URBAN STORMWATER MANAGEMENT FOR PROPERTY DEVELOPMENT PROJECTS IN SELANGOR AND NEGERI SEMBILAN MOHD YAZID BIN ABDULLAH Universiti Teknologi Malaysia iv ACKNOWLEDGEMENT In preparing this thesis, I was in contact with many people, researchers, and academicians, and practitioners. They have contributed towards my understanding and thoughts. In particular, I wish to express my sincere appreciation to my main thesis supervisor, Professor Dr. Muhd Zaimi Abd. Majid for encouragement, guidance, critics and friendship. I am also very thankful to Associate Professor Dr. Mohamad Ibrahim Mohammad and Associate Professor Zainudin Mohamed Shamsudin for their guidance, advices and motivation. Without their continued support and interest, this thesis would not have been the same as presented here. I am also indebted to Jabatan Pengairan dan Saliran Negeri Selangor and Negeri Sembilan especially to Tuan Haji Ahmad Husaini Sulaiman and Mr. Lee Lock Chong the State Directors; Mr. Abu Bakar Mohd Yusoff, Deputy Director JPS Selangor; Puan Wan Hasitinaziah bt Mohd Hasan, Assistant Director JPS Negeri Sembilan and their staff for assistance in supplying information to make this study possible. I would also express my sincere appreciation to all project engineers participating in the conducted survey. My fellow postgraduate students should also be recognized for their support. My sincere appreciation also extends to all my colleagues and others who have provided assistance at various occasions. Their views and tips are useful indeed. Unfortunately, it is not possible to list all of them in this limited space. I am also very grateful to all my family members for their continuous support and encouragement. iii Especially dedicated to my beloved mother Puan Halimah Abdullah; my sons and daughters; Ahmad Khumayni, Anith Sofiyyah, Aiman Mardhiyyah, Amnah Amirah, Afwan Nadzirah and Ahmad Akram Mukhlis to strive for excellence; and to my dear wife, Che Maziah bt Abdulah for her perserveance and support. vi ABSTRACT Rapid urbanizations and its consequent increase in impervious surfaces and changes in land use generally resulted in problem of flooding and heavy pollution of urban water system and other receiving waters. Urban drainage practice and control philosophy has been based on solving localized floods by transferring excessive flows into the drainage systems downstream. The consequence of removing the stormwater from the land surface so quickly is to increase volumes and peak discharge, overloading the drainage system. This causes severe flooding to downstream areas and a threat to the ecosystem and environment. Since 2001, Urban Stormwater Management Manual for Malaysia (MASMA) was introduced by Drainage Irrigation Department of Malaysia and approved by the Cabinet for the application to replace the earlier manual for storm water management in urban areas. The focus of this study is on the implementation of MASMA in property development projects. The objective of this study is to investigate and identify the problems encountered in its implementation. The study also identifies its effects on project cost and time and benefit of MASMA compliance to property development projects. The methodology adopted involving literature search, interviews with authorities, consultants, developers, contractors and property owners and questionnaire survey to the project engineers. Frequency Analysis and Relative Index analyses were used to analyze the data. The study is limited to on going and completed property development projects of 10 Ha and above in the states of Selangor and Negeri Sembilan only. In conclusion, the problems encountered at MASMA implementation to property development projects have been identified. It includes the identification of cost and time implications on MASMA compliance to the project. Various benefits of MASMA compliance to the developers and property owners have also been identified. Several recommendations are proposed to enhance MASMA application. viii TABLE OF CONTENTS CHAPTER TITLE PAGE TITLE PAGE DECLARATION ii DEDICATION iii ACKNOWLEDGEMENTS iv ABSTRACT v ABSTRAK TABLE OF CONTENTS I vi-vii viii –xiv LIST OF TABLES xv LIST OF FIGURES xvi LIST OF APPENDICES xvii INTRODUCTION 1 1.1 Introduction 1 1.2 Background of the study 2 1.3 Problem Statement 4 1.4 Aim and Objectives of the Study 5 1.5 Scope of the Study 6 1.6 Importance of the Study 7 1.7 Research Methodology 7 1.8 Organisation of the Thesis 10 ix II URBAN STORMWATER MANAGEMENT 12 2.1 Introduction 12 2.2 Definition of terms 12 2.2.1 Urban Stormwater Management 12 2.2.2 Urban Area 12 2.2.3 Best Management Practices (BMPs) in 13 stormwater management 2.3 Current Development Issues and Previous 14 Drainage Practice 2.4 2.3.1 Development Consequences and Needs 14 2.3.2 Local stormwater- related problems 15 2.3.3 Previous Drainage Practices 16 New Direction in Urban Stormwater 17 management 2.4.1 The Need for a New Approach to Urban 17 stormwater management 2.4.2 Stormwater Management in the 19 Developed Countries 2.4.3 Strategic approach in stormwater 19 management 2.4.4 Sustainability in urban stormwater 20 management 2.4.5 Need for Integrated Management 21 Approach 2.4.6 Urban Water System 21 2.5 Objectives of Stormwater Management 23 2.6 Stormwater Management Principles 24 2.7 Urbanisation and Urban Areas 24 2.7.1 25 Urban areas populations x 2.8 Best Management Practices in Urban stormwater 25 management 2.9 2.8.1 Runoff Quantity Management 26 2.8.2 Runoff Quality Management 26 Problems in Best Management Practices 27 Application III 2.10 Urban Stormwater as a Resource 28 2.11 Summary 29 MASMA APPLICATION IN PROPERTY 30 DEVELOPMENT PROJECTS 3.1 Introduction 30 3.2 Purpose, Scope, Application and Organisation of 31 MASMA 3.3 3.2.1 Aim and Objectives 31 3.2.2 Scope and Application of MASMA 31 3.2.3 Organisation and Format 31 Relevancy of MASMA Applications to Users 32 and Activities 3.3.1 Relevancy of MASMA to the Authorities 32 and Users 3.3.2 Relevancy of MASMA to Different 32 Activities 3.4 MASMA Planning and Design concepts 33 3.5 Urban Drainage Practice in Malaysia before 33 2001 3.6 MASMA Application related to Land 34 Development 3.6.1 Submission and approval of land subdivision and layout plans 34 xi 3.6.2 Application for approval of drainage and 35 earthwork plans 3.6.3 Application for approval of building and 36 infrastructural plans 3.6.4 Approval of certificate of fitness for 36 occupation 3.7 Roles, problems, issues and challenges in 36 property development industry 3.7.1 The importance of property development 36 3.7.2 FIABCI criteria for Malaysia Property 37 Awards 3.7.3 Factors house buyer taking into 37 consideration in choosing of property 3.7.4 Developers expectation to the 38 government 3.7.5 Property development project in Selangor 39 and Negeri Sembilan 3.8 Problems, implication and benefits of MASMA 40 application 3.8.1 Problems of MASMA applications in 40 Property Development Projects 3.8.2 Cost implications of MASMA 41 compliance 3.8.3 Time implications of MASMA 42 compliance 3.8.4 3.9 Benefits of MASMA compliance Summary 42 43 xii IV V RESEARCH METHODOLOGY 45 4.1 Introduction 45 4.2 Research Methodology 45 4.3 Identification of Related Problems and Issues 47 4.4 Questionnaire Study 47 4.4.1 Design of the Questionnaire 47 4.4.2 Pilot Study 49 4.4.3 Cover Letter 49 4.4.4 Sampling for Survey 49 4.5 Data Collection 50 4.6 Data Processing 50 4.7 Questionnaire Measure 50 4.8 Summary 52 DATA COLLECTION AND ANALYSIS 53 5.1 Introduction 53 5.2 Data Collection and Response 53 5.3 Analysis of the results 54 5.4 Project Background 54 5.4.1 Land Area of the Projects 54 5.4.2 Project Duration, Starting Year and 54 Implementation Status 55 Stormwater Management Components of 57 5.4.3 the Projects 5.5 Problems in MASMA Implementation 58 5.5.1 58 Problems of MASMA Implementation at Planning Stage 5.5.2 Problems of MASMA Implementation at Design Stage 58 xiii 5.5.3 Problems of MASMA Implementation at 59 Construction Stage 5.5.4 Problems of MASMA Implementation 59 after completion 5.6 Cost implication of MASMA compliance 60 5.7 Time implication of MASMA compliance 60 5.7.1 61 Delay of project plan approvals and issuance of Certificate of Fitness for Occupation. 5.7.2 The factors contributing to delay of 61 approvals 5.8 Benefits of MASMA compliance to the 61 developers and property owners 5.8.1 Benefits of MASMA compliance to the 61 developers 5.8.2 Benefits of MASMA compliance to 62 property owners 5.9 VI Summary DISCUSSION OF RESULTS 63 64 6.1 Introduction 64 6.2 Problems in MASMA Implementation 64 6.2.1 66 Problems in MASMA implementation at the Planning Stage 6.2.2 Problems in MASMA implementation at 67 design stage 6.2.3 Problems in MASMA implementation at 79 the Construction Stage 6.2.4 Problems in MASMA Implementation 70 after Completion 6.3 Cost implication of MASMA compliance 71 xiv 6.4 Time implication of MASMA compliance 73 6.5 The Benefits of MASMA implementation to the 74 developers 6.6 The Benefits of MASMA implementation to the 76 property owners 6.7 VII Summary 77 CONCLUSION AND RECOMMENDATION 79 7.1 Introduction 79 7.2 Conclusion 79 7.3 Problem encountered during the Study 82 7.4 Recommendation 84 REFERENCES 85 – 88 APPENDICES A - G 89 – 121 xv LIST OF TABLES TABLE NO. TITLE PAGE 4.1 The Content of Questionnaire 47 6.1 Ranking of Top Twelve Problems in MASMA 65 Implementation (with RI value of 0.5 and above) 6.2 Ranking of Top 3 Problems in MASMA 68 Implementation at Design Stage 6.3 Ranking of Top 3 Problems in MASMA 69 Implementation at Construction Stage 6.4 Ranking Of Relative Index Value for Cost 72 Implication of MASMA Compliance 6.5 Ranking of Relative Index Value for Delay in 73 Plan Approvals 6.6 Ranking of Relative Index Value for Factors 74 Contribution to Delay in Plan Approvals 6.7 Ranking of Relative Index Value for Benefits of 75 MASMA Compliance To Property Owners 6.8 Ranking of Relative Index Value for Benefits of MASMA Compliance To Property Owners 77 xvi LIST OF FIGURES FIGURE TITLE PAGE NO. 1.1 Flow Chart of the Study 9 2.1 Urban Water System 23 4.1 Schematic Events in the Study 46 4.2 Five (5) ordinal measures of agreement by 51 Likert’s Scale 5.1(a) Project Duration 55 5.1(b) Project Starting Year 56 5.1(c) Project Development Stage 56 5.1(d) Stormwater Management Component 57 xvii LIST OF APPENDICES APPENDIX TITLE PAGE A Typical Stormwater Management Measures 89 B Relevance of MASMA to Different Authorities 90 C Relevance of MASMA to Different Activities 91 D Cover Letter and Questionnaire E Frequency Analysis Result for Project Background F Frequency Analysis Result for Problems, Cost, 92-100 101 102-118 Time and Benefit in MASMA Implementation G Relative Index Value for Problems, Cost, Time and Benefit in MASMA Implementation 119-123 CHAPTER I INTRODUCTION 1.1 Introduction The size of urban areas has increased to accommodate the increase in urban population and activities that power the economic engine for country’s development. These developments has brought about several positive results such economic improvement and alleviation of poverty. Inadequate controlled development has had significant adverse impact on the environment, such as flash flooding, erosion, mudflow and sedimentation, slope failure, water pollution and ecological damage, increased floatable and debris flow and depleting water resources. These negative impacts are in most cases brought about by inadequate handling of stormwater management during planning, development and maintenance resulting in much hardship to the urban community in the form of traffic jams, property damage, inconveniences, and loss of income, productivity and sometimes live. To address the problems, Drainage and Irrigation Department of Malaysia introduced a new manual, Urban Stormwater Management Manual for Malaysia or MASMA to replace the earlier guideline Urban Drainage Design and Standard and Procedures for Peninsular Malaysia published in 1975. 2 The new manual, MASMA utilised the concept of urban stormwater management control at source while the earlier drainage manual based on rapid disposal. MASMA introduces a comprehensive, broad and flexible approaches, strategies and guidelines for the current and future urban storm water management which covers management of quantity and quality for environmental enhancement and sustainable development. MASMA was approved by the Cabinet for application in storm water management throughout Malaysia from first of January 2001. 1.2 Background of the study Urbanization results in the growth of impervious areas and a diversification of urban land use practices with respect to the hydrologic and environmental terms. The construction of buildings, access road, highways, paved areas, footpaths, etc., increases the impermeability of the catchments and consequent changes in surface types reduce the quantity of water seeping into subsoil. The changes in land use usually involve the loss of vegetation cover with consequent water use due to evaporation. Very often marginal land, including reclaimed land in river flood plains, may be developed and this will generally reduce depression storage in the catchments. All above factors lead to an overall increase in impermeability and therefore in the quantity of rainwater that will run off the land into the drainage system. Development will decrease the response time to rainfall for many reasons. Smisson, 1979 concluded that the effect of a reduction in catchments response time is to increase the maximum rate of flow discharging to the drainage system or alternatively increase frequency of significant floods. In some river basins, development pressures on the water environment are now at alarming level. It is widely recognized that land use changes from rural to urban or industrial areas cause local runoff impacts on receiving water flow, quality and ecology. 3 As a result rivers, lakes, ponds, reservoirs, and estuarine and coastal water have become sensitive to increased rates and volumes of runoff and pollutant discharges. These discharges have posed major issues to many urban and residential centers, particularly in western states of the Peninsular. Apart from erosion and sedimentation problems associated with development, it has become increasingly apparent that storm water runoff contributes to receiving waters a significant part of total loads of such pollutants as nutrients, heavy metals, oil and grease, bacteria etc. Andoh, 1994, identified that the consequence of removing the stormwater from the land surface so quickly is to increase volumes and peak rates of flow discharged, overloading the natural drainage system. This causes severe damage not only to downstream areas but to the environment as a whole. In addition, the amounts of storm water to deal with are such that drainage scheme have become unaffordable for the community. There is therefore the need for a new approach. Source control is one of the proposed alternatives The application of Urban Stormwater Management Manual for Malaysia (MASMA) is regarded as important milestone to achieve an environmental friendly and sustainable development. The concept of stormwater management control at source is relatively new to the country and a paradigm shift would be required to turn around traditional concept of drainage engineering practices based on rapid disposal towards the new concept. As recognized in MASMA itself, the manual has its limitation in that being newly introduced it may be lacking in many aspects representing the peculiarities of the stormwater process and practice in the country. As mentioned in MASMA also it is imperative to understand that this manual is just a guideline and its applicability depends on many factors such as adoption and the extent of the manual by Local Governments, necessary adjustment to suit administrative 4 requirements of each Local Government and reform and changes in institutional and legal matters pertaining to stormwater that may take place in the country. 1.3 Problem Statement The implementation of MASMA poses enormous challenges to many parties especially in the land and property development sector. The implementation of MASMA requiring the developers to comply with new stormwater management guideline that is not familiar to them. The new concept will need new approaches and orientations to planning, design, construction and maintenance of stormwater infrastructures and facilities. Jefferies et. al,1999 recognised that at the time of the first system implemented in the United Kingdom, knowledge of the detail implementation of the relevant practice was limited and a number of systems have been constructed which are clearly not successful. He concluded that the poor performance might arise from a number of reasons including lack of availability of sufficient land for the system installed, particular administration factors in the region, bad design and construction and inadequate maintenance. Selangor Drainage and Irrigation Department Director, Lee Lock Chong, 2006 stated that some local authorities have been not given enough consideration to drainage when approving development projects and the consequence of this is manifested in the frequent floods in some areas (The Sun, Monday 10th July 2006). The developers have their own reservation with regard to MASMA application in their development projects. They need to complete within the tight budget and time constraints to meet their commitment to the consumer and try to maximize land 5 utilization to increase their profit. Application of MASMA may hinder their targets if those factors affecting their planning. 1.4 Aims and Objectives of the Study The aim of the study is to identify and establish the problems of MASMA implementation to the property development projects. The study will also identify implication of MASMA compliance on the project costs and time and benefits of its compliance to the developers and property owners. As to achieve the aims of the study, the following objectives have been identified: i. To identify and establish problems in MASMA implementation in property development projects; ii. To identify the cost implication of MASMA compliance to property development projects; iii. To identify time implication of MASMA compliance to property development projects; and iv. To identify the benefits of the MASMA compliance to the developers and property owners of projects The problems in MASMA implementation can be investigated through the experience of the construction players involved in its implementation by conducting survey using questionnaire. Some questions related to MASMA implementation at various project development stages will be asked to the project engineers identify the problems in MASMA implementation as experienced in their respective projects. The questionnaire covers the problems at four project development stages; planning stage, design stage, construction stage and utilisation stage. 6 Cost implication of MASMA compliance can be investigated through the experience of the project engineer in estimating the project cost or actual cost in the project implementation as compared to the cost if the previous manual is used. The costs have been classified into four project component costs; consultancy cost, construction cost, erosion and sediment control structure cost and maintenance cost. Time implication of MASMA compliance is mainly related to the time taken by the authorities to issue plans approvals and Certificate of Fitness for Occupancy. The time implication can be identified through the delay of the approvals of plans and CFO and its causes experienced by the project engineers in their respective project. And the fourth goal, the benefits of MASMA compliance to the developer and property owners is identified through the project engineers’ experience through their close relationship with the developers of projects and the property owners. 1.5 Scope of the Study The scope of the study encompasses completed and on-going projects property development projects in the states of Selangor and Negeri Sembilan. The respondents are the project engineers for the selected project in both states. The projects engineers are chosen as the respondent basically because of they are direct or indirectly involve in application of MASMA the whole stage of project development. As to achieve the objective of the study with the various limitations and constraints of the researcher will confined to the following scopes: i. The study will focus on MASMA implementation in property development projects; ii. The land size of the projects are 10 hectare and above; 7 iii. Projects are in Selangor and Negeri Sembilan; and iv. The surveys in form of questionnaire will be conducted to project engineers of the projects who handle the matters related to MASMA implementation. 1.6 Importance of the Study MASMA introduces a comprehensive, broad and flexible approaches, strategies and guidelines for the current and future urban storm water management. The manual is an important milestone and a new direction for storm water management in urban areas in Malaysia. Considering the broadness it covered and due to the complexity and the nature of construction industry in Malaysia, MASMA application posts an enormous challenge to regulators, planners, designers, developers and contractors who are involved in stormwater management. After five years of its implementation, the study on the problems and related implication of MASMA application to the construction industry is very useful. Property development projects are the most affected sector as the result of MASMA application for stormwater management. In the light of that, the study looks into the problems and implication of MASMA application in property development projects. The problems in MASMA application cover the whole project stages from planning to the maintenance stage. The implications of MASMA application cover the project cost and time, and the benefits to the developers and property owners (the buyer). The outcome of the study is formulated through experience and the feedback from the industry players involved in the implementation of MASMA is very useful for the future application. enhancement of its 8 1.7 Research Methodology To achieve the aim and the objectives of the study, an appropriate approach and research methodology will be adhered to. Chapter 4 of the thesis is specially dedicated to explain and discuss the methodology adopted in the study. This part is only directed to show briefly the flow diagram of the thesis commencement. The study will provide description on urban stormwater management practices in Malaysia and globally in the pasts and present. The focus of this study is to identify problems and issues encountered in its implementation. This will be obtained through literature review of journal papers, books, reports and web sites browsing. To understand the local problems further the interviews and discussion was carried out with several people involved with the stormwater management in Malaysia. They include engineers and planners from government agencies and consultancy companies, developers, contractors, and academicians. Besides that, the study will also be conducted through surveys in the form of questionnaire to the project engineers who in the implementation of MASMA in their respective projects in the past five years. The surveys are conducted to identify the problems and implications in the perspective of the project engineers through their own experience in MASMA implementation and their interaction with other related parties such as contractor, developers, other consultants and government agencies. Theoretical framework using determined dependent and independent variables are important to design relevant questions to be asked in the process of carrying out the survey. Figure 1.1 shows the flow chart of the study. 