A.K. Rampal Chief Engineer Telefax:011-26103242 Mobile:9868830172 भारत सरकार/Government of India ऊजा मंालय/Ministry of Power केय वधत ु ाधकरण Central Electricity Authority वधत ु णाल परयोजना बोधन भाग Power System Project Monitoring Division सेवा भवन, आर.के.परु म,/Sewa Bhawan, R.K. Puram नई &द(ल-110 066/New Delhi-110 066 Website: www.cea.nic.in No. 1/35(A)/PSPM/2012/ ISO. : 9001-2008 Dated: 19th June, 2012 To All concerned (as per list) Sub: Rescheduling of the meeting to review “Associated Transmission System” for evacuation of power from generating stations- Change of Date from 22nd to 25th June 2012. Sirs, Kindly refer to our letter dated 14th June, 2012 regarding meeting to review “Associated Transmission System” (ATS) for evacuation of power from generating stations to be chaired by Chairperson, CEA. It is to inform that due to unavoidable reason the date of meeting has been rescheduled from 22nd to 25th June, 2012. The revised reschedule is; Date: Time Venue 25th June, 2012 10.30 AM Conference Room, 2nd Floor, Central Electricity Authority, Sewa Bhawan, R.K. Puram, New Delhi-110066. Inconvenience is regretted. Kindly make it convenient to attend the meeting. The agenda has also been uploaded on CEA Website (www.cea.nic.in). Thanking you, Yours faithfully, (A.K. Rampal) Chief Engineer (PSPM) Copy for information to: 1. 2. 3. 4. Chairperson, CEA Member (Power System), CEA Member (Hydro), CEA Member (Thermal), CEA Copy also to: 1. Chief Engineer (SP & PA),CEA 2. Shri A.K. Manglik, Consultant (Transmission), Ministry of Power List of Addressees Utility/State Abhijeet Power Adani Power Limited Adhunik Power BHEL Chhattisgarh Address list Corporate Office Landmark Building, 6th Floor, Wardha Road, Ramdaspeth, Nagpur-440010, INDIA Phone : +91 712-7113400 / 401 / 402 Fax : +91 712-7113405 Chandwa Sharda Bhawan, Devi Mandap Road, Chandwa Dist. Latehar 829 203 Jharkhand, INDIA Phone : 06565 226 883 / 93 Sr. Vice President, Adani Power Limited, 7th Floor, Sambhav Building, Judges Bunglow Road, Bodakdev, Ahmedabad-380015 Gujarat, India Ph-079-25557134 Fax:079-25557177 Lansdowne Towers 2/1A, Sarat Bose Road Kolkata 700020, West Bengal, India Phone: 033 30517100 Fax: 033 22890285 E-mail: info@adhunikgroup.com Chairman & Managing Director, BHEL, BHEL House, Siri Fort, New Delhi – 110049, India Fax : 26493021; 26492534 Phone 66337000 Chairman , Chhattisgarh State Power Transmission Corporation Ltd, Dagania RAIPUR – 492013 Ph. 0771 5055855 FAX 0771-4066566/ 5066900 Agenda at S.NO. 16 29,32 1 6 30 List of Addressees Dans Energy Dans Energy Private Limited, Sonam Building Complex, Deveploment Area, Gangtok, East Sikkim -737101 Phone 03592-204709 Fax: 03592-201307 Chairman, Damodar Valley Corporation , DVC Towers, VIP Road, Kolkata Ph: 033-23557935 Fax: 033-23551252/23351931 Essar Power MP Ltd. Sh. R.P. Gupta CEO (Mahan), M/S Essar Power MP Ltd. Prakash Deep Building, 10th floor,7, Tolstoy Marg, New Delhi-110001 Fax 43501046/47 11 Gati Gati Infrastructure Ltd. Sungdung – Near Power Guest House Rongli – East Sikkim – 737131 Phone: 03592-255960 /255898 Fax 03592-255673 4 GMR Shri Raja Vaidyanathan, Executive Vice president (Transmission) GMR Group, IBC Knowledge Park, Phase 2, "D" Block, 9th Floor, 4/1, Bannerghatta Road,Bangalore, Karnataka 560 029 Phone: 080 40432000 Fax: 080 40432180 Email raja.vaidyanathan@gmrgroup.in, info@gmrgroup.in 7 DVC ESSAR GMR Energy Limited GMR Energy