A.K. Rampal Chief Engineer Central Electricity Authority

advertisement
A.K. Rampal
Chief Engineer
Telefax:011-26103242
Mobile:9868830172
भारत सरकार/Government of India
ऊजा मंालय/Ministry of Power
केय वधत
ु ाधकरण
Central Electricity Authority
वधत
ु णाल परयोजना बोधन भाग
Power System Project Monitoring Division
सेवा भवन, आर.के.परु म,/Sewa Bhawan, R.K. Puram
नई &द(ल-110 066/New Delhi-110 066
Website: www.cea.nic.in
No. 1/35(A)/PSPM/2012/
ISO. : 9001-2008
Dated: 19th June, 2012
To
All concerned (as per list)
Sub:
Rescheduling of the meeting to review “Associated Transmission System” for
evacuation of power from generating stations- Change of Date from 22nd to 25th
June 2012.
Sirs,
Kindly refer to our letter dated 14th June, 2012 regarding meeting to review
“Associated Transmission System” (ATS) for evacuation of power from generating stations
to be chaired by Chairperson, CEA. It is to inform that due to unavoidable reason the date of
meeting has been rescheduled from 22nd to 25th June, 2012. The revised reschedule is;
Date:
Time
Venue
25th June, 2012
10.30 AM
Conference Room, 2nd Floor, Central Electricity Authority,
Sewa Bhawan, R.K. Puram, New Delhi-110066.
Inconvenience is regretted.
Kindly make it convenient to attend the meeting.
The agenda has also been uploaded on CEA Website (www.cea.nic.in).
Thanking you,
Yours faithfully,
(A.K. Rampal)
Chief Engineer (PSPM)
Copy for information to:
1.
2.
3.
4.
Chairperson, CEA
Member (Power System), CEA
Member (Hydro), CEA
Member (Thermal), CEA
Copy also to:
1. Chief Engineer (SP & PA),CEA
2. Shri A.K. Manglik, Consultant (Transmission), Ministry of Power
List of Addressees
Utility/State
Abhijeet Power
Adani Power
Limited
Adhunik Power
BHEL
Chhattisgarh
Address list
Corporate Office
Landmark Building, 6th Floor,
Wardha Road, Ramdaspeth,
Nagpur-440010, INDIA
Phone : +91 712-7113400 / 401 / 402
Fax : +91 712-7113405
Chandwa
Sharda Bhawan,
Devi Mandap Road,
Chandwa Dist.
Latehar 829 203
Jharkhand, INDIA
Phone : 06565 226 883 / 93
Sr. Vice President,
Adani Power Limited,
7th Floor, Sambhav Building,
Judges Bunglow Road, Bodakdev,
Ahmedabad-380015
Gujarat, India
Ph-079-25557134
Fax:079-25557177
Lansdowne Towers
2/1A, Sarat Bose Road
Kolkata 700020, West Bengal, India
Phone: 033 30517100
Fax: 033 22890285
E-mail: info@adhunikgroup.com
Chairman & Managing Director,
BHEL,
BHEL House, Siri Fort,
New Delhi – 110049, India
Fax : 26493021; 26492534
Phone 66337000
Chairman ,
Chhattisgarh State Power Transmission Corporation Ltd,
Dagania
RAIPUR – 492013
Ph. 0771 5055855
FAX 0771-4066566/ 5066900
Agenda
at S.NO.
16
29,32
1
6
30
List of Addressees
Dans Energy
Dans Energy Private Limited,
Sonam Building Complex,
Deveploment Area, Gangtok,
East Sikkim -737101
Phone 03592-204709
Fax: 03592-201307
Chairman,
Damodar Valley Corporation ,
DVC Towers, VIP Road,
Kolkata
Ph: 033-23557935
Fax: 033-23551252/23351931
Essar Power MP Ltd.
Sh. R.P. Gupta
CEO (Mahan),
M/S Essar Power MP Ltd.
Prakash Deep Building,
10th floor,7, Tolstoy Marg,
New Delhi-110001
Fax 43501046/47
11
Gati
Gati Infrastructure Ltd.
Sungdung – Near Power Guest House
Rongli – East Sikkim – 737131
Phone: 03592-255960 /255898
Fax 03592-255673
4
GMR
Shri Raja Vaidyanathan,
Executive Vice president (Transmission)
GMR Group,
IBC Knowledge Park, Phase 2, "D" Block,
9th Floor, 4/1, Bannerghatta Road,Bangalore,
Karnataka 560 029
Phone: 080 40432000
Fax: 080 40432180
Email raja.vaidyanathan@gmrgroup.in, info@gmrgroup.in
7
DVC
ESSAR
GMR Energy
Limited
GMR Energy Limited
Kamalanga Thermal Power Project
HIG – 28 BDA,
Gangaghar Mehar Marg,
Jaydev Vihar,
Bhubaneswar – 751 013
Phone: 0674 -2303995 / 96 / 97
Fax:0674 – 2393994
25
15
13
List of Addressees
Gujarat
Ind Bharath Power
Infra Limited
Chairman ,
Gujarat Electricity Transmission Company,
Vidyut Bhawan, Race Course,
VADODARA – 390 007
Ph: 0265-2338299
Fax: 0265 2337918 / 0265 2338164 / 0265 2338221/ 0265
5512072
Corporate Office
20/129, Chamiers Road
Nandam, Chennai – 600 035
Tamil Nadu, INDIA.
