CRDM Projects Approved

advertisement
CRDM Projects Approved
Date
CRDM #
Project #
Bldg.
#
10/10/09
12/16/09
1/4/10
1/7/10
1/7/10
1/8/10
1/13/10
1/15/10
1/15/10
1/21/10
1/22/10
1/22/10
1/25/10
FY08-0001
FY08-0002
FY09-0001
FY08-0003
FY08-0004
FY09-0002
FY08-0006
FY08-0005
FY09-0003
FY08-0007
FY08-0008
FY08-0009
FY08-0010
P779344
P779345
P779346
P779347
P779348
P779349
P779273
P779350
P779351
P779286
P779352
P779353
P779354
586
547
587
543
503
543
550
543
543
593
509
701
543
Description
Cameron elevator renovation
PG Hoffman roof repairs
Farish Hall classroom 232 doors
Architecture water seal rm 214
Technology loading dock repairs
Architecture Enviro investigation
S&R 1 lighting & auditorium seat covers
Architecture lighting & life safety
Architecture leak investigation
HSC Cooling coil replacement
MD Anderson library envelope seal
TMC Pharmacy roof assessment
Architecture guttering assessment
Original
Budget
12,248.51
4,900.00
4,748.75
30,591.00
17,490.00
100,506.85
1,148.00
111,812.58
211,004.46
22,351.35
164,190.24
88,517.69
124,749.48
PM
Final
Cost
1/25/10 FY08-0012 P779356
516 Framework model addition
24,440.00
1/26/10
1/26/10
1/29/10
1/29/10
1/29/10
2/3/10
2/4/10
2/4/10
2/5/10
2/5/10
2/11/10
2/11/10
2/12/10
2/15/10
2/15/10
106 TLCC Anex roof collapse repair
Diesel tank farm landscaping
537 Law Ctr water filtration assessment
543 Architecture brick ledge repairs
516 E. Cullen drain scope for blockage
509 MD Anderson guttering assessment
578 Agnes Arnold cooling coils replacement
551 S&R2 C/W coil replacement
593 HSC coils, dampers & air grilles
499 Campus fire alarm network
524 Student Svs. Replace elevator flooring
586 Cameron sanitary line replacement
544 Cemo tunnel 6" water line leak repair
581 Engineering fire alarm upgrade
585 GSB fire alarm upgrade
585516Asbestos sample testing for 4 buildings
532543
536 CPB replace broken window
520 School of Music storm drain assessment
590 Hilton sump pump monitor alarms
550 S&R 1 rm 325 ACM abatement
586 Cameron Human/Hlth kitchen trap repair
535 EHRM 2 drainage repair
Campus wide card access license
532 Garrison carpet replacement
585 GSB rm 177 carpet replacement
34,059.00
4,019.25
75,000.00
201,105.15
56,508.34
39,351.84
8,405.00
7,125.00
18,000.00
3,009.00
1,895.00
40,461.00
1,801.38
304,116.00
321,148.00
Theriot
Barnes
Barnes
Oliver
Oliver
Oliver
Howard
Oliver
Oliver
Sameer
Oliver
Oliver
Oliver
LaMontag
ne
Gill
Jenkins
Doyle
Oliver
Jenkins
Oliver
Madrigal
Madrigal
Sameer
Sameer
Oliver
Gill
Gill
Jenkins
Jenkins
513.31
Wright
513.31
632.00
5,017.00
5,737.00
4,133.00
9,177.30
47,016.05
4,120.00
4,742.28
5,032.34
Wright
Gill
Maal
Doyle
Oliver
Jenkins
Jenkins
Villarreal
Villarreal
632.00
FY08-0011
FY08-0013
FY08-0014
FY08-0015
FY08-0016
FY08-0017
FY08-0018
FY08-0019
FY08-0020
FY08-0022
FY08-0023
FY08-0024
FY08-0025
FY08-0028
FY08-0029
P779355
P779289
P779359
P779360
P779361
P779362
P779363
P779364
P779365
P779367
P779368
P779369
P779370
P779374
P779375
2/22/10 FY08-0026 P779372
2/22/10
2/22/10
2/23/10
3/2/10
3/3/10
3/3/10
3/3/10
3/4/10
3/4/10
FY08-0027
FY08-0031
FY08-0030
FY08-0032
