iv OPTIMIZING PRODUCTION LINE OF IBS BY USING SIMULATION MODEL ALI MOHAMMED ALASHWAL A project report submitted in partial fulfillment of the requirements for the award of the Degree of Master of Science (Construction Management) Faculty of Civil Engineering Universiti Teknologi Malaysia November 2006 UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESISƇ OPTIMIZING PRODUCTION LINE OF (IBS) BY USING SIMULATION MODEL. JUDUL: SESI PENGAJIAN: 2005/2006 ALI MOHAMMED MOHAMMED ALASHWAL. Saya: (HURUF BESAR) Mengaku membenarkan tesis (PSM/Sarjana/Doktor Falsafah)* ini disimpan di perpustakaan Universiti Teknologi Malaysia dengan syarat-syarat kegunaan seperti berikut:1. 2. 3. 4. Tesis adalah hakmilik Universiti Teknologi Malaysia. Perpustakaan Universiti Teknologi Malaysia dibenarkan membuat salinan untuk tujuan pengajian sahaja. Perpustakaan dibenarkan membuat salinan tesis ini sebagai bahan pertukaran antara institusi pengajian tinggi. **Sila tandakan (¥) ¥ SULIT (Mengandungi maklumat berdarjah keselamatan atau kepentingan Malaysia seperti yang termaktub di dalam AKTA RAHSIA RASMI 1972) TERHAD (Mengandungi maklumat TERHAD yang telah ditentukan oleh organisasi/badan dimana penyelidikan dijalankan TIDAK TERHAD Disahkan oleh (TANDATANGAN PENULIS) ALAMAT TETAP: (TANDATANGAN PENYELIA) PROF. MADYA DR. ABDUL KADIR Yahsob School St. – Yareem – Ibb – Republic of Yemen. (Phone +9674501550). MARSONO NAMA PENYELIA TARIKH: TARIKH: NOVEMBER 2006 NOVEMBER 2006 CATATAN: * Potong yang tidak berkenaan. ** Jika tesis ini SULIT atau TERHAD, sila lampirkan surat daripada pihak berkuasa /organisasi erkenaan dengan menyatakan sekali sebab dan tempoh tesis ini perlu dikelaskan sebagai SULIT atau TERHAD. Tesis dimaksudkan sebagai tesis bagi Ijazah Doktor Falsafah dan Sarjana secara penyelidikan, atau disertasi bagi pengajian secara kerja kursus dan penyelidikan, atau Laporan Projek Sarjana Muda (PSM). Status Declaration Letter Date: November, 2006 Librarian Perpustakaan Sultanah Zanariah UTM, Skudai Johor Sir, CLASSIFICATION OF THESIS AS RESTRICTED OPTIMIZING PRODUCTION LINE OF IBS BY USING SIMULATION MODEL ALI MOHAMMED ALASHWAL Please be informed that the above mentioned thesis entitled “OPTIMIZING PRODUCTION LINE OF IBS BY USING SIMULATION MODEL” be classified as RESTRICTED for a period of three (3) years from the date of this letter. The reasons for this classification are (i) (ii) (iii) COMMERCIALIZATION OF RESEARCH PRODUCT NEGOTIATION STAGE WITH UTSB SDN. BHD. AS BUSINESS CONSULTANT NICHE IBS PRODUCT COMPONENTS ARE WAITING TO BE MANUFACTURED Thank you. Sincerely yours, ASSOC. PROF. DR. ABDUL KADIR MARSONO M46-238 07-5531606 013-7257737 iii “We hereby declare that I have read this project and in my opinion this project is sufficient in terms of scope and quality for the award of the degree of Master of Science (Construction Management) by taught course.” Signature : ……………………………………. Name of Supervisor I : ASSOC. PROF. DR. ABDUL KADIR MARSONO Date : November 2006 Signature : Name of Supervisor II : ASSOC. PROF. DR. MASINE MD. TAP Date : November 2006 Signature : ……………………………………….. …………………………………… Name of Supervisor II : ASSOC. PROF. DR. AHMAD MAHIR MAKHTAR Date : November 2006 v “I declared that this project report entitled “OPTIMIZING PRODUCTION LINE OF IBS BY USING SIMULATION MODEL” is the result of my own research except as cited in references. This report has not been accepted for any degree and is not concurrently submitted in candidature of any degree”. Signature Name : : …………………………………… ALI MOHAMMED ALASHWAL Date : November 2006 vi Especially dedicated to my beloved family vii ACKNOWLEDGEMENT The author wishes to express his sincere appreciation to all who have helped directly or indirectly in his Masters Project research work. The first gratitude is to Allah for his prosperity and guidance. A big thank is to the project supervisor, Associate Professor Dr. Abdul Kadir Bin Marsono, for his passionate assistance, and concern. With his invaluable advices and superb directions, the author has successfully completed his Masters Project. It is indeed a true honor and privilege for being able to work under the supervision of such a dedicated and enthusiastic lecturer. Special thanks are due to Associate Professor Dr. Masine Md Tap for her close guidance and assistance throughout the process of carrying out the research work. Besides, the author would like to thank Associate Professor Dr. Ahmad Mahir Makhtar for his helpful and concern. A particular grateful is due to my cousin Hani Tahir