9 IDENTIFY PROBLEMS Identify the issue of the study LITERATURE REVIEW Literature review from journal purpose, conference preceding, books and website to understand and formulated the objectives of the OBJECTIVES OF THE STUDY To identify the cost of implication of MASMA compliance to housing To identify and establish problems in MASMA implementation To identify time implication of MASMA compliance to property development projects To identify the benefits of the MASMA implementation of the developers and property owners of projects QUESTIONNAIRE SURVEY -Identify population and sample -Design of the questionnaire -Pilot Study COLLECTING DATA -Distributing questionnaire -Collecting questionnaire ANALYSIS/PROCESSING DATA -Using Statistical Analysis Method REPORTING RESULTS -Describing data distribution -Measuring item interaction -Reporting the information CONCLUSION AND RECOMMENDATION Figure 1.1: Flow Chart of the Study 10 1.8 Organisation of the Thesis Chapter I discusses the background and problem statement of the study, follows by the aims and the objectives, scope and important of the study. The methodology of the study is then discussed briefly to show the direction of the study towards achieving the objectives. It then summarizes the contents of this project report. Chapter II highlights the development and issues related to stormwater management in Malaysia and globally. It covers the discussion on stormwater management issues and drainage practices, new direction in urban stormwater management, stormwater management principles, urbanisation and urban areas. Best Management Practices in urban stormwater management, urban stormwater as a resource and problems in Best Management Practices application in developed countries. Chapter III discusses on Urban Stormwater Management Manual for Malaysia (MASMA), its purpose, goal and objectives, scope and application, and its organization and format. The relevancy of MASMA application to the authorities and users to different activities is also discussed. It also briefly explains the previous drainage practice and the application of MASMA related to land development. Roles, problems, issues and challenges in property development industry related to MASMA application are also elaborated. It ends with the discussion on problems of MASMA application, cost and time implication of MASMA compliance and benefits of MASMA compliance to developers and property owners. Chapter IV outlines the detail of methodology adopted in the study. The study is conducted using interviews and questionnaire survey. This chapter explains the type of data used, method of sampling, description of sample and population, technique of data collection, processing and analysis and questionnaire design. 11 Chapter V details out the finding of the study concerning the problems in MASMA application in property development projects as experience by the developers and project engineers in their projects. To determine the ranking of the significant of the problems, cost and time implications and benefits gained by developers and property owners, the costs increase, the relative index of the responses was computed and ranked to compare their ratings and relative importance. The results derived from Statistical Package for Social Science (SPSS) are appended in the Appendices as Appendix E, F, and G. Chapter VI elaborates and discusses at length the findings of the study from the questionnaire survey conducted. The problems of MASMA implementation at the planning, design, construction and after construction is identified, established and elaborated. The implication of the problems at one stage that causes the problems to other stages is also discussed then followed by discussion on the cost and time implications of MASMA compliance. The factors that contribute to the delay also highlighted. The benefits of MASMA compliance to the developers and property owners is discussed towards the end of the chapter. Chapter VII, the final chapter concluded the aim and the objectives of the study, problems encountered during the course of the study and the recommendation for the improvement in MASMA implementation and suggestion for the future research works. CHAPTER II URBAN STORMWATER MANAGEMENT 2.1 Introduction This chapter highlights the development and issues related to stormwater management in Malaysia and globally. It covers the discussion on stormwater management issues and drainage practices, new direction in urban stormwater management, stormwater management principles, urbanisation and urban areas. Best Management Practices in urban stormwater management, urban stormwater as a resource and problems in Best Management Practices application in developed countries. 2.2 Definition of terms 2.2.1 Urban Stormwater Management Urban stormwater management, simply stated is everything done within catchments to remedy existing stormwater problems to prevent the occurrence of new problems (Welsh, 1989). 13 It involves the development and implementation of structural and non-structural measures to reconcile the conveyance and storage of stormwater systems within the space and related needs of an expanding human population. It also involved the development and implementation of a range of measures of Best Management Practices (BMPs) to improve the quality of stormwater runoff prior to its discharge to receiving water. From a stream ecosystem perspective, the role of stormwater management is to significantly improve in-stream hydrology, water quality and ecology. 2.2.2 Urban Area According to Department of Statistics, urban area in Malaysia is defined as a gazetted area together with adjoining built-up areas having a population of 10,000 and above, at least sixty percent (60%) of these populations engage in non agricultural activities and at least thirty percent (30%) of the housing units are equipped with modern toilet facilities. 2.2.3 Best Management Practices (BMPs) in stormwater management Braune and Wood, 1999, defined Best Management Practices in stormwater management as a multi-disciplinary approach in applying appropriate technology to preserve the natural environment, enhance living standards and improve the quality of life. The use and selection of specific BMPs depends on site conditions and objectives such as water quality control, flood remediation, ground water protection etc. In many cases there are multiple goals and needs necessitating the application of various BMPs to obtain an integrated “treatment train”. In this way cost-effective measures can be implemented to minimize the impact of urbanization on both water quality and quantity in an urban environment. 14 2.3 Current Development Issues and Previous Drainage Practice 2.3.1 Development Consequences and Needs Urbanization results in the growth of impervious areas and a diversification of urban land use practices with respect to the hydrologic and environmental terms. Smisson, 1979 concluded that the construction of buildings, access road, highways, paved areas, footpaths, etc., increases the imperviousness of the catchments and consequent changes in surface types reduce the quantity of water seeping into subsoil. The changes in land use usually involve the loss of vegetation cover with consequent water use due to evaporation. Very often marginal land, including reclaimed land in river flood plains, may be developed and this will generally reduce depression storage in the catchments. All above factors lead to an overall increase in imperviousness and therefore in the quantity of rainwater that will run off the land into the drainage system. Development will decrease the response time to rainfall for many reasons. The effect of a reduction in catchments response time is to increase the maximum rate of flow discharging to the drainage system or alternatively increase frequency of significant floods. Allison, 2006, described that in the present housing boom, the heavy machinery strip the land of trees and top soil and compact the ground. Roads, parking lots, commercial buildings, and residential housing cover the landscape with impervious surfaces. Precipitation runs off the landscape, erosive gullies formed. Trash and chemical pollutants washed into storm drains and impaired the streams resulting only the most tolerant species persist. In some river basins in Malaysia, development pressures on the water environment are now at alarming level. It is widely recognized that land use changes 15 from rural to urban or industrial areas cause local runoff impacts on receiving water flow, quality and ecology. Apart from erosion and sedimentation problems associated with development, it has become increasingly apparent that storm water runoff contributes to receiving waters a significant part of total loads of such pollutants as nutrients, heavy metals, oil and grease, bacteria etc. As a result rivers, lakes, ponds, reservoirs, and estuarine and coastal water have become sensitive to increased rates and volumes of runoff and pollutant discharges. These discharges have posed major issues in many urban and residential centres, particularly in western states of the Peninsular. The problems have become even more aggravated by frequent intense rainfall, the physiological nature of the basins and the pattern of urbanization with relatively poor urban services. 2.3.2 Local stormwater- related problems Some of the stormwater-associated problems being encountered in Malaysia are construction activities and mud flows, flash flooding, water pollution, ecological damage and urban slope failures. Other related problems are related to traffic disruptions and accidents, surcharges and overflows from wastewater facilities, garbage and floating litters and sedimentation of rivers and lakes. Major zones that are prone to these problems include urbanised and urbanising centres in Klang Valley, Putrajaya/Cyberjaya region, Upper Kinta Valley, Penang, Linggi Basin, and other new socio-economic growth areas in West Coast of the Peninsular. Inland localities normally experience short flash floods while coastal towns face larger, longer duration flood due to expanded basin runoff contribution, flattened flood plain and tidal influences. Wan Mokhtar, 1998, find that many urban rivers, lakes, and ponds are rendered unfit for use, either in-stream or off-stream, as they are flooded and overloaded with non point source pollutants in wet periods and their water bodies experience more 16 concentrated point source due to reduce base flow contribution in dry periods. An interpretative of river water quality has revealed that more than 69% of Malaysia in-land waters are failing due to pollution contribution from the non-point source or storm generated activities, particularly in urban areas. 2.3.3 Previous Drainage Practices Past experience indicated that rapid disposal, localized, reactive and mono functional drainage concepts had been widely practiced in Malaysia. Rational Method was adopted for sizing most drainage structures. While standard design procedures have been available since early 1970s, the peak discharge estimation method has been freely used, even for large and complex hydraulic structures in large catchments and tidal areas. Practices in Malaysia has thus far relied on very much on slight adaptation or even direct use of temperate region-based urban rainfall and runoff design procedures and computer models. Research on characteristics of urbanized and urbanized urban areas is relatively scarce within Malaysia and continue to be frustrated by the lack of data, in term of quantity, quality and length of record from which meaningful design information may be deduced sufficiently and reliably. Urban drainage practice has been largely based on the 1975 DID Urban Drainage Design Manual The approaches to the design procedures, in terms of methods and techniques employed, have not been reviewed and upgraded although advances in urban drainage and stormwater management technology are continuing and circumstances changing as evidenced by the increased frequency of flash flood and water quality problems occurring in many urbanizing areas in Malaysia towns and cities. In relation to the contents of this manual, some recognized weaknesses are associated with institutional and legal issues, strategic and master planning concepts, discharge estimation, minor and major drainage facilities, computer simulation, and 17 quantity and quality controls. These were either inadequately covered or not included in the manual. 2.4 New Direction in Urban Stormwater management 2.4.1 The Need for a New Approach to stormwater management Conventional storm drainage management based on rapid disposal concept has long been on practice in many countries including Malaysia. Urban drainage practice and control philosophy has, until recently, been based on solving localized floods either by transferring excessive flows in drainage systems downstream by upgrading sewer pipes or relieving localized problems by constructing storm overflows. The consequence of removing the stormwater from the land surface so quickly is to increase volumes and peak rates of flow discharged, overloading the natural drainage system. This causes severe damage not only to downstream areas but to the environment as a whole. In addition, the amounts of storm water to deal with are such that drainage scheme have become unaffordable for the community. There is therefore the need for a new approach. Andoh, 1994, suggested that an approach of urban drainage by mimicking nature’s way, inspired by the concept of natural distributed system. This alternative strategy looks at ways stormwater flow into through urban centres can be reduced or attenuated before they arrive at the problem areas. The further upstream a control measure, the closer it is to nature’s way of a spatially distributed control system. A number of case studies described by Andoh (1995), Claridge (1995) and Anduh and Lamb(1995) suggested that the alternative strategy of source control is more cost- effective as compared to the traditional solution that have typically involved relief sewers and large storage tanks. A systematic study was carried out to evaluate the scope for generalizing the assertion that: Nature utilizes its wide range of natural feature to 18 store, attenuate drainage system is composed of an accumulation of small volume of system storage which, all together provide an efficient natural distribute and absorb into soil, run off before its release into the receiving water course. Its drainage system is composed of an accumulation of small volumes of system storage which, all together, provide an efficient natural distributed control system to slow down the rate of runoff. Andoh and Declerck, 1997, concluded that the approach to urban drainage which would mimics natures could be more viable and sustainable alternative. The further upstream a control measure, the closer to source and hence the closer to nature’s way. Facets of this approach have been called Source Control, Best Management Practices etc. Allison. et .al, 2006, identified that stormwater runoff from new or existing development can be addressed using either centralised management systems, such as large conveyance pipes and water treatment plants, or decentralised systems, such as retention ponds, grassy swales, and porous pavement. Although the centralised approach can minimize large fluctuations in stream flows and flooding risk to urban areas, this approach does not address the ecological requirements of maintaining adequate base flows and natural fluctuations in storm flows that are necessary for healthy aquatic ecosystems. Decentralised systems distribute stormwater management practices throughout watersheds and can more effectively mimic predevelopment hydrologic cycles throughout stream networks. While these systems require a great deal of coordination between landowners and government authorities, especially for longterm maintenance, decentralised systems have more flexibility than large centralised systems, allowing for adjustments and experimentation over time. Conventionally stormwater drainage has been designed to provide the fastest possible transport of stormwater runoff out of the catchments into receiving waters. However new concepts are now combining infiltration, distributed storage and treatment as well as delayed transport. In the sense of sustainable development ecological criteria 19 are taken into account in these modern drainage plans which are potentially much closer to nature than the traditional approach. 2.4.2 Stormwater Management in the Developed Countries The comprehensive Best Management Practices for stormwater management are very popular topic of development for urban drainage in Germany. Beginning with first exemplary projects (Sieker and Harms, 1988; Grotehusmann et al., 1994) and also including investigation of influences on ground water quality (Gowler, 1987; Grotenhusmann, 1995), stormwater Best Management Princinples are now widely used in drainage planning (Geiger and Dreiseitl, 1995; Uhl and Harms, 1996). The approach is also beginning to be used more extensively in other European Countries e.g. in the UK (Bettess, 1996; Jefferies et al 1998), France (Chocat, 1997) and Switzerland (Boller, 1998) as well as in the US (Urbonas, 1997) and Australia (Argue and Pezzati, 1998).” 2.4.3 Strategic approach in stormwater management The control of both quantity and quality of urban runoff is now being seen to be also of major importance in the management of catchments and receiving waters. A different approach to management of urban stormwater including the establishment of a storage-oriented approach for controlling runoff quantity from development sites, the identification of the environmental values or beneficial use of particular water bodies which are to be protected and the establishment of objectives which will achieve required level of flood protection and water quality enhancement. The strategic approach should also include the establishment of water quality management strategy, the development and implementation of monitoring and surveillance programs to ensure that runoff quantity and water quality objectives are 20 being maintained and the implementation of research programs to gain a better understanding of the behaviour of aquatic system in order to improve water quality design and management techniques. Public involvement is emphasized at all stages of this approach. This reflects the philosophy that all organization and individual who influence of are affected by the stormwater system should have a say in its management. This approach is based on the following set of broad and holistic principle for effective stormwater environmental management within the catchments and it’s receiving waters. The principles aimed at minimizing changes to the hydrological characteristics of a catchment, including wet and dry weather flows, to achieve flow objectives, minimizing the amount of pollution entering stormwater system and removing an appropriate amount of any residual pollution by implementing treatment Best Management Practices. It also aimed at maximizing the value of indigenous riparian, floodplain, and foreshore vegetation and also to maximizing the value of habitats for aquatic fauna within the stormwater system. These principles are interrelated and the failure to consider any one of them may compromise the values of stormwater system. 2.4.4 Sustainability in urban stormwater management. Roesner, 1999, defined sustainability as applied to a resource is usually defined as exploitation of the resources by the current generation for their improved quality of life and standard of living, but not to the extent it compromises future generations from achieving the same quality of life and standard of living. Developing a sustainable urban water resource system that does in fact increase the quality of life of the city citizens requires a paradigm shift in our thinking about urban runoff. That is we must cease thinking about the product of rainfall –runoff and infiltration- as nuisances, and regard them as asset. 21 2.4.5 Need for Integrated Management Approach Major problems in Malaysia related to urban water management include the storage of water, pollution of water body, urban flood hazards, and deterioration of environment surrounding rivers. To date piecemeal approach has been adopted to solve these problems. Appropriate adjustments of these piecemeal efforts are needed in order to achieve efficient and environmentally sustainable operation of urban water cycle. As noted by Musiake (1991), the inertia of the existing fragmented administrative arrangement makes this adjustment difficult. Nevertheless, it must be pursued. Some examples of integrated measures which can be adopted include integrated land use planning to achieve multiple uses for urban land, capturing and storage of roof runoff in order to reduce demands on the household potable water supply, impounding of surface runoff for community non-potable water supply use and the use of infiltration facilities to reduce direct storm runoff and increase base flows in rivers during dry periods. Ellis, 1995, suggested that successful integrated approaches to the management of river corridor requirement in urban catchment demanded not only the implementation of sound and sustainable eco-technology but also appropriate institutional cooperation and local planning. Local Government influence and guide urban development by identifying where and how development should occur through local land use plans and associated policy. Such plans and policy review should include screening criteria for institutional management practices as well as for preservation of critical habitat areas and the integrity of drainage corridor. Each development plan should aim to enhance the features and functions of natural drainage system in order to maximize local environment and economic benefits. 