Annex 4.1 SHORT CIRCUIT LEVEL OF SOUTHERN REGION SUBSTATIONS Sl. No. Substation Name 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 CUDP800 KURL800 SHOLAPUR HYDR_800 DICHPALI WARN800 NELL‐POL SRI_POOL VEM‐II80 CPETA800 RAIC800 SALE800 NCTPS765KV TIRUVLM ETPSREP7 ARIYALUR7 COIMBTR7 RSTP HYDR NSAG KHAM VIJW* GAZW CUDP* GOOT CHAND‐SR GAZU‐SR SSLBPH4 HYDR‐AP4 KURNOOL4 SIMHADRI SIMHD‐II VIZPOOL VEMAGIR4 TPCIL4 Single Phase Three Phase Voltage level (kV) Fault Current kA Short Circuit MVA Fault Current kA Short Circuit MVA 765 765 765 765 765 765 765 765 765 765 765 765 765 765 765 765 765 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 33.6 35.0 16.0 30.5 20.8 29.0 16.5 19.7 20.9 25.7 25.7 10.4 23.0 34.7 20.9 34.6 15.2 36.8 32.1 31.4 31.2 41.9 32.2 47.2 34.9 10.0 32.2 21.6 32.6 39.4 34.4 29.1 35.7 44.8 28.3 44531 46345 21139 40429 27556 38421 21843 26128 27713 34049 34044 13798 30518 45949 27667 45908 20122 25466 22220 21782 21608 29040 22310 32679 24190 6947 22310 14952 22602 27275 23837 20148 24743 31073 19588 21.3 23.3 11.1 19.2 11.6 18.6 13.3 14.9 14.9 15.8 17.8 7.5 17.5 22.5 16.0 22.4 4.6 37.6 21.6 23.1 22.0 32.5 30.3 33.1 21.8 6.6 30.3 19.1 21.7 27.9 34.1 27.7 35.7 33.4 27.0 28167 30906 14701 25496 15336 24697 17569 19684 19718 20956 23524 9996 23165 29842 21192 29713 6123 26084 14965 15970 15259 22547 21015 22955 15099 4546 21015 13251 15066 19298 23656 19172 24708 23118 18719 Higher limits * * * * * * 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 NELLORE4 RAM‐PVT4 DICHPAL4 GAJWEL4 MAHABUB4 CHITOR VIJ‐AP KRISH‐AP KURL‐NEW KAKTIA‐G VIJTP‐IV* SINGARENI GARIVIDI HINDPR40 KOTH‐IV MAILARM4 MALKARM4 MUDN400 SURYPET4 NIRMAL WARN4 PODLI SIMHP‐OA MENAK‐OA EAST‐OA VEMAG‐II NEL‐POOL NCCPPL HINDJ‐OA CPETA400 MAHESWRM NELLORE‐AP KVKOTA40 KONDPRM URVKND FSC‐1 FSC‐2 FSC‐3 FSC‐4 SMNH MNRB RAIC DAVAN4 HOODI4 TALAGUP4 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 47.2 26.1 27.3 30.4 26.1 48.1 37.6 33.4 40.7 26.3 41.6 11.5 18.4 13.6 14.1 40.4 20.2 9.4 17.9 9.5 37.8 15.8 19.2 20.9 27.1 45.1 48.0 28.3 32.7 30.6 42.7 46.9 25.0 15.9 16.2 6.2 6.5 4.8 4.8 36.1 11.3 38.3 25.3 34.8 9.5 32711 18064 18921 21036 18083 33334 26035 23129 28223 18212 28836 7970 12772 9442 9754 27970 13961 6499 12401 6563 26201 10960 13332 14481 18757 31260 33234 19588 22658 21221 29594 32519 17293 11003 11232 4267 4516 3295 3295 25002 7802 26508 17509 24131 6611 36.8 21.0 18.0 21.1 16.6 32.5 27.1 31.4 30.4 24.1 32.5 11.0 13.0 8.7 12.0 27.3 13.6 9.3 11.8 7.9 29.1 11.1 16.8 19.9 25.8 33.1 43.3 27.0 32.1 22.3 30.1 36.6 16.6 9.8 10.0 3.6 3.8 2.8 2.8 22.5 7.3 32.3 17.4 21.7 7.5 25477 14560 12474 14598 11529 22512 18747 21762 21047 16676 22490 7624 9033 6015 8284 18882 9451 6425 8204 5471 20191 7701 11653 13763 17867 22912 30026 18719 22253 15421 20845 25351 11497 6768 6895 2520 2651 1921 1921 15612 5079 22379 12063 15032 5200 * * * * * * * * * * * * * 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 NELMANG4 UDUPI400 HASSAN4 MYSORE4 KOLAR KAIGA RAIC‐NEW NARDR‐NW GULBRG KUDGI‐NT ECITY HIRY NAREND‐4 TORNGL4 BIDADI BELLARY YERAMRS YELAHNKA EDLAPUR BELLARY‐POOL CNHALLI MADHUGI4 KOCHIN4 TNRT TRIVAND4 KOZIKOD4 PALAKKAD CHENN‐EX NYVL MADR SALE TRIC MADURAI4 UDMP HOSUR4 PAVOORCHATRM NEYEXTN4 NAGAPTNM4 PUGALUR4 ARSUR4 PUGALUR‐NEW KARAIK TIRUNEL4 NEY_IIEX KUDAN4 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 40.7 13.3 20.6 22.1 34.2 18.2 39.1 32.7 8.2 32.1 22.6 22.4 29.6 36.1 37.7 40.9 25.7 31.5 24.4 42.2 23.5 48.1 16.7 20.7 9.0 13.5 21.0 33.2 46.9 33.0 34.9 18.4 32.7 39.1 24.4 17.8 37.7 32.8 31.7 27.4 30.2 26.4 36.4 37.1 26.0 28201 9226 14249 15285 23707 12613 27114 22671 5710 22247 15641 15507 20489 25018 26143 28338 17780 21831 16921 29208 16292 33298 11596 14357 6255 9326 14527 22973 32470 22881 24167 12725 22673 27071 16879 12330 26141 22719 21943 18964 20913 18284 25202 25682 18031 26.0 14.3 14.4 14.1 20.9 14.6 31.5 32.3 4.5 33.5 14.4 14.6 24.7 34.7 23.8 40.2 27.1 20.3 24.6 40.6 15.8 32.2 9.8 13.4 4.7 7.4 13.4 29.4 44.4 20.8 19.9 10.0 19.6 23.5 13.5 10.5 33.1 28.9 18.0 15.4 18.3 15.2 28.6 32.3 27.1 18023 9932 9980 9770 14493 10081 21813 22348 3105 23215 9944 10087 17141 24013 16495 27856 18759 14039 17015 28147 10945 22278 6786 9307 3234 5126 9261 20395 30743 14393 13817 6954 13584 16307 9387 7290 22913 20036 12439 10675 12708 10517 19846 22392 18752 * * * * * * * * * * * * 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 ALMATI4 OPG400KV MANGLAPURAM KANAPATT KAYATHAR4 KORATUR4 MANALI4 METTUR4 NEY(REP)4 TANJORE4 TUTICORN UDNGDI4 PONDY4 MYLAPRE4 MALEKTT TIRUVLM VALLUR TPS SVCHTRM SHOLNGNR KARMDAI TAPPAKUN ANIKADAV TUTI‐POOL ILFS‐OA RASIPALA DHARMPR* CEPL IND‐BARATH EDAMLYRM ETPSEXP4 PULNTOPE4 THERVOI4 ARIYALUR4 COIMBTR4 KARAIKUD74 NCTPSSTG4 KAMUTHI4 GUINDY4 KOLAPALUR4 PALAVADI4 OTTAPIDARAM4 SAMUGARANGAP SOLINGHUR4 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 38.5 18.1 24.4 34.2 41.4 28.1 30.9 26.6 45.5 12.0 29.2 29.4 14.5 33.0 35.8 66.2 29.9 37.5 31.9 22.9 9.1 29.6 38.8 30.4 37.1 46.9 24.9 22.9 40.4 30.3 31.7 15.1 40.4 40.1 23.5 32.5 15.6 36.0 26.1 41.5 19.7 19.8 25.6 26705 12556 16889 23688 