Alashwal for his unlimited helpful, support, and assistance. Last but not least, the author would like to express his heartfelt gratitude to his family members and friends for their utmost support and motivation throughout this research work. My thanks to them all. viii ABSTRACT Even though IBS has the ability to offer intensive production elements, the rapid increasing demands of providing a shelter for every citizen is enforced enhancing the productivity and the delivery time of IBS. That may obtained by improving the production line layout of the manufacture plant, enhancing production time, and resources utilization. Recently, simulation has begun to be applied in construction industry sector. In this study, “Witness 2001” program has been testified to be able to build a simulation model for the production line of pre-cast concrete columns and beams. This simulation model offers the alternatives to modify the production line attributes as the capacity of elements treatment area, number of re-useable moulds and labour, breakdown of activities and so on. In fact, that imitates a real plant production line. The model provides the opportunity to identify the optimum production line of the suggested layout. This research presents the results of two simulation models either for columns and beams. The results involve basically on the selection of the appropriate production layout, the required time to produce the assumed amount of columns and beams. Finally, the effect of machineries breakdown and the required resources has been determined in this research. ix ABSTRAK Walaupun IBS berupaya menawarkan elemen-elemen yang dihasilkan secara intensif, namun peningkatan terhadap permintaan yang begitu mendadak untuk menyediakan tempat perlindungan bagi setiap penduduk memerlukan peningkatan produktiviti dan masa yang lebih singkat. Ianya boleh dicapai dengan memperbaiki susun atur loji pengeluar bahagian pengeluaran, mengurangkan masa pengeluaran, dan penggunaan sumber-sumber secara efisyen. Simulasi project ini diuji untuk dalam sektor industri pembinaan. Dengan pevisian “Witness 2001”, ujikaji bagi menunjukkan keupayaannya dalam membina model simulasi yang digunakan oleh bahagian pengeluaran rasuk dan tiang konkrit IBS. Model simulasi yang dimanipulasikan menawarkan alternatif untuk mengubahsuai ciri-ciri bahagian pengeluaran seperti kapasiti kawasan yang diperlukan untuk pengawalan pengeluaran, bilangan pekerja dan bahan yang perlu digunakan, pecahan aktiviti-aktiviti dan sebagainya. Hakikatnya, ianya menggambarkan keadaan sebenar sesuatu bahagian pengeluaran kilang IBS Sebenarnya, model yang dihasilkan memberikan peluang untuk mengenalpasti penggunaan susun atur yang optimum dalam bahagian pengeluaran bagi susun atur yang dicadangkan. Kajian ini memberikan hasil simulasi dua model iaitu bagi penghasilan tiang dan rasuk. Hasil kajian secara asasnya melibatkan pemilihan susun atur pengeluaran yang bersesuaian, serta masa yang diperlukan bagi menghasilkan sebilangan jumlah tiang dan rasuk. Akhir sekali, kesan kerosakan jentera yang digunakan serta sumber-sumber yang diperlukan juga telah ditentukan di dalam kajian ini. x TABLE OF CONTENTS Chapter CHAPTER 1 Description Page TITLE i DECLARATION ii DEDICATION vi ACKNOWLEDGEMENT vii ABTRACT viii ABSTRAK ix TABLE OF CONTENTS x LIST OF TABLES xiv LIST OF FIGURES xvi LIST OF CHART xviii INTRODUCTION 1.1 Introduction 1 1.2 Problem Statement 3 1.3 Aim and Objectives of Study 3 1.4 Scope of Study 4 1.5 Significance of Study 5 xi CHAPTER 2 LITERATURE REVIEW 2.1 Introduction 6 2.2 Industrialised Building System (IBS) 7 2.2.1 The Definition of IBS 7 2.2.2 The Feature of IBS 7 2.2.3 The Benefits and Limitation of IBS 8 2.2.4 IBS Components 9 2.2.5 IBS in Malaysia 10 2.3 2.4 2.5 Pre-cast Concrete 11 2.3.1 The Definition of Pre-cast Concrete 11 2.3.2 Advantages of Using Pre-cast Concrete 12 2.3.3 Pre-cast Concrete Production Stages 13 2.3.4 Stage (1): Preparation 14 2.3.5 Stage (2): Casting 15 2.3.6 Stage (3): Curing 19 2.3.7 Stage (4): Stripping and Demoulding 22 2.3.8 Stage (5): In-process Check 23 2.3.9 Stage (6): Lifting and Handling 23 Work Organization 24 2.4.1 All-purpose Team Method 25 2.4.2 Workstation Method 26 Production Line Layout 2.5.1 2.6 27 Flow Analysis and Activities Analysis of Layout 28 2.5.2 Types of Flow Patterns 29 2.5.3 Types of Layout 31 Simulation 32 2.6.1 32 Simulation Definition xii 2.7 2.6.2 Importance of Simulation 33 2.6.3 Advantages of Using Simulation 33 2.6.4 Disadvantages of Using Simulation 34 2.6.5 