22 2.4.6 Urban Water System The natural process has been very extensively modified in urban areas (Musiake, 1991). Butler, and Parkinson, 1997 stressed that sustainable urban drainage should maintain a good public health barrier, avoid local and distant pollution of environment, minimize the utilization of resources (e.g. water, energy, materials) and be operable in long term and adaptable to future requirements. These strategies are proposed that can be carried out immediately, incrementally and effectively and these are to reduce potable water use, to reduce and then eliminate the mixing of industrial wastewater with domestic waste, and to reduce then eliminate the mixing of stormwater and domestic wastewater. A number of techniques are described which may allow adoption of these strategies, many of them small scale, source control techniques’. Figure 2.1 gives representation of the urban water system. The flows taking place in the system can be classified into three streams, the natural process of rainfall, infiltration, evaporation-transpiration, and runoff, artificial paths for drainage of stormwater such as gutters, pipes, open drains, detention basins and engineered waterways, and water supply system , which feeds into the sewerage system. These flow paths are not fully independent but are partly connected to each other. To fully understand the urban water system, it is necessary to quantify each of these components and their relationship in the cycle. 23 Figure 2.1: Urban Water System 2.5 Objectives of Stormwater Management An idealized goal for urban water management would be the restoration of each component of the hydrological cycle to its natural level (Musiake, 1991). Within broad objective of achieving an optimum urban environment, the underlying objective can be set for the responsible stormwater management are to provide safety for publics, minimize and control nuisance flooding and to provide for the save passage of less frequent flood events, stabilize the land form and control erosion, protect property, enhance urban landscape, optimize the land available for urbanization and to minimize the environmental impact of urban runoff on water quality. These objectives will be seen as being achieved when the planning, design, and construction of new facilities are adequate to service the requirement of new and future 24 development, there is compatibility with existing stormwater facilities, operational methods and maintenance techniques, and stormwater facilities provide adequate environmental, community, and asset protection consistent with acceptable planning, design, and construction requirements and the principle of ecologically sustainable development. 2.6 Stormwater Management Principles New South Wales Environment Protection Agency, 1996, identified several important management principles for achieving the stated stormwater management objectives. The principles are accepting shared responsibility, integrated land use planning, water sensitive urban design, multi-purpose of stormwater infrastructure, promoting ecologically sustainable development, developing of best mix of strategies and encouraging innovation. 2.7 Urbanisation and Urban Areas The size of urban areas has increase to accommodate an increase in urban population and activities that power the economic engine for country’s development. These developments has brought about several positive results such economic improvement and alleviation of poverty. Nevertheless, inadequate controlled development has had significant adverse impact on the environment, such as flash flooding, erosion, mudflow and sedimentation, slope failure, water pollution and ecological damage, increased floatable and debris flow and depleting water resources. 25 2.7.1 Urban areas populations. The National Physical Plan (NPP) Report 2005 developed by the Town and Country Planning Department (TCPD) shows that urban areas in Peninsular Malaysia presently occupies about 3.3 percent of the total land areas (432,000 hectare). The census of 2000 indicated that about 9.3 million of the total population of 18.5 million for Peninsular Malaysia resides within urban areas. The figure is projected by NPP to increase to 13.2 out of 26.8 million total populations in the year 2020. The figure reflects a rural-urban migration trend that places more emphasis on urban areas to promote better overall quality of life for country’s population. The figure is based on Department of Statistic definition of urban area. 2.8 Best Management Practices in Urban stormwater management Braune and Wood, 1999, concluded that the control of stormwater runoff quality and quantity is often considered separately, and does not address all the issues regarding urban stormwater runoff control. This often results in costly and inappropriate control measures. He suggested a new and improved approach already applied successfully in the USA and Australia is Best Management Practices approach. The can be defined as a multi-disciplinary approach in applying appropriate technology to preserve the natural environment, enhance living standards and improve the quality of life. The use and selection of specific Best Management Practices depends on site conditions and objectives such as water quality control, flood remediation, ground water protection etc. In many cases there are multiple goals and needs necessitating the application of various Best Management Practices to obtain an integrated “treatment train”. In this way cost-effective measures can be implemented to minimize the impact of urbanization on both water quality and quantity in an urban environment. 26 2.8.1 Runoff Quantity Management Stormwater in Malaysia has traditionally focus primarily on managing the impact of flooding be adopting a conveyance-oriented approach. Stormwater runoff is viewed as a nuisance to be disposed of as quickly and efficiently as possible. The disadvantages of this approach are the increase in conveyance sizes; insufficient capacity of downstream conveyance, hard lined open system can be a hazard to the public during and after flood and transportation of urban pollutants to the downstream areas. In addition to traditional conveyance oriented approach, a potentially effective and preferable approach to stormwater management is the storage-oriented approach. The function of this approach is to provide for the temporary storage of stormwater runoff at or near its point of origin with subsequent slow release to the downstream stormwater system or receiving water (detention) or infiltration into the surrounding soil (retention). This approach can minimize flood damage and disruption both within and downstream of the collection area. Runoff may also be stored for re-use as a second class water supply for irrigation and domestic purposes. The principle elements and techniques used in a storage-oriented system are stormwater detention facilities and retention facilities. 2.8.2 Runoff Quality Management Source control and treatment control of stormwater runoff from urban areas to remove urban pollutants and enhance the quality of the discharges to receiving waters has to be addressed. There are three techniques used for runoff quality management. Housekeeping Best Management Practices are techniques that aim to change human behaviors to reduce the amount of pollutants that enter stormwater system by targeting the control and/or prevention of pollution at source. The techniques include the introduction and improvement of community education and participation activities, 27 management activities, operation and maintenance activities such as garbage collection and street sweeping and improve site planning and management. Source Control BMPs are those practices that tend to keep both runoff pollutants contained at source. These include pervious areas and buffer strip toward which runoff is directed, infiltration controls, porous pavement, etc. Treatment Controls BMPs are series of treatment to protect the quality of local streams, lakes and rivers. The treatment control may be by the establishment of urban lakes as biological treatment system, water quality control pond and wetlands, incorporation of gross pollutant traps, and incorporation of off-stream sediment basins to intercept runoff prior to its discharge to receiving waters. Typical stormwater management measures to control stormwater quantity and quality for construction works are as shown in Appendix A. 2.9 Urban Stormwater as a Resource As growing urban community approach the viable limits of water supplies, opportunity associated with the use of local water sources such urban stormwater and ground water are being recognized. Better management of the water cycle at the resident lot needs to be achieved to reduce demand for domestic water supply. Veldkamp, et. al, 1997 identified that utilisation of stormwater greatly affects the reduction of drinking water consumption. If all toilets are flushed with stormwater instead of pure drinking water, a 30% reduction is achieved. Where urban areas are located over or adjacent to ground water aquifers, there is potential for stormwater to be used to recharge aquifers provided the water quality is protected. Next to utilization comes infiltration of stormwater. Infiltration is ranked 28 before discharge into surface water because infiltration better fit with pursuit of restoration of hydrological system. Obviously this is only true for areas with a sufficiently low ground water tables (Veldkamp, et. al, 1997). 2.10 Problems in Best Management Practices Application Mc Kissock, et. al, 1998 identified that initial investigation, showed that cost implication, lack of knowledge of suitable construction details and methods, together with the responsibility of maintenance are the major impediments to successful BMP system construction. Jefferies, 1999 established that at the time of the first system, knowledge of the detail implementation of the relevant practices was limited and a number of system have been constructed which are clearly not successful. Poor performance might arise from a number of reasons including lack of availability of sufficient land for the system installed, particular administration factors in the region, bad design and construction and inadequate maintenance. Jefferies, 1999 also assessed the extent to which the fears of many developers concerning the use of BMPs have been realized. Such fears include the propensity for children to be attracted to a pond, the extent of surface impounding during rainfall or erosion of swales side slopes. The matter of maintenance is a key issue encountered in Scotland. Having convinced planners and developers that BMPs are desirable, the need to ensure that the system once constructed, are then maintained satisfactorily have been a more problematical issue. Maintenance is a crucial issue with the infiltration and pond system from which solid must be periodically removed to ensure effective performance of the treatment system (Jefferies, et al, 1999). 29 Cost effectiveness is another crucial issue in stormwater management. In planning and implementation of stormwater management, the whole life cycle cost and benefit of the project and various possible alternatives have to be considered. 2.11 Summary Urbanisation results in increase of impervious areas and a diversification of urban land use practices with respect to hydrology and environment. The changes cause various stormwater associated problems such as flash flood, water pollution and ecological damage. These negative impacts in most cases are brought by inadequate handling of stormwater during planning, development and maintenance, resulting in much hardship to urban community. To address the problems, the government introduced the new manual, Urban Stormwater Management Manual or MASMA based on control at source concept, incorporated comprehensive planning, design and maintenance procedures for controlling discharge and pollution, with the objectives of enhancing the environment for the sustainable development. CHAPTER III MASMA APPLICATION IN PROPERTY DEVELOPMENT PROJECTS 3.1 Introduction This chapter discusses on Urban Stormwater Management Manual for Malaysia (MASMA), its purpose, goal and objectives, scope and application, and its organization and format. The relevancy of MASMA application to the authorities and users to different activities is also discussed. It also briefly explains the previous drainage practice and the application of MASMA related to land development. Roles, problems, issues and challenges in property development industry related to MASMA application are also elaborated. It ends with the discussion on problems of MASMA application, cost and time implication of MASMA compliance and benefits of MASMA compliance to developers and property owners. 31 3.2 Purpose, Scope, Application and Organisation of MASMA 3.2.1 Aim and Objectives The aim of the Manual is to provide guidance to all regulators, planers and designers who are involved in stormwater management and identifies new direction for stormwater management in Malaysia. The objectives of MASMA are to ensure the safety of the public, control nuisance flooding, protect properties, stabilize the landform and control erosion, optimise land available for urban development, and minimise the environmental impact of urban runoff on water quality and to enhance urban landscape. 3.2.2 Scope and Application of MASMA The Manual covers all aspects and requirement of stormwater management for urban areas throughout Malaysia. The Manual is considered as a guideline and the applicability depends on many factors such as its adoption and extent of its adoption by Local Authority, necessary adjustment to suit administrative requirement of each Local Authority, and reforms and changes in institutional and legal matters pertaining to stormwater. 3.2.3 MASMA Organisation and Format The Manual has forty eight (48) Chapters. It is divided into nine (9) Parts according to different main topics that form the Manual. The first three Parts contain background information on environmental process and stormwater management, administration aspects and planning processes. 32 The remaining Parts contain detailed information on hydrology and hydraulics, runoff quantity control and conveyance, source of pollutant and treatment runoff quality control, runoff quality control during construction and special stormwater applications. 3.3 Relevancy of MASMA Applications to Users and Activities Depending on the role of each user there are different issues and activities for which it is necessary to gain an understanding, while there are other issues and activities of which it would be advantageous to have an understanding. 3.3.1 Relevancy of MASMA to the Authorities and Users MASMA is relevant to regulators, planners, designers, developers and contractors in stormwater management and to educators who are training urban planners, hydrologists, deign engineers, environmental scientists and landscape architects. An indication of expected relevance of each chapter in the Manual to regulators, planners, designers, developers, contractors, and educators is given in Appendix B. 3.3.2 Relevancy of MASMA to Different Activities Depending on the activity being undertaken, different chapters on the Manual will be relevant. The relevant chapters for range of activities are indicated in Appendix C 33 3.4 MASMA Planning and Design concepts Planning and design concept of MASMA are based on eight acceptance criteria which are mandatory requirement for planning and design of stormwater management system for new urban development or upgrading of stormwater system in existing urban areas. The criteria are concerning public safety, land development, design average recurrence intervals, runoff quantity control, conveyance system, runoff quality control, ecological criteria, and operation and maintenance. 3.5 Urban Drainage Practice in Malaysia before 2001 In Malaysia prior to 2001, urban drainage practice has been largely based on the 1975 DID Urban Drainage Design Manual. The manual covers the topics on planning, basis of design, flood estimation, hydraulic design of open channels, structures, storm drainage design for urban streets, detention storage, erosion and sediment control, and information to be submitted with design. This rapid disposal, localized, reactive and mono functional drainage concepts have been practiced in Malaysia since then. The Rational Method is adopted for sizing most drainage structures. While standard design procedures have been available since early 1970s, the peak discharge estimation method has been freely used, even for large and complex hydraulic structures in large catchment and tidal areas. Practices in Malaysia has thus far relied on very much on slight adaptation or even direct use of temperate region-based urban rainfall rain-off design procedures and computer models. Research on characteristics of urbanized and urbanized urban areas is relatively scarce within Malaysia and continue to be frustrated by a lack of data, in term of quantity, quality, and length of record from which meaningful design information may be deduced sufficiently and reliably. 34 The approaches to the design procedures, in terms of methods and techniques employed, have not been reviewed and upgraded although advances in urban drainage and stormwater management technology are continuing and circumstances changing as evidenced by the increased frequency of flash flood and water quality problems occurring in many urbanizing areas in Malaysia towns and cities. In relation to the contents of former manual, some recognized weaknesses are associated with institutional and legal issues, strategic master planning concepts, discharge estimation, minor and major drainage facilities, computer simulation, and quantity and quality controls. 3.6 MASMA Application related to Land Development Housing development project is a process to convert agricultural or forest areas for the construction of buildings and other infrastructures for various functions and activities. In the land development process, MASMA compliance is related to submission and approval of land subdivision and layout plans, drainage and earthwork plans, building and infrastructural plans and approval of Certificate of Fitness for Occupancy. 3.6.1 Submission and approval of land subdivision and layout plans Planners for the project submit the proposed development to the state JPBD or Local authority planning department for approval. State JPBD or the local authority refers the application to DID for comments. The proposed development plan will be commented by DID regarding the allocation of required reserves for drains, rivers, beach, and retention ponds. The 35 comments will be forwarded to State TCPD or local authority and discussed in the meeting for approval. The comments by DID and other authorities will then be attached to the developers for necessary amendments to the plans. The developer is required to submit the amended plans for final approval. 3.6.2 Application for approval of drainage and earthwork plans At this stage the drainage and earthwork plans will be submitted to the Local/ Town Council. The council will then forward the plans to DID for comments. The consulting engineers are also allowed to directly submit the plans to DID. In the checking drainage plans, DID will check the plans based on a checklist of requirements and will give due attention to main drainage system (main and internal drains), retention ponds, river and beach and other things especially those can possibly cause flooding. In the checking of earthwork plans, DID will ensure that proposed levels for development higher than flood levels at that area also the requirement erosion and sediment control structures (ESCP). All the approval for the drainage and earthwork plans is subjected to deposition of financial guarantee to the local council. This guarantee will be used to finance repairs the damages caused by drainage and earthworks and to complete unfinished drainage by the developers. The approval of drainage and earthworks plans is under the jurisdiction of local/town council. DID function is to give technical advice to the respective council. 36 There are councils that do not forward these plans to DID as the have their own technical officials to handle the matter. 3.6.3 Application for approval of building and infrastructural plans Processing of the plans is carried by Local/Town council. These plans should be forwarded together with the approved drainage layout plans. The reference to DID is to comment on drainage and infrastructure proposed and the hydraulic calculations. 3.6.4 Approval of certificate of fitness for occupation (CFO) One of the aspects taking into consideration for issuing of CFO is the developer has constructed all drainage system as approved and complies with all the requirements during the approval of layout, drainage and building and infrastructural plans. 3.7 Roles, problems, issues and challenges in property development industry 3.7.1 The importance of property development The real estate industry is one of the most productive contributors to the national economy through its link to more than 100 other industry sectors. International Real Estate Federation (FIABCI), Malaysia hopes to build an impeccable reputation for the real estate fraternity through a new rating system for the developers and top-notch industry standards to upgrade the standards in local real estate industry and improve environment. 37 The rating system will be used as a benchmark to differentiate developers based on their track records, quality standards and reliability. According to Datuk Richard Fong, FIABCI Malaysia president, FIABCI provides a platform for fraternity to highlight the achievements and problems of the industry players. The people changing lifestyles and needs are pushing real estate excellence bar a few notches higher each year. Those who want to excel in the industry should brush up on their quality practice, reputation and creativity. Benchmarking against the world’s best is another great inspiration for local developers to challenge their own limit to come out with world class real estate designs and quality standards. 