Engineering H193 - Team Project Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading Guidelines for Notebook and Brainstorming Next Week Week 1 Day 3 Spring Quarter Gateway Engineering Education Coalition P. 1 Engineering H193 - Team Project Documentation Areas (Sets) • Management Set – Project Schedule, Status Assessment Reports, Configuration Management, etc. • Requirements Set – Design Problem Statement and Specification, etc. • Design Set – Brainstorming Ideas, Architecture, Design Sketches, Calculations, Data Charts & Graphs, Photographs, etc. • Implementation Set – Source code, manufacturing drawings, etc. • Deployment Set – Release documentation, final report, etc. Spring Quarter Gateway Engineering Education Coalition P. 2 Engineering H193 - Team Project Project Notebook Grading Item Points Content Ideas 4 Decisions 4 Sketches, CAD Models and drawings 4 Meeting Notes 4 Scheduling & Budget 4 Contacts & References 4 Testing Log 4 Drafts of reports and code 4 Organization 10 Overall Usefulness 8 TOTAL Spring Quarter Gateway Engineering Education Coalition 50 P. 3 Engineering H193 - Team Project Testing Log • The testing log is the record of all of the tests of the robot functions. This should include the day and date, time, what was tested, what were the results, what worked OK, what needs to be modified. • The testing log could show the number of hours spent on a test track or in a wind tunnel for which there is a real cost. We are not charging for testing on the robot course, but we could have made it a part of the budget. Spring Quarter Gateway Engineering Education Coalition P. 4 Engineering H193 - Team Project Sketches Of Strategy & Brainstorming Ideas • For Monday - Week Two – Turn in categorized, typed list of ideas – Turn in sketches of good concepts for features – Turn in a written and/or sketched strategy – Turn in sketches of three overall concepts Spring Quarter Gateway Engineering Education Coalition P. 5 Engineering H193 - Team Project Cover Page Title of Submission Project Schedule Team Name and Number Team A-1 – The Tops Due Date Due: 4/5/03 Team Members’ Names Instructor’s Name and Section Sherlock Holmes Charlie Chan V. I. Warshawski Kinsey Milhone Professor Moriarty - Midnight Spring Quarter Gateway Engineering Education Coalition P. 6 Engineering H193 - Team Project Brainstorming, Sketches & Strategy Grading Item Cover Sheet 2 Brainstorming List Organized 5 Sketches (3 view, etc) 10 Notations / Scale 3 Identification Info (draftsperson, date) 2 Clarity & Formatting (Neatness) 3 Strategy 5 TOTAL Spring Quarter Points Gateway Engineering Education Coalition 30 P. 7 Engineering H193 - Team Project Preparation for Next Week • Project Management - Read Chapter 5 in TTD • Pre-lab Assignment: Break - Beam Sensors (shaft encoders, Motors, Gears, and Mechanisms ) – Read Sections 3.7, 3.8, 4.1, 4.2, 4.3 in Robotic Explorations by Martin Spring Quarter Gateway Engineering Education Coalition P. 8 Engineering H193 - Team Project Next Week (7:30, 9:30, 11:30, 1:30) • Monday – DC Motors lab (Lab #2) – Turn in Brainstorming Assignment • Wednesday – Lecture on developing a Design Project Schedule – Work on schedule and Lab 1 report • Friday – Lecture on Building a Mockup for your design – Teams meet with Teaching Staff to review progress (have notebook ready) – Due: Lab #1 Report - Individual Spring Quarter Gateway Engineering Education Coalition P. 9 Engineering H193 - Team Project Next Week (8:30, 10:30, 2:30) • Monday – Lecture on developing a Design Project Schedule – Work on schedule and Lab 1 report – Turn in Brainstorming Assignment • Wednesday – DC Motors lab (Lab #2) • Friday – Lecture on Building a Mockup for your design – Teams meet with Teaching Staff to review progress (have notebook ready) – Due: Lab #1 Report - Individual Spring Quarter Gateway Engineering Education Coalition P. 10