FY08-0033
FY08-0034
FY08-0035
FY08-0036
FY08-0037
P779373
P779377
P779376
P779378
P779380
P779381
P779382
P779384
P779385
CRDM New Project Log as of 10.25.10
Page 1 of 5
Critical ,
Def. Maint.,
Deferred,
Project
CB
Design Flaw,
Emerg. Adaptation,
Status
Catagories
Energy
Planned,
On-going
Closed
Def Maint
Elec
X
Closed
Def Maint
Arch
Def Maint
Arch
X
Closed
Def Maint
Arch
X
Closed
Def Maint
Arch
X
Def Maint
L&M
Def Maint
Other
Def Maint
Safety
Closed
Def Maint
Arch
Energy
HVAC
X
Def Maint
Arch
X
Def Maint
Arch
Def Maint
Arch
12,248.51
4,900.00
1,895.00
Closed
24,069.91
17,490.00
########
Def Maint
Other
X
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Energy
Energy
Energy
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Arch
L&M
Safety
Arch
Arch
Arch
HVAC
HVAC
HVAC
Safety
Safety
Plumbing
Plumbing
Safety
Safety
X
Closed
Def Maint
L&M
Closed
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Arch
Plumbing
Other
L&M
Plumbing
Plumbing
Safety
Arch
Arch
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
11/12/2010
CRDM Projects Approved
Original
Budget
PM
21,313.32
280,180.40
104,599.88
3,054.24
29,701.00
116,744.00
63,758.44
145,950.00
Sameer
Sameer
Jenkins
Barnes
Gill
Doyle
Hajecate
Sameer
8,121.80
Jenkins
Def Maint
Arch
11,339.95
Jenkins
Def Maint
Arch
X
324,850.00
Ruck
Def Maint
Arch
X
7,485.00
Oliver
Def Maint
L&M
X
400.00
Howard
Def Maint
L&M
51,346.00
Norcom
Def Maint
Arch
3/31/10 FY09-0017 P779400
3/31/10 FY09-0019 P779402
Campus wide sprinkler deficiencies
543 Architecture fire alarm replacement
Campus wide Basic card access controls
551 S&R 2 trench drain cleaning
499 Lynn Eusan park sanitary line replace
524 Student Svs. Bldg new fire alarm system
Campus wide fire alarm network breakout
Campus wide infrastructure study
Modify lighting for projection in Social Work
549
rm 101 auditorium
Modify lighting for projection in Social Work
549
rm 102 auditorium
506 Communications replace airhandling units
Fire hydrant replacement near Robertson
530
stadium
516 E. Cullen restroom modifications for TDLR
Arch & Eng. Study of E. Cullen, PGH,
Fleming & Agnes Arnold
516 E. Cullen 3rd flr air return obstruction
509 MD Anderson design MEP systems
7,360.00
72,460.50
Martin
Jenkins
Energy
Def Maint
HVAC
Arch
X
X
3/31/10 FY09-0022 P779405
525 Health Ctr replace controller transfer switch
1,730.40
Bartow
Def Maint
Elec
X
3/31/10 FY09-0023 P779406
505 Optometry replace controller transfer switch
2,438.01
Bartow
Def Maint
Elec
X
3/31/10 FY09-0024 P779408
1,771.60
Bartow
Def Maint
Other
X
2,365.27
Norcom
Def Maint
L&M
X
1,920.23
17,030.16
768.00
Def Maint
Def Maint
Def Maint
Arch
Arch
Arch
X
X
8,500.00
Wright
Wright
Jenkins
LaMontag
ne
Bartow
Oliver
Date
CRDM #
Project #
3/4/10
3/4/10
3/9/10
3/10/10
3/12/10
3/22/10
3/23/10
3/24/10
FY08-0038
FY09-0004
FY09-0005
FY09-0006
FY09-0007
FY09-0008
FY09-0009
FY09-0010
P779386
P779383
P779387
P779388
P779389
P779390
P779391
P779392
3/25/10 FY09-0011 P779393
3/25/10 FY09-0012 P779394
3/25/10 FY09-0013 P779396
3/25/10 FY09-0014 P779397
3/25/10 FY09-0015 P779398
3/31/10 FY09-0016 P779399
Bldg.
