Innovation for Competitive Advantage in Manufacturing Randal Karg PIMA/TAPPI Annual Meeting March 2007 Innovation Topics Broaden the concept of technology Illustrate the practical management of technology innovation Practical principles for managing innovation for competitive advantage Copyright © 2007 Sinclair Group, Ltd. Disruptive vs Sustaining Innovation Innovation Unbounded creativity In side /Out side Outside / Inside Support Current Business Models Disrupts Business Models Bounded Creativity Enables new entrants Discourages new entrants Copyright © 2007 Sinclair Group, Ltd. Technology From Webster’s Dictionary: The application of scientific knowledge, especially in industry or business Copyright © 2007 Sinclair Group, Ltd. Technology is Everywhere in Your Business Human Resources Financial Methods Strategy and Planning Sourcing Marketing and Sales Manufacturing Product Design & Development Copyright © 2007 Sinclair Group, Ltd. Technology- A Management Definition THE SINCLAIR GROUP , LTD . A SSET R ELIABILITYL EVEL 3 P ROCESSM AP P AGE 2 TAM 1.5 TAM 5.3 SP 1.1 AM 1.1 TSG ASSET RELIABILITY 5. 1 PHASE6 – MONITOR AND ANALYZE PROGRAM PERFORMANCEPHASE7 – ESTABLISH RCA CRITERIA AI 1.2 AA 3.2 AI 5.2 AM 4.12 EX P E R T N A N CE Work Process Design 7.1 ESTABLISH RCA LEVEL CRITERIA FROM4.3 5.1 6.1 6.2 6.3 8.1 8.3 8.4 8.5 8.2 FROM4.6 IMPLEMENT RISK MANAGEMENT RECOMMENDATIONS MONITOR ASSET RELIABILITY ANALYZE PROGRAM PERFORMANCE IDENTIFY AND PRIORITIZE POTENTIAL OPPORTUNITIES FOR RCA PROJECTS ASSEMBLE RCA TEAM AS S E T OP E R A T I O N S EX P E R T AS S E T MA I N T E 15MAY 2006 DETERMINE PROBLEM CAUSE (S) IDENTIFY AND DOCUMENT CORRECTIVE ACTIONS Tools 8.2 8.2 DETERMINE LEVEL OF RCA TO BE DONE YES TEAM REQUIRED ? NO Standards TA S K PE R F O R M E R OP E R A T O R S OP E R A T I O N S MA I N T E N A N C E GA T E K E E P E R THE WOODLANDS , TX 77380 COPYRIGHT © 2000-2006 ALLRIGHTSRESERVED PHASE8 – PERFORM ROOT CAUSE ANALYSIS AM 4.15 AS S E T OP E R A T I O N S LE A D E R OT H E R WO R K PR O C E S S E S PHASE5 – IMPLEMENT TASKS The application of knowledge, especially in business or industry Copyright © 2007 Sinclair Group, Ltd. Information Architecture Structure Business Architecture Systems Architecture Drivers Influences Technical Architecture Product Architecture Copyright © 2007 Sinclair Group, Ltd. Results of Using an I/T Architecture Business Aligned Work Processes & Strategy Systems Re-engineered, Coherent Work Processes Technical Technical Framework for Integration & Low Cost of Ownership Product Standard Application Toolset Portfolio Copyright © 2007 Sinclair Group, Ltd. Instrument Installation Systems What Are These Things? Process Piping Impulse Piping Transmitter Copyright © 2007 Sinclair Group, Ltd. The Conventional Wisdom Process Measurements are Critical to Operational Excellence Accuracy Requires Routine Calibration Installation Should Facilitate Maintainability Tubing Fittings are the Obvious Low Cost Piping Method Copyright © 2007 Sinclair Group, Ltd. Analysis of Experience Maintenance Work Order History Revealed 60% of Effort Non-Value Added Activity “Zero Transmitter” “No Problem Found” Transmitter Is Not the Problem #1 Source of Error & Maintenance -Impulse Lines! Copyright © 2007 Sinclair Group, Ltd. The New Reality Electronic Transmitters Do Not Fail or Drift Over 50% of Field Maintenance Activity is Non Value Added Root Cause Failure Analysis Determined That Most Problems are Caused by Improper Installation Installation for Maintainability Caused Most of the Problems Copyright © 2007 Sinclair Group, Ltd. The Solution Design Standard Installations for High Accuracy and Low Maintenance Standard Designs Reduced by 10X Determine Fabrication Method Reduced Set of Standards Enables Shop Fabricated Welded Piping Design » New Designs Significantly Stronger With Reduced Leak Points » Improves Safety and Environmental Performance Changed Work Processes for Design and Construction Copyright © 2007 Sinclair Group, Ltd. A Typical Design Copyright © 2007 Sinclair Group, Ltd. Impact On Work Process Virtually Eliminated Instrument Installation Design from Detailed Engineering Effort Significantly Reduced Field Construction Effort and Cost Copyright © 2007 Sinclair Group, Ltd. Impact on Construction Process Old Process Weld Root Valves to Process Piping Obtain Transmitter Build Stand or Mounting Bracket Mount Transmitter Install Impulse Piping Install Conduit Install Wiring and Verify Continuity Verify Calibration New Process Weld Root Valves to Process Piping Obtain Transmitter and Mounting Kit Install Mounting Kit and Transmitter Install Conduit Install Wiring and Verify Continuity Verify Calibration Copyright © 2007 Sinclair Group, Ltd. Impact on Installation Costs Cost Breakdown: Avg. Traditional vs. Direct Mount Normalized Installation Costs 100 Savings vs. Trad Method ~40% 75 50 Engr Procurement Labor 25 Material 0 Traditional Direct Copyright © 2007 Sinclair Group, Ltd. Results in the Field Three Year’s Experience 90% Reduction in Transmitter Work Orders 46% Reduction in Transmitter Maintenance Copyright © 2007 Sinclair Group, Ltd. Instrument Installation Lessons Learned Business Objectives Drive Technology Objectives Technology Solutions Should Not be Searching for a Problem to Solve! Use Data to Develop Profound Knowledge Variability is the Enemy! Separate “Develop Technology” Process from “Implement Technology” Process Copyright © 2007 Sinclair Group, Ltd. Instrument Installation Experience st Co Fa st w Lo The The Ideal Ideal Solution Solution Good Enter Here!! Copyright © 2007 Sinclair Group, Ltd. Disciplined Innovation Principles Create the environment for success Align innovation to business objectives Measure the results of innovations Success is measured against the business objective Separate technology innovation from technology application Actively manage the work processstandards-tools relationship Copyright © 2007 Sinclair Group, Ltd.