Simulation Software 35 Witness 2001 Software 2.7.1 Building a Simulation Model in Witness 2001 CHAPTER 3 CHAPTER 4 36 36 METHODOLOGY 3.1 Introduction 37 3.2 Production Stages Determination 37 3.3 Data Collection 39 3.4 Modelling and Simulation 40 3.5 Data Analysis and Discussion 41 3.6 Research Methodology Flowchart 41 DATA COLLECTION 4.1 Introduction 43 4.2 Data Collection 44 4.3 The Production Line 44 4.4 4.3.1 Preparation Stage Data 45 4.3.2 Casting Stage Data 48 4.3.3 Treatment Stage Data 48 Production Plant Layout 4.5 Working Shifts 51 52 xiii 4.6 Witness 2001 Software 4.7 Applying Data CHAPTER 5 53 54 RESULTS AND DISCUSSION 5.1 Introduction 56 5.2 Columns Production Line 56 5.2.1 Trial One 56 5.2.2 Trial Two 58 5.2.3 Trial Three 59 5.2.4 Trial Four (Increasing the Number of Moulds 5.2.5 60 Trial Five (Increasing The Labour and Machines 61 5.3 Columns Production Line and Working Shifts 63 5.4 Activities Breakdown 63 5.5 Beam Production Line 66 5.6 Beam Production Time and Working Shifts 70 5.7 Beam Production Line Breakdown 70 5.8 Production Lines Resources 72 CHAPTER 6 CONCLUSION AND RECOMMENDATIONS 6.1 Conclusion 75 6.2 Recommendations 77 REFERENCES 78 APPENDIXES 80 xiv LIST OF TABLES Table No. 4.1 Title Page The preparation of cement and raw materials data 45 4.2 The preparation of steel reinforcement data 46 4.3 Mould preparation data 47 4.4 Placing steel cage and cleaning data 48 4.5 The casting stage data 48 4.6 Treatment stage data 49 4.7 The stages of concrete pre-cast production elements 50 5.1 First trial results (columns production line) 57 5.2 Second trial results (columns production line) 58 5.3 Third trial results (columns production line) 59 5.4 Fourth trial results (columns production line) 61 5.5 Fifth trial results (columns production line) 62 xv 5.6 Columns production line attributes and the obtained time (250 columns) 5.7 63 Comparison between times required to produce Columns and times after breakdown 65 5.8 First trial results (beams production line) 67 5. 9 Second trial results (beams production line) 68 5.10 Third trial results (beams production line) 68 5.11 Fourth trial results (beams production line) 68 5.12 Fifth trial results (beams production line) 69 5.13 Sixth trial results (beams production line) 69 5.14 Beam production line attributes and the obtained time (two production lines - 750 beams) 5.15 Comparison between the times required to produce beams and time after breakdown 5.16 71 One shift work to produce 1000 columns and beams in 50.5 days 5.17 70 73 Two shifts work to produce 1000 columns and beams in 25.3 days 74 xvi 5.18 Two shifts work to produce 1000 columns and beams in 16.8 days 74 LIST OF FIGURES Figure No. Title Page 1.1 Pre-cast concrete beam and column 5 2.1 The fabricated reinforcement steel cage 14 2.2 Fixing the steel cage to the steel useable mould 15 2.3 All-purpose team work method 25 2.4 The workstation method 26 2.5 Communication links among product, process, schedule and layout design 27 2.6 Basic flow pattern 30 2.7 Vertical flow pattern 30 2.8 Model building steps in Witness 2001 36 3.1 The flowchart of the stages of production pre-cast concrete elements 38 xvii 3.2 The production line to be developed in the research 39 3.3 Research methodology flowchart 42 4.1 Concrete pre-cast columns and beams production line layout 51 4.2 The start up window of Witness 2001 software 53 4.3 The six elements used to build the model 55 5.1 Columns production line simulation model 57 5.2 Breakdown window in Witness 2001 software 64 5.3 Beams production line simulation model 67 xviii LIST OF CHARTS Chart No. Title Page 2.1 The growth of Malaysian economy and [GDP] 11 5.1 The production line time for the trials one, two, and three 60 5.2 A comparison between trials three, four, and five 62 5.3 Effect of the activities breakdown on columns production line time 5.4 65 Effect of the activities breakdown on beams production line time 71 CHAPTER 1 INTRODUCTION 1.1 Introduction The improvement of productivity and quality in building construction can be attained only through intensive industrialization and building system process development. The industrialization of building is most effective when as many as possible of the building components are prefabricated in a plant with appropriate equipment and efficient technological and managerial methods. Comprehensive prefabricated elements that produced in the plant considerably reduce both the amount of work onsite and dependence on the skill of available labour, on the weather, and