CRDM Projects Approved Date CRDM # Project # Bldg .# 10/10/09 12/16/09 1/4/10 1/7/10 1/7/10 1/8/10 1/13/10 1/15/10 1/15/10 1/21/10 1/22/10 1/22/10 1/25/10 FY08-0001 FY08-0002 FY09-0001 FY08-0003 FY08-0004 FY09-0002 FY08-0006 FY08-0005 FY09-0003 FY08-0007 FY08-0008 FY08-0009 FY08-0010 P779344 P779345 P779346 P779347 P779348 P779349 P779273 P779350 P779351 P779286 P779352 P779353 P779354 586 547 587 543 503 543 550 543 543 593 509 701 543 Description Cameron elevator renovation PG Hoffman roof repairs Farish Hall classroom 232 doors Architecture water seal rm 214 Technology loading dock repairs Architecture Enviro investigation S&R 1 lighting & auditorium seat covers Architecture lighting & life safety Architecture leak investigation HSC Cooling coil replacement MD Anderson library envelope seal TMC Pharmacy roof assessment Architecture guttering assessment Original Budget PM 12,248.51 4,900.00 4,748.75 30,591.00 17,490.00 97,785.36 1,148.00 111,812.58 211,004.46 22,351.35 164,190.24 88,517.69 124,749.48 Theriot Barnes Barnes Oliver Oliver Oliver Howard Oliver Oliver Sameer Oliver Oliver Oliver Final Cost Project Status 12,248.51 4,900.00 Closed Closed 24,069.91 17,490.00 97,785.36 Closed Closed Closed 132,529.87 Closed Critical , Deferred, CB Emerg. Adaptation, Catagories Planned, On-going Elec X Arch Arch X Arch X Arch X L&M Other Safety Arch HVAC X Arch X Arch Arch 1/25/10 FY08-0012 P779356 516 Framework model addition 24,440.00 LaMontagne Other X 1/26/10 1/26/10 1/29/10 1/29/10 1/29/10 2/3/10 2/4/10 2/4/10 2/5/10 2/5/10 2/11/10 2/11/10 2/12/10 2/15/10 2/15/10 106 TLCC Anex roof collapse repair Diesel tank farm landscaping 537 Law Ctr water filtration assessment 543 Architecture brick ledge repairs 516 E. Cullen drain scope for blockage 509 MD Anderson guttering assessment 578 Agnes Arnold cooling coils replacement 551 S&R2 C/W coil replacement 593 HSC coils, dampers & air grilles 499 Campus fire alarm network 524 Student Svs. Replace elevator flooring 586 Cameron sanitary line replacement 544 Cemo tunnel 6" water line leak repair 581 Engineering fire alarm upgrade 585 GSB fire alarm upgrade 585516Asbestos sample testing for 4 buildings 532543 536 CPB replace broken window 520 School of Music storm drain assessment 590 Hilton sump pump monitor alarms 550 S&R 1 rm 325 ACM abatement 586 Cameron Human/Hlth kitchen trap repair 535 EHRM 2 drainage repair N/A Campus wide card access license 532 Garrison carpet replacement 585 GSB rm 177 carpet replacement 34,059.00 4,019.25 75,000.00 201,105.15 73,098.34 39,351.84 8,405.00 7,125.00 18,000.00 3,009.00 1,895.00 40,461.00 1,801.38 304,116.00 321,148.00 Gill Jenkins Doyle Oliver Jenkins Oliver Madrigal Madrigal Sameer Sameer Oliver Gill Gill Jenkins Jenkins Arch L&M Safety Arch Arch Arch HVAC HVAC HVAC Safety Safety Plumbing Plumbing Safety Safety X 513.31 632.00 5,017.00 5,737.00 4,133.00 9,177.30 43,100.29 4,120.00 4,742.28 5,032.34 FY08-0011 FY08-0013 FY08-0014 FY08-0015 FY08-0016 FY08-0017 FY08-0018 FY08-0019 FY08-0020 FY08-0022 FY08-0023 FY08-0024 FY08-0025 FY08-0028 FY08-0029 P779355 P779289 P779359 P779360 P779361 P779362 P779363 P779364 P779365 P779367 P779368 P779369 P779370 P779374 P779375 2/22/10 FY08-0026 P779372 2/22/10 