#
Description
4/1/10
FY09-0018 P779401
4/1/10
4/1/10
4/1/10
FY09-0020 P779403
FY09-0021 P779404
FY09-0025 P779409
515 Locate covered manhole near Justin Dart
E.Cullen 1st flr rm 125, door and fire alarm
516
devices
528 Melcher Hall recycling center
505 Optometry termite treatment
516 E. Cullen rm 209 & 27 recarpet
4/1/10
FY09-0026 P779410
Campus wide detention bank map updates
4/5/10
4/7/10
4/7/10
4/13/10
4/19/10
FY08-0021
FY08-0039
FY08-0040
FY08-0041
FY08-0042
P779366
P779411
P779412
P779413
P779414
4/20/10 FY08-0043 P779415
590
550
544
564
585
CRDM New Project Log as of 10.25.10
7,485.00
2,365.27
Closed
Closed
Def Maint
Wright
Oliver
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Elec
Plumbing
Arch
Plumbing
Arch
X
X
X
4,221.00
Javaid
Def Maint
Plumbing
X
20,737.50
Oliver
Def Maint
Plumbing
X
56,804.00
Doyle
Def Maint
Arch
Hilton storm pump controllers
S&R 1 emergency water leaks
Cemo Hall water infiltration in tunnel
Fleming hot water pipe leaks
GSB paint booth system replacement
3,800.00
108,000.00
53,820.00
2,308.00
66,000.00
505 Optometry animal care plumbing leak study
499/5
E Cullen emergency water line repairs
16
4/22/10 FY08-0045 P779417 589 Fine Arts organ recital hall ceiling repair
4/22/10 FY08-0044 P779416
Final
Cost
Critical ,
Def. Maint.,
Deferred,
Project
CB
Design Flaw,
Emerg. Adaptation,
Status
Catagories
Energy
Planned,
On-going
Def Maint
L&M
X
Def Maint
L&M
Def Maint
Safety
X
Def Maint
Plumbing
Def Maint
Plumbing
X
Def Maint
Safety
Def Maint
Safety
Def Maint
Other
X
Page 2 of 5
Miller
11/12/2010
CRDM Projects Approved
Date
CRDM #
Project #
4/22/10
4/23/10
4/23/10
4/26/10
FY08-0048
FY08-0046
FY08-0047
FY10-0001
P779420
P779418
P779419
P779422
4/27/10 FY08-0049 P779421
4/29/10
4/29/10
4/29/10
4/30/10
FY08-0050
FY08-0051
FY08-0053
FY08-0054
P779423
P779424
P779426
P779427
5/1/10
FY09-0027 P779433
5/3/10
5/4/10
5/4/10
5/5/10
FY08-0052
FY08-0055
FY08-0056
FY08-0057
5/5/10
FY08-0058 P779431
5/12/10
5/14/10
5/17/10
5/21/10
5/21/10
5/21/10
5/25/10
FY09-0028
FY10-0002
FY08-0059
FY08-0060
FY09-0029
FY09-0030
FY07-0001
P779425
P779428
P779429
P779430
P779434
P779436
P779435
P779437
P779438
P779439
P779440
5/27/10 FY09-0031 P779441
6/1/10
6/10/10
6/21/10
6/21/10
6/21/10
6/21/10
6/21/10
6/23/10
6/29/10
6/30/10
6/30/10
FY09-0032
FY09-0033
FY07-0002
FY07-0003
FY07-0004
FY07-0005
FY07-0006
FY09-0034
FY07-0007
FY07-0008
FY07-0009
P779442
P779443
P779444
P779445
P779446
P779447
P779448
P779449
P779450
P779451
P779452
7/1/10
FY07-0010 P779453
7/7/10
7/8/10
7/8/10
FY07-0011 P779454
FY07-0012 P779455
FY07-0013 P779456
CRDM New Project Log as of 10.25.10
Bldg.