Phone : +91 44 24346711/2/3/4
Fax : +91 44 24346715
E-mail : chennai@ibpil.com
24,27
9
Regd Office
Plot No.30-A, Road No.1
Film Nagar, Jubilee Hills
Hyderabad-500 096
Andhra Pradesh, INDIA.
Phone : +91 40 23553459, 23553460
Fax : +91 40 23607522
E-mail : hyderabad@ibpil.com
Karnataka
Chairman & Managing Director
Karnataka Power Transmission Corporation Ltd.
Kaveri Bhawan, P./B. No. 9999,
Bangalore – 560 009
Ph. 080-22253414/22253424/ 22264931
Fax 080 -22213526
Maharashtra
Chairman ,
Maharashtra State Electricity Transmission Co. Ltd.,
C-19,E-BLOCK,Prakashganga,
Bandra Kurla Complex, Bandra (E),
MUMBAI – 400 051
Ph: 022-26598595/26595000/26475740/26474211
Fax: 022 -26598587/26476749
31
2,3,6,29
List of Addressees
NHPC
North East
Transmission Co.
Ltd
Orissa
Chairman & Managing Director ,
NHPC,
N.H.P.C Office Complex,
Sector-33, Faridabad - 121003 (Haryana)
E-Mail: webmaster@nhpc.nic.in
FAX : 2277941
Managing Director,
North East Transmission Co. Ltd.,
1st Floor, Ambience Corporate Tower,
Ambience Mall, NH-8,
Gurgaon-122001,Haryana.
Fax 0124-24716060.
Chairman & Managing Director,
Orissa Power Transmission Corporation Ltd.,
Vidyut Bhawan, Janpath,
Bhubaneshwar – 751 022
Ph: 0674 410098/413396
Fax: 0674 2541904/411901/412734
5,19,28
21
9,10
PGCIL
Chairman & Managing Director,
Power grid Corporation of India Ltd.,
Plot No.2, Sector-29,
Near IFCO Chowk,
Gurgaon-122001
Ph: 0124- 2571800/2571900
Fax:01242571990/2571922/2571760/ 9810530571
Punjab
Chairman & Managing Director,
Punjab State Transmission Corporation Ltd.,
The Mall,
Patiala – 147 001
Ph: 0175 2212005/2214927
Fax: 0175 2213199
8
Rajasthan
Chairman & Managing Director ,
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.,
Vidyut Bhawan, Janpath,
Jaipur – 302 005
Ph: 0141 2740118
Fax: 0141 2740168
Chairman & Managing Director ,
Rural Electrification Corporation Ltd.,
Core- 4, SCOPE Complex,
7, Lodhi Road,
New Delhi-110003
12,14,26
REC
7,9,11,17,
21,22,33,
34
5,19
List of Addressees
Sterlite Energy
Limited
General Manager
Sterlite Energy Limited,
Bhurkamunda, Jharsuguda-768202,
Orissa, India
Fax-06645-266679/80
Tamil Nadu
Chairman,
Tamil Nadu Transmission Corporation Ltd.,
6th Floor, NPKRR Maaligai,
144, Anna Salai,
Chennai – 600 002
Ph: 044 -28521300/28521378
Fax: 044 -28516362 28544528
UPPTCL
Chairman & Managing Director,
Uttar Pradesh Power Transmission Corporation Ltd.,
Shakti Bhawan, 3rd Floor,14, Ashok Marg,
Lucknow – 220 001
Ph: 0522 2287701/2287827
Fax: 0522 -2288410/22877892
23
WBSETCL
Chairman,
West Bengal State Transmission Corporation Limited
7th Floor, DJ Block,
Sector-II Salt Lake
KOLKATA – 700 091
Ph: 033 23591915
Fax: 033-23373002/ 23591954
28
10
18,20,33
ANNEXURE
Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations
S.NO
.
Construction progress
Associated
Transmission
Lines and Substations
1
STC(N TE(No STG(C
Origina
Month
TL(No
Voltage
Revised
os)/Ci s)/Re km)/Er
Ckm/ s)/Lan
l
of
Level
Target
vil cp.Ma ection
MVA d Acq.
Target
Completi
Date
(KV)
Work terial( (%)
Date
on
(%)
(%)
%)
5
400
50
Butibori (2x300 MW) TPS Phase -II,PS,Maha,RPL,U1-9/12,
1 Butibori -Butibori I
D/C
RPTL
220
4
220/132
100
220
2
butibori III
3
Buttibori -Buttibori-III
Organization involved
Chujachen HEP (2x 49.5 MW)
1 LILO of Melli Gangtok at Chujachen
Organisation Involved:
7
8
9
10
11
12
13
.
