Government of India
Central Electricity Authority
Ministry of Power
Power SystemProjectMonitoring Division
Sewa Bhawan, R.K.Puram
New Delhi-110 066
Email:ceapspmcea@rediffmail.com
Tele : 011 - 26100660
Telefax: 011 – 26103242
ISO. : 9001-2008
Dated: 19th Nov.2012
No.CEA/PS/PSPM/7/1//2012
To,
All concerned (as per list)
Subject: Meeting to review the RFD targets in respect of commissioning of
transmission lines for the year 2012-13.
Sir,
Shri A. K. Rampal, Chief Engineer (PSPM) CEA, would review the achievements
(Till 31-10-2012) of result frame works document (RFD) targets for the year 2012-13 at
11:00 am on 23-11-2012 in the conference room, 6th floor, CEA, Sewa Bhawan, R. K.
Puram, New Delhi.
2.
Please make it convenient to attend the above mentioned meeting and bring
updated status in respect of transmission lines and sub-stations (for transformation
capacity), which have been commissioned/made ready for commissioning by your
Department/Organization.
3.
The information may
ceapspmcea@rediffmail.com .
be
sent
to
PSPM
division,
CEA
on
e-mail:
4.
In this meeting ATS of generation projects will also be discussed. The list of
projects will be posted on CEA’s website.
Thanking you.
Yours faithfully,
(SD)
(Prahlad)
Director (PSPM)
Tele-fax : 26103242
Mobile No : 9968481810
E-mail : prahladparihar@cea.nic.in
RFD Meeting on 23-11-2012, Address list
Chief Engineer(Transmission)
Chattisgarh State Electricity Board, Dagania
RAIPUR – 492013
Fax No: 0771 5066900/4066566
Gujarat
Chief Engineer (Project),
Gujarat Energy Transmission Corporation Limited,
Sardar Patel Vidyut Bhawan,
Race Course,
VADODARA-390 007
Fax No: 0265-2338164
Goa
Chief Engineer
Electricity Department,
Government of Goa,
IIIrd Floor, Vidyut Bhawan,
PANAJI(GOA)-403 001
Fax No: 0832-2222354
Madhya
Chief Engineer(Power System),
Pradesh
Madhya Pradesh Power Transmission Company Limited,
Shakti Bhavan, Vidyut Nagar, Rampur, Block-3
JABALPUR - 482 008
Fax No: 0761-2665593/2665593
Maharashtra
Chief Engineer (Tr. Projects)
Maharashtra State Electricity Transmission Co. Ltd.,
Prakashganga, Bandra Kurla Complex,Plot No C-19,
E-Block, Bandra (E),
MUMBAI – 400 051
Fax No: 022 – 26598587
Uttar Pradesh Chief Engineer (Control & Monitoring),
U.P. Power Transmission Corporation Ltd.,
Shakti Bhawan Extn. 11th Floor,
14, Ashok Marg,
Lucknow – 226 001
Fax No: 0522-2288410/2287785
J&K
Chief Engineer(Jammu)
New Secretariat Building, Jammu (J&K)
Ph: J: 0191 2532809
S: 0914 2452236
Fax:J: 0191 2456206
S: 0914 2434279
Delhi
Director (Operation),
Delhi Transco Limited,
Shakti Sadan, Kotla Road,
New Delhi – 110 002
Fax No: 23234640
Chattisgarh
Punjab
Chairman and Managing Director,
Punjab State Transmission Corporation Ltd.
The Mall Road, Patiala-147001
Fax:0175-2213199
Uttrakhand
General Manager(Project),
Power Transmission Corporation of Uttrakhand (PTCUL),
650 Kanwali Road,
Dehrudun-248001
Fax No: 0135-2762460
Chief Engineer (Transmission),
Himachal Pradesh State Electricity Board,
Vidyut Bhawan, Kumar House,
Shimla – 171004
Fax No: 0177-2658984
Chief Engineer (Plg. & Design),
Haryana Vidyut Prasaran Nigam,
Shakti Bhawan, Sector – 6,
Panchkula – 134 113
Fax No:0172-2560640
Chief Engineer (T&C),
Rajasthan Rajya Vidyut Prasaran Nigam Limited,
Old power House,Ram Mandir ,
Jaipur – 302 006
Fax No: 0141-2740168/2740794
Chief Engineer, 400kV
APTRANSCO,
Vidyut Soudha,
Hyderabad – 500 082
Fax No: 040 23320565/23313791
Director (Transmission)
,
Karnataka Power Transmission Corporation Ltd.
Kaveri Bhawan,
P./B. No. 9999,Bangalore – 560 009
Fax No: 080-2221352/080-22215187
Chief Engineer(Corporate Planning)
Kerala State Electricity Board
Vidyuthi Bhavanam, Pattom,
Thiruvananthapuram – 695 004
Fax No: 0471-2441328
Chief Engineer (Transmission)
TANTRANSCO,
6th Floor, NPKRR Maaligai,
800, Anna Salai,
Chennai – 600 002
Fax No: 044-28516362
Himachal
Pradesh
Haryana
Rajasthan
Andhra
Pradesh
Karnataka
Kerala
Tamil Nadu
Tripura
Meghalaya
BSEB
WBSEB
OPTCL
Assam
NETCL
RPTL
Chief Engineer
Tripura State Electricity Corpn.Ltd.,
Vidyut Bhawan,
Agartala – 799 001
Fax: 0381 2323286
Director (Transmission),
Meghalaya Power Transmission Corporation Limited (MePTCL) ,
Lumjingshai, Short Round Road,
Shillong.– 793 001
Fax No: 0364 2592022
Chairman, Bihar State Electricity Board,
Vidyut Bhavan ,
Bailey Road,
Patna-800021.