2/22/10 2/23/10 3/2/10 3/3/10 3/3/10 3/3/10 3/4/10 3/4/10 FY08-0027 FY08-0031 FY08-0030 FY08-0032 FY08-0033 FY08-0034 FY08-0035 FY08-0036 FY08-0037 CRDM New Project Log As of 02-04-11 P779373 P779377 P779376 P779378 P779380 P779381 P779382 P779384 P779385 Page 1 of 5 1,895.00 Closed Wright 513.31 Closed L&M Wright Gill Maal Doyle Oliver Jenkins Jenkins Villarreal Villarreal 632.00 Closed 43,100.29 Closed Arch Plumbing Other L&M Plumbing Plumbing Safety Arch Arch X X X X X X X X X X X X X X X X 2/22/2011 CRDM Projects Approved Date CRDM # Project # Bldg .# 3/4/10 3/4/10 3/9/10 3/10/10 3/12/10 3/22/10 3/23/10 3/24/10 FY08-0038 FY09-0004 FY09-0005 FY09-0006 FY09-0007 FY09-0008 FY09-0009 FY09-0010 P779386 P779383 P779387 P779388 P779389 P779390 P779391 P779392 N/A 543 N/A 551 499 524 N/A N/A 3/25/10 FY09-0011 P779393 549 3/25/10 FY09-0012 P779394 549 3/25/10 FY09-0013 P779396 506 3/25/10 FY09-0014 P779397 530 3/25/10 FY09-0015 P779398 516 3/31/10 FY09-0016 P779399 Description Campus wide sprinkler deficiencies Architecture fire alarm replacement Campus wide Basic card access controls S&R 2 trench drain cleaning Lynn Eusan park sanitary line replace Student Svs. Bldg new fire alarm system Campus wide fire alarm network breakout Campus wide infrastructure study Modify lighting for projection in Social Work rm 101 auditorium Modify lighting for projection in Social Work rm 102 auditorium Communications replace airhandling units Fire hydrant replacement near Robertson stadium E. Cullen restroom modifications for TDLR Arch & Eng. Study of E. Cullen, PGH, Fleming & Agnes Arnold E. Cullen 3rd flr air return obstruction MD Anderson design MEP systems 3/31/10 FY09-0017 P779400 3/31/10 FY09-0019 P779402 516 509 3/31/10 FY09-0022 P779405 525 Health Ctr replace controller transfer switch 3/31/10 FY09-0023 P779406 505 3/31/10 FY09-0024 P779408 515 4/1/10 FY09-0018 P779401 516 4/1/10 4/1/10 4/1/10 Final Cost Critical , Deferred, Project CB Emerg. Adaptation, Status Catagories Planned, On-going L&M X L&M Safety X Plumbing Plumbing X Safety Safety Other X Original Budget PM 21,313.32 280,180.40 104,599.88 3,054.24 29,701.00 116,744.00 63,758.44 145,950.00 Sameer Sameer Jenkins Barnes Gill Doyle Hajecate Sameer 8,121.80 Jenkins Arch 11,339.95 Jenkins Arch X 324,850.00 Ruck Arch X 7,485.00 Oliver L&M X 400.00 Howard L&M 51,346.00 Norcom Arch 7,360.00 72,460.50 Martin Jenkins HVAC Arch X X 1,730.40 Bartow Elec X 2,438.01 Bartow Elec X 1,771.60 Bartow Other X L&M X Arch Arch Arch X X 7,485.00 Closed 2,365.27 Norcom FY09-0020 P779403 FY09-0021 P779404 FY09-0025 P779409 528 505 516 Optometry replace controller transfer switch Locate covered manhole near Justin Dart E.Cullen 1st flr rm 125, door and fire alarm devices Melcher Hall recycling center Optometry termite treatment E. Cullen rm 209 & 27 recarpet 1,920.23 17,030.16 768.00 Wright Wright Jenkins 4/1/10 FY09-0026 P779410 N/A Campus wide detention bank map updates 8,500.00 LaMontagne 4/5/10 4/7/10 4/7/10 4/13/10 4/19/10 4/20/10 FY08-0021 FY08-0039 FY08-0040 FY08-0041 FY08-0042 FY08-0043 590 550 544 564 585 505 499/ 516 589 590 586 Hilton storm pump controllers S&R 1 emergency water leaks Cemo Hall water infiltration in tunnel Fleming hot water