D/C
2
6
Remarks
Adhunik Power
Bela TPP (1x270 MW),PS,Maha,IEPL,U1-9/12,
1 LILO of Koradi II- Wardh(PG) at Bela
IEPL
TPP
Organization involved
3
Ckts
(S/C)
&
(D/C)
1
2
3
4
Adhunik Power TPP (2x270 MW), PS,Jhk, APCL.U1&2, 11/12 & 02/13
D/C
400
1 Adhunik - Jamshedupur (PG)
ADHUNIK
(Padampur)
2 LILO of Maithon - Jamshedpur at
D/C
400
ADHUNIK
Adhunik TPP
Organisation Involved:
2
State/Agen
cy
Executing
Asociated
Trans.
Works
75
72
68
40
AUG-12
The progress of Koradi-Wardha line is slow .
Forest clearence awaited.
MSETCL
MSETCL
RPTL
MSETCL
D/C
Gati
GATI
D/C
AUG-12
DEC-12
58
The work of butibori stoped. Difficult to
evacuation from Butibori.
AUG-12
4
5
47
Chutak-HEP (4x11 MW), CS, J&K, NHPC, U1-11/11,U2-1/12,U3-6/12, U4-7/12.,
1 Gramthong -II - Chutak S/S
S/C
66
5
NHPC
2 Gramthong -II - Sankoo
S/C
66
31
NHPC
3 Kargil-I - Chutak S/S
S/C
66
10
NHPC
4 Khangral - Mulbek -II
S/C
66
23
NHPC
5 Mulbek-II - Kargil -I
S/C
66
28
NHPC
Agenda for Review Meeting to be held on 25.06.2012
29
166
55
117
120
29
133
55
113
100
23
87
55
68
90
Page 1 of 11
3
15
10
7
12
AUG-12
AUG-12
OCT-11
AUG-12
AUG-12
Stringting completed.
Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations
S.NO
.
Construction progress
Associated
Transmission
Lines and Substations
1
6
7
Gramthong S/S
Kargil S/S
8 Khangral (Bodhkharbu)
9 Mulbeck
10 Sankoo S/S
Organization involved
6
Dhariwal TPS (2x300 MW),
1 Dhariwal TPS -Channdrapur II
2 LILO of one ckt of Bhadravati (PG) Parli at Dhariwal
Organization involved
7
2
3
NHPC
NHPC
NHPC
NHPC
NHPC
NHPC &
REC
MSETCL
MSETCL
D/C
D/C
STC(N TE(No STG(C
Origina
Month
TL(No
Revised
Voltage
os)/Ci s)/Re km)/Er
Ckm/ s)/Lan
l
of
Level
Target
vil cp.Ma ection
MVA d Acq.
Target
Completi
(KV)
Date
Work terial( (%)
Date
on
(%)
(%)
%)
4
66/11
66/11
5
60
60
6
100
100
7
50
100
66/11
66/11
66/11
60
60
60
100
50
100
10
400
400
16
29
29
400
80
8
20
100
9
100
20
29
16
10
11
AUG-12
DEC-11
AUG-12
AUG-12
AUG-12
Remarks
12
13
Sub-stations has been charged successfully.
Cutting/leveling of plot is in progress.
AUG-12
.
MSETCL & BHEL
for Chandrapur S/S
100
DEC-12
ROW problem at 8 location. Project authority
sorting out the issue. Hopful to complete the
line before synchronization.
GMR/
PGCIL
Goindwal Sahib (2x270MW), PS,Punjab,GVK, U1-4/13,U2-8/13,
1 Goindwal Sahib - Ferozpur
D/C
PSTCL
2 Goindwal Sahib - Khasa (Amritsar)
D/C
PSTCL
D/C
3 Gondwal Sahib - Kapurthalahasa
PSTCL
4 Goindwal Sahib - Sultanpur Lodhi
D/C
PSTCL
Organization involved
9
Ckts
(S/C)
&
(D/C)
EMCO Warora TPP (2x300 MW), PS,Maha,GMR, U1-12/12,U2,
1 EMCO - Bhadrawathi (PG)
D/C
GMR
Organization involved
8
State/Agen
cy
Executing
Asociated
Trans.
Works
220
220
220
220
.
37
58
57
55
35
JUL-12
Work is in progress
PSTCL
Ind Bharat TPP (2x350MW),PS,Orissa,Bharat, U1, & 2, 4/13, 6/13
1 Ind Barath - Jharsuguda pooling
D/C
OPTCL
Station
Agenda for Review Meeting to be held on 25.06.2012
400
.
Page 2 of 11
Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations
S.NO
.
Construction progress
Associated
Transmission
Lines and Substations
2
State/Agen
cy
Executing
Asociated
Trans.
Works
1
2
LILO of Raipur -Raurkela at Ind Barath Ind Bharat
Organization involved
Ckts
(S/C)
&
(D/C)
3
STC(N TE(No STG(C
Origina
Month
TL(No
Revised
Voltage
os)/Ci s)/Re km)/Er
Ckm/ s)/Lan
l
of
Level
Target
vil cp.Ma ection
MVA d Acq.
