Tri-State Generation and Transmission Association, Inc. Open Access Transmission Tariff APPENDIX 1 to GIP INTERCONNECTION REQUEST FOR A GENERATING FACILITY 1. The undersigned Interconnection Customer submits this request to interconnect its Generating Facility with Transmission System pursuant to a Tariff. 2.a This Interconnection Request is for (check one): _____ A proposed new Generating Facility. _____ An increase in the generating capacity or a Material Modification of an existing Generating Facility. 2.b. This interconnection agreement shall be studied as: _____ A Network Resource (see GIP Sections 3.2.2.2, 7.1, and 8.1). _____ A Non-Network Resource (see GIP section Sections 3.2.2.3, 7.1, and 8.1). 3. Interconnection Customer provides the following information: 4. a. Address or location or the proposed new Generating Facility site (to the extent known) or, in the case of an existing Generating Facility, the name and specific location of the existing Generating Facility; b. Maximum summer at ____ degrees C and winter at _____ degrees C megawatt electrical output of the proposed new Generating Facility or the amount of megawatt increase in the generating capacity of an existing Generating Facility; c. General description of the equipment configuration; d. In-Service Date (Day, Month, and Year); e. Commercial Operation Date (Day, Month, and Year); f. Name, address, telephone number, and e-mail address of Interconnection Customer’s contact person; g. Approximate location of the proposed Point of Interconnection (optional); and h. Interconnection Customer Data (set forth in Attachment A); and i. Evidence of Site Control as specified in the GIP Applicable deposit amount as specified in the GIP. (Check Deposit Included). ______$50,000 Deposit for Project less than 20 MW $75,000 Deposit for Project greater than 20 MW but no more than 75 MW $250,000 Deposit for Project 76 MW or Greater Effective January 1, 2013 Pg. 1 of 2 Tri-State Generation and Transmission Association, Inc. Open Access Transmission Tariff 5. Signed Confidentiality Agreement in the form of Appendix 2 to the GIP (two originals included). 6. This Interconnection Request, and any subsequent inquiries related to the Interconnection Request shall be submitted to the representative indicated below: If by mail: Transmission Interconnection Administrator Tri-State Generation and Transmission Association, Inc. 1100 W. 116th Avenue Westminster, CO 80234 303-452-6111 If by overnight delivery: Tri-State Generation and Transmission Association, Inc. (System Operations) Attn: Transmission Interconnection Administrator 3761 Eureka Way Frederick, Colorado 80516 7. Representative of Interconnection Customer to contact: [To be completed by Interconnection Customer] 8. This Interconnection Request is submitted by: Name of Interconnection Customer:______________________ By (signature): _______________________________________ Name (type or print): __________________________________ Title: _______________________________________________ Date: _______________________________________________ Effective January 1, 2013 Pg. 2 of 2