Sponsor Acknowledgment of Receipt and Evaluation of Final Project Proposal ECE 4810 Electrical and Computer Engineering Senior Design I version 16 December 2009 Dear Senior Design Project Sponsor: Please indicate that you have received a copy of your senior design group’s final project proposal by filling out and providing a signed copy (use blue ink) of this form to the design team. Also please provide a rating of the statement: This proposal develops an acceptable engineering solution to the need that I (we) originally specified as the project sponsor (please check one box): strongly disagree disagree neutral agree strongly agree Thank you for supporting our students! Dr. Damon Miller ECE 4810 Instructor 269.276.3158 damon.miller@wmich.edu _____________________________________________________ NAME (please print) _____________________________________________________ TITLE _____________________________________________________ ORGANIZATION _____________________________________________________ SIGNATURE ___________ DATE (OVER) © 2009 Damon A. Miller Page 1 of 2 TO BE FILLED OUT BY STUDENT TEAM: _____________________________________________________ PROJECT TITLE This form must be attached to the final version of the project proposal PRIOR to submission to your project advisor. Also submit a copy to Dr. Miller via his mailbox in the ECE Department office. Teams failing to submit this form will earn an incomplete ECE 4810 grade. © 2009 Damon A. Miller Page 2 of 2