ENTE
"SAEC
"S
"S
SALM "SNSTR
"
CRFD S""S "S
DETROIT
")B"S
")"S
ENTERPRISE
ADSO
DSOS
HEDVILLE
Summ
ABILENE
"S
GYPS
"S
DILLON
GYPSUM
ELLSWORTH
CARLTON
ELMO"S
")
ELMO
MORRIS
HOPE
"S
)B
")
HERINGTON
"S
RDSO
"S
HRFH
"S
RAMONA
LSPR
"S
MARQ
"S
"SLOST SPRINGS
ROXBURY
"S
TAMPA
MARQUETTE
CRAWFORD
GENESEO
DURH
LINCOLNVILLE
"S
PILSEN
DURHAM
ANTELOPE
DOC
WIND
MITCHELLLITTLE RIVER
"
WINDOM
"S
"S")S")")"S
WHEA
"S
"S "S
GALVA
"S
"S
CHASE
CANTON
CANT
LEGH
"S
"S HILLSBORO
"S
HILLSBOROHSFH
MARION
EMCP
LYONS
MARION
HILL
LEHIGH
"S
"S
CANADA
MRFH" "SMARION
S
MARION
"S
115.55
RICE
"S
MCPHERSON
WMCP
"S
SAXMAN
AULINE
FLOJ
"S
FLORENCE
.1
5
"SINMAN
INMA
11
5
"S
")")"S
"S
MEDORA
")
COND
43LO
CIRC
RENO"S)"F
HEC
MDOW HECG
"S "
WILLOWBROOK
S
18PL
"
"
S
S
14LO
"S 11HL
"S
3VAN
2ELM "") "SHUTCHINSON
FMON SMIWI
"S CENA
" DAVI
CITI S"S"S"S "S" "S ")B "S)"+"S")"S
")
CITS
B
"S
BUHLER
")
BUHL
8
115.9
""S
S
S
"S
"S SOUTH HUTCHINSON
HARVEY
WATC
YOST
PEABODYPEABODY
"S
HESSTON
138.14
SAVC
NICKERSON
MOUNDRIDGE
MOUN
HESS"S
"S
GATZ
WALTON
PEAB
12
"S
"SNORTH NEWTON
MDAM NEWT
BURR
"S
"S
BURRTON
MUDC
"S
GOLD
")
"")
S
NEWTON
ELBING
BUTLER
69.85
STERLING
RENO
FLCE
"S
GOESSEL
ALDEN
BURNS
Scheduled to
be completed
September
2010
345 kV Projects: Rose Hill-Sooner
"S
"S
OAKL
"S
"S HYDR"S
"S
"SSTEA
OATV
LIN
MURR
VULC "S
T28S R01W
3
8
13
.1
HAYS
"S
2
.0
T28S R02E
"S
OAKLAWN
WICHITA
59TH
"S
"SWACO
)"F
138.30
SCHULTE
"S
"S
)"B
"S
"S
MACA
"S
MIDL
MAGN
345.16
ROSE
ROSE HILL
"S
T28S R04E
T28S R03E
"S
Latham
"S
HAYSVILLE
DERBY
FARB
SEDGWICK
CLEARWATER
"S
T29S R01W
"S
T29S R02E
"S
CLEARWATER
RICH
WACO
PECK
CLEARWATER
T28S R07E
T28S R06E
T28S R08E
T28S R05E
ELPA
"S
BAYNESVILLE
13
8
"S
T29S R04E
T29S R03E DOUGLASS
BUTLER
3t4o
5.1R
1os
e Hill
LATHAM
T29S R08E
T29S R06E
T29S R05E
T29S R07E
")B
DOUGLASS
T29S R01E
CLEARWATER
T30S R01W
MULVANE
ROCK
69.42
Bell to Peck
PECK
Rose Hill Sub
to OGE’s
Sooner Sub
T30S R03E
T30S R02E
ATLANTA
T30S R05E
T30S R04E
T30S R07E
T30S R08E
T30S R06E
T30S R01E
T30S R02W
"S
WILMOT
TIMB
AKRO
RIVERDALE
"S
T31S R01E
AKRON
T31S R03E
T31S R02E
T31S R01W
Timber Tap to Winfield
T31S R04E
"S
)"F
FLORAL
T31S R05E
FLOR
T31S R07E
T31S R06E
T31S R08E
"S
NEW SALEM
CAMBRIDGE
BURDEN
OXFO
WELLINGTON
)"F
SUMNER
W
)"F
T32S R02E
el R01E
T32S
T33S R01E
"S
lin
gt
on
to
SC
4
Ro
m
CAV6
69.99
DALTON
T32S R04E
")B
T32S R05E
T32S R07E
T32S R06E
T32S R08E
COWLEY
WINFIELD
T32S R03E
7RAIN
)"F
³
e
"S
T33S R02E
DEXTER
T33S R03E
T33S R04E
69.101
Bell to SC3 Miller
UDAL
BELLE PLAINE
"S
T31S R02W
)"F
BELL
T33S R05E
T33S R06E
T33S R07E
T33S R08E
")F OAK
PRLD
"S
"S
CRSW
T34S R02E
CVC3
)"F
"S
")
PARI"S
")B
T34S R03E
T35S R03E
T34S R04E
ARKANSAS CITY
PARKERFIELD
ARKA
T34S R08E
T34S R06E
T34S R07E
T35S R06E
T35S R07E T35S R08E
")B
T34S R05E
13
SILVERDALE
"S
T35S R04E
T35S R05E
Westar’s
portion is
scheduled to
be completed
mid-2012
Other Projects: North-Central Kansas
SUMMERFIELD
BERN
")F
BERN"S
OKETO
T01S R08E
"S
