CRDM Projects Approved

advertisement
CRDM Projects Approved
Bldg.
#
Date
CRDM #
Project #
5/25/10
6/21/10
6/21/10
6/21/10
6/21/10
6/21/10
6/29/10
6/30/10
6/30/10
FY07-0001
FY07-0002
FY07-0003
FY07-0004
FY07-0005
FY07-0006
FY07-0007
FY07-0008
FY07-0009
P779440
P779444
P779445
P779446
P779447
P779448
P779450
P779451
P779452
7/1/10
FY07-0010 P779453
7/7/10
7/8/10
7/8/10
7/8/10
FY07-0011
FY07-0012
FY07-0013
FY07-0014
P779454
P779455
P779456
P779457
529
551
551
551
551
532
586
516
553
550/
551
516
553
545
593
7/8/10
FY07-0015 P779458
593
7/9/10
FY07-0016 P779459
551
7/9/10
FY07-0017 P779460
590
7/9/10
7/9/10
7/12/10
7/12/10
7/12/10
7/15/10
FY07-0018
FY07-0019
FY07-0020
FY07-0021
FY07-0022
FY07-0023
P779461
P779462
P779463
P779464
P779465
P779466
551
551
581
586
516
516
7/21/10 FY07-0024 P779468
509
7/21/10
7/15/10
7/21/10
7/27/10
7/30/10
8/4/10
8/4/10
8/5/10
8/18/10
8/24/10
593
585
551
516
550
581
509
519
509
499
FY07-0025
FY07-0026
FY07-0027
FY07-0028
FY07-0029
FY07-0030
FY07-0031
FY07-0032
FY07-0033
FY07-0034
P779469
P779467
P779470
P779471
P779472
P779473
P779474
P779475
P779476
P779477
PM
Science Engineering classroom shades
S&R 2 4th flr filter vents
S&R 2 3rd flr filter vents
S&R 2 2nd flr filter vents
S&R 2 1st flr filter vents
Garrison Gym AHU coil replacement
Cameron asbestos tiles clean up
E. Cullen exterior window cleaning
Welcome Center replace glass panels
20,167.00
3,306.65
5,015.21
3,711.62
609.30
6,601.00
9,067.00
5,580.00
5,400.00
Doyle
Madrigal
Madrigal
Madrigal
Madrigal
Madrigal
Oliver
Davis
Davis
SR1 and SR2 Generator Addition
29,000.00
Gill
Def Maint
Elec
E. Cullen rm 122 reconfiguration
Continuing Education AHU-2
SERC emergency 15 KV switch
HSC dock & corridor door replacement
HSC elevator hydraulic cylinder
replacement
S&R 2 lab 228 water damage & mold
remediation
Hilton Continuing Ed window replacement &
re-seal
S&R 2 restroom fixture replacement
S&R 2 hallway abatement & flooring
Engineering D3 roof assessment
Cameron emergency mold remediation
E. Cullen 502D drain line for roof catch pan
Flooding mechanical rm Cullen fountain
MD Anderson water in basement, test &
clean
HSCA new condensate drains AHU
GSB water heater tank replacment
S&R 2 lab OAHU repairs
E. Cullen 3rd floor lobby lighting
S&R 1 emergency vacuume pump
Engineering D2 envelope assessment
MD Anderson exterior façade
DPS roof & waterproof analysis
MD Anderson cooling system
Emergency plumbing infrastructure repairs
1,555.02
15,446.00
7,774.54
20,582.00
Martin
Martin
Bartow
Brungardt
Def Maint
Def Maint
Def Maint
Def Maint
Elec
HVAC
Elec
Arch
46,263.00
Rahurkar
Def Maint
Elec
8,932.00
Davis
Def Maint
Safety
9,672.93
Davis
Def Maint
Arch
19,125.70
89,246.00
5,000.00
56,961.83
975.00
7,100.00
Davis
Davis
Oliver
Oliver
Oliver
Rahurkar
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Plumbing
Safety
Arch
Safety
Plumbing
Plumbing
25,082.50
Jenkins
Def Maint
Safety
7,513.70
7,250.00
15,761.56
3,320.00
22,182.08
4,900.00
268,201.58
4,500.00
96,250.00
14,022.53
Madrigal
Wright
Martin
Rahurkar
Madrigal
Oliver
Oliver
Davis
Jenkins
Gill
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
HVAC
Plumbing
HVAC
Arch
Elec
Arch
Arch
Arch
HVAC
Plumbing
CRDM New Project Log as of 9-22-10
Final
Cost
7,774.54
975.00
Project
Status
Def. Maint.,
CB
Design Flaw,
Catagories
Energy
Def Maint
Arch
Def Maint
HVAC
Def Maint
HVAC
Def Maint
HVAC
Def Maint
HVAC
Def Maint
HVAC
Def Maint
Safety
Def Maint
Other
Def Maint
Safety
Original
Budget
Description
Closed
Closed
CRDM Projects Approved
Date
CRDM #
Project #
Bldg.