28703 19437 21390 18437 31498 8331 20235 20388 10027 22848 24814 45872 20747 25955 22116 15884 6297 20538 26900 21067 25708 32469 17250 15853 27970 20985 21936 10437 27987 27771 16290 22486 10783 24951 18082 28721 13642 13752 17706 29.1 16.7 12.3 24.2 30.1 19.0 21.1 18.9 43.0 5.7 26.1 29.2 8.2 20.1 22.9 46.4 28.3 25.8 19.9 12.8 8.7 20.8 34.4 28.2 27.6 24.6 24.0 19.9 23.5 28.1 19.0 13.7 16.5 23.7 13.2 30.4 9.5 22.9 15.7 16.5 12.6 14.6 14.9 20184 11567 8554 16734 20868 13185 14649 13082 29814 3962 18092 20239 5657 13936 15841 32137 19640 17884 13800 8896 6020 14444 23860 19534 19123 17063 16645 13798 16248 19486 13136 9473 11415 16440 9172 21067 6598 15872 10904 11437 8719 10127 10301 * * * * * * * * * * * * * * Annex-5.1 TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED From: The Chief Engineer/Power Systems APTRANSCO, Vidyut Soudha, Hyderabad – 500 082 To The Chief Engineer (SP & PA), Central Electricity Authority, Seva Bhavan, R.K.Puram, NEW DELHI – 110 066 Lr. No. CE(PS) / SE(SP)/DE(SS)/ADE-2/F. Ph-chevella/D. No. 64 /2014, Dt. 16 .04.2014. Sir, Sub: Dr. B.R.Ambedkar Pranahitha Chevella Sujala Project – Dedicated Power Supply to the Pumping Stations at Myadaram (Pkg-6), Choppadandi (Pkg-7) Ramadugu (Pkg8), Malakpet (Pkg-9) and Tippapur (Pkg-10) – Request to include as agenda item for discussion in the forthcoming Standing Committee meeting - Reg. *** The following pumping stations are coming up in Karimanagar district under Dr. B.R.Ambedkar Pranahitha Chevella Sujala Project lift scheme. i) Myadaram, Karimnagar Dt. (Pkg-6) – 756 MW ii) Choppadandi, Karimnagar Dt. (Pkg-7) – 150 MW iii) Ramadugu, Karimnagar Dt. (Pkg-8) – 720 MW iv) Malakpet, Karimnagar Dt. (Pkg-9) - 30 MW v) Tippapur, Karimnagar Dt. (Pkg-10) - 336 MW Accordingly the following dedicated Transmission scheme approved by APTRANSCO for extension of supply to the above packages of Dr. B.R. Ambedkar Pranahita – Chevella Sujala Sravanti Lift Irrigation Scheme is proposed as follows: a) Erection of 400kV SS at Ramadugu (Pkg-8). b) Erection of 400kV Sub-Station at Choppadandi (Pkg-7) with 2x315 MVA ICTs. c) Erection of 400kV SS at Myadaram (Pkg-6) d) Erection of 400kV SS at Tippapur (Pkg-10) e) Erection of a 132kV SS at Malakpet (Pkg-9) f) Erection of 400kV Quad Moose DC line for making LILO of both the circuits of 400kV SCCL – Gajwel Quad Moose DC Line at the proposed 400kV Ramadugu SS (total 50kM for two LILO DC lines). g) Erection of 90kM 400kV Twin Moose DC line from 400kV Dichpally SS to the proposed 400kV Ramadugu SS. h) Erection of 25kM 400kV Quad Moose DC line from 400kV Ramadugu SS to 400kV Myadaram SS. i) Erection of 25kM 400kV Quad Moose DC line from 400kV Ramadugu SS to 400kV Choppadandi SS. j) Erection of 40kM 400kV Twin Moose DC line from 400kV Choppadandi SS to 400kV Tippapur SS. k) Erection of 400kV Twin Moose DC line for making LILO of both the circuits of 400kV KTPP – Gajwel Twin Moose DC Line at the proposed 400kV Tippapur SS (total 80kM for two LILO DC lines). l) Erection of 60kM 400kV Twin Moose DC line from 400kV Dichpally SS to the upcoming 400kV Nirmal SS. m) Erection of 30kM 132kV DC line from 220kV Jagityala SS to the proposed 132kV Malakpet SS. The Load flow results in the Normal conditions as well as Contingency conditions are herewith enclosed. It is requested to include the above proposal as an agenda item for discussion in the forthcoming 37th Standing Committee meeting. Yours faithfully, Encl: - As above Sd/Chief Engineer (Power Systems) Copy to: Sri Pardeep Jindal, Director (SP&PA) Central Electricity Authority, Seva Bhavan, R.K.Puram, NEW DELHI – 110066 Sri Dilip Rozekar, DGM(SEF) PGCIL, 'Saudamini' Plot NO.2 Sector-29, GURGAON - 122001, Haryana. Annex‐5.2 400kV Gajwel ‐ Jaipur (SCCL) DC LILO at 400kV Ramadugu SS (Pkgs: 6,7,8 & 10) 400/220KV Gajwel SS 400/220kV Ghanapur SS TM 1x500MW + 1x600MW 400kV KTPP TM TM 400KV Tippapur SS (PKG‐10) 336MW TM TM To Oglapur SS 150MW TM 400/220kV Choppadandi SS (Pkg‐7) QM 400KV Jaipur SS (SCCL) 2x600MW 720MW TM QM QM QM 2500MW QM 400KV Ramadugu (PKG‐8) 720MW 400/220KV Ramagundam SS (NTPC) QM 400/220KV Dichpally SS TM 756MW TM TM TM 400KV Myadaram SS (PKG‐6) SS (PKG 6) TM TM 400/220kV Nirmal SS 765/400kV Dichpally (PGCIL) TM TM Legend: 400/220kV Yeddumailaram Proposed 400kV Connectivity Proposed 400kV SS 202.2 67.6 430 NRSPUR 9008 SCCL 1.0000 1.0000 397.1 72.2 -103.2 -259.7 -103.2 -169.1 -236.8 -169.1 205.3 205.3 231.6 231.6 205.3 231.6 10.3 10.3 229.0 -24.2 229.0 -379.9 -259.7 -236.8 403 RST 1 -21.9 413 DICH -33.6 402 GHP -21.9 93.9 1 -33.6 -93.7 93.9 32.3 429 SCCL -23.7 443 RAMADUGU -16.2 316 GJWL -32.3 1.0000 1.0000 -93.7 398.5 73.1 -166.9 -166.9 -231.6 -231.6 -166.9 -231.6 1.0000 -41.1 -53.4 1.0000 1.0000 -76.5 281 NML1 1.0000 -41.1 -278.8 394.0 70.6 -278.8 -227.9 -53.4 -227.9 92.2 -156.9 444 MEDARAM -156.4 -35.2 -35.2 281.8 -226.4 -540.0 -226.4 92.2 237.6 -330.5 237.6 -156.9 -330.5 404.2 79.6 -76.5 403.2 79.3 281.8 270.0H 105.7 120.7 -540.0 331.4 208.6 63.1 -2.2 63.1 -2.2 0.0 0.0 -0.0 -0.0 0.0 -0.0 -0.0 0.0 101.9 230.1 101.9 230.1 27.5R 36.3R 427.0 563.0 -70.0 -70.0 264.9 264.9 2 -156.4 457 DICH 38.2 540.0 270.0 540.0 270.0 21.3 9009 81.9 SCCL 540.0 0.9000 540.0 21.3 81.9 0.9000 270.0H 105.7 120.7 0.0 0.0 -63.1 645 CHPDANDI2 107.3 179.9 207.0 -179.9 331.4 208.6 0.0 0.0 2.2 -63.1 2.2 1.0000 1.0000 -10.5 1.0000 1.0000 1.0000 383.7 0.9773 0.9773 436 NML 1.0000 35.3R -149.8 179.9 -207.0 -179.9 -207.0 -23.2 0.0 -23.2 0.0 43.8 43.8 -2.2 -2.2 398.4 73.3 -69.2 204.4 70.1 -207.0 398.8 75.2 -149.8 241 DIC1 207.0 417.1 78.1 285.1 1.0000 1.0000 -207.0 44.1 95.1 44.1 95.1 409.5 75.8 -7.1 -283.0 -93.0 -85.9 224.7 75.8 -94.8 -93.0 -94.8 409.3 75.8 -16.1 -236.5 -85.9 -236.5 408.5 75.8 -0.2 112.7 4.8 1.4 -16.1 4.8 0.2 1.4 157.2 236.5 112.7 236.5 16.9 16.9 -263.2 68.6 -263.2 68.6 260.9 260.9 -85.5 2.3 -85.5 2.3 406.1 75.8 2459.0 403.8 74.9 -0.2 403.6 74.9 0.2 208.4 69.4 157.2 445 TIPPAPUR 8 1 428 KTPP 1.0000 1.0000 442 CHOPPADANDI 420 GAJWL 424 YML4 -74.7 -107.1 -120.6 -229.6 -120.6 -229.6 399.4 78.5 435 OGLAPU 281 NML1 390.2 39.1 194.2 31.6 429 SCCL 430 NRSPUR 9008 SCCL 1.0000 1.0000 385.1 37.8 -51.0 18.9 -24.1 182.1 182.1 200.2 200.2 182.1 200.2 -8.8 -8.8 169.4 -143.9 169.4 -468.5 -70.6 -51.0 -70.6 18.9 -24.1 413 DICH 403 RST 1 -55.2 402 GHP 3.0 1 -55.2 -63.4 -63.4 -123.9 443 RAMADUGU -240.7 316 GJWL 97.6 1.0000 1.0000 241.8 -150.2 -150.2 -200.2 -200.2 -150.2 -200.2 1.0000 -97.5 -34.7 1.0000 1.0000 -97.5 -241.0 -168.8 -34.7 -168.8 -56.3 -178.6 1 -241.0 379.4 34.8 1.0000 3.0 63.5 17.4 17.4 243.4 -220.7 -18.9 -377.4 444 MEDARAM 63.5 403.2 44.5 243.4 270.0H -540.0 -220.7 -540.0 144.4 76.2 -84.9 -155.1 404.2 43.5 -44.2 457 DICH 46.8 540.0 270.0 540.0 270.0 20.0 9009 44.2 SCCL 540.0 0.9000 540.0 20.0 44.2 0.9000 270.0H 378.8 161.2 -56.3 -178.6 378.0 756.0 -84.9 -155.1 40.7 40.7 75.0 75.0 75.0 -37.5 -75.0 -37.5 150.0 -75.0 135.7 96.5 135.7 96.5 238.3R 314.3R 427.0 563.0 140.6 140.6 398.5 398.5 645 CHPDANDI2 188.4 133.0 -133.0 -160.2 144.4 76.2 -18.9 -377.4 -189.0 -378.0 -189.0 -378.0 44.2 44.2 80.1 80.1 1.0000 1.0000 142.0 1.0000 1.0000 1.0000 475.1 0.9773 0.9773 436 NML 1.0000 703.1R -113.7 160.2 133.0 -133.0 378.8 178.4 378.5 178.4 378.5 -60.6 -60.6 -80.1 -80.1 381.9 37.0 89.5 195.6 32.9 -113.7 160.2 377.0 37.3 -160.2 241 DIC1 161.2 390.7 39.8 306.5 1.0000 1.0000 -160.2 -160.2 -62.9 -262.2 -62.9 1 2459.0 31.6 263.6 31.6 360.0 376.4 35.7 -153.0 -303.6 -85.3 380.5 36.8 -262.2 720.0 206.2 35.1 -149.5 80.7 -25.9 263.6 -98.7 381.5 37.0 -350.8 130.3 -85.3 -239.0 -98.7 -239.0 2 -44.2 351.3 150.2 239.0 130.3 239.0 -160.3 -160.3 -394.0 9.0 -394.0 9.0 70.7 70.7 67.3 155.4 67.3 155.4 384.6 37.7 -149.5 80.7 -25.9 388.1 40.6 -350.8 386.1 39.8 351.3 197.1 33.6 150.2 445 TIPPAPUR 1 8 1 428 KTPP 1.0000 1.0000 442 CHOPPADANDI 420 GAJWL 424 YML4 -96.2 398.6 43.1 -79.7 -187.9 -157.5 -96.2 -157.5 168.0 336.0 1 435 OGLAPU Annex 6.1 TAMILNADU TRANSMISSION CORPORATION LTD. (Subsidiary of TNEB Ltd.) From K.Rangaraj, B.E.,M.C.A.,F.I.E., Director/Transmission Projects (I/C), TANTRANSCO, 144, Anna Salai, Chennai -2. To The Member (Power System), Central Electricity Authority, Sewa Bhavan, R.K.Puram, New Delhi 110 066. Lr.No. CE/Plg.&R.C/SE/SS/EE1/AEE1/F.400kV Bays/D.202 /14Dated. 21.06.14 Sir, Sub: TANTRANSCO – 400kV Bays at Dharmapuri 765/400kV PGCIL SS requested – reg. ***** 1.0. In the 34th Standing Committee, the following system has been agreed for additional inter-connection with ISTS and increased reliability. LILO of one Rasipalayam – Palavady (Singarapet) 400kV D/c line at Salem 2.0 The erection of Thappagundu – Anaikadavu – Rasipalayam 400kV DC line with 400kV substations is on the fast track, which has been approved in the 34th Standing Committee Meeting for the evacuation of wind power projects. 3.0 Now, the land for the Singarapet 400kV SS has been identified near Salem (Dharmapuri) 765kV PGCIL SS i.e., at Palavady., and the work is expected to be taken up shortly. Out of the 2 DC 400kV circuits from Rasipalayam to Palavady (Singarapet). One DC circuit has been already taken up and the other DC circuit is included in the Kfw funding. 4.0 As communicated by PGCIL that Salem 765kV substation is initially to be charged at 400kV level, there are no bays available at Dharmapuri substation for TANTRANSCO now, and at a later stage when the operating voltage is at 765kV level, 400kV bays will get released for termination of TANTRANSCO lines. Now, it is requested that at least one of the Rasipalayam – Palavady 400kV line, the execution of which is on the fast track may be permitted to be made LILO at Dharmapuri. 