Fax No. 0612-2504937 / 250557
Chairman & Managing Director,
WBSETCL,
Vidyut Bhavan, 7th Floor,
Sector-II, Bidhannagar,
Kolkata-700091.
Fax # 033-23373002
Chairman-cum-Managing Director,
Orissa Power Transmission Corporation Ltd.,
Janpath,
Bhubaneswar-751022.
Fax No. 0674-2541904
Chief Engineer
, Assam Electricity Grid Corporation Ltd.,
Bijulee Bhawan, Paltan Bazar,
Guwahati – 781 001,
Fax: 0361 2541090.
Managing Director
North East Transmission Company Ltd.
1st Floor Ambiance Corporate Tower
Ambiance Mall, Gurgaon Haryana – 122001
Fax : 0124-24716060
Shri Alok Roy, CEO,
Reliance Power Transmission Limited,
12th Floor, Building No. 10 B,
DLF Cyber City
Gurgaon,
Haryana – 122002
PGCIL
DVC
NHPC
Abhijeet
Power
BHEL
Ideal Energy
Adani
Chairman & Managing Director,
Power Grid Corporation of India Ltd.,
Saudamini, Plot No. 2,Sector-29,
Gurgaon-122001.
Fax No.0124-2571922
The Chairman,
Damodar Valley Corporation,
DVC Towers, VIP Road,
Kolkata -700054.
Fax No.033-23551252
Chairman & Managing Director ,
NHPC,
N.H.P.C Office Complex,
Sector-33, Faridabad - 121003 (Haryana)
E-Mail: webmaster@nhpc.nic.in
FAX : 0129 -2277941
Corporate Office
Landmark Building, 6th Floor,
Wardha Road, Ramdaspeth,
Nagpur-440010, INDIA
Phone : +91 712-7113400 / 401 / 402
Fax : +91 712-7113405
Chandwa Sharda Bhawan,
Devi Mandap Road,Chandwa Dist.
Latehar 829 203
Jharkhand, INDIA
Phone : 06565 226 883 / 93
Chairman & Managing Director,BHEL,
BHEL House, Siri Fort,
New Delhi – 110049, India
Fax : 26493021; 26492534
Phone 66337000
Ideal Energy Projects Ltd.
122,2nd Floor, Telecom Nagar,
Near Ranapratap Square,
Nagpur-440022
Fax-0712-2295987
Sr. Vice President,
Adani Power Limited,
7th Floor, Sambhav Building,
Judges Bunglow Road, Bodakdev,
Ahmedabad-380015,Gujarat, India
Ph-079-25557134
Fax:079-25557177
Email-info@adanipower.com
India Bulls
Corp. officeIndiabulls Realtech Limited
India bulls House , 448-451,
Udyog Vihar, Phase V,
Gurgaon-122001
Fax-0124-6682121
Fax-mukeshsinghal@indiabulls.com
Reg. Office
M-62 & 63 , 1st Floor,
Connaught Place,
New Delhi-110001
-
Corrected address
Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station
1
Construction progress
Status
Associated
Transmission
Lines and Substations
State/Agenc
y
Executing
Asociated
Trans.
Works
Ckts
(S/C)
&
(D/C)
1
2
3
4
5
6
7
8
9
1 LILO of Koradi II- Wardh(PG) at Bela
TPP
IEPL
D/C
400
50
75
73
72
44
2 LILO of Mouda - Wardha at Bela
IEPL
D/C
400
0.3
2
2
2
Voltage
Ckm/ TL(No STC(N
Level
MVA s)/Lan os)/Civ
(KV)
d Acq. il Work
(%)
(%)
TE(No STG(C Origin Revised Month
of
al
s)/Rec km)/Er
Target
Comple
p.Mat ection Target
Date
tion
Date
erial(
(%)
%)
10
11
Remark
13
12
Bela TPP (1x250 MW),PS,Maha,IEPL,U1-11/12,
DEC-12
The progress of Koradi-Wardha line is slow . Forest clearence awaited.
NOV-12
For Startup Power.
Remark: The work of LILO of Mouda - Wardha at Bela to be expedited for startup power - ATS critical for evacuation of power & expeced to be commissioned by 12/12
2
Chutak-HEP (4x11 MW), CS, J&K, NHPC, U1-( C) U2- ( C) U3- (C), U4-11/12.,
1 Chutak HEP-Gramthong -II
JKPDD
S/C
66
5
29
29
29
5
SEP-12
Completed.
Stringting completed.
2 Chutak HEP-Kargil-I
JKPDD
S/C
66
10
55
55
55
10
OCT-12
3 Gramthong -II - Sankoo
JKPDD
S/C
66
31
152
131
107
16
DEC-12
4 Khangral - Mulbek -II
JKPDD
S/C
66
23
117
117
113
19
DEC-12
5 Mulbek-II - Kargil -I
JKPDD
S/C
66
28
120
105
100
19
DEC-12
6 Gramthong S/S
JKPDD
66/11
60
100
100
100
100
SEP-12
Work Completed & back charged.
7 Kargil S/S
JKPDD
66/11
60
100
100
100
100
SEP-12
Sub-stations has been charged successfully.
8 Khangral (Bodhkharbu)
JKPDD
66/11
60
100
100
95
95
DEC-12
Equipment erection is in progress.
9 Mulbeck
JKPDD
66/11
60
100
100
JUN-13
Equipment foundation completed.