Limited Kamalanga Thermal Power Project HIG – 28 BDA, Gangaghar Mehar Marg, Jaydev Vihar, Bhubaneswar – 751 013 Phone: 0674 -2303995 / 96 / 97 Fax:0674 – 2393994 25 15 13 List of Addressees Gujarat Ind Bharath Power Infra Limited Chairman , Gujarat Electricity Transmission Company, Vidyut Bhawan, Race Course, VADODARA – 390 007 Ph: 0265-2338299 Fax: 0265 2337918 / 0265 2338164 / 0265 2338221/ 0265 5512072 Corporate Office 20/129, Chamiers Road Nandam, Chennai – 600 035 Tamil Nadu, INDIA. Phone : +91 44 24346711/2/3/4 Fax : +91 44 24346715 E-mail : chennai@ibpil.com 24,27 9 Regd Office Plot No.30-A, Road No.1 Film Nagar, Jubilee Hills Hyderabad-500 096 Andhra Pradesh, INDIA. Phone : +91 40 23553459, 23553460 Fax : +91 40 23607522 E-mail : hyderabad@ibpil.com Karnataka Chairman & Managing Director Karnataka Power Transmission Corporation Ltd. Kaveri Bhawan, P./B. No. 9999, Bangalore – 560 009 Ph. 080-22253414/22253424/ 22264931 Fax 080 -22213526 Maharashtra Chairman , Maharashtra State Electricity Transmission Co. Ltd., C-19,E-BLOCK,Prakashganga, Bandra Kurla Complex, Bandra (E), MUMBAI – 400 051 Ph: 022-26598595/26595000/26475740/26474211 Fax: 022 -26598587/26476749 31 2,3,6,29 List of Addressees NHPC North East Transmission Co. Ltd Orissa Chairman & Managing Director , NHPC, N.H.P.C Office Complex, Sector-33, Faridabad - 121003 (Haryana) E-Mail: webmaster@nhpc.nic.in FAX : 2277941 Managing Director, North East Transmission Co. Ltd., 1st Floor, Ambience Corporate Tower, Ambience Mall, NH-8, Gurgaon-122001,Haryana. Fax 0124-24716060. Chairman & Managing Director, Orissa Power Transmission Corporation Ltd., Vidyut Bhawan, Janpath, Bhubaneshwar – 751 022 Ph: 0674 410098/413396 Fax: 0674 2541904/411901/412734 5,19,28 21 9,10 PGCIL Chairman & Managing Director, Power grid Corporation of India Ltd., Plot No.2, Sector-29, Near IFCO Chowk, Gurgaon-122001 Ph: 0124- 2571800/2571900 Fax:01242571990/2571922/2571760/ 9810530571 Punjab Chairman & Managing Director, Punjab State Transmission Corporation Ltd., The Mall, Patiala – 147 001 Ph: 0175 2212005/2214927 Fax: 0175 2213199 8 Rajasthan Chairman & Managing Director , Rajasthan Rajya Vidyut Prasaran Nigam Ltd., Vidyut Bhawan, Janpath, Jaipur – 302 005 Ph: 0141 2740118 Fax: 0141 2740168 Chairman & Managing Director , Rural Electrification Corporation Ltd., Core- 4, SCOPE Complex, 7, Lodhi Road, New Delhi-110003 12,14,26 REC 7,9,11,17, 21,22,33, 34 5,19 List of Addressees Sterlite Energy Limited General Manager Sterlite Energy Limited, Bhurkamunda, Jharsuguda-768202, Orissa, India Fax-06645-266679/80 Tamil Nadu Chairman, Tamil Nadu Transmission Corporation Ltd., 6th Floor, NPKRR Maaligai, 144, Anna Salai, Chennai – 600 002 Ph: 044 -28521300/28521378 Fax: 044 -28516362 28544528 UPPTCL Chairman & Managing Director, Uttar Pradesh Power Transmission Corporation Ltd., Shakti Bhawan, 3rd Floor,14, Ashok Marg, Lucknow – 220 001 Ph: 0522 2287701/2287827 Fax: 0522 -2288410/22877892 23 WBSETCL Chairman, West Bengal State Transmission Corporation Limited 7th Floor, DJ Block, Sector-II Salt Lake KOLKATA – 700 091 Ph: 033 23591915 Fax: 033-23373002/ 23591954 28 10 18,20,33 ANNEXURE Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations S.NO . Construction progress Associated Transmission Lines and Substations 1 STC(N TE(No STG(C Origina Month TL(No Voltage Revised os)/Ci s)/Re km)/Er Ckm/ s)/Lan l of Level Target vil cp.Ma ection MVA d Acq. Target