GENERATOR NOTICE OF INTENTION TO CONNECT

advertisement
GENERATOR NOTICE OF INTENTION TO CONNECT
About This
Form:
This form must be completed for each generating plant which the Generator intends to connect to the grid or a local network with
a generating unit rated greater than 1 MW.
Note: A minimum of five business days notice must be given prior to the intended date of commencing to offer generation under
the ‘Code’.
This form is to be completed and emailed to system.operator@transpower.co.nz:
Investigation Group
System Operations Division,
Transpower New Zealand Ltd
PO Box 1021,
Wellington
Code
Requirement:
Part 8
Clause
8.21 (2)
…Whether likely to be an excluded generation station or not, a generator who is planning to connect to the grid or a
local network a generating unit with rated net maximum capacity equal to or greater than 1 MW must provide the
system operator with written advice of its intention to connect together with other information relating to that
generating unit in accordance with clause 8.25(4)
Section 1 Generator Owner Information
Company Name:
Contact Person:
Phone:
Fax:
Email:
Section 2 Generator Operator Information
Company Name:
Contact Person:
Generating Plant Name:
Grid Point of Connection
(i.e. XYZ0331):
Type of Plant:
Page 1 of 1
Phone:
Fax:
Email:
Section 3 Generating Plant Details
Type of Connection
MW Capacity:
Select
Form ID: FM-EA-006/V2.0