Additional Agenda notes for the 39th Meeting of Standing Committee on Power
System Planning in Western Region
1.0
Provision of 4nos of 220kV feeder bays at 750MW Rewa Ultra Mega Solar
Project (UMSP) Pooling Station – proposal by MSETCL.
1.1
Rewa Ultra Mega Solar Project (UMSP) of 750MW capacity to be constructed in
Gurh tehsil of Rewa district has already been approved by MNRE. Rewa UMSP is a
joint venture company of MP Urja Vikas Nigam Ltd (MPUVNL) and Solar Energy
Corporation of India (SECI). The following transmission system for Rewa Ultra Mega
Solar Project (RUMSP) has been agreed in the 38th SCM of WR :
1.2
a.
LILO of Vindhyachal – Jabalpur 400kV 2nd D/c line (circuit-3&4) at Rewa
Pooling Station – 59KM (2x27=54KM D/c portion + 5KM M/s portion)
b.
Establishment of 400/220kV, 3x500 MVA Pooling station at Rewa
c.
1x125 MVAr bus reactor at Rewa Pooling Station
d.
6 Nos. 220kV Line bays at Rewa Pooling station (for its interconnection with
solar park)
MPPTCL Vide letter 04 – 02/PSP – 421/2988 dated 20.11.2015 has informed that
400/220kV Satna (PGCIL) S/s is feeding power to Rewa, Satna, Sidhi and
Chhatarpur areas. The above substation is critically loaded and outage of any
element would result in loss of supply in the above areas. 400/220kV substation at
Rewa which has been proposed as a part of the evacuation system for 750MW
RUMSP (solar power which is available around 8hrs during the day time only) would
be utilized for 8hrs only and for remaining period of about 16hours the proposed
pooling station remains unutilized.For better utilization of proposed 400/220kV Rewa
pooling station and to relive loading on 400/220kV transformers at Satna (PGCIL),
MPPTCL has proposed the following transmission system:
1.3
220kV D/C line from 400/220kV Rewa Solar Pooling Station to Rewa 220kV
S/s.
220kV D/C line from 400/220kV Rewa Solar Pooling Station to Sidhi 220kV
S/s.
For termination of aforesaid 220kV lines, MPPTCL has requested for provision of
4nos of 220kV feeder bays at the proposed 400/220kV Rewa pooling station and
MPPTCL would also bear the cost of these 4nos of 220kV feeders if agreed by
PGCIL.
Members may deliberate.
2.0
Standardization of OPGW in lieu of One Earth Wire in all Transmission lines –
agenda by POWERGRID
2.1
The Power System requirement for Communication is increasing multifold due to
a. special protection scheme
39th SCMPSPWR Additional Agenda
1
b.
c.
d.
e.
Ever increasing data reporting to Load Dispatch Centre.
Phasor measurements based data collection and reporting.
Remote monitoring/operation of sub-station/elements.
Differential protection on Lines
The present practice of putting fiber in select lines for a stations connectivity lead
to situation where stations connectivity is held up whenever the identified OPGW
implementation held up either due to line delay, rerouting or LILO of under
construction line for example connectivity of Siratu 132 KV.
2.2
OPGW installation on existing lines is taking long time / delayed due to shut down,
ROW issues as well as capacity constraints of executing agencies.
2.3
It is proposed to include one 24 Fiber (OPGW) in all transmission lines which will
ensure availability of wideband Communication from all substations to cater
bandwidth for various power system application for which communication equipment
(SDH– STM-16) shall be provided at all upcoming substations.
2.4
POWERGRID may present the case and members may deliberate.
3.0
Provision of 2 nos of 220kV bays at Raipur (PG) substation for LILO of
Khedamara (CSPTCL) – Borjhara S/c line at 220kV Raipur (PG) substation.
3.1
In 38th Meeting of Standing Committee on Power System Planning in Western
Region held on 17.07.2015, construction of 2 nos. 220kV line bays by POWERGRID
at its Raipur 400/220kV substation was agreed for termination of LILO of Khedamara
(CSPTCL) – Borjhara S/c line of CSPTCL.
3.2
2 nos. 220kV line bays were constructed along with installation of additional 315
MVA, 400/220 kV ICT at Raipur 400/220kV substation as part of WRSS-6 (approved
in the 25th Meeting of Standing Committee on Power System Planning in Western
Region held on 30-09-2006). It is understood that CSPTCL has earmarked these
2no of 220kV line bays at Raipur for termination of 220kV D/c line from DOMA.
However, these 220kV line bays are still unutilized.
3.3
POWERGRID has requested CSPTCL to confirm whether these 2 nos. 220 kV line
bays shall be utilized by them for termination of 220 kV D/c line from DOMA
(CSPTCL) or the same can be utilized for LILO of Khedamara (CSPTCL) - Borjhara
220 kV S/c line.
CSPTCL may confirm regarding utilization of the 220 kV bays.
4.0
4.1
Augmentation of Transformation Capacity at ISTS substations in WR to meet
n-1 contingency of transformer- agenda by POWERGRID
It has been observed that at many ISTS substations, n-1 transmission planning
criteria doesn’t get fulfilled in case of transformer outage. Sometimes it leads to load
restriction during peak demand to avoid overloading of transformers. List of such
substations along with recorded peak loadings is given in the table below. Further,
load flow studies have been carried out to assess the extent of loading on these
39th SCMPSPWR – Additional Agenda
2
transformers for 2018-19 time frame when almost all the under implementation /
planned transmission schemes shall be commissioned and the same is also
indicated in the table below:
Sl.
No.
1
2
Name of
the S/S
Khandwa
400/220kV
Boisar
400/220kV
ICT
Rating
(MVA)
315
2
315
2
1130
500
3
Bhachau
400/220kV
4
Kala(DNH)
400/220kV
No.
of
ICT
DETAILS OF ICTs IN WESTERN REGION
N-1
Loading
Capacity
Peak
in 2018Aggregate
(Outage
Loadi
19 Time
capacity
of
ng
Frame
(MVA)
Largest
(MW)
(MVA)
ICT)
2x241 =
482
630
315
530
(345:n-1)
315
315
630
800
1
2
2
630
630
315
315
510
466
2x366+58
1= 1313
(500:n-1
of
500MVA)
2x163 =
326 (245:
n-1)
2x278 =
558 (389:
n-1)
3x335 =
1005
(2x415: n1)
5
6
7
8
Vapi
400/220kV
Dehgam
400/220kV
Raigarh
(Existing)
400/220kV
Bhatapara
400/220kV
315
3
945
630
836
2x257=
514 (331:
n-1)
315
2
630
315
450
2x168 =
336 (262:
n-1)
315
2
630
315
400
2x183 =
366 (263:
n-1)
315
2
39th SCMPSPWR – Additional Agenda
630
315
3
440
Remark
Provision
of
1x500MVA,
400/220kV (3rd)
ICT is required
Provision
of
1x500MVA,
400/220kV (4th)
ICT is required
Provision
of
1x500MVA,
400/220kV (3rd)
ICT is required
Provision
of
1x500MVA,
400/220kV (3rd)
ICT is required
Due to space
constraints in the
substation, it is
proposed
to
replace existing
3x315MVAR,
400/220kV ICTs
with 3x500MVA,
400/220kV ICTs
and utilize 315
MVA ICTs at
other S/s.
Provision
of
1x315MVA,
400/220kV (3rd)
ICT is required
(to be shifted
from
Vapi
400/220kV s/s)
Provision
of
1x500MVA,
400/220kV (3rd)
ICT
is
required(to
be
shifted from Vapi
400/220kV s/s)
Provision
of
1x500MVA,
400/220kV (3rd)
ICT
is
required(to
be
shifted from Vapi
400/220kV s/s)
9
Bina(PG)
400/220kV
315
1
315
0
235
304 (n-1
criteria
violated
as only 1
trf)
No space is
available at Bina
(PG) 400/220kV
S/s for provision
of additional ICT
4.2
It has been observed that loading on transformers at Boisar, Bhachau, Raigarh
(Existing) and Bhatapara are expected to be reduced after commissioning of ongoing and planned transmission in future and n-1 criteria is fulfilled even without
augmentation. However, Maharashtra, Gujarat and Chhattisgarh may confirm
whether they envisage requirement of additional ICTs at these substations.
4.3
Members may discuss and concur
5.0
Measure to control Fault Level at pooling stations/ substations in Chhattisgarh
area
5.1
A large number of generation projects are coming up in Chhattisgarh which are
getting pooled at various substations (at 765kV level) for onward transfer of power to
other parts of the grid. This is leading to very high short circuit levels at almost all
pooling stations of Chhattisgarh viz. Raigarh (Kotra) Pool (400kV & 765kV), Raigarh
(Tamnar) Pool (400kV & 765kV), Champa Pool (400kV & 765kV), Dharamjaygarh
Pool (400kV & 765kV), Bilaspur Pool (400kV & 765kV) and Raipur Pool (400kV &
765kV). Studies have been carried out to suggest suitable measures so as to control
the fault levels of the substations in Chhattisgarh area within design values. The
issue was discussed in the last Standing Committee Meeting (SCM) wherein it was
decided that joint studies shall be done by CEA and CTU and the issue shall be
finalized in the next WR SCM.
5.2
Joint study results indicate that following measures need to be taken to control the
fault levels of the substations in the Chhattisgarh area:
a. To improve the reliability of power transfer from generating stations connected at
Raigarh Pool (Tamnar), LILO of both ckts of Jharsuguda – Dharamjaygarh765kV
1x D/c line at Raigarh (Tamnar) Pool was agreed in 36th SCM of Western Region
held on 29.08.2013.
In 17th SCM of ER held on 25.05.2015, ERPC stated that Jharsuguda –
Dharmajaygarh 765kV lines were planned for evacuation of power from Odisha
IPPs and Surplus generation in ER to WR & NR. It was also envisaged that LILO
of above line at Raigarh (Tamnar) Pool may restrict power evacuation from ER
side and would create congestion, thereby overloading in Eastern regional
networks. Also, the concerns were raised by ER constituents regarding rising
values of fault level at Jharsuguda and nearby substations after LILO of above
line at Raigarh (Tamnar) Pool. The case was studied and found that with the
proposed LILO line, fault level of a number of substations incl. Dharamjaygarh
Pool, Raigarh (Tamnar) Pool and Jharsuguda, is becoming very high. In view of
the above, it is proposed to withdraw the LILO of Jharsuguda – Dharamjaygarh
765kV D/c line at Raigarh (Tamnar) Pool. Further, in order to ensure reliable
39th SCMPSPWR – Additional Agenda
4
evacuation of power for generation projects getting pooled at Raigarh (Tamnar)
Pool, following is proposed.
Raigarh Pool (Tamnar) Pool – Dharamjaygarh 765 kV D/c Line.
b. In order to contain the fault level within designed value Champa Pool, proposal
for Series Reactors and BUS Split arrangement was discussed in the 37th WR
SCM held on 05.09.2014. After comprehensive studies, it has been observed that
fault levels at Champa Pool may be contained with Bus splitting arrangement at
both 765kV & 400kV levels even without series reactors.
c. Further, in the 30th WR SCM held on 08.07.2010, it was decided to keep following
circuits in normally open condition at a later date:
Raigarh Pool (Kotra) – Raigarh (Existing) 400 kV D/c line.
Raipur Pool– Raipur (Existing) 400kV D/c line.
These lines may be kept normally open and may be used depending on the
system condition
d. Splitting of 765kV Dharamjaygarh S/s and both 765kV & 400kV buses of Raigarh
Pool (Kotra) S/s.
e. During the studies, it was observed that the interconnection between 4x600MW
TPP and 4x250MW TPP of M/S Jindal Power Ltd, when switched ON, contributes
excessive fault current to Raigarh (Tamnar) Pool & Raipur Substations. Hence,
the same has been switched OFF in the studies. The same shall have to be
ensured by M/s Jindal Power Ltd.
The results with the above bus split are shown in the table below:
1
2
Fault level after
Proposed bus
splitting (kA)
Part A
Part B
33
#
41
38
47
31
38
19
30
#
44
#
Voltage Level
(in kV)
Designed SC
MVA (in kA)
400
765
400
765
400
765
50
50
50
50
50
50
37
71
102
59
49
53
400
50
90
48
42
765
50
62
37
26
Bilaspur Pool
S/s
400
40
40
39
#
765
40
46
44
#
6
Raigarh Pool
(Tamnar)
765
50
61
38
#
400
50
55
46
#
400
40
47
26
#
7
Raipur(Existin
g)
Raipur
(Existing) Split
400
40
41
39
#
400
40
88
34
#
Sl.No
1
2
Substation
Dharamjaigar
h
Raigarh Pool
(Kotra)
3
Raipur Pool
4
Champa Pool
5
8
Raigarh
39th SCMPSPWR – Additional Agenda
5
Fault level
in Base Case
(kA)
9
10
Rajnandgaon
Sipat
765
50
36
34
#
765
50
42
41
#
400
50
40
39
#
# BUS not split
The Power Map of Chhattisgarh showing power flows and short-circuit levels before
and after splitting arrangement of Dharamjaygarh Pool, Champa Pool and Raigarh
Pool (Kotra) is enclosed at Annexure 1.
5.3
The Single Line Diagram of the pooling stations/ substations after bus splitting are
given belowi.
Dharamjaygarh Pooling Station after splitting:
BILASPUR
POOL
CHAMPA
POOL(A)
JHARSUGUDA
(B)
JABALPUR POOL
JHARSUGUDA–
[A]
A
B
DHARAMJAYGARH
765kV
2 x 1500 MVA
765/400 kV
2x330 MVAR
RAIGARH
(TAMNAR)
DHARAMJAYGARH
400 kV
BALCO (4X300
=1200)
VANDANA (2X135
+1X270) = 540
RANCH
INEW
----- Proposed
Fig. 1: Dharamjaygarh Pooling Station after splitting
Dharamjaygarh
S/s Voltage
Level (in kV)
Description
BUS
Section A
BUS
Section B
1740
-
Available
-
-
Proposed
1x125
-
Available
2x1500
-
Available
Proposed
2x330
-
1X330 to be
shifted from
BUS Section A
Generation (in MW)
400
765
BUS Reactor (in
MVAR)
765/400kV ICT(in
MVA)
BUS Reactor(in
MVAR)
# Balco TPP is a captive plant and LTA granted for 584MW (200MW for Balco Ltd
& 384MW for CSPTCL)
ii.