3.7.2 FIABCI criteria for Malaysia Property Awards According to Kumar Tharmalingam, secretary general of FIABCI Asia-Pacific, for the Malaysian Property Award, there are five main criteria for judges to consider. First, the product has to be successful in its category. Purchasers must want to buy and regard it as a good investment. Second, the project must generate profits- it has to be financially successful. Third, the project has to represent a recognizable icon. It has to be unique, with people wanting to be associated with it. Fourth, the project should encompass consideration to the environment, and the environmental scope is through landscaping, waste management, energy-saving ideas etc. Fifth, quality of construction is an important point. The longevity of the building depends on the quality of construction and that the project will stand the test of time . 3.7.3 Factors house buyer taking into consideration in choosing of property Observation to brochures and other advertisements in the various media revealed that several criterions have been used by the developers to attract the house buyers. 38 Amongst the popular features are homes with wide array of selection, with well designed, specious built-up areas complemented with good ventilation and natural lighting, and high quality construction and finishes for both interior and exterior. Other features are on environment, safety and security. On environment pointed on the availability of parks and lakes associated with recreational facilities, scenic landscaped surroundings and environment-friendly development with concealed infrastructures. On safety and security the features are the single entry point to each precinct, pedestrian safe paths, crosswalks and other child friendly features and well lit streets, landscaped back lanes and jogging track. Other factors mentioned are affordable prices and value for money, strategic location, closeness to amenities such as schools, kindergarten, shops, mosques, offices, banks and golf courses and easily accessible to the main roads and highways. 3.7.4 Developers expectation to the government Just as house buyers demand the best from the developer the sign up with, the developers too have demands on the government. The Real Estate and Developers Association (Rehda) president, stressed that while the association has met with the Government at various levels and exchanged several ideas as well as concern, too often what the Housing and Local Government said and what the local authorities thereafter do are quite different. The authorities need to be more reasonable about the concern of the property development industry. The primary concerns today according to him are the slow take-up of houses, the implementation of the build then sell mode of housing delivery, and the status of abandoned housing projects. He also stressed that developers have too many rules and regulations governing property development and they also have to bear with all the demands and requirements of local authorities, from planning approval to issuance of Certificate of Fitness for Occupation. He advises buyers to make 39 them sure they check out the background and reputation of the developer before committing to buy a property and they should not just depend on brochures. 3.7.5 Property development project in Selangor and Negeri Sembilan. Selangor and Negeri Sembilan are two of the states in Malaysia where property development project growing at fast rate at pace of the development in the states. The number of application received by the DID in Selangor is about 1500 and Negeri Sembilan is about 300 every year. Almost about 80% or more of these applications is with the land area of less then 10 hectares. The property developers currently face a stiff competition to attract the house buyers and have offered various incentive and advantages. For the developers the marketability of the property, project time and cost is of crucial importance. Marketability is also important because developers will normally start the construction only after 65% of the properties are already sold. Marketability of the property will depend on various factors such as the closeness to working places, safety, and future development, and good surrounding areas, existence of recreational and sport activities, efficient road, and transportation system. Rehda Deputy Chairman, Datuk Michael Yam said that in a survey carried out in early 2006, a majority of developers responded that they had unsold stock because of weak market conditions and tightening of bank lending. Over 70% said they could manage unsold stock of between 10% and 20%. The survey also found out that 63% of respondents were starting new projects in the second half of the year compared with 78% the year before, while 43% felt that the property market was still trending towards the residential segment in 2006. He cautioned that while 42% of respondents were neutral on 2006’s property outlook and there was a higher percentage of respondents (37%) compared with 22% the year before who were pessimistic, this may be due to the macro-economic conditions during the survey period (The Sun, October 9, 2006). 40 Lately flooding is another factor influencing the marketability of the property due to the frequent of the flood in the developed areas. The flood has caused the damage to the properties and inconveniences to the population of the areas involved. The buyers will shy away from the flood prone housing areas and resulting in significant lowering in property prices. Nowadays free from flooding is a crucial prerequisite to attract the house buyers to buy the property. 3.8 Problems, implication and benefits of MASMA application 3.8.1 Problems of MASMA applications in Property Development Projects There are various problems encountered by the developers and project engineers in the application of MASMA and its implementation in property development project. These problems encountered at planning, design, construction and maintenance stage after completion of the projects. During the planning stage there are conflicting needs for suitable site and open spaces for stormwater management facilities and other uses such for recreational facilities and sewerage treatment plants. Sometimes there is no proper consideration on the types of stormwater facilities required and on natural drainage lay-out during the planning stage. Even if land is provided for the facilities, it is unsuitable in location, size and shape. There are also inconsistencies in the enforcement of MASMA requirement between authorities, districts and states. Some of the stormwater facilities are inappropriately and improperly designed, and lack of safety concern and consideration on constructability. Stormwater facilities also designed without proper consideration on ecological aspects for habitats, aesthetic and landscaping. The designer also faced the problem of inadequate space, unsuitable shape and unsuitable location of reserve, inexperience and lack of knowledge in 41 choosing appropriate design alternatives and unavailability or limited choice of local stormwater products. Some stormwater facilities designed by the designers are also not cost effective. During the construction stage, the contractors encountered the difficulties to construct or install the facilities designed. There are also problems of inadequate space for construction of Storm Water Management facilities. Other problem is unavailability of skilled and experience of workers, suitable equipment and machineries for construction and installation, and local product of the facilities proposed by the designer. Failure to construct Storm Water Management facilities in accordance to design plans and technical specifications and failure to construct erosion and sediment control and associated structures as approved are problems in the part of contractors. Performance of erosion and sediment control structures is another problem during the construction stage. After the completion there are several problems encountered. Some facilities are very difficult to maintain, fail to function and perform as intended and misused or vandalized by the publics. There is also poor and insufficient maintenance of the facilities by the developers and authorities. Financial constraints on the part of developers and authorities to finance maintenance of Storm Water Management facilities and infrastructures are another problem. Unavailability of suitable equipment and machineries, limited access and land space give problem to maintenance works. There also thefts and corrosions of metal used for stormwater facilities, safety and health hazards create by ponds and wetlands. 3.8.2 Cost implications of MASMA compliance Cost is a very crucial factor in housing development project. Regarding the cost implication to MASMA compliance, there are conflicting opinions among the 42 consultants as whether it causes the increase in infrastructural cost of the project. As the new approach based on control at source in contrast to previous manual based on rapid disposal, there could be different in cost of the various component of Storm Water Management facilities. The study will evaluate the increase in components of cost for providing Storm Water Management facilities and other related costs to comply with MASMA requirements. For the purpose of this study, the costs are divided into four components; Consultancy cost, Construction of Storm Water Management facilities cost. Construction and maintenance of erosion and sediment control structures and perimeter drain (temporary structures), and Maintenance cost before handing over to the authorities 3.8.3 Time implications of MASMA compliance Time is another very crucial factor in housing development project and it will also affect the cost of the project. As the new approach totally differs to previously practiced, MASMA adoption may caused delays to project implementation due to various reasons. The delays may effects the project scheduling, overall project costs, and marketing strategies and buyers expectations. This study will try to identify at what stage the delays occurs due to MASMA compliance and the reason of the delays. 3.8.4 Benefits of MASMA compliance The benefit expected from MASMA implementation are to attenuate and reduce flow into river to reduce the damage to river environment, environmental friendly and reinstate the greenery in urban areas, safer and people friendly features, avoid accumulation of rubbish, spacious green areas, integrated use of dry and wet ponds, purification of run-off, erosion control, run-off filtration, barrier for water velocity, river bank stabilities, encourage infiltration and giving better habitat for fish and animals. 43 As for the developers who finance the project and property owner who will bear the development cost of the project, the return in term of benefit as a result of the compliance will make them appreciate the importance of manual implementation. The survey carried in the study will identify and evaluate the benefit of MASMA compliance to the developers and the property owners of the project. The expected benefits for the developers are enhancing the marketability, appreciation of property value, enhance the reputation to the customer and authority while reducing of complaints from various parties related to the project during construction and after project completion. The expected benefit for the property owners who are the customers and end users of the projects may be derived from uses of environmentally friendly types of Storm Water Management infrastructures adopted to comply with MASMA requirements. They will benefit from damages of the property and inconveniences due to flooding, spacious green areas, safer and people friendly features, integrated use of dry and wet ponds and other facilities for recreation, sports, social and educational activities, water and cost saving through reuse and recycle of storm water and give value for money for the investment in the property they own. 3.9 Summary MASMA is a new guideline for stormwater management introduced by the government to improve the stormwater management and enhance the environment towards the sustainable development. As oppose to the previous manual which is based on rapid disposal system, MASMA utilized the concept of control at source. Application of this new stormwater management has brought some problems and implication to the project implementation in the property development project. The problems arise during all the implementation stages, from planning until the maintenance stage. The MASMA 44 application has also bring the implications to the project cost and time. The MASMA compliance at the same time brings various benefits to the developers and buyers of the property at large. CHAPTER IV RESEARCH METHODOLOGY 4.1 Introduction This chapter outlines the detail of methodology adopted in the study. The study is conducted using interviews and questionnaire survey. This chapter explains the type of data used, method of sampling, description of sample and population, technique of data collection, processing and analysis and questionnaire design. 4.2 Research Methodology The overall design and conduct of the study is done by mainly referring to Alreck and Settle, 2004. The sequential events of the study in simplicity are given in Figure 4.1 The study will provide description of urban storm water management practices in Malaysia and globally from the past and present state of the art and the direction its moving to. This will be obtained through literature review of journal papers, books, reports and conference papers. Besides that, the data of the study will be collected through surveys in the form of questionnaire on parties involved in the implementation of Urban Storm water Management Manual for Malaysia for the past five years. The investigation will uncover the related issues and problems and implication on the 46 development in term of time, cost and quality. Figure 4.1 shows the schematic diagram of the steps of the study. Theoretical framework using determined dependent and independent variables are important to design relevant questions to be asked in the process of carrying out the survey QUESTIONNAIRE SURVEY x Sampling for Survey x Design Questionnaire x Pilot Study REPORTING THE RESULTS xDescribing data distributions xMeasuring item interactions xReporting the information COLLECTING DATA xDistributing Questionnaire xCollecting Questionnaire PROCESSING AND ANALYSIS DATA xUsing Statistical Analysis Method Figure 4.1: Schematic Events in the Study. The study will provide description of urban storm water management practices in Malaysia and globally from the past and present state of the art and the direction its moving to. This will be obtained through literature review of journal papers, books, reports and conference papers. Besides that, the data of the study will be collected through surveys in the form of questionnaire on parties involved in the implementation of Urban Storm water Management Manual for Malaysia (MASMA) for the past five years. The investigation will uncover the related issues and problems and implication on 47 the implementation in term of time, cost and quality. Figure 4.1 shows the schematic diagram of the steps of the study. Theoretical framework using determined dependent and independent variables are important to design relevant questions to be asked in the process of carrying out the survey. 4.3 Identification of Related Problems and Issues The study start with the literature review on urban storm water management practices in Malaysia and globally in the pasts and present and the direction it is moving to. This has been obtained through literature review of journal papers, books, reports and conference papers. To achieve the objectives of the study the initial interviews and discussions have been carried out with officials in Federal, states, and districts agencies, consultants, developers, contractors and property owners to determine the problems, issues and elements related to the objectives of the study. 4.4 Questionnaire Study 4.4.1 Design of the Questionnaire Regarding the problems in MASMA implementation it is decided to divide the problems according to implementation of the project so that the problems will be studied in sequence and systematically. A long list of possible problems was produced based on literature review, newspaper reports and discussion with parties involved: Officers from DID headquarters, Negeri Sembilan and Selangor, Local authorities, planers, consulting engineers, developers and contractors. During the discussions the problems in the list have been added or deleted in accordance to the significant of the problems and its relatedness to MASMA implementation. The list of problems was finally produced in 48 the form of questionnaire that was handed over to the project engineers for their feedback on every problem that appears in the list. The same process has been carried out concurrently to determine the issues and elements to be considered to achieve the objectives. Structured questions are selected as the survey format over unstructured question for it is feasible and has many advantages. It addressed precisely what information is sought from the respondents and therefore avoiding the respondents from being in different frame of mind and respond on different dimensions. The questionnaire is grouped into five (5) sections. It starts off with general background project name, developer, location, size, development components, project duration and status, and stormwater management components. Section A is regarding the problems in MASMA implementation while Section C and D asking on cost and time implication of MASMA compliance respectively. Finally Section E is concerning the benefits of MASMA compliance to the developers and property owners of the project. The sections of the questionnaire are referred to the objectives of the study as listed in Table 4.1 SECTION TOPIC OBJECTIVES A Project Background - B Problems in MASMA implementation 1 C Cost implication of MASMA compliance 2 D Time implication of MASMA compliance 3 E Benefits of MASMA compliance to the developers 4 and property owners Table 4.1: The Content of Questionnaire 49 The Questionnaire developed is as shown in Appendix D. 4.4.2 Pilot Study The pilot study was conducted to ascertain the relevancy of the questionnaire to the objectives of the study and the response, opinion and attitude towards the questionnaire was designed and also ensure they understand and response correctly to the questions asked. Several questionnaires set were sent or discussed with the relevant parties to ascertain their appropriateness. Amendments were made to the questionnaire based on the feedback received from this pilot study. 4.4.3 Cover Letter The cover letter is prepared to introduce the survey and the objectives of the study. In the absence of personal contact and conversation, the cover letter played an important role to win the respondent to response positively to the questionnaire. The cover letter must be able to explain the project briefly and address what to be expected from the study, and to win the cooperation of the respondents. The cover letter as per Appendix D 4.4.4 Sampling for Survey The questionnaire survey was targeted to the list of sixty three (63) on-going and completed projects within the scope of the study produced by JPS Selangor and Negeri Sembilan. The projects are those have gone through MASMA compliance requirements in their implementation. The list represents main property development projects developed during that period in those states. 50 4.5 Data Collection Data collection is carried out using questionnaire survey to the project engineers handling the MASMA implementation in their projects. The questionnaires are sent by mail or delivered by hand. In addition, survey via mail and delivered by hand also consists of the return envelope, which is ready to be delivered, complete with return address and stamp. A week was given to finish and sending back the completed forms. The completed forms could be sent back to the by mail or facsimiles picked by hand. The response from the respondent is also properly administered. Approximately in a week where viable the respondents were contacted by phone to remind them about the questionnaire to promote response. 4.6 Data Processing The data collected from the respondent are processed to produce statistical data representing the opinion and experience of the project engineers with regard to the application of MASMA in their respective projects. The analysis of the data has been carried out using SPSS statistical analysis method. It has many advantages including the capability and flexibility in performing various statistical analyses. Thus the discussion is made properly and easier. The usable respondents are twenty six (41 %) out of sixty three questionnaire sets that were sent out to the project engineers. 4.7 Questionnaire Measure To acquire the extent of contribution of factors, the survey respondents were asked to rate against the five-point scale. The responses to the questionnaire is base on 51 Likert’s Scale of five ordinal measures which is from one (1) to five (5) according to the level of contributing factors attributed to each question. Ordinal Scale of 1 to 5 ----------------------------------------------------1 2 3 4 5 Increasing degree of Contribution Figure 4.2: Five (5) ordinal measures of agreement by Likert’s Scale Likert’s Scale of measurement represents the following rating: 5 : Highly Contributing 4 : High Contributing 3 : Medium Contributing 2 : Low Contributing 1 : Least Contributing Responses from the questionnaire were then analysed. The analysis include the ranking the factors in term of degree of contribution. To determine the ranking of different factors from the point of view of project engineers, the ‘Relative Important Index (RI) as computed as: Sum (5n5 +4n4 +3n3 +2n2 +1n1) RI = -------------------------------------------5 (n5 +n4 +n3 +n2 +n1) Where RI = Relative Index n5, n4, n3, n2, n1 = number of responding indices 52 In the study where ordinal data were employed, performance levels were used in the answers, e.g.; “1 – no significant problem”, “2 – slightly significant problem”, “3 - moderately significant problem”, “4 – very significant problem”, and “5 – extremely significant problem”. Likert scaling is a very popular scale to use because the simplicity of the format (Alreck and Settle, 2004). It can be composed quickly and easily. Respondents understand what are required in the questionnaire and can complete items very quickly. The computation of RI using the formula yields the value of RI ranging from 0.2 to 1. The value of 0.2 represents the lowest strength and value 1 represents the maximum strength. It was distributed according to range as < 0.2: no significant problem, 0.2 0.4: slightly significant problem, 0.4 - 0.6: moderately significant problem, 0.6 – 0.8: very significant problem and > 0.8: extremely significant problem. The ranges of index values were also discussed by Abd Majid and McCafer, 1997. 