T01S R12E
T01S R11E
T01S R10E
T01S R09E
T01S R13E
MARIETTA
T01S R07E
ST BENEDICT
AXTL
"S
T02S R07E
SMIT
ONEIDA
"S
T03S R09E
T03S R08E
SSEN
F
)"
"S
)"F
T03S R07E
T02S R13E
"S
SENECA")
115.22
"SKNOB
T03S R06E
MARSHALL
"S
115.100
NEMAHA
NM 5 Smittyville to Knob Hill
"S
T02S R11E
HOME
MARYSVILLE
"S
T02S R12E
AXTELL")
BEATTIE
"S
"S
T02S R10E
T02S R09E
T02S R08E
EMSV
T03S R10E
T03S R13E
T03S R12E
NEMAHA T03S R11E
KELL
WINIFRED
"S
KELLY
VLIETS
BEST
"S
FKFT"S
T04S R08E
"S
T04S R13E
FRANKFORT
BLRA
NCRA")
CENTRALIA
CNTL
"S
VERMILLION
T04S R07E
BLUE RAPIDS
T04S R10E
T04S R11E
T04S R12E
BIGE
"S
T04S R09E
KIHI GOFF
CORNING
LILLIS
T05S R07E
T05S R08E
BRCW
T06S R06E
T05S R09E
T05S R10E
T05S R11E
T05S R12E
"S
T05S R13E
"S
AMERICA CITY
RILEY
T06S R07E
Rebuilding
Kelly-S.
Seneca 115
kV and
building a
new 115 kV
line from
Knob Hill
Sub to the
State border
14
T06S R11E
POTTAWATOMIET06S R08E
T06S R09E
T06S R10E
DULUTH
SOLDIER
T06S R12E
JACKSON
T06S R13E
SLDR
HAVENSVILLE
WHEATON
ONAGA
"S
Both
scheduled to
be completed
by Dec 2010
er C
re e
115.92
115.92
k t
o P la
tte
City
Other Projects: Northeast Kansas
Building a
new 115 kV
line between
Stranger
Creek and
Thornton
Subs
")B
SPRU
115.06
Stra
ng
"S
THOR
LEAVENWORTH
"S
³
7
WADS
"S
LEAVENWORTH
HALL
115.42
"S
rth
St
re
et
Scheduled to
be completed
by Dec 2010
STRA
M
to
t.
Jc
o
11
5
.0
6
al
Ja
rb
36
115
.
Jarbalo to Hallmark
ar
io
n
"S
345.06
LANSING
15
")
Other Projects: South-Central Kansas
"S
"S
"S
"S
"
S
17TH KENM NORT
"S
"
S
RIVE
VIST
"S ³7 MOSS
69.58C
BEEC
"S
WEBS
"S
MINN
"S
"S MEAD
PLAZ
")B
"S
TYLE HOOV
"S
")B EAST "
)"F)"F "S"S "S"S
S
FOWL" EASTBOROUGH
"S
"S
S
T27S R02W
"
)
"
B
RUTA S
OSAG
GRED
HARR
T27S R01W
CANA GLEN
"S
"S
SHER
"S
CENT WICHITA
")B "
"S
GODDARD
"S
")B
SOLIV
"S
INTE
SENE
64TH
"S
"S
WASS
"
S
"S
"S
"
"S
BOEI )B
MACA HYDR
OATV
OAKL
"S
69.58
LIN
"S
8. 1
13
HAYS
ek
to
R
T27S R06E
T28S R04E
T28S R05E
T28S R06E
MAGN
ROSE
"S
Latham
"S
3t4o
5.1R1os
e Hill
FARB
"S
"SCLWA
T29S R01W
CLEARWATER
WACO
PECK
"S
CLEARWATER
RICH
T29S R02E
T29S R04E
"S
T29S R03E
T29S R06E
T29S R05E
DOUGLASS
CLEARWATER
T30S R01W
T30S R02W
MULVANE
ROCK
69.42
Bell to Peck
PECK
T30S R03E
T30S R02E
"S
)"F
"S
Bell to SC3 Miller
WILMOT
"S
T31S R01E
T31S R01W
AKRON
T31S R03E
T31S R02E
T31S R04E
"S
)"F
T31S R05E
T31S R06E
FLORAL FLOR
T31S R07E
"S
SUMNER
COWLEY
NEW SALEM
BURDEN
OXFO
DALTON
WELLINGTON
"S
)"F
T32S R02E
)"F
CAV6
T32S R04E
T32S R05E
")B
T32S R06E
T32S R07E
T32S R03E
T32S R01E
WINFIELD
16
T33S R02E
T33S R01E
7RAIN
³
"S
Building the
new 138 kV line
from Sumner
Co. to Timber
Junction
TIMB
AKRO
69.99
MAYFIELD
T30S R07E
UDAL
BELLE PLAINE
RIVERDALE
T31S R02W
ATLANTA
T30S R01E
BELL
ANSON
T30S R06E
T30S R05E
T30S R04E
Rebuilding the 69
kV lines from
Gill-Peck,
Weaver-Rose Hill
Junction, Timber
Junction-Winfield
T29S R07E
DOUGLASS
T29S R01E
T29S R02W
T28S R07E
BUTLER
DERBY
CLEARWATER
T27S R07E
69.100A
345.10B
e
Cr
ll
Hi
ELPA