on various local constraints. Historically, the industrial revolution affected the building sector in many ways. Perhaps its most important affects were the introduction of structural steel and reinforced concrete as main building materials in the second half of the 19th century. In addition, reinforced concrete established itself as one of the major building materials because it had some distinctive advantages over other prevalent material. Its production process was 2 relatively simple; it could be moulded into any shape and with proper processing yield an attractive exterior surface. One of the first applications of pre-cast concrete components was by W.H. Lascelles in England in1878. Lascelles employed thin pre-cast concrete plates attached to timber posts for use in walls and attached to concrete joints for use in floors of residential cottages (Warszawski, 1999). In Malaysia IBS started with the establishment of the Ministry of Local Government and Housing in 1964. The Ministry focused then on the need to provide low cost houses for the low income group. Towards this, housing programmes for the low income people was launched and by 1966 the Ministry has launched two pilot projects in two major cities namely Kuala Lumpur and Penang (AbdulRahim S., 2004). During the five years of the Seventh Malaysian Plan, Malaysia built an amazing one million dwelling, which constantly amazes visiting building professionals. The Malaysian housing industry mass-produces more houses on per capita basis than any other countries in the world. However, we must come to terms with harsh reality that Malaysia is stuck at the bottom rung of the building technology ladder. The information revolution started in the second part of the 20th century draws from the use of computer for storing, processing, and transmitting information of industrialized processes. The information revolution had a considerable effect on design work in building and on some aspects of its administration and control in manufacturing plant. Actually, the applications of simulation in manufacturing and industrialized building system are increasing rapidly. Consequently, simulation is a unique ability to accurately predict the performance of complex processes which makes it ideally suited for systems planning. In addition, simulation is emerging as an important developed tool to enhance the production process performance of IBS. 3 Overall, a highly processing planning and an accurate layout of manufacturing production lines are required to enrich the production activities of industrialized building system elements. 1.2 Problem Statement The production of Industrialized Building System elements at the prefabrication plant involves many stages. One of the most important stages of IBS is the production stage, especially if we talk about the pre-cast production as a part of IBS. In fact, this stage is considered as one of the longest stages in term of time, processes, and activities. The requirements of providing the appropriate shelter for every citizen enforced multiple efforts to cover that increasing requirements and to enhance once again the productivity of IBS elements. It is essential to reduce time and plan the resources and the activities of the whole production processes. The need to adopt an optimized production layout is essential to enhance the productivity, reduces the lead time and eliminates the resources involved in the plant. 1.3 Aim and Objectives of Study The aim of this study is to improve the performance of the production process at a manufacturing plant to produce some of the pre-cast concrete elements as a part of IBS. The word improvement involves reducing the production time, selecting the accurate amount of resources, and identifying the optimum production line according to a specific layout. There are some specific objectives of this study, which are: 4 x Propose an optimized layout of preparing raw materials and moulds, casting the concrete, and curing the elements processes. x Estimate based on simulation test, the lead time, this is the time required to produce IBS elements. x Determine the accurate number of resources such as labour and machineries involved in manufacturing plant. 