5.0 The two numbers 400kV Bays meant for ICTs in the Salem 765kV SS may be temporarily permitted to be used for making LILO of the above said line. -sd( K.Viji) Chief Engineer/Planning & R.C (For Director/Transmission Projects) Annex 10.1 Agenda of Reactive Compensation for Various Transmission Schemes approved in previous SCMs Reactive Compensation is proposed on the new transmission lines upon approval of Standing Committee and preliminary survey so that approximate line length is available for Reactive Power Planning Studies for normal operation & for charging of the transmission lines. Accordingly, Reactive Compensation has been proposed for the following transmission Schemes approved in previous Standing Committee Meetings: 1) Wardha – Hyderabad (Maheswaram)765 kV Link: ¾1 no. 240 MVAR, 765 kV Bus Reactors at Nizamabad. ¾1 no. 240 MVAR switchable line reactor at Maheshwaram and Wardha for both circuits of Wardha – Hyderabad (Maheshwaram) 765kV D/c line with anchoring at Nizamabad. ¾1 no. 240 MVAR switchable line reactor at Nizamabad for both circuits of Wardha – Nizamabad 765kV D/c line and Nizamabad – Hyderabad (Maheshwaram) 765kV D/c line 2) Substation works associated with Hyderabad (Maheswaram) 765 kV Substation ¾2 nos. 240 MVAR, 765 kV Bus Reactors at Maheshwaram Pooling Station System Studies were carried out for assessing Reactive Compensation for the above transmission Schemes and the results have been given at Annexure‐I 3) Sub‐station Works associated with System Strengthening in Southern Region for import of power from Eastern Region: ¾ 1 no. 240 MVAR switchable line reactor at Vemagiri Pooling Station and Srikakulam Pooling Station each for both circuits of Srikakulam PP – Vemagiri‐II Pooling Station 765kV D/C line. ¾ 2 nos. 240 MVAR, 765 kV Bus Reactors at Vemagiri Pooling Station. ¾ 1 no. 80 MVAR, 400 kV Bus Reactors at Vemagiri Pooling Station System Studies were carried out for assessing Reactive Compensation for the above transmission Scheme and the results have been given at Annexure‐II 4) Transmission System associated with ISGS Projects in Nagapattinam/Cuddalore Area of Tamilnadu – Part A1 (b) ¾1 no. 63 MVAR line reactor at Nagapattinam Pooling Station and Salem New (Dharmapuri) each for both circuits of Nagapttinam Pooling Station – Salem (New) 765 kV D/c line (initially charged at 400 kV) being implemented under Tariff based Bidding. ¾1 no. 63 MVAR line reactor at Madhugiri end of Salem New (Dharmapuri) – Madhugiri 765 kV S/c line (initially charged at 400 kV) being implemented under Tariff based Bidding. System Studies were carried out for assessing Reactive Compensation for the above transmission Scheme and the results have been given at Annexure‐III. Annexure‐I Studies for Reactive Compensation for Wardha – Hyderabad (Maheswaram) 765 kV Link & Substation works associated with Hyderabad (Maheswaram) 765 kV Substation Studies for provision of Line Reactors Wardha – Nizamabad – Hyderabad 765kV D/c line Line Length: • Wardha – Nizamabad 765kV D/c line – approx 270 Km • Hyderabad – Nizamabad 765kV D/c line – approx 270 Km Following results have been obtained while charging the Wardha – Nizamabad – Hyderabad 765kV D/c lines without line reactors, the relevant outputs are enclosed at Exhibit‐I Charging of Wardha – Nizamabad line from Wardha end without line reactors Source rise Line Rise Total Rise – – – 11 kV 40 kV 51 kV Charging of Hyderabad‐Nizamabad line from Hyderabadend without line reactors Source rise Line Rise Total Rise – – – 55 kV 42 kV 97 kV From the above it may be seen that charging of Wardha – Nizamabad line or charging of Hyderabad – Nizamabad line without line reactors shall lead to very high voltages at the open end and practically not possible to charge the lines under such conditions. Further, the voltage at Nizamabad bus crosses 800 kV thus rendering it impossible to charge either circuit from Nizamabad end. Similarly to control the bus Voltages during off‐peak conditions or while charging of the lines at Wardha, Nizamabad and Hyderabad substations, necessary bus reactors were also identified. Accordingly, necessary line reactors were identified through reactive power planning studies for charging of the lines. Relevant charging studies are given at Exhibit‐I Charging of Wardha – Nizamabad line From Wardha end with 240 MVAR line reactors at both ends Source rise Line Rise Total Rise – – – 3 kV 13 kV 16 kV From Nizamabad end with 240 MVAR line reactors at both ends Source rise Line Rise Total Rise – – – 30 kV 13 kV 43 kV Charging of Nizamabad ‐ Hyderabad line From Nizamabad end with 240 MVAR line reactors at both ends Source rise – 15 kV Line Rise – 13 kV Total Rise – 28 kV From Hyderabad end with 240 MVAR line reactors at both ends Source rise Line Rise Total Rise – – – 17 kV 13 kV 30 kV Exhibit‐I Charging of Wardha – Nizamabad – Hyderabad 765kV D/c line without reactive compensation A. Charging of Wardha – Nizamabad 765kV D/c line Pre‐charging condition 32806 WARDHA8 32872 ARBD8 1429 -466 20 -112 31832 SEONI8 0 241 467 -1414 -142 0 65 238 767 1429 397 20 -84 -1414 1085 65 78 518062 NIZAMABAD 761 31803 RAPPOO4 999 WAR TAP 769 1586 -59 518051 HYDR_800 998 NIZ TAP1 997 NIZ TAP2 996 HYD TAP 808 830 790 1586 -59 -1567 0 38 243 -1567 -0 808 38 -0 769 768 514021 DICHPAL4 767 514101 MAHESWRM 400 402 On‐charging (from Wardha end) 32806 WARDHA8 32872 ARBD8 1442 65 31832 SEONI8 -472 0 -39 244 473 -1427 0 -220 11 241 1442 65 772 399 34 -1427 1087 11 189 518062 NIZAMABAD 766 31803 RAPPOO4 1597 -1 0 765 0 -122 518051 HYDR_800 999 WAR TAP 998 NIZ TAP1 997 NIZ TAP2 996 HYD TAP 778 818 830 790 1597 -122 -1578 0 90 245 -1578 -0 808 90 -0 773 