CRDM Projects Approved

advertisement
CRDM Projects Approved
Date
CRDM #
Project #
Bldg
.#
10/10/09
12/16/09
1/4/10
1/7/10
1/7/10
1/8/10
1/13/10
1/15/10
1/15/10
1/21/10
1/22/10
1/22/10
1/25/10
FY08-0001
FY08-0002
FY09-0001
FY08-0003
FY08-0004
FY09-0002
FY08-0006
FY08-0005
FY09-0003
FY08-0007
FY08-0008
FY08-0009
FY08-0010
P779344
P779345
P779346
P779347
P779348
P779349
P779273
P779350
P779351
P779286
P779352
P779353
P779354
586
547
587
543
503
543
550
543
543
593
509
701
543
Description
Cameron elevator renovation
PG Hoffman roof repairs
Farish Hall classroom 232 doors
Architecture water seal rm 214
Technology loading dock repairs
Architecture Enviro investigation
S&R 1 lighting & auditorium seat covers
Architecture lighting & life safety
Architecture leak investigation
HSC Cooling coil replacement
MD Anderson library envelope seal
TMC Pharmacy roof assessment
Architecture guttering assessment
Original
Budget
PM
12,248.51
4,900.00
4,748.75
30,591.00
17,490.00
97,785.36
1,148.00
111,812.58
211,004.46
22,351.35
164,190.24
88,517.69
124,749.48
Theriot
Barnes
Barnes
Oliver
Oliver
Oliver
Howard
Oliver
Oliver
Sameer
Oliver
Oliver
Oliver
Final
Cost
Project
Status
12,248.51
4,900.00
Closed
Closed
24,069.91
17,490.00
97,785.36
Closed
Closed
Closed
132,529.87
Closed
Critical ,
Deferred,
CB
Emerg. Adaptation,
Catagories
Planned,
On-going
Elec
X
Arch
Arch
X
Arch
X
Arch
X
L&M
Other
Safety
Arch
HVAC
X
Arch
X
Arch
Arch
1/25/10 FY08-0012 P779356
516 Framework model addition
24,440.00
LaMontagne
Other
X
1/26/10
1/26/10
1/29/10
1/29/10
1/29/10
2/3/10
2/4/10
2/4/10
2/5/10
2/5/10
2/11/10
2/11/10
2/12/10
2/15/10
2/15/10
106 TLCC Anex roof collapse repair
Diesel tank farm landscaping
537 Law Ctr water filtration assessment
543 Architecture brick ledge repairs
516 E. Cullen drain scope for blockage
509 MD Anderson guttering assessment
578 Agnes Arnold cooling coils replacement
551 S&R2 C/W coil replacement
593 HSC coils, dampers & air grilles
499 Campus fire alarm network
524 Student Svs. Replace elevator flooring
586 Cameron sanitary line replacement
544 Cemo tunnel 6" water line leak repair
581 Engineering fire alarm upgrade
585 GSB fire alarm upgrade
585516Asbestos sample testing for 4 buildings
532543
536 CPB replace broken window
520 School of Music storm drain assessment
590 Hilton sump pump monitor alarms
550 S&R 1 rm 325 ACM abatement
586 Cameron Human/Hlth kitchen trap repair
535 EHRM 2 drainage repair
N/A Campus wide card access license
532 Garrison carpet replacement
585 GSB rm 177 carpet replacement
34,059.00
4,019.25
75,000.00
201,105.15
73,098.34
39,351.84
8,405.00
7,125.00
18,000.00
3,009.00
1,895.00
40,461.00
1,801.38
304,116.00
321,148.00
Gill
Jenkins
Doyle
Oliver
Jenkins
Oliver
Madrigal
Madrigal
Sameer
Sameer
Oliver
Gill
Gill
Jenkins
Jenkins
Arch
L&M
Safety
Arch
Arch
Arch
HVAC
HVAC
HVAC
Safety
Safety
Plumbing
Plumbing
Safety
Safety
X
513.31
632.00
5,017.00
5,737.00
4,133.00
9,177.30
43,100.29
4,120.00
4,742.28
5,032.34
FY08-0011
FY08-0013
FY08-0014
FY08-0015
FY08-0016
FY08-0017
FY08-0018
FY08-0019
FY08-0020
FY08-0022
FY08-0023
FY08-0024
FY08-0025
FY08-0028
FY08-0029
P779355
P779289
P779359
P779360
P779361
P779362
P779363
P779364
P779365
P779367
P779368
P779369
P779370
P779374
P779375
