Engineering H193 - Team Project
Lab Day – Controller Lab 1
Brief Follow-up from Wednesday
Grading Guidelines for Notebook and Brainstorming
Next Week
Week 1 Day 3
Spring Quarter
Gateway Engineering Education Coalition
P. 1
Engineering H193 - Team Project
Documentation Areas (Sets)
• Management Set
– Project Schedule, Status Assessment Reports,
Configuration Management, etc.
• Requirements Set
– Design Problem Statement and Specification, etc.
• Design Set
– Brainstorming Ideas, Architecture, Design Sketches,
Calculations, Data Charts & Graphs, Photographs, etc.
• Implementation Set
– Source code, manufacturing drawings, etc.
• Deployment Set
– Release documentation, final report, etc.
Spring Quarter
Gateway Engineering Education Coalition
P. 2
Engineering H193 - Team Project
Project Notebook Grading
Item
Points
Content
Ideas
4
Decisions
4
Sketches, CAD Models and drawings
4
Meeting Notes
4
Scheduling & Budget
4
Contacts & References
4
Testing Log
4
Drafts of reports and code
4
Organization
10
Overall Usefulness
8
TOTAL
Spring Quarter
Gateway Engineering Education Coalition
50
P. 3
Engineering H193 - Team Project
Testing Log
• The testing log is the record of all of the tests of
the robot functions. This should include the day
and date, time, what was tested, what were the
results, what worked OK, what needs to be
modified.
• The testing log could show the number of hours
spent on a test track or in a wind tunnel for which
there is a real cost. We are not charging for
testing on the robot course, but we could have
made it a part of the budget.
Spring Quarter
Gateway Engineering Education Coalition
P. 4
Engineering H193 - Team Project
Sketches Of Strategy & Brainstorming Ideas
• For Monday - Week Two
– Turn in categorized, typed list of ideas
– Turn in sketches of good concepts for features
– Turn in a written and/or sketched strategy
– Turn in sketches of three overall concepts
Spring Quarter
Gateway Engineering Education Coalition
P. 5
Engineering H193 - Team Project
Cover Page
Title of Submission
Project Schedule
Team Name and Number
Team A-1 – The Tops
Due Date
Due: 4/5/03
Team Members’ Names
Instructor’s Name and Section
Sherlock Holmes
Charlie Chan
V. I. Warshawski
Kinsey Milhone
Professor Moriarty - Midnight
Spring Quarter
Gateway Engineering Education Coalition
P. 6
Engineering H193 - Team Project
Brainstorming, Sketches & Strategy Grading
Item
Cover Sheet
2
Brainstorming List Organized
5
Sketches (3 view, etc)
10
Notations / Scale
3
Identification Info (draftsperson, date)
2
Clarity & Formatting (Neatness)
3
Strategy
5
TOTAL
Spring Quarter
Points
Gateway Engineering Education Coalition
30
P. 7
Engineering H193 - Team Project
Preparation for Next Week
• Project Management - Read Chapter 5 in TTD
• Pre-lab Assignment: Break - Beam Sensors (shaft
encoders, Motors, Gears, and Mechanisms )
– Read Sections 3.7, 3.8, 4.1, 4.2, 4.3 in Robotic
Explorations by Martin
Spring Quarter
Gateway Engineering Education Coalition
P. 8
Engineering H193 - Team Project
Next Week (7:30, 9:30, 11:30, 1:30)
• Monday
– DC Motors lab (Lab #2)
– Turn in Brainstorming Assignment
• Wednesday
– Lecture on developing a Design Project Schedule
– Work on schedule and Lab 1 report
• Friday
– Lecture on Building a Mockup for your design
– Teams meet with Teaching Staff to review
progress (have notebook ready)
– Due: Lab #1 Report - Individual
Spring Quarter
Gateway Engineering Education Coalition
P. 9
Engineering H193 - Team Project
Next Week (8:30, 10:30, 2:30)
• Monday
– Lecture on developing a Design Project Schedule
– Work on schedule and Lab 1 report
– Turn in Brainstorming Assignment
• Wednesday
– DC Motors lab (Lab #2)
• Friday
– Lecture on Building a Mockup for your design
– Teams meet with Teaching Staff to review
progress (have notebook ready)
– Due: Lab #1 Report - Individual
Spring Quarter
Gateway Engineering Education Coalition
P. 10