#
Original
Budget
PM
7,488.52
3,630.00
Wright
Davis
12,248.51
4,900.00
30,591.00
17,490.00
111,812.58
1,148.00
22,351.35
164,190.24
88,517.69
124,749.48
34,059.00
Theriot
Barnes
Oliver
Oliver
Oliver
Howard
Sameer
Oliver
Oliver
Oliver
Gill
24,440.00
Diesel tank farm landscaping
Law Ctr water filtration assessment
Architecture brick ledge repairs
E. Cullen drain scope for blockage
MD Anderson guttering assessment
Agnes Arnold cooling coils replacement
S&R2 C/W coil replacement
HSC coils, dampers & air grilles
Hilton storm pump controllers
Campus fire alarm network
Student Svs. Replace elevator flooring
Cameron sanitary line replacement
Cemo tunnel 6" water line leak repair
Asbestos sample testing for 4 buildings
Description
8/24/10 FY07-0035 P779478
8/25/10 FY07-0036 P779479
550 S&R2 faulty gas valves replacement
512 Modular office park restroom awning
10/10/09
12/16/09
1/7/10
1/7/10
1/15/10
1/13/10
1/21/10
1/22/10
1/22/10
1/25/10
1/26/10
586
547
543
503
543
550
593
509
701
543
106
FY08-0001
FY08-0002
FY08-0003
FY08-0004
FY08-0005
FY08-0006
FY08-0007
FY08-0008
FY08-0009
FY08-0010
FY08-0011
P779344
P779345
P779347
P779348
P779350
P779273
P779286
P779352
P779353
P779354
P779355
1/25/10 FY08-0012 P779356
1/26/10
1/29/10
1/29/10
1/29/10
2/3/10
2/4/10
2/4/10
2/5/10
4/5/10
2/5/10
2/11/10
2/11/10
2/12/10
FY08-0013
FY08-0014
FY08-0015
FY08-0016
FY08-0017
FY08-0018
FY08-0019
FY08-0020
FY08-0021
FY08-0022
FY08-0023
FY08-0024
FY08-0025
P779289
P779359
P779360
P779361
P779362
P779363
P779364
P779365
P779366
P779367
P779368
P779369
P779370
2/22/10 FY08-0026 P779372
2/22/10
2/15/10
2/15/10
2/23/10
2/22/10
FY08-0027
FY08-0028
FY08-0029
FY08-0030
FY08-0031
P779373
P779374
P779375
P779376
P779377
Cameron elevator renovation
PG Hoffman roof repairs
Architecture water seal rm 214
Technology loading dock repairs
Architecture lighting & life safety
S&R 1 lighting & auditorium seat covers
HSC Cooling coil replacement
MD Anderson library envelope seal
TMC Pharmacy roof assessment
Architecture guttering assessment
TLCC Anex roof collapse repair
516 Framework model addition
537
543
516
509
578
551
593
590
499
524
586
544
585516532543
536
581
585
590
520
CPB replace broken window
Engineering fire alarm upgrade
GSB fire alarm upgrade
Hilton sump pump monitor alarms
School of Music storm drain assessment
Final
Cost
Project
Status
12,248.51
4,900.00
Closed
Closed
17,490.00
Closed
Def. Maint.,
CB
Design Flaw,
Catagories
Energy
Def Maint
Safety
Def Maint
Arch
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Energy
Def Maint
Def Maint
Def Maint
Def Maint
Elec
Arch
Arch
Arch
Safety
Other
HVAC
Arch
Arch
Arch
Arch
LaMontagne
Def Maint
Other
4,019.25
75,000.00
201,105.15
56,508.34
39,351.84
8,405.00
7,125.00
18,000.00
3,800.00
3,009.00
1,895.00
40,461.00
1,801.38
Jenkins
Doyle
Oliver
Jenkins
Oliver
Madrigal
Madrigal
Sameer