Completi Date (KV) Work terial( (%) Date on (%) (%) %) 5 400 50 Butibori (2x300 MW) TPS Phase -II,PS,Maha,RPL,U1-9/12, 1 Butibori -Butibori I D/C RPTL 220 4 220/132 100 220 2 butibori III 3 Buttibori -Buttibori-III Organization involved Chujachen HEP (2x 49.5 MW) 1 LILO of Melli Gangtok at Chujachen Organisation Involved: 7 8 9 10 11 12 13 . D/C 2 6 Remarks Adhunik Power Bela TPP (1x270 MW),PS,Maha,IEPL,U1-9/12, 1 LILO of Koradi II- Wardh(PG) at Bela IEPL TPP Organization involved 3 Ckts (S/C) & (D/C) 1 2 3 4 Adhunik Power TPP (2x270 MW), PS,Jhk, APCL.U1&2, 11/12 & 02/13 D/C 400 1 Adhunik - Jamshedupur (PG) ADHUNIK (Padampur) 2 LILO of Maithon - Jamshedpur at D/C 400 ADHUNIK Adhunik TPP Organisation Involved: 2 State/Agen cy Executing Asociated Trans. Works 75 72 68 40 AUG-12 The progress of Koradi-Wardha line is slow . Forest clearence awaited. MSETCL MSETCL RPTL MSETCL D/C Gati GATI D/C AUG-12 DEC-12 58 The work of butibori stoped. Difficult to evacuation from Butibori. AUG-12 4 5 47 Chutak-HEP (4x11 MW), CS, J&K, NHPC, U1-11/11,U2-1/12,U3-6/12, U4-7/12., 1 Gramthong -II - Chutak S/S S/C 66 5 NHPC 2 Gramthong -II - Sankoo S/C 66 31 NHPC 3 Kargil-I - Chutak S/S S/C 66 10 NHPC 4 Khangral - Mulbek -II S/C 66 23 NHPC 5 Mulbek-II - Kargil -I S/C 66 28 NHPC Agenda for Review Meeting to be held on 25.06.2012 29 166 55 117 120 29 133 55 113 100 23 87 55 68 90 Page 1 of 11 3 15 10 7 12 AUG-12 AUG-12 OCT-11 AUG-12 AUG-12 Stringting completed. Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations S.NO . Construction progress Associated Transmission Lines and Substations 1 6 7 Gramthong S/S Kargil S/S 8 Khangral (Bodhkharbu) 9 Mulbeck 10 Sankoo S/S Organization involved 6 Dhariwal TPS (2x300 MW), 1 Dhariwal TPS -Channdrapur II 2 LILO of one ckt of Bhadravati (PG) Parli at Dhariwal Organization involved 7 2 3 NHPC NHPC NHPC NHPC NHPC NHPC & REC MSETCL MSETCL D/C D/C STC(N TE(No STG(C Origina Month TL(No Revised Voltage os)/Ci s)/Re km)/Er Ckm/ s)/Lan l of Level Target vil cp.Ma ection MVA d Acq. Target Completi (KV) Date Work terial( (%) Date on (%) (%) %) 4 66/11 66/11 5 60 60 6 100 100 7 50 100 66/11 66/11 66/11 60 60 60 100 50 100 10 400 400 16 29 29 400 80 8 20 100 9 100 20 29 16 10 11 AUG-12 DEC-11 AUG-12 AUG-12 AUG-12 Remarks 12 13 Sub-stations has been charged successfully. Cutting/leveling of plot is in progress. AUG-12 . MSETCL & BHEL for Chandrapur S/S 100 DEC-12 ROW problem at 8 location. Project authority sorting out the issue. Hopful to complete the line before synchronization. GMR/ PGCIL Goindwal Sahib (2x270MW), PS,Punjab,GVK, U1-4/13,U2-8/13, 1 Goindwal Sahib - Ferozpur D/C PSTCL 2 Goindwal Sahib - Khasa (Amritsar) D/C PSTCL D/C 3 Gondwal Sahib - Kapurthalahasa PSTCL 4 Goindwal Sahib - Sultanpur Lodhi D/C PSTCL Organization involved 9 Ckts (S/C) & (D/C) EMCO Warora TPP (2x300 MW), PS,Maha,GMR, U1-12/12,U2, 1 EMCO - Bhadrawathi (PG) D/C GMR Organization involved 8 State/Agen cy Executing Asociated Trans. Works 220 220 220 220 . 