Target
Completi
(KV)
Date
Work terial( (%)
Date
on
(%)
(%)
%)
4
5
6
7
8
9
70
85
60
85
14
49
9
10
11
Remarks
12
13
Ind
Bharat&
OPTCL
10
Jhasugda (Sterlite TPP),PS, Ori,Sterlite, U1-12/10(C), U2-10/10(C),U3-8/11(C),U4-6/12,
1 LILO of Rourkela - Raigarh at Sterlite
D/C
400
58
92
SEL
LILO) - Raigarh at Sterlite
D/C
400
49
85
2 TPP
LILO(of2nd
Rourkela
SEL
(Existing
line) captive plant D/C
D/C
220
9
3 TPP
Sterlite
TPP - Sterlite
SEL
Sterlite
Organization involved
Energy &
OPTCL
11
Jorethang - New Melli (Tokal) via
Tashiding
Organization involved
DEPL
S/C
220
D/C
400
APR-13
.
DEPL, &
PGCIL
Kalisindh TPS (600 MW), SS,Rag,RRVUNL, U-1,
1 Kalisindh TPS -Anta(Baran) Pooling
RVPNL
Station
Organization involved
13
ROW problem.
FEB-11 Commissioned 2/11.
AUG-10 Ist ckt commissioned, 2nd ckt commissioned 8/10.
Jorethang Loop HEP (2x48MW)PS,Sikkim,DANS,U1&2,
1
12
APR-13
FEB-11
AUG-10
RRVPNL
Kamalanga TPP (3x350MW),PS,GMR, U1,2, & 3, 11/12, 4/13, 7/13
1
Kamalanga (GMR) - Angul
Organization involved
GMR
ENERG
D/C
400
.
GMR
Energy
Agenda for Review Meeting to be held on 25.06.2012
Page 3 of 11
Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations
S.NO
.
Construction progress
Associated
Transmission
Lines and Substations
State/Agen
cy
Executing
Asociated
Trans.
Works
Ckts
(S/C)
&
(D/C)
1
2
3
4
5
6
7
8
D/C
400
100
136
136
86
ESSAR
ESSAR
D/C
D/C
400
400
202
44
275
67
165
67
70
67
10
44
APR-13
Server ROW Problem.
MAR-12 MAR-12 Commissioned 3/12
D/C
400
670
946
445
295
40
APR-13
400/220 2x50
0
50
20
STC(N TE(No STG(C
Origina
Month
TL(No
Revised
Voltage
os)/Ci s)/Re km)/Er
Ckm/ s)/Lan
l
of
Level
Target
vil cp.Ma ection
MVA d Acq.
Target
Completi
(KV)
Date
Work terial( (%)
Date
on
(%)
(%)
%)
9
10
11
Remarks
12
13
14
Kawai Super Critical TPS (2x660 MW),SS,Raj,
1 Kawai - Anta (Baran)
RVPNL
RRVPNL
Organization involved
15
Mahan TPP Ph-1,PS, Guj,SR Power,
1 Gandhar-Hazira
2 LILO of Viindhyachal -Korba line at
Mahan S/S
3
Mahan -Sipat
ESSAR
4
Hazira S/S
ESSAR
Organization involved
16
ESSAR
.
Corporate
Power
Mauda TPS (500 MW), CS, Maha, NTPC, U1-4/12 (C), U2-9/12,
1 Mauda - Wardha (2nd Ckt)
D/C
PGCIL
D/C
2 Mauda STPS - Wardha line
PGCIL
(Quad)(Ckt-1)
3
78 KM forest involved. FAC has
recommended the 1st phase forest
clearance in 10th March FAC meeting.
Approval yet to receive Execution likely be
delayed due to delay in Forest approval
APR-13
Maitrishi Usha TPP (Corporate Power) (Chandwa) (Abhijit) (4x27MW), U1/9/12,U2/12/12,U3-4,9/13,
1 Corporate TPP - Jharkhand Pooling
D/C
400
CPL
Station
2 Latehar - Namkum
D/C
400
CPL
Organization involved
17
SEP-12
400
400
124
124
345
345
345
Downward system from Wardha
Substation.
Agenda for Review Meeting to be held on 25.06.2012
Page 4 of 11
124
MAY-12 MAY-12 Commisisoned 05/12
MAR-12 MAR-12 Commissioned 3/12.
Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations
S.NO
.
Construction progress
Associated
Transmission
Lines and Substations
1
STC(N TE(No STG(C
Origina
Month
TL(No
Revised
Voltage
os)/Ci s)/Re km)/Er
Ckm/ s)/Lan
l
of
Level
Target
vil cp.Ma ection
MVA d Acq.