10 Sankoo S/S
JKPDD
66/11
60
100
100
DEC-12
Civil work completed & equipment erection is in progress.
Remark: Land Development problem is to be resolved.Full load commissioning is pending due to non- availability of load.
3
Dhariwal TPS (2x300 MW), PS, Maharashtra, DIPL, U1-1/13,U2-4/13,
1 Dhariwal TPS -Channdrapur II
DIPL
D/C
400
2 LILO of one ckt of Bhadravati (PG) Parli at Dhariwal
DIPL
D/C
400
16
29
29
29
36
50
4
16
APR-13
Chandrapur II S/S to be ready by Jan 2013.
DEC-12
.
Remark: Chandrapur -II Sub-station is critical for startup power and evacuation of power -action: MSETCL
4
Kalisindh TPS (2x600 MW), SS,Rag,RRVUNL, U1-3/13,U2-8/13,
1 Kalisindh-Jhalawar line
RVPNL
D/C
220
19
35
35
35
19
APR-12
2 Kalisndh TPS - Anta (Baran) Pooling
Station (Quad)
RVPNL
D/C
400
200
220
200
200
138
NOV-12
1
APR-12 Commissioned 4/12.
Forest Approval awaited
Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station
Construction progress
Status
Associated
Transmission
Lines and Substations
State/Agenc
y
Executing
Asociated
Trans.
Works
Ckts
(S/C)
&
(D/C)
1
2
3
Station (Quad)
Voltage
Ckm/ TL(No STC(N
Level
MVA s)/Lan os)/Civ
(KV)
d Acq. il Work
(%)
(%)
4
5
6
7
TE(No STG(C Origin Revised Month
al
of
s)/Rec km)/Er
Target
Comple
p.Mat ection Target
Date
Date
tion
erial(
(%)
%)
8
9
2
10
11
12
Remark
13
Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station
Associated
Transmission
Lines and Substations
State/Agenc
y
Executing
Asociated
Trans.
Works
1
Construction progress
Status
Ckts
(S/C)
&
(D/C)
TE(No STG(C Origin Revised Month
al
of
s)/Rec km)/Er
Target
Comple
p.Mat ection Target
Date
Date
tion
erial(
(%)
%)
2
3
4
5
6
7
8
3 Phagi GSS (Jaipur) - Heerpura
RVPNL
D/C
400
86
123
81
32
4 Phagi(Jaipur south-765 kV)-Ajmer line
RVPNL
D/C
400
210
284
219
154
5 Anta - Phagi (Jaipur South Ckt-1)
RVPNL
S/C
765
210
586
584
549
143
NOV-12
S/C
765
220
570
570
530
130
NOV-12
100
55
70
11
FEB-13
6 Anta - Phagi (Jaipur South Ckt-2)
RVPNL
7 Ajmer S/S
RVPNL
400/220 2x315
8 Anta Pooling station
RVPNL
9 Phagi S/S
RVPNL
765/400 2x150
0
765/400 2x150
0
Remark: Evacuation line critical.
5
Voltage
Ckm/ TL(No STC(N
Level
MVA s)/Lan os)/Civ
(KV)
d Acq. il Work
(%)
(%)
9
10
11
Remark
13
12
NOV-12
DEC11
NOV-12
APR-14
Boundry wall 85 % completed.
APR-14
Boundry wall 80% completed.
Kawai Super Critical TPS (2x660 MW),PS,Adani , Unit 1-3/13,U2-3/13,
1 Kawai - Anta (Baran)
RVPNL
D/C
400
100
136
136
121
26
NOV-12
2 Chhabra TPS-Kawai SCTPS
RVPNL
S/C
400
17
46
45
39
12
NOV-12
3 Anta Pooling station(3 rd)
RVPNL
765/400 1500
MAR-14
Remark: Evacuation system critical.
6
Mettur TPS Stage III (600 MW), SS,TN,U1-9/12(C),
1 LILO of MTPS -Malco at MTPS Stage III TANTRANS
D/C
230
3
9
9
9
3
FEB-11
C
TANTRANS
C
D/C
400
280
324
317
315
211
AUG-12
Based on the order of High Court/ Chennai the works was commenced
as per original approved route. Subsequently, the works was stopped
based on the interim stay orders issued by the High Court Chennai. The
stay was cleared for 8 locations on 21.09.12 and for balance one location
hearing postponted to 11.10.12. Action taken to execute the work at 8
location with police protection. In the mean while, Supreme Court issued
stay for four weeks on 05.10.12 for all Locations
D/C
400
200
MAR-14
Tender will be floated on acquining the land for Sirngarapet ss.
2 MTPS St.III - Arasur
3 MTPS St.III - Singarpet
TANTRANS
C
3
FEB-11 MTPS III- Malco energised 2/11 for start up power.
Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station
Associated
Transmission
Lines and Substations
1
State/Agenc
y
Executing
Asociated
Trans.
Works
Construction progress
Status
Ckts
(S/C)
&
(D/C)
Voltage
Ckm/ TL(No STC(N
Level
MVA s)/Lan os)/Civ
(KV)
d Acq. il Work
(%)
(%)
TE(No STG(C Origin Revised Month
al
of
s)/Rec km)/Er
Target
Comple
p.Mat ection Target
Date
Date
tion
erial(
(%)
%)
2
3
4
5
6
7
8
9
4 MTPS Stage-III - Gobi
TANTRANS
C
S/C
230
3
8
8
8
3
5 MTPS Stage-III - Thingalur
TANTRANS
C
S/C +
D/C
230
90
10
11
Remark
13
12
MAR-12 MAR-12 Commissioned 3/12
JUL-13
Remark: One unit commissioned in 9/12. Evacuation Critical.
