NAME OF ESCO ESCO company registration number – CK _________________ ESCO VENDOR NO. __________________________ Postal and street address (including postal codes) Tel : (011) _______________ Fax : (011) _______________ E-mail: ___________________________ NAME OF CUSTOMER Customer company registration number – CK _________________ Postal and street address (including postal codes) Tel : (011) _______________ Fax : (011) _______________ E-mail: ___________________________ NAME OF PROJECT: TYPE OF PROJECT: _______________________ _______________________ PROPOSAL ACCEPTED: ____________________________________ CUSTOMER PROPOSAL SUBMITTED: _____________________________________ ESCO DATE: _____________________________________ IDM Project Proposal Example Template Identifier: 240-55464756 Rev 1 Effective date: 2013-02-13 Page 1 of 13 1. PROJECT SITE INFORMATION: Table 1: Project site information and responsible person Site Name of Company Site information Type of Operation Postal and Contact Person Physical address Contact phone, details, cell and email Site 1 Site 2 Site 3 Site 4 Site 5 IDM Project Proposal Example Template Identifier: 240-55464756 Rev 1 Effective date: 2013-02-13 Page 1 of 13 2. PROJECT SUMMARY Short overview of project a. State what you will be doing: lighting – replacing (state clearly the reason for refurbishment), retrofitting or relamping. b. What the MW and MWh savings will be? c. Are the savings (MW and MWh) monthly/yearly/seasonal/winter/summer? d. Are Eskom evening peaks – 17:00-19:00 (winter) and/or 18:00-20:00 (summer) clearly defined? e. Estimated Implementation period of the project. f. What are the monetary savings to the client due to the intervention? g. State lifespan of company / mine. If possible also include yield g/ton for mine. (Give references). h. Is it possible to compare the lifespan and yield to other companies/mines in the same group? i. Has the client signed a letter of intent (included later in the proposal) and also has the client seen and signed the project proposal document? j. Is the client aware of the DSM agreement, and payment details, if applicable? Show project costs – capital and labour, project management remember to include ALL costs [especially audit fee, project management, travelling etc. if these are not included in the labour costs in the table format see table example below]. Table 2: Project Savings and Finance Summary Total Capital Costs R xxx Total Labour Costs R xxx Project Management and Travelling Subsistence Costs R xxx Total Costs R xxx Total Project Savings xxx MW R’m/MW xxx k. Indicate the R’m/MW –“Rand million per MW” (this is the total project costs excl. VAT divided total project savings). 3. TABLE OF CONTENTS IDM Project Proposal Example Template Identifier: 240-55464756 Rev 1 Effective date: 2013-02-13 Page 1 of 13 List all sections and tables, with page numbers 4. INTRODUCTION 4.1 Background on ESCO Include expertise / track record of company and personnel Experience in project management Experience/track record with regard to the technology proposed Qualifications of staff Capacity to complete the work BEE/BWO/SMME status Has a consultancy agreement been signed between the ESCO and the customer (letter of intent)? 4.2 Background on Client – for example Gold Fields LTD is the head office for GFI Mining S.A. (PTY) LTD. Driefontein is a deep level mine situated in Carltonville. An audit was conducted, which included all sections of the mine. (It is often necessary to do Internet research on company background [give reference]) The customer should sign off the proposal (both on the front page and initial each page). Give a brief description as to how the project originated. Is the customer aware: 5. That M&V will be monitoring the project and will need access to the site? PROJECT BACKGROUND Mention what will be covered by the project (if there are many areas within one site like the different areas on a mine, list them here) e.g. IDM Project Proposal Example [NAME OF PROJECT] Table 3: Individual Site Proposed Savings Site Existing (KW) Proposed (KW) Savings Site 1 Site 2 Site 3 Site 4 Site 5 Total 5.1. Classification This project can be classified as an Industrial Energy Efficiency (ICEE) project 5.2. Targeted areas The following areas will be targeted Laboratory & Workshops General Areas Main Office Etc. etc 5.3. Summary of Proposed Intervention The following shows the summary of the costs and savings proposed per area. Table 4: Proposed savings according to area of installation Area of Installation Total Capital Costs (R) Labour Costs (R) Total Costs (R) Savings kW R 19,320,000 R 3,380,000 R 23,780,000 5999.264 Laboratory & Workshops General Areas Main Office TOTAL : For the diversity of 80% = 4799.20 kW = 4.799 MW IDM Project Proposal Example [NAME OF PROJECT] NB: For the detailed breakdown see the Appendix A: Consolidated Data, this will show, location, existing versus proposed, project savings and costs etc. The table in Appendix A (example for lighting) should be filled and can be adapted technology other than lighting. 6. PROJECT / PROCESS BACKGROUND (SCOPE OF WORK) Describe what you will be doing, and explain about the different areas – what will be done, how will it be done (time frames etc.), and the list of material and pricing. 7. SAVINGS & CONSUMPTION 7.1 Are the savings quantified, time stamped and stated on the proposal in terms of MWh and MW? (Daily, weekly, monthly, summer vs. winter, seasonal average, yearly average) 7.2 Have you included the methodology for the establishment of the savings (energy and demand) in the proposal? 7.3 Load and power factors? 7.4 What is the baseline based on (actuals or manufacturers specifications)? 7.5 Are the BEFORE and AFTER DSM intervention load profiles included in the proposal? 