Raigarh Pool (Kotra) after splitting :
39th SCMPSPWR – Additional Agenda
6
VISA POWER
(2X600)
KWPCL
SKS
(1X600)
(4X300)
LARA
(2X800)
DB POWER
(2X600)
PUGLUR NEW
HVDC(6000 MW)
ATHENA
(2X600) RKM(4X360)
RAIGARH
(EXISTING)
B
A
RAIGARH
POOL(KOTRA)400KV
2 x 1500 MVA
765/400 kV
2 x 1500 MVA
765/400 kV
A
80 MVAR
MVAR
B
RAIGARH
POOL
(KOTRA)
765KV
RAIPUR POOL
240 MVAR
RAIGARH
CHAMPA POOL TAMNAR
(A)
CHAMPA
POOL (B)
RAIPUR POOL
Fig. 2: Raigarh Pool (Kotra) after splitting.
Raigarh Pool
(Kotra)
Voltage Level
(in kV)
Description
Generation (in MW)
400
765
iii.
BUS Reactor(in
MVAR)
765/400kV ICT (in
MVA)
BUS Reactor (in
MVAR)
BUS Section
A
BUS
Section B
3000
3840
Available
Proposed
Available
1 X 125
2x1500
80
2x1500
Available
Proposed
240
240
Champa Pooling Station after BUS Splitting :
LANCO AMARKANTAK
(2X660)
KURUKSHETRA LARA
HVDC
(2X800)
KPCL(2X800)
KSK MAHANADI MBPOWER
(2X660)
(6X600)
A
CHAMPAP
3x1500MVA
OOL400KV
765/400 kV
B
80MVAR
3x1500 MVA
765/400 kV
2X80MVA
R
CHAMPA
POOL 765 KV
B
A
240 MVAR
RAIGARH
POOL
(KOTRA) -[A]
RAIGARH
POOL (KOTRA)
– [B]
DHARAMJAYGARH
-[B]
RAIPUR POOL
Fig. 3: Champa Pooling Station after splitting.
Champa Pool
Voltage
Description
39th SCMPSPWR – Additional Agenda
BUS Section A
7
BUS Section B
Level(in kV)
400
765
5.4
Generation (in MW)
Available
4920
4520
BUS Reactor (in
MVAR)
765/400 kV ICT(in
MVA)
BUS Reactor (in
MVAR)
Available
2x80
1x80
Available
3x1500
3x1500
Available
Proposed
240
240
-
The proposal to control fault level at pooling stations/ substations in Chhattisgarh
area is summarized below:
1.
Splitting Arrangement of following substations along with necessary
switching arrangement
(i) Dharamjaygarh Pool 765kV BUS as per Fig. 1.
(ii)
Raigarh Pool (Kotra) 400kV & 765kV BUS as per Fig. 2.
(iii)
Champa Pool 400 kV & 765kV BUS as per Fig 3.
2.
Followings ckts shall be operated as normally open and may be
switched on as per operational requirement of grid:
(iv)
(v)
3.
Raigarh Pool (Kotra) – Raigarh (Existing) 400 kV D/c line.
Raipur Pool – Raipur (Existing) 400kV D/c line
Reactors:
(vi)
1x125 MVAR BUS Reactor at 400 kV BUS Section A of
Dharamjaygarh Pool.
(vii) 1x125 MVAR BUS Reactor at 400 kV BUS Section A of
Raigarh Pool (Kotra).
(viii) 1x240MVAR BUS Reactor at 765 kV BUS Section A of Raigarh
Pool (Kotra).
(ix)
1x240MVAR BUS Reactor at 765 kV BUS Section A of
Champa Pool.
(x)
1X330MVAR BUS Reactor to be shifted from 765kV BUS
Section A to 765kV BUS Section B of Dharamjaygarh Pool
4.
Additional System for Power Evacuation from Generation Projects
pooled at Raigarh (Tamnar):
(xi)
Dharamjaygarh Pool section B - Raigarh (Tamnar) Pool 765kV
D/c line
Note
# 1: Wherever there is space constraint, GIS bay would be used.
# 2: The interconnection between 4x600MW TPP and 4x250MW TPP of
M/S Jindal Power Ltd shall normally remain in open condition and
may be switched on as per operational requirement of grid.
Members may deliberate.
6.0
Measure to control fault level at Wardha Substation
6.1
Fault levels at several substations in Chhattisgarh area were brought under control
through suitable splitting arrangements as discussed at item no. 5 without the need
39th SCMPSPWR – Additional Agenda
8
of installation of series reactors. Even after splitting the above buses in Chhattisgarh,
fault level at Wardha Substation remains very high. It was observed that short circuit
level of 765kV Wardha bus reaches about 46 kA and that at 400kV bus reaches
about 78 kA in 2018-19 condition.
The single line diagram of Wardha substation is given below:
SEONI
RAIPUR
AURANGABAD
NIZAMABAD
Wardha
765KV
(330 +240) MVAR
3X1500 MVA
765/400 kV ICT
Wardha
400 KV
50 MVAR
RAIPUR
WARORA
AKOLA
KORADI
2X315 MVA
400/220 kV ICT
MAUDA
PARLI/
WARORA
POOL
AURANGABAD
Fig. 4: Wardha Sub-Station
At 400kV Wardha bus, major fault current contributories are –
6.2
Warora Pool D/c line – 16kA
Warora (MSETCL) S/c line – 7.7kA
Koradi II (MSETCL) S/c line – 9.6kA
Mauda TPP D/c line – 5.6kA
765/400kV ICTs – 26kA
It is clear that Warora Pool contributes the most at Wardha 400kV bus. In view of the
above, the option of bypassing Mauda TPP – Wardha 400kV D/c line at Wardha bus
and connecting it with Wardha – Warora Pool 400kV D/c (Quad) line so as to form
Mauda TPP – Warora Pool 400kV D/c (Quad) line was explored. Further, it is
observed that the interconnection with MSETCL system contributes about 17.6kA at
400kV Wardha bus. Further, addition of 3x660MW generation at Koradi TPP II would
exaggerate the problem. From power flow point of view, these interconnections are
not very significant after development of state transmission system from Koradi TPP
II. In view of above, the following re-arrangement is proposed at Wardha Substation:
(i)
Bypassing Mauda TPP – Wardha 400kV D/c line at Wardha bus and connecting
it with Wardha – Warora Pool 400kV D/c (Quad) line so as to form Mauda TPP
– Warora Pool 400kV D/c (Quad) line
39th SCMPSPWR – Additional Agenda
9
(ii)
Bypassing Koradi TPP II – Wardha 400kV (Quad) line at Wardha bus and
connecting it with Wardha – Warora (MSETCL) 400kV (Quad) line so as to form
Koradi TPP II – Warora (MSETCL) 400kV (Quad) D/c line (one ckt via IEPL
TPP)
The Power Map of Wardha complex showing power flows and short-circuit levels
before and after re-arrangement of at Wardha 400kV bus is enclosed at Annexure
2. The corresponding short circuit levels are tabulated below:
Name of the
S/s (BUS)
Wardha (PG)
Wardha (PG)
Warora
MSETCL)
Koradi III
MSETCL)
Koradi TPP II
Koradi TPP I
Aurangabad
(PG)
Warora Pool
Chandrapur I
(MSETCL)
Chandrapur II
(MSETCL)
6.3
Voltage
Level
(kV)
400
765
400
3-Ph SC fault level of the Substations (in
kA)
Base Case + Proposed reBase Case
arrangement at Wardha (PG)
78
44
46
40
41
34
400
38
36
400
400
400
56
52
45
53
50
44
400
400
51
51
32
48
400
51
48
It may be noted here that design rating of Wardha substation is 40kA (3 phase) for
both 400kV and 765kV levels. With the proposed re-arrangement, fault levels
reduced from 78kA to 44kA at 400kV level and from 46 to 40kA at 765kV level.
Additional measures to contain the fault levels below 40kA needs to be further
worked out.
Members may deliberate.
7.0
Measures to control High fault levels observed in Vindhyachal complex
7.1
Fault levels in Vindhyachal complex have reached beyond the design limits. As
reported by WRTS II, in a fault on Vindhyachal - Korba 400kV line#2 on 11.10.15 at
a distance of 0.3km from Vindhyachal STPS, fault current fed from Vindhyachal was
around 47.4kA. There was a similar fault on the same line on 06.10.14 and the fault
current that was fed from Vindhyachal STPS was around 40kA. Such high fault
currents are detrimental to switchyard equipment’s. Failures of CT connectors,
isolator contacts, etc have already been reported during such faults.
7.2
Short circuit studies indicate following fault levels at Vindhyachal Complex:
Sl.
No.
1
Substation
3 Phase fault LG fault level
level
Vindhyachal STPS – I,II,III
59kA
64kA
39th SCMPSPWR – Additional Agenda
10
2
3
4
5
400kV
Vindhyachal STPS – IV, V
400kV
Sasan UMPP 400kV
Vindhyachal Pool 400kV
Korba STPS
56kA
59kA
49kA
50kA
57kA
46kA
48kA
56kA
From the above table, it is evident that all the substations in Vindhyachal complex
incl. Vindhyachal STPS and Sasan UMPP are exposed to very high fault currents.
Here, it may be noted that following was agreed in previous standing committee
meetings of Western Region:
1. LILO of Vindhyachal STPS – Jabalpur 400kV S/c line at Sasan UMPP has been
agreed to be delinked at Sasan UMPP in order to reduce SC levels in Sasan
UMPP and Vindhyachal STPS (agreed in 29th WR SCM held on 10.09.2009)
2. Vindhyachal STPS I,II, III – Vindhyachal STPS IV,V interconnection was agreed
as an interim arrangement till the commissioning of Vindhyachal STPS IV
Transmission System (agreed in the 33rd WR SCM held on 21.10.2011)
7.3
After considering the above agreed schemes in short circuit studies, fault levels are
seen to reduce considerably. The revised fault currents are tabulated below:
Sl. Substation
3 Phase fault LG fault level
No.
level
1
Vindhyachal (NTPC) – I,II,III
38kA
41kA
400kV
2
Vindhyachal (NTPC) – IV, V
24kA
26kA
400kV
3
Sasan UMPP 400kV
28kA
29kA
4
Vindhyachal Pool 400kV
29kA
30kA
5
Korba STPS
56kA
56kA
Since, Vindhyachal STPS IV Transmission system has already been commissioned,
the 400kV interconnection between Vindhyachal STPS I, II, III and Vindhyachal IV, V
of NTPC Ltd shall have to be opened.
Accordingly, Sasan Power Ltd. and NTPC Ltd. may update the status of opening of
the following elements in their respective switchyards:
1. LILO of one ckt of Vindhyachal STPS – Jabalpur 400kV D/c line at Sasan UMPP.
2. Vindhyachal STPS I,II,III – Vindhyachal STPS IV,V 400kV interconnection
Members may deliberate.
8.0
8.1
Reactive compensation of various schemes agreed to be implemented through
TBCB
The following transmission schemes has been approved in 36th / 37th /38th meeting of
Standing Committee on Power System Planning in Western Region held on
29.08.2013/05.09.2014/ 17.07.2014 respectively.
39th SCMPSPWR – Additional Agenda
11
Transmission System associated with Gadarwara STPS (2x800MW) of NTPC
(Part –A)
(i) Gadarwara STPS – Warora Pooling Station 765kV D/c line
(As per interim arrangement, LILO of existing Seoni – Bina 765kV S/c line at
Gadarwara STPP would be established. At a later date, LILO portion would be
delinked from Seoni – Bina 765kV S/c line to restore the Seoni – Bina 765kV
s/c direct, and the LILO portion would be extended to the Jabalpur 765/400kV
Pooling Station to form the proposed Gadarwara STPS – Jabalpur Pool765kV
D/c line)
(ii) Gadarwara STPS – Pooling Station (near Warora) 765 kV D/c line
(iii) Establishment of 2x1500 MVA, 765/400 Substations at Pooling Station (near
Warora)
(iv) LILO of both circuits of Wardha - Parli (PG) 400 kV D/c quad line at Pooling
Station (near Warora)
Transmission System associated with Gadarwara STPS (2x800MW) of NTPC
(Part –B) now renamed as WRSS 15.
(i)
(ii)
(iii)
(iv)
Pooling Station (near Warora) – Parli (new) 765 kV D/c line
Parli (new) – Solapur 765 kV D/c line
Establishment of 2x1500 MVA, 765/400 Substations at Parli (new)
Parli (new) – Parli (PG) 400 kV D/c (Quad) line
Additional Transmission System Strengthening for Sipat STPS
(i)
(ii)
Sipat – Bilaspur Pooling Station 765kV 3rd S/c line
Bilasapur Pooling Station – Rajnandgaon 765kV D/c line
System Strengthening for IPPs in Chhattisgarh and other generation projects
in Western Region
(i) 400kV interconnections at Gwalior 765/400kV S/s:
Gwalior 765/400 kV – Morena 400 kV D/C (Quad) line
Establishment of 2X315 MVA, 400/ 220 kV substation at Morena
(ii)
Additional evacuation line from Vindhyachal-IV & V STPP (3x500 MW):
Vindhyachal-IV & V STPP – Vindhyachal Pool 400 kV 2nd D/C (Quad) line
(iii) Additional System Strengthening Scheme for Chhattisgarh IPPs (Part A):
Sasan UMPP – Vindhyachal Pooling station 765 kV 2nd S/C line
LILO of one circuit of Aurangabad – Padghe 765 kV D/C line at Pune GIS
Raigarh (Kotra) - Champa Pool 765 kV 2nd S/C line.