768 514021 DICHPAL4 778 400 514101 MAHESWRM 402 B. Charging of Nizamabad – Hyderabad 765kV D/c line Pre‐charging condition 32806 WARDHA8 32872 ARBD8 1429 -466 20 -112 0 241 467 -1414 -142 0 65 238 31832 SEONI8 767 1429 397 20 -84 -1414 1085 65 78 518062 NIZAMABAD 761 31803 RAPPOO4 999 WAR TAP 769 1586 -59 518051 HYDR_800 998 NIZ TAP1 997 NIZ TAP2 996 HYD TAP 808 830 790 1586 -59 -1567 0 38 243 -1567 -0 808 38 -0 769 768 514021 DICHPAL4 514101 MAHESWRM 400 767 402 On‐charging (from Hyderabad end) 32806 WARDHA8 32872 ARBD8 1429 -466 19 -112 -1414 0 0 241 467 65 238 31832 SEONI8 -143 767 1429 397 19 -84 -1414 1085 65 761 78 31803 RAPPOO4 518062 NIZAMABAD 999 WAR TAP 998 NIZ TAP1 778 818 1586 -59 518051 HYDR_800 997 NIZ TAP2 996 HYD TAP 1 -1 -854 854 865 823 1586 -59 -1567 0 38 243 -1567 -1 808 38 854 769 823 514021 DICHPAL4 767 405 514101 MAHESWRM 417 Charging of Wardha – Nizamabad – Hyderabad 765kV D/c line with reactive compensation A. Charging of Wardha – Nizamabad 765kV D/c line Pre‐charging condition 32806 WARDHA8 32872 ARBD8 1429 -466 20 -112 31832 SEONI8 0 241 467 -1414 0 -142 65 238 1429 397 20 -84 -1414 1085 65 78 767 518062 NIZAMABAD 518051 HYDR_800 761 31803 RAPPOO4 999 WAR TAP 998 NIZ TAP1 997 NIZ TAP2 996 HYD TAP 770 763 767 764 1586 -59 1586 0.00000 -2.40000 -59 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 -1567 0 38 243 -0 -1567 0.00000 -2.40000 38 769 0.00000 -2.40000 0 0 766 514021 DICHPAL4 768 514101 MAHESWRM 400 767 0 402 On‐charging (from Wardha end) 32806 WARDHA8 32872 ARBD8 1434 34 0 31832 SEONI8 -468 0 -89 242 -1418 469 48 -168 239 769 1434 397 34 -46 -1418 1086 48 763 114 518062 NIZAMABAD 999 WAR TAP 31803 RAPPOO4 1589 -0 0 245 -0 770 -79 518051 HYDR_800 998 NIZ TAP1 997 NIZ TAP2 996 HYD TAP 783 767 764 1589 0.00000 -2.40000 -79 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 -1570 0 55 244 -1570 55 0.00000 -2.40000 771 0.00000 -2.40000 514021 DICHPAL4 770 400 767 0 514101 MAHESWRM 402 0 768 On‐charging (from Nizamabad end) 32806 WARDHA8 32872 ARBD8 0 1429 -466 19 -112 31832 SEONI8 0 241 -1413 467 65 -143 238 767 1429 397 19 -84 -1413 1085 65 761 78 518062 NIZAMABAD 999 WAR TAP 31803 RAPPOO4 1586 -59 0 998 NIZ TAP1 -0 -262 809 796 518051 HYDR_800 997 NIZ TAP2 996 HYD TAP 767 764 262 1586 0.00000 -2.40000 -59 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 -1567 0 243 38 -0 -1567 262 38 0.00000 -2.40000 769 796 0.00000 -2.40000 0 514021 DICHPAL4 771 514101 MAHESWRM 412 767 0 403 B. Charging of Nizamabad – Hyderabad 765kV D/c line Pre‐charging condition 32806 WARDHA8 32872 ARBD8 1300 -38 0 0 -79 242 598 -1287 -160 52 242 31832 SEONI8 -596 1300 271 -38 -84 -1287 883 52 768 73 768 518062 NIZAMABAD 518051 HYDR_800 999 WAR TAP 31803 RAPPOO4 1646 -1342 -1331 -7 -7 998 NIZ TAP1 1331 996 HYD TAP 767 764 7 763 770 -68 997 NIZ TAP2 1646 -68 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 -1626 0 78 243 -1626 1331 78 769 514021 DICHPAL4 770 399 0 7 763 -0 768 514101 MAHESWRM 402 On‐charging (from Nizamabad end) 32806 WARDHA8 32872 ARBD8 1300 -31 31832 SEONI8 -599 0 -67 243 -1287 0 600 43 243 -173 1300 270 -31 -65 -1287 881 43 91 769 518062 NIZAMABAD 518051 HYDR_800 769 999 WAR TAP 31803 RAPPOO4 1649 -1360 -1349 120 118 998 NIZ TAP1 1349 -118 996 HYD TAP -0 -0 250 778 772 -78 997 NIZ TAP2 0 778 791 1649 -78 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 -1629 0 87 243 1349 -1629 87 770 0 132 778 0.00000 -2.40000 0 770 514021 DICHPAL4 514101 MAHESWRM 405 772 0.00000 -2.40000 402 On‐charging (from Hyderabad end) 32806 WARDHA8 32872 ARBD8 1300 -37 31832 SEONI8 -596 0 -78 242 -1287 0 598 51 242 -162 1300 -37 768 271 -82 -1287 883 51 768 75 518062 NIZAMABAD 518051 HYDR_800 999 WAR TAP 31803 RAPPOO4 1647 -1345 -1334 5 5 998 NIZ TAP1 1334 996 HYD TAP 0 -0 -255 -5 764 770 -69 997 NIZ TAP2 798 255 785 1647 -69 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0.00000 -2.40000 0 1334 -1626 79 770 514021 DICHPAL4 770 0.00000 -2.40000 79 243 0.00000 -2.40000 -1626 400 -0 -5 764 0.00000 -2.40000 0.00000 -2.40000 514101 MAHESWRM 406 255 785 Annexure – II Studies for Reactive Compensation for Substation Works associated with System StregtheningSrikakulam Pooling Station – Vemagiri Pooling Station 765kV D/c line Studies for provision of Line Reactors on Sikakulam ‐ Vemagiri 765 kV D/c line Line Length: approx 350 km Following results have been obtained while charging from either ends of transmission line, the relevant outputs are enclosed at Exhibit‐II Reactive Compensation proposed: • 1x80 MVAR, 400 kV bus reactor at Vemagiri Pooling Station • 2x240 MVAR, 765kV bus reactor at Vemagiri Pooling Station • 1x240 MVAR Switchable line reactors for Srikakulam – Vemagiri 765 kV D/c line on each circuits at both the ends. Charging from Srikakulam end without Line Reactors. Source rise – 37 kV Line Rise – 56 kV Total Rise – 93 kV Charging from Vemagiri end without Line Reactors. Source rise Line Rise Total Rise – – – 341 kV 72 kV 413 kV From the above it may be seen that charging the line from either of the ends without reactor shall lead to very high voltage at the open