7
Maitrishi Usha TPP (Corporate Power) (Chandwa) (Abhijit) (4x270MW), U1-10/12,U2-12/12,U3 & U4 -9/13,
1 Corporate TPP - Jharkhand Pooling
Station
CPL
D/C
400
6
11
2 Latehar - Namkum
CPL
D/C
400
216
320
DEC-12
293
274
132
DEC-12
.
Remark: Generating Company to ensure commissioning of line matching with generation commissioning schedule Status of work not being reported.Jharkhand pooling
8
Nasik (5x270 MW) TPS, PS, Maharashtra, India Bulls, U1-11/12,U2-1/13,U3-6/13,U4-8/13,U5-10/13, U6 & 7-2015-16,
U8-10-Not Finalised,
1 Nasik-Bableshwar
IBPL
D/C
400
2 LILO of Ekherla - Babhaleshwar at
Nasik TPP
3 Nasik TPP - Nasik (MSETCL)
IBPL
D/C
220
For start up power.
IBPL
D/C
400
Completed for startup power.
114
152
151
151
105
DEC-12
Remark: As per generating company start up power & evacuation is no issue.
9
Nimoo Bazgo (NHPC) (3x15 MW),CS,J & K,NHPC,U1-11/12,U2-12/12,U3-2/13.,
1 Alachi - Khalsi S/S
JKPDD
S/C
66
31
145
115
2 Ganglas - Leh Army base
JKPDD
S/C
66
9
44
22
3 Kharu S/S - Himya S/S
JKPDD
S/C
66
51
242
238
186
18
DEC-12
4 Leh (C.P.) - Kharu S/S
JKPDD
S/C
66
25
107
107
95
10
NOV-12
5 Leh (C.P.) - Leh S/S
JKPDD
S/C
66
7
39
30
27
6
NOV-12
6 Leh III - Ganglas
JKPDD
S/C
66
10
53
29
8
7 Nimoo Bazgo HEP - Alachi
JKPDD
S/C
66
4
13
13
7
3
NOV-12
8 Nimoo S/S - Alachi S/S
JKPDD
S/C
66
17
77
77
77
17
SEP-12
64
6
DEC-12
DEC-12
one D/C tower and 7 S/C tower material received.
NOV-12
4
Two span stringing balance.
Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station
Associated
Transmission
Lines and Substations
1
State/Agenc
y
Executing
Asociated
Trans.
Works
Construction progress
Status
Ckts
(S/C)
&
(D/C)
Voltage
Ckm/ TL(No STC(N
Level
MVA s)/Lan os)/Civ
(KV)
d Acq. il Work
(%)
(%)
TE(No STG(C Origin Revised Month
al
of
s)/Rec km)/Er
Target
Comple
p.Mat ection Target
Date
Date
tion
erial(
(%)
%)
10
Remark
2
3
4
5
6
7
8
9
9 Nimoo S/S- Leh S/S
JKPDD
S/C
66
31
152
152
152
31
MAR-12
Stringing Completed.
10 Alchi. S/S
JKPDD
66/11
6.3
100
50
30
10
NOV-12
Civil works equipment installation completed. Power control cable laying
yet to be done.
11 Himya
JKPDD
66/11
60
100
30
12 Khalsi
JKPDD
66/11
60
100
50
13 Kharu
JKPDD
66/11
60
100
20
14 Leh
JKPDD
66/11
60
100
100
100
15 Nimoo S/S
JKPDD
66/11
60
100
50
40
11
13
12
DEC-12
30
100
DEC-12
Work suspended due to want of RCE.
DEC-12
Work suspended due to want of RCE.
SEP-12
Work almost completed.
JUN-13
Civil work completed. Equipment structure erection in progress.
Remark: ATS slow.
10
North Chennai TPS St.II (2x600 MW),SS,TN,U1-5/13,U2-1/13,
1 LILO of NCTPS- Mosur at NCTPS Stage TANTRANS
II (for startup power)
C
D/C
230
3
2
2
2
2
DEC10
NOV-10 NOV-10 Commissioned 11/10.
2 Alamathy -Sunguvarchatram
TANTRANS
C
M/C
400
94
160
143
123
100
JUN10
DEC-12
Tower foundation pending at 18 locations due to court case, ROW
issues etc., Tower erection pending at 19 other locations due to court
case, ROW issues etc.,
3 NCTPS St.II- Alamathy 400 kV S/S
TANTRANS
C
M/C
400
168
114
114
111
128
AUG-12
Row issues at 3 locations in respect of M/s Venkatesh Coke, District
collector/ Thiruvallur has issued orders on 18.05.12 against the
TANTRANSCO to deviate the line away from the parties land. Writ
appeal has been filed against the orders of the District Collector and
interim stay granted for 4 weeks. The work had stopped as the
petitioners had obtained interim stay order. Last hearing held on
19.10.12 & 02.11.12.Next hearing posted to 06.11.12.
Remark: Startup power no issue. TNEB stated that unit can be commissioned using ATS of Vallore TPS (to be get confirmed in the meeting). For evacuation from 2nd unit
11
Palatana CCGT (2x363.3 MW),PS,Tri,OTPC, Module 1 (GT-10/12,ST-10/12), Module 2 - 13/14,
1 Kukurmara - Azara line
AEGCL
D/C
132
10
28
DEC-12
5
Contract awarded on 23.11.2011 to M/s Horizone Hi-Trch
Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station
Associated
Transmission
Lines and Substations
1
State/Agenc
y
Executing
Asociated
Trans.