Champa Pool) – Dharamjaigarh 765 kV 2nd S/C line.
39th SCMPSPWR – Additional Agenda
12
Additional System Strengthening Scheme for Chhattisgarh IPPs (Part B):
(i) Raipur Pool – Rajnandgaon (TBCB) 765 kV D/c line.
(ii) Rajnandgaon (TBCB) – Warora Pool (TBCB) 765 kV D/c line.
8.2
The schemes have already been notified along with reactive compensation in 32nd
/33rd Empowered Committee on Transmission held on 06.02.2014 / 30.09.2014
respectively. The details for reactive compensation are as below
Bus Reactors
Sl.
Substation
Rating
No.
Transmission System associated with Gadarwara STPS (2x800MW) of NTPC
(Part –A)
1
765/400kV, 2x1500MVA Warora Pooling Station 765kV, 1x330MVAR
2
Gadarwara STPS Switchyard
765kV, 1x330MVAR
Transmission System associated with Gadarwara STPS (2x800MW) of NTPC
(Part –B) now renamed as WRSS-15
3
765/400kV, 2x1500MVA Parli (New) Substation 765kV, 1x330MVAR
System Strengthening for IPPs in Chhattisgarh and other generation projects
in Western Region
4
400/220kV, 2x315MVA Morena Substation
400kV, 1x125MVAR
Additional System Strengthening Scheme for Chhattisgarh IPPs – Part B
5
765kV Rajnandgaon Switching Station
765kV, 1x330MVAR
Line Reactors:
Sl.
No.
Transmission Line
Line Reactors (MVAR)
NGR (Ohm)
From End
To End
From End To End
Transmission System associated with Gadarwara STPS (2x800MW) of NTPC (Part –
A)
1
Gadarwara STPS – Warora
2x330*
2x330
Pooling Station 765kV D/c line
2x500
-2
Warora Pool – Parli (PG)
2x80*
-400kV D/c quad line (formed
after LILO of Wardha – Parli
(PG) 400kV D/c quad line at
Warora Pooling Station)
Transmission System associated with Gadarwara STPS (2x800MW) of NTPC (Part –
B) now renamed as WRSS-15
3
Warora Pooling Station – Parli
2x330*
2x330
(New) 765kV D/c line
Additional System Strengthening Scheme for Sipat STPS
6
Bilaspur Pooling Station –
2x240*
Rajnandgaon 765kV D/c line
Additional System Strengthening Scheme for Chhattisgarh IPPs – Part B
39th SCMPSPWR – Additional Agenda
13
Rajnandgaon – Warora Pooling
Station 765kV D/c line#
2x330*
2x 240*
(to be
included
in TBCB
scope)
*switchable line reactor
# As per PFCCL (SPV of the project), the length of Rajnandgaon – Warora Pooling
Station 765kV D/c line is coming out to be about 275KM after route survey. Addition
of 2x240MVAr switchable line reactor at Warora Pooling station for Rajnandgaon –
Warora Pooling Station 765kV D/c line may be taken up under Additional interRegional AC link for import of power into Southern Region (Warora – Warangal line).
(Presently under RFP stage)
Members may deliberate.
39th SCMPSPWR – Additional Agenda
14
kV: <=66.000 <=132.000 <=220.000
<=400.000 <=765.000 >765.000
1
273.1
NIZAMABAD
All Buses
1
WED, NOV 18 2015 17:01
1
804.9
AURANGABD-PG
0.0
790.4
783.5
400.0
RANCHI
765.0
1
15.9
59.4
-198.7
1
407.1
400.0
1
1
198.8
-170.4
-65.4
-55.4
-35.1
2
-183.8
402.8
-45.3
397.9
184.7
3
-35.1
400.0
-183.8
400.4
-45.3
400.0
184.7
F
12.4
23.5
-54.0
-178.0
51.2
72.6
0.0
37.6
173.7
37.6
173.7
37.6
173.7
-327.0
-68.8
2
327.0
1
-8.5
-103.9
15.9
-103.9
-66.1
3
-41.1
171.2
-66.3
292.8
-48.1
179.0
-82.8
-327.0
68.8
-25.0
-173.7
-25.0
-173.7
-25.0
-173.7
-82.8
331.4
68.8
RAIPUR2
104.7
CHHATTISGARH
104.7
SIPAT4
21.3
-214.1
-55.4
-24.5
-143.2 144.5
-24.5
400.5
27.8
765.0
215.8
0.0
-451.3
-143.2 144.5
-53.8
-182.0 183.0
-54.9
-327.0
51.2
-68.8
327.0
403.8
-8.5
782.0
-67.1
-72.2
45.5
0.0
400.0
27.8
1
-40.1
193.5
-19.9
-191.9
0.6
13.6
-208.7
-0.6
-32.9
1
397.4
-292.3
791.4
-25.6
-15.2
210.3
-24.6
1
BHATP4
81.0
-115.8R
444.0
400.7
44.2
VINDH_W4
81.0
3
-40.1
80.4
1
-80.7
775.4
-25.6
1
BHI4
-11.0
5
-355.8
1
-330.2
1
332.7
3.4
-80.3
401.7
-0.3
-46.3R
-6.3R
402.1
-20.3
1
177.6
4
-20.3
1
1953.1
400.0
-437.1
-62.6
54.4
RAIPUR-FSC2
-80.7
BRSGPR4
-0.3
417.7
518.1
1
-507.1
768.9
72.0
778.2
2303.8
417.7
518.1
KORBW4
-507.1
-48.0
-67.0
-48.0
-67.0
RAIPUR SPLT
72.0
-67.8
67.1
-67.8
331.4
403.8
185.6
1
-119.8
1
-119.8
1
67.1
KNTPC4
1040.3
1
0.0
1
-327.0
RAIPUR-FSC1
47.0
226.9
400.1
-135.5
-68.7
68.7
-6.3R
226.9
18.7
163.1
18.7
163.1
57.3
1
1040.3
-62.6
-77.0
0.0
1
1008.1
-68.7
54.4
BHADR4
68.7
24.4
155.0
1
1
-54.2
-19.8
89.7
-54.2
-24.4
154.0
-154.0
-77.0
155.0
-22.0
138.3
-96.7
96.7
-8.0
-163.1
-8.0
-163.1
-141.8
96.7
-141.8
18.8
-399.3
18.8
-399.3
-38.1
RAIGPG2
54.5
19.8
-503.3
-19.8
-154.0
24.4
-22.0
-281.7
1
1
-135.5
54.5
19.8
20.5
NSPCL4
1008.1
-93.9
-503.3
89.7
WARD4
-54.2
775.8
-19.8
-154.0
4
54.5
-67.9
147.7
-67.9
521.0
-147.7
400.0
-503.3 521.0
WAR_FS1
503.3
20.5
402.1
19.8
147.7
-24.4
-19.2
-63.1
154.0
-63.1
-154.0
RAIPUR-TCSC2
996.5
WAR_FS2
-503.3
2
-147.7
503.3
248.3
50.0
19.2
50.0
47.3
-19.2
-349.6
47.3
-349.6
1
-93.9
996.5
-1260.6
49.8
-227.4
0.0
92.2
-142.2
0.0
113.8
1
487.1
HYDR_800
49.8
-227.4
1272.7
766.3
42.5
-1260.6
49.8
1272.7
-615.3
138.3
-96.7
1
-556.7
42.5
-553.5
-1260.6
400.0
-141.8
-553.5
92.2
596.1
19.2
-615.3
596.1
-142.2
-3.8
-281.7
1
273.1
400.2
-227.4
173.2
-596.1
173.2
-596.1
RAIPUR-TCSC1
555.0
400.0
49.8
1272.7
-227.4
1272.7
770.6
-141.8
1
250.8
0.0
339.4
-3.8
-271.1
-38.1
544.6
-543.3
25.0
544.6
25.0
-543.3
36.0
-647.3
400.0
-556.7
2
555.0
-1260.6
WARDHA
0.0
0.0
766.1
246.5
-1059.1
-222.6
1695.4
2
52.3
-1683.5
400.0
414.9
1
-27.6
-1063.7
1
-27.6
20.3
20.3
SEONI7
-186.0
1235.3
-1231.6
-647.3
36.0
-76.3
1089.3
-27.5
-27.5
399.6
399.6
400.0
340.6
1
-93.0
617.6
-93.0
617.6
RAIPUR
54.9
71.2
RAIPUR_POOL
-222.6
71.2
636.6
-271.1
0.0
72.6
0.0
-70.3
162.8
-70.3
162.8
-39.3
649.2
-39.3
649.2
-54.9
799.2
-78.5
1298.4
-75.7
1051.8
-1435.9
0.0
-750.0
0.0
DB POWER
2718.2
1
1695.4
38.0
-635.4
38.0
400.6
414.9
-1683.5
WARORA POOL
52.3
14.9
636.6
108.8
108.8
-806.4
GMR
50.4
14.9
-866.9
0.0
404.0
240.0
SIPAT7
-1059.9
RAJNANDGAON
-635.4
-59.7
73.0
-189.6
RAIG4
901.9
763.1
-1059.9
-59.7
-584.5
-162.8
-162.8
73.0
0.0
809.7
769.6
-1059.1
-169.6
-177.6
50.0
586.1
-347.2
-806.4
402.6
55.0
1064.3
50.0L
-56.6
310.0
-672.7
-347.2
1271.9
12.51
0.8545
3017.9
1304.1
16.00
0.8500
-2795.9
1304.1
16.00
0.8500
-2795.9
ATHENA
0.0
400.0
1066.5
1
-169.6
324.5
-401.6
1
64.8
1
1064.3
-584.5
-310.0
1
-176.0
50.0
-1106.9
1110.8
1
1071.1
586.1
50.0L
KPCL
586.1
324.5
-401.6
135.4
1
-177.6
1
DHANWAHI
242.9
1
1066.5
400.0
586.1
-1106.9
1110.8
64.8
-672.7
RAIPUR_POOL
310.0
1
-310.0
1
0.0
1
242.4
1
-56.6
ANGUL
64.8
-56.6
ANGUL SPL
-310.0
310.0
0.0
2
72.6
1091.5
1
147.8
0.8500
207.4
151.9
-901.6
1142.1
0.8500
114.4
1271.9
12.51
-49.1R
426.2
-37.9
525.9
-37.9
525.9
400.0
50.4
873.7
401.1
-500.0
-46.0
-334.7
2714.1
-207.3
334.7
141.2
12.50
0.0
118.8
-46.0
KOTRA SPLT
-691.6
-873.4
16.63
-2492.0
34.1
251.9
147.8
-39.1
-78.3
-118.6
-32.2
34.1
-630.1
CHAMPA SPL
-1084.4
-251.9
-1500.0
-32.2
-630.1
769.6
691.6
-68.8
3
-901.6
632.0
1263.9
-39.1
632.0
118.8
185.5
591.6
-24.6
15.3
0.8545
3017.9
-24.6
213.1
-213.0
-83.9
1047.8
RKM
901.9
2
532.8
DHEERU
1 POWER
1
15.2
400.0
-34.4
0.0
1142.1
0.8500
768.9
1084.4
-35.9
15.2
1
-266.2
0.0
400.0
266.4
-34.4
PATH4
-61.9
-118.6
710.4
139.5R
185.5
591.6
56.0
-590.4
56.0
-590.4
-70.3
162.8
213.1
-213.0
15.3
KOTRA SPLT
-357.0
1085.1
401.1
-266.2
16.63
-2492.0
-977.6
488.2
266.4
400.0
-54.2
12.1
KURUKSHETR
542.5
710.4
139.5R
-162.8
73.0
-70.3
162.8
-151.9
72.6
0.0
MAHAN
-538.3
240.7
0.0
977.6
.2
-488400.0
542.5
29.7
-189.6
809.7
-102.2
216.1
-162.8
73.0
23.1
-524.6
23.1
400.0
357.0
-54.2
12.1
1
7.3
64.8
-310.0
-123.7
LARA STPP
-538.3
1
1091.5
0.8500
1
-666.6
1
-56.6
310.0
1
12.50
2714.1
56.0
-859.8
64.8
-310.0
-28.0
-94.4
-41.9
31.7
-524.6
-41.9
523.9
-522.3
523.9
31.7
-522.3
400.0
666.6
-44.0
861.6
-56.6
310.0
1
29.7
103.9
56.0
-859.8
CHAMPA SPLT
1
7.3
29.7
-666.6
-44.0
861.6
-156.2 143.8
144.9
0.0
0.0
-1231.6
PUGALUR-NEW
0.0
Diagram created using
'Y:\Study\Operation\Short Circuit study\SC level in Chhatisgarh\Study\All India 2018-19 Peak_After Final BUS SPLT_Wardha SC Study Rev4-Pratyush.sav'
'Y:\Study\Operation\Short Circuit study\SC level in Chhatisgarh\Study\2018-19 reference CG Ss_Base Case _After BUS Split_Final.sld'
666.6
400.0
7.3
-666.6
-176.0
3446.4
-216.0
142.4
283.3
-28.0
400.0
-24.0
-154.2
BIL-POOL
666.6
BLPSR WR
-656.6
400.0
-3.9
-26.2
64.8
-310.0
-449.3
296.0 -295.7
-156.2 143.8
-695.9
-94.4
-695.9
-207.2
2141.0
1
1
MCCPL
-118.3
1
-6.1
1
-56.6
310.0
CHAMPA_POOL
-12.5
4
56.0
2
-44.0
-859.8
0.0
-85.0L
-67.7
131.4R
499.0
-51.8
1
1
1
1
154.4
ARYN_CBL
246.6
-349.0
349.3
55.7
283.3
55.7
-67.7
1
118.4
2
0.0
-61.9
549.0
-61.9
7.1R
-25.7
-51.8
535.3
1
2.8
-109.0
KSK MAHNADI
675.8
1
861.6
1
-449.3
1
-87.9
2
-30.7
1
296.0 -295.7
IND-BHARATH
154.2
Rourkela
1
296.0
2
72.6
-549.0
90.0
Rourkela
1