Target
Completi
(KV)
Date
Work terial( (%)
Date
on
(%)
(%)
%)
4
5
6
7
8
9
Mettur TPS Stage III (600 MW), SS,TN,U1-3/12,
1 LILO of MTPS -Malco at MTPS Stage TANTRANSC
TANTRANSC
2 III
MTPS St.III - Arasur
D/C
D/C
230
400
3
280
9
324
9
317
9
315
3
211
3
MTPS St.III - Singarpet
TANTRANSC
D/C
400
200
4
5
MTPS Stage III -Pallakkapalayam
MTPS Stage-III - Gobi
TANTRANSC
S/C
S/C
230
230
6
3
20
8
20
8
20
8
Nimoo Bazgo (NHPC) (3x15 MW),CS,J & K,NHPC,U1-10/12,U2-11/12,U3-1/13.,
1 Alachi - Khalsi S/S
S/C
66
31
NHPC
2 Ganglas - Leh Army base
S/C
66
9
NHPC
3 Kharu S/S - Himya S/S
S/C
66
51
NHPC
4 Leh (C.P.) - Kharu S/S
S/C
66
25
NHPC
5 Leh (C.P.) - Leh S/S
S/C
66
7
NHPC
6 Leh III - Ganglas
S/C
66
10
NHPC
7 Nimoo - Alachi
S/C
66
17
NHPC
8 Nimoo - Leh S/S
S/C
66
31
NHPC
9 Nimoo Bazgo HEP - Alachi
S/C
66
2
NHPC
10 Alchi. S/S
66/11
60
NHPC
145
44
242
106
39
53
77
152
13
100
115
22
237
106
30
29
77
152
9
50
10
100
100
100
50
30
50
Organization involved
19
2
PGCIL
Ckts
(S/C)
&
(D/C)
3
Organization involved
18
State/Agen
cy
Executing
Asociated
Trans.
Works
11 Bazgo
12 Himya
13 Khalsi
TANTRANSC
10
11
FEB-11
JUN-12
MAR-14
6
3
Remarks
12
13
FEB-11 MTPS III- Malco energised 2/11 for start up power.
Court case - Judgement delivered in the case
original alignment. Further necessary action is being taken up.
Tender will be floated on acquining the land for Sirngarapet ss.
MAR-12 MAR-12 Commissioned 3/12
MAR-12 MAR-12 Commissioned 3/12
TANTRANSC
NHPC
NHPC
NHPC
Agenda for Review Meeting to be held on 25.06.2012
66/11
66/11
66/11
60
60
60
191
91
12
8
77
152
5
30
40
30
Page 5 of 11
18
15
31
10
AUG-12
AUG-12
AUG-12
AUG-12
AUG-12
AUG-12
AUG-12
AUG-12
AUG-12
AUG-12
AUG-12
AUG-12
AUG-12
Stringing Completed.
Gantry foundation, protecton work, erection
and slab, and plaster of control room
completed. Euipment and gentry structure in
progress.
Work suspended due to want of RCE.
Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations
S.NO
.
Construction progress
Associated
Transmission
Lines and Substations
1
State/Agen
cy
Executing
Asociated
Trans.
Works
Ckts
(S/C)
&
(D/C)
2
3
14 Kharu
15 Leh
NHPC
NHPC
Organization involved
NHPC &
REC
20
North Chennai TPS St.II (2x600 MW),SS,TN,U1-3/12,U2-6/12.,
TANTRANSC
1 LILO of NCTPS- Mosur at NCTPS
D/C
Stage II (for startup power)
TANTRANSC
2 Alamathy -Sunguvarchatram
M/C
TANTRANSC
3 NCTPS St.II- Alamathy 400 kV S/S
M/C
Organization involved
21
STC(N TE(No STG(C
Origina
Month
TL(No
Revised
Voltage
os)/Ci s)/Re km)/Er
Ckm/ s)/Lan
l
of
Level
Target
vil cp.Ma ection
MVA d Acq.
Target
Completi
(KV)
Date
Work terial( (%)
Date
on
(%)
(%)
%)
4
66/11
66/11
5
60
60
6
100
100
7
20
50
8
9
10
30
10
230
3
2
2
2
2
DEC-10 NOV-10
400
400
94
168
160
114
141
114
115
110
52
128
JUN-10 APR-13
JUN-12
400
492
680
672
667
474
JUN-12
938
850
372
APR-13
11
AUG-12
AUG-12
AUG-12
2
Silchar-Bongaigaon
NETC
D/C
400
830
1125
3
LILO of 400KV S/C Kaithalguri - Misa
line at Mariani (New) (Charged at
220KV)
LILO
of Loktak - Imphal at Imphal
(New) line
Mariani (New) - Mokikchung (PG)
Melriat (New) - Melriat (Mizo) line
PGCIL
D/C
400
2
20
DEC-12
PGCIL
D/C
132
60
150
DEC-12
PGCIL
PGCIL
D/C
D/C
220
132
112
60
160
85
Mokokchung (PG) - Mokokchung
(Nagaland) line
Palatana - Surajmaninagar line
(Charged at 132 KV)
PGCIL
D/C
132
2
4
PGCIL
D/C
400
70
118
5
6
7
8
13
Work suspended due to want of RCE.
Gantry foundation, protection work, erection
and slab, plaster of control room completed,
panel installation in progress.
NOV-10 Commissioned 11/10.
Court case for 9 nos location in high court.
Court case - Judgement delivered in favour of
received against the board.