4.8 Summary The study was referred to literature review of journal papers, conference proceedings, books, reports and conference papers. Information on the problems and related issues related to the study is also gathered through the interviews and discussions with wide range of people involved and related directly or indirectly with the MASMA implementation in property development projects. Besides that, the study was conducted through surveys in the form of questionnaires to the project engineers to identify, based in their experience, the problems and implications as well as the benefit of MASMA application in their respective project. Analyses were performed on the results tabulated with interpretations assisted by statistical computations as and discussed in the next Chapter V CHAPTER V DATA COLLECTION AND ANALYSIS 5.1 Introduction This chapter details out the finding of the study concerning the problems in MASMA application in property development projects as experience by the developers and project engineers in their projects. To determine the ranking of the significant of the problems, cost and time implications and benefits gained by developers and property owners, the costs increase, the relative index of the responses was computed and ranked to compare their ratings and relative importance. The results derived from Statistical Package for Social Science (SPSS) are appended in the Appendices as Appendix E, F and G where numbering are mentioned subsequently after results. 5.2 Data Collection and Response Data collection is carried out through questionnaire survey to the project engineers handling the MASMA implementation in those projects. The questionnaires are sent by mail or delivered by hand. In addition, survey via mail and delivered by hand also consists of the return envelope, which is ready to be delivered, complete with return address and stamp. 54 Out of sixty three (63) set of questionnaires sent, twenty seven (27) respondents returned the questionnaire. Out of that one returned questionnaire was excluded for analysis as it appeared to be outside the scope of the study (land area less than 10 ha). The respondents cover various types of properties development projects in Selangor and Negeri Sembilan. Out of twenty six (26) respondents, four (4) projects are in Negeri Sembilan while the other twenty two (22) projects are in Selangor. 5.3 Analysis of the results As mentioned earlier, the Likert’s scale of five ordinal measures used to represent rating of the study. The main approach to analyse the data is by using the ‘Relative Index’ (RI) technique. The frequency analysis of all questions been asked in the study is tabulated and shown in Appendix E and F. The relative index of every question been asked and average relative index are as shown in the Appendix G. Detail analysis of the data of each section of the questionnaire is elaborated in the next section. 5.4 Project Background The results of the analysis of project background using statistical analysis method are in Appendix E. The analysis is on the project land area; project duration; year of project start; project status; and stormwater management components in the project. 5.4.1 Land Area of the Project The land areas of the projects are mainly less than 100 hectare (34.6 %) followed by between 100 and 200 hectare (38.5 %). Only 11.5 % are of more than 400 hectare. 55 5.4.2 Project Duration, Starting Year and Implementation Status Figure 5.1(a) and 5.1(b) show the Project Duration and Starting Year of the projects. Eighteen projects (69.2%) are with the duration of four years or more while six projects (23.1 %) take 2 to 3 years to complete. One (3.8%) each takes less than 2 years and between 3 to 4 years to finish the project. Project Duration Percent 60 40 20 0 2 years or less 2 to 3 years 3 to 4 years 4 years and above Project Duration Figure 5.1(a): Project Duration Six projects (23.1 %) started in the year 2000 or before, nineteen projects (73.1 %) from 2001 to 2005 and one project (3.8 %) in 2006. 56 Project Start 30 25 Percent 20 15 10 5 0 2000 and before 2001 2002 2003 2005 2006 Project Start Figure 5.1(b): Project Starting Year. Project status 80 Percent 60 40 20 0 Detail design stage Construction stage Completed Project status Figure 5.1(c): Project Development Stage Figure 5.1(c) show development stage of the projects at the time when the survey was conducted. The table shows that the projects are at various development stages. Twenty 57 projects (76.9 %) are at the construction stage, two at the design stage (7.7 %) and four are completed projects (15.4 %). 5.4.3 Stormwater Management Components of the Projects There are several types of stormwater management structures and facilities used in the projects. The percentages of the projects that have employed the respective stormwater management component are illustrated in Figure 5.1(d). The most commonly used are concrete drain main conveyance (88.5 %) and wet pond and wetlands (80.8 %), followed by pipe drains main conveyance (42.3 %) and Gross Pollutant Traps (38.5 %). Earth main conveyance drain, swales, dry pond and porous pavement, and infiltration drain are very rarely used. Stormwater management component Figure 5.1(d): Stormwater Management components 58 5.5 Problems in MASMA Implementation 5.5.1 Problems of MASMA Implementation at Planning Stage The problem of MASMA implementation at planning stage shows that the average relative index value as 0.53. The RI value is in the range of 0.4-0.6 which is moderate significant problem. All five of the problems listed in the questionnaire have the range of 0.4 -0.6 value showing that all the problems are moderately significant. Out of five, two problems have the RI value of close to 0.6 and considered most significant during the planning stage. These problems are on ‘the conflicting need for suitable site and open space for stormwater management facilities and other uses’ and ‘inconsistency in the enforcement of requirement between states and districts’. Another problem that is also significant, with RI value of 0.54 is ‘no proper consideration of types of stormwater facilities required during planning stage’. 5.5.2 Problems of MASMA Implementation at Design Stage The problem of MASMA implementation at design stage shows the average relative index value as 0.45. The RI value is in the range of 0.4-0.6 which is moderately significant problem, towards the lesser significant value. This show the problems at this stage are less significant than that of during the planning stage. Seven out of nine the problems listed in the questionnaire have the RI values in the range of 0.4 -0.6 showing that all the problems are moderately significant while other two fall within the slightly significant range. Two most significant problems at design stage are ‘stormwater management facilities designed without proper consideration on ecological aspects for habitats, aesthetic and landscaping’ and ‘stormwater management facilities designed are not cost effective’ with the RI values of 0.51 and 0.50 respectively. Another problem with RI value of 0.49 that is also significant is ‘inadequate space, unsuitable 59 shape and unsuitable location of reserve provided for stormwater management of facilities’ 5.5.3 Problems of MASMA Implementation at Construction Stage For the problems of MASMA implementation at construction stage, analysis shows that the average relative index value of 0.44. The RI value is in the range of 0.40.6 which is moderately significant problem, towards the lesser significant value. Seven out of eight the problems listed in the questionnaire have the range of 0.4 -0.6 value showing that the problems are moderately significant. The most significant problem at the construction stage is ‘unavailability of local product of the facilities proposed by the designer’ with RI value of 0.51. Two other problems that are also significant both with RI value of 0.46 are ‘inadequate space for construction of stormwater facilities’ and ‘the contractor failed to construct erosion and sediment control and associated structures as approved’ 5.5.4 Problems of MASMA Implementation after completion The problem of MASMA implementation at planning stage shows that the average relative index value as 0.54. The RI value is in the range of 0.4-0.6 which is moderate significant problem, towards the more significant value. This shows that the problems at this stage are more significant as compared to other stages. Three of the problems with the RI value of 0.70, 0.68 and 0.66 are within the range of 0.6-0.8 which is very significant problem. The problems are ‘financial constraint on the part of authorities to finance maintenance of stormwater management facilities and infrastructures’, ‘financial constraints on the part of developers to finance maintenance of stormwater management SWM facilities and infrastructures’ and ‘poor or insufficient maintenance of the stormwater management facilities’. Other three problems that are also considered significant, with the RI values of 0.59, 0.53, and 0.50 are ‘thefts and corrosions of metal used for stormwater management facilities’, ‘misuse and vandalism 60 to the stormwater management facilities by the publics’ and ‘stormwater management SWM Facilities constructed are difficult to maintain’. 5.6 Cost implication of MASMA compliance For cost implication of MASMA compliance, average relative index value is 0.56. The RI value is in the range of 0.4-0.6 which is moderately significant increase. Construction and maintenance cost of stormwater management facilities shows the very significant increase with RI value of 0.65 and 0.64 each. This followed by erosion and sediment control structures cost of moderately influence with RI value of 0.55. Only slightly significant increase in consultancy cost with RI value of 0.38. 5.7 Time implication of MASMA compliance. Time implication of MASMA compliance is indicated through the occurrence delays in project development scheduling. In the context of MASMA compliance, the delays can be monitored by comparing the milestones of the project. In the property development projects, the important milestones are the project approval and issuance of CFO. The delays in one or more of this approval will result in the delay of the whole project. 5.7.1 Delay of project plan approvals and issuance of Certificate of Fitness for Occupation. Average relative index value for delay of the approvals shows the value of 0.54, in the range of 0.4-0.6 which is moderately significant delay approvals of plans due to the need to comply with MASMA requirements. Layout and Sub-division Plans Approval, Drainage and Earthworks Plan Approval, Building Plan Approval, Building 61 and Infrastructural Plan Approval and Issuance of CFO have RI values in the range of 0.4 -0.6 that are of moderately significant delay. Out four approvals, two have the RI value of close to 0.6 and classified more significant influence on delay. These are ‘delay in layout and subdivision plan approval’ and ‘delay in drainage and earthwork plan approval’ 5.7.2 The factors contributing to delays of approvals The factors contributing to delays of approvals show the average relative index value as 0.54. The RI value is in the range of 0.4-0.6 which is moderately significant contribution. Out of five factors listed in the questionnaire, one has the RI of 0.64 which has caused most significant contribution to the delay. This is the delay due to ‘repetitions in layout planning to comply with MASMA requirements’. Out of five, two factors have the RI value of close to 0.6 and considered significant. These factors are ‘delays in receiving comment from the authorities’ and ‘repetitions in design to comply with MASMA requirements’ 5.8 Benefits of MASMA compliance to the developers and property owners 5.8.1 Benefits of MASMA compliance to the developers Regarding the Benefits of MASMA compliance to the developers the analysis shows an average relative index value of 0.58. The RI value is in the range of 0.4-0.6 which is moderately significant contribution. The RI value of 0.58 is very close to 0.6 which shows that the developers benefit significantly in MASMA compliance and its implementation. The project engineers very agree that developers gained benefit of MASMA through ‘drainage corridor, waterways and Drainage corridor, waterways and other 62 SWM facilities can be properly planned to enhance environment and recreational use to add value to the property’ and ‘MASMA compliance has enhanced developers reputation and credibility to customers’ with relative index of 0.71 and 0.62 respectively. Other two benefits ‘MASMA compliance has reduced complaints from the publics and authorities during and after construction’ and ‘MASMA compliance has enhanced the marketability of the property’ with the RI value of close to 0.6 and are considered significant. 5.8.2 Benefits of MASMA compliance to property owners. For the benefits of MASMA compliance to property owners, the result shows the average relative index value as 0.59. The RI value is in the range of 0.4-0.6 which is moderate agree, but the value is close to very agree range of 0.6-0.8. Out of five benefits listed in the questionnaire, three one have the RI value in the range of 0.6-0.8 which is very agree to the benefit and another one with the RI value of 0.58 which also close to very aree range. This indicates that the project engineers are very agreeing that property owners gained benefit from MASMA implementation and compliance of its requirement. Four abovementioned benefits are ‘MASMA compliance reduce the nuisance of flooding to the owners in the project and downstream areas’, ‘MASMA compliance with proper integration with aesthetically designed landscape and spacious green areas creates pleasing and healthy environments’, ‘stormwater management facilities constructed can be used for access, and sports, recreational and social activities’, and ‘MASMA compliance improves public safety’. The fifth benefits in the list, ‘Property owners benefited from water saving through harvesting/storage’ has RI value of 0.38, within slightly agree range. rainwater 63 5.9 Summary The analysis carried out on the data collected from the questionnaire survey has been successfully indicated and established the problems in MASMA implementation in property development project. It also successfully indicate the cost and time implication of MASMA compliance as well as the significant factors that cause the delay in project plan approvals and issuance of CFO. The benefits of MASMA compliance to the developers and property owners (buyers) have also been shown and established. CHAPTER VI DISCUSSION OF RESULTS 6.1 Introduction This chapter elaborates and discusses the findings of the study from the questionnaire survey conducted. The problems of MASMA implementation at the planning, design, construction and after construction is identified, established and elaborated. The implication of the problems at one stage that causes the problems to other stages is also discussed. That is followed with the discussion on the cost and time implications of MASMA compliance and the factors that contribute to the delays. The benefits of MASMA compliance to the developers and property owners is discussed towards the end of the chapter. 6.2 Problems in MASMA Implementation The questionnaire listed thirty one (31) related problems encountered by the developers and project engineers in MASMA implementation during various stages of project development. The Relative indexes were ranked and then tabulated. The top twelve problems with RI of 0.5 and above are as shown in Table 6.1. 65 RANK PROBLEM 1 Financial constraint on the part of authorities to finance RI STAGE Maintenance 0.7 maintenance of SWM facilities and infrastructures. 2 Financial constraints on the part of developers to finance maintenance of SWM facilities and Maintenance 0.68 infrastructures 3 Poor or insufficient maintenance of the SWM facilities 4 Inconsistency in enforcement of requirement between 0.66 Maintenance Maintenance 0.59 states and districts 5 Conflicting need for suitable site and open space for Planning 0.59 storm water management facilities and other uses 6 Thefts and corrosions of metal used for SWM facilities 7 No proper consideration on types of SWM facilities 0.59 Planning Planning 0.54 required during planning stage 8 Misuse and vandalism to the SWM facilities by the Maintenance 0.53 publics 9 Unavailability of local product of the facilities proposed Construction 0.51 by the designer 10 SWM facilities designed without proper consideration on ecological aspects for habitats, aesthetic and Design 0.51 landscaping. 11 SWM Facilities constructed are difficult to maintain 0.50 Design 12 SWM facilities designed do not cost effective 0.50 Maintenance Table 6.1: Ranking of Top Twelve Problems in MASMA Implementation (with RI value of 0.5 and above) 66 Table 6.1: shows the ranking of top twelve problems in MASMA implementation that are more significant influence. These problems have the Relative Index values of 0.5 and above. From the analysis and the result shown in the table, it is revealed that the top twelve most significant problems in MASMA implementation with the relative index value of more than 0.5, six (6) are the problems during maintenance after the completion of the project, three (3) during the planning stage, and two (2) during the design and only one (1) during the construction stage. These problems, together with several other problems that are significant at respective stages are discussed in the next paragraph. 6.2.1 Problems in MASMA implementation at the Planning Stage Three most significant problems during the planning stage as shown in Table 6.1 are ‘the conflicting need for suitable site and open space for stormwater management facilities and other uses’; ‘inconsistency in enforcement of requirement between states and districts’; and ‘no proper consideration of types of stormwater facilities required during planning stage’. It is commonly recognized that the land is so valuable to the developers. The developers will try to make full use of the land for the construction of buildings to maximize profit. Town and Country Planning Department (TCPD) has allowed the use of open space and green areas provided as required by the developers to use for stormwater management facilities such as wet pond. The areas are normally used for public recreational area, children playground and other uses. There is also conflicting need for suitable site for other public utilities such as sewerage plants and high tension over head cables. All these factors will cause the conflicting need for suitable site and open space for stormwater management facilities and other uses’ 67 Inconsistency in enforcement of requirement between states and districts refers to the enforcement by the authorities such as DID, Local Authorities and Town and Country Planning Department (TCPD) of related laws and guidelines with regard to stormwater management during the planning stage. The inconsistencies occur due to several factors. Several local authorities especially the city councils do not consult DID pertaining to planning approvals. The procedures in plan development approvals and issuance of CFO are not consistent across the country. There are many other guidelines and legal requirements from various agencies but there is no integration between them. There are also different levels of understanding among the officials at the various levels of the agencies with regard to enforcement of MASMA requirements. The involvement of the experienced and competence engineers in stormwater management and MASMA requirement from the onset of the project planning is very crucial. Without the involvement and knowledge of suitable and appropriate types of stormwater management facilities to be provided in the project during the planning stage, the reserve provided for the facilities may not be suitable in location, size and shape. There should also be consideration on the method of construction, maintenance and accessibility to the facilities. 6.2.2 Problems in MASMA implementation at design stage Two most significant problems at the design stage are ‘stormwater management facilities designed without proper consideration on ecological aspects for habitats, aesthetic and landscaping’ and ‘stormwater management facilities designed are not cost effective’. Another problem that is also significant is the problem of inadequate space, unsuitable shape and unsuitable location of reserve provided for stormwater management of facilities. These top three problems and their RI values are as shown in Table 6.2. 68 RANK 1 PROBLEMS RI SWM facilities designed without proper consideration on ecological 0.51 aspects for habitats, aesthetic and landscaping. 2 SWM Facilities constructed are difficult to maintain 3 Inadequate space, unsuitable shape and unsuitable location of reserve 0.50 0.49 provided for SWM of facilities Table 6.2: Ranking of Top 3 Problems in MASMA Implementation at Design Stage The failure of the designers to give a proper consideration on ecological aspects of habitats, aesthetic and landscaping is a main problem in the design of stormwater management facilities. As the main objective of MASMA is to enhance the environment for sustainable development, the designers should give due consideration to the ecological aspects of habitats in their design. As to optimize and enhance the property value and marketability of the property, the designer should be able to integrate their design with aesthetic aspects and proper landscaping into their design. Cost effectiveness is a very important aspect in the design of stormwater management facilities. To produce a cost effective design, the designers should have a good understanding, wide knowledge and broad experience of MASMA concepts and its application. They must have knowledge on various design alternatives and suitable materials and products to be used as well as their availability and cost related to them. Cost effectiveness also related to constructability as difficulty in construction will increase cost. Cost effective requiring the cost consideration should cover the whole life span of the facilities. 