Government of India Central Electricity Authority Ministry of Power Power SystemProjectMonitoring Division Sewa Bhawan, R.K.Puram New Delhi-110 066 Email:ceapspmcea@rediffmail.com Tele : 011 - 26100660 Telefax: 011 – 26103242 ISO. : 9001-2008 Dated: 19th Nov.2012 No.CEA/PS/PSPM/7/1//2012 To, All concerned (as per list) Subject: Meeting to review the RFD targets in respect of commissioning of transmission lines for the year 2012-13. Sir, Shri A. K. Rampal, Chief Engineer (PSPM) CEA, would review the achievements (Till 31-10-2012) of result frame works document (RFD) targets for the year 2012-13 at 11:00 am on 23-11-2012 in the conference room, 6th floor, CEA, Sewa Bhawan, R. K. Puram, New Delhi. 2. Please make it convenient to attend the above mentioned meeting and bring updated status in respect of transmission lines and sub-stations (for transformation capacity), which have been commissioned/made ready for commissioning by your Department/Organization. 3. The information may ceapspmcea@rediffmail.com . be sent to PSPM division, CEA on e-mail: 4. In this meeting ATS of generation projects will also be discussed. The list of projects will be posted on CEA’s website. Thanking you. Yours faithfully, (SD) (Prahlad) Director (PSPM) Tele-fax : 26103242 Mobile No : 9968481810 E-mail : prahladparihar@cea.nic.in RFD Meeting on 23-11-2012, Address list Chief Engineer(Transmission) Chattisgarh State Electricity Board, Dagania RAIPUR – 492013 Fax No: 0771 5066900/4066566 Gujarat Chief Engineer (Project), Gujarat Energy Transmission Corporation Limited, Sardar Patel Vidyut Bhawan, Race Course, VADODARA-390 007 Fax No: 0265-2338164 Goa Chief Engineer Electricity Department, Government of Goa, IIIrd Floor, Vidyut Bhawan, PANAJI(GOA)-403 001 Fax No: 0832-2222354 Madhya Chief Engineer(Power System), Pradesh Madhya Pradesh Power Transmission Company Limited, Shakti Bhavan, Vidyut Nagar, Rampur, Block-3 JABALPUR - 482 008 Fax No: 0761-2665593/2665593 Maharashtra Chief Engineer (Tr. Projects) Maharashtra State Electricity Transmission Co. Ltd., Prakashganga, Bandra Kurla Complex,Plot No C-19, E-Block, Bandra (E), MUMBAI – 400 051 Fax No: 022 – 26598587 Uttar Pradesh Chief Engineer (Control & Monitoring), U.P. Power Transmission Corporation Ltd., Shakti Bhawan Extn. 11th Floor, 14, Ashok Marg, Lucknow – 226 001 Fax No: 0522-2288410/2287785 J&K Chief Engineer(Jammu) New Secretariat Building, Jammu (J&K) Ph: J: 0191 2532809 S: 0914 2452236 Fax:J: 0191 2456206 S: 0914 2434279 Delhi Director (Operation), Delhi Transco Limited, Shakti Sadan, Kotla Road, New Delhi – 110 002 Fax No: 23234640 Chattisgarh Punjab Chairman and Managing Director, Punjab State Transmission Corporation Ltd. The Mall Road, Patiala-147001 Fax:0175-2213199 Uttrakhand General Manager(Project), Power Transmission Corporation of Uttrakhand (PTCUL), 650 Kanwali Road, Dehrudun-248001 Fax No: 0135-2762460 Chief Engineer (Transmission), Himachal Pradesh State Electricity Board, Vidyut Bhawan, Kumar House, Shimla – 171004 Fax No: 0177-2658984 Chief Engineer (Plg. & Design), Haryana Vidyut Prasaran Nigam, Shakti Bhawan, Sector – 6, Panchkula – 134 113 Fax No:0172-2560640 Chief Engineer (T&C), Rajasthan Rajya Vidyut Prasaran Nigam Limited, Old power House,Ram Mandir , Jaipur – 302 006 Fax No: 0141-2740168/2740794 Chief Engineer, 400kV APTRANSCO, Vidyut Soudha, Hyderabad – 500 082 Fax No: 040 23320565/23313791 Director (Transmission) , Karnataka Power Transmission Corporation Ltd. Kaveri Bhawan, P./B. No. 9999,Bangalore – 560 009 Fax No: 080-2221352/080-22215187 Chief Engineer(Corporate Planning) Kerala State Electricity Board Vidyuthi Bhavanam, Pattom, Thiruvananthapuram – 695 004 Fax No: 0471-2441328 Chief Engineer (Transmission) TANTRANSCO, 6th Floor, NPKRR Maaligai, 800, Anna Salai, Chennai – 600 002 Fax No: 044-28516362 Himachal Pradesh Haryana Rajasthan Andhra Pradesh Karnataka Kerala Tamil Nadu Tripura Meghalaya BSEB WBSEB OPTCL Assam NETCL RPTL Chief Engineer Tripura State Electricity Corpn.Ltd., Vidyut Bhawan, Agartala – 799 001 Fax: 0381 2323286 Director (Transmission), Meghalaya Power Transmission Corporation Limited (MePTCL) , Lumjingshai, Short Round Road, Shillong.