TANTRANSC
Palatana CCGT (2x363.3 MW),PS,Tri,OTPC, U1-5/12,U2-6/12.,
1 Palatana -Silchar
D/C
NETC
4
12
Remarks
Agenda for Review Meeting to be held on 25.06.2012
39
113
6
108
Page 6 of 11
36
Forest clearance proposal in respect of 3 locat
has reached regional MoEF, Shillong on 21-07
Second stage forest clearance for Meghalaya
letter dated 15th April 2011 to Assam Forest d
MAR-13
MAR-13
Line already awarded. Completion matching re
MAR-13
All efforts shall be made to complete line matc
JUN-12
Completion of Surajmaninagar by Tripura Govt. - Critical.
Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations
S.NO
.
Construction progress
Associated
Transmission
Lines and Substations
9
10
11
12
13
14
1
(Charged at 132 KV)
Silchar - Badarpur (PG) line.
Silchar - Hailakandi line
Silchar - Imphal (New) line (charged at
132KV)
Silchar - Melriat (New) line (charged at
132KV)
Silchar - Purba Kanchan Bari line
(charged at 132KV)
Silchar - Srikona line
State/Agen
cy
Executing
Asociated
Trans.
Works
Ckts
(S/C)
&
(D/C)
2
3
4
5
6
7
8
9
PGCIL
PGCIL
PGCIL
D/C
D/C
D/C
132
132
400
38
50
280
69
86
490
69
61
89
69
59
11
38
18
APR-12
JUN-12
MAR-13
PGCIL
D/C
400
320
447
131
82
32
MAR-13
Ist stage forest clearance yet to be received.
PGCIL
D/C
400
252
373
294
171
38
MAR-13
Severe ROW problem, Works under police pro
PGCIL
D/C
132
6
7
7
7
2
MAR-12 MAR-12 Line commissioned in Mar'12.
7
1
7
4
1
664
624
606
STC(N TE(No STG(C
Origina
Month
TL(No
Revised
Voltage
os)/Ci s)/Re km)/Er
Ckm/ s)/Lan
l
of
Level
Target
vil cp.Ma ection
MVA d Acq.
Target
Completi
(KV)
Date
Work terial( (%)
Date
on
(%)
(%)
%)
10
11
Remarks
12
13
APR-12 Commissioned 4/12.
And Other Lines
Organization involved
22
PGCIL &
NETC
Parbati-III HEP (4x130 MW),CS,HP,NHPC,U1-10/12,U2-11/12,U3-12/12,U4-1/13.,
1 LILO of Parbati -II - Koldam/Nalagarh
D/C
400
2
PGCIL
at Parbati Pooling Point.
2 LILO of Parbati -II - Parbati Pooling
D/C
400
7
PGCIL
Point at Parbati -III
D/C
400
501
3 Parbati Pooling Point - Amritsar
PGCIL
Organization involved
JAN-10 AUG-12
PGCIL
Agenda for Review Meeting to be held on 25.06.2012
Page 7 of 11
JAN-10 AUG-12
391
FEB-13
Forest approval pending (Clubbed with
Parbati-III - Amritsar line)
Tower erection commened from Jan'12
Forest case (HP portion) forward to MOEF
N. Delhi in Jun'10. Joint Inspection held up
as 9 nos. locations in Mandi Div. are falling
under Nargo Wildlife Centuray, case for
delimetation of which is pending is H'ble
Supreme Court since more than 12 months.
Matter highly critical as Gen. in expected in
Dec'11/Jan'12. Hearing done in 5th Aug'11
& next hearing expected in Nov'11. joint
inspection by RMOEF partly done in Oct'11.
Yet to completed.
Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations
S.NO
.
23
Construction progress
Associated
Transmission
Lines and Substations
State/Agen
cy
Executing
Asociated
Trans.
Works
Ckts
(S/C)
&
(D/C)
1
2
3
5
6
7
8
67
111
64
44
9
10
11
13
Work in progress.Progress slow due to
ROW.
UPPTCL
D/C
400
300
400
393
376
220
DEC-12
3
Parichha - Orai
UPPTCL
D/C
400
222
300
297
283
150
DEC-10 DEC-12
4
5
6
Parichha - Banda
Parichha - Bhauti
Orai S/S
UPPTCL
UPPTCL
UPPTCL
S/C
S/C
220
210
220
400/220 2x31
5
606
606
606
210
Work in progress.Progress slow due to
ROW.
MAR-12 MAR-12 Commissioned 3/12
MAR-10 MAR-10 Commissioned 3/11
DEC-12
Land available. land handed Over to firm on
26.12.2011. Tendering under process.
UPPTCL
Pipavav CCPP(2x351MW),SS,Guj,GSECL,Block-1-1/12, Block-2-1/13.,
1 GPPC (Pipavav)- Dhokadva
D/C
220
GETCO
2 LILO of Savarkundla - Mahva (otha) at
D/C
220
GETCO
Pipavav (GPPC) (line-2)
3 LILO of Savarkundla - Mahva(otha) at
D/C
220
GETCO
Pipavav (GPPC) (line-1)
D/C
220
4 Otha (Mahuva) - Sagapara (Palitana)
GETCO
94
83
154
133
96
133
81
133
3
74
DEC-12
APR-11 DEC-12
91
149
149
149
91
AUG-10 MAR-12 MAR-12 Commissioned 3/12
96
163
108
59
400
21
33
33
33
21
MAY-09 AUG-12
400
311
438
397
373
86
APR-13
DEC-12
Severe ROW Problem
Severe ROW Problem.