Bartow
Sameer
Oliver
Gill
Gill
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Energy
Energy
Energy
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
L&M
Safety
Arch
Arch
Arch
HVAC
HVAC
HVAC
Elec
Safety
Safety
Plumbing
Plumbing
513.31
632.00
304,116.00
321,148.00
5,737.00
5,017.00
CRDM New Project Log as of 9-22-10
1,895.00
Closed
Wright
513.31
Closed
Def Maint
L&M
Wright
632.00
Closed
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Arch
Safety
Safety
Other
Plumbing
Jenkins
Jenkins
Maal
Gill
CRDM Projects Approved
Date
CRDM #
Project #
3/2/10
3/3/10
3/3/10
3/3/10
3/4/10
3/4/10
3/4/10
4/7/10
4/7/10
4/13/10
4/19/10
FY08-0032
FY08-0033
FY08-0034
FY08-0035
FY08-0036
FY08-0037
FY08-0038
FY08-0039
FY08-0040
FY08-0041
FY08-0042
P779378
P779380
P779381
P779382
P779384
P779385
P779386
P779411
P779412
P779413
P779414
4/20/10 FY08-0043 P779415
4/22/10 FY08-0044 P779416
4/22/10
4/23/10
4/23/10
4/22/10
FY08-0045
FY08-0046
FY08-0047
FY08-0048
P779417
P779418
P779419
P779420
4/27/10 FY08-0049 P779421
4/29/10
4/29/10
5/3/10
4/29/10
4/30/10
5/4/10
5/4/10
5/5/10
FY08-0050
FY08-0051
FY08-0052
FY08-0053
FY08-0054
FY08-0055
FY08-0056
FY08-0057
P779423
P779424
P779425
P779426
P779427
P779428
P779429
P779430
5/5/10
FY08-0058 P779431
5/17/10
5/21/10
9/13/10
9/13/10
FY08-0059
FY08-0060
FY08-0061
FY08-0062
P779435
P779437
P779487
P779488
Bldg.
#
PM
4,133.00
9,177.30
47,016.05
4,120.00
4,742.28
5,032.34
21,313.32
108,000.00
53,820.00
2,308.00
66,000.00
Doyle
Oliver
Jenkins
Jenkins
Villarreal
Villarreal
Sameer
Oliver
Miller
Wright
Oliver
4,221.00
Javaid
Def Maint
Plumbing
E Cullen emergency water line repairs
20,737.50
Oliver
Def Maint
Plumbing
Fine Arts organ recital hall ceiling repair
Cameron sewage line investigation
Moore School of Music structural Review
Hilton (cont. ed) parking garage appraisal
56,804.00
1,915.00
28,915.36
7,182.00
Doyle
Oliver
Lawrence
Lawrence
Def Maint
Def Maint
Def Maint
Def Maint
Arch
Plumbing
Arch
Arch
Campus wide condition assessment update
250,000.00
Norcom
Def Maint
Other
Madrigal
Bartow
Wright
Bartow
Javaid
Jenkins
Madrigal
Madrigal
Energy
Energy
Def Maint
Energy
Def Maint
Def Maint
Def Maint
Def Maint
HVAC
HVAC
Plumbing
HVAC
Plumbing
Arch
L&M
L&M
Doyle
Def Maint
Safety
Doyle
Madrigal
Def Maint
Def Maint
Def Maint
Energy
Arch
Plumbing
L&M
HVAC
550 S&R 1 rm 325 ACM abatement
586 Cameron Human/Hlth kitchen trap repair
535 EHRM 2 drainage repair
Campus wide card access license
532 Garrison carpet replacement
585 GSB rm 177 carpet replacement
Campus wide sprinkler deficiencies
550 S&R 1 emergency water leaks
544 Cemo Hall water infiltration in tunnel
564 Fleming hot water pipe leaks
585 GSB paint booth system replacement
505 Optometry animal care plumbing leak study
499/5
16
589
586
520
590
578 Agnes Arnold chill water coil replacement
3,500.00
501 Roy Cullen repair transfer switch controller