– 793 001 Fax No: 0364 2592022 Chairman, Bihar State Electricity Board, Vidyut Bhavan , Bailey Road, Patna-800021. Fax No. 0612-2504937 / 250557 Chairman & Managing Director, WBSETCL, Vidyut Bhavan, 7th Floor, Sector-II, Bidhannagar, Kolkata-700091. Fax # 033-23373002 Chairman-cum-Managing Director, Orissa Power Transmission Corporation Ltd., Janpath, Bhubaneswar-751022. Fax No. 0674-2541904 Chief Engineer , Assam Electricity Grid Corporation Ltd., Bijulee Bhawan, Paltan Bazar, Guwahati – 781 001, Fax: 0361 2541090. Managing Director North East Transmission Company Ltd. 1st Floor Ambiance Corporate Tower Ambiance Mall, Gurgaon Haryana – 122001 Fax : 0124-24716060 Shri Alok Roy, CEO, Reliance Power Transmission Limited, 12th Floor, Building No. 10 B, DLF Cyber City Gurgaon, Haryana – 122002 PGCIL DVC NHPC Abhijeet Power BHEL Ideal Energy Adani Chairman & Managing Director, Power Grid Corporation of India Ltd., Saudamini, Plot No. 2,Sector-29, Gurgaon-122001. Fax No.0124-2571922 The Chairman, Damodar Valley Corporation, DVC Towers, VIP Road, Kolkata -700054. Fax No.033-23551252 Chairman & Managing Director , NHPC, N.H.P.C Office Complex, Sector-33, Faridabad - 121003 (Haryana) E-Mail: webmaster@nhpc.nic.in FAX : 0129 -2277941 Corporate Office Landmark Building, 6th Floor, Wardha Road, Ramdaspeth, Nagpur-440010, INDIA Phone : +91 712-7113400 / 401 / 402 Fax : +91 712-7113405 Chandwa Sharda Bhawan, Devi Mandap Road,Chandwa Dist. Latehar 829 203 Jharkhand, INDIA Phone : 06565 226 883 / 93 Chairman & Managing Director,BHEL, BHEL House, Siri Fort, New Delhi – 110049, India Fax : 26493021; 26492534 Phone 66337000 Ideal Energy Projects Ltd. 122,2nd Floor, Telecom Nagar, Near Ranapratap Square, Nagpur-440022 Fax-0712-2295987 Sr. Vice President, Adani Power Limited, 7th Floor, Sambhav Building, Judges Bunglow Road, Bodakdev, Ahmedabad-380015,Gujarat, India Ph-079-25557134 Fax:079-25557177 Email-info@adanipower.com India Bulls Corp. officeIndiabulls Realtech Limited India bulls House , 448-451, Udyog Vihar, Phase V, Gurgaon-122001 Fax-0124-6682121 Fax-mukeshsinghal@indiabulls.com Reg. Office M-62 & 63 , 1st Floor, Connaught Place, New Delhi-110001 - Corrected address Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station 1 Construction progress Status Associated Transmission Lines and Substations State/Agenc y Executing Asociated Trans. Works Ckts (S/C) & (D/C) 1 2 3 4 5 6 7 8 9 1 LILO of Koradi II- Wardh(PG) at Bela TPP IEPL D/C 400 50 75 73 72 44 2 LILO of Mouda - Wardha at Bela IEPL D/C 400 0.3 2 2 2 Voltage Ckm/ TL(No STC(N Level MVA s)/Lan os)/Civ (KV) d Acq. il Work (%) (%) TE(No STG(C Origin Revised Month of al s)/Rec km)/Er Target Comple p.Mat ection Target Date tion Date erial( (%) %) 10 11 Remark 13 12 Bela TPP (1x250 MW),PS,Maha,IEPL,U1-11/12, DEC-12 The progress of Koradi-Wardha line is slow . Forest clearence awaited. NOV-12 For Startup Power. Remark: The work of LILO of Mouda - Wardha at Bela to be expedited for startup power - ATS critical for evacuation of power & expeced to be commissioned by 12/12 2 Chutak-HEP (4x11 MW), CS, J&K, NHPC, U1-( C) U2- ( C) U3- (C), U4-11/12., 1 Chutak HEP-Gramthong -II JKPDD S/C 66 5 29 29 29 5 SEP-12 Completed. Stringting completed. 2 Chutak HEP-Kargil-I JKPDD S/C 66 10 55 55 55 10 OCT-12 3 Gramthong -II - Sankoo JKPDD S/C 66 31 152 131 107 16 DEC-12 4 Khangral - Mulbek -II JKPDD S/C 66 23 117 117 113 19 DEC-12 5 Mulbek-II - Kargil -I JKPDD S/C 66 28 120 105 100 19 DEC-12 6 Gramthong S/S JKPDD 66/11 60 100 100 100 100 SEP-12 Work Completed & back charged. 7 Kargil S/S JKPDD 66/11 60 100 100 100 100 SEP-12 Sub-stations has been charged successfully. 8 Khangral (Bodhkharbu) JKPDD 66/11 60 100 100 95 95 DEC-12 Equipment erection is in progress. 9 Mulbeck JKPDD 66/11 60 100 100 JUN-13 Equipment foundation completed. 