7.6 Is data for at least two months (used to calculate the baseline) included in the proposal? 7.7 Have any variables that may affect the baseline been included in the proposal? 7.8 From which meter was the data taken to calculate the baseline (type of meter, location of meter)? 7.9 Is the project, after implementation of the DSM measures, energy neutral? 7.10 What is the electrical efficiency of the proposed equipment? 7.11 Have you stated the operational hours of the system clearly? Have you also included the tariff structure? 7.12 Have the voltage, energy and demand levels been measured and taken into consideration? 8. LOAD PROFILES 8.2 Daily load profile (kW/MW) - Should include baseline (before) vs. proposed profiles in a form of a graph. IDM Project Proposal Example [NAME OF PROJECT] Figure 1: Simple Baseline vs. Proposed profiles Baseline VS. Proposed 30,000 Baseline profile 25,000 Power kW 20,000 Savings 15,000 Proposed profile 10,000 5,000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Hour (We e kday) NB: This should be accompanied by data IDM Project Proposal Example [NAME OF PROJECT] 14 15 16 17 18 19 20 21 22 23 24 Some possibilities exist: If there is an existing DSM project(s) of the same technology on the site, the profile of the original baseline should be included and there will be a total of three profiles namely: The original baseline (before any DSM intervention), Actual (after the first intervention this is also the baseline for the new intervention), and then the proposed profile (Example below). Figure 2: Proposed profile for the site with an existing DSM project on the same technology Baseline VS Proposed Profiles 35,000 Savings: Old or Existing Project Original Baseline profile 30,000 New Baseline profile 25,000 Power kW 20,000 Proposed Savings: New Project 15,000 Proposed profile 10,000 5,000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hour (Weekday) If there are several technologies to be implemented, each technology should have its own profile (Existing vs. Proposed) 8.3 Plant, Building Operating and Shifts should be indicated clearly: 8.4 Tariff Structure: State municipality and type of tariff IDM Project Proposal Example [NAME OF PROJECT] Copy of client’s electricity bill (if available) 8.5 9 FINANCE 9.1 Overall project costs Table 5: Overall Costs Total Capital Costs R 19,320,000 Total Labour Costs R 3,380,000 Project Management R 800,000 Pre-Audit R 80,000 Travelling Subsistance R 200,000 Subtotal R 1,080,000 Total Costs excl. VAT R 23,780,000 Total Costs incl. VAT R 27,109,200 NB: Figures should tie up with the ones given in earlier sections of the document. 9.2 Monetary savings (as a result of energy savings) Show amount that client will save due to the intervention, also show calculations 10 PROJECT RISKS 10.1 10.2 Risks State any risks that you know of that may be detrimental to the project. Is there a risk associated with the technology/DSM Programme to the client? Is there any risk associated with the new technology in South Africa? If a risk assessment has been done for the project, kindly show the results. Mitigation State how all of the above risks will be mitigated correspondingly IDM Project Proposal Example [NAME OF PROJECT] 11 ENVIRONMENTAL ISSUES State how unwanted / old material will be disposed of during the implementation stage. Environmental impacts table to be inserted. 12 PROCUREMENT DETAILS 12.1 Indicate Finances (reference section 9) 12.2 Scope of work (Reference Section 6) 12.3 List of Equipment and Pricing (Reference Section 6) 12.4 Detailed Labour Cost Breakdown Labour cost: (specify who will be working on project and at what rate) NB: Must be consistent in rates used and should tie-up with the figures given earlier in the document Table 6: Example of detailed labour costs breakdown Quantity Hourly Rate Hours Total Costs Per Category Project manager 1 R450/hr 60 R27,000 Site Supervisor 1 R250/hr 30 R7,500 Electrician 10 R110/hr 100 R11,000 Semi skilled 1 R50/hr 200 R10,000 . . . . . . . . . . . . . . . Description - Labour Total Costs 12.5 R800,000 Project Pre-Audit Fees (rates and times must tie up with those already given). IDM Project Proposal Example [NAME OF PROJECT] 12.6 Travelling subsistence Costs (again rates and times must tie up with those already given). 12.7 Use of Subcontractors (BEE, SMME, etc.), state if, when & where you will be using a subcontractor and give details of the company/person etc. Also should state portion of “work” to be allocated to BEE Company – e.g. 30% if applicable. 12.8 State current list of directors and share percentages Give details: 12.9 Current financial statements and letter from auditor showing business capacity (if necessary, state accountant’s name and contact details) 12.10 Does the equipment to be used need to be imported? If so form “SA 47 I.G Rev 24” must be completed 12.11 Current TAX clearance certificate (original to be attached) 12.12 Current VAT Certificate – Include copy IDM Project Proposal Example [NAME OF PROJECT] APPENDIX A: CONSOLIDATED DATA SHEET Table 7: Example Lighting: Consolidated Project Data IDM Project Proposal Example [NAME OF PROJECT] Existing Total consumption should be greater than Proposed Total consumption Template Identifier: 240-55464756 Rev 1 Effective date: 2013-02-13 Page 10 of 13 APPENDIX B: DOCUMENTATION B1. Letter of Intent Notes This letter must be on client’s letterhead as no proposal will be evaluated without this important document. If the client is a municipality – the council resolution for the project must be attached. Also Please note that the proposal must be signed off by the customer on the front page of the proposal and each page should also be signed off. IDM Project Proposal Example [NAME OF PROJECT]