675.8
120.6
-396.4
90.0
2
56.0
-859.8
-36.6
0.0
-30.7
-266.1
397.4
120.6
105.1R
7.1R
226.9
355.4
1
-44.0
32.2
592.1
72.6
-266.1
55.7
349.3
-349.0
349.3
-67.7
-349.0
1
0.0
0.0
549.0
114.0
399.2
131.4R
-67.7
-25.7
226.9
226.9
7.1R
0.0
72.6
355.4
RAIGARH_KOTR
861.6
-591.3
592.1
768.3
MB POWER CH
-36.6
CHAMPA_POOL
-549.0
1
246.6
114.0
499.0
-349.0
1
-866.9
-396.4
-32.4
55.7
0.0
-29.9
696.4
-29.9
400.0
-73.1
1184.2
LANCO-AMARKA
32.2
768.3
-591.3
397.4
13.7
-32.4
161.3
13.7
-160.6
349.3
3
0.0
0.0
56.8
161.3
-160.6
-277.3
-187.5
-277.3
-65.5
681.2
1
437.8
1
34.5
-106.5
187.6
1
-245.7
-82.1
187.6
56.8
1
KWPCL
-8.6
784.0
0.0
RANCHI-NEW
34.5
-82.1
-106.5
STERLITE
-166.8
-285.4
JHARSUGUDA
-166.8
0.0
332.9
1119.4
1
400.0
109.0
3
3
246.1
-142.6
-535.0
48.9
-65.5
681.2
-65.5
48.9
681.2
2
246.1
-852.5
-285.4
JHARSUGUDA
-245.7
-142.6
454.2
1119.4
696.4
104.6
-681.2
104.6
-681.2
104.6
-681.2
-51.8
535.3
400.0
2
1
263.4
38.3
401.0
130.2
-29.9
-187.5
-23.7
853.5
-23.7
853.5
243.6
0.0
-65.5
535.3
-51.8
535.3
RAIGARH_POOL
-26.2
1
253.6
-852.5
-42.5
-64.7
-47.0
-535.0
681.2
-535.0
JIN4-B1
-15.3R
VANDANA
-1108.4
-54.8
DHRAM_SPL
246.7
288.1
38.3
-454.2
657.3
767.3
-29.1R
288.1
-287.7
-32.7
-30.7
42.5
-285.4
2
-29.9
2
-1108.4
-45.2
26.1
-153.6
26.1
1
253.6
BALCO
38.3
-64.7
82.1
241.5
0.0
-535.0
48.9
48.9
33.2
VISA POWER
-118.3
130.2
SURGUJA
1
-15.3R
1
252.1
JABALPR-POOL
-65.3
211.8
-285.4
1119.4
1
-1108.4
30.7
30.7
1119.4
1
0.0
1
-1108.4
400.0
38.3
1
1
576.2
0.0
104.6
-681.2
1
252.1
272.6
1
-32.7
-287.7
21.6
154.3
-153.6
33.2
-292.5
Load Flow
-6.1
3
716.7
-47.0
272.6
-78.9R
292.6
-39.4
1
17.9
1
-180.0L
-45.2
154.3
-4.8
585.2
-292.5
SKS
118.4
2
0.0
1
332.9
7.4
598
5
.0-5 98.0-5
9-95.9
95.9
-90
0.9
.9
JHARSU-SPLIT
96.9
96.9
-180.0L
DARLIPALLI
-254.1
-731.2
731.5
126.0
-180.1
-731.4
731.7
125.9
-179.9
-4.8
169.1
292.6
-39.4
TAMNAR
21.6
1
109.8
746.5
-169.1
7.4
400.0
-897.6
900.4
-254.1
169.1
TAMNAR_POOL
64.1
332.9
0.0
-169.1
SARDA ENERGY
-39.6
-541.0
900.4
Time Frame: 2018-19
Before Bus Split
1
1
541.0
109.8
-181.8
JPL_EXTN
17.9
-253.3
-253.3
DHARAMJAIGAR
64.1
JHARSU-SPLIT
-39.6
-541.0
DHARAMJAIGAR
541.0
OPGC
1196.0
TRN ENERGY
-897.6
Annexure - 1
SC level of CG S/s- Study for BUS Splitting
400.0
400.0
400.0
219.2
400.7
217.2
1
1
1
1
1
1
400.0
401.4
400.0
1
775.3
400.0
400.6
WED, NOV 18 2015 17:04
ASCC : Three Phase Fault: Ia1 (AMPS), Va1 (VOLTS), (POLAR)
Diagram created using
'Y:\Study\Operation\Short Circuit study\SC level in Chhatisgarh\Study\All India 2018-19 Peak_After Final BUS SPLT_Wardha SC Study Rev4-Pratyush.sav'
'Y:\Study\Operation\Short Circuit study\SC level in Chhatisgarh\Study\2018-19 reference CG Ss_Base Case _After BUS Split_Final.sld'
MAHAN
1
-87.5
-87.5
SIPAT7
0.0, 0.0
45236.1, -88.2
DHEERU POWER
1
All Buses
kV: <=66.000 <=132.000 <=220.000 <=400.000 <=765.000 >765.000
HYDR_800
1
WARDHA
0.0, 0.0
39249.0, -89.2
NIZAMABAD
AURANGABD-PG
0.0, 0.0
24690.1, -88.1
1
SURGUJA
2
SEONI7
CHHATTISGARH
1
0.0, 0.0
25534.1, -88.4
RANCHI
0.0, 0.0
41776.8, -88.2
1
-84.8
SIPAT4
-85.4
1921.3
-84.8
-87.0
2267.1
0.0, 0.0
36486.1, -86.7
0.0, 0.0
41092.2, -85.6
0.0, 0.0
51116.9, -87.1
0.0, 0.0
62420.5, -88.3
WAR_FS2
BRSGPR4
0.0, 0.0
31573.2, -87.8
2
1
0.0, 0.0
35239.3, -87.6
WARD4
1
VINDH_W4
1
WARORA POOL
-90.0
3010.8
-86.4
2791.3
-85.6
15256.2
-85.1
1679.8
-85.1
1679.8
-87.1
2124.5
-85.6
1162.6
-90.0
-84.8
-86.2
-86.2
F
3010.8
15329.8
-85.4
1888.4
3
3090.1
-86.1
-86.1
2253.5
-85.6
2196.3
-90.0
2325.2
-85.4
-88.2
BHADR4
0.0, 0.0
47090.6, -86.3
-84.8
3090.1
-85.0
2864.8
-87.2
8663.2
-85.4
1730.3
-86.3
2392.9
5754.7
-85.1
0.0, 0.0
13773.0, -85.3
1685.0
DHANWAHI
-85.3
-85.3
BHATP4
1872.5
-85.3
3
BHI4
-85.3
-86.2
21320.5
1
2082.1
JHARSUGUDA
2082.1
4672.4
1
2156.3
-87.0
5
-84.8
1
-90.0
4
1685.0
12.3
10020.5
KORBW4
951.5
WAR_FS1
-85.5
0.0, 0.0
48572.9, -87.7
-628.1
0.0, 0.0
58620.2, -86.8
13543.5
-85.2
2
1796.1
KNTPC4
2655.9
-85.6
2876.714848.6
1162.6
-86.6
1054.9
-86.6
1054.9
-86.6
1054.9
88.5
11711.4
-82.8
89.0
-85.0
3177.9
3177.9
-85.0
11397.2
4233.1
RAIPUR SPLT
0.0, 0.0
35927.3, -86.1
-85.5
1796.1
0.0, 0.0
53262.7, -87.8
-82.8
4233.1
88.5
11711.4
3168.3
-85.0
-85.0
3168.3
RAIPUR-FSC2
-89.7
KURUKSHETR
0.0, 0.0
65243.5, -88.4
-88.2
2876.714848.6
-82.8
4064.8
NSPCL4
-85.4
2655.9
-82.9
4
1
2603.2
-82.9
2399.2
89.0
-82.8
4064.8
0.0, 0.0
8243.0, 86.8
0.0, 0.0
8570.8, 86.2
-86.7
0.0, 0.0
89456.7, -88.9
2399.2
-88.1
10135.3
11397.2
-87.2
RAIPUR-TCSC2
0.0, 0.0
8243.0, 86.8
-85.2
-87.2
-88.1
1432.4
10135.3
1
2603.2
DARLIPALLI
-87.4
-84.8
9358.5
-84.8
9358.5
-89.1
2893.9
RAIPUR-FSC1
-89.7
-87.4
-89.6
12053.1
RAIPUR-TCSC1
2500.1
3282.3
-88.0
0.0, 0.0
25820.5, -87.5
1432.4
0.0, 0.0
60905.5, -88.2
2500.1
-87.4
-179.6
1
8487.6
-87.4
-89.1
-86.6
9420.5
RAIPUR
2500.1
-89.6
RAIPUR_POOL
-88.0
IND-BHARATH
2893.9
1
-87.5
2500.1
2
12053.1
GMR
6987.1
STERLITE
4733.9
3282.3
-86.6
9420.5
1
-87.6
4796.9
-87.6
4796.9
-88.0
-88.0
4175.7
1
-87.5
-89.5
27.6
100
8487.6
7074.3
-87.6
-87.7
-89.5
2629.7
-88.1
4175.7
-83.3
3433.6
-83.3
3433.6
-83.3
3341.9
-83.3
3341.9
-86.0
4315.1
-86.0
4315.1
-86.1
3986.5
-86.1
3986.5
-88.9
-87.7
-83.2
1017.2
-83.2
1017.2
-88.0
27812.4
-88.0
27812.4
-89.5
8446.4
-89.5
8446.4
-84.6
-84.6
13497.7
13497.7
1
2832.7
-89.8
2646.1
-89.8
2646.1
-89.0
2507.4
-89.0
2507.4
-89.5
2832.7
-89.5
0.0, 0.0
102111.1, -87.9
10122.8
-87.6
-87.7
5811.5
12716.7
-87.3
2629.7
-88.0
-87.7
-89.2
-89.0
3941.1
0.0, 0.0
RAIG4
58871.3, -88.3
4733.9
7074.3
5811.5
-90.0
3072.6
-87.3
3941.1
-88.9
3840.1
1
-88.0
4735.3
2344.5
RAJNANDGAON
-87.0
13246.9
-87.0
13246.9
-178.9
5814.4
-87.2
-87.2
24740.7
-360.0
7151.0
-87.0
-87.0
13222.6
13222.6
0.7
74
24
-88.0
2803.4
-87.5
-90.0
6380.7
5494.9
2463.0
7872.8
2995.7
-88.1
-88.3
-90.0
-180.0
5583.7
DB POWER
2803.4
4735.3
-87.5
1
2354.6
-87.5
KPCL
12716.7
3
2344.5
0.0, 0.0
32117.2, -87.8
3072.6
-88.0
5494.9
-87.7
-89.2
6380.7
1
2463.0
RAIPUR_POOL
2995.7
6727.1
KOTRA SPLT
40422.6
-89.0
7872.8
-88.3
-88.8
-89.0
1
-89.2
-87.3
KOTRA SPLT
42314.1
4302.7
-88.4
2463.0
ANGUL
-89.0
7872.8
6200.9
-87.3
6190.9
890.0
-86.1
-86.1
22819.1
ATHENA
0.0, 0.0
32304.0, -87.4
-448.8
-89.0
-89.3
2
-89.0
-87.3
5089.3
-86.5
-86.5
-89.3
2839.8
2839.8
-88.2
4167.8
0.0, 0.0
27258.5, -88.5
-179.6
12697.5
-89.9
440.3
0.0, 0.0
46526.1, -86.2
-87.8
3
4302.7
-87.3
12697.5
CHAMPA SPL
37842.5
-89.6
0.0, 0.0
45091.5, -88.0
6727.0
-86.2
19813.1
-86.2
-87.5
6804.0
-87.5
6804.0
-89.5
8446.4
22819.1
-87.0
-87.0
PUGALUR-NEW
9464.8
PATH4
-89.6
LANCO-AMARKA
1464.9
-88.3
1464.9
0.3
4473
7.6
4472
0.0, 0.0
89456.7, -88.9
6190.9
-90.0
3312.7
-90.0
3312.7
-88.4
-88.2
0.0, 0.0
19930.6, -87.0
11225.9
CHAMPA SPLT
5089.3
2
-89.1
-89.2
2463.0
-87.7
3840.1
3941.1
-88.9
0.0, 0.0
58871.3, -88.3
18448.8
11225.9
-88.6
-89.0
7872.8
-89.2
0.0, 0.0
62420.5, -88.3
24578.0
-88.7
-89.1
-89.0
-88.3
7007.2
-87.3
-179.4
3083.2
0.0, 0.0
18653.6, -86.8
2210.3
-89.1
3862.1
LARA STPP
-88.7
-88.0
11951.0
-88.0
-88.3
Rourkela
-89.2
1179.9
-88.0
2463.0
2
-89.2
10488.6
-89.2
1179.9
-89.2
1179.9
7872.8
6459.0
JHARSUGUDA
2210.3
-89.2
10488.6
-89.2
2
-89.7
BIL-POOL
10488.6
3862.1
-89.2
2463.0
0.0, 0.0
102111.1, -87.9
59805.7
-88.2
-89.7
146.2
BLPSR WR
-86.8
-86.9
124
7923.9
11951.0
-89.0
7872.8
-89.9
440.3
13210.8
13210.8
1
-360.0
6706.8
RKM
-87.8
MCCPL
-89.1
-89.5
8446.4
-178.9
5814.4
1
-87.8
9168.1
2
-88.0
3941.1
-88.9
-89.5
2989.6
-86.5
12500.7
-86.5
12500.7
0.0, 0.0
33564.8, -87.6
9464.8
1
-88.0
10847.0
-88.0
-89.5
2989.6
-88.9
2479.5
-88.9
2479.5
Time Frame: 2018-19
Before Bus Split
8075.9
74.4
4
-536.6
JABALPR-POOL
-90.0
ARYN_CBL
3862.1
CHAMPA_POOL
143.5
2
-88.5
CHAMPA_POOL
6651.4
KSK MAHNADI
1
11951.0
MB POWER CH
9366.8
1
-89.1
1
3862.1
2
-87.7
-90.0
-84.8
-360.0
-89.0
KWPCL
-87.0
1
17443.2
RANCHI-NEW
11951.0
1162.6
2561.2
RAIGARH_KOTR
-88.0
0.0, 0.0
71108.4, -88.2
47.0
-88.5
ANGUL SPL
-89.7
1
2
19477.5
9366.8
1
2831.9
3
19477.5
-90.0
-84.8
108
-87.7
1162.6
2561.2
-90.0
1162.6
0.0, 0.0
10769.5, -87.4
-89.7
-88.2
SARDA ENERGY
-180.0
6141.0
0.0, 0.0
71108.4, -88.2
1
2831.9
-88.0
6849.4
-89.2
10455.6
3
-88.0
1
2820.2
Rourkela
-88.0
8354.9
-88.1
-88.2
10027.6
0.0, 0.0
54905.1, -89.4
2820.2
-87.6
2659.5
1438.6
-89.9
-89.9
11167.4
-89.0
9790.1
9790.1
-89.0
9790.1
-89.0
9790.1
0.0, 0.0
50326.2, -89.2
-89.7
3
-87.6
2659.5
-88.0
6849.4
-87.9
10700.0
-89.2
10455.6
2
0.0, 0.0
30809.5, -87.0
-86.9
6264.8
1
-88.1
8354.9
1438.6
-89.9
2705.7
-89.9
2705.7
-89.9
2705.7
RAIGARH_POOL
143.5
VANDANA
-88.4
43439.9
JHARSU-SPLIT
-90.0
-88.0
27668.9
-87.9
10700.0
-89.2
10455.6
-89.2
10455.6
2705.7
-89.9
JIN4-B1
805.3
10781.
-87.8
5.4 055.4
1005
10
.8
.8
3194
3194
0.0, 0.0
36657.8, -89.6
10781.2
-88.2
9580.5
2
-90.0
BALCO
-360.0
JHARSU-SPLIT
1519.3
1
-88.0
2
-87.8
-88.0
11997.8
-88.1
DHRAM_SPL
-90.0
805.3
-87.6
2659.5
0.0, 0.0
42777.8, -88.8
7151.0
-89.9
1438.6
-89.9
1438.6
-90.0
1130.2
-90.0
1130.2
VISA POWER
2
10655.4
3
-88.1
1
-87.6
1
-89.4
11997.8
-90.0
-88.7
TAMNAR
-89.7
2659.5
-88.4
2976.9
2289.9
20244.2
Short Circuit
-86.9
2
-89.4
-89.6
OPGC
-89.6
1927.2
20244.2
-88.7
SKS
6651.4
1
13646.7
-88.4
2976.9
TAMNAR_POOL
-89.7
1487.4
1487.4
DHARAMJAIGAR
-89.6
1
1927.2
JPL_EXTN
19813.
DHARAMJAIGAR
-89.6
TRN ENERGY
13646.7
SC level of CG S/s- Study for BUS Splitting
0.0, 0.0
33144.6, -87.6
0.0, 0.0
55059.4, -87.5
RAIGPG2
1
0.0, 0.0
87769.8, -86.8
RAIPUR2
0.0, 0.0
8570.8, 86.2
2
1
0.0, 0.0
41172.3, -85.3
0.0, 0.0
39486.5, -87.4
Diagram created using
'Y:\Study\Operation\Short Circuit study\SC level in Chhatisgarh\Study\All India 2018-19 Peak_After Final BUS SPLT_Wardha SC Study Rev4-Pratyush.sav'
'Y:\Study\Operation\Short Circuit study\SC level in Chhatisgarh\Study\2018-19 reference CG Ss_Base Case _After BUS Split_Final.sld'
Bus - Voltage
(kV)
Branch - MW/Mvar
Equipment - MW/Mvar
kV: <=66.000 <=132.000 <=230.000 <=400.000 <=765.000 <=1200.000 >1200.000
1
HYDR_800
262.7
NIZAMABAD
1
1
805.8
AURANGABD-PG
0.0
791.9
784.9
400.0
RANCHI
765.0
1
17.4
35.9
-202.5
1
407.9
400.0
1
1
202.6
-184.2
-41.9
-53.5
-29.6
2
-198.7
402.8
-49.3
397.9
199.7
3
-29.6
400.0
-198.7
400.8
-49.3
400.0
199.7
F
17.6
26.1
-54.3
-185.7
-53.5
-25.4
-149.3 150.7
-25.4
25.9
72.8
0.0
38.9
175.1
38.9
175.1
38.9
175.1
-319.3
-42.4
2
319.3
1
-9.1
-109.2
17.4
-109.2
-68.0
3
-44.8
185.2
-69.6
264.7
0.0
-451.3
-60.7
-319.3
42.4
-26.2
-175.1
-26.2
-175.1
-26.2
-175.1
-60.7
323.4
42.4
RAIPUR2
110.1
CHHATTISGARH
110.1
SIPAT4
-46.4
186.8
-73.9
-319.3
25.9
-42.4
319.3
402.7
-9.1
784.3
400.5
31.3
765.0
23.9
-218.2
196.3
-194.7
-30.8
-149.3 150.7
-51.0
-189.7 190.8
-56.3
400.0
31.3
1
219.9
397.6
-264.2
791.7
-69.0
1
-39.7
-2.0
15.7
-212.6
-21.9
1
2.0
1
-26.9
-12.8
BHATP4
214.3
-26.3
3
71.8
45.5
0.0
400.4
46.0
VINDH_W4
71.8
780.6
-39.7
-117.9R
444.0
1
-71.5
BHI4
-26.9
-9.9
68.0
5
-347.2
1
-334.4
1
337.0
2.3
-68.0
403.2
-1.1
-47.2R
20.0R
400.0
-51.0
1
177.6
4
-51.0
1
1953.1
400.0
-446.0
-34.0
25.6
RAIPUR-FSC2
-71.5
BRSGPR4
-1.1
419.6
513.2
1
-502.4
771.3
70.6
780.7
2303.8
419.6
513.2
KORBW4
-502.4
-47.8
-82.6
-47.8
-82.6
RAIPUR SPLT
70.6
-66.9
82.9
-66.9
323.4
402.7
185.6
1
-116.7
1
-116.7
1
82.9
KNTPC4
1008.2
1
0.0
1
-319.3
RAIPUR-FSC1
47.2
226.9
400.1
977.0
-60.6
60.6
20.0R
226.9
160.7
24.9
1
-132.7
-34.0
1
1008.2
-60.6
25.6
BHADR4
60.6
24.9
160.7
58.3
0.0
1
1
-65.3
4.1
100.8
-65.3
4.1
-48.4
164.2
-48.4
164.2
7.3
-14.6
-160.7
-14.6
-160.7
-1467.4
0.0
72.6
0.0
-18.3
-647.3
-38.1
18.8
-399.3
18.8
-399.3
-38.1
544.6
-543.3
25.0
544.6
25.0
-543.3
36.0
-647.3
36.0
RAIGPG2
65.6
-4.1
-516.0
4.1
-8.3
-4.1
-163.1
7.3
-275.3
1
1
-132.7
65.6
-4.1
100.8
NSPCL4
977.0
-90.3
-516.0
WARD4
4.1
776.7
-65.3
4
65.6
163.1
400.0
-4.1
-163.1
-163.1
-4.1
RAIPUR-TCSC2
-72.0
-8.3
-163.1
1
972.8
-72.0
534.8
161.9
400.0
-161.9
WAR_FS1
-516.0 534.8
2
516.0
4.1
163.1
45.7
-349.6
45.7
-349.6
1
-90.3
972.8
136.8
-136.8
0.0
113.6
1
-539.3
161.9
WAR_FS2
-161.9
-615.3
RAIG4
-516.0
250.0
136.8
615.3
766.2
516.0
-243.9
0.0
-615.3
615.3
-136.8
1
262.7
17.4
-1144.4
17.4
-243.9
1154.4
765.0
80.3
-1144.4
17.4
169.4
-615.3
169.4
-615.3
-275.3
47.7
-373.1
47.7
-373.1
18.9
-266.2
80.9
80.9
-18.3
400.0
-539.3
80.3
-662.9
-1144.4
400.0
-162.8
-662.9
-243.9
1154.4
1154.4
-243.9
1154.4
RAIPUR-TCSC1
665.2
400.0
17.4
0.0
340.2
771.0
-162.8
1
252.2
-1144.4
-221.6
1621.2
1
-30.9
400.1
665.2
2
0.0
0.0
WARDHA
246.4
-1111.0
765.6
66.3
-1610.4
-273.9
1235.3
400.0
392.5
-137.0
617.6
1
-30.9
51.0
51.0
SEONI7
-1115.8
2
69.0
617.6
-137.0
RAIPUR
514.2
1
-221.6
112.7
301.0
112.7
301.0
213.4
-208.2
126.2
-80.9
-80.9
18.9
0.0
208.6
1271.9
12.51
0.8545
3017.9
1304.1
16.00
0.8500
-2795.9
1304.1
16.00
0.8500
-2795.9
-1431.3
0.0
-750.0
0.0
-76.3
1089.3
-27.5
-27.5
399.6
399.6
400.0
2718.2
1
1621.2
-355.6
0.0
RAIPUR_POOL
392.5
-1610.4
WARORA POOL
66.3
-22.7
-300.7
-22.7
-59.7
-345.6
-1362.6
401.2
111.1
74.2
-1320.5
-59.7
-584.5
256.5
-405.9
102.4
404.0
240.0
SIPAT7
-300.7
RAJNANDGAON
74.2
-1320.5
764.5
881.2
-179.8
-172.4
50.0
586.1
-96.0
-364.8
365.4
-259.2
-844.2
-345.6
GMR
-1111.0
1327.3
1119.2
50.0L
-584.5
256.5
-405.9
102.4
403.3
113.8
-179.8
50.0
1
259.2
-364.8
365.4
-259.2
-12.3
240.7
1271.9
12.51
-49.1R
426.2
ATHENA
0.0
400.0
1327.3
1
-170.8
586.1
KPCL
50.0L
1
-39.3
649.2
-39.3
649.2
-54.9
799.2
DB POWER
488.2
0.0
TUE, NOV 17 2015 16:19
1
1124.0
1
DHANWAHI
1
-96.0
-844.2
1
-172.4
1
259.2
0.0
1
244.0
1
102.4
ANGUL SPL
-259.2
RAIPUR_POOL
586.1
-96.0
1
1119.2
400.0
586.1
259.2
0.0
-46.7
KOTRA SPLT
72.6
1091.5
-46.4
1
86.6
0.8500
260.7
46.8
534.1
1
-880.9
1142.1
0.8500
-500.0
2714.1
0.0
34.1
ANGUL
82.0
12.50
-531.2
15.4
34.1
-630.1
-24.6
15.3
0.8545
3017.9
-24.6
213.1
-213.0
400.0
111.1
853.6
401.0
-853.3
16.63
-2492.0
-39.1
-78.3
400.0
86.6
-1500.0
632.0
-39.1
-46.4
400.0
-58.0
DHEERU
1 POWER
1
1263.9
15.4
-630.1
534.1
218.1
176.3
11.1
-176.2
11.1
-176.2
-91.5
-72.9
213.1
-213.0
15.3
-78.5
1298.4
-75.7
1051.8
RKM
881.2
2
532.8
3
-880.9
400.0
9.8
1
-29.0
0.0
632.0
CHAMPA SPL
-33.8
9.8
1142.1
0.8500
400.0
-266.2
0.0
710.4
171.7R
218.1
176.3
770.9
266.4
-29.0
PATH4
-63.2
-531.2
710.4
171.7R
-171.8
92.7
72.9
-91.5
-72.9
KOTRA SPLT
1085.1
401.0
-266.2
400.0
266.4
16.63
-2492.0
KURUKSHETR
11.0
764.9
-53.2
-53.2
542.5
-538.3
240.4
0.0
81.2
1371.8
72.9
92.7
400.0
72.6
0.0
MAHAN
542.5
11.0
1
25.3
-293.7
LARA STPP
11.7
15.1
-635.8
15.1
-635.8
-532.1
-47.4
-37.9
525.9
-37.9
525.9
PUGALUR-NEW
-538.3
1
1091.5
0.8500
1
18.7
635.8
1
12.50
2714.1
56.0
-859.8
18.7
635.8
1
-666.6
-44.0
861.6
56.0
-859.8
-58.6
144.9
0.0
23.1
-524.6
23.1
-83.9
1047.8
400.0
666.6
303.8
-44.0
861.6
1
25.3
-666.6
25.3
-666.6
-176.0
3446.4
CHAMPA SPLT
1
11.7
666.6
11.7
400.0
-24.1
-154.2
BIL-POOL
666.6
-1402.2
BLPSR WR
-3.7
-26.3
399.4
-12.5
-118.3
532.7
-156.4 144.0
276.8
-58.6
-41.9
31.7
-524.6
-41.9
523.9
-522.3
523.9
31.7
-522.3
1
1
MCCPL
-6.0
1
118.4
1
15.1
-635.8
CHAMPA_POOL
18.7
635.8
142.9
296.0 -295.7
-156.4 144.0
1
154.4
4
56.0
2
-44.0
-420.7
1
-859.8
0.0
-492.7
-47.4
-492.7
0.0
-1251.2
1
1
1
-85.0L
-27.9
74.3R
499.0
-218.6
2141.0
1
2.9
-109.0
ARYN_CBL
249.9
-349.0
349.3
15.8
276.8
15.8
-27.9
-54.6
KWPCL
-8.8
2
0.0
-116.8
587.8
-116.8
59.4R
-54.6
535.3
400.0
109.0
KSK MAHNADI
849.0
1
861.6
1
-420.7
1
129.1
2
-109.9
1
296.0 -295.7
IND-BHARATH
-686.9
Rourkela
1
296.0
2
72.6
-587.8
149.8
Rourkela
1
849.0
160.9
-436.4
149.8
15.8
349.3
-349.0
349.3
-27.9
-349.0
2
56.0
-859.8
-36.6
0.0
-686.9
-302.2
437.7
160.9
0.0
587.8
114.3
8.2R
-24.1
1
-44.0
32.2
592.1
72.6
-302.2
-587.8
249.9
1
0.0
2
-1580.8
91.4
399.2
8.2R
226.9
355.4
RAIGARH_KOTR
861.6
-591.3
763.3
592.1
LANCO-AMARKA
MB POWER CH
-36.6
CHAMPA_POOL
-436.4
1
-111.9
114.3
74.3R
-27.9
226.9
-24.1
400.0
-73.1
1184.2
774.0
32.2
437.7
0.0
-27.0
499.0
-349.0
1
0.0
-111.9
JHARSUGUDA
-591.3
1
5.3
15.8
1
0.0
3
439.4
-96.8
70.5
-27.0
STERLITE
129.1
5.3
-128.7
349.3
1
91.4
1
-144.5
129.1
1
2
1
263.4
782.8
0.0
RANCHI-NEW
-128.7
226.9
8.2R
0.0
72.6
355.4
3
-205.4
-91.3
-207.5
-83.7
JHARSUGUDA
-205.4
-96.8
70.5
-69.8
681.2
-54.6
535.3
400.0
207.8
-91.3
-207.5
-83.7
-144.5
-535.0
51.8
-69.8
681.2
-69.8
51.8
681.2
2
207.8
0.0
337.8
-233.4
-82.4
493.0
-82.4
493.0
108.9
-681.2
108.9
-681.2
108.9
-681.2
-69.8
-54.6
535.3
RAIGARH_POOL
-26.3
3
1167.1
-233.4
401.2
0.3R
-868.4
90.8
1167.1
90.8
-868.4
-257.2
869.5
-257.2
869.5
243.7
0.0
-535.0
681.2
-535.0
535.3
VISA POWER
-118.3
1
-0.6
2
0.6
-1155.4
-0.6
-27.9
-84.6
-535.0
51.8
51.8
36.1
JIN4-B1
130.2
VANDANA
253.6
288.1
-2.2
4.3
-185.8
1405.6
-279.9
765.8
0.6R
288.1
-287.7
-1155.4
110.0
DHRAM_SPL
0.6
2
253.6
BALCO
251.3
-27.9
83.8
-45.7
31.1
-194.9
31.1
108.9
-681.2
1
246.7
SURGUJA
1
0.3R
130.2
1
-4.3
JABALPR-POOL
240.5
0.0
1
-1263.9
244.2
-279.9
1278.5
1
576.2
1
1
0.0
687.4
687.4
1278.5
1
-1263.9
400.0
110.0
375.9
1
-2.2
0.0
196.0
-194.9
1
251.3
716.7
-84.6
375.9
-84.6R
36.1
-292.5
Load Flow
-6.0
3
-287.7
-8.9
1
-145.6R
-45.7
196.0
22.7
292.6
-42.3
-292.5
1
-12.5
0.0
1
328.5
-22.6
598
5
.0-5 98.0-5
9-1
95.9
5.9
-10
01
1.41
JHARSU-SPLIT
07.5 .4107.5
-151.6R
DARLIPALLI
-192.3
-731.2
731.5
94.7
-148.6
-731.4
731.7
94.6
-148.5
585.2
TAMNAR
-8.9
1
31.5
746.5
22.7
24.0
292.6
-42.3
SKS
118.4
2
-753.3
-24.0
-22.6
400.0
3.1
755.3
-192.3
24.0
TAMNAR_POOL
21.4
328.5
0.0
-24.0
Time Frame: 2018-19
After BUS Split : Final
1
1
-541.0
755.3
SARDA ENERGY
541.0
31.5
-202.7
JPL_EXTN
-12.5
-253.3
-253.3
DHARAMJAIGAR
3.1
JHARSU-SPLIT
21.4
-541.0
DHARAMJAIGAR
541.0
OPGC
1196.0
TRN ENERGY
-753.3
SC level of CG S/s- Study for BUS Splitting
400.0
400.0
400.0
220.4
403.9
217.4
1
1
1
1
1
1
400.5
401.6
400.0
1
775.1
400.0
400.6
MAHAN
Diagram created using
'Y:\Study\Operation\Short Circuit study\SC level in Chhatisgarh\Study\All India 2018-19 Peak_After Final BUS SPLT_Wardha SC Study Rev4-Pratyush.sav'
'Y:\Study\Operation\Short Circuit study\SC level in Chhatisgarh\Study\2018-19 reference CG Ss_Base Case _After BUS Split_Final.sld'
All Buses
kV: <=66.000 <=132.000 <=220.000 <=400.000 <=765.000 >765.000
1
SIPAT7
0.0, 0.0
43604.4, -88.2
DHEERU POWER
1
TUE, NOV 17 2015 16:21
ASCC : Three Phase Fault: Ia1 (AMPS), Va1 (VOLTS), (POLAR)
HYDR_800
1
WARDHA
0.0, 0.0
38751.4, -89.2
NIZAMABAD
AURANGABD-PG
0.0, 0.0
22998.2, -88.1
1
2
SEONI7
CHHATTISGARH
1
0.0, 0.0
25342.9, -88.4
RANCHI
0.0, 0.0
40548.5, -88.2
1
-84.9
SIPAT4
1690.6
DHANWAHI
-85.4
1828.5
-85.4
-85.0
0.0, 0.0
35662.5, -86.7
0.0, 0.0
39250.8, -85.7
0.0, 0.0
49464.3, -87.2
0.0, 0.0
26162.3, -88.1
WAR_FS2
BRSGPR4
0.0, 0.0
24418.4, -88.2
2
1
0.0, 0.0
34274.1, -87.6
WARD4
1
VINDH_W4
1
WARORA POOL
-90.0
2996.0
-86.4
2777.5
-85.7
14848.0
-85.1
1679.2
-85.1
1679.2
-87.1
2123.8
-84.3
-84.9
-86.2
-86.2
14240.6
-85.4
1823.5
F
2996.0
-86.2
-87.1
2258.6
-85.7
2141.6
-86.2
2197.4
1691.1
-86.4
2313.0
5671.0
-85.1
-90.0
2325.2
3
2979.5
-85.3
-86.3
20825.8
-85.4
BHADR4
0.0, 0.0
25976.1, -85.1
-84.9
-87.2
8548.4
-85.3
1782.1
-85.3
0.0, 0.0
13590.9, -85.3
2979.5
-85.3
BHATP4
2084.4
3
2084.4
4625.2
JHARSUGUDA
BHI4
-85.1
-87.1
1
2050.6
9728.2
1
-84.9
1
5
1690.6
06.9
-90.0
4
-85.6
KORBW4
951.5
WAR_FS1
1796.7
0.0, 0.0
29894.6, -89.3
-628.1
0.0, 0.0
39985.1, -88.1
13543.5
2
2762.3
KNTPC4
2666.7
-88.3
1162.6
-90.0
-86.6
988.9
-86.6
988.9
-86.6
988.9
88.5
11697.2
-83.1
3297.8
RAIPUR SPLT
0.0, 0.0
23086.2, -85.4
-85.6
1796.7
0.0, 0.0
44020.7, -87.9
-85.4
-84.3
86.9
14524.7
1
3247.4
-85.4
-83.1
3297.8
88.5
11697.2
3108.7
-85.1
-85.1
3108.7
RAIPUR-FSC2
-89.6
KURUKSHETR
0.0, 0.0
43575.8, -89.0
2859.4 8475.3
1162.6
NSPCL4
-88.3
2859.4 8475.3
4
-83.0
3446.0
0.0, 0.0
11314.4, 84.7
2666.7
-82.9
RAIPUR-TCSC2
0.0, 0.0
11314.4, 84.7
-85.0
-82.9
3247.4
-85.4
1
0.0, 0.0
8614.9, 86.2
-86.8
0.0, 0.0
41927.4, -88.5
2593.2
-83.0
3446.0
RAIPUR-FSC1
2121.7
0.0, 0.0
21037.3, -88.5
2593.2
86.9
14524.7
-87.2
1432.4
-87.2
1
-85.0
-89.1
2893.9
-86.0
-83.2
3510.5
-83.2
3510.5
-83.6
3016.3
-83.6
3016.3
-85.9
4861.6
-85.9
4861.6
-83.1
1034.3
-83.1
1034.3
0.0, 0.0
RAIG4
19083.8, -88.3
2121.7
DARLIPALLI
-87.3
-89.3
12053.4
1432.4
-86.0
4413.1
1
-89.6
-87.3
2637.6
1296.6
-89.2
-89.1
-179.6
0.0, 0.0
37771.9, -88.2
2637.6
-87.3
-89.3
-87.9
7026.3
-89.6
-87.4
4413.1
2858.0
1
8449.0
-87.3
2637.6
-89.2
RAIPUR_POOL
2893.9
IND-BHARATH
-87.5
2637.6
2
12053.4
6987.1
RAIPUR
4746.1
1296.6
-87.9
7026.3
GMR
-87.5
1
-87.5
-87.5
5126.4
1
8449.0
6543.7
-87.6
-87.7
5126.4
-87.7
-88.7
2564.9
STERLITE
-88.7
7357.0
-88.7
7357.0
2832.7
2646.1
-89.8
2646.1
-89.8
-88.1
-88.1
7531.5
-89.0
2507.4
7531.5
-89.0
2507.4
-89.5
2832.7
-89.5
0.0, 0.0
30685.5, -89.1
9940.7
-87.6
-87.7
5847.2
-89.5
-87.8
5112.3
1
4746.1
6543.7
RANCHI-NEW
5847.2
-89.5
2629.7
9138.7
-87.5
-88.7
-87.5
-88.9
-88.7
RAIPUR-TCSC1
-88.0
-87.5
-87.5
RAJNANDGAON
-178.9
5814.4
-88.5
-88.5
10151.1
1.1
15
10
-88.0
2812.3
4824.2
2364.0
-90.0
3072.6
3
2629.7
0.0, 0.0
47852.2, -89.1
-87.5
2858.0
-89.6
5279.3
-87.9
8090.9
-90.0
-360.0
7151.0
-88.1
7418.2
-88.1
7418.2
-180.0
5583.7
DB POWER
2812.3
-87.5
-90.0
3153.6
6549.7
2568.0
6924.0
3321.2
-87.8
3321.2
-87.5
890.0
-87.3
-87.3
14834.6
ATHENA
0.0, 0.0
20876.2, -88.5
-448.8
4824.2
-87.5
1
2374.2
-87.5
9138.7
KPCL
2364.0
0.0, 0.0
24895.8, -88.2
3072.6
-88.7
6549.7
-87.5
-88.9
3153.6
1
2568.0
-88.5
RAIPUR_POOL
-88.7
6924.0
1
-88.9
2568.0
ANGUL
-88.7
6924.0
5360.8
-87.5
5257.7
KOTRA SPLT
-89.0
-89.3
5110.1
-87.3
-87.3
-89.3
2839.8
2839.8
-89.9
440.3
KOTRA SPLT
4315.3
-87.6
-179.6
-87.6
9086.2
2
-89.0
4180.0
-89.0
4315.3
3
-89.6
0.0, 0.0
25432.9, -88.5
9086.2
0.0, 0.0
32850.5, -88.5
6727.0
-87.9
11424.3
-87.9
-87.7
6863.2
-87.7
6863.2
-89.3
10728.3
0.0, 0.0
30558.2, -87.4
-87.8
-89.6
5257.7
-90.0
3312.7
-90.0
3312.7
-87.5
5405.1
3686.6
-89.2
14834.6
PUGALUR-NEW
9045.1
PATH4
1464.9
LANCO-AMARKA
1464.9
CHAMPA SPLT
5110.1
-89.5
2616.6
CHAMPA SPL
-88.2
0.0, 0.0
19804.2, -87.0
11130.3
2
11130.3
-89.0
8913.4
-89.5
0.0, 0.0
36644.5, -88.3
-88.7
-89.1
-89.0
-88.1
9608.5
0.0, 0.0
38275.3, -88.2
-179.4
3083.2
0.0, 0.0
18542.7, -86.9
2210.3
-89.1
3862.1
-88.0
Rourkela
-89.2
1179.9
-89.2
-88.7
6533.4
-88.7
2616.6
LARA STPP
-88.7
-89.2
1179.9
-88.1
8913.4
2
-89.2
10322.7
-89.2
10322.7
-89.2
1179.9
3862.1
JHARSUGUDA
2210.3
-89.7
BIL-POOL
10322.7
6533.4
9884.8
0.0, 0.0
46998.0, -88.8
-88.2
-89.7
146.2
BLPSR WR
-86.8
-86.9
-536.6
-89.5
2616.6
-89.9
440.3
-87.6
9649.2
-87.6
9649.2
1
-360.0
6706.8
RKM
-87.9
MCCPL
-89.0
8913.4
-89.3
10728.3
-178.9
1
-87.8
8761.5
2
-89.1
3686.6
-89.2
-89.5
2989.6
-87.2
5814.4
0.0, 0.0
26445.1, -88.3
9045.1
1
7875.9
ARYN_CBL
-88.0
7945.1
-88.0
7945.1
-89.5
2989.6
-88.9
-87.2
9349.3
2479.5
9349.3
-88.9
2479.5
Time Frame: 2018-19
After BUS Split : Final
8075.9
74.4
105
-90.0
4
-88.7
CHAMPA_POOL
143.5
2
3862.1
CHAMPA_POOL
6608.3
KSK MAHNADI
1
-88.5
-90.0
-84.7
-360.0
-88.7
KWPCL
-87.0
1
17443.2
JABALPR-POOL
6761.6
1
-89.1
1
3862.1
2
6533.4
MB POWER CH
-88.5
1162.6
2316.1
RAIGARH_KOTR
-88.2
0.0, 0.0
38278.7, -87.9
-89.7
2
13356.0
6761.6
ANGUL SPL
2831.9
1
-89.7
1
2831.9
3
-88.2
-87.7
-90.0
-84.7
0.0, 0.0
10279.2, -87.4
13356.0
-88.0
5483.7
1
2886.5
1162.6
2316.1
-90.0
1162.6
1
-88.7
0.0, 0.0
41248.6, -88.2
-87.7
Rourkela
-88.0
5483.7
0.0, 0.0
45594.1, -89.2
2886.5
8295.6
-88.1
-88.9
8128.1
3
-89.7
3
-87.4
7488.3
-88.1
8295.6
2
0.0, 0.0
24509.8, -87.8
-86.9
6224.6
1
-88.2
1438.6
-89.9
-89.9
-88.9
8128.1
11167.4
-88.7
7908.8
7908.8
-88.7
7908.8
-88.7
7908.8
0.0, 0.0
42800.4, -89.1
6533.4
7.3
-87.4
-87.6
7714.9
1438.6
-89.9
2705.7
-88.9
SARDA ENERGY
-180.0
6141.0
108
7
3281.1
JHARSU-SPLIT
-90.0
2
3281.1
JHARSU-SPLIT
-88.2
7488.3
-87.6
7714.9
2705.7
-89.9
-88.9
8128.1
-89.9
8128.1
2705.7
RAIGARH_POOL
143.5
-87.8
-88.0
-87.4
-89.9
2705.7
-89.9
JIN4-B1
805.3
9935.2
-90.0
SURGUJA
1519.3
VANDANA
-87.8
-360.0
9456.0
-88.0
3225.7
DHRAM_SPL
-88.0
BALCO
-90.0
-88.0
1
9935.2
2
7151.0
-88.0
1438.6
-89.9
1438.6
-90.0
1130.2
-90.0
1130.2
VISA POWER
2
10592.5
3
-87.4
0.0, 0.0
37035.1, -88.7
805.3
.5
.5
9142
9142
.8
.8
3194
3194
0.0, 0.0
32704.4, -89.4
-89.4
1
-89.7
1
9456.0
-90.0
-88.6
TAMNAR
3225.7
-88.1
3272.0
2289.9
17372.9
Short Circuit
-86.9
2
-89.4
-89.6
OPGC
-89.4
1927.2
17372.9
-88.6
SKS
6608.3
1
11670.0
-88.1
3272.0
TAMNAR_POOL
-89.7
1487.4
1487.4
DHARAMJAIGAR
-89.6
3
1927.2
JPL_EXTN
11424.
DHARAMJAIGAR
-89.4
TRN ENERGY
11670.0
SC level of CG S/s- Study for BUS Splitting
0.0, 0.0
21540.6, -88.7
0.0, 0.0
25884.3, -88.8
RAIGPG2
1
0.0, 0.0
33663.1, -84.8
RAIPUR2
0.0, 0.0
8614.9, 86.2
2
1
0.0, 0.0
38653.8, -85.5
0.0, 0.0
38916.5, -87.5
790.9
PARLI4
1
TUE, NOV 17 2015 11:57
Diagram created using
'Y:\Study\Operation\Short Circuit study\SC fault at Wardha\All India 2018-19 Peak_After Final BUS SPLT_Wardha SC Study Rev4-Pratyush.sav'
'Y:\Study\Operation\Short Circuit study\SC fault at Wardha\Wardha SLD.sld'
1
400.27.9
36
358.8
110.7
403.8
1
402.9
1
155.1
4.6
155.1
4.6
549.4
167.6
1
WARORA
CHANDRPR-II
F
1
406.9
552.3
167.2
220.4
400.5
101.6
DHARIWAL
CHNDR4
353.9
WAROR2
1
2
1
2
3.
23
RAIPUR
400.0
WAR_FS2
2
784.5
344.1
406.9
402.5
219.7
400.0
1
CHAND2
1
PADGH4
1
1
F
220.0
400.0
400.0
0.0
481.8 113.6
72.1
770.3
WAR_FS1
415.9
466.6
125.2
400.0
34.8
BHI4
466.6
125.2
1
45.2
402.3
1106.1
244.2
1106.1
244.2
1106.1
244.2
1106.1
244.2
400.0
466.6 466.6481.8
125.2 125.2 72.1
K-KHD-N
93.1
22.3
65.5
9.3
177.6
105.0H
774.4
702.4
259.6
702.4
259.6
KORADI-WARDH
TIRODA
1
RAIPUR_POOL
0.0
249.9
62.2
8.3
62.2
8.3
186.2
5.6
38
8.6
443.9 62.2
20.5R 48.2
62.2
33.0
2.8
46.1
KORAD2
267.0
177.6
8.9
49.7R
168.2
5.6
219.8
0.0
196.6
1
116.0
17.0
116.0
17.0
1
400.0
88.5 52.7
564.3 532.7
50.9 98.0
334.9
1192.0
262.1
1192.0
262.1
1223.2
330.0
402.7
580.4
337.0 68.7
88.2 580.4
337.0 68.7
88.2
KORADI-I
148.0
21.1
93.5
24.0
1
TIRODA
1834.8
313.7
9
332.5
3.5
332.5
3.5
131.6
IEPL
384.4
62.0
177.6
50.2R
177.6
50.2R
592.8
159.0 0.0
592.8
246.3
159.0
400.0
444.1
95.0 125.0L
22.5
95.0
22.5
KORADI-II
77.7
KORADI III
344.1
77.6 77.6
400.0
SEONI7
0.0
635.5
1864.7
196.6
1
113.5
77.7
KORADI III
62.9
53.2
62.9 245.2
53.2 8.8
1
85.5
1
12
6.0
1
4.4
36.1
4.4
36.1
4.9
38.9
4.9
38.9
95.0
23.2
95.0
23.2
32.9
40.2
WARDH-PG
401.0
113.5
8
56.1
113.4
104.4
113.4
104.4
582.2
475.8
345.5
564
.6
143.1 50.3
1
473.5
129.2
227.6 227.2
43.7
17.4
401.0
1075.1
114.6
1075.1
114.6
226.9
155.4
1188.6
35.3
1188.6
35.3
1
678.9
273.7
0.0 678.9
2000.0 273.7
0.0
-414.9
PARLI-PG
410.7
2071.7
337.1
SATPU4
11
62.9
39.9
368.0 79.6
62.9
45.9
354.2 79.6
444.1
50.0
125.0L
BHADR4
231.6
45.6
1
4.4
22.6
4.4
22.6
4.9
26.9
4.9
26.9
1
33.0 223.2
4.7 10.9
409.6
85.3
18.0
85.3
18.0
10
50.2
101.6
35.7
19
7.
1
344.1
0.0 77.6
466.6
46.9
75.6
466.6
75.6
1
MAUDA
266.3
75.0L
WARORA POOL
783.5
82.2 947.0
125.6 270.0
17.1
405.1
158.8
34.6
158.8
34.6
777.4
0.0
451.3
407.3
410.3
140.7 38.0
410.3 514.0
140.7 38.0
AMRAVATI IBL
38.2
56.1
0.0
45.5
337.3
358.3
508.9
61.8
508.9
61.8
1
349.4
31.1
254.6
119.1
44.7 39.1
337.3 197.1
44.7 39.1
231.6
82.3
231.6
82.3
231.6
82.3
WARD4
349.7
56.2
349.7
56.2
423.6 420.7
82.8 95.8
423.6 420.7
82.8 95.8
BETULGIS
359.0
38.0
345.5
30.6
345.2
30.6
NIZAMABAD
606.1
170.8
606.1
170.8
406.9
254.6
119.1
605.8
170.1
605.8
170.1
327.8
23.1
BETULGIS
280.6
180.9
280.6
353.9 180.9
100.8
353.9
100.8
318.4
22.9
KHAND4
8
5.
WARDHA BYPAS
2
24
AURANGBD
404.0
1015.7
153.3
1015.7
153.3
AKOLA II
1068.7
38.8
1068.7
38.8
BHUSAWAL-I
281.0 408.3
142.6 83.1
281.0 408.3
142.6 83.1
MAUDA
1072.0
112.6
1072.0
112.6
1038.9
128.7
1038.9 0.0
128.7 251.8
1021.6
82.9
1021.6
82.9
591.0
65.3
591.0
65.3
1097.0
1.2
231.6 1097.0
87.1 1.2
231.6 1097.0
87.1 1.2
231.6 1097.0
87.1 1.2
3
514.0
AURANGABD-PG
1064.1
87.8
1064.1
87.8
1031.2
107.6
1031.2
107.6
WARDHA
265.7
63.7
265.7
63.7
196.0 321.8
3.1 41.2
196.0 401.9
3.1 59.4
BASE CASE
8.0
18
AKOLA-I
262.1
15.3
262.1
15.3
420.5
79.8
420.5
79.8
333.6
5.5
333.6
5.5
STUDY: SC FAULT LEVEL AT WARDHA
LOAD FLOW
Annexure - 2
775.0
5
220.0
400.0
3
5
2
400.5
2
400.4
415.9
780.7
1
0.0, 0.0
1
51092.3, -87.8
1
NIZAMABAD
TUE, NOV 17 2015 11:58
ASCC : Three Phase Fault: Ia1 (AMPS), Va1 (VOLTS), (POLAR)
Diagram created using
'Y:\Study\Operation\Short Circuit study\SC fault at Wardha\All India 2018-19 Peak_After Final BUS SPLT_Wardha SC Study Rev4-Pratyush.sav'
'Y:\Study\Operation\Short Circuit study\SC fault at Wardha\Wardha SLD.sld'
0.0, 0.01.4
158
33851.6,
1573.8-86.55.2
0.0, 0.0-8
5.3
-834493.0,
-86.3
1
1
0.0, 0.0
33434.3, -86.2
0.0, 0.0
28464.8, -87.8
KORADI-II
IEPL
8696.8
-85.7
F
0.0, 0.0
16919.3, -87.3
TIRODA
KORADI-WARDH
0.0, 0.0
39740.2, -87.6
1
WARORA
WARDH-PG
1
0.0, 0.0
42862.5, -86.8
CHANDRPR-II
DHARIWAL
CHNDR4
0.0, 0.0
55999.2, -87.8
TIRODA
11650.6
-85.4
1
1
0.0, 0.0
37113.5, -87.9
1692.3 3511.2
-85.4 -85.3
2854.4
-87.8 -270.0
3202.7 15790.8 4896.4
-90.0 -86.8
-87.1
15790.8 4896.4
3710.9
-86.8
-87.1
-85.5
2240.1
-85.2
K-KHD-N
0.0, 0.0
29145.3, -88.7
1
WAR_FS2
0.0, 0.0
4913.1, 87.6
0.0, 0.0
WAR_FS1
4913.1, 87.6
0.0, 0.0
1
2 -87.5
77388.5,
1
PADGH4
1
F
6821.0 1920.4
89.8 -84.7
55.6
0.0, 0.0
20098.1, -88.4
0.0, 0.0
77388.5, -87.5
0.0, 0.0
40847.1, -86.2
WAROR2
2
0.0, 0.0
50654.5, -87.2
1
CHAND2
0.0, 0.0
50843.1, -87.2
1
1
0.0, 0.0
43712.5, -86.2
6821.0
1920.4
89.8
-84.7
1
2503.2
-86.0
2503.2
-86.0
KORADI III
285
KORADI-I
4355.6
-87.9
4355.6
-87.9
4420.0
-180.0
KORADI III
9206.0
-270.0
BETULGIS
7215.1
2762.0 -89.3
-84.9 7215.1
2762.0 -89.3
-84.9
9
2445.1
-90.0
MAUDA
8
1
71871.1 5517.5
-87.5 -87.4
5
11
8417.5
-86.2
8417.5 4075.8
-86.2 -87.5
3008.4
-87.7
3008.4
-87.7
-87.2 14115.9
11501.5
-89.2
-87.2
3540.5
-88.9
3540.5
-88.9
SATPU4
10
6418.3
-85.6
6418.3
-85.6
2445.1
-90.0
11501.5
0.0, 0.0
20448.6, -86.7
3230.1
-85.7
5157.0
-88.8
5157.0
-88.8
12679.9
-270.0
6072.8 19593.9
-87.1 -86.6
0.0, 0.0
24216.6, -86.1
2777.5
-179.4
8009.6 4126.5
-87.6
6135.2 -86.9
-86.7
SHORT CIRCUIT
-87.6
13674.3
-87.6
BHADR4
7348.7
-86.8
7348.7
-86.8
8237.2
-86.8
8237.2 2221.9
-86.8 -86.8
10737.7
-360.0
1
4 .3
PARLI4
67
PARLI-PG
0.0, 0.0
45337.8, -87.8
2895.8
-87.7
1373.9
-85.5
1322.0
-85.5
13
71
7.0
3946.7
-85.6 5030.1
4321.6 -360.0
-85.3
BASE CASE
1323.8 2503.7
-85.5 -86.6
2503.7
-86.6
2806.4
-86.6
2806.4
-86.6
10189.8 11397.9
-540.0 -86.7
11397.9
-86.7
3578.3
-85.5
WARORA POOL
13
30676.4
-86.4
0.0, 0.0
44401.3, -87.6
2269.7
-86.3
2269.7
-86.3
AMRAVATI IBL
5517.5
-87.4
2207.5
-83.0
2207.5
-83.0
6002.2
-86.9
6002.2
-86.9
1866.9
-85.2
1
1597.2
-90.0
22174.0
-88.0
1467.9
-85.3
4001.5
-88.5
4001.5
-88.5
4001.5
-88.5
MAUDA
1557.5
-85.3
WARD4
2581.3
-85.5
2581.3
-85.5
8689.9
-89.1
8689.9
-89.1
8689.9
-89.1
0.0, 0.0
19679.9, -87.9
1566.8
-85.5
1507.7
-85.5
1510.2
-85.5
0.0, 0.0
77388.5, -87.5
55215.8
-87.3
1512.0
-87.1
1512.0
-87.1
WARDHA
3282.8
-87.7
3282.8
-87.7
2770.7
-87.6
2770.7
-87.6
2770.7
-87.6
2770.7
-87.6
0.0, 0.0
30388.8, -86.3
10387.1
-86.5
10387.1
-86.5
WARDHA BYPAS
3067.0
-88.1
3067.0
-88.1
AKOLA II
1800.0 -87.0
-86.6
1800.0
-86.6
AURANGABD-PG
3694.3
-87.8
3694.3
-87.8
3079.6
-85.4
BHUSAWAL-I
2
1998.2
-86.9
5980.4
1998.2
-85.7
5980.4 -86.9
-85.7
7392.7
-88.1
7392.7
-88.1
2614.8
-87.4
2614.8
-87.4
2534.0
-87.4
2534.0
-87.4
2694.4
-87.4
2694.4
-87.4
2894.1
-85.4
2669.1
-87.1
AKOLA-I
2910.8
-87.5
2910.8
-87.5
2820.8
-87.5
2820.8
-87.5
1981.6
-85.2
1981.6
-85.2
3817.9
-85.1
3817.9
-85.1
3
13717.0
-87.0
AURANGBD
1714.7
-84.9
1714.7
-84.9
9624.7
-89.4
9624.7
-89.4
1842.7
-87.0
1842.7
-87.0
STUDY: SC FAULT LEVEL AT WARDHA
1
SEONI7
KORAD2
KHAND4
BETULGIS
0.0, 0.0
51796.3, -87.3
3
0.0, 0.0
43038.3, -87.0
RAIPUR_POOL
2
1
5
BHI4
1
0.0, 0.0
18449.2, -88.7
2
RAIPUR
NIZAMABAD
PARLI-PG
PARLI4
791.9
154.9
4.1
154.9
4.1
BHADR4
1
1
403.0
400.18.3
39
102.7
TUE, NOV 17 2015 11:25
Diagram created using
'Y:\Study\Operation\Short Circuit study\SC fault at Wardha\All India 2018-19 Peak_After Final BUS SPLT_Wardha SC Study Rev4-Pratyush.sav'
'Y:\Study\Operation\Short Circuit study\SC fault at Wardha\Wardha SLD.sld'
1
1
1
402.1
1
220.3
F
132
.0
400.0
1
KORADI-WARDH
WARORA
400.5
CHANDRPR-II
DHARIWAL
CHNDR4
WAROR2
1
1
1
RAIPUR_POOL
1
8
6.
18
400.0
400.0
1
CHAND2
PADGH4
1
F
77.2
9.6
77.2
9.6
1154.4
243.9
1154.4
243.9
1154.4
243.9
1154.4
243.9 0.0
250.0
400.0
769.5
RAIPUR
WAR_FS2
1
1
2
784.9
10
9.
9
402.6
407.9
401.7
2
219.6
400.0
1
219.9
400.0
400.0
0.0
534.8 113.6
72.0
BHI4
34.0
402.1
46.4
1
K-KHD-N
516.0
161.9
TIRODA
534.8
72.0
773.3
516.0
161.9
400.9
443.9
27.8R
371.0
82.2
768.3 532.7
70.6 77.0
KORADI-I
1239.1
252.2
1239.1
252.2
1223.2
330.0
402.4
627.5
289.9 54.2
85.5 627.5
289.9 54.2
85.5
290.6
177.6
10.6
52.6R
183.1
6.7
KORAD2
93.5
23.0
65.5
9.3
177.6
105.0H
412.0
TIRODA
1834.8
279.3
219.7
0.0
161.8
16.00
13.88
678.9
702.4
273.7
259.6
1.0937
1.1052
16.00 702.4
13.88
0.0 678.9
2000.0 273.7
1.0937 259.6
1.1052
0.0
-412.3
1
9
151.3
11.1
151.3
11.1
1
131.6
447.3
76.1
665.2
162.8 0.0
665.2
246.4
162.8
400.0
0.0
635.5
1864.7
161.8
1
400.0
17.8
77.8
KORADI III
193.9
6.5
17.9
48.2
MAUDA
KORADI-II
SEONI7
444.1
116.9R 148.0
21.1
WARDH-PG
KORADI III
99.5
138.0
(b) KORADI-II - WARDHA LINE CONNECTED WITH WARDHA - WARORA(MSETCL)
18.4
223.3
18.4
1
IEPL
1
444.1
116.9R
407.7
1
49.7
96.4
49.7
96.4
582.2
407.0
8
11
48.2
41.7
48.2
41.7
54.0
45.2
54.0
45.2
210.5
19.7
210.5
19.7
15.7
41.8
WARORA POOL
1
223.3
784.3
10
473.5
119.3
279.2
44.8
SATPU4
177.6
44.9R
177.6
44.9R
(a) MAUDA - WARDHA D/c LINE CONNECTED WITH WARDHA - WARORA POOL D/c
31.8
WARD4
0.0
47.2
MAUDA
2071.7
383.8
BYPASSING WARDHA (PG)
266.3
75.0L
1
947.0
270.0
AMRAVATI IBL
33.0 219.8
4.7 10.4
207.9
8.4
776.2
104.7
44.3
104.7
44.3
BETULGIS
0.0
451.3
392.7
168.6
392.7
168.6
409.5
86.8
17.0
86.8
17.0
BETULGIS
387.5
46.8
372.8
39.1
372.2
38.8
409.1
48.4
0.0
45.5
1
527.8
63.8
527.8
63.8
437.9
101.1
437.9
101.1
KHAND4
385.7
WARDHA BYPAS
27.4
295.2 109.9
48.5 27.4
295.2 4.1
48.5 65.3
4.1
65.3
4.1
65.3
AURANGABD-PG
354.5
63.4
354.5
63.4
404.1
4.1
65.6
4.1
65.6
4.1
65.6
AKOLA II
1177.8
59.2
1177.8
59.2
307.5
19.4
BHUSAWAL-I
2
584.1
184.2
584.1
184.2
WARDHA
1008.2
116.7
1008.2
116.7
977.0
132.7
977.0 0.0
132.7 252.2
972.8
90.3
972.8
90.3
438.9
70.7
AKOLA-I
3
390.2
150.8
390.2
150.8
AURANGBD
433.9
74.6
433.9
74.6
BYPASSING WARDHA (PG)
2.2
15
266.4
65.1
266.4
65.1
STUDY: SC FAULT LEVEL AT WARDHA
LOAD FLOW
1
775.1
5
220.0
400.0
3
5
2
400.6
400.8
2
WAR_FS1
400.4
419.6
419.6
780.7
1
STUDY: SC FAULT LEVEL AT WARDHA
1
SHORT CIRCUIT
(a) MAUDA - WARDHA D/c LINE CONNECTED WITH WARDHA - WARORA POOL D/c
BYPASSING WARDHA (PG)
10
11
8
9
SEONI7
1
SATPU4
(b) KORADI-II - WARDHA LINE CONNECTED WITH WARDHA - WARORA(MSETCL)
BYPASSING WARDHA (PG)
3
2
5
1
KORAD2
BETULGIS
-87.2
1
BHI4
0.0, 0.0
5401.7, 87.5
0.0, 0.0
WAR_FS1
5401.7, 87.5
WAR_FS2
2
1
.6
6183
0.0, 0.0
17128.7, -86.8
8477.0
-86.1
8477.0 3875.6
-87.0
-86.1 -87.5
4102.5 10945.1
-87.3
-86.7
2486.6
-85.9
2486.6
-85.9
0.0, 0.0
44141.2, -87.5
WARORA
1
6909.5
-87.1
6909.5
-87.1
7744.9
-87.1
7744.9
-87.1 -86.7
WAROR2
0.0, 0.0
41059.4, -87.0
F
1
CHANDRPR-II
2930.1
-87.6
1407.7
-85.5
1354.6
-85.5
0.0, 0.0
1
31631.0, -88.4
2
1
0.0, 0.0
47582.9, -87.4
1
1
13
58
6 .0
6.9
2936
NIZAMABAD
1560.5
-85.3
1891.8
-87.0
5995.5
1891.8
-85.7
5995.5 -87.0
-85.7
1
PARLI-PG
0
2.
CHAND2
-86.6
WARORA POOL
3348.9
-87.4
3348.9
1932.2 -87.4
-86.5
1932.2
-86.5
1488.3
-85.3
BHADR4
0.0, 0.07.7
159
32558.5,
1576.8-86.75.2
0.0, 0.0-8
5.3
-834307.4,
-86.3
1597.2
-90.0
-86.9
3
22
2445.1
-90.0
1636.2
0.0, 0.0
43466.8, -87.6
4918.5
-86.3
4918.5
-86.3
2445.1
-90.0
WARDH-PG
0.0, 0.0
33247.7, -86.6
1
DHARIWAL
CHNDR4
1355.1 2522.8
-85.5 -86.5
2522.8
-86.5
2827.9
-86.5
2827.9
-86.5
10189.8 9998.7
-540.0 -87.2
9998.7
-87.2
3415.5
-85.6
84
15
.5
-87.6
13586.0
-87.6
2278.4
-82.9
2278.4
-82.9
WARD4
1626.1
-86.9
1626.1
-86.9
0.0, 0.0
24563.4, -87.9
2817.1
-85.2
2817.1
-85.2
9316.2
-89.0
9316.2
-89.0
9316.2
-89.0
3866.3
8415.5 -87.5
3866.3
-88.0 -87.5
-88.0
0.0, 0.0
28738.3, -88.7
.6
62
2680.9
-87.3
2680.9
-87.3
2598.0
-87.3
2598.0
-87.3
57
1
RAIPUR
0.0, 0.0
47862.8, -87.5
1
1568.2
-85.5
1509.1
-85.5
1511.6
-85.5
PARLI4
10297.3
-86.5
10297.3
-86.5
1
TUE, NOV 17 2015 11:32
ASCC : Three Phase Fault: Ia1 (AMPS), Va1 (VOLTS), (POLAR)
Diagram created using
'Y:\Study\Operation\Short Circuit study\SC fault at Wardha\All India 2018-19 Peak_After Final BUS SPLT_Wardha SC Study Rev4-Pratyush.sav'
'Y:\Study\Operation\Short Circuit study\SC fault at Wardha\Wardha SLD.sld'
0.0, 0.0
33279.4, -86.2
0.0, 0.0
43632.0, -86.2
PADGH4
1
1
F
7328.3
1939.9
89.6
-84.7
-86.7
0.0, 0.0
16362.2, -87.3
2
0.0, 0.0
18246.2, -88.7
7328.3 1939.9
89.6 -84.7
TIRODA
9206.0
-270.0
0.0, 0.0
52808.6, -87.9
4306.9
-87.9
4306.9
-87.9
4420.0
-180.0
TIRODA
7162.5
2610.5 -89.3
-85.1 7162.5
2610.5 -89.3
-85.1
IEPL
-85.6
5137.9
-88.8
5137.9
-88.8
12679.9
-270.0
3380.8 19509.8
-87.1 -86.6
KORADI-II
0.0, 0.0
24342.0, -88.1
1.3
0.0, 0.0
38707.3, -87.5
1654.9
-84.9
1654.9
-84.9
9476.5
-89.3
9476.5
-89.3
1636.2
-86.9
2
5
KORADI-WARDH
AURANGBD
3202.7 15202.7 4817.7
-90.0 -86.8
-87.2
15202.7 4817.7
3547.9
-86.8
-87.2
-85.6
2234.7
-85.2
3499.5
-88.9
-88.9
14053.7
-89.2
3017.8
-87.7
-87.7
-87.2
0.0, 0.0
36181.9, -88.0
2777.5
-179.4
7825.0 3669.1
-87.0
-87.7
10737.7
-360.0
MAUDA
331
1
3897.4
-87.3 -86.3
3897.4 2292.9
-87.3 -86.3
2627.7
-87.5
2627.7
-87.5
2546.5
-87.5
2546.5
-87.5
2756.1
-87.5
2756.1
-87.5
1879.9
-86.2
1879.9
-86.2
1879.9
-86.2 -87.6
3361.3
-87.7
3361.3
-87.7
2842.6
-87.6
2842.6
-87.6
2842.6
-87.6
2842.6
0.0, 0.0
39591.5, -87.4
MAUDA
WARDHA BYPAS
RAIPUR_POOL
0.0, 0.0
41698.5, -87.0
1
34
WARDHA
16
.2
AURANGABD-PG
3
11066.7
3890.7
0.0, 0.0
20309.0, -86.8
11066.7
3067.0
-88.1
3067.0
-88.1
0.0, 0.0
29463.7, -86.4
AMRAVATI IBL
0.0, 0.0
19505.6, -87.9
2292.9
1946.5
-85.2
1946.5
-85.2
3416.2 2880.5
-85.4 -85.4
2680.6
-85.4 -87.0
AKOLA II
-85.7 5030.1
4319.4 -360.0
-85.3
3017.8
KORADI III
1
K-KHD-N
.5
99
34
1870.4
-85.2
0.0, 0.0
24139.7, -86.1
3048.0
-85.4
BHUSAWAL-I
AKOLA-I
0.0, 0.0
19853.1, -88.4
KORADI III
265
1
0.0, 0.0
49698.5, -87.4
55.7
KORADI-I
BETULGIS
1711.7 3541.7
-85.3 -85.3
2854.4
-88.0 -270.0
KHAND4
Download