69 The problem of inadequate space, unsuitable shape and unsuitable location of reserve provided for stormwater management of facilities is due to the failure to ascertain exactly the nature, types and the requirements of the stormwater management facilities during the planning stage. The effective involvement stormwater engineers at the planning stage will ensure suitable reserve is provided accordingly. 6.2.3 Problems in MASMA implementation at the Construction Stage Three most significant problems at the construction stage is ‘unavailability of local product of the facilities proposed by the designer’, ‘inadequate space for construction of stormwater facilities’ and ‘the contractor failed to construct erosion and sediment control and associated structures as approved’. These top three problems and their RI values are as shown in Table 6.3. RANK PROBLEMS RI 1 Unavailability of local product of the facilities proposed by the designer 0.51 2 Inadequate space for construction of SWM facilities 0.46 3 The contractor failed to construct erosion and sediment control and 0.46 associated structures as approved. Table 6.3: Ranking of Top 3 Problems in MASMA Implementation at Construction Stage The unavailability of local product of facilities proposed by designer means the designers does not ensure the availability of the products in the market before proposing the design or the products are not available in the market where it is difficult to suit the design requirement. This is also related to the availability of locally manufactured products as a replacement to the imported products. The inadequate space for construction of stormwater facilities is the outcome of the failure to give due 70 consideration on the space needed for the construction of the facilities during the planning and design stage. Erosion and sediment control structures is considered a temporary works. The failure of contractor to construct erosion and sediment control along with the associated structures as approved will depend on the developers and engineers to include them within the scope of contract and provide an adequate budget for it. This is also subject to sufficient enforcement by the authorities and proper supervision of the projects by the superintending officers during construction. 6.2.4 Problems in MASMA Implementation after Completion Three most significant problems after the completion of the project during the maintenance and operation of the facilities are ‘financial constraint on the part of authorities to finance the maintenance of stormwater management facilities and infrastructures’; ‘financial constraints on the part of developers to finance maintenance of stormwater management facilities and infrastructures’; and ‘poor or insufficient maintenance of the stormwater management facilities’. Other three problems that are also considered significant, ‘thefts and corrosions of metal used for stormwater management facilities’; ‘misuse and vandalism to the stormwater management facilities by the publics’; and ‘stormwater management SWM Facilities constructed are difficult to maintain’. These top six problems and their RI values are as shown in Table 6.1. All the first three problems are related to proper and sufficient maintenance to stormwater management facilities. Inadequate budget provided by the authorities and developers will result in poor and insufficient maintenance of the facilities. Sufficient budget should be allocated by the developers who construct the facilities to maintain them immediately after completion before handing them over to the authorities. The authorities should plan for proper and adequate maintenance of the facilities. This will 71 require adequate budget and human resources as well as suitable and enough machineries and equipments. Operation and maintenance of stormwater management infrastructures is funded by local authorities who derived their income through collection of assessment tax and grant from State and Federal Government. Due to limited resources available and priority given to other facilities such as roads, traffic signs lighting, building etc, only small portion of the allocation is allocated for the maintenance of stormwater management facilities. Other three problems that are also considered significant, ‘thefts and corrosions of metal used for stormwater management facilities’; ‘misuse and vandalism to the stormwater management facilities by the publics’; and ‘stormwater management facilities constructed are difficult to maintain’. Roots cause of these three problems are related to the design criteria and orientation; the choose construction materials; and prevention and precautionary measures taken to protect the structures. The designers, during the design stage should ensure proper protection of the facilities from the theft, corrosions, misuse and vandalism after the completion in the long run through proper choice of appropriate materials and consideration on safety of the infrastructures. The designers should ensure that the stormwater management facilities are designed for cheaper and easier maintenance. 6.3 Cost implication of MASMA compliance The result shows that in the opinion project engineers there are very significant increase in construction and maintenance costs and moderately significant increase in erosion and sediment control structures (ESCS) construction cost. There is only slightly significant increase in consultancy cost of the project. For comparison, RI values of all project cost components are tabulated in Table 6.4 72 RANK PROJECT COST COMPONENT RI 1 Construction cost of SWM facilities 0.65 2 Maintenance cost of SWM facilities 0.64 3 Erosion and sediment control structures cost 0.55 4 Consultancy cost for SWM facilities 0.38 . Table 6.4: Ranking Of Relative Index Value for Cost Implication of MASMA Compliance The results indicate that there are very significant increased in construction and maintenance costs due to MASMA compliance. The increase in maintenance cost is easier to understand because MASMA promote the utilization of earth main drains, swales, detention storage, gross pollutant traps and on-site traps which need regular and continuous maintenance. The increase in construction cost is a bit difficult to explain and justify which sometimes contradictory among the engineers. This is also related to the fact that there is just slight increased in consultancy cost of the project. In normal practice the increased in the construction cost will automatically increase the consultancy cost because consultancy fees are normally based on project cost. Or may be in the case of property development project, the practice of charging the consultancy fees are based on the land size of the project and not on the individual component of the infrastructures. MASMA promoted earth main conveyance, swales and reduction in drain size with the provision of detention storage and the use of infiltration basins and porous pavement. This should reduce the construction cost significantly if all these proposals properly implemented in the design of the project. Except the commonly used of detention ponds and wetlands, the engineers still prefer to use concrete main conveyance drains. Earth main conveyance drain, swales, dry pond and porous pavement, and infiltration drain are very rarely used. 73 The moderate increase in ESCS construction cost is justifiable. This component is just a temporary structure manned to protect the site and downstream areas from the problems of erosion and sedimentation during construction. The needs for the construction of a proper structures certified by professional engineers and strict enforcement by the authorities has contributed in the cost increase. The structures must also be regularly and continuously maintained to ensure the performance. 6.4 Time implication of MASMA compliance The result shows that there are moderate delays due to the need to comply MASMA requirements all plan approvals, with Lay-out and Sub-division Plan approval and Drainage and Earthwork Plan approval of more significant. For comparison, RI values of all project cost components are tabulated in Table 6.5 RANK DELAY IN APPROVALS RI 1 Delay in layout and subdivision plan approval 0.58 2 Delay in drainage and earthwork plan approval 0.56 3 Delay in building and infrastructural plan approval 0.53 4 Delay in issuing of Certificate of Fitness for Occupation (CFO) 0.50 Table 6.5: Ranking of Relative Index Value for Delay in Plan Approvals The significant factors that contributed to the delays are due to repetitions in layout planning to comply with MASMA requirements; delays in receiving comment from the authorities; and repetitions in design to comply with MASMA requirements. For comparison, RI values of all project cost components are tabulated in Table 6.6 74 RANK DELAY FACTORS 1 Inconsistency of in enforcement of MASMA requirement between RI 0.64 states and districts 2 Delays in receiving comment from the authorities 0.59 3 Repetitions in design to comply with MASMA requirements 0.56 4 Repetitions in layout planning to comply with the MASMA 0.49 requirements 5 Fail to comply MASMA requirements 0.42 Table 6.6: Ranking of Relative Index Value for Factors Contribution to Delay in Plan Approvals The result shows the close relationship of the approval of Lay-out and Subdivision and Drainage and Earthwork to MASMA implementation during the planning and design stage and the crucial role of the authorities. As the plans forwarded to the authorities, the promptness in replying with the application with clear and comprehensive comment is very crucial to avoid delay. After receiving these comments, the planners and engineers have to make changes and adjustments to the plans to suit the comments. Faster and clearer the comments received from authorities will expedite the planners’ and engineers’ tasks to amend the plans as required. 6.5 The Benefits of MASMA implementation to the developers Benefits of MASMA compliance with their respective RI values are shown in Table 6.7. The most significant benefit gained by the developers is the opportunity to use corridor, waterways and other SWM facilities to enhance environment and recreational use to add value to the property. 75 MASMA compliance has enhanced developers’ reputation and credibility to customers. The developers’ reputation and credibility could also be alleviated. Most buyers considered the commitment to buy a property as an important decision in their life and consider it seriously. They will only buy the property from the developers with high reputations and credibility to ensure a good return to their investment. True high reputation and credible developers they expect for house with high quality construction, safe, convenience and pleasing to stay. MASMA compliance also reduced complaints from the publics and authorities during and after construction. Reduction of complaints is one of the important targets of RANK 1 BENEFITS Drainage corridor, waterways and other SWM facilities can be properly RI 0.71 planned to enhance environment and recreational use to add value to the property. 2 MASMA compliance enhanced developers' reputation and credibility to 0.62 customers 3 MASMA compliance enhanced the marketability of the property 0.58 4 MASMA compliance reduced complaints from the publics and 0.55 authorities during and after construction 5 MASMA compliance enhanced value of the property 0.53 6 Water from ponds and wetlands constructed can be used as water source 0.49 for watering plants and other uses Table 6.7: Ranking of Relative Index Value for Benefits of MASMA Compliance to Developer 76 the high reputation and credible developers and contractors. The complaints are usually concerning the safety and quality of the construction, flooding and sedimentation to downstream areas and environmental degradation. MASMA compliance has also enhanced the marketability of the property. MASMA compliance project will attract customers to buy property with recreation areas, gardens with water channels and streams and other pleasant environment integrated with stormwater facilities and infrastructures. 6.6 The Benefits of MASMA implementation to the property owners The ranking of Relative Index values for benefits of MASMA compliance to property owners is appeared in Table 6.8. The result indicates that the project engineers have agreed with the property owners that the benefit of MASMA implementation and compliance. The most significant benefit is the reduction in the nuisance of flooding in the project and downstream areas. Reduction of floods is one of the important aspects of MASMA implementation. MASMA compliance with proper integration with aesthetically designed landscape and spacious green areas creates pleasing and healthy environments that benefited the buyers. The stormwater management facilities constructed in compliance the MASMA can be used for access, and sports, recreational and social activities. MASMA compliance has also improves public safety. The public safety enhanced through the preference of using pipe drain, earth main conveyance drains and swales, safe design criteria and gentle slopes and shallow depth in waterways and pond. 77 RANK 1 BENEFIT MASMA compliance reduce the nuisance of flooding to the owners in RI 0.72 the project and downstream areas 2 MASMA compliance with proper integration with aesthetically designed 0.68 landscape and spacious green areas creates pleasing and healthy environments 3 SWM facilities constructed can be used for access, and sports, 0.62 recreational and social activities 4 MASMA compliance improves public safety 0.58 5 Property owners benefited from water saving through rainwater 0.38 harvesting/storage. Table 6.8: Ranking of RI Values for Benefits of MASMA Compliance to Property Owners The finding shows that the property owners do not benefit significantly from water saving through rainwater harvesting and storage as promoted in the MASMA. This indicates that in a larger projects, wet ponds are widely use as suggested and preferred by DID instead of individual storage tanks preferred in smaller projects. This deferred the owners from the advantage of water saving through the stormwater harvesting and storage. 6.7 Summary The results of the study identify several problems in MASMA implementation in Selangor dan Negeri Sembilan .The problems are encountered at all project development stages. Many problems encountered during maintenance stage, and the problems are 78 more serious than of other stages. There are very significant increases in construction and maintenance cost and moderately increase in erosion and sediment control structure construction cost. It is found that moderately delays encountered due to the need to comply MASMA requirements of all plan approvals, with the delay in Lay-out and Subdivision Plan approval and Drainage and Earthwork Plan approval of more significant. The significant factors that contributed to the delays are due to repetitions in layout planning and repetition in design to comply with MASMA requirements, and delay in receiving comments from the authorities. Developers and property owners benefit significantly from the implementation of MASMA in their projects. CHAPTER VII CONCLUSION AND RECOMMENDATION 7.1 Introduction This chapter highlights the summary of the findings in relation to the objectives of the study, problems encountered during the course of the study and the recommendations for the improvement of MASMA implementation and suggestions for the future research works. 7.2 Conclusion Through this study the following objectives which are highlighted in Chapter I have been successfully achieved. x To identify and establish problems in MASMA implementation in property development projects; x To identify the cost implication of MASMA compliance to property development projects; 80 x To identify time implication of MASMA compliance to property development projects; and x To identify the benefits of the MASMA compliance to the developers and property owners of projects. To identify and establish problems in MASMA implementation in property development projects The study has successfully identified and established the problems of MASMA implementation to the property development project. From the top twelve most significant problems, it is identified and established that six of the problems occurred during the maintenance stage; three during the planning stage; two at the design stage; and one at the construction stage. The problems at the planning stage are related to the conflicting use of open space and suitable area, inconsistency in enforcement between states and district; and failure to properly consider the appropriate types of stormwater management facilities during the planning stage. Failures to take into consideration on ecological aspects, aesthetic and landscaping; inadequate reserve, unsuitable shape and unsuitable location of reserve; and cost effectiveness of the design are the main problems at the design stage. At the construction stage, there are problems of the unavailability of local stormwater management products, inadequate space for construction, and the failure to construct erosion and sediment control structures. Financial constraints of the authorities and developers; poor or insufficient maintenance; and corrosions, thefts, misuse and vandalism to the constructed stormwater management facilities are the serious problems encountered after the completion of projects. 81 To identify the cost implication of MASMA compliance to property development projects The cost implication of MASMA compliance to property development project has been successfully identified. It is identified that there are an increase in four component costs of the project with the construction cost, maintenance cost, and erosion and sediment control structure construction cost indicated more significant influence. To identify time implication of MASMA compliance to property development projects The time implication of MASMA compliance has also been identified. There is significant delay of plan approvals and issuance of CFO due to the need to comply with the MASMA requirements. Among the four, Lay-out and Sub-division Plan approval and Drainage and Earthwork Plan approval show more significant delay than the others. The significant factors that contributed to the delays are due to repetitions in layout planning to comply with MASMA requirements; delays in receiving comment from the authorities; and repetitions in design to comply with MASMA requirements. To identify the benefits of the MASMA compliance to the developers and property owners Several significant benefit of MASMA compliance to the developers and property owners have also been identified. The most significant benefit gained by the developers is the opportunity to use drainage corridor, waterways and other Storm Water Management facilities to enhance environment and recreational use to add value to the property. MASMA compliance has also enhanced developers’ reputation and credibility to customers, reduced complaints from the publics and authorities during and after construction, and enhances the marketability of the property. 82 The most significant benefit of MASMA compliance to the property owners is the reduction in the nuisance of flooding in the project and downstream areas. MASMA compliance with proper integration with aesthetically designed landscape and spacious green areas creates pleasing and healthy environments that benefited the buyers. The stormwater management facilities constructed in compliance the MASMA can be used for access, and sports, recreational and social activities. MASMA compliance has also improves public safety. The property owners do not benefit significantly from water saving through rainwater harvesting and storage as promoted in the MASMA. 7.3 Problem encountered during the Study There are several problems encountered during the study. One of the problems is to enough samples for the study especially in Negeri Sembilan. Except a few large projects in Seremban, most of the projects are of the small scale, with the area of less than 10 hectare in land area. Some large projects are just at planning stage, and a few other projects did not take off due to financial constraints or not enough demand from the buyers. As the progress of the projects also are not directly monitored by DID, the information on the projects not easily available. There are the problems of the specialization of the project engineers of the projects and the changes in office addresses of the consultants. 83 7.4 Recommendation There are several recommendations that have been identified from this study as followed; Proper maintenance and integrate utilisation of the completed stormwater management facilities. The authorities should to look into the problems of maintenance of the completed stormwater management facilities. The problems are related to provision of adequate budget, man power and machineries for maintenance and operation of completed stormwater infrastructures and facilities. They also need to ensure and continuously monitor the safety and security of the facilities. The facilities should be properly integrated with the landscaping, beautification programs and recreational activities. Inconsistency in MASMA requirements and delivery system of related agencies The authorities should look into the problems of inconsistency in MASMA requirements in the different district and states of different agencies, and providing the timely comments and approval of the submissions by the developers to avoid delays in project implementation Innovation and creativity in the design of stormwater management facilities The developers and the design engineers should be more innovative and creative in planning and design of stormwater management facilities and infrastructures to realize the maximum benefit and achieve most economical out of them. The designer should creatively apply the alternatives provided in MASMA and combination of various design alternatives available to achieve the targets. 