2/22/10 FY08-0026 P779372
2/22/10
2/22/10
2/23/10
3/2/10
3/3/10
3/3/10
3/3/10
3/4/10
3/4/10
FY08-0027
FY08-0031
FY08-0030
FY08-0032
FY08-0033
FY08-0034
FY08-0035
FY08-0036
FY08-0037
CRDM New Project Log As of 02-04-11
P779373
P779377
P779376
P779378
P779380
P779381
P779382
P779384
P779385
Page 1 of 5
1,895.00
Closed
Wright
513.31
Closed
L&M
Wright
Gill
Maal
Doyle
Oliver
Jenkins
Jenkins
Villarreal
Villarreal
632.00
Closed
43,100.29
Closed
Arch
Plumbing
Other
L&M
Plumbing
Plumbing
Safety
Arch
Arch
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
2/22/2011
CRDM Projects Approved
Date
CRDM #
Project #
Bldg
.#
3/4/10
3/4/10
3/9/10
3/10/10
3/12/10
3/22/10
3/23/10
3/24/10
FY08-0038
FY09-0004
FY09-0005
FY09-0006
FY09-0007
FY09-0008
FY09-0009
FY09-0010
P779386
P779383
P779387
P779388
P779389
P779390
P779391
P779392
N/A
543
N/A
551
499
524
N/A
N/A
3/25/10 FY09-0011 P779393
549
3/25/10 FY09-0012 P779394
549
3/25/10 FY09-0013 P779396
506
3/25/10 FY09-0014 P779397
530
3/25/10 FY09-0015 P779398
516
3/31/10 FY09-0016 P779399
Description
Campus wide sprinkler deficiencies
Architecture fire alarm replacement
Campus wide Basic card access controls
S&R 2 trench drain cleaning
Lynn Eusan park sanitary line replace
Student Svs. Bldg new fire alarm system
Campus wide fire alarm network breakout
Campus wide infrastructure study
Modify lighting for projection in Social
Work rm 101 auditorium
Modify lighting for projection in Social
Work rm 102 auditorium
Communications replace airhandling units
Fire hydrant replacement near Robertson
stadium
E. Cullen restroom modifications for TDLR
Arch & Eng. Study of E. Cullen, PGH,
Fleming & Agnes Arnold
E. Cullen 3rd flr air return obstruction
MD Anderson design MEP systems
3/31/10 FY09-0017 P779400
3/31/10 FY09-0019 P779402
516
509
3/31/10 FY09-0022 P779405
525 Health Ctr replace controller transfer switch
3/31/10 FY09-0023 P779406
505
3/31/10 FY09-0024 P779408
515
4/1/10
FY09-0018 P779401
516
4/1/10
4/1/10
4/1/10
Final
Cost
Critical ,
Deferred,
Project
CB
Emerg. Adaptation,
Status Catagories
Planned,
On-going
L&M
X
L&M
Safety
X
Plumbing
Plumbing
X
Safety
Safety
Other
X
Original
Budget
PM
21,313.32
280,180.40
104,599.88
3,054.24
29,701.00
116,744.00
63,758.44
145,950.00
Sameer
Sameer
Jenkins
Barnes
Gill
Doyle
Hajecate
Sameer
8,121.80
Jenkins
Arch
11,339.95
Jenkins
Arch
X
324,850.00
Ruck
Arch
X
7,485.00
Oliver
L&M
X
400.00
Howard
L&M
51,346.00
Norcom
Arch
7,360.00
72,460.50
Martin
Jenkins
HVAC
Arch
X
X
1,730.40
Bartow
Elec
X
2,438.01
Bartow
Elec
X
1,771.60
Bartow
Other
X
L&M
X
Arch
Arch
Arch
X
X
7,485.00
Closed
2,365.27
Norcom
FY09-0020 P779403
FY09-0021 P779404
FY09-0025 P779409
528
505
516
Optometry replace controller transfer
switch
Locate covered manhole near Justin Dart
E.Cullen 1st flr rm 125, door and fire alarm
devices
Melcher Hall recycling center
Optometry termite treatment
E. Cullen rm 209 & 27 recarpet
1,920.23
17,030.16
768.00
Wright
Wright
Jenkins
4/1/10
FY09-0026 P779410
N/A Campus wide detention bank map updates
8,500.00
LaMontagne
4/5/10
4/7/10
4/7/10
4/13/10
4/19/10
4/20/10
FY08-0021
FY08-0039
FY08-0040
FY08-0041
FY08-0042
FY08-0043
590
550
544
564
585
505
499/
516
589
590
586
Hilton storm pump controllers
S&R 1 emergency water leaks
Cemo Hall water infiltration in tunnel
