Insert image here Project Name: XXX ESCo Addition Model Project No.: Insert image here Insert image here Insert image here XXX A presentation to: Eskom IDM Project Evaluation Committee Presented by: XXX IDM Project Manager: XXX Date: XXX ESCo/PD Name: XXX Overview • • • • • • • • • • • • • • • • Decision Required ESCo/Developer Background ESCo/Developer Performance Customer Background Letter of Intent Site Information Scope of Work Technology Overview Schematic Diagram Daily Load Profile Load Reduction Calculation Cost breakdown Risks and Mitigations Environmental Impacts Employment Opportunities Decision Required 2016-06-27 Template Identifier: 240-55244916 Rev 1 2 Decision Required Request the Project Evaluation Committee’s (PEC) recommendation to take the project under ESCO addition model to the next level for approval of the implementation of (technology ------) EE/LM project to reduce by XXX MW (XXX GWh) at ----sites). Total Project Costs R XXXX MW Savings XXXX MW saving Annual total energy (GWh) savings XXXX GWh saving Rm/MW XXXX Eskom to pay R XXXX Customer to pay R XXXX Implementation period XXXX Estimated savings to customer 2016-06-27 Template Identifier: 240-55244916 Rev 1 R XXXX 3 PEC Re-submission History The previous PEC decision being presented are stated below. Previous Submission Current Submission Submission Date Funding Model Decision outcome Demand (MW) Energy (MWh) Cost of Project (R) Delivery Time (months) 2016-06-27 Template Identifier: 240-55244916 Rev 1 4 ESCo/Developer Background 2016-06-27 Template Identifier: 240-55244916 Rev 1 5 ESCo/Developer Performance Previous Project 2016-06-27 Date completed Template Identifier: 240-55244916 Rev 1 Measured Performance(%) 6 Customer Background 2016-06-27 Template Identifier: 240-55244916 Rev 1 7 Letter of Intent 2016-06-27 Template Identifier: 240-55244916 Rev 1 8 Site Information Site information XXXX Name of company XXX (Pty) Ltd Type of operation XXXXX Postal address XXXX 2016-06-27 Template Identifier: 240-55244916 Rev 1 9 Scope of Work 2016-06-27 Template Identifier: 240-55244916 Rev 1 10 Technology Overview • The proposed technology, • SABS Approval • Standards & specifications 2016-06-27 Template Identifier: 240-55244916 Rev 1 11 Schematic Diagram 2016-06-27 Template Identifier: 240-55244916 Rev 1 12 Daily Load Profile 2016-06-27 Template Identifier: 240-55244916 Rev 1 13 Individual Site Proposed Savings Site Existing [kW] Proposed [kW] Savings [kW] Site 1 Site 2 Site 3 Site 4 Site 5 Total Savings: 2016-06-27 rev 1 14 Load Reduction Calculations Show how savings were calculated against the existing 2016-06-27 Template Identifier: 240-55244916 Rev 1 15 Cost Breakdown Project cost elements Amount [R] Cost of Equipment & Installation R XXXX Consulting and Project Management R XXXX Transport & Accommodation R XXXX Total Cost Excl. VAT R XXXX 2016-06-27 MW Savings Actual R’m/MW XXXX MW XXXX Template Identifier: 240-55244916 Rev 1 16 Risks and Mitigation Strategies RISK Risk impact (1 – 10) (A) Probability (1 – 10) (B) Risk Level (AxB) Mitigation Low (30) Low (27) Low (10) Low (6) Low (6) Ranking Criteria 2016-06-27 1 – 39 Low Risk 40 – 69 Medium Risk Template Identifier: 240-55244916 Rev 1 70 – 100 High Risk 17 Risks and Mitigation Strategies RISK Risk impact (1 – 10) (A) Probability (1 – 10) (B) Risk Level (AxB) Mitigation SHE incident occurring Low (30) SHE plan to be compiled, reviewed by Eskom SHE Function and implemented during project execution SD & L targets not met Low (30) SD & L performance to be tracked throughout project execution and submitted Low (30) Project Quality Plan (PQP) to be compiled, reviewed by Eskom Quality and implemented during project execution Quality requirements not complied with Ranking Criteria 2016-06-27 1 – 39 Low Risk 40 – 69 Medium Risk Template Identifier: 240-55244916 Rev 1 70 – 100 High Risk 18 Environmental Impact Item Factors1 [/kWh] Coal use (kilogram) 0.54 Water use (litre) 1.37 Ash produced (gram) 155 Particulate emissions (gram) 0.31 CO2 emissions (kilogram) 0.99 SOx emissions (gram) 7.93 NOx emissions (gram) 4.19 kWh Savings Projected per year Reductions per year Factors as cited in the Eskom 2012 Annual Integrated Report (http://financialresults.co.za/2012/eskom_ar2012/fact-sheets/006.php) 2016-06-27 Template Identifier: 240-55244916 Rev 1 19 Employment Opportunities through IDM Projects Employment Opportunities ESCo/Developer Feedback The number of new employment opportunities that will created due to the IDM Funded project Training that will offered to the new employees Characterise the new employees (a) by ages i.e. youth 18-35 years (b) (female or male) Duration of the employment of these new employees 2016-06-27 Template Identifier: 240-55244916 Rev 1 20 Decision Required Request the Project Evaluation Committee’s (PEC) recommendation to take the project to the next level for approval of the implementation of (technology -----) EE/LM project to reduce by XXX MW (XXX GWh) at ----sites). Total Project Costs R XXXX MW Savings XXXX MW saving Annual total energy (GWh) savings XXXX GWh saving R/MW XXXX Eskom to pay R XXXX Customer to pay R XXXX Implementation period XXXX Estimated savings to customer R XXXX 2016-06-27 Template Identifier: 240-55244916 Rev 1 21 Insert image here Insert image here Thank you