end and practically not possible to charge the lines under such conditions. Accordingly, necessary line reactors were identified through reactive power planning studies for charging of the lines. Relevant charging studies are given at Exhibit‐II. Further to control the bus Voltages during off‐peak conditions or while charging of the lines at Srikakulam and Vemagiri substations, necessary bus reactors were also identified. Charging from Srikakulamend with 240 MVAR Line Reactor at both ends Source rise Line Rise Total Rise – 8 kV – 22 kV – 30 kV Charging from Vemagiri end with 240 MVAR Line Reactor at both ends. Source rise – 80 kV Line Rise – 25 kV Total Rise – 105 kV In view of weak connectivity at Vemagiri bus, the transmission lines cannot be charged from Vemagiri end, however studies were conducted for the same and the Srikakulam – Vemagiri 765 kV D/c line is preferred to be charged from Srikakulam end. Exhibit‐II Charging of Srikakulam – Vemagiri 765kV D/c line without reactive compensation Pre‐charging condition 518091 SRI_POOL 514092 VEMAG-II 310 518092 VEM-II80 999 V_TAP -0 2 998 S_TAP -121 0 1 586 -310 0 0 73 42814 ANGL-765 -199 0 765 765 0 -0 327 404 756 514091 EAST-OA 1 -310 620 -42 214R 310 51 772 1 0 1 112 762 400 On‐charging condition (from Vemagiri end) 42814 ANGL-765 518091 SRI_POOL 514092 VEMAG-II -1 2 763 0 117 310 518092 VEM-II80 999 V_TAP -2 2 1525 -1525 1 998 S_TAP -121 0 1013 1 586 -310 -199 1085 0 -735 327 511 756 514091 EAST-OA 1 -310 620 -42 213R 310 50 1013 1 0 1 113 762 400 On‐charging condition (from Srikakulam end) 518091 SRI_POOL 514092 VEMAG-II -0 2 0 73 999 V_TAP 998 S_TAP 0 -0 799 763 514091 EAST-OA 1 -310 620 152 -165L 310 772 1 597 -470 0 360 404 0 -308 948 855 0 143 -2 0 0 42814 ANGL-765 309 518092 VEM-II80 -142 799 0 120 1 1 413 Charging of Srikakulam – Vemagiri 765kV D/c line with 240 MVAR with line reactors at both ends Pre‐charging condition 518091 SRI_POOL 514092 VEMAG-II 310 518092 VEM-II80 999 V_TAP -0 2 998 S_TAP -121 0 -310 0 0 73 42814 ANGL-765 1 586 -199 0 765 765 0 -0 327 404 0.00000 -2.40000 0.00000 -2.40000 756 514091 EAST-OA 1 -310 620 -42 214R 310 51 772 762 0.00000 -2.40000 1 0 1 112 400 0.00000 -2.40000 On‐charging condition (from Vemagiri end) 42814 ANGL-765 518091 SRI_POOL 514092 VEMAG-II 310 518092 VEM-II80 999 V_TAP -0 2 226 0 87 -0 0 453 -453 0 998 S_TAP -121 0 -310 -199 877 852 0 -223 327 439 1 586 0.00000 -2.40000 0.00000 -2.40000 756 514091 EAST-OA 1 -310 620 -42 214R 310 51 852 762 0.00000 -2.40000 1 0 1 113 400 0.00000 -2.40000 On‐charging condition (from Srikakulam end) 518091 SRI_POOL 514092 VEMAG-II 518092 VEM-II80 0 2 0 0 73 0 42814 ANGL-765 310 999 V_TAP 998 S_TAP -66 -0 -0 -0 370 770 792 0 0.00000 -2.40000 0.00000 -2.40000 772 0.00000 -2.40000 758 514091 EAST-OA 1 -310 620 84 -39R 770 0.00000 -2.40000 1 588 -257 0 334 404 0 -309 310 0 -76 113 400 1 1 Annexure‐III Studies for Reactive Compensation for Transmission System associated with ISGS Projects in Nagapattinam / Cuddalore area of Tamilnadu – Part A1 (b). Studies for provision of Line Reactors on Nagapattinam Pooling Station – Salem New (Dharmapuri) 765kV D/c line& Salem New – Madhugiri 765 kV S/c line (both lines are initially charged at 400 kV) Line Length: • Nagapattinam Pooling Station – Salem New (Dharmapuri) 765kV D/c line– approx 270 Km • Salem New – Madhugiri 765kV D/c line –approx 240 Km Following results have been obtained while charging Nagapattinam Pooling Station – Salem New 765 kV D/c line &Salem (New) – Madhugiri 765 kV S/c line (both lines initially charged at 400 kV) without line reactors, the relevant outputs are enclosed at Exhibit‐III Charging of Nagapattinam Pooling Station – Salem (New) line from Nagapattinam Pooling Station end without line reactors Source rise Line Rise Total Rise – – – 06 kV 17 kV 23 kV Charging of Nagapattinam Pooling Station – Salem (New) line from Dharmapuriend without line reactors Source rise Line Rise Total Rise – – – 03 kV 17 kV 20 kV Charging of Salem New – Madhugiriline from Salem New (Dharmapuri) without line reactors Source rise Line Rise Total Rise – – – 03 kV 12 kV 15 kV From the above it may be seen that charging of Nagapattinam Pooling Station – Salem New 765 kV line or charging of Salem New – Madhugiri 765 kV line without line reactors shall lead to very high voltages at the open end and practically not possible to charge the lines under such conditions. Accordingly, necessary line reactors were identified through reactive power planning studies for charging of the lines. Relevant charging studies are given at Exhibit‐III Charging of Nagapattinam Pooling Station – Salem New (Dharmapuri) 765 kV line From Nagapattinam end with 63 MVAR line reactors at both ends Source rise – 02 kV Line Rise – 06 kV Total Rise – 08 kV From Salem New (Dharmapuri) end with 63 MVAR line reactors at both ends Source rise – 01 kV Line Rise – 06 kV Total Rise – 07 kV Charging of Salem New (Dharmapuri) ‐ Madhugiri 765 kV line From Salem New end with 63 MVAR line reactor at Madhugiri end Source rise Line Rise Total Rise – – – 02 kV 03 kV 05 