Fleming hot water pipe leaks
GSB paint booth system replacement
Optometry animal care plumbing leak
study
E Cullen emergency water line repairs
3,800.00
108,000.00
53,820.00
2,308.00
66,000.00
4,221.00
Bartow
Oliver
Miller
Wright
Oliver
Javaid
Elec
Plumbing
Arch
Plumbing
Arch
Plumbing
20,737.50
Oliver
Plumbing
X
Fine Arts organ recital hall ceiling repair
Hilton (cont. ed) parking garage appraisal
Cameron sewage line investigation
56,804.00
6,669.21
1,915.00
Doyle
Lawrence
Oliver
Arch
Arch
Plumbing
X
P779366
P779411
P779412
P779413
P779414
P779415
4/22/10 FY08-0044 P779416
4/22/10 FY08-0045 P779417
4/22/10 FY08-0048 P779420
4/23/10 FY08-0046 P779418
CRDM New Project Log As of 02-04-11
Page 2 of 5
2,365.27
6,669.21
1,915.00
Closed
Closed
Closed
X
X
X
X
2/22/2011
CRDM Projects Approved
Date
CRDM #
Project #
4/23/10 FY08-0047 P779419
4/26/10 FY10-0001 P779422
4/27/10 FY08-0049 P779421
4/29/10
4/29/10
4/29/10
4/30/10
FY08-0050
FY08-0051
FY08-0053
FY08-0054
P779423
P779424
P779426
P779427
5/1/10
FY09-0027 P779433
5/3/10
5/4/10
5/4/10
5/5/10
FY08-0052
FY08-0055
FY08-0056
FY08-0057
5/5/10
FY08-0058 P779431
5/12/10
5/14/10
5/17/10
5/21/10
5/21/10
5/21/10
5/25/10
FY09-0028
FY10-0002
FY08-0059
FY08-0060
FY09-0029
FY09-0030
FY07-0001
P779425
P779428
P779429
P779430
P779434
P779436
P779435
P779437
P779438
P779439
P779440
5/27/10 FY09-0031 P779441
6/1/10
6/10/10
6/21/10
6/21/10
6/21/10
6/21/10
6/21/10
6/23/10
6/29/10
6/30/10
6/30/10
FY09-0032
FY09-0033
FY07-0002
FY07-0003
FY07-0004
FY07-0005
FY07-0006
FY09-0034
FY07-0007
FY07-0008
FY07-0009
7/1/10
FY07-0010 P779453
7/7/10
7/8/10
7/8/10
7/8/10
FY07-0011
FY07-0012
FY07-0013
FY07-0014
CRDM New Project Log As of 02-04-11
P779442
P779443
P779444
P779445
P779446
P779447
P779448
P779449
P779450
P779451
P779452
P779454
P779455
P779456
P779457
Bldg
.#
Description
520 Moore School of Music structural Review
N/A Campus Design Guideline Standards
Campus wide condition assessment
N/A
update
578 Agnes Arnold chill water coil replacement
501 Roy Cullen repair transfer switch controller
Engineering complex transfer switch repair
551 S&R 2 replace drainage plumbing in 439
R. Cullen HVAC repairs & fire damper
501
install
509 MDA Library emergency water main break
509 MDA Library hand dryer project
579 Engineering asbestos abatement 2nd floor
579 Engineering asbestos abatement 3rd floor
S&R 1 protective structures for loading
550
dock and entrance
520 Moores Music handrail install
564 Fleming classrooms #154, 160 & 162
529 SEC emergency lighting configuration
528 Melcher water leak in crawlspace
543 Architecture AHU drain pan and piping
551 SR II lab 329 replace faulty HVAC controls
529 Science Engineering classroom shades
Utility infrastructure study for entire
N/A
campus chilled water & steam
515 8" water valve replacement Central Plant
516 E. Cullen 1st floor hallway reflooring
551 S&R 2 4th flr filter vents
551 S&R 2 3rd flr filter vents
551 S&R 2 2nd flr filter vents
551 S&R 2 1st flr filter vents
532 Garrison Gym AHU coil replacement
Irrigation loop at OB woods
586 Cameron asbestos tiles clean up
516 E. Cullen exterior window cleaning
553 Welcome Center replace glass panels
550/
SR1 and SR2 Generator Addition
551
516 E. Cullen rm 122 reconfiguration
553 Continuing Education AHU-2
545 SERC emergency 15 KV switch
593 HSC dock & corridor door replacement
Original
Budget
PM
28,915.36
225,000.00
Lawrence
Yancey
250,000.00
Norcom
Other
3,500.00
19,825.00
14,860.00
5,000.00
Madrigal
Bartow
Bartow
Javaid
HVAC
HVAC
HVAC
Plumbing
X
3,675.00
Oliver
HVAC
X
4,707.10
53,721.80
5,184.00
5,184.00
Wright
Jenkins
Madrigal
Madrigal
Plumbing
Arch
L&M
L&M
X
X
X
X
64,250.00
Doyle
Safety
X
20,994.05
423,881.00
3,703.00
8,000.00
3,181.22
7,120.00
20,167.00
Jenkins
Davis
Doyle
Madrigal
Madrigal
Martin
Doyle
Arch
Arch
Arch
Plumbing
HVAC
HVAC
Arch
X
X
X
X
X
X
X
51,500.00
Sameer
Other
4,785.00
26,673.28
3,306.65
5,015.21
3,711.62
609.30
6,601.00
10,924.95
9,067.00
5,580.00
5,400.00
Gill
Davis
Madrigal
Madrigal
Madrigal
Madrigal
Madrigal
Smith
Oliver
Davis
Davis
Plumbing
Arch
HVAC
HVAC
HVAC
HVAC
HVAC
Plumbing
Safety
Other
Safety
32,717.00
Gill
Elec
X
1,555.02
15,446.00
7,774.54
20,582.00
Martin
Martin
Bartow
Brungardt
Elec
HVAC
Elec
Arch
X
X
X
Page 3 of 5
Final
Cost
Critical ,
Deferred,
Project
CB
Emerg. Adaptation,
Status Catagories
Planned,
On-going
Arch
X
Arch
7,774.54
Closed
X
X
X
X
X
X
X
X
X
2/22/2011
CRDM Projects Approved
Project #
Bldg
.#
7/8/10
FY07-0015 P779458
593
7/9/10
FY07-0016 P779459
551
7/9/10
FY07-0017 P779460
590
7/9/10
7/9/10
7/12/10
7/12/10
7/12/10
7/15/10
7/15/10
FY07-0018
FY07-0019
FY07-0020
FY07-0021
FY07-0022
FY07-0023
FY07-0026
P779461
P779462
P779463
P779464
P779465
P779466
P779467
551
551
581
586
516
516
585
7/21/10 FY07-0024 P779468
509
7/21/10
7/21/10
7/27/10
7/30/10
8/4/10
8/4/10
8/4/10
8/4/10
8/5/10
8/18/10
8/23/10
8/23/10
8/23/10
8/23/10
8/24/10
8/24/10
8/25/10
9/9/10
9/13/10
9/13/10
9/21/10
9/27/10
P779469
P779470
P779471
P779472
P779473
P779474
P779474
P779474
P779475
P779476
P779481
P779482
P779483
P779484
P779477
P779478
P779479
P779486
P779487
P779488
P779490
P779492
593
551
516
550
581
509
509
509
519
509
515
515
515
515
499
550
512
N/A
590
529
499
550
9/29/10 FY08-0065 P779493
512
9/29/10
10/11/10
10/11/10
10/12/10
528
509
543
543
Date
CRDM #
FY07-0025
FY07-0027
FY07-0028
FY07-0029
FY07-0030
FY07-0031
FY09-0035
FY10-0003
FY07-0032
FY07-0033
FY11-0001
FY12-0001
FY13-0001
FY14-0001
FY07-0034
FY07-0035
FY07-0036
FY11-0002
FY08-0061
FY08-0062
FY08-0063
FY08-0064
FY08-0066
FY08-0067
FY08-0068
FY08-0069
CRDM New Project Log As of 02-04-11
P779494
P779495
P779496
P779497
Description
HSC elevator hydraulic cylinder
replacement
S&R 2 lab 228 water damage & mold
remediation
Hilton Continuing Ed window replacement
& re-seal
S&R 2 restroom fixture replacement
S&R 2 hallway abatement & flooring
Engineering D3 roof assessment
Cameron emergency mold remediation
E. Cullen 502D drain line for roof catch pan
Flooding mechanical rm Cullen fountain
GSB water heater tank replacment
MD Anderson water in basement, test &
clean
HSCA new condensate drains AHU
S&R 2 lab OAHU repairs
E. Cullen 3rd floor lobby lighting
S&R 1 emergency vacuume pump
Engineering D2 envelope assessment
MD Anderson exterior façade
MD Anderson exterior façade
MD Anderson exterior façade
DPS roof & waterproof analysis
MD Anderson cooling system
FY11 CRDM Central Plant Expansion
FY12 CRDM Central Plant Expansion
FY13 CRDM Central Plant Expansion
FY14 CRDM Central Plant Expansion