1.4 Scope of Study The scope of this study is limited to the pre-cast concrete elements as a part of IBS components production. The suggestion here is to produce 1,000 pre-cast concrete elements namely: 750 beams and 250 columns. While the number of reusable steel moulds is limited by 50 steel moulds to produce all the elements. Accelerators admixtures are adopted in this research. The admixtures have been assumed to be added during the concrete mixing process in order to hasting the hardening of those elements, shortage the duration of the production process, and reducing the number of moulds used. Besides, using simulation software namely ‘Witness 2001’ program to build a simulation model represent a production line of pre-cast concrete columns and beam. Activities breakdown has been considered in this research. The effect of two machines breakdown has been studied. These two machines are concrete compactor table and concrete mixer. Finally, there are some assumptions made in this study such as the production will not to be interrupted due to lack of labours or insufficient supply of raw materials or parts. The following figure shows the elements of IBS which are beam and column 5 produced by a pre-cast plant to build a typical house consist of 100 % prefabricated components. © EBS 2005 Figure 1.1: Pre-cast concrete beam and column. 1.5 x Significance of Study The proposed simulation model in this study can be applied in the planning of IBS plants especially the production line of concrete pre-cast and the treatment areas. x Propose a way to ease the determination of the period time required to produce and delivery of IBS elements to the erection site. x Propose a suggestion to determine the resources in the fabrication plant such as labours, machineries and equipments involved. x Propose an economical production line by reducing the steel moulds used and the production time. x The cost of the production line can be calculated from the proposed model. 6 CHAPTER 2 LITERATURE REVIEW 2.1 Introduction This chapter exposes the literature related to Industrialized Building System (IBS), the production of concrete pre-cast processes, work organization method, and the manufacturing layout. It also depicts the simulation and Witness 2001 simulation program in some details. This chapter is divided into three parts: the first part defines and describes IBS and its features, benefits, limitations, and its components. This section also gives an overview of IBS in Malaysia. The second section talks about the pre-cast concrete; and it focuses on the production of pre-cast processes which is divided into six processes: preparation, casting, curing, demoulding, handling and check process. Also this part provides an overview about the manufacturing layout. The last part is about the simulation which has been commented in some details and it starts with the definition of the simulation, its purpose, advantages and disadvantages, and finally, the simulation software. 7 2.2 Industrialized Building System (IBS) 2.2.1 The Definition of IBS Industrialized Building System means any of components which is wholly or in substantial part fabricated in or off site manufacturing facility for installation or assembly on a permanent foundation at the building site. Another definition of IBS in the construction industry includes the industrialized process by which components of building are conceived, planning, fabricated, transported and erected on site (Thanoon & others (2), 2003). Warszawski, (1999) defined the building system as a set of interrelated elements that act together to enable the designated performance of a building. 2.2.2 The Features of IBS The main features of an industrialized building system are as follows: (Warszawski, 1999). 1. As many of the building elements are prefabricated offsite, at a central facility, where specialized equipment and organization can be established for this purpose. 2. The various building works are incorporated into large prefabricated assemblies with minimum erection, jointing and finishing work onsite. 3. Materials and component handling onsite is extensively mechanized; in concrete work, large standard steel forms, ready-mixed concrete, and concrete pumps are used. 4. Design, production, and erection onsite are strongly interrelated. They must be viewed therefore as parts of an integrated process which has to be planned and coordinated accordingly. 8 2.2.3 The Benefits and Limitations of IBS The benefits of Industrialized Building System are: 1. Saving in manual labour onsite (up to 40-50 % of the input in conventional construction), especially in skilled trades such as formwork, masonry, plastering, carpentry, tiling, and pipelaying (electrical and water supply). 2. Faster construction process, that is, earlier completion of building projects. 