kV Exhibit‐III Charging of Nagapattinam Pooling Station – Salem New (Dharmapuri) 765kV D/c line& Salem New – Madhugiri 765 kV S/c line without reactive compensation A. Charging of Nagapattinam Pooling Station – Salem New 765kV D/c line (charged at 400 kV) Pre‐charging condition 524082 BELLARY 524098 MADHUGI4 1 -72 61 116 -87 525 -294 -87 524015 NARDR-NW 407 -9 61 522098 MADHUGIR -82 -707 -9 -54 -373 524001 SMNH -52 409 -159 -257 400 524077 BIDADI 400 -433 1 -64 -193 792 54411 DHARMP SPL 54401 NAGA-SPL 400 -218 63 -218 0.00000 0.00000 400 -67 405 1 544097 RASIPALA 266 360 63 80 0 1 407 119 -53 -143 410 18 1 -280 561 55 -115 -280 0 55 114 402 119 -40 403 -143 413 SW -0 544096 ILFS-OA 544095 T UT I-POOL 60 34 544004 T RIC 63 400 0.00000 0.00000 0.00000 0.00000 544151 PALAVADI4 -433 400 -80 400 0.00000 0.00000 -67 179 1 -48 -56 400 1 400 544010 NEYEXT N4 -1371 54412 DHARM-SPL2 52409 MADHU-SPL -378 57 404 399 -56 -11 -159 548003 SALE800 -93 -378 -352 0 1 -257 221 544001 NYVL 536 -121 -373 -93 -82 -66 544003 SALE 544113 DHARMPR -52 1446 524084 YELAHNKA 544012 NAGAPT NM4 514008 GOOT 0 525 410 410 On‐charging (from Nagapattinam Pooling Station end) 524082 BELLARY 524098 MADHUGI4 1 60 116 -87 525 -294 -87 524015 NARDR-NW 407 -9 60 522098 MADHUGIR -84 -707 -9 -54 409 -151 -258 -188 -55 524077 BIDADI 58 1 179 -80 1 -47 1 -135 794 54411 DHARMP SPL 54401 NAGA-SPL 404 -220 39 0 -0 400 -432 400 0.00000 0.00000 -66 -187 0.00000 0.00000 426 -66 406 544097 RASIPALA 1 266 359 63 90 0 -143 411 1 SW -0 411 544096 ILFS-OA -280 561 54 -115 -280 0 54 118 409 409 -143 412 544004 T RIC 39 119 -40 414 544095 T UT I-POOL 119 -53 18 1 60 34 -220 187 409 0.00000 0.00000 0.00000 0.00000 544151 PALAVADI4 -432 401 0 -26 404 544010 NEYEXT N4 -1370 54412 DHARM-SPL2 52409 MADHU-SPL -352 -120 405 400 -378 -140 1 548003 SALE800 -95 -55 536 -151 -258 -378 544001 NYVL -71 -373 -95 221 -84 -373 524001 SMNH -53 400 401 544003 SALE 544113 DHARMPR -53 1446 524084 YELAHNKA 544012 NAGAPT NM4 514008 GOOT 0 525 412 On‐charging (from Salem New end) 524082 BELLARY 524098 MADHUGI4 1 -294 -88 407 -73 536 60 116 -88 1446 525 544012 544001 NAGAPTNM4 NY VL 514008 GOOT 0 525 544113 DHARMPR -54 524015 NARDR-NW 60 522098 -54 MADHUGIR -9 -85 -707 -9 -54 524084 -85 Y ELAHNKA 400 -378 -259 -374 -177 400 524077 BIDADI 400 -432 400 0.00000 0.00000 -64 -48 54411 795 DHARMP SPL -0 0 -0 -432 406 544097 RASIPALA 1 0.00000 0.00000 266 361 63 138 0 1 -218 -0 61 408 544096 ILFS-OA 544095 TUTI-POOL 61 34 120 -60 -150 412 18 402 -218 61 SW 430 0.00000 0.00000 413 544151 PALAVADI4 402 54401 NAGA-SPL 191 0.00000 0.00000 -64 1 544004 TRIC -64 -136 -54 401 -80 1 -1376 54412 DHARM-SPL2 52409 MADHU-SPL 179 406 548003 SALE800 -103 -378 402 544010 NEY EXTN4 1 -259 -54 1 -10 57 -177 -103 221 -120 0 -374 524001 SMNH 410 -65 -352 544003 SALE 1 -280 561 55 -115 -280 0 55 115 120 -50 404 -150 414 413 411 B. Charging of Salem New – Madhugiri765kV S/c line (charged at 400 kV) Pre‐charging condition 524082 BELLARY 524098 MADHUGI4 1 -294 -87 407 -72 536 61 116 -87 1446 525 544012 544001 NAGAPTNM4 NY VL 514008 GOOT 0 525 524015 NARDR-NW 61 522098 -52 MADHUGIR -9 -82 -707 -159 -257 221 399 524077 BIDADI 400 -433 400 400 0.00000 0.00000 405 544097 RASIPALA 1 266 360 63 80 0 400 -218 63 SW On‐charging (from Salem New end) 407 1 544096 ILFS-OA -280 561 55 -115 -280 0 55 114 119 -40 413 544095 TUTI-POOL -143 410 63 0.00000 0.00000 119 -53 18 1 60 34 54401 NAGA-SPL 544151 PALAVADI4 -67 400 54411 DHARMP SPL -218 -0 0.00000 0.00000 -433 1 544004 TRIC -64 792 400 0.00000 0.00000 -67 -48 -193 -56 400 -80 1 -1371 54412 DHARM-SPL2 52409 MADHU-SPL -378 179 404 548003 SALE800 -93 -56 400 544010 NEY EXTN4 1 -373 -93 1 -11 57 -159 -257 -54 -9 524084 -82 YELAHNKA 400 -378 -121 0 -373 524001 SMNH 409 -66 -352 544003 SALE 544113 DHARMPR -52 403 -143 410 410 524082 BELLARY 524098 MADHUGI4 1 -294 -88 407 544113 DHARMPR -54 524015 NARDR-NW 60 522098 -54 MADHUGIR -9 -85 -707 -9 -54 -55 524077 BIDADI 52409 MADHU-SPL 54412 DHARM-SPL2 -0 -0 0 -48 -1375 -143 400 0.00000 -0.57000 544151 PALAVADI4 -64 544097 RASIPALA 1 266 361 63 130 0 54401 NAGA-SPL 402 -218 61 SW 544095 TUTI-POOL -149 412 61 400 0.00000 -0.57000 120 -59 1 408 544096 ILFS-OA -280 561 55 -115 -280 0 55 114 404 120 -49 414 1 61 34 18 1 544004 TRIC -64 54411 795 DHARMP SPL -218 -0 0.00000 0.00000 -433 406 -80 1 413 0.00000 0.00000 -64 179 406 166 425 -433 401 -175 548003 SALE800 400 -378 401 544010 NEY EXTN4 1 -374 -258 -102 -55 1 -10 57 -175 -258 221 -120 0 -374 524001 SMNH 409 -65 -352 544003 SALE -102 524084 -85 Y ELAHNKA 400 -378 401 -73 536 60 116 -88 1446 525 544012 544001 NAGAPTNM4 NY VL 514008 GOOT 0 525 404 -149 413 411 Charging of Nagapattinam Pooling Station – Salem New (Dharmapuri) 765kV D/c line& Salem New – Madhugiri 765 kV S/c line with reactive compensation A. Charging of Nagapattinam Pooling Station – Salem New 765kV D/c line (charged at 400 kV) Pre‐charging condition 524082 BELLARY 524098 MADHUGI4 1 -72 536 61 116 -87 524015 NARDR-NW -294 -87 61 522098 -52 MADHUGIR -9 -82 -707 -9 -54 524084 -82 Y ELAHNKA 400 -378 -159 -257 399 