19,825.00
509 MDA Library emergency water main break
4,707.10
Engineering complex transfer switch repair
14,860.00
551 S&R 2 replace drainage plumbing in 439
5,000.00
509 MDA Library hand dryer project
53,721.80
579 Engineering asbestos abatement 2nd floor
5,184.00
579 Engineering asbestos abatement 3rd floor
5,184.00
S&R 1 protective structures for loading dock
550
61,750.00
and entrance
529 SEC emergency lighting configuration
3,703.00
528 Melcher water leak in crawlspace
8,000.00
590 FY08 CRDM Continuing Education ADA Uprades 3,678.13
529 FY08 CRDM SER Classrooom JCI HVAC Controllers
21,867.76
CRDM New Project Log as of 9-22-10
Jenkins
Martin
Final
Cost
1,915.00
Project
Status
Def. Maint.,
CB
Design Flaw,
Catagories
Energy
Def Maint
L&M
Def Maint
Plumbing
Def Maint
Plumbing
Def Maint
Safety
Def Maint
Arch
Def Maint
Arch
Def Maint
L&M
Def Maint
Plumbing
Def Maint
Arch
Def Maint
Plumbing
Def Maint
Arch
Original
Budget
Description
Closed
CRDM Projects Approved
Bldg.
#
Date
CRDM #
Project #
1/4/10
1/8/10
1/15/10
3/4/10
3/9/10
3/10/10
3/12/10
3/22/10
3/23/10
3/24/10
FY09-0001
FY09-0002
FY09-0003
FY09-0004
FY09-0005
FY09-0006
FY09-0007
FY09-0008
FY09-0009
FY09-0010
P779346
P779349
P779351
P779383
P779387
P779388
P779389
P779390
P779391
P779392
587
543
543
543
3/25/10 FY09-0011 P779393
549
3/25/10 FY09-0012 P779394
549
3/25/10 FY09-0013 P779396
506
3/25/10 FY09-0014 P779397
530
3/25/10 FY09-0015 P779398
516
551
499
524
3/31/10 FY09-0016 P779399
Description
Farish Hall classroom 232 doors
Architecture Enviro investigation
Architecture leak investigation
Architecture fire alarm replacement
Campus wide Basic card access controls
S&R 2 trench drain cleaning
Lynn Eusan park sanitary line replace
Student Svs. Bldg new fire alarm system
Campus wide fire alarm network breakout
Campus wide infrastructure study
Modify lighting for projection in Social Work
rm 101 auditorium
Modify lighting for projection in Social Work
rm 102 auditorium
Communications replace airhandling units
Fire hydrant replacement near Robertson
stadium
E. Cullen restroom modifications for TDLR
Arch & Eng. Study of E. Cullen, PGH,
Fleming & Agnes Arnold
E. Cullen 3rd flr air return obstruction
E.Cullen 1st flr rm 125, door and fire alarm
devices
MD Anderson design MEP systems
Melcher Hall recycling center
Optometry termite treatment
Final
Cost
PM
4,748.75
100,506.85
211,004.46
280,180.40
104,599.88
3,054.24
29,701.00
116,744.00
63,758.44
145,950.00
Barnes
Oliver
Oliver
Sameer
Jenkins
Barnes
Gill
Doyle
Hajecate
Sameer
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Arch
L&M
Arch
L&M
Safety
Plumbing
Plumbing
Safety
Safety
Other
8,121.80
Jenkins
Def Maint
Arch
11,339.95
Jenkins
Def Maint
Arch
324,850.00
Ruck
Def Maint
Arch
7,485.00
Oliver
Def Maint
L&M
400.00
Howard
Def Maint
L&M
51,346.00
Norcom
Def Maint
Arch