pipe leaks GSB paint booth system replacement Optometry animal care plumbing leak study E Cullen emergency water line repairs 3,800.00 108,000.00 53,820.00 2,308.00 66,000.00 4,221.00 Bartow Oliver Miller Wright Oliver Javaid Elec Plumbing Arch Plumbing Arch Plumbing 20,737.50 Oliver Plumbing X Fine Arts organ recital hall ceiling repair Hilton (cont. ed) parking garage appraisal Cameron sewage line investigation 56,804.00 6,669.21 1,915.00 Doyle Lawrence Oliver Arch Arch Plumbing X P779366 P779411 P779412 P779413 P779414 P779415 4/22/10 FY08-0044 P779416 4/22/10 FY08-0045 P779417 4/22/10 FY08-0048 P779420 4/23/10 FY08-0046 P779418 CRDM New Project Log As of 02-04-11 Page 2 of 5 2,365.27 6,669.21 1,915.00 Closed Closed Closed X X X X 2/22/2011 CRDM Projects Approved Date CRDM # Project # 4/23/10 FY08-0047 P779419 4/26/10 FY10-0001 P779422 4/27/10 FY08-0049 P779421 4/29/10 4/29/10 4/29/10 4/30/10 FY08-0050 FY08-0051 FY08-0053 FY08-0054 P779423 P779424 P779426 P779427 5/1/10 FY09-0027 P779433 5/3/10 5/4/10 5/4/10 5/5/10 FY08-0052 FY08-0055 FY08-0056 FY08-0057 5/5/10 FY08-0058 P779431 5/12/10 5/14/10 5/17/10 5/21/10 5/21/10 5/21/10 5/25/10 FY09-0028 FY10-0002 FY08-0059 FY08-0060 FY09-0029 FY09-0030 FY07-0001 P779425 P779428 P779429 P779430 P779434 P779436 P779435 P779437 P779438 P779439 P779440 5/27/10 FY09-0031 P779441 6/1/10 6/10/10 6/21/10 6/21/10 6/21/10 6/21/10 6/21/10 6/23/10 6/29/10 6/30/10 6/30/10 FY09-0032 FY09-0033 FY07-0002 FY07-0003 FY07-0004 FY07-0005 FY07-0006 FY09-0034 FY07-0007 FY07-0008 FY07-0009 7/1/10 FY07-0010 P779453 7/7/10 7/8/10 7/8/10 7/8/10 FY07-0011 FY07-0012 FY07-0013 FY07-0014 CRDM New Project Log As of 02-04-11 P779442 P779443 P779444 P779445 P779446 P779447 P779448 P779449 P779450 P779451 P779452 P779454 P779455 P779456 P779457 Bldg .# Description 520 Moore School of Music structural Review N/A Campus Design Guideline Standards Campus wide condition assessment N/A update 578 Agnes Arnold chill water coil replacement 501 Roy Cullen repair transfer switch controller Engineering complex transfer switch repair 551 S&R 2 replace drainage plumbing in 439 R. Cullen HVAC repairs & fire damper 501 install 509 MDA Library emergency water main break 509 MDA Library hand dryer project 579 Engineering asbestos abatement 2nd floor 579 Engineering asbestos abatement 3rd floor S&R 1 protective structures for loading 550 dock and entrance 520 Moores Music handrail install 564 Fleming classrooms #154, 160 & 162 529 SEC emergency lighting configuration 528 Melcher water leak in crawlspace 543 Architecture AHU drain pan and piping 551 SR II lab 329 replace faulty HVAC controls 529 Science Engineering classroom shades Utility infrastructure study for entire N/A campus chilled water & steam 515 8" water valve replacement Central Plant 516 E. Cullen 1st floor hallway reflooring 551 S&R 2 4th flr filter vents 551 S&R 2 3rd flr filter vents 551 S&R 2 2nd flr filter vents 551 S&R 2 1st flr filter vents 532 Garrison Gym AHU coil replacement Irrigation loop at OB woods 586 Cameron asbestos tiles clean up 516 E. Cullen exterior window cleaning 553 Welcome Center replace glass panels 550/ SR1 and SR2 Generator Addition 551 516 E. Cullen rm 122 reconfiguration 553 Continuing Education AHU-2 545 SERC emergency 15 KV switch 593 HSC dock & corridor door replacement Original Budget PM 28,915.36 225,000.00 Lawrence Yancey 250,000.00 Norcom Other 3,500.00 19,825.00 14,860.00 5,000.00 Madrigal Bartow Bartow Javaid HVAC HVAC HVAC Plumbing X 3,675.00 Oliver HVAC X 4,707.10 53,721.80 5,184.00 5,184.00 Wright Jenkins Madrigal Madrigal Plumbing Arch L&M L&M X X X X 64,250.00 Doyle Safety X 20,994.05 423,881.00 3,703.00 8,000.00 3,181.22 7,120.00 20,167.00 Jenkins Davis Doyle Madrigal Madrigal Martin Doyle Arch Arch Arch Plumbing HVAC HVAC Arch X X X X X X X 51,500.00 Sameer Other 4,785.00 26,673.28 3,306.65 5,015.21 3,711.62 609.30 6,601.00 10,924.95 9,067.00 5,580.00 5,400.00 Gill Davis Madrigal Madrigal Madrigal Madrigal Madrigal Smith Oliver Davis Davis Plumbing Arch HVAC HVAC HVAC HVAC HVAC Plumbing Safety Other Safety 32,717.00 Gill Elec X 1,555.02 15,446.00 7,774.54 20,582.00 Martin Martin Bartow Brungardt Elec HVAC Elec Arch X X X Page 3 of 5 Final Cost Critical , Deferred, Project CB Emerg. Adaptation, Status Catagories Planned, On-going Arch X Arch 7,774.54 Closed X X X X X X X X X 2/22/2011 CRDM Projects Approved Project # Bldg .# 7/8/10 FY07-0015 P779458 593 7/9/10 FY07-0016 P779459 551 7/9/10 FY07-0017 P779460 590 7/9/10 7/9/10 7/12/10 7/12/10 7/12/10 7/15/10 7/15/10 FY07-0018 FY07-0019 FY07-0020 FY07-0021 FY07-0022 FY07-0023 FY07-0026 P779461 P779462 P779463 P779464 P779465 P779466 P779467 551 551 581 586 516 516 585 7/21/10 FY07-0024 P779468 509 7/21/10 7/21/10 7/27/10 7/30/10 8/4/10 8/4/10 8/4/10 8/4/10 8/5/10 8/18/10 8/23/10 8/23/10 8/23/10 8/23/10 8/24/10 8/24/10 8/25/10 9/9/10 9/13/10 9/13/10 9/21/10 9/27/10 P779469 P779470 P779471 P779472 P779473 P779474 P779474 P779474 P779475 P779476 P779481 P779482 P779483 P779484 P779477 P779478 P779479 P779486 P779487 P779488 P779490 P779492 593 551 516 550 581 509 509 509 519 509 515 515 515 515 499 550 512 N/A 590 529 499 550 9/29/10 FY08-0065 P779493 512 9/29/10 10/11/10 10/11/10 10/12/10 528 509 543 543 Date CRDM # FY07-0025 FY07-0027 FY07-0028 FY07-0029 FY07-0030 FY07-0031 FY09-0035 FY10-0003 FY07-0032 FY07-0033 FY11-0001 FY12-0001 FY13-0001 FY14-0001 FY07-0034 FY07-0035 FY07-0036 FY11-0002 FY08-0061 FY08-0062 FY08-0063 FY08-0064 FY08-0066 FY08-0067 FY08-0068 FY08-0069 CRDM New Project Log As of 02-04-11 P779494 P779495 P779496 P779497 Description HSC elevator hydraulic cylinder replacement S&R 2 lab 228 water damage & mold remediation Hilton Continuing Ed window replacement & re-seal S&R 2 restroom fixture replacement S&R 2 hallway abatement & flooring Engineering D3 roof assessment Cameron emergency mold remediation E. Cullen 502D drain line for roof catch pan Flooding mechanical rm Cullen fountain GSB water heater tank replacment MD Anderson water in basement, test & clean HSCA new condensate drains AHU S&R 2 lab OAHU repairs E. Cullen 3rd floor lobby lighting S&R 1 emergency vacuume pump Engineering D2 envelope assessment MD Anderson exterior façade MD Anderson exterior façade MD Anderson exterior façade DPS roof & waterproof analysis MD Anderson cooling system FY11 CRDM Central Plant Expansion FY12 CRDM Central Plant Expansion FY13 CRDM Central Plant Expansion FY14 CRDM Central Plant