10 Sankoo S/S JKPDD 66/11 60 100 100 DEC-12 Civil work completed & equipment erection is in progress. Remark: Land Development problem is to be resolved.Full load commissioning is pending due to non- availability of load. 3 Dhariwal TPS (2x300 MW), PS, Maharashtra, DIPL, U1-1/13,U2-4/13, 1 Dhariwal TPS -Channdrapur II DIPL D/C 400 2 LILO of one ckt of Bhadravati (PG) Parli at Dhariwal DIPL D/C 400 16 29 29 29 36 50 4 16 APR-13 Chandrapur II S/S to be ready by Jan 2013. DEC-12 . Remark: Chandrapur -II Sub-station is critical for startup power and evacuation of power -action: MSETCL 4 Kalisindh TPS (2x600 MW), SS,Rag,RRVUNL, U1-3/13,U2-8/13, 1 Kalisindh-Jhalawar line RVPNL D/C 220 19 35 35 35 19 APR-12 2 Kalisndh TPS - Anta (Baran) Pooling Station (Quad) RVPNL D/C 400 200 220 200 200 138 NOV-12 1 APR-12 Commissioned 4/12. Forest Approval awaited Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station Construction progress Status Associated Transmission Lines and Substations State/Agenc y Executing Asociated Trans. Works Ckts (S/C) & (D/C) 1 2 3 Station (Quad) Voltage Ckm/ TL(No STC(N Level MVA s)/Lan os)/Civ (KV) d Acq. il Work (%) (%) 4 5 6 7 TE(No STG(C Origin Revised Month al of s)/Rec km)/Er Target Comple p.Mat ection Target Date Date tion erial( (%) %) 8 9 2 10 11 12 Remark 13 Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station Associated Transmission Lines and Substations State/Agenc y Executing Asociated Trans. Works 1 Construction progress Status Ckts (S/C) & (D/C) TE(No STG(C Origin Revised Month al of s)/Rec km)/Er Target Comple p.Mat ection Target Date Date tion erial( (%) %) 2 3 4 5 6 7 8 3 Phagi GSS (Jaipur) - Heerpura RVPNL D/C 400 86 123 81 32 4 Phagi(Jaipur south-765 kV)-Ajmer line RVPNL D/C 400 210 284 219 154 5 Anta - Phagi (Jaipur South Ckt-1) RVPNL S/C 765 210 586 584 549 143 NOV-12 S/C 765 220 570 570 530 130 NOV-12 100 55 70 11 FEB-13 6 Anta - Phagi (Jaipur South Ckt-2) RVPNL 7 Ajmer S/S RVPNL 400/220 2x315 8 Anta Pooling station RVPNL 9 Phagi S/S RVPNL 765/400 2x150 0 765/400 2x150 0 Remark: Evacuation line critical. 5 Voltage Ckm/ TL(No STC(N Level MVA s)/Lan os)/Civ (KV) d Acq. il Work (%) (%) 9 10 11 Remark 13 12 NOV-12 DEC11 NOV-12 APR-14 Boundry wall 85 % completed. APR-14 Boundry wall 80% completed. Kawai Super Critical TPS (2x660 MW),PS,Adani , Unit 1-3/13,U2-3/13, 1 Kawai - Anta (Baran) RVPNL D/C 400 100 136 136 121 26 NOV-12 2 Chhabra TPS-Kawai SCTPS RVPNL S/C 400 17 46 45 39 12 NOV-12 3 Anta Pooling station(3 rd) RVPNL 765/400 1500 MAR-14 Remark: Evacuation system critical. 6 Mettur TPS Stage III (600 MW), SS,TN,U1-9/12(C), 1 LILO of MTPS -Malco at MTPS Stage III TANTRANS D/C 230 3 9 9 9 3 FEB-11 C TANTRANS C D/C 400 280 324 317 315 211 AUG-12 Based on the order of High Court/ Chennai the works was commenced as per original approved route. Subsequently, the works was stopped based on the interim stay orders issued by the High Court Chennai. The stay was cleared for 8 locations on 21.09.12 and for balance one location hearing postponted to 11.10.12. Action taken to execute the work at 8 location with police protection. In the mean while, Supreme Court issued stay for four weeks on 05.10.12 for all Locations D/C 400 200 MAR-14 Tender will be floated on acquining the land for Sirngarapet ss. 2 MTPS St.III - Arasur 3 MTPS St.III - Singarpet TANTRANS C 3 FEB-11 MTPS III- Malco energised 2/11 for start up power. Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station Associated Transmission Lines and Substations 1 State/Agenc y Executing Asociated Trans. Works Construction progress Status Ckts (S/C) & (D/C) Voltage Ckm/ TL(No STC(N Level MVA s)/Lan os)/Civ (KV) d Acq. il Work (%) (%) TE(No STG(C Origin Revised Month al of s)/Rec km)/Er Target Comple p.Mat ection Target Date Date tion erial( (%) %) 2 3 4 5 6 7 8 9 4 MTPS Stage-III - Gobi TANTRANS C S/C 230 3 8 8 8 3 5 MTPS Stage-III - Thingalur TANTRANS C S/C + D/C 230 90 10 11 Remark 13 12 MAR-12 MAR-12 Commissioned 3/12 JUL-13 Remark: One unit commissioned in 9/12. Evacuation Critical. 