84 MASMA compliance made compulsory under Street Drainage and Building Act In view of the rapid pace of development, especially in states like Selangor and Negeri Sembilan, it is proposed that requirements contained in MASMA are made compulsory under Street Drainage and Building Act 1974, and enforced as a part of it by the Local Authorities. The planning department of Local Authority to give equal attention and importance to drainage plans and requirements in new development projects as they did to requirement for road and open space. If this is done less money will be spent for remedial and compensation due to the flooding. Research works in Stormwater Management and MASMA Application. There is really a need of continuous and intensive research and study by the responsible authorities and institution of higher learning on stormwater management especially the application of MASMA in Malaysia. As most of the MASMA guidelines, applications and concepts are adapted from developed and temperate countries with less storm intensity and annual precipitation, its application in Malaysia needs the adjustments to suit the local weather and other climatic conditions. The research on the suitable facilities and solutions to local problems of stormwater management should be initiated to improve the effectiveness and performance of MASMA implementation. There are also need to study the legal constraints, economic challenges, social concerns and hydrologic aspects in MASMA implementation as a multidisciplinary approach to the solution of stormwater management problems. 85 REFERENCES Abd. Majid, M. Z. and McCafer R (1997). Discussion of Assessment of Work Performance of Maintenance Contractors in Saudi Arabia. Journal of Management in Engineering, ASCE. Vol. 13, No. 5, pp91. Alreck P.L; Settle R.B (2004). The Survey Research Handbook 3rdedition. United States; McGraw-Hill/ Irwin Companies. Andoh, R.Y.G. (1994). Urban runoff: nature characteristics and control. J. IWEM, 4 August, pp 107-199 Andoh, R.Y.G and Lamb, T.J (1996). An integrated approach to management of urban drainage. In: Proc. WaterTECH, AWWA, Sydney, Australia, 27-28 May. Smisson, R.P.M. (1979). A review of the stormwater drainage of new development. IPHE, 8(1), 64-73 Roesner, L.A. (1999). Urban runoff pollution -Summary Thoughts- The state of practice today and for 21st Century. Wat. Sci. Tech. Vol 39. No 12, pp 353-360. 86 Braune, M.J and Wood, A(1999). Best Management Practices Applied to Urban Stormwater Runoff Quantity and Quality Control. Wat. Sci.Tech. Vol 39, No 12, pp. 117-121, 1999. Robin, G.V and Others (1997). A decision network for urban water management. Wat. Sci. Tech. Vol. 36, No 8-9, pp 111-115 Andoh, R.Y.G. and Declerck, C (1997). A cost effective approach to SWM. Wat. Sci. Tech. Vol. 36, No 8-9, pp307-311. Butler, D. and Parkinson, J. (1997). Towards Sustainable Urban Drainage. Wat. Sci. Tech. Vol 35, No 9, pp 53-63, 1997. Bettess, R. (1996). Infiltration drainage-manual of good practice. Construction Industry Research Information Association (CIRIA) report 156, London. Boller, M. (1998). Stormwater on new paths, EAWAG news, 44 E, 6-11. Chocat, B. (1997). Infiltration devices for urban drainage: A 50-year experience in Lyons. Proc. Engg. Found. Conf. Stormwater management-Creating sustainable water resources for the 21st Century, Malmo. 87 Geiger, W. And Dreiseitl, H.(1995). New Path for Stormwater. Handbook for retention and infiltration of stormwater at development Site. Oldenburg Verlag, Munchen, Germany. Gowler, A (1987). Experiences with stormwater infiltration from paved areas. Beridite der ATV e.v., 38, 381-394. Germany. Grotehusmann, D. (1995). Infiltration of stormwater under consideration of groundwater protection. PhD thesis, University of Hanover, Germany. Grotehusmann, D. Khelil, A. Sieker, F. And Uhl, M. (1994). Alternative urban drainage concept and design. Wat. Sci. Tech. 29(1/2), 277-282. Jefferies, C., Fleming, R., Dring, D. (1998). The costs and benefits of source control drainage. Proc. 3rd Int. Conf. NOVATECH, Lyon, Germany. Jefferies, C. et al. (1999). Assessing the Performance of BMPs in Scotland. Wat. Sci. Tech. Vol. 39, No 12, pp 123-131 Sieker, F. and Harms, R.W., (1998). Infiltration for stormwater drainage. Dokumentation und Schriftenreihe der ATV aus Wissenschaff und Praxiss, GFA, St. Augustine, Germany. 88 Uhl, M. and Harms, R.W., (1996). Water concept for a new district in Hanover. Proc. 7th Int. Conf. on Urban Storm Drainage, Hanover, 629-634. Urbanos, B. (1997). Design and Selection guidance for structural BMPs. Proc. Engg. Found. Conf. Stormwater management-Creating sustainable urban water resources for the 21st Century, Malmo. Ristenpart, E. (1999). Planning of stormwater management with a new model for drainage Best Management Practices. Wat. Sci. Tech. Vol.39, No 9. pp 253-260. Ellis, J.B. (1995). Integrated approach for achieving sustainable development of urban storm drainage. Wat. Sci. Tech. Vol. 32, No 1, pp 1-6 Drainage and Irrigation Department, (2000). Urban Stornwater Management Manual. DID Malaysia National Physical Plan (NPP) Report (2005). TCPD, Malaysia. 89 APPENDIX A Typical Stormwater Management Measures 90 APPENDIX B 91 APPENDIX C 92 APPENDIX D For Researcher: ID Number …………………………………… District …………………………………... State …………………………………... Date sent ………………………………….. Date received …………………………………. QUESTIONNAIRE IMPLEMENTATION OF URBAN STORMWATER MANAGEMENT MANUAL FOR MALAYSIA (MASMA) TO PROPERTY DEVELOPMENT PROJECTS Dear Project Engineer / Respondent; The Urban Stormwater Management Manual for Malaysia or Manual Saliran Mesra Alam (MASMA) has been commissioned by DID in year 2000 to replace the earlier manual Urban Drainage Design Standard for Peninsular Malaysia, Planning and Design Procedures No 1 published in 1975. In June 2000, the Cabinet has directed that the manual to be adopted throughout the country starting 1st January 2001. The new manual, MASMA is an important milestone and a new direction for storm water management in urban and rural areas in Malaysia. MASMA gives a comprehensive, broad and flexible approaches, strategies and guidelines for the current and future storm water management in terms of quantity and quality control for environmental enhancement and sustainable development. As MASMA utilizes the concept of stormwater management control at source as against the rapid disposal concept, the implementation posts a significant challenge to regulators, planners, designers, developers and contractors who are involved in providing storm water management facilities. This questionnaire is a part of a study on “The Implementation of Urban Stormwater Management Manual for Malaysia (MASMA) to Property Development Projects”. 93 The objectives of the study are to identify and establish the problems of MASMA implementation and to identify its implications on project cost and time. The study will also identify the benefit of MASMA compliance to the developers and property owners of the project. Your project is selected for the reason that the project has been planned, designed and constructed in accordance to MASMA requirements. The respondent is expected to be the management representative who speaks on behalf of the project. The questionnaire is designed so that you can complete it very quickly and easily. It takes a few minutes for you to check off your answers and tick the numbers. You can absolutely sure that all the information you provide is strictly confidential, and the identity of the project would not be disclosed in any circumstances. Your answers would be used with other selected projects for statistical analysis only. This is an independent – academic study designed for the interest of the manual users and related parties and the policy makers; and meant to establish a win-win situation. Your experience is indeed necessary to be sure that the outcome of the study are useful to policy makers and would bring benefit to the DID and other government departments and thus the environment. To enable the researcher to meet the dateline of the study, please complete the questionnaire and return it by 15th October 2006. Upon completing the questionnaire, please post it to the researcher using the envelope provided or send back via facsimile. Again, thank you for your co-operation and participation in the study. For further information, please contact: Mohd Yazid bin Abdullah Project Director, College Agriculture Malaysia, Majlis Latihan Pertanian Kebangsaan (NATC) Aras 3, Blok 4G1, Wisma Tani, Kementerian Pertanian dan Industri Asas Tani Malaysia, Pusat Pentadbiran Kerajaan Persekutuan, 62624 PUTRAJAYA. Tel: 013 934 0497(HP) 03 8870 1687(Off). E-mail: iryazid@yahoo.com.my. Facsimile no: 03 8870 1699 94 THE QUESTIONNAIRE ON THE IMPLEMENTATION OF URBAN STORMWATER MANAGEMENT MANUAL FOR MALAYSIA (MASMA) TO PROPERTY DEVELOPMENT PROJECTS 1. This questionnaire consists of five sections, A, B, C, D, and E x Section A: Project background and detail information x Section B: Problems in MASMA implementation to property development project. x Section C: Cost implication of MASMA compliance to ‘property development project x Section D: Time implication of MASMA compliance to property development project. x Section E: Benefits of MASMA compliance to the developers and property owners of the project. 2. MASMA means Urban Stormwater Management Manual for Malaysia 2000 3. SWM means storm water management SECTION A: PROJECT BACKGROUND AND DETAIL INFORMATION Please fill in the information about the project. 1. Name of the project: ………………………………………………………………………….. ………………………………………………………………………….. 2. Project Developer …………………………………………………………………………… 3. Project Location: State: ………… District: …………………………….. 4. Project land area: …………………….. Ha. 95 For no. 5 to no. 9, please tick (/) in the appropriate boxes 5. Project development components: 1. Shop houses/offices 2. Link residential houses 3. Semi-detached houses 4. Bungalow 5 Apartment/condominium 6 Factories 7 School 6. Project durations: 1. 2. 3. 4. 2 years or less 2 to 3 years 3 to 4 years 4 years and above 7. Project start: 1. 2. 3. 4. 5. 6. 7. 2000 and before 2001 2002 2003 2004 2005 2006 8. Project status: 1. 2. 3. 4. Planning stage Detail design stage Construction stage Completed 9. Stormwater management components in the project: 1. 2. 3. 4. 5. 6. 7. 8. Main conveyance(concrete drains) Main conveyance(earth drains) Main conveyance (pipe drains) Swales Wet pond and wetlands Dry pond and porous pavement Infiltration trench, filter drains, and soak away Gross pollutant traps (GPT) 96 SECTION B: PROBLEMS IN MASMA IMPLEMENTATION TO PROPERTY DEVELOPMENT PROJECTS (The statements concerned problems faced by the developers and the consulting engineers in complying MASMA requirements. In your experience in this project, how significant are these problems affecting the project implementation? Please tick your appropriate response using the scale below) 1- No significant problem 4- Very significant problem 2- Slightly significant problem 5- Extremely significant problem 3- Moderately significant problem a) Problems in MASMA implementation at planning stage 1. 2. 3. 4. 5. 1 2 3 4 5 1 2 3 4 5 Conflicting need for suitable site and open space for stormwater management facilities and other uses Inconsistency in enforcement of requirement between states and districts No proper consideration on types of SWM facilities required during planning stage Unsuitable location, size and shape of reserve provided for SWM facilities No proper consideration on natural drainage in the preparation of layout plans. b) Problems in MASMA implementation at design stage 1 2. 3. 4. 5. 6. 7. 8. Inappropriate and improper design of SWM facilities Inadequate space, unsuitable shape and unsuitable location of reserve provided for SWM of facilities Lack of safety concern in the design of facilities Inexperience and lack of knowledge of the designers in choosing appropriate design alternatives Lack of consideration on constructability of SWM facilities during the design stage SWM facilities designed without proper consideration on ecological aspects for habitats, aesthetic and landscaping. Unavailability or limited choice of local SWM products SWM facilities designed do not cost effective 97 c) Problems of MASMA implementation at the construction stage 1. 2. 3. 4. 5. 6. 7. 8. 1 2 3 1 2 3 4 5 SWM facilities difficult to construct or install. Inadequate space for construction of SWM facilities Unavailability of skilled and experience of workers Unavailability of suitable equipment and Machineries for construction/installation of SWM facilities Unavailability of local product of the facilities proposed by the designer Failure of the contractor to construct SWM facilities in accordance to design plans and technical specifications The contractor failed to construct erosion and sediment control and associated structures as approved. Erosion and sediment control structures fail to perform d) Problems of MASMA implementation after completion. 1. 2. 3. 4. 5. 6. SWM Facilities constructed are difficult to maintain SWM Facilities fail to function and perform as intended Misuse and vandalism to the SWM facilities by the publics Safety and health hazard from ponds and wetlands Poor or insufficient maintenance of the SWM facilities Financial constraints on the part of developers to finance maintenance of SWM facilities and infrastructures 7. Financial constraint on the part of authorities to finance maintenance of SWM facilities and infrastructures. 8. Unavailability of suitable equipment and machineries for maintenance works 9. Limited access and land space for maintenance works 10 Thefts and corrosions of metal used for SWM facilities 4 5 98 SECTION C: COST IMPLICATION OF MASMA COMPLIANCE TO HOUSING DEVELOPMENT PROJECTS Implementation of MASMA may have resulted in increasing of the project cost. In your experience in this project comparing the previous manual with MASMA, please indicate how significant is the increase in the cost to the developer on each cost component below. 1- No significant increase 4- Very significant increase 2- Slightly significant increase 5- Extremely significant increase 3- Moderately significant increase 1 1. 2. 3. 4. 2 3 4 5 Consultancy cost for SWM facilities Construction cost of SWM facilities Erosion and sediment control structures cost Maintenance cost of SWM facilities SECTION D: TIME IMPLICATION OF MASMA COMPLIANCE TO PROPERTY DEVELOPMENT PROJECTS a). Delay of project plan approvals and issuance of Certificate of Fitness for Occupation. The statements below concerning delay of project approvals due to the need of complying MASMA requirements as compared to your original project schedule. How significant is the delay of the approval plans and CFO as a result of needs to comply MASMA requirements? Please tick your appropriate response using the scale below) 1- No significant delay 4- Very significant delay 2- Slightly significant delay 5- Extremely significant delay 3- Moderately significant delay 1 1. 2. 3. 4. Delay in layout and subdivision plan approval Delay in drainage and earthwork plan approval Delay in building and infrastructural plan approval Delay in issuing of Certificate of Fitness for Occupation(CFO) 2 3 4 5 99 a). Factors contributing to delays of approvals The MASMA compliance may cause delay to your project schedule. In your project, how significant are these factors contribute to the delays? Please tick your appropriate response using the scale below 1- No significant contribution 4- Very significant contribution 2- Slightly significant contribution 5- Extremely significant contribution 3- Moderately significant contribution 1 1. 2. 3. 4. 5. 6. 2 3 4 5 Delays in receiving comment from the authorities Failure of the planner to comply MASMA requirements Failure of the designer to comply MASMA requirements Inconsistency of in enforcement of MASMA requirement between states and districts Repetitions in layout planning to comply with the MASMA requirements Repetitions in design to comply with MASMA requirements SECTION E: BENEFITS OF MASMA COMPLIANCE TO THE DEVELOPERS AND PROPERTY OWNERS OF DEVELOPMENT PROJECT (a). Benefits of MASMA compliance to the developers The statements below concerned the benefits of MASMA compliance to the developer of the project. In your experience in this project, please tick (/) from the scale 1 to 5 to show how much you agree or disagree with each statement) 1- Disagree 4- Very agree 2- Slightly agree 3- Moderately agree 5- Extremely agree 1 1. 2. 3. 4. 5. 6. Drainage corridor, waterways and other SWM facilities can be properly planned to enhance environment and recreational use to add value to the property. MASMA compliance enhanced developers’ reputation and credibility to customers MASMA compliance reduced complaints from the publics and authorities during and after construction Water from ponds and wetlands constructed can be used as water source for watering plants and other uses MASMA compliance enhanced the marketability of the property MASMA compliance enhanced value of the property 2 3 4 5 100 (b). Benefits of MASMA compliance to property owners. The statements below concerned the benefit of MASMA compliance to property owners. In your experience in the project, please tick (/) from the scale 1 to 5 below to show how much you agree or disagree with each statement 1- Disagree 4- Very agree 2- Slightly agree 3- Moderately agree 5- Extremely agree 1 1. 2. 3. 4. 5. 2 3 4 5 MASMA compliance reduce the nuisance of flooding to the owners in the project and downstream areas SWM facilities constructed can be used for access, and sports, recreational and social activities MASMA compliance improves public safety MASMA compliance with proper integration with aesthetically designed landscape and spacious green areas creates pleasing and healthy environments Property owners benefited from water saving through rainwater harvesting/storage. END OF QUESTIONAIRE Thank you very much for answering the questionnaire. I am indeed very grateful for the cooperation given. Please fold neatly, put into the stamped-self-addressed envelope provided and post it back to me as soon as possible or send back via facsimile to: 03-8870 1699. Your early reply is very much appreciated. Details of the respondent, Name: …………………………………………………………………. Company: ……………………………………………………………… Designation: ……………………………………………………………. Address: ……………………………………………………………….. ……………………………………………………………….. Contacts: Tel: ……………………. (HP) ……………………… (Off) E-mail: …………………………………………………….. 101 APPENDIX E Project Background Project Duration Valid 2 years or less Frequency 1 Percent 3.8 Valid Percent 3.8 Cumulative Percent 3.8 6 23.1 23.1 26.9 2 to 3 years 3 to 4 years 1 3.8 3.8 30.8 4 years and above 18 69.2 69.2 100.0 Total 26 100.0 100.0 Project Start Valid Frequency 6 Percent 23.1 Valid Percent 23.1 Cumulative Percent 23.1 2001 3 11.5 11.5 34.6 2002 7 26.9 26.9 61.5 2003 6 23.1 23.1 84.6 2005 3 11.5 11.5 96.2 2006 1 3.8 3.8 100.0 Total 26 100.0 100.0 2000 and before Project status Valid Cumulative Percent 7.7 Detail design stage Frequency 2 Percent 7.7 Valid Percent 7.7 Construction stage 20 76.9 76.9 84.6 4 15.4 15.4 100.0 26 100.0 100.0 Completed Total 102 APPENDIX F Frequency Analysis of Problems, Cost, Time and Benefit in MASMA Implementation Main conveyance (concrete drains) Valid yes Frequency 23 Missing System 3 11.5 26 100.0 Total Percent 88.5 Valid Percent 100.0 Cumulative Percent 100.0 Main conveyance(earth drains) Valid yes Frequency 4 Missing System 22 84.6 26 100.0 Total Percent 15.4 Valid Percent 100.0 Cumulative Percent 100.0 Main conveyance (pipe drains) Valid yes Frequency 11 Missing System 15 57.7 26 100.0 Percent 7.7 Total Percent 42.3 Valid Percent 100.0 Cumulative Percent 100.0 Valid Percent 100.0 Cumulative Percent 100.0 Valid Percent 100.0 Cumulative Percent 100.0 Swales Valid yes Frequency 2 Missing System 24 92.3 26 100.0 Total Wet pond and wetlands Valid yes Frequency 21 Missing System 5 19.2 26 100.0 Total Percent 80.8 Dry pond and porous pavement Valid yes Frequency 7 Missing System 19 73.1 26 100.0 Total Percent 26.9 Valid Percent 100.0 Cumulative Percent 100.0 103 Infiltration trench, filter drains, and soak away Valid yes Frequency 1 Missing System 25 96.2 26 100.0 Total Percent 3.8 Valid Percent 100.0 Cumulative Percent 100.0 Gross pollutant traps (GPT) Valid yes Frequency 10 Missing System 16 61.5 26 100.0 Total Percent 38.5 Valid Percent 100.0 Cumulative Percent 100.0 a) Problems in MASMA implementation at planning stage Conflicting need for suitable site and open space for stormwater management facilities and other uses Valid Cumulative Percent No significant problem Frequency 3 Percent 11.5 Valid Percent 11.5 Slightly significant problem 6 23.1 23.1 34.6 Moderately significant problem 9 34.6 34.6 69.2 Very significant problem 6 23.1 23.1 92.3 Extremely significant problem 2 7.7 7.7 100.0 Total 26 100.0 100.0 11.5 Inconsistency in enforcement of requirement between states and districts Valid No significant problem Frequency 6 Percent 23.1 Valid Percent 23.1 Cumulative Percent 23.1 Slightly significant problem 3 11.5 11.5 34.6 Moderately significant problem 7 26.9 26.9 61.5 Very significant problem 6 23.1 23.1 84.6 Extremely significant problem 4 15.4 15.4 100.0 Total 26 100.0 100.0 104 No proper consideration on types of SWM facilities required during planning stage Valid No significant problem Frequency 8 Percent 30.8 Valid Percent 30.8 Cumulative Percent 30.8 Slightly significant problem 3 11.5 11.5 42.3 Moderately significant problem 7 26.9 26.9 69.2 Very significant problem 5 19.2 19.2 88.5 Extremely significant problem 3 11.5 11.5 100.0 Total 26 100.0 100.0 Unsuitable location, size and shape of reserve provided for SWM facilities Valid Cumulative Percent No significant problem Frequency 7 Percent 26.9 Valid Percent 26.9 Slightly significant problem 10 38.5 38.5 65.4 Moderately significant problem 5 19.2 19.2 84.6 Very significant problem 3 11.5 11.5 96.2 Extremely significant problem 1 3.8 3.8 100.0 Total 26 100.0 100.0 26.9 No proper consideration on natural drainage in the preparation of layout plans. Valid No significant problem Frequency 11 Percent 42.3 Valid Percent 42.3 Cumulative Percent 42.3 Slightly significant problem 3 11.5 11.5 53.8 Moderately significant problem 6 23.1 23.1 76.9 Very significant problem 3 11.5 11.5 88.5 Extremely significant problem 3 11.5 11.5 100.0 Total 26 100.0 100.0 b) Problems in MASMA implementation at design stage Inappropriate and improper design of SWM facilities Valid No significant problem Frequency 12 Percent 50.0 Valid Percent 50.0 Cumulative Percent 50.0 Slightly significant problem 5 20.8 20.8 70.8 Moderately significant problem 5 20.8 20.8 91.7 Very significant problem 2 8.3 8.3 100.0 Total 24 100.0 100.0 105 Inadequate space, unsuitable shape and unsuitable location of reserve provided for SWM of facilities Valid No significant problem Frequency 6 Percent 25.0 Valid Percent 25.0 Cumulative Percent 25.0 Slightly significant problem 6 25.0 25.0 50.0 Moderately significant problem 7 29.2 29.2 79.2 Very significant problem 4 16.7 16.7 95.8 Extremely significant problem 1 4.2 4.2 100.0 Total 24 100.0 100.0 SWM facilities designed without proper consideration on ecological aspects for habitats, aesthetic and landscaping. Valid No significant problem Frequency 6 Percent 25.0 Valid Percent 25.0 Cumulative Percent 25.0 Slightly significant problem 5 20.8 20.8 45.8 Moderately significant problem 8 33.3 33.3 79.2 Very significant problem 4 16.7 16.7 95.8 Extremely significant problem 1 4.2 4.2 100.0 Total 24 100.0 100.0 No significant problem Frequency 7 Percent 29.2 Valid Percent 29.2 Cumulative Percent 29.2 Slightly significant problem 5 20.8 20.8 50.0 Moderately significant problem 5 20.8 20.8 70.8 Very significant problem 6 25.0 25.0 95.8 Extremely significant problem 1 4.2 4.2 100.0 Total 24 100.0 100.0 SWM facilities designed do not cost effective Valid 106 c) Problems of MASMA implementation at the construction stage SWM facilities difficult to construct or install. Valid Missing No significant problem Frequency 13 Percent 50.0 Valid Percent 52.0 Cumulative Percent 52.0 Slightly significant problem 4 15.4 16.0 68.0 Moderately significant problem 5 19.2 20.0 88.0 Very significant problem 3 11.5 12.