7,360.00
Martin
Energy
HVAC
2,365.27
Norcom
Def Maint
L&M
72,460.50
1,920.23
17,030.16
Jenkins
Wright
Wright
Def Maint
Def Maint
Def Maint
Arch
Arch
Arch
7,485.00
Project
Status
Def. Maint.,
CB
Design Flaw,
Catagories
Energy
Original
Budget
Closed
3/31/10 FY09-0017 P779400
516
4/1/10
FY09-0018 P779401
516
3/31/10 FY09-0019 P779402
4/1/10 FY09-0020 P779403
4/1/10 FY09-0021 P779404
509
528
505
3/31/10 FY09-0022 P779405
525 Health Ctr replace controller transfer switch
1,730.40
Bartow
Def Maint
Elec
3/31/10 FY09-0023 P779406
505 Optometry replace controller transfer switch
2,438.01
Bartow
Def Maint
Elec
3/31/10 FY09-0024 P779408
4/1/10 FY09-0025 P779409
515 Locate covered manhole near Justin Dart
516 E. Cullen rm 209 & 27 recarpet
1,771.60
768.00
Bartow
Jenkins
Def Maint
Def Maint
Other
Arch
8,500.00
LaMontagne
Def Maint
3,675.00
Oliver
Energy
HVAC
20,994.05
3,181.22
7,120.00
Jenkins
Madrigal
Martin
Def Maint
Def Maint
Def Maint
Arch
HVAC
HVAC
4/1/10
FY09-0026 P779410
5/1/10
FY09-0027 P779433
5/12/10 FY09-0028 P779434
5/21/10 FY09-0029 P779438
5/21/10 FY09-0030 P779439
Campus wide detention bank map updates
R. Cullen HVAC repairs & fire damper
install
520 Moores Music handrail install
543 Architecture AHU drain pan and piping
551 SR II lab 329 replace faulty HVAC controls
501
CRDM New Project Log as of 9-22-10
2,365.27
Closed
CRDM Projects Approved
Date
CRDM #
Project #
Bldg.
#
Description
Original
Budget
PM
Final
Cost
Project
Status
Def. Maint.,
CB
Design Flaw,
Catagories
Energy
Utility infrastructure study for entire campus
chilled water & steam
515 8" water valve replacement Central Plant
516 E. Cullen 1st floor hallway reflooring
Irrigation loop at OB woods
509 MD Anderson exterior façade
51,500.00
Sameer
Energy
Other
4,785.00
26,673.28
10,924.95
200,000.00
Gill
Davis
Smith
Oliver
Def Maint
Def Maint
Def Maint
Def Maint
Plumbing
Arch
Plumbing
Arch
Campus Design Guideline Standards
564 Fleming classrooms #154, 160 & 162
509 MD Anderson exterior façade
225,000.00
423,881.00
842,638.42
Yancey
Davis
Oliver
Other
Def Maint
Def Maint
Arch
Arch
Arch
8/23/10 FY11-0001 P779481 515 FY11 CRDM Central Plant Expansion
4,996,670.00
9/9/10 FY11-0002 P779486 N/A FY11 CRDM Main Campus Utility Documentation345,340.00
Bueller
Ivy
Def Maint
Energy
Other
Other
8/23/10 FY12-0001 P779482 515 FY12 CRDM Central Plant Expansion
5,903,107.00
Bueller
Def Maint
Other
8/23/10 FY13-0001 P779483 515 FY13 CRDM Central Plant Expansion
7,325,297.00
Bueller
Def Maint
Other
8/23/10 FY14-0001 P779484 515 FY14 CRDM Central Plant Expansion
5,378,122.00
Bueller
Def Maint
Other
5/27/10 FY09-0031 P779441
6/1/10
6/10/10
6/23/10
8/4/10
FY09-0032
FY09-0033
FY09-0034
FY09-0035
P779442
P779443
P779449
P779474
4/26/10 FY10-0001 P779422
5/14/10 FY10-0002 P779436
8/4/10 FY10-0003 P779474
30,846,798.19
CRDM New Project Log as of 9-22-10
Download