37 58 57 55 35 JUL-12 Work is in progress PSTCL Ind Bharat TPP (2x350MW),PS,Orissa,Bharat, U1, & 2, 4/13, 6/13 1 Ind Barath - Jharsuguda pooling D/C OPTCL Station Agenda for Review Meeting to be held on 25.06.2012 400 . Page 2 of 11 Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations S.NO . Construction progress Associated Transmission Lines and Substations 2 State/Agen cy Executing Asociated Trans. Works 1 2 LILO of Raipur -Raurkela at Ind Barath Ind Bharat Organization involved Ckts (S/C) & (D/C) 3 STC(N TE(No STG(C Origina Month TL(No Revised Voltage os)/Ci s)/Re km)/Er Ckm/ s)/Lan l of Level Target vil cp.Ma ection MVA d Acq. Target Completi (KV) Date Work terial( (%) Date on (%) (%) %) 4 5 6 7 8 9 70 85 60 85 14 49 9 10 11 Remarks 12 13 Ind Bharat& OPTCL 10 Jhasugda (Sterlite TPP),PS, Ori,Sterlite, U1-12/10(C), U2-10/10(C),U3-8/11(C),U4-6/12, 1 LILO of Rourkela - Raigarh at Sterlite D/C 400 58 92 SEL LILO) - Raigarh at Sterlite D/C 400 49 85 2 TPP LILO(of2nd Rourkela SEL (Existing line) captive plant D/C D/C 220 9 3 TPP Sterlite TPP - Sterlite SEL Sterlite Organization involved Energy & OPTCL 11 Jorethang - New Melli (Tokal) via Tashiding Organization involved DEPL S/C 220 D/C 400 APR-13 . DEPL, & PGCIL Kalisindh TPS (600 MW), SS,Rag,RRVUNL, U-1, 1 Kalisindh TPS -Anta(Baran) Pooling RVPNL Station Organization involved 13 ROW problem. FEB-11 Commissioned 2/11. AUG-10 Ist ckt commissioned, 2nd ckt commissioned 8/10. Jorethang Loop HEP (2x48MW)PS,Sikkim,DANS,U1&2, 1 12 APR-13 FEB-11 AUG-10 RRVPNL Kamalanga TPP (3x350MW),PS,GMR, U1,2, & 3, 11/12, 4/13, 7/13 1 Kamalanga (GMR) - Angul Organization involved GMR ENERG D/C 400 . GMR Energy Agenda for Review Meeting to be held on 25.06.2012 Page 3 of 11 Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations S.NO . Construction progress Associated Transmission Lines and Substations State/Agen cy Executing Asociated Trans. Works Ckts (S/C) & (D/C) 1 2 3 4 5 6 7 8 D/C 400 100 136 136 86 ESSAR ESSAR D/C D/C 400 400 202 44 275 67 165 67 70 67 10 44 APR-13 Server ROW Problem. MAR-12 MAR-12 Commissioned 3/12 D/C 400 670 946 445 295 40 APR-13 400/220 2x50 0 50 20 STC(N TE(No STG(C Origina Month TL(No Revised Voltage os)/Ci s)/Re km)/Er Ckm/ s)/Lan l of Level Target vil cp.Ma ection MVA d Acq. Target Completi (KV) Date Work terial( (%) Date on (%) (%) %) 9 10 11 Remarks 12 13 14 Kawai Super Critical TPS (2x660 MW),SS,Raj, 1 Kawai - Anta (Baran) RVPNL RRVPNL Organization involved 15 Mahan TPP Ph-1,PS, Guj,SR Power, 1 Gandhar-Hazira 2 LILO of Viindhyachal -Korba line at Mahan S/S 3 Mahan -Sipat ESSAR 4 Hazira S/S ESSAR Organization involved 16 ESSAR . Corporate Power Mauda TPS (500 MW), CS, Maha, NTPC, U1-4/12 (C), U2-9/12, 1 Mauda - Wardha (2nd Ckt) D/C PGCIL D/C 2 Mauda STPS - Wardha line PGCIL (Quad)(Ckt-1) 3 78 KM forest involved. FAC has recommended the 1st phase forest clearance in 10th March FAC meeting. Approval yet to receive Execution likely be delayed due to delay in Forest approval APR-13 Maitrishi Usha TPP (Corporate Power) (Chandwa) (Abhijit) (4x27MW), U1/9/12,U2/12/12,U3-4,9/13, 1 Corporate TPP - Jharkhand Pooling D/C 400 CPL Station 2 Latehar - Namkum D/C 400 CPL Organization involved 17 SEP-12 400 400 124 124 345 345 345 Downward system from Wardha Substation. Agenda for Review Meeting to be held on 25.06.2012 Page 4 of 11 124 MAY-12 MAY-12 Commisisoned 05/12 MAR-12 MAR-12 Commissioned 3/12. Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations S.NO . Construction progress Associated Transmission Lines and Substations 1 STC(N TE(No STG(C Origina Month TL(No Revised Voltage os)/Ci s)/Re km)/Er Ckm/ s)/Lan l of Level Target vil cp.Ma ection MVA d Acq. Target Completi (KV) Date Work terial( (%) Date on (%) (%) %) 4 5 6 7 8 9 Mettur TPS Stage III (600 MW), SS,TN,U1-3/12, 1 LILO of MTPS -Malco at MTPS Stage TANTRANSC TANTRANSC 2 III MTPS St.III - Arasur D/C D/C 230 400 3 280 9 324 9 317 9 315 3 211 3 MTPS St.III - Singarpet TANTRANSC D/C 400 200 4 5 MTPS Stage III -Pallakkapalayam MTPS Stage-III - Gobi TANTRANSC S/C S/C 230 230 6 3 20 8 20 8 20 8 Nimoo Bazgo (NHPC) (3x15 MW),CS,J & K,NHPC,U1-10/12,U2-11/12,U3-1/13., 1 Alachi - Khalsi S/S S/C 66 31 NHPC 2 Ganglas - Leh Army base S/C 66 9 NHPC 3 Kharu S/S - Himya S/S S/C 66 51 NHPC 4 Leh (C.P.) - Kharu S/S S/C 66 25 NHPC 5 Leh (C.P.) - Leh S/S S/C 66 7 NHPC 6 Leh III - Ganglas S/C 66 10 NHPC 7 Nimoo - Alachi S/C 66 17 NHPC 8 Nimoo - Leh S/S S/C 66 31 NHPC 9 Nimoo Bazgo HEP - Alachi S/C 66 2 NHPC 10 Alchi. S/S 66/11 60 NHPC 145 44 242 106 39 53 77 152 13 100 115 22 237 106 30 29 77 152 9 50 10 100 100 100 50 30 50 Organization involved 19 2 PGCIL Ckts (S/C) & (D/C) 3 Organization involved 18 State/Agen cy Executing Asociated Trans. Works 11 Bazgo 12 Himya 13 Khalsi TANTRANSC 10 11 FEB-11 JUN-12 MAR-14 6 3 Remarks 12 13 FEB-11 MTPS III- Malco energised 2/11 for start up power. Court case - Judgement delivered in the case original alignment. Further necessary action is being taken up. Tender will be floated on acquining the land for Sirngarapet ss. MAR-12 MAR-12 Commissioned 3/12 MAR-12 MAR-12 Commissioned 3/12 TANTRANSC NHPC NHPC NHPC Agenda for Review Meeting to be held on 25.06.2012 66/11 66/11 66/11 60 60 60 191 91 12 8 77 152 5 30 40 30 Page 5 of 11 18 15 31 10 AUG-12 AUG-12 AUG-12 AUG-12 AUG-12 AUG-12 AUG-12 AUG-12 AUG-12 AUG-12 AUG-12 AUG-12 AUG-12 Stringing Completed. Gantry foundation, protecton work, erection and slab, and plaster of control room completed. Euipment and gentry structure in progress. Work suspended due to want of RCE. Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations S.NO . Construction progress Associated Transmission Lines and Substations 1 State/Agen cy Executing Asociated Trans. Works Ckts (S/C) & (D/C) 2 3 14 Kharu 15 Leh NHPC NHPC Organization involved NHPC & REC 20 North Chennai TPS St.II (2x600 MW),SS,TN,U1-3/12,U2-6/12., TANTRANSC 1 LILO of NCTPS- Mosur at NCTPS D/C Stage II (for startup power) TANTRANSC 2 Alamathy -Sunguvarchatram M/C TANTRANSC 3 NCTPS St.II- Alamathy 400 kV S/S M/C Organization involved 21 STC(N TE(No STG(C Origina Month TL(No Revised Voltage os)/Ci s)/Re km)/Er Ckm/ s)/Lan l of Level Target vil cp.Ma ection MVA d Acq. Target Completi (KV) Date Work terial( (%) Date on (%) (%) %) 4 66/11 66/11 5 60 60 6 100 100 7 20 50 8 9 10 30 10 230 3 2 2 2 2 DEC-10 NOV-10 400 400 94 168 160 114 141 114 115 110 52 128 JUN-10 APR-13 JUN-12 400 492 680 672 667 474 JUN-12 938 850 372 APR-13 11 AUG-12 AUG-12 AUG-12 2 Silchar-Bongaigaon NETC D/C 400 830 1125 3 LILO of 400KV S/C Kaithalguri - Misa line at Mariani (New) (Charged at 220KV) LILO of Loktak - Imphal at Imphal (New) line Mariani (New) - Mokikchung (PG) Melriat (New) - Melriat (Mizo) line PGCIL D/C 400 2 20 DEC-12 PGCIL D/C 132 60 150 DEC-12 PGCIL PGCIL D/C D/C 220 132 112 60 160 85 Mokokchung (PG) - Mokokchung (Nagaland) line Palatana - Surajmaninagar line (Charged at 132 KV) PGCIL D/C 132 2 4 PGCIL D/C 400 70 118 5 6 7 8 13 Work suspended due to want of RCE. Gantry foundation, protection work, erection and slab, plaster of control room completed, panel installation in progress. NOV-10 Commissioned 11/10. Court case for 9 nos location in high court. Court case - Judgement delivered in favour of received against the board. TANTRANSC Palatana