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total Unavailability of skilled and experience of workers Valid Missing No significant problem Frequency 8 Percent 30.8 Valid Percent 33.3 Cumulative Percent 33.3 Slightly significant problem 10 38.5 41.7 75.0 Moderately significant problem 2 7.7 8.3 83.3 Very significant problem 4 15.4 16.7 100.0 Total 24 92.3 100.0 System 2 7.7 26 100.0 Total Unavailability of suitable equipment and Machineries for construction/installation of SWM facilities Valid Missing Total Cumulative Percent No significant problem Frequency 8 Percent 30.8 Valid Percent 32.0 Slightly significant problem 11 42.3 44.0 76.0 Moderately significant problem 2 7.7 8.0 84.0 Very significant problem 4 15.4 16.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 32.0 107 Unavailability of local product of the facilities proposed by the designer Valid Missing No significant problem Frequency 7 Percent 26.9 Valid Percent 28.0 Cumulative Percent 28.0 Slightly significant problem 2 7.7 8.0 36.0 Moderately significant problem 12 46.2 48.0 84.0 Very significant problem 3 11.5 12.0 96.0 Extremely significant problem 1 3.8 4.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total Failure of the contractor to construct SWM facilities in accordance to design plans and technical specifications Valid Missing No significant problem Frequency 6 Percent 23.1 Valid Percent 24.0 Cumulative Percent 24.0 Slightly significant problem 12 46.2 48.0 72.0 Moderately significant problem 5 19.2 20.0 92.0 Very significant problem 2 7.7 8.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total The contractor failed to construct erosion and sediment control and associated structures as approved. Valid Missing Total No significant problem Frequency 5 Percent 19.2 Valid Percent 20.0 Cumulative Percent 20.0 Slightly significant problem 12 46.2 48.0 68.0 Moderately significant problem 5 19.2 20.0 88.0 Very significant problem 2 7.7 8.0 96.0 Extremely significant problem 1 3.8 4.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 108 Erosion and sediment control structures fail to perform Valid Missing No significant problem Frequency 10 Percent 38.5 Valid Percent 40.0 Cumulative Percent 40.0 Slightly significant problem 5 19.2 20.0 60.0 Moderately significant problem 7 26.9 28.0 88.0 Very significant problem 1 3.8 4.0 92.0 Extremely significant problem 2 7.7 8.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total d) Problems of MASMA implementation after completion SWM Facilities constructed are difficult to maintain Valid Missing No significant problem Frequency 7 Percent 26.9 Valid Percent 28.0 Cumulative Percent 28.0 Slightly significant problem 4 15.4 16.0 44.0 Moderately significant problem 9 34.6 36.0 80.0 Very significant problem 5 19.2 20.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total SWM Facilities fail to function and perform as intended Valid Missing Total No significant problem Frequency 7 Percent 26.9 Valid Percent 28.0 Cumulative Percent 28.0 Slightly significant problem 8 30.8 32.0 60.0 Moderately significant problem 6 23.1 24.0 84.0 Very significant problem 3 11.5 12.0 96.0 Extremely significant problem 1 3.8 4.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 109 Misuse and vandalism to the SWM facilities by the publics Valid Missing No significant problem Frequency 8 Percent 30.8 Valid Percent 32.0 Cumulative Percent 32.0 Slightly significant problem 3 11.5 12.0 44.0 Moderately significant problem 6 23.1 24.0 68.0 Very significant problem 6 23.1 24.0 92.0 Extremely significant problem 2 7.7 8.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total Safety and health hazard from ponds and wetlands Valid Missing Cumulative Percent No significant problem Frequency 7 Percent 26.9 Valid Percent 28.0 Slightly significant problem 9 34.6 36.0 64.0 Moderately significant problem 5 19.2 20.0 84.0 Very significant problem 4 15.4 16.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total 28.0 Poor or insufficient maintenance of the SWM facilities Valid Missing Total No significant problem Frequency 3 Percent 11.5 Valid Percent 12.0 Cumulative Percent 12.0 Slightly significant problem 2 7.7 8.0 20.0 Moderately significant problem 7 26.9 28.0 48.0 Very significant problem 10 38.5 40.0 88.0 Extremely significant problem 3 11.5 12.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 110 Financial constraints on the part of developers to finance maintenance of SWM facilities and infrastructures Valid Missing No significant problem Frequency 1 Percent 3.8 Valid Percent 4.0 Cumulative Percent 4.0 Slightly significant problem 3 11.5 12.0 16.0 Moderately significant problem 8 30.8 32.0 48.0 Very significant problem 11 42.3 44.0 92.0 Extremely significant problem 2 7.7 8.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total Financial constraint on the part of authorities to finance maintenance of SWM facilities and infrastructures. Valid Missing No significant problem Frequency 1 Percent 3.8 Valid Percent 4.0 Cumulative Percent 4.0 Slightly significant problem 3 11.5 12.0 16.0 Moderately significant problem 5 19.2 20.0 36.0 Very significant problem 14 53.8 56.0 92.0 Extremely significant problem 2 7.7 8.0 100.0 Total 25 96.2 100.0 System 1 3.8 Total 26 100.0 Unavailability of suitable equipment and machineries for maintenance works Valid Missing Total No significant problem Frequency 8 Percent 30.8 Valid Percent 32.0 Cumulative Percent 32.0 Slightly significant problem 8 30.8 32.0 64.0 Moderately significant problem 4 15.4 16.0 80.0 Very significant problem 5 19.2 20.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 111 Limited access and land space for maintenance works Valid Missing No significant problem Frequency 11 Percent 42.3 Valid Percent 44.0 Cumulative Percent 44.0 Slightly significant problem 10 38.5 40.0 84.0 Moderately significant problem 2 7.7 8.0 92.0 Very significant problem 2 7.7 8.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total Thefts and corrosions of metal used for SWM facilities Valid Missing No significant problem Frequency 3 Percent 11.5 Valid Percent 12.0 Cumulative Percent 12.0 Slightly significant problem 6 23.1 24.0 36.0 Moderately significant problem 8 30.8 32.0 68.0 Very significant problem 5 19.2 20.0 88.0 Extremely significant problem 3 11.5 12.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total COST IMPLICATION OF MASMA COMPLIANCE Consultancy cost for SWM facilities Valid Missing Total No significant increase Frequency 10 Percent 38.5 Valid Percent 40.0 Cumulative Percent 40.0 Slightly significant increase 8 30.8 32.0 72.0 Moderately significant increase 6 23.1 24.0 96.0 Very significant increase 1 3.8 4.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 112 Construction cost of SWM facilities Valid Missing Frequency Percent Valid Percent Cumulative Percent Slightly significant increase 4 15.4 16.0 16.0 Moderately significant increase 12 46.2 48.0 64.0 Very significant increase 8 30.8 32.0 96.0 Extremely significant increase 1 3.8 4.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 No significant increase Frequency 2 Percent 7.7 Valid Percent 8.0 Cumulative Percent 8.0 Slightly significant increase 3 11.5 12.0 20.0 Moderately significant increase 9 34.6 36.0 56.0 Very significant increase 10 38.5 40.0 96.0 Extremely significant increase 1 3.8 4.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total Maintenance cost of SWM facilities Valid Missing Total TIME IMPLICATION OF MASMA COMPLIANCE a) Delay of Project Plan Approvals Delay in layout and subdivision plan approval Valid Missing Total No significant delay Frequency 7 Percent 26.9 Valid Percent 28.0 Cumulative Percent 28.0 Slightly significant delay 2 7.7 8.0 36.0 Moderately significant delay 7 26.9 28.0 64.0 Very significant delay 5 19.2 20.0 84.0 Extremely significant delay 4 15.4 16.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 113 Delay in drainage and earthwork plan approval Valid Missing No significant delay Frequency 5 Percent 19.2 Valid Percent 20.0 Cumulative Percent 20.0 Slightly significant delay 5 19.2 20.0 40.0 Moderately significant delay 7 26.9 28.0 68.0 Very significant delay 6 23.1 24.0 92.0 Extremely significant delay 2 7.7 8.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total Delay in building and infrastructural plan approval Valid Missing No significant delay Frequency 5 Percent 19.2 Valid Percent 20.0 Cumulative Percent 20.0 Slightly significant delay 9 34.6 36.0 56.0 Moderately significant delay 3 11.5 12.0 68.0 Very significant delay 6 23.1 24.0 92.0 Extremely significant delay 2 7.7 8.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Total Delay in issuing of Certificate of Fitness for Occupation(CFO) Valid Missing Total No significant delay Frequency 8 Percent 30.8 Valid Percent 32.0 Cumulative Percent 32.0 Slightly significant delay 7 26.9 28.0 60.0 Moderately significant delay 3 11.5 12.0 72.0 Very significant delay 4 15.4 16.0 88.0 Extremely significant delay 3 11.5 12.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 114 b) Factors Contributing to Delay of Approval Delays in receiving comment from the authorities Valid No significant contribution Frequency 5 Percent 19.2 Valid Percent 19.2 Cumulative Percent 19.2 Slightly significant contribution 3 11.5 11.5 30.8 Moderately significant contribution 10 38.5 38.5 69.2 4 15.4 15.4 84.6 Extremely significant contribution 4 15.4 15.4 100.0 Total 26 100.0 100.0 Very significant contribution Failure of the planner to comply MASMA requirements Valid No significant contribution Frequency 8 Percent 30.8 Valid Percent 30.8 Cumulative Percent 30.8 Slightly significant contribution 5 19.2 19.2 50.0 Moderately significant contribution 7 26.9 26.9 76.9 5 19.2 19.2 96.2 Extremely significant contribution 1 3.8 3.8 100.0 Total 26 100.0 100.0 Very significant contribution Failure of the designer to comply MASMA requirements Valid No significant contribution Percent 38.5 Valid Percent 40.0 Slightly significant contribution 7 26.9 28.0 68.0 Moderately significant contribution 5 19.2 20.0 88.0 1 3.8 4.0 92.0 Extremely significant contribution 2 7.7 8.0 100.0 Total 25 96.2 100.0 System 1 3.8 26 100.0 Very significant contribution Missing Total Cumulative Percent Frequency 10 40.0 115 Inconsistency of in enforcement of MASMA requirement between states and districts Valid No significant contribution Frequency 3 Percent 11.5 Valid Percent 11.5 Cumulative Percent 11.5 Slightly significant contribution 6 23.1 23.1 34.6 Moderately significant contribution 6 23.1 23.1 57.7 5 19.2 19.2 76.9 Extremely significant contribution 6 23.1 23.1 100.0 Total 26 100.0 100.0 Very significant contribution Repetitions in layout planning to comply with the MASMA requirements Valid No significant contribution Frequency 4 Percent 15.4 Valid Percent 15.4 Cumulative Percent 15.4 Slightly significant contribution 6 23.1 23.1 38.5 Moderately significant contribution 9 34.6 34.6 73.1 5 19.2 19.2 92.3 Extremely significant contribution 2 7.7 7.7 100.0 Total 26 100.0 100.0 Very significant contribution Repetitions in design to comply with MASMA requirements Valid Cumulative Percent No significant contribution Frequency 5 Percent 19.2 Valid Percent 19.2 Slightly significant contribution 5 19.2 19.2 38.5 Moderately significant contribution 6 23.1 23.1 61.5 8 30.8 30.8 92.3 Extremely significant contribution 2 7.7 7.7 100.0 Total 26 100.0 100.0 Very significant contribution 19.2 116 a) Benefits of MASMA compliance to developers Drainage corridor, waterways and other SWM facilities can be properly planned to enhance environment and recreational use to add value to the property. Valid Disagree Frequency 1 Percent 3.8 Valid Percent 3.8 Cumulative Percent 3.8 Slightly agree 4 15.4 15.4 19.2 Moderately agree 6 23.1 23.1 42.3 Very agree 10 38.5 38.5 80.8 Extremely agree 5 19.2 19.2 100.0 Total 26 100.0 100.0 MASMA compliance enhanced developers' reputation and credibility to customers Valid Disagree Frequency 3 Percent 11.5 Valid Percent 11.5 Cumulative Percent 11.5 Slightly agree 3 11.5 11.5 23.1 Moderately agree 10 38.5 38.5 61.5 Very agree 8 30.8 30.8 92.3 Extremely agree 2 7.7 7.7 100.0 Total 26 100.0 100.0 MASMA compliance reduced complaints from the publics and authorities during and after construction Valid Disagree Frequency 2 Percent 7.7 Valid Percent 7.7 Cumulative Percent 7.7 Slightly agree 7 26.9 26.9 34.6 Moderately agree 11 42.3 42.3 76.9 Very agree 4 15.4 15.4 92.3 Extremely agree 2 7.7 7.7 100.0 Total 26 100.0 100.0 Water from ponds and wetlands constructed can be used as water source for watering plants and other uses Valid Disagree Frequency 8 Percent 30.8 Valid Percent 30.8 Cumulative Percent 30.8 Slightly agree 7 26.9 26.9 57.7 Moderately agree 4 15.4 15.4 73.1 Very agree 6 23.1 23.1 96.2 Extremely agree 1 3.8 3.8 100.0 Total 26 100.0 100.0 117 MASMA compliance enhanced the marketability of the property Valid Disagree Frequency 2 Percent 7.7 Valid Percent 7.7 Cumulative Percent 7.7 Slightly agree 9 34.6 34.6 42.3 Moderately agree 8 30.8 30.8 73.1 Very agree 7 26.9 26.9 100.0 Total 26 100.0 100.0 MASMA compliance enhanced value of the property Valid Cumulative Percent Disagree Frequency 2 Percent 7.7 Valid Percent 7.7 Slightly agree 9 34.6 34.6 42.3 Moderately agree 11 42.3 42.3 84.6 Very agree 4 15.4 15.4 100.0 Total 26 100.0 100.0 7.7 b) Benefits of MASMA compliance to property owners. MASMA compliance reduce the nuisance of flooding to the owners in the project and downstream areas Valid Slightly agree Frequency 3 Percent 11.5 Valid Percent 11.5 Cumulative Percent 11.5 Moderately agree 9 34.6 34.6 46.2 Very agree 9 34.6 34.6 80.8 Extremely agree 5 19.2 19.2 100.0 Total 26 100.0 100.0 SWM facilities constructed can be used for access, and sports, recreational and social activities Valid Disagree Frequency 3 Percent 11.5 Valid Percent 11.5 Cumulative Percent 11.5 Slightly agree 4 15.4 15.4 26.9 Moderately agree 7 26.9 26.9 53.8 Very agree 12 46.2 46.2 100.0 Total 26 100.0 100.0 MASMA compliance improves public safety Valid Cumulative Percent Disagree Frequency 4 Percent 15.4 Valid Percent 15.4 Slightly agree 7 26.9 26.9 42.3 Moderately agree 5 19.2 19.2 61.5 Very agree 8 30.8 30.8 92.3 Extremely agree 2 7.7 7.7 100.0 Total 26 100.0 100.0 15.4 118 MASMA compliance with proper integration with aesthetically designed landscape and spacious green areas creates pleasing and healthy environments Valid Disagree Frequency 2 Percent 7.7 Valid Percent 7.7 Cumulative Percent 7.7 Slightly agree 4 15.4 15.4 23.1 Moderately agree 6 23.1 23.1 46.2 Very agree 10 38.5 38.5 84.6 Extremely agree 4 15.4 15.4 100.0 Total 26 100.0 100.0 Property owners benefited from water saving through rainwater harvesting/storage. Valid Cumulative Percent Disagree Frequency 12 Percent 46.2 Valid Percent 46.2 Slightly agree 6 23.1 23.1 69.2 Moderately agree 7 26.9 26.9 96.2 Very agree 1 3.8 3.8 100.0 Total 26 100.0 100.0 46.2 BB 1 2 3 4 5 6 7 8 No BA 1 2 3 4 5 No 14 7 13 9 10 6 5 8 FA 6 3 3 10 3 FA 23.08 11.54 11.54 38.46 11.54 % Slightly significant problem 9 7 7 5 6 FA 34.62 26.92 26.92 19.23 23.08 % Moderately significant problem 6 6 5 3 3 FA 23.08 23.08 19.23 11.54 11.54 % Very significant problem 53.85 26.92 50.00 34.62 38.46 23.08 19.23 30.77 % 5 6 8 8 8 6 12 5 FA 19.23 23.08 30.77 30.77 30.77 23.08 46.15 19.23 % Slightly significant problem 5 8 5 2 2 9 6 6 FA 19.23 30.77 19.23 7.69 7.69 34.62 23.08 23.08 % Moderately significant problem 2 4 0 2 3 4 0 6 FA 7.69 15.38 0.00 7.69 11.54 15.38 0.00 23.08 % Very significant problem b) Problems in MASMA implementation at design stage Frequency Analysis 11.54 23.08 30.77 26.92 42.31 % No Significant Problem 3 6 8 7 11 FA No Significant Problem a) Problems in MASMA implementation at planning stage Frequency Analysis 7.69 15.38 11.54 3.85 11.54 % 0 1 0 4 3 1 3 1 FA 0.00 3.85 0.00 15.38 11.54 3.85 11.54 3.85 % Extremely significant problem 2 4 3 1 3 FA Extremely significant problem 47 64 44 59 59 66 62 65 a 76 77 70 59 62 a 130 130 130 125 130 130 130 130 b 130 130 130 130 130 b 0.362 0.492 0.338 0.472 0.454 0.508 0.477 0.5 RI 0.585 0.592 0.538 0.454 0.477 RI SECTION B: PROBLEMS IN MASMA IMPLEMENTATION TO PROPERTY DEVELOPMENT PROJECTS 100 100 100 100 100 100 0.45 25 26 26 26 26 3.60 2.65 100 100 0.53 26 26 100 26 100 100 26 26 100 26 26 100 26 APPENDIX G Relative Index Value of Problems, Cost, Time and Benefit in MASMA Implementation 119 BD 1 2 3 4 5 6 7 8 9 10 No BC 1 2 3 4 5 6 7 8 No 4 9 10 11 2 12 12 5 FA 7 7 8 7 3 1 1 8 11 3 FA 15.38 34.62 38.46 42.31 7.69 46.15 46.15 19.23 % 5 9 2 2 12 5 5 7 FA 19.23 34.62 7.69 7.69 46.15 19.23 19.23 26.92 % Moderately significant problem 3 2 4 4 3 2 2 1 FA 11.54 7.69 15.38 15.38 11.54 7.69 7.69 3.85 % Very significant problem 26.92 26.92 30.77 26.92 11.54 3.85 3.85 30.77 42.31 11.54 % 4 8 3 9 2 3 3 8 10 6 FA 15.38 30.77 11.54 34.62 7.69 11.54 11.54 30.77 38.46 23.08 % Slightly significant problem 9 6 6 5 7 8 5 4 2 8 FA 34.62 23.08 23.08 19.23 26.92 30.77 19.23 15.38 7.69 30.77 % Moderately significant problem 5 3 6 4 10 11 14 5 2 5 FA 19.23 11.54 23.08 15.38 38.46 42.31 53.85 19.23 7.69 19.23 % Very significant problem Problems of MASMA implementation after completion. Frequency Analysis 50.00 19.23 30.77 30.77 26.92 23.08 19.23 38.46 % No Significant Problem c) 13 5 8 8 7 6 5 10 FA Slightly significant problem FA 0 1 2 0 3 2 2 0 0 3 0.00 0.00 0.00 0.00 3.85 0.00 3.85 7.69 % 0.00 3.85 7.69 0.00 11.54 7.69 7.69 0.00 0.00 11.54 % Extremely significant problem 0 0 0 0 1 0 1 2 FA Extremely significant problem Problems of MASMA implementation at the construction stage Frequency Analysis No Significant Problem c) 62 58 66 56 83 85 88 56 45 74 a 48 58 50 52 64 53 57 55 a 125 125 125 125 125 125 125 125 125 125 b 125 125 120 125 125 125 125 125 b 0.50 0.46 0.53 0.45 0.66 0.68 0.70 0.45 0.36 0.59 RI 0.384 0.464 0.417 0.416 0.512 0.424 0.456 0.44 RI 100 100 100 100 100 100 100 0.54 25 25 25 25 25 5.38 0.44 3.51 25 100 25 100 100 25 25 100 25 100 100 25 25 100 25 100 100 24 25 100 25 25 100 25 120 38.46 0.00 3.85 7.69 % 8 4 11 3 FA 30.77 15.38 42.31 11.54 % 6 12 7 9 FA 23.08 46.15 26.92 34.62 % Moderately significant increase 1 8 5 10 FA 3.85 30.77 19.23 38.46 % Very significant increase 0 1 1 1 FA 0.00 3.85 3.85 3.85 % Extremely significant increase 48 81 69 80 a 125 125 125 125 b DA 1 2 3 4 No 0.38 0.65 0.55 0.64 RI 7 5 5 8 FA 26.92 19.23 19.23 30.77 % No significant delay 2 5 9 7 FA 7.69 19.23 34.62 26.92 % Slightly significant delay 7 7 3 3 FA 26.92 26.92 11.54 11.54 % Moderately significant delay 5 6 6 4 FA 19.23 23.08 23.08 15.38 % Very significant delay 4 2 2 3 FA 15.38 7.69 7.69 11.54 % Extremely significant delay 72 70 66 62 a 125 125 125 125 b 0.58 0.56 0.53 0.50 RI SECTION D: TIME IMPLICATION OF MASMA COMPLIANCE TO PROPERTY DEVELOPMENT PROJECTS 10 0 1 2 FA No significant increase Frequency Analysis a). Delay of project plan approvals and issuance of Certificate of Fitness for Occupation. Frequency Analysis C 1 2 3 4 No Slightly significant increase SECTION C: COST IMPLICATION OF MASMA COMPLIANCE TO HOUSING DEVELOPMENT PROJECTS 100 100 100 0.54 25 2.16 2.22 25 100 0.56 25 100 100 25 25 100 25 25 100 25 121 5 8 10 3 4 FA 19.23 30.77 38.46 11.54 15.38 % No significant delay 3 5 7 6 6 FA 11.54 19.23 26.92 23.08 23.08 % 10 7 5 6 9 FA 38.46 26.92 19.23 23.08 34.62 % Moderately significant delay 4 5 1 5 5 FA 15.38 19.23 3.85 19.23 19.23 % Very significant delay Frequency Analysis Slightly significant delay 4 1 2 6 2 FA 15.38 3.85 7.69 23.08 7.69 % Extremely significant delay 77 64 53 83 73 a 130 130 125 130 130 b EA 1 2 3 4 5 6 1 3 2 8 2 2 FA 3.85 11.54 7.69 30.77 7.69 7.69 % Disagree 4 3 7 7 9 9 FA 15.38 11.54 26.92 26.92 34.62 34.62 % Slightly Agree 6 10 11 4 8 11 FA 23.08 38.46 42.31 15.38 30.77 42.31 % Agree 10 8 4 6 7 4 FA 38.46 30.77 15.38 23.08 26.92 15.38 % Very Agree (a). Benefits of MASMA compliance to the developers Frequency Analysis No Moderately 5 2 2 1 0 0 FA 19.23 7.69 7.69 3.85 0.00 0.00 % Extremely Agree 92 81 75 63 72 69 a 130 130 130 130 130 130 b SECTION E: BENEFITS OF MASMA COMPLIANCE TO THE DEVELOPERS AND PROPERTY OWNERS OF DEVELOPMENT PROJECT DB 1 2 3 4 5 No b). Factors contributing to delays of approvals 0.708 0.623 0.577 0.485 0.554 0.531 RI 0.592 0.492 0.424 0.638 0.562 RI 100 100 100 100 0.46 26 26 26 2.77 0.54 2.71 100 100 26 26 100 26 100 100 25 26 100 26 26 100 26 122 EB 1 2 3 4 5 0 3 4 2 12 FA 0.00 11.54 15.38 7.69 46.15 % Disagree 3 4 7 4 6 FA 11.54 15.38 26.92 15.38 23.08 % Slightly Agree 9 7 5 6 7 FA 34.62 26.92 19.23 23.08 26.92 % Agree (b). Benefits of MASMA compliance to property owners Frequency Analysis No Moderately 9 12 8 10 1 FA 34.62 46.15 30.77 38.46 3.85 % Very Agree 5 0 2 4 0 FA 19.23 0.00 7.69 15.38 0.00 % Extremely Agree 94 80 75 88 49 a 130 130 130 130 130 b 0.723 0.615 0.577 0.677 0.377 RI 100 100 100 100 100 0.59 26 26 26 26 26 2.97 123