WIP/ Severe ROW Problem
GETCO
RaghunathpurTPS (2x600 MW),CS,WB,DVC, U1-1/13, U2-6/13
1 LILO of Maithon-Ranchi (PG) at
D/C
DVC
Raghunathpur
2 Raghunathpur TPS -Ranchi (PG)
D/C
DVC
Organization involved
12
LOI issued to M/s Hythro Power on
11.3.11.Survey completed.Work in progress.
Orai - Mainpuri
100
Remarks
APR-13
2
Organization involved
25
4
Parichha Extn. TPS (2x250 MW),SS,UP,UPRVUNL,U5-5/12(C),U6-9/12,
1 LILO of 1st Ckt Bhogaon-Mainpuri at
D/C
400
UPPTCL
Sirsaganj
Organization involved
24
STC(N TE(No STG(C
Origina
Month
TL(No
Revised
Voltage
os)/Ci s)/Re km)/Er
Ckm/ s)/Lan
l
of
Level
Target
vil cp.Ma ection
MVA d Acq.
Target
Completi
(KV)
Date
Work terial( (%)
Date
on
(%)
(%)
%)
DVC
Agenda for Review Meeting to be held on 25.06.2012
Page 8 of 11
Commissioned 3/11.
40 nos. loc. are under forest clearence.1st sta
MOEF,GoI on 25-1-12 for 2nd stage clearance
Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations
S.NO
.
26
Construction progress
Associated
Transmission
Lines and Substations
State/Agen
cy
Executing
Asociated
Trans.
Works
Ckts
(S/C)
&
(D/C)
1
2
3
5
6
7
8
9
420
71
309
119
302
119
4
112
45
MAR-13
SEP-12
226
356
353
531
353
309
353
181
226
58
NOV-09 MAY-11
NOV-09 DEC-12
81
282
277
265
49
DEC-09
29
Tirora TPP PH-I (2x660 MW),PS,MAHA,ADANI,U1-9/12,U2-12/12 ,PH II (2x660 MW) U1-3/13,
1 Tiroda TPP - Warora
D/C
400
588
579
400
APL
579
390
APR-11 JUN-12
99
32
SEP-12 DEC-12
30
12
13
Delay on the part of contractor & due to
ROW problem
MAY-11 Commissioned 5/11.
WIP
.
220
WBSETCL
2
Warora
MSETCL
3
4
Koradi-III - Akola-II
Tiroda TPP - Koradi -III
APL
APL
MSETCL/
APL
Organization involved
11
GETCO
Teesta Low Dam III (4x33 MW),CS,WB,NHPC, U1-4-2013/14,
1 Teesta LD III-New Jalpaiguri
S/C
WBSETCL
Organization involved
10
Remarks
RRVPNL
Salaya (Essar Power ) (2x600 MW),PS, Guj,SR Power U1-2/12(C),U2-9/12,
D/C
400
1 Vadinar (Essar)-Hadala
GETCO
2 Vadinar(Essar)- Amreli
D/C
400
GETCO
3 Vadinar (Essar) - Bachcau (PGCIL)
D/C
400
GETCO
Organization involved
28
4
Ramgarh CCPP Extn.-III, (110+50 MW), SS,Rag, RRVUNL, (GT+ST),
D/C
220
1 Ramgarh (GTPP) - Dechu
RVPNL
2 Dechu - Phalodi
S/C
220
RVPNL
Organization involved
27
STC(N TE(No STG(C
Origina
Month
TL(No
Revised
Voltage
os)/Ci s)/Re km)/Er
Ckm/ s)/Lan
l
of
Level
Target
vil cp.Ma ection
MVA d Acq.
Target
Completi
(KV)
Date
Work terial( (%)
Date
on
(%)
(%)
%)
400/220 1000
2xS/C
2xS/C
Uchpinda TPP, (4x360MW), PS,Chg, RKMPPL, U1,2,3,&4,
1 LILO of Rraigarh (Kotra)-Raipur at
D/C
CSPTCL
Uchpinda TPP (Interim Arrangement)
Agenda for Review Meeting to be held on 25.06.2012
100
62
765
765
400
Page 9 of 11
Advisoroy committee meeting for stage I
Forest clearence on 12/03/12.
work in progress.
Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations
S.NO
.
Construction progress
Associated
Transmission
Lines and Substations
State/Agen
cy
Executing
Asociated
Trans.