524077 BIDADI 792 54401 NAGA-SPL 63 SW -218 -0 0.00000 0.00000 400 400 0.00000 0.00000 544151 PALAVADI4 -433 -67 405 400 400 -218 400 0.00000 0.00000 -67 1 544004 TRIC -64 54411 DHARMP SPL 400 -433 -48 -193 -56 400 -80 1 -1371 54412 DHARM-SPL2 52409 MADHU-SPL -378 179 404 548003 SALE800 -93 -56 400 544010 NEY EXTN4 1 -373 -93 544097 RASIPALA 1 266 360 63 80 0 1 63 407 0.00000 0.00000 544096 ILFS-OA 544095 TUTI-POOL 60 34 119 -53 -143 410 18 1 -11 57 -159 -257 221 -121 0 -373 524001 SMNH 409 -66 -352 544003 SALE 544113 DHARMPR -52 1446 525 407 544001 544012 NAGAPTNM4 NY VL 514008 GOOT 0 525 1 -280 561 55 -115 -280 0 55 114 119 -40 403 -143 413 410 410 On‐charging (from Nagapattinam Pooling end) 524082 BELLARY 524098 MADHUGI4 1 -294 -87 407 -72 536 61 116 -87 1446 525 544012 544001 NAGAPTNM4 NY VL 514008 GOOT 0 525 524015 NARDR-NW 61 522098 -52 MADHUGIR -9 -83 -707 -9 -54 524084 -83 Y ELAHNKA 400 -378 -156 -257 399 -191 -55 400 524077 BIDADI 411 0.00000 -0.57000 544151 PALAVADI4 -66 406 544097 RASIPALA 1 266 360 63 84 0 413 544095 TUTI-POOL -143 410 54 SW -219 -0 54 1 409 544096 ILFS-OA -280 561 55 -115 -280 0 55 115 405 119 -40 402 -219 405 0.00000 -0.57000 119 -53 18 1 60 34 54401 NAGA-SPL -63 63 0.00000 0.00000 -433 401 1 544004 TRIC -88 54411 793 DHARMP SPL 400 0.00000 0.00000 -66 -48 0 -0 400 -433 -80 1 -1370 54412 DHARM-SPL2 52409 MADHU-SPL -378 179 405 548003 SALE800 -94 -55 402 544010 NEY EXTN4 1 -373 -94 1 -18 58 -156 -257 221 -121 0 -373 524001 SMNH 409 -90 -352 544003 SALE 544113 DHARMPR -52 405 -143 411 411 On‐charging (from Salem New end) 524082 BELLARY 524098 MADHUGI4 1 -294 -87 407 -73 536 61 116 -87 1446 525 544001 544012 NAGAPTNM4 NY VL 514008 GOOT 0 525 544113 DHARMPR -52 524015 NARDR-NW 61 522098 -52 MADHUGIR -9 -83 -707 -9 -54 524084 -83 Y ELAHNKA 400 -378 -165 -257 399 524077 BIDADI 54411 793 DHARMP SPL 0.00000 0.00000 -433 406 401 544097 RASIPALA 1 0.00000 -0.57000 266 360 63 100 0 -218 -0 0 411 544151 PALAVADI4 -66 1 119 -56 -145 411 62 417 0.00000 -0.57000 544095 TUTI-POOL 60 34 18 1 544004 TRIC 401 -218 62 SW -0 65 400 0.00000 0.00000 -66 54401 NAGA-SPL -0 400 -433 -48 -64 -174 -55 400 -80 1 -1372 54412 DHARM-SPL2 52409 MADHU-SPL -378 179 405 548003 SALE800 -96 -55 401 544010 NEY EXTN4 1 -373 -96 1 -11 57 -165 -257 221 -121 0 -373 524001 SMNH 409 -66 -352 544003 SALE 1 408 544096 ILFS-OA -280 561 55 -115 -280 0 55 114 119 -43 403 -145 413 411 411 B. Charging of Salem New – Madhugiri765kV D/c line (initially charged at 400 kV) Pre‐charging condition 524082 BELLARY 524098 MADHUGI4 1 -294 -87 407 -72 536 61 116 -87 1446 525 544001 544012 NAGAPTNM4 NY VL 514008 GOOT 0 525 544113 DHARMPR -52 524015 NARDR-NW 61 522098 -52 MADHUGIR -9 -82 -707 -9 -54 524084 -82 Y ELAHNKA 400 -378 -159 -257 399 524077 BIDADI 400 -433 405 544097 RASIPALA 1 266 360 63 80 0 18 413 1 63 SW 119 410 63 407 0.00000 0.00000 544095 TUTI-POOL -143 1 544096 ILFS-OA -280 561 55 -115 -280 0 55 114 119 -40 400 60 -53 400 0.00000 0.00000 34 54401 NAGA-SPL 544151 PALAVADI4 -67 400 54411 DHARMP SPL 400 -218 -218 -0 0.00000 0.00000 -433 1 544004 TRIC -64 792 400 0.00000 0.00000 -67 -48 -193 -56 400 -80 1 -1371 54412 DHARM-SPL2 52409 MADHU-SPL -378 179 404 548003 SALE800 -93 -56 400 544010 NEY EXTN4 1 -373 -93 1 -11 57 -159 -257 221 -121 0 -373 524001 SMNH 409 -66 -352 544003 SALE 403 -143 410 410 On‐charging (from Salem New end) 524082 BELLARY 524098 MADHUGI4 1 -294 -87 407 544113 DHARMPR -53 524015 NARDR-NW 60 522098 -53 MADHUGIR -9 -84 -707 -9 -54 -169 524077 BIDADI -433 -0 103 415 412 0.00000 -0.57000 -65 -162 -0 0 -55 -48 406 401 544097 RASIPALA 1 54401 NAGA-SPL 400 266 360 63 111 0 1 62 400 0.00000 -0.57000 0.00000 -0.57000 408 544096 ILFS-OA 544095 TUTI-POOL 60 34 119 -57 -146 411 18 401 -218 62 SW 544151 PALAVADI4 -65 1 544004 TRIC -64 54411 794 DHARMP SPL -218 -0 0.00000 0.00000 -433 -80 1 -1374 54412 DHARM-SPL2 52409 MADHU-SPL 179 405 548003 SALE800 400 -378 401 544010 NEY EXTN4 1 -373 -258 -98 -55 1 -10 57 -169 -258 221 -121 0 -373 524001 SMNH 409 -65 -352 544003 SALE -98 524084 -84 Y ELAHNKA 400 -378 401 -73 536 60 116 -87 1446 525 544001 544012 NAGAPTNM4 NY VL 514008 GOOT 0 525 1 -280 561 55 -115 -280 0 55 114 403 119 -45 403 -146 414 412 411 On‐charging (from Mdhugiri end) 524082 BELLARY 524098 MADHUGI4 1 -294 -91 408 544113 DHARMPR -61 524015 NARDR-NW 61 522098 -61 MADHUGIR -9 -90 -709 -9 -62 -159 -191 -0 0 -64 524077 BIDADI 99 0.00000 0.00000 -77 400 0.00000 -0.57000 544097 RASIPALA 1 266 360 63 85 0 1 408 544096 ILFS-OA -280 561 55 -115 -280 0 55 114 403 119 -40 413 544095 TUTI-POOL -144 410 62 400 0.00000 -0.57000 119 -54 18 1 60 34 401 -218 -218 -0 544151 PALAVADI4 407 54401 NAGA-SPL 62 SW -433 402 1 544004 TRIC -64 54411 793 DHARMP SPL 419 0.00000 -0.57700 -77 -48 -99 407 -433 -80 1 -1370 54412 DHARM-SPL2 52409 MADHU-SPL 179 405 548003 SALE800 400 -379 401 544010 NEY EXTN4 1 -373 -257 -89 -64 1 -11 57 -159 -257 221 -121 0 -373 524001 SMNH 410 -66 -352 544003 SALE -89 524084 -90 Y ELAHNKA 400 -379 401 -73 536 61 117 -91 1446 526 544001 544012 NAGAPTNM4 NY VL 514008 GOOT 0 526 403 -144 411 411