7 Maitrishi Usha TPP (Corporate Power) (Chandwa) (Abhijit) (4x270MW), U1-10/12,U2-12/12,U3 & U4 -9/13, 1 Corporate TPP - Jharkhand Pooling Station CPL D/C 400 6 11 2 Latehar - Namkum CPL D/C 400 216 320 DEC-12 293 274 132 DEC-12 . Remark: Generating Company to ensure commissioning of line matching with generation commissioning schedule Status of work not being reported.Jharkhand pooling 8 Nasik (5x270 MW) TPS, PS, Maharashtra, India Bulls, U1-11/12,U2-1/13,U3-6/13,U4-8/13,U5-10/13, U6 & 7-2015-16, U8-10-Not Finalised, 1 Nasik-Bableshwar IBPL D/C 400 2 LILO of Ekherla - Babhaleshwar at Nasik TPP 3 Nasik TPP - Nasik (MSETCL) IBPL D/C 220 For start up power. IBPL D/C 400 Completed for startup power. 114 152 151 151 105 DEC-12 Remark: As per generating company start up power & evacuation is no issue. 9 Nimoo Bazgo (NHPC) (3x15 MW),CS,J & K,NHPC,U1-11/12,U2-12/12,U3-2/13., 1 Alachi - Khalsi S/S JKPDD S/C 66 31 145 115 2 Ganglas - Leh Army base JKPDD S/C 66 9 44 22 3 Kharu S/S - Himya S/S JKPDD S/C 66 51 242 238 186 18 DEC-12 4 Leh (C.P.) - Kharu S/S JKPDD S/C 66 25 107 107 95 10 NOV-12 5 Leh (C.P.) - Leh S/S JKPDD S/C 66 7 39 30 27 6 NOV-12 6 Leh III - Ganglas JKPDD S/C 66 10 53 29 8 7 Nimoo Bazgo HEP - Alachi JKPDD S/C 66 4 13 13 7 3 NOV-12 8 Nimoo S/S - Alachi S/S JKPDD S/C 66 17 77 77 77 17 SEP-12 64 6 DEC-12 DEC-12 one D/C tower and 7 S/C tower material received. NOV-12 4 Two span stringing balance. Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station Associated Transmission Lines and Substations 1 State/Agenc y Executing Asociated Trans. Works Construction progress Status Ckts (S/C) & (D/C) Voltage Ckm/ TL(No STC(N Level MVA s)/Lan os)/Civ (KV) d Acq. il Work (%) (%) TE(No STG(C Origin Revised Month al of s)/Rec km)/Er Target Comple p.Mat ection Target Date Date tion erial( (%) %) 10 Remark 2 3 4 5 6 7 8 9 9 Nimoo S/S- Leh S/S JKPDD S/C 66 31 152 152 152 31 MAR-12 Stringing Completed. 10 Alchi. S/S JKPDD 66/11 6.3 100 50 30 10 NOV-12 Civil works equipment installation completed. Power control cable laying yet to be done. 11 Himya JKPDD 66/11 60 100 30 12 Khalsi JKPDD 66/11 60 100 50 13 Kharu JKPDD 66/11 60 100 20 14 Leh JKPDD 66/11 60 100 100 100 15 Nimoo S/S JKPDD 66/11 60 100 50 40 11 13 12 DEC-12 30 100 DEC-12 Work suspended due to want of RCE. DEC-12 Work suspended due to want of RCE. SEP-12 Work almost completed. JUN-13 Civil work completed. Equipment structure erection in progress. Remark: ATS slow. 10 North Chennai TPS St.II (2x600 MW),SS,TN,U1-5/13,U2-1/13, 1 LILO of NCTPS- Mosur at NCTPS Stage TANTRANS II (for startup power) C D/C 230 3 2 2 2 2 DEC10 NOV-10 NOV-10 Commissioned 11/10. 2 Alamathy -Sunguvarchatram TANTRANS C M/C 400 94 160 143 123 100 JUN10 DEC-12 Tower foundation pending at 18 locations due to court case, ROW issues etc., Tower erection pending at 19 other locations due to court case, ROW issues etc., 3 NCTPS St.II- Alamathy 400 kV S/S TANTRANS C M/C 400 168 114 114 111 128 AUG-12 Row issues at 3 locations in respect of M/s Venkatesh Coke, District collector/ Thiruvallur has issued orders on 18.05.12 against the TANTRANSCO to deviate the line away from the parties land. Writ appeal has been filed against the orders of the District Collector and interim stay granted for 4 weeks. The work had stopped as the petitioners had obtained interim stay order. Last hearing held on 19.10.12 & 02.11.12.Next hearing posted to 06.11.12. Remark: Startup power no issue. TNEB stated that unit can be commissioned using ATS of Vallore TPS (to be get confirmed in the meeting). For evacuation from 2nd unit 11 Palatana CCGT (2x363.3 MW),PS,Tri,OTPC, Module 1 (GT-10/12,ST-10/12), Module 2 - 13/14, 1 Kukurmara - Azara line AEGCL D/C 132 10 28 DEC-12 5 Contract awarded on 23.11.2011 to M/s Horizone Hi-Trch Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station Associated Transmission Lines and Substations 1 