Works
Construction progress
Status
Ckts
(S/C)
&
(D/C)
Voltage
Ckm/ TL(No STC(N
Level
MVA s)/Lan os)/Civ
(KV)
d Acq. il Work
(%)
(%)
TE(No STG(C Origin Revised Month
al
of
s)/Rec km)/Er
Target
Comple
p.Mat ection Target
Date
Date
tion
erial(
(%)
%)
2
3
4
5
6
7
8
9
2 Kukurmara - Boko line
AEGCL
D/C
132
80
126
126
126
80
10
JUL-12
3 LILO of Agia - Sarusajai line at
Kukurmara S/S
AEGCL
D/C
220
4
8
8
8
4
SEP-12
4 LILO of Palatana - Bongaigaon line at
Kukurmara S/S
AEGCL
D/C
400
7
17
5 LILO of Bongaigaon - Palatana line at
Killing (Byrnihat)
MeECL
D/C
400
9
9
7
6
6 Byrnihat - Bongaigaon
NETC
D/C
400
408
572
432
396
7 Palatana -Silchar
NETC
D/C
400
495
680
680
8 Silchar - Byrnihat
NETC
D/C
400
420
582
555
9 LILO of 400KV S/C Kaithalguri - Misa
line at Mariani (New) (Charged at
PGCIL
D/C
400
1
4
DEC-12
10 LILO of Aizwol (PG) - Zemabawk at
Melriat (PG)
11 LILO of Loktak - Imphal at Imphal (New)
line
12 Mariani (New) - Mokikchung (PG)
PGCIL
D/C
132
30
45
DEC-12
PGCIL
D/C
132
2
5
DEC-12
PGCIL
D/C
220
56
156
13 Melriat (New) - Sihmui line
PGCIL
D/C
132
12
30
11
13
12
Completed 7/12
SEP-12 Commissioned 9/12.
JUL-13
Deposited work contract given to PGCIL on 12.10.2011. work in
progress.
NOV-12
Detail survey completed.
142
MAR-13
March 2013 (anticipated) which is likely to be shifted because
(i) Permission for tree cutting from Assam Forest Deptt. is yet to be
received and consequently commencement of work in 72 locations is
getting delayed;
(ii) Forest clearance is pending for additional stretch of 1.034 Km of
forest part of which was earlier declared by Assam Forest Deptt. as non
forest area during the processing of original proposal;(iii) Deterioration of
law and order situation in Kokrajhar District in previous months affected
progress;
(iv) Prolonged monsoon and flood situations in Assam adversely
influenced progress ; and
(v) Unprecedented rise in water level in Brahmputra river till last week of
October 2012 delayed recommencement of work in well foundations by 1
month.
680
495
AUG-12 AUG-12 Commissioned 8/12
530
344
DEC-12
220KV)
53
Remark
27
MAR-13
DEC-13
6
Completion of line is expected in December 2012.
Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station
Associated
Transmission
Lines and Substations
1
State/Agenc
y
Executing
Asociated
Trans.
Works
Construction progress
Status
Ckts
(S/C)
&
(D/C)
Voltage
Ckm/ TL(No STC(N
Level
MVA s)/Lan os)/Civ
(KV)
d Acq. il Work
(%)
(%)
2
3
4
5
6
PGCIL
D/C
132
2
4
15 Palatana - Surajmaninagar line
(Charged at 132 KV)
PGCIL
D/C
400
74
118
118
118
74
JUN-12
JUN-12 Commissioned 6/12
16 Silchar - Badarpur (PG) line.
PGCIL
D/C
132
38
69
69
69
38
APR-12
APR-12 Commissioned 4/12.
17 Silchar - Hailakandi (Contingency
arrangement)
PGCIL
D/C
132
50
65
65
65
39
JUN-12
Line test charged in Jun'12.
18 Silchar - Imphal (New) line (to be
charged at 132KV)
PGCIL
D/C
400
332
470
159
35
JUN-13
Severe ROW problem.
19 Silchar - Melriat (New) line (charged at
132KV)
PGCIL
D/C
400
286
439
135
89
32
MAR-13
Ist stage forest clearance yet to be received.
20 Silchar - Purba Kanchan Bari line
(charged at 132KV)
PGCIL
D/C
400
256
376
313
231
38
MAR-13
Severe ROW problem, Works under police protection. Ist stage forest
clearance yet to be received.
21 Silchar - Srikona line
PGCIL
D/C
132
2
7
7
7
2
MAR-12 MAR-12 Line commissioned in Mar'12.
22 Surajmani Nagar - Agartala 79 Tilla
TSECL
D/C
132
36
41
18
23 Surajmani Nagar - Badarghat
TSECL
D/C
132
6
24 Surajmani Nagar - Budhujngnagar
TSECL
D/C
132
36
25 Surajmani Nagar - Rokhia
TSECL
D/C
132
35
26 Surajmani Nagar - Udaipur
TSECL
D/C
132
50
27 Surajmani nagar-P.K.Bari
TSECL
D/C
400
260
28 Udaipur - Palatana
TSECL
D/C
132
12
41
41
29 Killing (Byrnihat)-EPIP-I
MeECL
M/C
132
17
19
10
30 LILO of Zemabawk - W.Phaileng at
Sihhmui
31 Pasighat - Roing line.
P&ED,
S/C
132
5
PGCIL
S/C on
D/C
132
70
8
9
10
Remark
14 Mokokchung (PG) - Mokokchung
(Nagaland) line
63
7
TE(No STG(C Origin Revised Month
al
of
s)/Rec km)/Er
Target
Comple
p.Mat ection Target
Date
Date
tion
erial(
(%)
%)
11
MAR-13
25
50
413
12
13
12
All efforts shall be made to complete line matching with commissioning
of unit-2 of Palatanna GBPP>
DEC-12
Work awarded. Survey works complected. Engg. Work is in progress.
ROW Problem.
DEC-12
Fund not yet tied up. Fund proposed in World Bank.
DEC-12
Survey works complected. Engg. In progress. Expected date of
commissioning of 1st ckt by Dec'11 and entire works by March'12. ROW
problem.
MAR-13
Fund not yet tied up. Propsoed in World Bank / NLCPR.
DEC-12
Fund not yet tied up. Proposed in World Bank / NEC.
MAR-13
Fund not yet tied up. Proposed under World Bank Financing
AUG-11 AUG-11 Line test charged on 21.08.2011.
DEC-12
Work in Progress.
SEP-12
338
42
MAR-13
7
Progress affected due to ROW problem (geogrephical condition)
Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station
Associated
Transmission
Lines and Substations
1
State/Agenc
y
Executing
Asociated
Trans.
Works
Construction progress
Status
Ckts
(S/C)
&
(D/C)
Voltage
Ckm/ TL(No STC(N
Level
MVA s)/Lan os)/Civ
(KV)
d Acq. il Work
(%)
(%)
TE(No STG(C Origin Revised Month
al
of
s)/Rec km)/Er
Target
Comple
p.Mat ection Target
Date
Date
tion
erial(
(%)
%)
2
3
4
5
6
7
8
32 Roing - Tezu line
PGCIL
132
60
241
70
37
33 Tezu - Namsai line.
PGCIL
S/C on
D/C
S/C on
D/C
132
90
330
54
30
34 Kukumara S/S (2x50)
AEGCL
220/132
100
100
30
10
35 Kukurmara S/S
AEGCL
400/220
630
100
30
9
10
11
APR11
MAR-13
Remark
13
12
MAR-13
Completion matching with S/Stn. (land problem.)
DEC-13
Transformer is available. Base casting of 5 nos. of column foundation
completed and rest are in progress.
DEC-13
Structure received. Base and 50% of chimney casting works completed
(total-37 nos.) Bolts grouting of 2 nos. of foundations completed and rest
are in progress. W. O. for Tr. and reactors placed.
36 Panchgram (Aug.) S/S
AEGCL
132/33
50
100
100
100
100
DEC-11 DEC-11 Commissioned 12/11
37 Killing (Byrnihat) S/S
MeECL
400/220
630
100
50
95
60
FEB-13
38 Yurembam (Aug.) S/S
P&ED,
100
100
Land though acquired but could not be taken possession due to
resistance by the landowners. Matter has already been taken up with the
District Admisnistration. Additional award for the crops has been
prepared and approval of the Revenue Deppt, Govt of Meghalaya is
awaited. As of now work is being implemented in the available area.
39 Imphal S/S
PGCIL
132/33 3X33.
5
132/33 2x50
DEC-12
40 Melriat S/S (Upgadable to 400 kV)
PGCIL
132/33
2x50
100
6
DEC-13
Engg. in progress.Civil works under progress.
41 Mokokchung (New)
PGCIL
220/132 2x50
100
10
MAR-13
Engg.& civil works under progress.
42 Namsai S/S
PGCIL
132/33
2x15
100
6
DEC-13
43 Roing S/S
PGCIL
132/33
2x15
100
30
20
Civil works under progress
.
Civil works & supply under progress
44 Silchar (New)
PGCIL
400/220 2x200
100
100
100
100
MAR-12 MAR-12 Commissioned 3/12.
DEC-13
Civil works under progress
100
80
AUG-12
In 1st phase, out of nine no bays,Pgcil wii complete 2 no bays and
balance seven no bays by TSECL by Aug'2012. Site leveling work
MAR-13
45 Tezu S/S
PGCIL
132/33
2x15
100
20
46 Surajmaninagar S/S (Upgrdable to 400
kV)
TSECL
132/33
2x50
100
100
DEC-13
8
Completion likely to be delayed.
Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station
Construction progress
Status
Associated
Transmission
Lines and Substations
State/Agenc
y
Executing
Asociated
Trans.
Works
Ckts
(S/C)
&
(D/C)
1
2
3
kV)
Voltage
Ckm/ TL(No STC(N
Level
MVA s)/Lan os)/Civ
(KV)
d Acq. il Work
(%)
(%)
4
TE(No STG(C Origin Revised Month
al
of
s)/Rec km)/Er
Target
Comple
p.Mat ection Target
Date
Date
tion
erial(
(%)
%)
5
6
7
8
9
10
11
12
Remark
13
balance seven no bays by TSECL by Aug'2012. Site leveling work
already completd and control room have already started and completed
around 20% Equipment. Equipment receiving is in progress.
Remark: Work of Silchar-Bongaigaon is slow and neds to be expedite.
12
Parbati-III HEP (4x130 MW),CS,HP,NHPC,U1-1/13,U2-11/12,U3-1/13,U4-6/13.,
1 LILO of Parbati -II - Koldam at Parbati
Pooling Point.