Emergency plumbing infrastructure repairs
S&R2 faulty gas valves replacement
Modular office park restroom awning
Main Campus Utility Documentation
Continuing Education ADA Uprades
SER Classroom JCI HVAC Controllers
Valve replacement near Lot 19E
S&R1 sewer ejector system
Mobile office park restroom awning
(classroom facility)
MelcherHall handrail repair
MD Anderson bad odor in basement
Architecture indoor air quality assessment
Architecture 4th floor air balance
Original
Budget
PM
Final
Cost
46,263.00
Rahurkar
8,582.87
Davis
8,582.87
6,452.00
Davis
6,452.00
24,953.44
89,246.00
5,000.00
56,961.83
975.00
7,100.00
7,250.00
Jenkins
Davis
Oliver
Oliver
Oliver
Rahurkar
Wright
25,082.50
Critical ,
Deferred,
Project
CB
Emerg. Adaptation,
Status Catagories
Planned,
On-going
Elec
X
Closed
Safety
X
Closed
Arch
X
Plumbing
Safety
Arch
Safety
Plumbing
Plumbing
Plumbing
X
X
Jenkins
Safety
X
7,513.70
15,761.56
3,320.00
22,182.08
88,485.00
268,201.58
200,000.00
842,638.42
14,189.09
96,250.00
4,996,670.00
5,903,107.00
7,325,297.00
5,378,122.00
14,022.53
7,488.52
3,630.00
335,280.00
3,678.13
21,867.76
8,315.00
18,468.00
Madrigal
Martin
Rahurkar
Madrigal
Oliver
Oliver
Oliver
Oliver
Davis
Jenkins
X
Ivy
Jenkins
Martin
Gill
Wright
HVAC
HVAC
Arch
Elec
Arch
Arch
Arch
Arch
Arch
HVAC
Other
Other
Other
Other
Plumbing
Safety
Arch
Other
L&M
HVAC
Plumbing
Plumbing
2,583.24
Davis
Arch
1,210.25
7,210.00
21,958.50
12,460.00
Jenkins
Gill
Oliver
Martin
Arch
HVAC
HVAC
HVAC
Page 4 of 5
Bueller
Bueller
Bueller
Bueller
Gill
Wright
Davis
975.00
Closed
X
X
X
Deferred
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Planned
Defered
Planned
Critical
Critical
Defered
X
X
X
Critical
Critical
Defered
Defered
2/22/2011
CRDM Projects Approved
Project #
Bldg
.#
10/14/10 FY08-0070 P779498
553
10/26/10 FY08-0071 P779499
516
10/28/10 FY08-0072 P779500
507 Wortham Theater mold & mildew cleaning
Student Svs. Bldg replace 2 roof skylights
524 that are leaking in rain
532 Hallway floor abatement at Melcher &
/533 Garrison
Campus wide Honeywell controller
N/A replacement
551 SDS vent stack smoke test
551 S&R2 SDS vent stack smoke testing
MD Anderson water damage carpet
509 replacement
579 Engineering ADA biomedical lab S-143
545 SERC exterior glass replacement
MD Anderson Library Exterior Assessment
Date
CRDM #
11/3/10 FY11-0003 P779502
11/15/10 FY11-0004 P779503
11/30/10 FY11-0005 P779504
12/17/10 FY07-0037 P779506
12/17/10 FY08-0073 P779506
12/22/10 FY11-0006 P779509
1/3/11 FY07-0039 P779508
1/5/11 FY07-0038 P779507
1/24/11 FY11-0007 P779510 509
Original
Budget
PM
Welcome Center sewer gas odor
investigation
3,240.00
Wright
Plumbing
E. Cullen TDLR upgrades, signage, access
buttons, handicap parking striping, etc
8,352.00
Wiesman
L&M
881.80
Norcom
Other
X
Defered
3,509.32
Jenkins
Arch
X
Critical
52,363.46
Wiesman
Arch
14,789.73
Martin
HVAC
X
Deferred
2,500.00
2,500.00
Gill
Gill
Plumbing
Plumbing
X
X
Critical
Critical
28,590.34
Jenkins
Safety
X
Critical
8,100.00
11,413.00
Harless
Wiesman
L&M
Safety
X
X
Critical
Critical
54,105.90
Oliver
Arch
Description
Final
Cost
Critical ,
Deferred,
Project
CB
Emerg. Adaptation,
Status Catagories
Planned,
On-going
Defered
Deferred
Planned
31,210,477.46
CRDM New Project Log As of 02-04-11
Page 5 of 5
2/22/2011
Download