State/Agenc y Executing Asociated Trans. Works Construction progress Status Ckts (S/C) & (D/C) Voltage Ckm/ TL(No STC(N Level MVA s)/Lan os)/Civ (KV) d Acq. il Work (%) (%) TE(No STG(C Origin Revised Month al of s)/Rec km)/Er Target Comple p.Mat ection Target Date Date tion erial( (%) %) 2 3 4 5 6 7 8 9 2 Kukurmara - Boko line AEGCL D/C 132 80 126 126 126 80 10 JUL-12 3 LILO of Agia - Sarusajai line at Kukurmara S/S AEGCL D/C 220 4 8 8 8 4 SEP-12 4 LILO of Palatana - Bongaigaon line at Kukurmara S/S AEGCL D/C 400 7 17 5 LILO of Bongaigaon - Palatana line at Killing (Byrnihat) MeECL D/C 400 9 9 7 6 6 Byrnihat - Bongaigaon NETC D/C 400 408 572 432 396 7 Palatana -Silchar NETC D/C 400 495 680 680 8 Silchar - Byrnihat NETC D/C 400 420 582 555 9 LILO of 400KV S/C Kaithalguri - Misa line at Mariani (New) (Charged at PGCIL D/C 400 1 4 DEC-12 10 LILO of Aizwol (PG) - Zemabawk at Melriat (PG) 11 LILO of Loktak - Imphal at Imphal (New) line 12 Mariani (New) - Mokikchung (PG) PGCIL D/C 132 30 45 DEC-12 PGCIL D/C 132 2 5 DEC-12 PGCIL D/C 220 56 156 13 Melriat (New) - Sihmui line PGCIL D/C 132 12 30 11 13 12 Completed 7/12 SEP-12 Commissioned 9/12. JUL-13 Deposited work contract given to PGCIL on 12.10.2011. work in progress. NOV-12 Detail survey completed. 142 MAR-13 March 2013 (anticipated) which is likely to be shifted because (i) Permission for tree cutting from Assam Forest Deptt. is yet to be received and consequently commencement of work in 72 locations is getting delayed; (ii) Forest clearance is pending for additional stretch of 1.034 Km of forest part of which was earlier declared by Assam Forest Deptt. as non forest area during the processing of original proposal;(iii) Deterioration of law and order situation in Kokrajhar District in previous months affected progress; (iv) Prolonged monsoon and flood situations in Assam adversely influenced progress ; and (v) Unprecedented rise in water level in Brahmputra river till last week of October 2012 delayed recommencement of work in well foundations by 1 month. 680 495 AUG-12 AUG-12 Commissioned 8/12 530 344 DEC-12 220KV) 53 Remark 27 MAR-13 DEC-13 6 Completion of line is expected in December 2012. Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station Associated Transmission Lines and Substations 1 State/Agenc y Executing Asociated Trans. Works Construction progress Status Ckts (S/C) & (D/C) Voltage Ckm/ TL(No STC(N Level MVA s)/Lan os)/Civ (KV) d Acq. il Work (%) (%) 2 3 4 5 6 PGCIL D/C 132 2 4 15 Palatana - Surajmaninagar line (Charged at 132 KV) PGCIL D/C 400 74 118 118 118 74 JUN-12 JUN-12 Commissioned 6/12 16 Silchar - Badarpur (PG) line. PGCIL D/C 132 38 69 69 69 38 APR-12 APR-12 Commissioned 4/12. 17 Silchar - Hailakandi (Contingency arrangement) PGCIL D/C 132 50 65 65 65 39 JUN-12 Line test charged in Jun'12. 18 Silchar - Imphal (New) line (to be charged at 132KV) PGCIL D/C 400 332 470 159 35 JUN-13 Severe ROW problem. 19 Silchar - Melriat (New) line (charged at 132KV) PGCIL D/C 400 286 439 135 89 32 MAR-13 Ist stage forest clearance yet to be received. 20 Silchar - Purba Kanchan Bari line (charged at 132KV) PGCIL D/C 400 256 376 313 231 38 MAR-13 Severe ROW problem, Works under police protection. Ist stage forest clearance yet to be received. 21 Silchar - Srikona line PGCIL D/C 132 2 7 7 7 2 MAR-12 MAR-12 Line commissioned in Mar'12. 22 Surajmani Nagar - Agartala 79 Tilla TSECL D/C 132 36 41 18 23 Surajmani Nagar - Badarghat TSECL D/C 132 6 24 Surajmani Nagar - Budhujngnagar TSECL D/C 132 36 25 Surajmani Nagar - Rokhia TSECL D/C 132 35 26 Surajmani Nagar - Udaipur TSECL D/C 132 50 27 Surajmani nagar-P.K.Bari TSECL D/C 400 260 28 Udaipur - Palatana TSECL D/C 132 12 41 41 29 Killing (Byrnihat)-EPIP-I MeECL M/C 132 17 19 10 30 LILO of Zemabawk - W.Phaileng at Sihhmui 31 Pasighat - Roing line. P&ED, S/C 132 5 PGCIL S/C on D/C 132 70 8 9 10 Remark 14 Mokokchung (PG) - Mokokchung (Nagaland) line 63 7 TE(No STG(C Origin Revised Month al of s)/Rec km)/Er Target Comple