3. Higher quality of components attainable through careful choice of materials, use of better production tools – in batching and casting – and strict quality control. Despite these benefits, the share of industrialized building in the total output is not increasing in most countries, as expected, mainly due to the following reasons: 1. Volatility of the building market and a general decline in demand for large public housing projects. 2. The excessive tendency toward repetitiveness and standardization in public projects, where industrialization was most widely applied, resulted in monotonous complexes that very often turned into dilapidated slums within several years. 3. Industrialized systems were considered very rigid with respect to changes, which might be required in the building over its economic life. 4. The technology, organization, and design of prefabrication building systems never became an integral part of the professional knowledge of engineers and architect, obtained as other subjects through a regular academic education (Warszawski, 1999). 9 2.2.4 IBS Components Building Systems can be classified in different ways, depending on the particular interest of their users or producers. A frequent basis for such classification is the construction technology. In this manner four major groups can be distinguished: systems with (1) timber, (2) steel, (3) cast in situ concrete, and (4) pre-cast concrete as their main structural and space-enclosing material (Warszawski, 1999). The IBS classifications in Malaysia are expounded by Thanoon & others (1), (2003). The IBS generally divided into four categories, namely: (1) system formwork – table and half-tunnel form, (2) frame system – pre-cast concrete and pre-cast steel, (3) panel system – sandwich panel, half slabs, hollow core slabs and solid concrete panel, and (4) block system – interlocking block, hollow block, solid block and lightweight block. Warszawski, (1999) emphasized on the pre-cast concrete systems and listed three groups of building systems as the following: 1. Linear or skeleton (beam and column) systems; 2. Planar or panel systems; 3. Three-dimensional or box systems. Linear systems use as their main structural elements columns, beams, frame, or trusses made of plain or prestressed concrete. Their important feature is the capacity to transfer heavy loads over large spans. Probably the most widely used type of prefabricated are those employing planar or panel shaped elements for floor slabs, vertical supports, partitions, and exterior walls. The three-dimensional systems use, as their main building element, box units that contain concrete walls and floors. The units can be either cast in boxlike molds or assembled in the plant from panel elements. 10 2.2.5 IBS in Malaysia The idea of using IBS in Malaysia was first mooted during the early sixties when the Minister of Housing and Local Government visited several European countries and evaluated their building systems performance. Then, in 1964, the government took a brave decision to try two pilot projects using IBS concept. The first pilot project was constructed on 22.7 acres of land along Jalan Pekeliling, which included the construction of 7 blocks of 17 storey flats, and 4 blocks of 4 storey flats comprising about 3,000 units of low cost flats and 40 storey shop lots. The project was awarded to the Gammon/Larsen Nielsen using the Danish System of large panel industrialized prefabricated system. Meanwhile, the second pilot project was built in Penang with the construction of 6 blocks of 17 storey flats and 3 blocks of 18 storey flats comprising 3,699 units and 66 shop lots along Jalan Rifle Range. The project was awarded to Hochtief/Chee Seng using the French Estiot System. (Thanoon & others (1), 2003). Rao & Naik, (1991) stated that the first large scale project of constructing prefabricated residential buildings was awarded to the Japanese team of Marubeni Taisei, who developed the Shah Alam Area, capital of the state of Selangor, about 25 km from Kuala Lumpur. This trigerred off a chain of developments in large panel pre-cast concrete construction. The construction industry in Malaysia has contributed significantly to the economic growth, it contributing about 24% of the country's Gross Domestic Product [GDP]. Over the last 20 years, the industry has been consistently contributing between 3% to 5% of GDP (Sumadi & others, 2003)& (Abd. Hamid & Sarshar, 2003). The following chart shows the growth of Malaysian economy and Gross Domestic Product [GDP]: