Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi – 110066 No. 51/4/SP&PA-2013/ 469-480 Date: 22-July-2013 To 1.The Member Secretary, Southern Regional Power Committee, 29, Race Course Cross Road, Bangalore 560 009. FAX : 080-22259343 3.The Director (Transmission), Transmission Corp. of Andhra Pradesh Ltd., Vidyut Soudha, Hyderabad – 500 082. FAX : 040-66665137 5.The Member (Transmission), Kerala State Electricity Board, Vidyuthi Bhawanam, Pattom, P.B. No. 1028, Thiruvananthapuram - 695 004. FAX : 0471-2444738 7.The Director (Power), Corporate Office, Block – I, Neyveli Lignite Corp. Ltd., Neyveli , Tamil Nadu – 607 801. FAX : 04142-252650 9. Director (Projects), National Thermal Power Corp. Ltd. (NTPC), NTPC Bhawan, Core-7, Scope Complex, Lodhi Road, New Delhi-110003. FAX-011-24360912 Sub: 2.The Director (Projects), Power Grid Corp. of India Ltd. “Saudamini”, Plot No.2, Sector-29, Gurgaon 122 001, Haryana. FAX : 95124-2571932 4.The Director (Transmission), Karnataka State Power Transmission Corp.Ltd., Cauvery Bhawan, Bangalore 560 009. FAX : 080 -22228367 6. Member (Distribution), Tamil Nadu electricity Board (TNEB), 6th Floor, Eastern Wing, 800 Anna Salai, Chennai - 600002. FAX : 044-28516362 8.The Superintending Engineer –I, First Floor, Electricity Department, Gingy Salai, Puducherry – 605 001. FAX : 0413-2334277/2331556 10. Director (Operations), NPCIL, 12th Floor,Vikram Sarabhai Bhawan, Anushakti Nagar, Mumbai – 400 094. FAX : 022- 25991258 36th meeting of the Standing Committee on Power System Planning of Southern Region - Additional Agenda. Sir, The 36th meeting of the Standing Committee on Power System Planning of Southern Region is proposed to be held by next month. Complete agenda is available at CEA’s website ( www.cea.nic.in ). Exact date and venue of the meeting would be conveyed separately. Please make it convenient to attend the meeting. Yours faithfully, (K. K.Arya) Chief Engineer(I/C) (SP&PA) (Telephone: 011 26732305, Fax No. 011 26102045) Copy to: Shri S. K. Soonee, CEO, POSOCO, B-9, Qutub Institutional Area, Katwaria Sarai, New Delhi-110016 GM, SRLDC, 29, Race Course Cross Road, Bangalore 560 009 FAX – 080-22268725 1 ADDITIONAL AGENDA Agenda Note for 36th Meeting of Standing Committee on Power System Planning in Southern Region (SCPSPSR) Date and Venue: (to be communicated shortly) A.0 Installation of reactors at certain 400kCV Substations by APTRANSCO A.1 APTRANSCO vide their letter CTO/131/F/D.No.377/13 dated 29-6-2013 has proposed the installation of 8 number of reactors at following substations in order to avoid line trippings in 400kV transmission lines: S. No. 400kV Substation Capacity of reactor (MVAR) 1 Vemagiri 125(in addition to 80MVAR already planned) 2 Kalpakka 80 (additional) 3 Mamadipalli 125 4 Sankarpalli 80 5 Gajwel 125 6 Malkaram 125 7 Mahboobnagar 80 8 Kurnool 125 A.2 APTRANSCO may present the studies. Members may discuss and agree. B.0 Development of Analytics as part of Unified Real Time Dynamic State Measurement (URTDSM) scheme B.1 Implementation of Unified Real Time Dynamic State Measurement (URTDSM) scheme as system strengthening consists of installation of Phasor Measurement Unit(PMU) at existing State, ISTS and IPP stations and lines at 400kV and above including that coming up by 2014-15, generation switchyard at 220kV and above, Phasor Data Concentrator(PDC) at all SLDC, RLDC & NLDC along with OPGW communication links was agreed in the Joint meeting of all the five(5) Regional Standing committees on Power System Planning held on 05.03.2012. 2 B.2 In URTDSM, the user interface application software is proposed to visualize and analyze the real time phasor data. It was also decided that following analytics are to be developed in parallel with implementation of the URTDSM scheme in association with premier academic institutions like IIT using PMU based measurement. • • • • Line Parameter Estimation Vulnerability analysis of distance relays Linear state estimator Supervised Zone-3 distance protection scheme to prevent unwanted tripping of backup distance relays • CT/CVT calibration • Control Schemes for improving system security (based on angular, voltage and frequency instability) Purpose and deliverables for above analytics is enclosed at Annexure-I. B.3 Based on the discussion, development of above analytics in association with IIT Bombay progressively in three(3) years has been undertaken which will be installed at all SLDC, RLDC, NLDC, RPC, CEA and CTU. The cost of development of analytics is included in the URTDSM project. CTU would involve CEA and POSOCO in development of analytics. B.4 Members may discuss. C.0 Provision of Bus Reactor for controlling high voltages C.1 POWERGRID have furnished following information regarding high voltages at different grid points in SR as per the details below: a. POSOCO in its quarterly feedback to planners had raised issue regarding over voltages encountered during real time operation (copy of the relevant pages of the recent operational feedback are enclosed at Annexure-II). b. The issue of high voltages was deliberated during recently held TCC & SRPC meetings wherein incidences of high voltages have been deliberated. During the meeting, provision of 1x125 MVAR bus reactor at Gooty was in-principally approved subject to ratification in the Standing Committee. c. The issue of high voltages were also discussed in the special TCC meeting held at Bengaluru on 24th June , 2013 wherein persistent high voltage issues at Kaiga, Narendra, Guttur, Hasan, Hiriur, Vijayawada, Gooty, Kurnool, Nagarjunasagar, Tirunelveli etc. were deliberated. During the meeting it was decided to explore providing bus reactor at Trivendrum or conversion of line reactor to switchable line reactor. Further, it was also agreed to recommend to Standing Committee for higher capacity reactor requirement at Kaiga and additional reactor at 400 kV Hassan substation. 3 d. From the recently collected shift reports from SRLDC (copy attached at Annexure-III), it is seen that high voltages are also experienced at Malkaram and Gajwel substations of APTRANSCO. In this regard, a large number of lines are getting tripped on overvoltage. Such occurrences have adverse effect on the healthiness of the equipment. e. High voltages are also experienced at Khammam substation. Earlier a 765/400 kV substation equipped with adequate bus and line compensation was planned at Khammam. However, due to certainty of the gas in vemagiri area, the implementation of the substation has been put on hold. As the time frame of the commissioning of this substation is uncertain, it is proposed to install bus reactor at Khammam for controlling high voltages. f. Yelahanka is going to be the latest addition in the Bengaluru Ring Main. This substation is presently having only 1x63 MVAR bus reactor and no line reactors. The short circuit level in the Bengaluru area is quite high, therefore to have desired effect on voltages, it is prudent to provide additional bus reactor in the substation to control the high voltages. C.2 In view of the above, following bus reactors are proposed: Installation of 1x125 MVAR bus reactor each at (i)Gooty, (ii)Kaiga, (iii) Hassan, (iv)Khammam, (v) Malkaram, (vi) Gajwel, (vii)Narendra(New), (viii)Trivendrum and 2x63 MVAR bus reactors at (ix)Yelahanka substation. C.3 Members may kindly discuss and approve. D.0 Provision of Transformation capacity at Madurai. D.1 It has been reported that transformers at Madurai are getting high loading specially during high wind conditions. The above issue was deliberated during the special TCC meeting held at Bengaluru on 24th June, 2013. D.2 To address the overloading of transformers, it is proposed to provide 1x500 MVA 400/220 kV transformer at Madurai. D.3 Members may discuss and agree. E.0 Provision of Spare 765/400 kV Transformers in Southern Region. E.1 To cater to the increasing load demand and import requirement Southern Region is going to have substantial 765 kV grid. In the near future 7 nos. of 765 kV substations are likely to be available which include Nellore pooling station, Raichur, Kurnool, Tiruvallem, Srikakulam, Vemagiri & Hyderabad. Further, in the present meeting 3 more new 765/400 kV stations are proposed at Chilakluripeta, Cudddapha, Nizamabad. E.2 765 kV system are bulk capacity systems which shall have very adverse effects incase of outage of 765/400 kV transformers requiring long time for repair and 4 replacement. Further, in the near future the Southern region shall be dependent to a large extent on power import through 765 kV systems. Therefore, it is prudent to have 765/400 kV transformers as Regional Spare to meet the any contingency on the transformers. E.3 Therefore, POWERGRID has proposed to procure 2x1500 MVA transformers as spare and kept at suitable location to meet any exigencies at the earliest. Members may kindly discuss and approve. F.0 Proposal of Electricity Department, Puducherry for erection of 230kV line to Karaikal (The above agenda item has already been given in Main Agenda under Agenda item no# 4.0. The system study results for above proposal are now enclosed at AnnexureIII) G.0 Review of the evacuation scheme for Yeramarus (2x800 MW), Edlapur(1x800 MW) Thermal Power Generation (The above agenda item has already been given in Main Agenda under Agenda item no# 11.0. The system study results for above proposal are now enclosed at Annexure-IV) 5 Annexure-I DEVELOPMENT OF ANALYTICAL TOOLS USING PMU BASED PHASOR S MEASUREMENTS Aim Deliverables No. Task 1. Line Parameter Estimate & Validate • Positive and Zero sequence Line Estimation transmission line parameter estimation (R,X,B) parameter. • Errors in line parameters will be logged for information to operator Inputs required: & correction in linear state a) PMU based phasor estimator parameter. measurement at both ends of line, bus voltage phasor 2. On line vulnerability analysis of distance relays. 3. Linear Estimator Development of • Visualization of relay software for characteristic and apparent validating distance impedance trajectory in the R-X relay characteristic plane. (Zone-1, Zone-2, • Alarm / messages when Zone-3) in real time thresholds are violated or apparent basis by impedance is some margin (say superimposing on 20%) from Zone 1, 2 or Zone 3 field setting of characteristics of the relay. distance relays. • Identification of power swing beyond a configurable threshold Inputs required: due to any disturbance in the b) PMU based phasor system measurement at • Identification of load both ends of line, encroachment condition in the bus voltage phasor system c) Distances relay • Creation & storage of distance characteristic and relay characteristics of different settings. lines using templates & available settings • Data available in standard format(CSV, excel, comtrade) • Trigger input for DSA State Development of 3- • Network topology processor to phase linear state update the bus model estimator, software • Bad data detection based on weighted • Topology error detection to least square identify the switch device errors technique. 6 S MEASUREMENTS No. Task Aim Inputs required: a) PMU based phasor measurement at both ends of line and bus voltage phasor, b) Substation bus switching scheme/topology Deliverables • Observability analysis to identify maximum observable network with available measurement. • Pseudo & historical measurement generation in case of lack of observability. • Alarms & warnings for model inconsistencies & limit violation. • Network connectivity/graph to provide: • Island details • Issue alarm for loss of connectivity • visualisation by making line dotted/different colour • Component outage • Visualization of state estimator output in tabular & graphical form. • Power system condition can be played-back along with topology connectivity and flow measurement • Three phase State Estimator The analytics will • Identification of presence of provide adaptive persistent fault in the observable Zone-3 backup system. protection to avoid • Identification of presence of unwanted Zone-3 power swing & load tripping. encroachment in the observable system. Inputs required: • The software will generate control a) PMU based phasor signal for disabling of Zone -3 measurement at protection based on system both ends of line condition and adopted protection and bus voltage philosophy b) Distance relay characteristics and settings of candidate line 4. Supervised Zone-3 distance protection scheme to prevent unwanted tripping 5. CT/CVT Calibration. This module will • Evaluation of CT/CVT errors in evaluate the accuracy magnitude of these instruments. • Evaluation of CT/CVT errors in phase 7 S MEASUREMENTS No. Task 6 Emergency control for improving system security(Based on angular, voltage & frequency stability) Aim Deliverables Inputs required: a) PMU based phasor measurement at both ends of line, bus voltage phasor b) Benchmarked PT to act as reference c) Linear State Estimator • Identification of faulty CT/CVT from steady state and transient response • Computation of compensation factors for correcting the steady state response of CT/CVT for state estimation • Verification of measurements against benchmark-CT/CVT • Highlighting the variation using graphs The module will • Based on the analysis of the continuously monitor evolving trajectories a decision on and analyse the whether to take an automatic stability (like voltage control action and its quantum & & angular) based on location shall be taken by such a the trajectories of scheme. various parameters • Five such Wide-Area Emergency like voltage, current Control Schemes shall be phasors, breaker developed, which will involve status etc appropriate action in any or all regions, adaptively, depending on Inputs required: the event, such as Controlled d) PMU based system separation (adaptive phasor islanding), Adaptation of relays measurement at and control systems using wide both ends of line, area Information etc. bus voltage phasor 8 5.2. ICT Constraints Has t he S. No Seasonl ICT Antecedent Conditio ns Description of th e Figurel table constra ints no. constra int occurred in earlier qu arter? Deta il s. 400/220kV 315MVA ICTs 1 at Hyderabad (Ghanapur, Mamidipalli and Durin g the Pea load Whole year will be high Malkara m 5 5 ) 2 period Hyderab ad loads 400/230kV 315MVA ICTs at Hosur During peak period of every day N-1 criteria will not satisfy during the peak Graph 0-31 Graph No-32 Graph No-33 Yes Yes During peak 3 400/220kV 500 MVA period During N-1 criteria will not Graph No- le Ts at Sornanahalli peak period of satisfy during the peak 34,35 Yes every day 5.3. Nodes Experiencing High Voltage Has the S. No Seasonl Nodes Anteced ent Description of the constraints Conditions Figu rel constraint table occurred in no . earlier quarter ? Voltages at Vemagiri and Vijayawada area remain very high (>415 kV) even during peak months. At least one 400 V line is kept open at all times to conta in this over voltage. During off-peak months Vemagiri and 1 Vijayawada area the voltages cross 438 KV for sustained periods and W hole Year many lines are kept open. Many of the IPPs connected to Vemagiri are at 400 kV level and are absorbing reactive power. GT taps were optimized and yet the problem persists. W ith more IPPs slated to connect in this area Bus Reacto rs of sufficient capa city needs to be provided at Vemagiri. 16 Graph No-36 Yes Has th e s. No Seasonl Nodes A ntecedent Descri pt ion o f th e con s tra in ts Co ndition s Figu re! co nstrai nt ta ble oc curred in no. ea r li er qua rt er? 2 Gooty, Monsoon Kamool , period and Srisailam & off peak Ghanapur period Kaiga,Guttur 3 and Narendra Voltages at Gooty , Kamool and Srisa ilam rema in very high during mon soo n period and offpeak condition. 400kV Kaiga , 400kV Narendra VOlt age are very High . Sr. N o . 1 2 3 •s • 7 • 9 10 11 12 13 I. " " I. 17 19 20 21 22 23 2. 2' 2. Graph Yes G <aph No-39 Graph Yes N0-40 "'ea 5,4, No- 37 No- 38 During Low generation period and offpeak period Whole Year Graph Lines opened on high voltage Name Total no. day s o pen during Quarter 400 kV TAlAGUPPA - NEElAMANGAlA 400 kV TIRUNElVElI · KUDAMKULAM 3 400 ev TIRUNElVElI · KUOAMKULAM 2 400 kV TIRUNEl VEli - KUDAMKULAM 1 400 kV SRISAILAM-MAMIDIPAlli l 400 kV GUTTUR · NARENDRA 1 400 kV UDUMAl PET · TIRUNEl VElIl 400 Kv TRICHUR • KOCHI 1 400 kV VTPS IV · SRISAILAM 2 400 kV KAIGA - GUTTUR 1 400 kV UDUMAlPET· T1RUNElVE1I 2 400 Kv HASSAN - UPCL 2 400 kV V1JAYAWADA · VEMA-GIRl 1 400 kVVlJAYAWA DA· VEMAGIRI 4 400 kV VEMAGIRI • SIMHADRI 2 400 kV V1JAYAWADA· VEMAGIRI 2 400 kV MYSORE - HASAN 1 400 kV RAMAGUNDAM · HYDERABAD 4 400 kV KALPAKKA· VEMAGIRl l 400 kV MADURAI - TIRUNELVElI 1 400 kV TRIVENORUM · TIRUNElVElI 2 400 kVVIJAYAWADA · LANCO 1 400 Kv HASSAN - UPCl l 400 kV GUTTUR · NARENDRA2 400 kV TlRUNElVElI · KUOAM KULAM 4 400 Kv TRICHUR - KOCHI 2 Corresponding n od es e x perienci n g hiah v o lt aa e Graph No. .7 •• 44 '2 39 36 32 29 2. 2. 2. 2. 23 21 I.I. 17 17 " " " " 13 11 11 11 17 400kV Talag uppa , 400kV r lruneiveui. 400k V Srisailem , 400kV Guttur 400kV Kaiga. 400kV Vemagiri. 400kV Naren dra , 4QOkV Vija yawada. 400kV Kamool 4QQkV Hassan 400kV Hyderabad Graph No· 36-46 27 28 2. 30 31 32 33 • 400 kV KAIGA • GUITUR 2 8 8 8 7 7 7 7 6 6 6 6 6 6 5 5 5 4 4 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 824 400 kV SRISA ILAM- MAMIDIPALlI 2 400 kV VEMAGIRI • SIMHADRI 1 400 kV VIJAVAWAOA · LANCO 2 400 kV GUTTU R · HIR1YUR 1 400 kV HASSAN· NEE LAMA NGALA 1 400 kV KHAMMAM - KAlPA KKA 1 34 400 kV KHAMMAM · MAMIDIPALlY 2 35 400 kV CHmOOR - SPDR 36 400 kV C UOOAPPA - C HITTOQR 37 38 3. 40 41 42 43 400 kV MADURAI - PUGAl UR 1 44 400 kV MAHABOOB NAGAR - RAl CHUR 45 46 47 48 49 50 400 kV NELAMANGALA - M YSO RE 1 400 kVVIJAYAWADA - NElLORE 1 400 kV MAD URA I · PUGA LUR 2 400 kV N'SA GAR • GOOTY 400 kV vrs s IV · SRlSA ILAM 1 400 kV HYDERABAD - N'SA GA R 400 kV KAlPAKKA · VEMAGIRl 2 400 kV N'SAGAR • MAHABOO B NAGAR 400 kV GAJ'v\lEL • HYDERABAD 400 kV MYSQRE - HASA N 2 400 kV NEYV ELl TS 2 - TRICHY 400 kV N'SA GAR • CUODA PPA 1 51 400 kV Vl JAYAWA DA - VEMAGIRJ 3 52 53 400 kVAlAMATHI - VAl LUR 1 54 400 kV KAIGA· NARENDRA 2 55 56 400 kV KHAMMAM - MAMID IPA lLY , 57 58 5. 60 61 62 63 400 kV MADURAI • TIR UNEl 64 65 66 400 kV RAMAG UNQAM • HY DERA BAO 3 67 68 6. 70 71 72 73 74 400 kV GHANAP UR · MAMIDlPAl lY 400 kV JEYPO RE - GAZlNVAKA 1 400 kV KHAMMAM - N'SAGAR veu 2 400 kV NELLORE - A LA M.&.T HI 1 400 kV NEL LOR E - ALAMATHI 2 400 kV RAICHU R - GOOTY 1 400 kV RAICHUR · GOO TY 2 400 kV RAICH UR • MUNIRABAO 400 kV RAMAGUN OAM · GAJWEl 400 kV TA LAGU PPA · HASSAN 400 kV Vl JAYAWADA - NEl lORE 2 400 kV HYD ERABAD - KURN OO L 400 kV MAlKARAM · HYDE RA BA D 400 kV NEYVELI TS 2 fEXP • PUGA LUR 400 kV RAMAG UNDAM · C HANDRAPUR 1 400 kV RAMAGU NDAM - MALKARAM 400 kV TR IVENORU M - Tl RUNEl VEU 1 4QO kV Vl JA YAW ADA -VTPS rv z Grand Tota l 18 Annex VI.C: Graphs Indicating Nodes Experiencing High Voltage in SR Duration Histogram of 400kV Vemagiri Voltage Jan-13 Feb-13 Mar-13 40.00 35.00 % of time 30.00 25.00 20.00 15.00 10.00 5.00 0.00 390 394 398 402 406 410 414 418 422 426 430 434 438 442 446 438 442 446 Voltage(kV) Figure 98 Duration Histogram of 400kV Vijayawada(Nunna) Voltage Jan-13 Feb-13 Mar-13 35.00 30.00 % of time 25.00 20.00 15.00 10.00 5.00 0.00 390 394 398 402 406 410 414 418 422 Voltage(kV) Figure 99 135 426 430 434 Duration Histogram of 400kV Gooty Voltage Jan-13 30.00 Feb-13 Mar-13 25.00 % of time 20.00 15.00 10.00 5.00 0.00 390 394 398 402 406 410 414 418 422 426 430 434 438 442 446 Voltage(kV) Figure 100 Duration Histogram of 400kV Karnool Voltage Jan-13 Feb-13 Mar-13 30.00 25.00 % of time 20.00 15.00 10.00 5.00 0.00 390 394 398 402 406 410 414 418 422 Voltage(kV) Figure 101 136 426 430 434 438 442 446 Duration Histogram of 400kV Srisailam Voltage Jan-13 Feb-13 Mar-13 30.00 25.00 % of time 20.00 15.00 10.00 5.00 0.00 390 394 398 402 406 410 414 418 422 426 430 434 438 442 446 434 438 442 446 Voltage(kV) Figure 102 Duration Histogram of 400kV Kaiga Voltage Jan-13 Feb-13 Mar-13 35.00 30.00 % of time 25.00 20.00 15.00 10.00 5.00 0.00 390 394 398 402 406 410 414 418 422 Voltage(kV) Figure 103 137 426 430 Duration Histogram of 400kV Narendra Voltage Jan-13 Feb-13 Mar-13 25.00 % of time 20.00 15.00 10.00 5.00 0.00 390 394 398 402 406 410 414 418 422 426 430 434 438 442 446 434 438 442 446 Voltage(kV) Figure 104 Duration Histogram of 400kV Hassan Voltage Jan-13 Feb-13 Mar-13 30.00 25.00 % of time 20.00 15.00 10.00 5.00 0.00 390 394 398 402 406 410 414 418 Voltage(kV) Figure 105 138 422 426 430 Duration Histogram of 400kV Tirunelvelli Voltage Jan-13 Feb-13 Mar-13 25.00 % of time 20.00 15.00 10.00 5.00 0.00 390 394 398 402 406 410 414 418 Voltage(kV) Figure 106 139 422 426 430 434 438 442 446 I Even ing Shift SRlDC: Shift Summary Iss u es Less general ion Reduced IR Impo rt Lowvohage H'Oh YOlla\Ie HIQh Line Loa dlflg FlOwgate VIOlalio n Sudden vananen of loa ds Sudde n Load cr ash UNIT - Units tripped /Revived (210 MW & above) Tr ipp ing Deta ls o . Tripped at KOTHAGUDAM TPS r 500MW I BELLARYTPS (500MW) S-Jul- 13 NIL No loss ot gene rallon in NLC cue 10 strike Nil INIL MALKARAM.KRNl • r~Afl GTR. RAMAGUNDAM. VEMA GIRI VU AYAWADA. INIL Nil Nil Nil 2 I ~ nronls Reason 15:17- 1-11 AI ru A Q V <:1 eclat I DPLV ~ A.u..u ll AUXILUARY SUPPLY FAILURE 15:48 ~ ."' .c - :- -- - :- Lo ss 01 Generation 20:28 1000 III - Tripping LIN E/l e T Rema rk TlIl1ll 15:48 ' 00 Kv HIRIYUR·8T PS I Norma ised at 20:46 BREAKER PROB LEM AT BTPS END kV (HVDCI 1220 kV elements) Freqency Proflle 50.19 <l 9.S-; Maximum MInimum Hz. Hz. al at 14:02 15:19 Hrs I Hrs I I I Freque ncy In IEGC range 89 % RellSOtl lor LowM IQhIrea I . ONE CONT IGENCY APPROVED IER · SR PATH) FO R 05.07.13 OpenAocess (Curlll llmenl, Ne w 2. ONE CONT IGEN CY APPROV ED ( KPTCL TO AP ) FOR 06 .07.13 Approva ls,pend ing Approvals 3. ER • SR PATH STER LfTE STOA CUT ILMENT DONE FROM 83·96 BLKS. 10 MW I AS PER ERLD C MSG ele) Scheclulng deta ils Sl aU SunenderlR ea oca lion ot ISGS ATC Bnd congestion S/W ,o l>lod iSSU~ i SCADA URS de:ails URS powet f<Il 1·96 BLKS . ER • SR • W R • SA NO MARGINE. AS PER NLOC MSG. Communication. Data NIL NIL 11, St hod ullng 5/ W Nil O'ura:xlB'tllJ< - Statu s of FSCs in PG CIL PGC IL PG CIL PGCIL SR APTRANSCO Compens anon % 40.000k 40.00% 40.00% 40.00% Nam e of Line Ow ner 400 400 400 400 KV KV KV KV N.Sagar·Cud apa 1 N.Sa9ar·Cudapa 2 Gooty ·N elamangala Goo ty ·Somanahalli KPTCL KSEB 2 TNEB PONO Y Status FSC FSC FSC FSC c uoaca Cudap a Go otv Goot v Men ac es to --- p: ,":':":': in in in in Service Service Service Service Rea son ol her s Me ssa ge 'A' Message '8 ' Message 'C' 1 co nstitue nt s and --- - Ins talle d End _. Cllnle mpla ling Regu lato ry me asures Uncfeiil ra wa m ess ag e Maxim ising MVARd raw als To ta ke a ll mea s ure s to co nta in OV HIGH Vo ltage mess age reculat io n If any N il Deta ils of Grid Incide nts an d Grid Distu rbance s with Snap shots of Abnorm al events In ease of grid IncJdent & gn d dtstu rbancl! FIR report t o be enclose' Details of major line/ equipment 5/0 in SR ShutdownPI.nned ISI.No Nil N.m. of the elem.nt Owner Planned/ D.llyBasi,/ Emergency Continuous Ruson Start Oate St.rt li me End o.t. ShutdownActu.1 End Tim. St. rt o.t. St.rt Time End Date n C/AI C End Revision Il me R. mark, SRLDC: Shift Summary Less gtl netlllion Reduced IR im potl Low vohage Hyderabad, Gajwel, Malk aram. Kurnool , GODly, Khamma m.Vijayawada( Above 430kV THR OUGHT N.SH IFT at AP Area ) H"ogh Line Loadin g F!ow9ale vIOlalion SUOden Varllllicn 01 loads Suoden Loa d cr ash UNIT " iii iii rd No. Tripped al Synchron ls ed al ROli so n NIL Un il s tripped (Re vived & (210 " aboY ) Loss 01 Genenll n ( Tripping Time 23:10 23:13 LI NE/ ICT Tripp'ng Delall (HVDC I kV I22Ol<.V elemen ts ) 14-Jun-13 'Nil Nil High voll age Issuos Nigh t Shift ,r.,. 4001221l kV ICT-l AT HOODY AOO Kv HASSAN • UPCl 2 AOO kV RAMAGU"'DAI.I • GAJWEl. 400'220 Kv 1CT·3 AT 1AAl.KARAI.I 400 kV MAl.KARAM • HYOERABAD 400 kV KHAMMAM· KALPAKKA 2 400 kV HYOERABAD• MAMIDIPALl.Y _ M~ Ximll m rreq ncy _ -50-~ MinImum Pro II 49.61 EMERGENCY Sot) BY KPTCl. TO ATIEND ISO. PROBlE M 0:40 TR PPED ON OVER VOI..TAGE TRIPPED ON OVER VOL T AG E OV ER R.UX PROTE CTION OPERATED TRIPP ED O N OVER VOLT AGE TRIPP ED ON OVER VOL TA GE TRIPPED ON OVER VOLTAGE 0:00 0:02 2:34 ui . _ :: _, C:O:--l-'_"" al Normalised at Remark 23:46 23 :46 Hz. Nil H~ 6:35 -=rr, .-+ ncy lcul,; 6 :54 - range - 7 :02 7 :l18 84 % Rea son l or Low/HIgh Ir eq NIL Open Access (Curtail m nt ,New Approva ls.pe nding Aporovals etc) Sl aU Scheduling delall. ~ SUfi roer Docalion 01 ISGS ATC and congestion S rrbl.,j issu es o:AA KsrB PONDY URSde:aiIs SURR. L'l SURR.IN RE·A LLOCATED FROM SURR. IN URS{JOWrJf c1JratioMJj;, RGDMU I-6.7 ,NLCIIST I I2 ,SIM -ST 2.1GSTPS OlFF. BLKS . RGDM U I-6.7.NLCIIST' I2 .SIM-ST2.TAL-ST2.NtCEX P NLCIISTlI2 ,IGST PS RGDMU7,NL CIIST I / 2 DIFF. BlI<S. DIFF. BLKS. DIFF. BLKS. INIL SCADA Ml C ommu ".c ~ tJOt'l. Dit. MAltA800B NAGAR DATANO' UI'1.lAII NG Nil IT, S<hedu lln~ S/W Owner Name ot Lin Cornpens ation % Ins ta lle d End Status SU tu, 0/ FSCs PGCIL 400 KV N .Sagar-Gudapa , 40.00% in SR PGCIL 4 00 KV N .Sagar·Cudapa 2 40 .00% Cudapa Cudapa PGCIL 4 00 KV Gooty · N elamangala 40.00% Gooty FSC in Service PGCIL 4 00 KV Gooty -So m an aha lli 40.00% Gooly FSC in Service PONOY others APTRANSCO KPTCL KSED 2 1 MesQ a to TNEa iiJny " 4 22 Dna is o/Grid Ni l lncid C!'n and Grid Oist u rban(e'J, with Snap shOll of Abn"",,,,1 _ to In u se of VJd tnOOenl & gnd d"lurt>aoce FIR reeon 10 be! enclosed FSC in Service R e a ~on Me=ge 'A' M euace 'S' Mewlce 'C Contemplating Regulatory rnenur es (OftSt.tI:uenU and phY\iU1 reoc:uli tiot'l it FSC not in se rvice{UN E SHUT DOWN) Und erdra wal m essage AP/ SEPL M aximl,ing M VAR absorpt ler, To take all measur es 10 conta in OV SRLDC: Shift Summary Low_ ....,. Lei' ,-- R&dueMl IR ~ "" ......... ~ HogrlLN L'*""O F\owolIl<I vioI&toon ........ "" ,- 'at.d .Kemool~ ~ load crash "'" 5-Jul-13 Night Shift ~ $I.odclen Vlriillion of loads Sudd.~ I NIL. Nil 10" 01 e ne' alion i~ Nl C ece 10s l,ik.. r\f!'111cfl "" Nil No- KOlHAGl.IOAI.ITPS Unlls Ir1pped ,......,- ,_ ....... __ 21:"8 " Reuon - - ."". '" "" NW. I l>oYe) (MW) UNE.'lCT m ....,. ~ Loss III ........"'" kV AM!lEWAOo · POI'«M. 1 -- .. ... ~ Reason lot low '-. 50'" ,, 19 63 Clpen A=e•• , ...... -- OirecI ~o-eurr.... ~ ,., "'" ...... I _... .. ......... T_ "" ... F~ "'IEGC ~ "" (Ctl rlallme nl, N9W ApprOVIls.pencf"'ll ~als "'deta ils 0<' &.nendetlRealoclllioo of ISGS "TCand~ S/W,.... 0'lI "'UI' Sl'"r~ ~ """" (omm""",,~_ . Dill IT, rKhedu.nC S/W ..'" MC '" URS_ . . . -ee- surre<>deled !rom URS ...- "m '·1 8 NLYlI 1·18 Status of FSCs In SR O w ner Name of Li ne PGC IL PGCI L 4 00 KV N.Sagar-C udapa 1 40 0 KV N .Sagar -C udapa 2 PGCI L PGCIL 400 KV GOOly -Nelam an gala 4 00 KV Gooly -So ma na halli APTRANSCO _ KPT CL KSEB TNEB Compens atlon °/0 Installe d End 40,00% 40.00% 40.00% 40 .00% Cu dapa PONPY Stat us FSC in Service FS C in Service Cudana FSC in Service FSC in Servic e Goo ty Goo lv others Reason M essage 'A' 4 1 Messages to rnn-.;titi"i"ilnti,,?'ntl M essage '8' Message 'C' llll l~ rnp:.tlngi;" glll..I"'V"TTl" ""'" physlca' Underdrawa! m essage Max im ising MVA R drawals 9 regulilt ion if any To take all measures to cont ain OV For corr ecti ve st eps for H/ F and U/ Orawals Nil Detail s of Grid Incidenu and Grid nlstu rb anc es with Snap shots of Abnorma' eve nts In ca se of gnd incident & gnd disturbance FIR report to be enclosed Details of major Unci equ ipm ent SiD In SR Shutdown Pliinne-d Sl.No 1 2 N;ame of t be ~irm e n l Nd Ow ner PI..nned} fmeflencv O.irty h sh l Continuous Renon Sto" Start Date Time- End Cale- Shutdown Actual End Tim. Stil rt Stitrt End End Dilt e TIm< C.-te Time nC{ATC Revision Remarkl Annex-III Karaikal Studies 1 1 9 .2 395.6 -27.4 3 7 0 .0 54473 RAMNPURM 1.0000 8 8 .5 212.9 -31.8 4 3 .8 9 0 .1 4 3 .8 3 1 .0 1 2 9 .9 3 1 .9 6 0 .0 9 0 .1 3 7 0 .0 1.0000 54273 RAMNPURM 54232 VILLI2 54201 NEYV 200.0 1 96.0 71.0 72.1 60.8 44.0 90.0 209.8 -33.7 24.4R 178.6 54200 BAHOOR 59.8 24.4R 24.4R 180.0 29.0 131.5 5.1 220.0 -31.6 9.0 17.0 100.0 48.0 54340 KARIKAL 128.8 9.0 14.6 213.7 -32.6 54167 KRAIKL 5.7 137.9 20.3 215.0 -33.4 1 1 137.9 7.6 47.9 24.1 54267 TIRV 30.0 1 47.9 393.8 1 20.3 195.0 206.6 -42.4 19.0H 0.0 120.0 1 1 .0 0 0 0 178.6 44.0 88.0 212.5 -32.0 1 .0 0 0 0 3 90.0 31.1 1 .0 0 0 0 2 129.0 1 .0 0 0 0 1 64.9 178.6 54300 THONDAMN 27.5 30.0 106.5 -38.6 1 1 OUTAGE OF NEYVELI- VILLINAUR S/C LINE 1 7 9 .0 393.0 -27.7 4 0 6 .8 54473 RAMNPURM 1.0000 4 0 6 .8 209.0 -32.6 4 3 .9 9 0 .1 4 3 .9 9 0 .1 5 6 .2 2 0 2 .7 1 0 6 .8 2 4 .0 1 3 8 .3 1.0000 54273 RAMNPURM 54232 VILLI2 54201 NEYV 200.0 1 96.0 54300 THONDAMN 200.0 90.0 96.0 37.1R 37.1R 180.0 1.5 139.4 9.9 220.0 -31.4 21.8 100.0 48.0 54340 KARIKAL 136.4 1.4 18.8 19.4 214.4 -33.3 1 211.1 -33.0 54167 KRAIKL 0.6 137.8 1 88.0 208.5 -32.8 137.8 6.7 47.8 23.0 54267 TIRV 30.0 1 47.8 393.8 1 19.3 195.0 206.5 -42.4 19.0H 0.0 120.0 1 1 .0 0 0 0 178.6 44.0 54.1 1 .0 0 0 0 3 54200 BAHOOR 23.8 1 .0 0 0 0 2 44.0 90.0 200.8 -35.6 37.1R 178.6 1 .0 0 0 0 1 178.6 27.4 30.0 106.3 -38.6 1 2 OUTAGE OF NEYVELI- KARAIKAL S/C LINE 395.1 -27.6 3 9 1 .2 1 2 8 .9 54473 RAMNPURM 1.0000 1 1 6 .7 3 0 .9 9 4 .3 2 4 .2 212.3 -32.3 9 0 .1 4 3 .8 9 0 .1 4 3 .8 3 9 1 .2 9 4 .4 1.0000 54273 RAMNPURM 54232 VILLI2 54201 NEYV 200.0 1 96.0 84.0 85.3 62.4 209.3 -34.0 23.1R 178.6 54200 BAHOOR 94.0 23.1R 44.0 180.0 88.0 211.8 -32.5 23.1 178.6 85.0 23.1R 8.3 100.0 54340 KARIKAL 82.9 212.5 -33.4 2.9 208.3 -40.8 54267 TIRV 54167 KRAIKL 2.9 82.9 1 1 48.0 82.9 1.9 7.0 13.3 30.0 1 7.0 393.8 1 13.0 195.0 204.3 -43.6 19.0H 0.0 120.0 1 1 .0 0 0 0 220.0 -31.4 1 .0 0 0 0 3 44.0 90.0 1 .0 0 0 0 2 90.0 30.9 1 .0 0 0 0 1 65.1 178.6 54300 THONDAMN 116.0 26.2 30.0 104.1 -44.1 1 3 Annexure-IV Load Flow Studies for Yeramaras (2x800 MW) and Edlapur (1x800 MW) generation projects for the 2016-17 Time Frame • The Load Flow results for the Base Case without the Yeramaras & Edlapur generation projects are placed at Exhibit-I • The results with the earlier approved transmission system are placed at Exhibit-II & III, wherein it may be observed that practically the evacuation of power from the Yeramaras & Edlapur generation projects is banking on the ISTS transmission network which also necessitated bypassing the LILO of Raichur – Gooty 400kV D/c line at Raichur (new) as this enhances the fault level at Raichur generation project beyond its designed capacity. Further for the Exhibit-III it may also be observed that this also overloads the Raihcur – Kurnool 765kV 2xS/c line under contingency of one circuit. Therefore this has necessitated the review of the transmission system associated with Yeramaras & Edlapur generation projects. • The load flow results for the base case with following new transmission system are placed at Exhibit-IV, o Yeramaras – Bellary 400kV 2xD/c (quad) line or multi circuit line utilizing corridor of Raichur – Bellary 400kV S/c line o Yeramaras – Gulbarga 400kV D/c line o Replacement of Bellary – Jindal – Davagere 400kV S/c line with 400kV quad D/c line o Bellary – C.N. Halli 400kV quad D/c line o C.N. Halli – Mysore 400kV D/c line o LILO of both circuits of Talguppa – Neelamangla 400kV D/c line at C.N. Halli o Terminate LILO of one circuit of Talguppa – Neelamangla 400kV D/c line at Hassan for making it C.N. Halli – Hassan 400kV D/c line o Establishment of 400/220kV substations at C.N. Halli & Gulbarga with 2x500MVA transformers • It may be observed that all the transmission lines are well within the limits. Further as per the Manual on Transmission Planning criteria the transmission is tested for N-1-1 contingency and the results are placed at Exhibit-V & VI. • In view of the above studies above transmission system is proposed associated with Yearamaras (2x800 MW) & Edlapur (1x800 MW) generation projects 4 Bus - Base voltage (kV) Branch - MW/Mvar Equipment - MW/Mvar kV: <=110.000 <=132.000 <=220.000 <=400.000 <=765.000 >765.000 1 54803 SALE800 -8.8 0.0 395.8 -24.8 1 394.8 -28.2 393.5 -27.8 393.8 -28.5 -73 .9 -21 .3 394.0 -27.6 400.7 -25.6 401.0 -35.6 1 757.2 -23.0 54887 TIRUVLM 404.1 -21.3 51493 NEL-POOL 766.3 -19.0 1 1 395.3 -26.5 .1 1 757.3 -18.8 51424 CHITOR 240.4 0.0 -117.8 319.9 51890 NELL-POL -4.8 -639.8 413.3 -22.9 295.8 1 -82.0 51413 KURNOOL4 70.9 -391.7 -229.4 942.6 -73.4 391.9 51428 KURL-NEW 587.9 -31.4 -37.2 174.5 -217.3 480.3 18.8 323.8 51203 NSAG 0.0 51807 CUDP800 -319.4 -114.8 -41.5 -593.2 -8.4 409.4 -18.4 -251.3 400.0 -15.8 604.9 441.3 0.0 -78.2 5.6 186.6 185.8 -0.9 150.8 15.8 -64.7 142.3 0.7 82.5 51403 NSAG -439.9 -13.9 -13.9 -292.6 51828 KURL800 0.0 -38.7 225.2 -28.0 11.9 -141.3 400.0 -16.8 -960.1 -292.6 401.3 -15.3 220.8 398.8 -24.7 -0.0 -0.0 SW 400.0 0.0 -35.8 524.6 51407 CUDP 72.4 -118.5 SW 103.8 447.2 -160.3 78.4 160.3 -332.6 3 86.8 -1.5 364.3 176.5 -4.0 292.6 241.0 0.0 766.6 -13.4 -832.1 -11.9 355.6 14.0 -1.5 593.9 -184.1 51533 URVKND -164.4 -522.9 54407 HOSUR4 325.6 52411 KOLAR 10.2 483.3 393.5 -28.1 -13.0 401.3 -23.1 219.9 -35 5 805.8 -72.1 17.8 587.8 -256.1 -57.3 240.2 220.0 -20.0 274.2 51408 GOOT -324.2 -100.9 -77.3 -1006.7 -56.3 1 -81.3 -114.5 52435 ECITY 5.6 315.5 -13.8 825.7 51423 MAHABUB4 -259.1 0.0 54403 SALE -290.8 52405 HOODI4 -9.6 -319.0 -0.0 1 210.0 263.2 1 50.0 37.3 18.7 656.5 -71.5 152.3 56.3 220.0 -23.5 -37.6 291.5 51442 HINDPR40 -185.7 -136.2 334.5 400.8 -15.5 117.3 404.0 -36.7 SW 401.2 -33.2 189.5 -59.5 -86.2 107.3 515.5 -62.5 -152.2 52803 RAIC800 -58.0 -236.9 -270.8 56.4 38.5 -52.6 -125.6 52413 RAIC-NEW -39.0 258.4 396.1 36.6 112.3 346.9 0.0 -321.9 715.0 400.2 -21.1 -38.4 -77.2 403.9 -30.6 948.5 -59.5 -345.0 52484 YELAHNKA -0.0 46.4 395.9 -28.3 -140.9 52401 SMNH 102.7 -58.4 60.9 -568.0 52498 MADHUGI4 16.5 381.0 30.0 352.5 225.0 0.0 -12.7 2040.0 47.8 1011.7 400.0 0.0 SW 52477 BIDADI 94.6 16.0 714.5 52203 RAIC -379.4 404.7 -28.0 117.1 400.0 0.0 -46.6 400.0 -19.4 9.0 -65.5 402.4 -65.5 402.4 11.7 -511.0 52416 GULBRG -56.1 400.0 -25.6 535.5 114.2 73.4 -41.1 52403 RAIC 92.2 -41.2 -73.2 399.5 -20.8 -86.2 112.0 579.9 0.0 -64.5 341.7 52483 400.2 YERAMRS -20.7 -56.2 15.6 -338.3 259.1 -49.6 26.8 -16.3 1 -9.0 -3.1 -205.5 1445.6 61.5 2 186.5 551.3 52407 NELMANG4 -269.5 66.7 271.7 -32.6 -402.3 -57.0 61.5 -402.3 -50.1 515.4 126.2 -15.8 162.9 400.0 -20.3 303.1 987.2 51.3 134.7 -98.0 300.9 364.6 -115.7 52482 BELLARY -298.5 -9.8 52444 HIRY -81.0 -162.8 5.8 52434 KUDGI-NT 782.0 -30.4 4 .9 32 .6 -33 -35.1 52409 HASSAN4 -68.6 32.7 141.0 542.4 -62.1 24.5 -14.2 -132.9 1 -102.6 52410 MYSORE4 -231.3 13.8 372.8 202.2 -67.5 54.8 52402 MNRB -8.3 52276 TORAN2 101.1 232.3 13.0 110.6 402.4 -21.6 292.1 52497 CNHALLI -93.7 1020.0 52476 TORNGL4 6.8 -301.5 85.4 -29.8 -73.9 322.3 -41.7 133.3 -71.1 57.0 1 -83.6 138.9 16.9 2.7 -54.7 -21.4 -24.5 111.4 0.0 -167.4 374.3 52447 NAREND-4 -0.0 SW 245.8 0.0 32822 SOLPR8 141.6 -28.5 116.0 59.9 413.1 -15.5 1.3 -115.2 52415 NARDR-NW 399.9 -28.1 34.3 49.2 434.9 53403 KOZIKOD4 -138.1 52406 TALAGUP4 3.9 -79.4 -101.2 303.2 52408 UDUPI400 -147.8 1020.0 54.7 -111.0 52404 DAVAN4 -69.5 -95.3 32419 KOLHPRPG 1045.8 53401 TNRT 79.5 52412 KAIGA 59.5 497.7 1 774.1 -19.8 Load Flow Studies for Yeramaras & Edlapur Generation (2016-17 Time Frame) 409.5 -16.7 220.0 -17.8 1 419.1 -19.8 405.7 -17.1 768.1 -14.9 406.0 -17.5 244.5 -13.0 404.1 -19.9 1 765.6 -12.8 400.7 -10.5 398.0 -20.7 Bus - Base voltage (kV) Branch - MW/Mvar Equipment - MW/Mvar kV: <=110.000 <=132.000 <=220.000 <=400.000 <=765.000 >765.000 1 54803 SALE800 -818.9 -9.8 392.6 -24.2 1 391.5 -27.4 390.3 -27.2 390.7 -27.9 -27 .0 -28 .1 391.0 -27.5 398.7 -26.6 400.5 -39.5 1 752.4 -23.5 54887 TIRUVLM 401.7 -20.6 51493 NEL-POOL 761.7 -18.6 1 1 392.1 -25.8 .5 1 749.8 -16.6 51424 CHITOR 237.9 0.0 -84.6 134.5 51890 NELL-POL -68.8 -268.9 411.4 -21.7 321.6 1 -72.7 51413 KURNOOL4 105.3 -644.1 -102.3 644.9 51428 KURL-NEW 576.4 -233.0 1617.6 -44.1 277.1 -195.0 480.3 18.8 323.8 51203 NSAG 0.0 -72.0 -19.2 -1391.6 -9.5 408.4 -17.7 -217.6 51807 CUDP800 -134.4 -89.7 594.8 717.2 0.0 -33.6 -5.1 206.9 163.8 14.0 152.6 -50.7 -58.8 162.6 -1.3 111.4 51403 NSAG -713.6 -13.3 51828 KURL800 0.0 11.9 -40.2 221.8 -36.9 -13.3 -317.8 1 -161.3 400.0 -12.3 -839.4 -317.8 399.6 -4.4 218.1 395.4 -23.2 -0.0 -0.0 SW 33.7 -150.4 400.0 -4.1 -28.9 637.6 51407 CUDP 49.7 -119.5 SW 96.0 445.6 238.1 0.0 -85.9 126.0 -5.2R -5.2R 680.0 -5.2R 680.0 3 76.4 3.9 349.5 179.4 2.6 4.6 -24.2 -131.0 1395.5 761.9 -6.5 -14.3 0.0 386.3 285.3 -45.9 260.3 267.7 -121.7 -975.4 -80.7 51533 URVKND -150.0 54407 HOSUR4 314.9 52411 KOLAR 11.2 475.2 399.0 -20.1 -635.2 52435 ECITY -0.3 -49.4 19.0 216.0 390.1 -27.0 850.5 -31 4 -384.3 -106.4 220.0 -17.3 -95.2 -53.9 52405 HOODI4 -283.5 51408 GOOT 18.0 259.2 -54.8 -840.3 1 580.3 54403 SALE -42.3 -420.2 51423 MAHABUB4 -280.4 0.0 -283.3 -13.3 29.0 212.1 1 51.1 -67.2 -118.7 86.3 -318.2 715.0 400.0 -16.8 55.2 402.4 -39.5 SW 51442 HINDPR40 -205.7 52413 RAIC-NEW 29.1 652.7 -69.7 -95.5 96.4 510.3 220.0 -23.1 -37.6 288.6 -264.4 161.2 55.4 378.7 36.0 -154.0 -62.1 52803 RAIC800 -0.0 398.0 -33.4 184.4 260.2 0.0 110.4 391.5 -772.6 92.6 -81.8 123.3 15.2 276.6 400.0 -18.5 -37.6 -256.5 -37.2 401.8 -30.3 959.2 -52.2 -389.1 52484 YELAHNKA -0.0 29.9 392.5 -27.4 -94.3 52401 SMNH 191.8 -46.9 15.8 448.9 52498 MADHUGI4 -62.0 52477 BIDADI 102.5 16.0 714.5 52203 RAIC -446.7 403.6 -27.0 118.8 400.0 0.0 -42.3 400.0 -16.4 -16.5 114.2 38.5 420.4 -46.3 599.6 -51.5 395.7 -51.5 395.7 225.0 0.0 45.2 2040.0 15.9 -540.5 66.2 980.1 400.0 0.0 SW 400.0 -25.2 542.8 32.3 -594.0 52403 RAIC 96.5 -47.4 112.0 795.0 0.0 -44.6 421.9 399.5 -19.0 22.9 15.9 -416.7 106.9 -51.4 -77.6 -5.6 680.0 1 16.5 9.1 47.4 2 186.4 553.8 52407 NELMANG4 -369.8 .9 99 .2 -23 52416 GULBRG -38.4 65.0 137.7 -97.7 -53.8 1445.6 -395.5 -41.9 47.4 -395.5 -46.2 545.5 154.9 -6.7 90.6 400.0 -17.9 306.8 974.9 -362.0 70.0 374.1 -45.3 52482 BELLARY 365.5 407.5 52444 HIRY -161.1 400.1 -12.5 -87.0 -11.5 -90.6 -4.1 52483 400.1 YERAMRS -18.3 797.5 -21.7 .9 -9 9 -42.0 52409 HASSAN4 -87.1 7.0 33.8 184.9 -50.9 -78.4 142.7 558.1 -54.7 -30.2 -12.6 -158.3 52434 KUDGI-NT -191.6 52410 MYSORE4 -271.5 19.3 421.1 -120.0 1020.0 52402 MNRB 3.6 16.2 110.6 52276 TORAN2 103.3 272.8 52497 CNHALLI 268.6 402.0 -18.0 -10.2 -309.9 107.9 -26.0 -76.6 399.3 52476 TORNGL4 -91.8 234.7 33.0 -13.3 14.5 -396.8 -41.7 158.8 1 1 -160.8 -2.3 161.7 78.5 -28.7 30.2 -65.9 57.0 77.9 0.0 -157.2 374.3 52447 NAREND-4 -0.0 SW 245.6 0.0 32822 SOLPR8 46.8 35.4 453.5 53403 KOZIKOD4 -232.4 66.6 486.8 -22.8 1.0 -99.1 52415 NARDR-NW 399.6 -26.1 62.2 5.7 52406 TALAGUP4 -15.4 -82.4 311.8 52408 UDUPI400 -110.4 1020.0 43.2 -77.7 52404 DAVAN4 -51.6 -119.5 32419 KOLHPRPG 1270.3 53401 TNRT -5.7 52412 KAIGA 55.8 495.5 1 773.9 -18.2 Load Flow Studies for Yeramaras & Edlapur Generation (2016-17 Time Frame) 408.4 -15.3 220.0 -16.5 1 417.2 -18.3 403.1 -13.9 761.7 -10.1 403.5 -14.7 385.6 -24.9 402.0 -18.5 1 761.7 -9.2 400.0 -8.2 395.7 -19.8 Bus - Base voltage (kV) Branch - MW/Mvar Equipment - MW/Mvar kV: <=110.000 <=132.000 <=220.000 <=400.000 <=765.000 >765.000 1 54803 SALE800 -817.6 -8.7 392.3 -25.0 1 391.1 -28.1 390.0 -27.9 390.3 -28.6 -21 .3 -29 .2 390.7 -28.4 398.5 -27.5 400.5 -40.4 1 751.8 -24.4 54887 TIRUVLM 401.3 -21.4 51493 NEL-POOL 760.8 -19.4 1 1 391.8 -26.5 .4 1 748.3 -17.9 51424 CHITOR 236.4 0.0 -63.2 164.9 51890 NELL-POL -110.0 -329.8 411.0 -22.7 312.7 1 -72.7 51413 KURNOOL4 121.8 -583.2 -120.1 583.8 51428 KURL-NEW 574.2 -297.4 1457.0 51828 KURL800 -90.9 -51.5 254.6 -187.2 480.3 18.8 323.8 51203 NSAG 0.0 51807 CUDP800 -164.8 -113.6 588.2 676.2 0.0 -10.9 407.9 -18.5 -199.7 -16.1 -41.9 -5.7 203.0 156.2 17.0 153.6 -34.6 -58.7 162.0 -0.8 110.1 51403 NSAG -673.0 0.0 9.4 -40.1 225.4 -22.9 -16.1 -309.1 1 -160.6 400.0 -12.4 -851.7 -309.1 399.3 -3.5 217.6 395.0 -23.8 -0.0 -0.0 SW 42.0 -149.2 32.0R 32.0R 680.0 32.0R 680.0 400.0 -3.2 -31.2 638.0 51407 CUDP 53.3 -119.2 SW 94.8 444.2 235.6 0.0 -88.9 118.6 88.0 348.8 -40.1 671.2 3 75.4 3.6 352.6 176.8 2.3 4.2 -27.3 -70.8 2492.6 758.0 -5.2 -14.5 0.0 386.7 279.9 -44.0 254.6 249.6 -130.5 -103.3 -897.7 51533 URVKND -147.2 54407 HOSUR4 305.7 52411 KOLAR 11.9 468.0 398.7 -20.5 -635.5 52435 ECITY 0.1 -53.0 19.0 215.4 389.7 -27.7 854.3 -30 5 -384.7 -106.8 220.0 -17.6 -95.9 -52.6 52405 HOODI4 -278.2 51408 GOOT 18.8 245.3 -163.5 -697.3 1 579.5 54403 SALE -92.6 -348.6 51423 MAHABUB4 -285.2 0.0 -270.9 -14.8 26.7 212.1 1 51.2 -66.0 -111.4 89.3 -302.7 715.0 400.0 -17.7 53.8 402.3 -40.3 SW 51442 HINDPR40 -202.0 52413 RAIC-NEW 31.5 650.2 -74.2 -96.7 94.0 510.0 220.0 -23.8 -36.5 287.7 -246.7 171.5 55.5 376.1 35.3 -162.9 -62.5 52803 RAIC800 -0.0 397.7 -34.1 178.2 260.2 0.0 110.2 398.7 -806.7 100.4 -78.1 132.2 14.6 271.0 91.7 400.0 -18.8 -34.8 -250.9 -38.4 401.6 -31.0 959.7 -50.4 -396.2 52484 YELAHNKA -0.0 27.1 392.2 -28.1 -95.7 52401 SMNH 204.0 -44.5 14.9 458.1 52498 MADHUGI4 -57.5 52477 BIDADI 105.0 52203 RAIC -455.8 403.5 -27.7 118.8 400.0 0.0 -42.0 400.0 -16.8 16.0 714.5 114.2 -50.1 -20.1 47.8 -664.2 52403 RAIC 97.3 -41.1 112.0 831.2 0.0 -41.1 436.6 -50.9 394.3 -50.9 394.3 225.0 0.0 47.9 2040.0 13.7 -525.5 73.0 901.6 400.0 0.0 SW 400.0 -25.9 543.7 22.6 16.5 -431.1 399.4 -19.5 -77.5 -4.8 680.0 1 20.1 12.4 46.8 2 186.4 553.9 52407 NELMANG4 -384.5 9.1 11 .2 -21 52416 GULBRG -35.4 66.1 137.9 -98.3 0.8 1445.6 -394.1 -39.7 46.8 -394.1 -48.2 530.1 163.9 -5.7 94.2 400.0 -18.2 307.1 973.0 -363.4 70.2 389.1 -46.8 52482 BELLARY 366.9 413.7 52444 HIRY -164.9 400.1 -12.7 -87.6 -13.0 -94.1 -5.1 52483 400.1 YERAMRS -18.6 798.3 -20.9 9.1 -1 1 -42.5 52409 HASSAN4 -86.9 5.2 34.0 181.9 -48.6 -90.4 143.3 563.0 -53.6 -29.8 -13.0 -157.6 52434 KUDGI-NT -203.9 52410 MYSORE4 -274.1 19.7 433.0 -120.0 1020.0 52402 MNRB 4.5 18.7 110.6 52276 TORAN2 103.7 275.5 52497 CNHALLI 266.8 401.8 -18.3 -11.8 -310.8 109.8 -25.6 -75.0 412.6 52476 TORNGL4 -92.6 238.3 34.9 -15.0 15.5 -409.9 -41.3 158.1 1 1 -171.0 -0.7 165.5 90.6 -29.7 29.8 -64.7 57.0 77.8 0.0 -154.2 374.3 52447 NAREND-4 -0.0 SW 245.7 0.0 32822 SOLPR8 48.1 34.3 454.3 53403 KOZIKOD4 -235.9 66.9 493.8 -24.0 0.9 -97.5 52415 NARDR-NW 399.7 -26.2 57.7 8.8 52406 TALAGUP4 -16.5 -80.6 312.6 52408 UDUPI400 -106.8 1020.0 42.1 -77.6 52404 DAVAN4 -50.5 -122.9 32419 KOLHPRPG 1271.1 53401 TNRT -8.8 52412 KAIGA 55.5 495.2 1 774.0 -18.0 Load Flow Studies for Yeramaras & Edlapur Generation (2016-17 Time Frame) 408.0 -16.2 220.0 -17.4 1 416.5 -19.3 401.8 -15.2 757.4 -11.7 402.4 -15.9 355.3 -34.4 401.7 -19.4 1 759.3 -10.6 399.9 -9.4 395.4 -20.9 Bus - Base voltage (kV) Branch - MW/Mvar Equipment - MW/Mvar kV: <=110.000 <=132.000 <=220.000 <=400.000 <=765.000 >765.000 1 54803 SALE800 9.6 0.0 401.8 3.9 1 401.1 1.2 399.7 1.3 400.0 0.8 -26 .3 -12 .9 398.9 1.1 403.8 2.8 402.6 -6.2 1 766.1 4.7 54887 TIRUVLM 409.8 5.9 778.4 7.8 1 1 401.8 2.5 .6 1 763.3 8.1 51424 CHITOR 67.0 243.8 0.0 -155.4 51493 NEL-POOL 354.4 51890 NELL-POL -101.9 -708.8 418.0 3.9 274.0 129.6 83.2 -412.5 51413 KURNOOL4 -8.4 -252.8 940.0 -85.5 412.8 51428 KURL-NEW 597.4 6.1 -36.4 107.0 -297.7 480.3 18.8 323.8 51203 NSAG 0.0 51807 CUDP800 -353.8 -99.9 -88.9 -482.8 -5.0 414.5 7.4 -283.1 404.5 13.2 618.2 366.6 0.0 -53.9 2.0 162.0 264.0 -3.5 140.9 -7.3 -72.9 98.8 -6.8 73.5 51403 NSAG -365.6 -2.9 -2.9 -271.3 51828 KURL800 0.0 -39.0 183.3 -35.0 41.9 -98.3 404.6 13.2 -825.2 -271.3 405.9 11.4 227.8 404.0 4.4 -0.0 -0.0 SW 400.0 18.8 -10.0 412.2 51407 CUDP 92.2 -115.3 SW 123.7 458.9 -161.7 54.0 188.4 -449.0 3 111.4 -2.1 372.3 105.8 -12.9 197.2 247.1 0.0 776.3 12.6 -857.8 -25.4 297.9 9.7 -9.2 483.2 -148.1 -735.4 -42.8 51533 URVKND -210.9 -411.2 54407 HOSUR4 334.5 52411 KOLAR 8.3 427.5 400.0 1.4 -31.9 406.0 6.9 247.7 -29 7 831.5 -91.8 12.8 601.8 -221.0 -53.5 193.9 220.5 9.2 184.7 51408 GOOT -333.1 -111.2 3.3 504.3 1 -70.9 -94.9 52435 ECITY -8.3 219.5 -80.7 77.2 51423 MAHABUB4 -180.1 0.0 54403 SALE -196.3 52405 HOODI4 -0.5 -140.6 -0.0 1 204.5 226.9 1 48.1 30.3 27.1 627.5 -79.5 27.5 220.0 7.7 -30.7 279.6 51442 HINDPR40 -161.3 -150.2 452.1 405.4 11.4 97.1 406.8 -6.3 SW 409.2 -0.8 146.2 -79.6 -75.3 133.4 506.1 -84.0 -27.5 52803 RAIC800 -70.4 -191.8 -183.2 78.6 54.9 366.6 18.3 -102.6 -33.8 52413 RAIC-NEW -46.6 257.6 0.0 115.3 313.8 86.7 -24.1 -321.9 715.0 400.7 7.6 -78.5 -64.8 409.1 2.6 926.8 -46.8 -312.3 52484 YELAHNKA -0.0 49.2 402.9 1.7 -96.7 52401 SMNH 196.3 -46.7 411.4 4.7 -1.4 52498 MADHUGI4 -639.9 52203 RAIC -348.7 143.9 350.0 39.6 161.5 -62.2 191.5 -180.0L -180.0L 680.0 680.0 38.6 380.8 -19.3 -190.4 225.0 0.0 -24.8 2040.0 -22.9 737.9 400.7 14.9 SW -113.1 52477 BIDADI -59.7 412.8 4.6 114.3 401.0 10.0 16.0 714.5 114.2 -103.9 414.2 -103.9 -180.0L 414.2 680.0 -67.3 417.9 -67.3 417.9 42.6 -720.9 52416 GULBRG -58.1 400.0 7.4 531.0 44.6 -411.5 52403 RAIC 103.0 -94.9 114.6 654.8 0.0 -67.8 44.6 344.7 -411.5 156.3 -43.4 83.1 16.7 -341.4 403.2 8.2 40.3 -34.1 63.5 -80.1 1 196.3 14.2 -417.7 103.0 63.5 -417.7 -13.3 729.7 2 113.2 -143.1 558.8 52407 -1 01.0 NELMANG4 -277.2 -128.4 -294.0 1445.6 2.8 -33.7 400.0 8.0 289.8 949.9 37.0 156.9 -105.1 541.5 -2.3 68.9 279.5 4.7 52482 BELLARY -17.1 45.1 185.1 -57.4 -29.6 22.6 -2.8 52483 400.2 YERAMRS 7.7 -156.2 156.9 382.3 52444 HIRY -129.3 58.3 352.4 -120.0 1020.0 136.7 483.5 -77.4 -59.0 -13.5 -180.0 52434 KUDGI-NT 850.5 -47.7 52276 TORAN2 111.7 312.6 -40.0 110.6 -74.5 7 -4 . .7 -1 4 10.7 52409 HASSAN4 -57.3 86.8 405.8 8.6 383.4 52497 CNHALLI -536.0 338.5 52476 TORNGL4 49.2 -216.6 -287.7 5.6 1.6 -9.2 -1.0 -336.7 -39.4 180.6 1 1 -196.1 -67.8 18.1 217.3 -67.5 183.5 129.6 29.6 -5.7 59.1 52402 MNRB -311.0 -182.0 -58.3 52410 MYSORE4 223.9 -8.6 -43.0 72.5 399.4 -86.6 57.3 66.8 0.0 -180.8 374.3 52447 NAREND-4 -0.0 SW 250.0 0.0 32822 SOLPR8 16.1 -44.4 -145.8 -63.0 8.6 -3.4 13.9 -120.6 52415 NARDR-NW 398.2 -2.9 97.0 71.9 -222.0 53403 KOZIKOD4 452.0 8.5 -4.0 52408 UDUPI400 289.5 52406 TALAGUP4 -236.4 1020.0 125.9 -66.6 52404 DAVAN4 -76.2 -17.3 32419 KOLHPRPG 822.4 53401 TNRT 4.0 52412 KAIGA 67.6 489.3 1 780.8 2.2 Load Flow Studies for Yeramaras & Edlapur Generation (2016-17 Time Frame) 413.4 9.0 220.0 7.9 1 424.2 6.5 410.5 9.2 776.5 11.4 410.8 8.7 1 409.1 7.5 1 771.0 13.6 401.8 16.1 400.1 6.6 Bus - Base voltage (kV) Branch - MW/Mvar Equipment - MW/Mvar kV: <=110.000 <=132.000 <=220.000 <=400.000 <=765.000 >765.000 1 54803 SALE800 8.8 0.0 401.6 3.6 1 400.8 1.0 399.4 1.1 399.7 0.5 -28 .0 -13 .5 398.7 0.9 403.7 2.5 402.6 -6.5 1 765.9 4.5 54887 TIRUVLM 409.6 5.7 778.1 7.6 1 1 401.5 2.2 .6 1 763.2 8.0 51424 CHITOR 65.9 243.7 0.0 -154.8 51493 NEL-POOL 352.5 51890 NELL-POL -101.2 -704.9 417.9 3.8 274.4 133.2 83.0 -412.4 51413 KURNOOL4 -7.4 -85.3 412.7 51428 KURL-NEW 597.1 -251.8 941.9 -35.8 109.2 -296.7 480.3 18.8 323.8 51203 NSAG 0.0 5.4 -88.8 -489.2 -4.9 414.5 7.3 -282.7 51807 CUDP800 -351.8 -99.8 618.0 370.2 0.0 -55.7 2.0 163.5 262.9 -3.3 141.2 -7.2 -72.5 100.4 -6.6 71.8 51403 NSAG -369.2 -3.4 -3.4 -271.6 51828 KURL800 0.0 -39.2 183.2 -35.4 41.1 -99.9 403.5 12.7 -825.9 -271.6 405.8 11.3 227.6 403.6 4.1 -0.0 -0.0 SW 400.0 23.5 -10.1 415.2 51407 CUDP 90.6 -115.5 SW 123.0 458.1 -161.5 55.9 188.9 -451.7 3 110.6 -1.5 371.5 108.0 -12.0 200.2 247.0 0.0 776.1 12.4 -856.7 -24.6 299.9 9.7 -8.7 489.7 -147.9 -735.6 -43.2 51533 URVKND -210.2 -414.1 54407 HOSUR4 334.3 52411 KOLAR 8.8 429.5 399.6 1.2 -31.2 405.5 6.6 246.5 -29 9 830.4 -90.3 13.0 601.4 -225.8 -52.6 196.0 220.1 8.9 190.4 51408 GOOT -332.9 -111.6 3.6 491.8 1 -71.4 -95.4 52435 ECITY -7.7 223.7 -80.0 76.9 51423 MAHABUB4 -180.9 0.0 54403 SALE -199.3 52405 HOODI4 -1.1 -145.5 -0.0 1 204.9 231.8 1 48.2 29.7 28.0 628.4 -79.4 16.4 220.0 8.3 -30.6 279.9 51442 HINDPR40 -162.8 -150.2 454.9 405.3 11.3 97.6 406.7 -6.6 SW 408.9 -1.1 147.9 -79.7 -76.6 132.8 506.2 -83.6 -16.4 52803 RAIC800 -69.0 -193.9 -188.8 76.1 55.1 367.1 17.9 -104.9 -34.9 52413 RAIC-NEW -46.5 257.4 0.0 115.1 312.4 90.3 -5.9 400.6 7.4 -76.0 -65.6 408.8 2.3 926.6 -46.4 -311.0 52484 YELAHNKA -0.0 48.2 402.6 1.4 -98.1 52401 SMNH 192.5 -46.0 411.2 4.4 -2.1 52498 MADHUGI4 -626.6 52203 RAIC -347.0 348.2 -321.9 715.0 42.6 458.1 -21.3 -229.1 225.0 0.0 -17.1 2040.0 -22.5 738.2 399.4 18.8 SW -110.9 52477 BIDADI -59.3 140.9 114.2 412.4 4.2 37.4 131.3 -54.1 230.8 -78.9R -78.9R 680.0 680.0 -64.3 -78.9R 789.2 680.0 -65.4 420.9 -65.4 420.9 42.3 -718.2 52416 GULBRG -57.2 400.0 7.1 530.8 400.8 9.7 16.0 714.5 114.2 52403 RAIC 102.9 403.5 12.8 -101.7 114.0 641.0 0.0 -71.5 112.3 337.8 -779.5 161.6 -41.9 81.4 19.5 -334.5 402.9 8.0 39.9 -35.6 61.6 -78.6 1 196.0 15.2 -420.8 105.3 61.6 -420.8 -14.0 726.9 2 111.0 -140.2 558.4 52407 -1 00.7 NELMANG4 -274.0 -134.0 -294.0 9.2 -30.6 400.0 7.8 290.2 950.6 37.6 156.7 -105.5 533.6 .2 -10 -9.1 67.8 276.2 1445.6 52482 BELLARY -17.8 45.5 183.0 -56.9 -22.3 19.5 -9.2 52483 400.2 YERAMRS 7.4 -157.3 158.0 380.1 52444 HIRY -131.7 54.5 340.4 -120.0 1020.0 136.8 483.6 -75.1 -54.7 -12.8 -177.9 52434 KUDGI-NT 849.6 -47.4 52276 TORAN2 111.2 310.9 -40.0 110.6 -79.5 .2 10 8 -7 . 10.3 52409 HASSAN4 -55.2 91.0 405.4 8.3 382.1 52497 CNHALLI -528.3 329.6 52476 TORNGL4 47.0 -214.0 -287.9 5.2 2.6 -9.7 3.1 -327.9 -40.2 178.5 1 1 -192.4 -67.2 15.9 214.7 -68.0 182.0 132.1 22.3 -8.1 54.8 52402 MNRB -309.3 -180.5 -59.1 52410 MYSORE4 222.3 -9.4 -44.1 70.8 397.8 -84.8 57.2 69.2 0.0 -180.8 374.3 52447 NAREND-4 -0.0 SW 250.0 0.0 32822 SOLPR8 17.1 -43.9 -143.7 -61.7 9.4 -5.0 11.9 -121.3 52415 NARDR-NW 398.2 -3.1 98.4 71.6 -220.4 53403 KOZIKOD4 451.7 8.0 -5.4 52408 UDUPI400 289.6 52406 TALAGUP4 -232.2 1020.0 123.5 -69.0 52404 DAVAN4 -75.8 -18.9 32419 KOLHPRPG 828.3 53401 TNRT 5.4 52412 KAIGA 67.4 489.5 1 780.7 2.1 Load Flow Studies for Yeramaras & Edlapur Generation (2016-17 Time Frame) 413.4 8.8 220.0 7.8 1 424.1 6.3 410.4 9.0 776.4 11.2 410.8 8.6 1 408.9 7.3 1 770.9 13.4 401.8 15.9 400.0 6.4 Bus - Base voltage (kV) Branch - MW/Mvar Equipment - MW/Mvar kV: <=110.000 <=132.000 <=220.000 <=400.000 <=765.000 >765.000 1 54803 SALE800 4.2 0.0 400.3 3.0 1 399.3 0.1 398.1 0.3 398.3 -0.3 -33 .1 -17 .1 397.7 0.2 403.3 1.7 402.2 -6.8 1 764.7 3.7 54887 TIRUVLM 51493 NEL-POOL 776.8 7.0 51424 CHITOR 1 1 400.1 1.6 .0 1 762.5 7.5 59.2 -687.2 408.9 5.1 243.4 0.0 -151.3 343.6 51890 NELL-POL 282.5 417.4 3.3 -98.1 165.1 83.0 -416.9 51413 KURNOOL4 -6.6 -85.3 417.2 51428 KURL-NEW 596.1 -249.3 968.3 -35.1 128.6 -290.8 480.3 18.8 323.8 51203 NSAG 0.0 1.5 -85.0 -522.0 -4.8 414.0 7.0 -280.3 51807 CUDP800 -343.0 -100.2 616.8 380.9 0.0 -61.6 2.2 166.8 256.9 -2.8 142.0 -5.3 -70.7 104.8 -5.4 67.3 51403 NSAG -379.8 -3.8 -3.8 -279.6 51828 KURL800 0.0 -40.3 179.3 -36.0 37.3 -104.3 400.0 18.5 -812.2 -279.6 405.3 11.0 226.8 403.2 1.8 -0.0 -0.0 SW 400.0 23.9 -11.3 435.0 51407 CUDP 86.3 -116.6 SW 118.2 438.9 -161.2 61.8 192.6 -466.6 3 107.1 2.0 368.3 111.9 -6.0 202.0 246.5 0.0 775.3 12.1 -851.4 -18.0 14.1 -5.7 -256.4 -60.4 195.5 522.5 -149.7 -749.8 -46.3 51533 URVKND -206.0 -433.9 54407 HOSUR4 290.3 52411 KOLAR 341.8 401.0 8.9 10.4 441.1 398.3 0.3 -25.5 -86.0 14.1 241.1 -29 0 826.8 52435 ECITY 274.9 220.0 12.6 -340.3 51408 GOOT -76.3 -88.7 -116.4 8.6 454.6 1 599.6 54403 SALE -201.1 52405 HOODI4 -2.7 283.3 -79.5 263.5 -33.6 79.6 -151.8 470.0 51423 MAHABUB4 -187.5 0.0 -72.0 -7.9 0.7 -0.0 1 206.8 -79.0 1 49.3 51442 HINDPR40 -166.0 220.0 8.7 22.0 626.8 129.9 52803 RAIC800 -31.4 277.1 -59.7 -271.5 504.0 -86.3 404.8 11.1 90.8 405.4 -6.7 SW 405.9 -0.5 162.3 -74.4 5.9 80.6 227.2 39.5 -202.9 -21.1 33.6 -321.9 715.0 400.1 8.6 -72.9 -193.4 -49.0 -78.8 0.0 114.8 167.9 52413 RAIC-NEW 23.4 -71.7 259.3 887.0 405.9 3.6 -0.0 52484 YELAHNKA -167.4 400.3 1.2 40.8 52498 MADHUGI4 -95.3 52401 SMNH 175.0 -79.1 408.8 6.1 18.1 5.7 52203 RAIC -186.7 240.6 187.1 32.9 105.9 -54.3 229.7 -112.4R -112.4R 680.0 680.0 42.5 456.0 -21.3 -228.0 225.0 0.0 75.6 2040.0 -16.8 752.5 399.4 19.2 SW -247.1 52477 BIDADI -19.2 408.3 6.2 115.0 400.0 11.4 16.0 714.5 114.2 71.9 -57.2 395.2 -57.2 -112.4R 395.2 680.0 -42.2 422.3 -42.2 422.3 46.5 -747.8 52416 GULBRG -50.0 400.0 8.4 517.6 -5.3 -392.7 52403 RAIC 52.6 112.0 0.0 -54.3 -5.3 512.5 -392.7 -30.4 269.9 52.5 -504.9 401.4 9.7 3.6 -48.3 38.4 1 247.6 58.7 -263.5 -422.1 -75.2 38.4 -422.1 2 193.4 567.0 -238.6 -400.9 -100.1 757.1 757.3 -6.5 204.4 4.9 -117.6 400.0 8.7 292.9 929.1 24.0 155.6 -95.2 52407 NELMANG4 8.7 23 .8 -22 57.6 405.8 400.0 17.9 -71.5 1445.6 52482 BELLARY -33.0 8.4 43.2 158.5 -36.0 -86.8 -15.4 117.6 52483 400.1 YERAMRS 8.3 -101.3 101.6 485.2 52444 HIRY -143.5 21.5 464.6 -119.5 1020.0 134.4 458.3 -47.6 -129.3 -4.2 -217.5 52434 KUDGI-NT 869.2 -47.2 52276 TORAN2 105.9 364.1 17.6 110.6 -78.9 8.5 -2 3 18.1 52409 HASSAN4 -27.3 142.4 402.6 10.9 407.7 52497 CNHALLI -746.2 516.2 52476 TORNGL4 21.6 -280.3 -287.7 -9.1 19.1 -28.3 42.3 -512.0 -45.0 218.5 1 1 -174.9 -52.8 -6.0 281.4 -71.1 222.0 144.0 87.0 -31.0 129.7 52402 MNRB -361.8 -219.7 -67.1 52410 MYSORE4 248.1 2.2 -56.1 61.6 442.1 -66.5 57.0 26.2 0.0 -164.6 374.3 52447 NAREND-4 -0.0 SW 249.8 0.0 32822 SOLPR8 -5.9 -28.9 -118.4 -48.1 -2.2 -24.2 1.3 -115.2 52415 NARDR-NW 397.7 -2.7 95.7 63.9 -245.8 53403 KOZIKOD4 457.7 -3.0 16.9 52408 UDUPI400 289.3 52406 TALAGUP4 -181.2 1020.0 96.2 -26.2 52404 DAVAN4 -64.5 4.5 32419 KOLHPRPG 867.7 53401 TNRT -16.9 52412 KAIGA 65.5 487.3 1 780.5 2.0 Load Flow Studies for Yeramaras & Edlapur Generation (2016-17 Time Frame) 413.1 8.4 220.0 7.4 1 423.6 5.9 410.0 8.6 775.6 10.8 410.3 8.1 1 408.3 6.5 1 770.4 13.0 401.7 15.4 399.8 5.9