p.Mat ection Target Date Date tion erial( (%) %) 11 MAR-13 25 50 413 12 13 12 All efforts shall be made to complete line matching with commissioning of unit-2 of Palatanna GBPP> DEC-12 Work awarded. Survey works complected. Engg. Work is in progress. ROW Problem. DEC-12 Fund not yet tied up. Fund proposed in World Bank. DEC-12 Survey works complected. Engg. In progress. Expected date of commissioning of 1st ckt by Dec'11 and entire works by March'12. ROW problem. MAR-13 Fund not yet tied up. Propsoed in World Bank / NLCPR. DEC-12 Fund not yet tied up. Proposed in World Bank / NEC. MAR-13 Fund not yet tied up. Proposed under World Bank Financing AUG-11 AUG-11 Line test charged on 21.08.2011. DEC-12 Work in Progress. SEP-12 338 42 MAR-13 7 Progress affected due to ROW problem (geogrephical condition) Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station Associated Transmission Lines and Substations 1 State/Agenc y Executing Asociated Trans. Works Construction progress Status Ckts (S/C) & (D/C) Voltage Ckm/ TL(No STC(N Level MVA s)/Lan os)/Civ (KV) d Acq. il Work (%) (%) TE(No STG(C Origin Revised Month al of s)/Rec km)/Er Target Comple p.Mat ection Target Date Date tion erial( (%) %) 2 3 4 5 6 7 8 32 Roing - Tezu line PGCIL 132 60 241 70 37 33 Tezu - Namsai line. PGCIL S/C on D/C S/C on D/C 132 90 330 54 30 34 Kukumara S/S (2x50) AEGCL 220/132 100 100 30 10 35 Kukurmara S/S AEGCL 400/220 630 100 30 9 10 11 APR11 MAR-13 Remark 13 12 MAR-13 Completion matching with S/Stn. (land problem.) DEC-13 Transformer is available. Base casting of 5 nos. of column foundation completed and rest are in progress. DEC-13 Structure received. Base and 50% of chimney casting works completed (total-37 nos.) Bolts grouting of 2 nos. of foundations completed and rest are in progress. W. O. for Tr. and reactors placed. 36 Panchgram (Aug.) S/S AEGCL 132/33 50 100 100 100 100 DEC-11 DEC-11 Commissioned 12/11 37 Killing (Byrnihat) S/S MeECL 400/220 630 100 50 95 60 FEB-13 38 Yurembam (Aug.) S/S P&ED, 100 100 Land though acquired but could not be taken possession due to resistance by the landowners. Matter has already been taken up with the District Admisnistration. Additional award for the crops has been prepared and approval of the Revenue Deppt, Govt of Meghalaya is awaited. As of now work is being implemented in the available area. 39 Imphal S/S PGCIL 132/33 3X33. 5 132/33 2x50 DEC-12 40 Melriat S/S (Upgadable to 400 kV) PGCIL 132/33 2x50 100 6 DEC-13 Engg. in progress.Civil works under progress. 41 Mokokchung (New) PGCIL 220/132 2x50 100 10 MAR-13 Engg.& civil works under progress. 42 Namsai S/S PGCIL 132/33 2x15 100 6 DEC-13 43 Roing S/S PGCIL 132/33 2x15 100 30 20 Civil works under progress . Civil works & supply under progress 44 Silchar (New) PGCIL 400/220 2x200 100 100 100 100 MAR-12 MAR-12 Commissioned 3/12. DEC-13 Civil works under progress 100 80 AUG-12 In 1st phase, out of nine no bays,Pgcil wii complete 2 no bays and balance seven no bays by TSECL by Aug'2012. Site leveling work MAR-13 45 Tezu S/S PGCIL 132/33 2x15 100 20 46 Surajmaninagar S/S (Upgrdable to 400 kV) TSECL 132/33 2x50 100 100 DEC-13 8 Completion likely to be delayed. Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station Construction progress Status Associated Transmission Lines and Substations State/Agenc y Executing Asociated Trans. Works Ckts (S/C) & (D/C) 1 2 3 kV) Voltage Ckm/ TL(No STC(N Level MVA s)/Lan os)/Civ (KV) d Acq. il Work (%) (%) 4 TE(No STG(C Origin Revised Month al of s)/Rec km)/Er Target Comple p.Mat ection Target Date Date tion erial( (%) %) 5 6 7 8 9 10 11 12 Remark 13 balance seven no bays by TSECL by Aug'2012. Site leveling work already completd and control room have already started and completed around 20% Equipment. Equipment receiving is in progress. Remark: Work of Silchar-Bongaigaon is slow and neds to be expedite. 