Expansion Emergency plumbing infrastructure repairs S&R2 faulty gas valves replacement Modular office park restroom awning Main Campus Utility Documentation Continuing Education ADA Uprades SER Classroom JCI HVAC Controllers Valve replacement near Lot 19E S&R1 sewer ejector system Mobile office park restroom awning (classroom facility) MelcherHall handrail repair MD Anderson bad odor in basement Architecture indoor air quality assessment Architecture 4th floor air balance Original Budget PM Final Cost 46,263.00 Rahurkar 8,582.87 Davis 8,582.87 6,452.00 Davis 6,452.00 24,953.44 89,246.00 5,000.00 56,961.83 975.00 7,100.00 7,250.00 Jenkins Davis Oliver Oliver Oliver Rahurkar Wright 25,082.50 Critical , Deferred, Project CB Emerg. Adaptation, Status Catagories Planned, On-going Elec X Closed Safety X Closed Arch X Plumbing Safety Arch Safety Plumbing Plumbing Plumbing X X Jenkins Safety X 7,513.70 15,761.56 3,320.00 22,182.08 88,485.00 268,201.58 200,000.00 842,638.42 14,189.09 96,250.00 4,996,670.00 5,903,107.00 7,325,297.00 5,378,122.00 14,022.53 7,488.52 3,630.00 335,280.00 3,678.13 21,867.76 8,315.00 18,468.00 Madrigal Martin Rahurkar Madrigal Oliver Oliver Oliver Oliver Davis Jenkins X Ivy Jenkins Martin Gill Wright HVAC HVAC Arch Elec Arch Arch Arch Arch Arch HVAC Other Other Other Other Plumbing Safety Arch Other L&M HVAC Plumbing Plumbing 2,583.24 Davis Arch 1,210.25 7,210.00 21,958.50 12,460.00 Jenkins Gill Oliver Martin Arch HVAC HVAC HVAC Page 4 of 5 Bueller Bueller Bueller Bueller Gill Wright Davis 975.00 Closed X X X Deferred X X X X X X X X X X X X X X Planned Defered Planned Critical Critical Defered X X X Critical Critical Defered Defered 2/22/2011 CRDM Projects Approved Project # Bldg .# 10/14/10 FY08-0070 P779498 553 10/26/10 FY08-0071 P779499 516 10/28/10 FY08-0072 P779500 507 Wortham Theater mold & mildew cleaning Student Svs. Bldg replace 2 roof skylights 524 that are leaking in rain 532 Hallway floor abatement at Melcher & /533 Garrison Campus wide Honeywell controller N/A replacement 551 SDS vent stack smoke test 551 S&R2 SDS vent stack smoke testing MD Anderson water damage carpet 509 replacement 579 Engineering ADA biomedical lab S-143 545 SERC exterior glass replacement MD Anderson Library Exterior Assessment Date CRDM # 11/3/10 FY11-0003 P779502 11/15/10 FY11-0004 P779503 11/30/10 FY11-0005 P779504 12/17/10 FY07-0037 P779506 12/17/10 FY08-0073 P779506 12/22/10 FY11-0006 P779509 1/3/11 FY07-0039 P779508 1/5/11 FY07-0038 P779507 1/24/11 FY11-0007 P779510 509 Original Budget PM Welcome Center sewer gas odor investigation 3,240.00 Wright Plumbing E. Cullen TDLR upgrades, signage, access buttons, handicap parking striping, etc 8,352.00 Wiesman L&M 881.80 Norcom Other X Defered 3,509.32 Jenkins Arch X Critical 52,363.46 Wiesman Arch 14,789.73 Martin HVAC X Deferred 2,500.00 2,500.00 Gill Gill Plumbing Plumbing X X Critical Critical 28,590.34 Jenkins Safety X Critical 8,100.00 11,413.00 Harless Wiesman L&M Safety X X Critical Critical 54,105.90 Oliver Arch Description Final Cost Critical , Deferred, Project CB Emerg. Adaptation, Status Catagories Planned, On-going Defered Deferred Planned 31,210,477.46 CRDM New Project Log As of 02-04-11 Page 5 of 5 2/22/2011