#
Description
590 Hilton (cont. ed) parking garage appraisal
586 Cameron sewage line investigation
520 Moore School of Music structural Review
Campus Design Guideline Standards
Original
Budget
7,182.00
1,915.00
28,915.36
225,000.00
Critical ,
Def. Maint.,
Deferred,
Final Project
CB
PM
Design Flaw,
Emerg. Adaptation,
Cost
Status
Catagories
Energy
Planned,
On-going
Lawrence
Def Maint
Arch
Oliver
1,915.00 Closed
Def Maint
Plumbing
X
Lawrence
Def Maint
Arch
X
Yancey
Other
Arch
Campus wide condition assessment update
250,000.00
Norcom
Def Maint
Other
578 Agnes Arnold chill water coil replacement
501 Roy Cullen repair transfer switch controller
Engineering complex transfer switch repair
551 S&R 2 replace drainage plumbing in 439
R. Cullen HVAC repairs & fire damper
501
install
509 MDA Library emergency water main break
509 MDA Library hand dryer project
579 Engineering asbestos abatement 2nd floor
579 Engineering asbestos abatement 3rd floor
S&R 1 protective structures for loading
550
dock and entrance
520 Moores Music handrail install
564 Fleming classrooms #154, 160 & 162
529 SEC emergency lighting configuration
528 Melcher water leak in crawlspace
543 Architecture AHU drain pan and piping
551 SR II lab 329 replace faulty HVAC controls
529 Science Engineering classroom shades
Utility infrastructure study for entire campus
chilled water & steam
515 8" water valve replacement Central Plant
516 E. Cullen 1st floor hallway reflooring
551 S&R 2 4th flr filter vents
551 S&R 2 3rd flr filter vents
551 S&R 2 2nd flr filter vents
551 S&R 2 1st flr filter vents
532 Garrison Gym AHU coil replacement
Irrigation loop at OB woods
586 Cameron asbestos tiles clean up
516 E. Cullen exterior window cleaning
553 Welcome Center replace glass panels
550/
SR1 and SR2 Generator Addition
551
516 E. Cullen rm 122 reconfiguration
553 Continuing Education AHU-2
545 SERC emergency 15 KV switch
3,500.00
19,825.00
14,860.00
5,000.00
Madrigal
Bartow
Bartow
Javaid
Energy
Energy
Energy
Def Maint
HVAC
HVAC
HVAC
Plumbing
X
3,675.00
Oliver
Energy
HVAC
X
4,707.10
53,721.80
5,184.00
5,184.00
Wright
Jenkins
Madrigal
Madrigal
Def Maint
Def Maint
Def Maint
Def Maint
Plumbing
Arch
L&M
L&M
X
X
X
X
61,750.00
Doyle
Def Maint
Safety
X
20,994.05
423,881.00
3,703.00
8,000.00
3,181.22
7,120.00
20,167.00
Jenkins
Davis
Doyle
Madrigal
Madrigal
Martin
Doyle
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Arch
Arch
Arch
Plumbing
HVAC
HVAC
Arch
X
X
X
X
X
X
X
51,500.00
Sameer
Energy
Other
4,785.00
26,673.28
3,306.65
5,015.21
3,711.62
609.30
6,601.00
10,924.95
9,067.00
5,580.00
5,400.00
Gill
Davis
Madrigal
Madrigal
Madrigal
Madrigal
Madrigal
Smith
Oliver
Davis
Davis
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Plumbing
Arch
HVAC
HVAC
HVAC
HVAC
HVAC
Plumbing
Safety
Other
Safety
31,717.00
Gill
Def Maint
Elec
X
1,555.02
15,446.00
7,774.54
Martin
Martin
Bartow
Def Maint
Def Maint
Def Maint
Elec
HVAC
Elec
X
X
Page 3 of 5
7,774.54 Closed
X
X
X
X
X
X
X
X
X
11/12/2010
CRDM Projects Approved
Date
CRDM #
Project #
7/8/10
FY07-0014 P779457
7/8/10
FY07-0015 P779458
7/9/10
FY07-0016 P779459
7/9/10
FY07-0017 P779460
7/9/10
7/9/10
7/12/10
7/12/10
7/12/10
7/15/10
7/15/10
FY07-0018
FY07-0019
FY07-0020
FY07-0021
FY07-0022
FY07-0023
FY07-0026
P779461
P779462
P779463
P779464
P779465
P779466
P779467
7/21/10 FY07-0024 P779468
7/21/10
7/21/10
7/27/10
7/30/10
8/4/10
8/4/10
8/4/10
8/4/10
8/5/10
8/18/10
8/23/10
8/23/10
8/23/10
8/23/10
8/24/10
8/24/10
8/25/10
FY07-0025
FY07-0027
FY07-0028
FY07-0029
FY07-0030
FY07-0031
FY09-0035
FY10-0003
FY07-0032
FY07-0033
FY11-0001
FY12-0001
FY13-0001
FY14-0001
FY07-0034
FY07-0035
FY07-0036
P779469
P779470
P779471
P779472
P779473
P779474
P779474
P779474
P779475
P779476
P779481
P779482
P779483
P779484
P779477
P779478
P779479
9/9/10
9/13/10
9/13/10
9/21/10
9/27/10
FY11-0002
FY08-0061
FY08-0062
FY08-0063
FY08-0064
P779486
P779487
P779488
P779490
P779492
9/29/10 FY08-0065 P779493
9/29/10 FY08-0066 P779494
10/11/10 FY08-0067 P779495
CRDM New Project Log as of 10.25.10
Bldg.