12 Parbati-III HEP (4x130 MW),CS,HP,NHPC,U1-1/13,U2-11/12,U3-1/13,U4-6/13., 1 LILO of Parbati -II - Koldam at Parbati Pooling Point. PGCIL D/C 400 2 4 2 1 2 LILO of Parbati -II - Parbati Pooling Point at Parbati -III PGCIL D/C 400 4 7 5 5 2 DEC-12 3 Parbati Pooling Point - Amritsar PGCIL D/C 400 502 664 624 606 398 FEB-13 JAN-10 DEC-12 Forest approval received in Aug'12 (Clubbed with Parbati-III - Amritsar line) All efforts being made to complete the line earlier to matching with Gen. Re-routing of line done avoiding Wildlife Sanctuary area & revised proposal forwarded to MOEF. Ist stage clearance received in Jun'12. Final clearance received in Sep'12. Tree marking & cutting being delayed due to election in HP. Remark: Parbati-II - Koldam is planned to be connected to Parbati-III as contingency agreement. 13 Ramgarh CCPP Extn.-III, (110+50 MW), SS,Rag, RRVUNL, (GT-1/13,ST-5/13, 1 Chandan - Dechu RVPNL D/C 220 210 322 149 43 2 Dechu - Phalodi RVPNL D/C 220 71 119 119 119 3 Ramgarh (GTPP) - Chandan RVPNL D/C 220 194 309 309 114 MAR-13 71 SEP-12 SEP-12 Commissioned 9/12. MAR-13 Remark: Transmission lines needs to be expedited critical.Dechu S/S Commissioned. Full load evacuation critical. 14 RaghunathpurTPS (2x600 MW),CS,WB,DVC,U1-1/13,U2-6/13, 1 LILO of Maithon-Ranchi (PG) at Raghunathpur DVC D/C 400 21 33 33 33 21 MAR-11 MAR-11 Commissioned 3/11. 2 Raghunathpur TPS -Ranchi (PG) DVC D/C 400 311 438 397 374 96 DEC-12 Remark: Transmission lines needs to be expedited. 9 Forest clearance obtained from MOEF,GoI on 29-5-12.Matter is being persued with the Govt. of Jharkhand for issuance of Working clearance.For Bengal portion final forest clearance also obtained.Power Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station 15 Construction progress Status Associated Transmission Lines and Substations State/Agenc y Executing Asociated Trans. Works Ckts (S/C) & (D/C) 1 2 3 Voltage Ckm/ TL(No STC(N Level MVA s)/Lan os)/Civ (KV) d Acq. il Work (%) (%) 4 5 7 6 TE(No STG(C Origin Revised Month al of s)/Rec km)/Er Target Comple p.Mat ection Target Date Date tion erial( (%) %) 8 9 10 11 Remark 13 12 Sasan UMPP (6x660 MW),PS,MP,Reliance,U1-5/13,U2-12/13,U3-7/14,U4-2/15,U5-9/15,U6-4/16, 1 Bina (ICT-II) S/S PGCIL 2 LILO of both ckt Vindhyachal -Jabalpur at Sasan PGCIL 2xD/C 400 13 3 Bina - Bina (MPPTCL) PGCIL D/C 400 10 6 6 6 4 Indore - Indore (MPPTL) PGCIL D/C 400 50 139 139 139 98 5 Fatehpur- Agra line-II PGCIL S/C 765 303 896 816 586 90 6 Sasan - Satna line -I PGCIL S/C 765 246 689 655 648 220 7 Sasan - Satna line -II PGCIL S/C 765 243 671 612 596 8 Sasaram - Fatehpur line-II PGCIL S/C 765 356 953 788 390 765/400 1000 100 85 95 80 DEC-12 26 26 26 13 MAR-12 MAR-12 Ready for commissioning 3/12. DEC12 Supply, civil works & erection under progress. DEC-12 MAR-12 MAR-12 Commisisoned 03/12 FEB-13 . DEC-12 Completion being expedited for evacuation of Vindhyachal-IV Unit through contingency arrangement, however delay due to delay in forest approval(Stage -I accorded in July'12). 172 DEC-12 Forest clearance awaited. Critical. 80 FEB-13 DEC12 DEC12 9 Satna - Bina line -I PGCIL S/C 765 274 738 738 738 274 MAR-12 JAN-12 Line commissioned in Jan'12(charged at 400 KV) 10 Satna - Bina line -II PGCIL S/C 765 276 737 737 737 276 JUN-12 JUN-12 Commissioned 6/12 11 Bina. S/S PGCIL 765/400 1000 100 100 100 100 AUG-12 AUG-12 Commissioned 8/12. 12 Gwalior PGCIL 765/400 2x150 0 100 90 85 70 DEC-12 Award placed in Aug'10. Supply, Civil works & erection under progress. 13 Indore PGCIL 765/400 2x150 0 100 70 80 48 DEC-12 Award placed in Aug'10. Supply, Civil works & erection under progress. 14 Satna (1st ICT) PGCIL 765/400 1000 100 100 100 100 JUN-12 15 Satna (2nd ICT) PGCIL 765/400 1000 100 100 100 100 AUG-12 AUG-12 Commissioned 8/12. JUN-12 ICT-I Commissioned 6/12. Remark: Tranmission works need to be expedited by PGCIL 16 Tiroda TPP (Gondia ) PH-I (2x660 MW),PS,MAHA,ADANI,U1-9/12, (C),U2-11/12 ,PH II (3x660 MW) U1-2/13, U22/13,U3-3/13, 1 Tiroda TPP - Warora (2nd ckt) APL D/C 400 218 2 Tiroda TPP -Warora (1st ckt) APL S/C 400 218 587 587 587 436 AUG-12 AUG-12 218 Ckm Commissioned 8/12 218 SEP-12 10 2nd ckt commissioned 8/12. and 1st ckt ready for commissioning. Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station Construction progress Status Associated Transmission Lines and Substations State/Agenc y Executing Asociated Trans. Works Ckts (S/C) & (D/C) 1 2 3 3 Warora S/S MSETCL 4 Aurangabad II - Aurangabad (PG) Voltage Ckm/ TL(No STC(N Level MVA s)/Lan os)/Civ (KV) d Acq. il Work (%) (%) 4 5 400/220 1000 TE(No STG(C Origin Revised Month al of s)/Rec km)/Er Target Comple p.Mat ection Target Date Date tion erial( (%) %) 6 7 8 9 10 11 100 65 99 57 SEP12 MAR-13 MSETCL 2xS/C 5 Akola- I - Akola-II APL D/C 400 62 89 88 84 34 DEC-12 6 Tiroda - Koradi - Akola - Aurangabad line ckt-I APL S/C 765 579 1598 1431 1235 259 MAR-13 7 Tiroda - Koradi - Akola - Aurangabad line ckt-II APL S/C 765 573 1584 1194 324 8 Akola S/S APL 765/400 1500 9 Koradi S/S APL 765/400 3000 10 Tiroda (Gondia) S/S APL 765/400 2x150 0 765/400 2x150 0 11 Aurangabad II S/S MSETCL 765 JUN-13 Remark 13 12 work in progress. . JAN-13 100 90 50 MAR-13 . Work order issued recently Remark: Works to be completed matching with the generation. 17 Ukai Extn. (2x490 MW),PS,Guj,GSECL, U6-12/12,U7-3/13, 1 Kosamba-Chorania line GETCO D/C 400 457 636 556 488 164 JUL-11 APR-13 2 LILO of Asoj - Ukai at Kosamba GETCO D/C 400 64 96 96 96 64 JAN-12 3 UKai-Kosamba GETCO D/C 400 136 215 198 177 85 DEC-12 WIP 99 27 FEB-13 Readiness of Jaipur (RVPNL) S/S critical. JUN-13 Vindhychal PS critical contigency arrangement being planned by-passing V'chal pooling stn. DEC-12 Vindhyachal PS critical contigency arrangament being planned bypassing Vindhyachal Pooling Stn. for evacuation of Vindhyachal Power. Efforts being made to complete earlier. WIP JAN-12 Commissioned 1/12. Remark: No issue. 18 Vindhyachal-IV ,CS,MP,NTPC, U11 C), U12-3/13 Rihand - III,(1000MW each) Gen. U5- (C ), U6-3/13,, 1 Bassi (PG)- Jaipur (RVPN) 765 KV line (Q) PGCIL D/C 400 114 136 120 2 Sasan - Vindhyachal Pooling station PGCIL D/C 400 6 18 11 3 Vindhyachal-IV - Vindhyachal Pooling Station line (Q) PGCIL D/C 400 62 86 83 77 54 11 Agenda for Meeting to be held on 23-11-2012 to review ATS for power generating station Associated Transmission Lines and Substations 1 State/Agenc y Executing Asociated Trans. Works Construction progress Status Ckts (S/C) & (D/C) Voltage Ckm/ TL(No STC(N Level MVA s)/Lan os)/Civ (KV) d Acq. il Work (%) (%) TE(No STG(C Origin Revised Month al of s)/Rec km)/Er Target Comple p.Mat ection Target Date Date tion erial( (%) %) 2 3 4 5 6 7 8 4 Satna - Gwalior line (60 Km D/C Portion) Ckt-II PGCIL D/C+S/C 765 304 778 502 124 5 Vindhyachal Pooling Station - Satna line (2 Km D/C Portion) Ckt-II PGCIL D/C+S/C 765 234 628 326 201 6 Gwalior - Jaipur (RVPN) line PGCIL S/C 765 300 794 450 302 7 Rihand - Vindhyachal Pooling Station line-I PGCIL S/C 765 32 8 Rihand - Vindhyachal Pooling Station line-II PGCIL S/C 765 9 Sasan - Vindhyachal Pooling Station line PGCIL S/C 765 9 10 11 Remark 13 12 JUN-13 Completion likely delay due to delay in forest clearance. 25 JUN-13 Completion likely delay due to forest clearance. Vindhyachal PS critical. 25 MAR-13 Best efforts target wildlife santuary clearance & readiness of Jaipur(RRVPN)S/S. Critical. 91 JUN-13 Award placed in Sep'12.Engg./survey under progress. 31 91 JUN-13 Package re-tendered (under award). Critical. 10 19 DEC-12 Vindhyachal PS critical. 19 19 10 10 Satna - Gwalior line (Ckt-I) PGCIL S/C 765 337 902 604 245 38 JUN-13 Completion likely delay due to delay in forest clearance. 11 Vindhyachal Pooling Station Satna line (Ckt-I) PGCIL S/C 765 253 681 356 190 10 JUN-13 Completion likely delay due to forest clearance. Vindhyachal PS critical. 12 Vindhyachal Pooling Station PGCIL MAR-13 Award placed in Feb'11. Completion affected due to land acquiation & encrochement. Completion critical. 765/400 2x150 0 Remark: Transmission System critical.PGCIL to ensure the commissioning of contingency plan matching with generation. 12