PGCIL
D/C
400
2
4
2
1
2 LILO of Parbati -II - Parbati Pooling
Point at Parbati -III
PGCIL
D/C
400
4
7
5
5
2
DEC-12
3 Parbati Pooling Point - Amritsar
PGCIL
D/C
400
502
664
624
606
398
FEB-13
JAN-10 DEC-12
Forest approval received in Aug'12 (Clubbed with Parbati-III - Amritsar
line)
All efforts being made to complete the line earlier to matching with Gen.
Re-routing of line done avoiding Wildlife Sanctuary area & revised
proposal forwarded to MOEF. Ist stage clearance received in Jun'12.
Final clearance received in Sep'12. Tree marking & cutting being delayed
due to election in HP.
Remark: Parbati-II - Koldam is planned to be connected to Parbati-III as contingency agreement.
13
Ramgarh CCPP Extn.-III, (110+50 MW), SS,Rag, RRVUNL, (GT-1/13,ST-5/13,
1 Chandan - Dechu
RVPNL
D/C
220
210
322
149
43
2 Dechu - Phalodi
RVPNL
D/C
220
71
119
119
119
3 Ramgarh (GTPP) - Chandan
RVPNL
D/C
220
194
309
309
114
MAR-13
71
SEP-12
SEP-12 Commissioned 9/12.
MAR-13
Remark: Transmission lines needs to be expedited critical.Dechu S/S Commissioned. Full load evacuation critical.
14
RaghunathpurTPS (2x600 MW),CS,WB,DVC,U1-1/13,U2-6/13,
1 LILO of Maithon-Ranchi (PG) at
Raghunathpur
DVC
D/C
400
21
33
33
33
21
MAR-11 MAR-11 Commissioned 3/11.
2 Raghunathpur TPS -Ranchi (PG)
DVC
D/C
400
311
438
397
374
96
DEC-12
Remark: Transmission lines needs to be expedited.
9
Forest clearance obtained from MOEF,GoI on 29-5-12.Matter is being
persued with the Govt. of Jharkhand for issuance of Working
clearance.For Bengal portion final forest clearance also obtained.Power
Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station
15
Construction progress
Status
Associated
Transmission
Lines and Substations
State/Agenc
y
Executing
Asociated
Trans.
Works
Ckts
(S/C)
&
(D/C)
1
2
3
Voltage
Ckm/ TL(No STC(N
Level
MVA s)/Lan os)/Civ
(KV)
d Acq. il Work
(%)
(%)
4
5
7
6
TE(No STG(C Origin Revised Month
al
of
s)/Rec km)/Er
Target
Comple
p.Mat ection Target
Date
Date
tion
erial(
(%)
%)
8
9
10
11
Remark
13
12
Sasan UMPP (6x660 MW),PS,MP,Reliance,U1-5/13,U2-12/13,U3-7/14,U4-2/15,U5-9/15,U6-4/16,
1 Bina (ICT-II) S/S
PGCIL
2 LILO of both ckt Vindhyachal -Jabalpur
at Sasan
PGCIL
2xD/C
400
13
3 Bina - Bina (MPPTCL)
PGCIL
D/C
400
10
6
6
6
4 Indore - Indore (MPPTL)
PGCIL
D/C
400
50
139
139
139
98
5 Fatehpur- Agra line-II
PGCIL
S/C
765
303
896
816
586
90
6 Sasan - Satna line -I
PGCIL
S/C
765
246
689
655
648
220
7 Sasan - Satna line -II
PGCIL
S/C
765
243
671
612
596
8 Sasaram - Fatehpur line-II
PGCIL
S/C
765
356
953
788
390
765/400 1000
100
85
95
80
DEC-12
26
26
26
13
MAR-12 MAR-12 Ready for commissioning 3/12.
DEC12
Supply, civil works & erection under progress.
DEC-12
MAR-12 MAR-12 Commisisoned 03/12
FEB-13
.
DEC-12
Completion being expedited for evacuation of Vindhyachal-IV Unit
through contingency arrangement, however delay due to delay in forest
approval(Stage -I accorded in July'12).
172
DEC-12
Forest clearance awaited. Critical.
80
FEB-13
DEC12
DEC12
9 Satna - Bina line -I
PGCIL
S/C
765
274
738
738
738
274
MAR-12
JAN-12 Line commissioned in Jan'12(charged at 400 KV)
10 Satna - Bina line -II
PGCIL
S/C
765
276
737
737
737
276
JUN-12
JUN-12 Commissioned 6/12
11 Bina. S/S
PGCIL
765/400 1000
100
100
100
100
AUG-12 AUG-12 Commissioned 8/12.
12 Gwalior
PGCIL
765/400 2x150
0
100
90
85
70
DEC-12
Award placed in Aug'10. Supply, Civil works & erection under progress.
13 Indore
PGCIL
765/400 2x150
0
100
70
80
48
DEC-12
Award placed in Aug'10. Supply, Civil works & erection under progress.
14 Satna (1st ICT)
PGCIL
765/400 1000
100
100
100
100
JUN-12
15 Satna (2nd ICT)
PGCIL
765/400 1000
100
100
100
100
AUG-12 AUG-12 Commissioned 8/12.
JUN-12 ICT-I Commissioned 6/12.
Remark: Tranmission works need to be expedited by PGCIL
16
Tiroda TPP (Gondia ) PH-I (2x660 MW),PS,MAHA,ADANI,U1-9/12, (C),U2-11/12 ,PH II (3x660 MW) U1-2/13, U22/13,U3-3/13,
1 Tiroda TPP - Warora (2nd ckt)
APL
D/C
400
218
2 Tiroda TPP -Warora (1st ckt)
APL
S/C
400
218
587
587
587
436
AUG-12 AUG-12 218 Ckm Commissioned 8/12
218
SEP-12
10
2nd ckt commissioned 8/12. and 1st ckt ready for commissioning.
Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station
Construction progress
Status
Associated
Transmission
Lines and Substations
State/Agenc
y
Executing
Asociated
Trans.
Works
Ckts
(S/C)
&
(D/C)
1
2
3
3 Warora S/S
MSETCL
4 Aurangabad II - Aurangabad (PG)
Voltage
Ckm/ TL(No STC(N
Level
MVA s)/Lan os)/Civ
(KV)
d Acq. il Work
(%)
(%)
4
5
400/220 1000
TE(No STG(C Origin Revised Month
al
of
s)/Rec km)/Er
Target
Comple
p.Mat ection Target
Date
Date
tion
erial(
(%)
%)
6
7
8
9
10
11
100
65
99
57
SEP12
MAR-13
MSETCL
2xS/C
5 Akola- I - Akola-II
APL
D/C
400
62
89
88
84
34
DEC-12
6 Tiroda - Koradi - Akola - Aurangabad
line ckt-I
APL
S/C
765
579
1598
1431
1235
259
MAR-13
7 Tiroda - Koradi - Akola - Aurangabad
line ckt-II
APL
S/C
765
573
1584
1194
324
8 Akola S/S
APL
765/400 1500
9 Koradi S/S
APL
765/400 3000
10 Tiroda (Gondia) S/S
APL
765/400 2x150
0
765/400 2x150
0
11 Aurangabad II S/S
MSETCL
765
JUN-13
Remark
13
12
work in progress.
.
JAN-13
100
90
50
MAR-13
.
Work order issued recently
Remark: Works to be completed matching with the generation.
17
Ukai Extn. (2x490 MW),PS,Guj,GSECL, U6-12/12,U7-3/13,
1 Kosamba-Chorania line
GETCO
D/C
400
457
636
556
488
164
JUL-11 APR-13
2 LILO of Asoj - Ukai at Kosamba
GETCO
D/C
400
64
96
96
96
64
JAN-12
3 UKai-Kosamba
GETCO
D/C
400
136
215
198
177
85
DEC-12
WIP
99
27
FEB-13
Readiness of Jaipur (RVPNL) S/S critical.
JUN-13
Vindhychal PS critical contigency arrangement being planned by-passing
V'chal pooling stn.
DEC-12
Vindhyachal PS critical contigency arrangament being planned bypassing Vindhyachal Pooling Stn. for evacuation of Vindhyachal Power.
Efforts being made to complete earlier.
WIP
JAN-12 Commissioned 1/12.
Remark: No issue.
18
Vindhyachal-IV ,CS,MP,NTPC, U11 C), U12-3/13 Rihand - III,(1000MW each) Gen. U5- (C ), U6-3/13,,
1 Bassi (PG)- Jaipur (RVPN) 765 KV line
(Q)
PGCIL
D/C
400
114
136
120
2 Sasan - Vindhyachal Pooling station
PGCIL
D/C
400
6
18
11
3 Vindhyachal-IV - Vindhyachal Pooling
Station line (Q)
PGCIL
D/C
400
62
86
83
77
54
11
Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station
Associated
Transmission
Lines and Substations
1
State/Agenc
y
Executing
Asociated
Trans.
Works
Construction progress
Status
Ckts
(S/C)
&
(D/C)
Voltage
Ckm/ TL(No STC(N
Level
MVA s)/Lan os)/Civ
(KV)
d Acq. il Work
(%)
(%)
TE(No STG(C Origin Revised Month
al
of
s)/Rec km)/Er
Target
Comple
p.Mat ection Target
Date
Date
tion
erial(
(%)
%)
2
3
4
5
6
7
8
4 Satna - Gwalior line (60 Km D/C
Portion) Ckt-II
PGCIL
D/C+S/C
765
304
778
502
124
5 Vindhyachal Pooling Station - Satna line
(2 Km D/C Portion) Ckt-II
PGCIL
D/C+S/C
765
234
628
326
201
6 Gwalior - Jaipur (RVPN) line
PGCIL
S/C
765
300
794
450
302
7 Rihand - Vindhyachal Pooling Station
line-I
PGCIL
S/C
765
32
8 Rihand - Vindhyachal Pooling Station
line-II
PGCIL
S/C
765
9 Sasan - Vindhyachal Pooling Station line
PGCIL
S/C
765
9
10
11
Remark
13
12
JUN-13
Completion likely delay due to delay in forest clearance.
25
JUN-13
Completion likely delay due to forest clearance. Vindhyachal PS critical.
25
MAR-13
Best efforts target wildlife santuary clearance & readiness of
Jaipur(RRVPN)S/S. Critical.
91
JUN-13
Award placed in Sep'12.Engg./survey under progress.
31
91
JUN-13
Package re-tendered (under award). Critical.
10
19
DEC-12
Vindhyachal PS critical.
19
19
10
10 Satna - Gwalior line (Ckt-I)
PGCIL
S/C
765
337
902
604
245
38
JUN-13
Completion likely delay due to delay in forest clearance.
11 Vindhyachal Pooling Station Satna line
(Ckt-I)
PGCIL
S/C
765
253
681
356
190
10
JUN-13
Completion likely delay due to forest clearance. Vindhyachal PS critical.
12 Vindhyachal Pooling Station
PGCIL
MAR-13
Award placed in Feb'11.
Completion affected due to land acquiation & encrochement. Completion
critical.
765/400 2x150
0
Remark: Transmission System critical.PGCIL to ensure the commissioning of contingency plan matching with generation.