#
Description
593 HSC dock & corridor door replacement
HSC elevator hydraulic cylinder
593
replacement
S&R 2 lab 228 water damage & mold
551
remediation
Hilton Continuing Ed window replacement
590
& re-seal
551 S&R 2 restroom fixture replacement
551 S&R 2 hallway abatement & flooring
581 Engineering D3 roof assessment
586 Cameron emergency mold remediation
516 E. Cullen 502D drain line for roof catch pan
516 Flooding mechanical rm Cullen fountain
585 GSB water heater tank replacment
MD Anderson water in basement, test &
509
clean
593 HSCA new condensate drains AHU
551 S&R 2 lab OAHU repairs
516 E. Cullen 3rd floor lobby lighting
550 S&R 1 emergency vacuume pump
581 Engineering D2 envelope assessment
509 MD Anderson exterior façade
509 MD Anderson exterior façade
509 MD Anderson exterior façade
519 DPS roof & waterproof analysis
509 MD Anderson cooling system
515 FY11 CRDM Central Plant Expansion
515 FY12 CRDM Central Plant Expansion
515 FY13 CRDM Central Plant Expansion
515 FY14 CRDM Central Plant Expansion
499 Emergency plumbing infrastructure repairs
550 S&R2 faulty gas valves replacement
512 Modular office park restroom awning
FY11 CRDM Main Campus Utility
N/A Documentation
590 Continuing Education ADA Uprades
529 SER Classroom JCI HVAC Controllers
499 Valve replacement near Lot 19E
550 S&R1 sewer ejector system
Mobile office park restroom awning
512
(classroom facility)
528 MelcherHall handrail repair
509 MD Anderson bad odor in basement
Original
Budget
PM
20,582.00
Brungardt
46,263.00
Rahurkar
Def Maint
Elec
X
8,932.00
Davis
Def Maint
Safety
X
9,672.93
Davis
Def Maint
Arch
X
19,125.70
89,246.00
5,000.00
56,961.83
975.00
7,100.00
7,250.00
Davis
Davis
Oliver
Oliver
Oliver
Rahurkar
Wright
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Plumbing
Safety
Arch
Safety
Plumbing
Plumbing
Plumbing
X
X
25,082.50
Jenkins
Def Maint
Safety
X
7,513.70
15,761.56
3,320.00
22,182.08
4,900.00
268,201.58
200,000.00
842,638.42
4,500.00
96,250.00
4,996,670.00
5,903,107.00
7,325,297.00
5,378,122.00
14,022.53
7,488.52
3,630.00
Madrigal
Martin
Rahurkar
Madrigal
Oliver
Oliver
Oliver
Oliver
Davis
Jenkins
HVAC
HVAC
Arch
Elec
Arch
Arch
Arch
Arch
Arch
HVAC
Other
Other
Other
Other
Plumbing
Safety
Arch
X
Gill
Wright
Davis
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
Def Maint
335,280.00
Ivy
Energy
Other
Planned
3,678.13
21,867.76
8,315.00
18,468.00
Jenkins
Martin
Gill
Wright
Def Maint
Energy
Def Maint
Def Maint
L&M
HVAC
Plumbing
Plumbing
Defered
Planned
Critical
Critical
2,583.24
Davis
Def Maint
Arch
1,210.25
7,210.00
Jenkins
Gill
Def Maint
Def Maint
Arch
HVAC
Page 4 of 5
Bueller
Bueller
Bueller
Bueller
Final
Cost
Critical ,
Def. Maint.,
Deferred,
Project
CB
Design Flaw,
Emerg. Adaptation,
Status
Catagories
Energy
Planned,
On-going
Def Maint
Arch
X
975.00
Closed
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Defered
X
X
Critical
Critical
11/12/2010
CRDM Projects Approved
Date
CRDM #
Project #
10/11/10 FY08-0068 P779496
10/12/10 FY08-0069 P779497
10/14/10 FY08-0070 P779498
Bldg.
#
Description
543 Architecture indoor air quality assessment
543 Architecture 4th floor air balance
Welcome Center sewer gas odor
553
investigation
Original
Budget
PM
5,000.00
12,460.00
Oliver
Martin
3,240.00
Wright
Final
Cost
Critical ,
Def. Maint.,
Deferred,
Project
CB
Design Flaw,
Emerg. Adaptation,
Status
Catagories
Energy
Planned,
On-going
Def Maint
HVAC
Defered
Def Maint
HVAC
Defered
X
Def Maint
Plumbing
Defered
30,897,941.68
CRDM New Project Log as of 10.25.10
Page 5 of 5
11/12/2010