Works
1
Uchpinda - Raigarh (Kotra) pooling
Station
CSPTCL
2
Ckts
(S/C)
&
(D/C)
7
8
9
10
5
400
358
529
481
463
221
MAY-12
220
48
919
91
91
48
OCT-09
Constraint: ROW problems in 4 locations. Ca
District Court, Mangalore. Forest Clearance re
OCT-09 Commissioned 10/09. (For start up power)
D/C
D/C
400
400
64
136
96
215
96
193
96
158
64
73
JAN-12
AUG-12
JAN-12 Commissioned 1/12.
WIP
D/C
D/C
D/C on
M/C
400
400
400
72
8
131
104
14
129
54
14
129
31
12
129
1
131
APR-13
MAR- APR-13
11
JUL-10
JUL-11
Supplementary Transmission System Associated with Vallur TPS.,
1 Tiruvelam (PG) - Chitoor
D/C
400
PGCIL
42
Organization involved
6
11
Remarks
4
400
2
3
D/C
STC(N TE(No STG(C
Origina
Month
TL(No
Revised
Voltage
os)/Ci s)/Re km)/Er
Ckm/ s)/Lan
l
of
Level
Target
vil cp.Ma ection
MVA d Acq.
Target
Completi
(KV)
Date
Work terial( (%)
Date
on
(%)
(%)
%)
12
13
.
CSPTCL
31
Udupi TPP (2x600 MW),PS,KAR,UPCL,U1-7/10(C),U2-4/11(C),
1 Nandikur (UTPS) - Shantigrama
D/C
KPTCL
(Hassan)
2 UTPS-Nandikur - Khemar (partly on
D/C
KPTCL
Multi-ckt Multi - Voltage towers & partly
on D/C
towers)
Organization
involved
KPTCL
32
Ukai Extn. (490 MW),PS,Guj,GSECL, U6-12/12,
1 LILO of Asoj - Ukai at Kosamba
GETCO
2 UKai-Kosamba
GETCO
Organization involved
33
VallureTPS. (2x500 MW),CS,TN,NTPC,U1-32/12,
1 Vallure TPS - Melakottaiyur line
PGCIL
TANTRANSC
2 Vallur JV Project-NCTPS St.II
3 LILO of Alamathy - Sriperumbdur at
PGCIL
Vallure TPS
Organization involved
34
GETCO
APR-13
TANTRANSC/
PGCIL
Vindhyachal-IV and Rihand - III (1000MW each) Gen. Proj.,CS,MP,NTPC, U1-3/12,
Agenda for Review Meeting to be held on 25.06.2012
Page 10 of 11
Work under progress.
JUL-11 Commissioned 7/11
Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations
S.NO
.
Construction progress
Associated
Transmission
Lines and Substations
1
1
Bassi - Jaipur (RVPN) line (Q)
State/Agen
cy
Executing
Asociated
Trans.
Works
2
Ckts
(S/C)
&
(D/C)
STC(N TE(No STG(C
Origina
Month
TL(No
Revised
Voltage
os)/Ci s)/Re km)/Er
Ckm/ s)/Lan
l
of
Level
Target
vil cp.Ma ection
MVA d Acq.
Target
Completi
(KV)
Date
Work terial( (%)
Date
on
(%)
(%)
%)
3
D/C
4
400
5
114
6
152
7
103
8
61
9
PGCIL
9
54
10
11
NOV-12
12
Remarks
13
2
3
Sasan - Vindhyachal
Vindhyachal-IV - Vindhyachal Pooling
Station line (Q)
PGCIL
PGCIL
D/C
D/C
400
400
10
62
21
86
21
72
21
71
4
Satna - Gwalior line (359 Km + 60 Km
D/C Portion) Ckt-II
Vindhyachal Pooling Station - Satna
line (234 Km + 12 Km D/C S/C
Portion) -Ckt-II
Gwalior
Jaipur (RVPN) line
PGCIL
D/C+S/C
765
331
897
389
6
PGCIL
D/C+S/C
765
234
628
276
155
PGCIL
S/C
765
300
794
292
183
PGCIL
S/C
765
32
91
NOV-12
Stringing commenced from
May'12.Vindhyachal PS critical.
Best efforts target wildlife santuary clearance
Critical.
Engg. in progress.
PGCIL
S/C
765
31
91
MAR-13
Package re-tendered (under award). Critical.
PGCIL
S/C
765
6
21
21
21
9
NOV-12
Vindhyachal PS critical.
PGCIL
PGCIL
S/C
984
484
114
18
NOV-12
MAR-13
5
6
7
Rihand - Vindhyachal Pooling Station
line-I
8 Rihand - Vindhyachal Pooling Station
line-II
9 Sasan - Vindhyachal Pooling Station
line
10 Satna - Gwalior line (Ckt-I)
11 Vindhyachal Pooling Station
Organization involved
765
392
765/400 2x15
00
PGCIL
Agenda for Review Meeting to be held on 25.06.2012
Page 11 of 11
NOV-12
NOV-12
Vindhyachal PS critical contigency
arrangament being planned by-passing
Vindhyachal Pooling Stn. for evacuation of
Vindhyachal Power. Efforts being made to
complete earlier.
NOV-12
15
NOV-12
MAR-13
Award placed in Feb'11.
Completion affected due to land acquiation &
encrochement.
Download