HAYSVILLE
BAYNESVILLE
T27S R04E
ose
T27S R05E
"S
"S
MIDL
"S
3
olf
W
T28S R03E
ROSE HILL
59TH
"S
"S
"S
)"F
T28S R01E
LEON
MOBI
WEAV )"F
69.100B
"S
AUGUSTA
T27S R02E
T28S R02E
LEON
")BWHIT
T27S R03E
138.27
69.46
18
"SSDAL
2
MURR
VULC "S
ANDOVER
.0
"S
"S
"S
WACO
SEDGWICK
"S
"S
"SSTEA
OAKLAWN"S
"S
T28S R01W
138
.
ANDO"S
13
8
SCHULTE
T28S R02W
138.30
138.22A
WEST
COWS
)"F
T33S R05E
T33S R04E
T33S R06E T33S R07E
DEXTER
All scheduled
to be
completed in
2010
Other Projects: Southeast Kansas
T22S R18E
T22S R17E
T22S R16E
T22S R15E
LEROY
Rebuilding
the 69 kV line
from Green to
Athens Subs
GREE
"S
ANDERSON
69.27
CC4 Vernon to Green
COFFEY
T23S R18E
T23S R17E
T23S R16E
T23S R15E
GENEVA
NEOSHO FALLS
WOODSON
ALLEN
T24S R18E
T24S R16E
T24S R15E
Athens to Orchard
T25S R15E
)"F
Athens to CC4 Vernon
VERNON
Scheduled to
be completed
Spring 2011
ORCH
T25S R16E
"S
YATES CENTER
T24S R17E
IOLA
)"F
PIQUA
ATHE
")B
OWLC
BASSETT
"S
T25S R17E
17
T25S R18E
")F
The New Delivery Point Addition/Modification Process
 Delivery Point Addition Task Force created
Did so pre-emptively to assure customer voice represented
Worked diligently to make process more efficient and fair
 Depicted in Attachment AQ of the SPP Tariff
 Went into effect May 1, 2010
 Much more formal, with SPP involved
 Applies to all wholesale entities wanting to connect to
Transmission Owners’ facilities
KEPCo, KPP, Westar Genco
18
Add or
Modify
Delivery
Point(s)
Delivery
Point
Addition
Process
Is TC an
Existing
SPP
Customer?
Existing Tariff
N
Y
GFA
Conversion/
Rollover?
New Transmission
Service Request
N
New Transmission
Service Request
TO
Host TO
Review
Customer sends Request for
Change in Local Delivery
Facilities to SPP and Host TO
Aggregate Study
Process
PTP
PTP or
NITS
Request?
SPP
NITS
Preliminary
Review by
TO
Preliminary
Review by SPP
Significant
Impact
to System?
Y
N
Y
Construction
Required?
N
New or
Updated
PTP
New or
Updated
NITSA
Delivery Point
Network
Study
(DPNS)
Y
Y
Load Connection
Study
By TO
Construction
Required?
N
DP Letter
Agreement
New or
Updated
Interconnection
Overview of the Westar-Customer Process…
1.
Customer submits request to WR
and SPP.
2.
All related WR departments are
notified.
6.
Once SPP is satisfied with all
necessary studies, a Delivery Point
Agreement is issued to the
Customer.
7.
Once executed, WR and the
Customer work closely together to
determine milestones and the project
scope.
3.
Appropriate engineering group
performs preliminary study and
notifies SPP.
4.
If necessary, a Load Connection
Study Agreement is issued to
Customer.
8.
If applicable, Regulatory assures
FERC is notified and that all related
agreements are updated.
5.
Once executed, WR performs LCS
and issues LCS Report within 60
days of LCS Agreement’s execution.
9.
If applicable, Customer is notified of
related Wholesale Distribution
Charge.
10. WR and Customer work together to
assure timely completion.
20