CCGT (2x363.3 MW),PS,Tri,OTPC, U1-5/12,U2-6/12., 1 Palatana -Silchar D/C NETC 4 12 Remarks Agenda for Review Meeting to be held on 25.06.2012 39 113 6 108 Page 6 of 11 36 Forest clearance proposal in respect of 3 locat has reached regional MoEF, Shillong on 21-07 Second stage forest clearance for Meghalaya letter dated 15th April 2011 to Assam Forest d MAR-13 MAR-13 Line already awarded. Completion matching re MAR-13 All efforts shall be made to complete line matc JUN-12 Completion of Surajmaninagar by Tripura Govt. - Critical. Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations S.NO . Construction progress Associated Transmission Lines and Substations 9 10 11 12 13 14 1 (Charged at 132 KV) Silchar - Badarpur (PG) line. Silchar - Hailakandi line Silchar - Imphal (New) line (charged at 132KV) Silchar - Melriat (New) line (charged at 132KV) Silchar - Purba Kanchan Bari line (charged at 132KV) Silchar - Srikona line State/Agen cy Executing Asociated Trans. Works Ckts (S/C) & (D/C) 2 3 4 5 6 7 8 9 PGCIL PGCIL PGCIL D/C D/C D/C 132 132 400 38 50 280 69 86 490 69 61 89 69 59 11 38 18 APR-12 JUN-12 MAR-13 PGCIL D/C 400 320 447 131 82 32 MAR-13 Ist stage forest clearance yet to be received. PGCIL D/C 400 252 373 294 171 38 MAR-13 Severe ROW problem, Works under police pro PGCIL D/C 132 6 7 7 7 2 MAR-12 MAR-12 Line commissioned in Mar'12. 7 1 7 4 1 664 624 606 STC(N TE(No STG(C Origina Month TL(No Revised Voltage os)/Ci s)/Re km)/Er Ckm/ s)/Lan l of Level Target vil cp.Ma ection MVA d Acq. Target Completi (KV) Date Work terial( (%) Date on (%) (%) %) 10 11 Remarks 12 13 APR-12 Commissioned 4/12. And Other Lines Organization involved 22 PGCIL & NETC Parbati-III HEP (4x130 MW),CS,HP,NHPC,U1-10/12,U2-11/12,U3-12/12,U4-1/13., 1 LILO of Parbati -II - Koldam/Nalagarh D/C 400 2 PGCIL at Parbati Pooling Point. 2 LILO of Parbati -II - Parbati Pooling D/C 400 7 PGCIL Point at Parbati -III D/C 400 501 3 Parbati Pooling Point - Amritsar PGCIL Organization involved JAN-10 AUG-12 PGCIL Agenda for Review Meeting to be held on 25.06.2012 Page 7 of 11 JAN-10 AUG-12 391 FEB-13 Forest approval pending (Clubbed with Parbati-III - Amritsar line) Tower erection commened from Jan'12 Forest case (HP portion) forward to MOEF N. Delhi in Jun'10. Joint Inspection held up as 9 nos. locations in Mandi Div. are falling under Nargo Wildlife Centuray, case for delimetation of which is pending is H'ble Supreme Court since more than 12 months. Matter highly critical as Gen. in expected in Dec'11/Jan'12. Hearing done in 5th Aug'11 & next hearing expected in Nov'11. joint inspection by RMOEF partly done in Oct'11. Yet to completed. Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations S.NO . 23 Construction progress Associated Transmission Lines and Substations State/Agen cy Executing Asociated Trans. Works Ckts (S/C) & (D/C) 1 2 3 5 6 7 8 67 111 64 44 9 10 11 13 Work in progress.Progress slow due to ROW. UPPTCL D/C 400 300 400 393 376 220 DEC-12 3 Parichha - Orai UPPTCL D/C 400 222 300 297 283 150 DEC-10 DEC-12 4 5 6 Parichha - Banda Parichha - Bhauti Orai S/S UPPTCL UPPTCL UPPTCL S/C S/C 220 210 220 400/220 2x31 5 606 606 606 210 Work in progress.Progress slow due to ROW. MAR-12 MAR-12 Commissioned 3/12 MAR-10 MAR-10 Commissioned 3/11 DEC-12 Land available. land handed Over to firm on 26.12.2011. Tendering under process. UPPTCL Pipavav CCPP(2x351MW),SS,Guj,GSECL,Block-1-1/12, Block-2-1/13., 1 GPPC (Pipavav)- Dhokadva D/C 220 GETCO 2 LILO of Savarkundla - Mahva (otha) at D/C 220 GETCO Pipavav (GPPC) (line-2) 3 LILO of Savarkundla - Mahva(otha) at D/C 220 GETCO Pipavav (GPPC) (line-1) D/C 220 4 Otha (Mahuva) - Sagapara (Palitana) GETCO 94 83 154 133 96 133 81 133 3 74 DEC-12 APR-11 DEC-12 91 149 149 149 91 AUG-10 MAR-12 MAR-12 Commissioned 3/12 96 163 108 59 400 21 33 33 33 21 MAY-09 AUG-12 400 311 438 397 373 86 APR-13 DEC-12 Severe ROW Problem Severe ROW Problem. WIP/ Severe ROW Problem GETCO RaghunathpurTPS (2x600 MW),CS,WB,DVC, U1-1/13, U2-6/13 1 LILO of Maithon-Ranchi (PG) at D/C DVC Raghunathpur 2 Raghunathpur TPS -Ranchi (PG) D/C DVC Organization involved 12 LOI issued to M/s Hythro Power on 11.3.11.Survey completed.Work in progress. Orai - Mainpuri 100 Remarks APR-13 2 Organization involved 25 4 Parichha Extn. TPS (2x250 MW),SS,UP,UPRVUNL,U5-5/12(C),U6-9/12, 1 LILO of 1st Ckt Bhogaon-Mainpuri at D/C 400 UPPTCL Sirsaganj Organization involved 24 STC(N TE(No STG(C Origina Month TL(No Revised Voltage os)/Ci s)/Re km)/Er Ckm/ s)/Lan l of Level Target vil cp.Ma ection MVA d Acq. Target Completi (KV) Date Work terial( (%) Date on (%) (%) %) DVC Agenda for Review Meeting to be held on 25.06.2012 Page 8 of 11 Commissioned 3/11. 40 nos. loc. are under forest clearence.1st sta MOEF,GoI on 25-1-12 for 2nd stage clearance Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations S.NO . 26 Construction progress Associated Transmission Lines and Substations State/Agen cy Executing Asociated Trans. Works Ckts (S/C) & (D/C) 1 2 3 5 6 7 8 9 420 71 309 119 302 119 4 112 45 MAR-13 SEP-12 226 356 353 531 353 309 353 181 226 58 NOV-09 MAY-11 NOV-09 DEC-12 81 282 277 265 49 DEC-09 29 Tirora TPP PH-I (2x660 MW),PS,MAHA,ADANI,U1-9/12,U2-12/12 ,PH II (2x660 MW) U1-3/13, 1 Tiroda TPP - Warora D/C 400 588 579 400 APL 579 390 APR-11 JUN-12 99 32 SEP-12 DEC-12 30 12 13 Delay on the part of contractor & due to ROW problem MAY-11 Commissioned 5/11. WIP . 220 WBSETCL 2 Warora MSETCL 3 4 Koradi-III - Akola-II Tiroda TPP - Koradi -III APL APL MSETCL/ APL Organization involved 11 GETCO Teesta Low Dam III (4x33 MW),CS,WB,NHPC, U1-4-2013/14, 1 Teesta LD III-New Jalpaiguri S/C WBSETCL Organization involved 10 Remarks RRVPNL Salaya (Essar Power ) (2x600 MW),PS, Guj,SR Power U1-2/12(C),U2-9/12, D/C 400 1 Vadinar (Essar)-Hadala GETCO 2 Vadinar(Essar)- Amreli D/C 400 GETCO 3 Vadinar (Essar) - Bachcau (PGCIL) D/C 400 GETCO Organization involved 28 4 Ramgarh CCPP Extn.-III, (110+50 MW), SS,Rag, RRVUNL, (GT+ST), D/C 220 1 Ramgarh (GTPP) - Dechu RVPNL 2 Dechu - Phalodi S/C 220 RVPNL Organization involved 27 STC(N TE(No STG(C Origina Month TL(No Revised Voltage os)/Ci s)/Re km)/Er Ckm/ s)/Lan l of Level Target vil cp.Ma ection MVA d Acq. Target Completi (KV) Date Work terial( (%) Date on (%) (%) %) 400/220 1000 2xS/C 2xS/C Uchpinda TPP, (4x360MW), PS,Chg, RKMPPL, U1,2,3,&4, 1 LILO of Rraigarh (Kotra)-Raipur at D/C CSPTCL Uchpinda TPP (Interim Arrangement) Agenda for Review Meeting to be held on 25.06.2012 100 62 765 765 400 Page 9 of 11 Advisoroy committee meeting for stage I Forest clearence on 12/03/12. work in progress. Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations S.NO . Construction progress Associated Transmission Lines and Substations State/Agen cy Executing Asociated Trans. Works 1 Uchpinda - Raigarh (Kotra) pooling Station CSPTCL 2 Ckts (S/C) & (D/C) 7 8 9 10 5 400 358 529 481 463 221 MAY-12 220 48 919 91 91 48 OCT-09 Constraint: ROW problems in 4 locations. Ca District Court, Mangalore. Forest Clearance re OCT-09 Commissioned 10/09. (For start up power) D/C D/C 400 400 64 136 96 215 96 193 96 158 64 73 JAN-12 AUG-12 JAN-12 Commissioned 1/12. WIP D/C D/C D/C on M/C 400 400 400 72 8 131 104 14 129 54 14 129 31 12 129 1 131 APR-13 MAR- APR-13 11 JUL-10 JUL-11 Supplementary Transmission System Associated with Vallur TPS., 1 Tiruvelam (PG) - Chitoor D/C 400 PGCIL 42 Organization involved 6 11 Remarks 4 400 2 3 D/C STC(N TE(No STG(C Origina Month TL(No Revised Voltage os)/Ci s)/Re km)/Er Ckm/ s)/Lan l of Level Target vil cp.Ma ection MVA d Acq. Target Completi (KV) Date Work terial( (%) Date on (%) (%) %) 12 13 . CSPTCL 31 Udupi TPP (2x600 MW),PS,KAR,UPCL,U1-7/10(C),U2-4/11(C), 1 Nandikur (UTPS) - Shantigrama D/C KPTCL (Hassan) 2 UTPS-Nandikur - Khemar (partly on D/C KPTCL Multi-ckt Multi - Voltage towers & partly on D/C towers) Organization involved KPTCL 32 Ukai Extn. (490 MW),PS,Guj,GSECL, U6-12/12, 1 LILO of Asoj - Ukai at Kosamba GETCO 2 UKai-Kosamba GETCO Organization involved 33 VallureTPS. (2x500 MW),CS,TN,NTPC,U1-32/12, 1 Vallure TPS - Melakottaiyur line PGCIL TANTRANSC 2 Vallur JV Project-NCTPS St.II 3 LILO of Alamathy - Sriperumbdur at PGCIL Vallure TPS Organization involved 34 GETCO APR-13 TANTRANSC/ PGCIL Vindhyachal-IV and Rihand - III (1000MW each) Gen. Proj.,CS,MP,NTPC, U1-3/12, Agenda for Review Meeting to be held on 25.06.2012 Page 10 of 11 Work under progress. JUL-11 Commissioned 7/11 Agenda for Meeting to Review ATS for Evacuation of Power From Generating Stations S.NO . Construction progress Associated Transmission Lines and Substations 1 1 Bassi - Jaipur (RVPN) line (Q) State/Agen cy Executing Asociated Trans. Works 2 Ckts (S/C) & (D/C) STC(N TE(No STG(C Origina Month TL(No Revised Voltage os)/Ci s)/Re km)/Er Ckm/ s)/Lan l of Level Target vil cp.Ma ection MVA d Acq. Target Completi (KV) Date Work terial( (%) Date on (%) (%) %) 3 D/C 4 400 5 114 6 152 7 103 8 61 9 PGCIL 9 54 10 11 NOV-12 12 Remarks 13 2 3 Sasan - Vindhyachal Vindhyachal-IV - Vindhyachal Pooling Station line (Q) PGCIL PGCIL D/C D/C 400 400 10 62 21 86 21 72 21 71 4 Satna - Gwalior line (359 Km + 60 Km D/C Portion) Ckt-II Vindhyachal Pooling Station - Satna line (234 Km + 12 Km D/C S/C Portion) -Ckt-II Gwalior Jaipur (RVPN) line PGCIL D/C+S/C 765 331 897 389 6 PGCIL D/C+S/C 765 234 628 276 155 PGCIL S/C 765 300 794 292 183 PGCIL S/C 765 32 91 NOV-12 Stringing commenced from May'12.Vindhyachal PS critical. Best efforts target wildlife santuary clearance Critical. Engg. in progress. PGCIL S/C 765 31 91 MAR-13 Package re-tendered (under award). Critical. PGCIL S/C 765 6 21 21 21 9 NOV-12 Vindhyachal PS critical. PGCIL PGCIL S/C 984 484 114 18 NOV-12 MAR-13 5 6 7 Rihand - Vindhyachal Pooling Station line-I 8 Rihand - Vindhyachal Pooling Station line-II 9 Sasan - Vindhyachal Pooling Station line 10 Satna - Gwalior line (Ckt-I) 11 Vindhyachal Pooling Station Organization involved 765 392 765/400 2x15 00 PGCIL Agenda for Review Meeting to be held on 25.06.2012 Page 11 of 11 NOV-12 NOV-12 Vindhyachal PS critical contigency arrangament being planned by-passing Vindhyachal Pooling Stn. for evacuation of Vindhyachal Power. Efforts being made to complete earlier. NOV-12 15 NOV-12 MAR-13 Award placed in Feb'11. Completion affected due to land acquiation & encrochement.