15.1.4

15.3.2

15.3.3

15.3.5

Project/Initiative

IBM Support - Incident, Change, Release,

Problem and Demand Process Design

UTS Intranet

Digital Asset Management

15.4.1

ServiceNow Configuration Management

Database

Knowledge Management

SERVICE MANAGEMENT

EXECUTIVE DIRECTOR: MICHAEL CATHCART

Starting Ending Notes

7.1.2015 10.23.2015 Design and implement processes in ServiceNow tool

8.3.2015 11.30.2015 Design an UTS intranet site to replace UTS Insider

7.4.2015 11.13.2015 Develop digital asset management strategy, plan and staffing.

7.5.2015 12.31.2015 To support IBM contract we need to develop a CMDB and populate with EA systems

10.1.2015 12.30.2015 Develop Knowledge Management strategy, plan, process and staffing

UNIVERSITY INFORMATION SECURITY OFFICE

EXECUTIVE DIRECTOR: JAMES D. PERRY II

ID#

15.4.1

15.4.2

15.4.3

15.4.4

Project/Initiative Starting Ending Notes

UISO Website Update

Establish Information Security Advisory

Council

National Cyber Security Awareness

Month required to comply with new State of South Carolina security policy requirements.

10.1.2015 12.31.2015

The UISO website will be updated to reflect program changes, improve navigation, and streamline content organization.

10.1.2015 12.31.2015 Develop charter, establish membership, and initiate meetings with advisory council to provide advice to the CISO on information security strategy, priorities, and tactics.

10.1.2015 11.1.2015 Develop and execute system-wide cyber security awareness efforts, including workshops, training sessions, executive briefings, and other awareness activities.

University Information Security Office Cont’d.

15.4.5 Symantec DLP Infrastructure Update 10.1.2015 12.31.2015 Upgrade Symantec DLP software and hardware infrastructure to latest release.

15.4.6

15.4.7

Security Information and Event

Management System Expansion

Perform Health Information

Technology HIPAA Gap Analysis

10.1.2015 12.31.2015 Install and configure SIEM System event collection infrastructure at USC Aiken

Campus.

10.1.2015 12.31.2015 Perform a HIPAA compliance gap analysis to assist HIT in ensuring that their people, processes, and technology comply with applicable regulations and best practices to establish credibility as a service provider.

BUSINESS OFFICE

ID#

15.1.1

Project/Initiative

PeopleSoft finance implementation

15.1.2 Pinnacle Upgrade

BUSINESS OPERATIONS

EXECUTIVE DIRECTOR: BOB SWAB

Starting Ending

1.7.2015 12.31.2015

Notes

Continue to refine processes/workflows; to begin preparation for

HR/Payroll phase, which will involve travel, desktop SLAs, and NSR

(services tied to Payroll)

1.7.2015 12.31.2015 AES Migration -Continue to develop and review plan and to meet with Inventory Management regarding inventory needs to accomplish this migration

Business Operations cont’d.

HUMAN RESOURCES

ID#

15.3.1

Name

Workforce Planning Project

15.1.4 SPUR Employee Recognition

Program and Leadership

Program

15.3.3 UTS Bonus Program for 2015-

16

15.4.1 360 Leadership Survey

Starting

7.1.15

Ending

12.31.15

Notes

Workforce planning to provide succession planning, prepare the future blue print of UTS.

1.2.15

7.1.15

12.31.15 Coordinate and organize UTS employee activities and recognition programs throughout the year. The SPUR and Leadership programs. Several employee events are planned.

6.30.16 Coordinate and implement the UTS Bonus Eligibility Program for 2015-16

10.1.15 12.31.15 Coordinate the 360 Leadership survey project for UTS

PROJECT MANAGEMENT OFFICE

ID#

14.3.1

Project/Initiative

USC-CSR (Calendar Space Reservation system)

15.1.2 PeopleSoft OnBase

15.1.3 MF Decommissioning

15.1.4

13.3.5

PeopleSoft Data Warehouse

Backup Systems Enhancement

14.2.9 Beyond the Classroom Matters

Starting

9.2.2014

Ending

12.30.2015

3.30.2015

1.20.2015

3.30.2015

1.1.2016

6.30.2016

1.1.2016

Notes

Columbia Campus Space Reservation live and in use by trained schedulers; continuing training of schedulers and increase usage. Calendaring go-live for School of Music Nov 1; USC Aiken and Beaufort live; Upstate implementing with Nov go-live planned

Closing separate project and rolling into OneCarolina

PeopleSoft implementation plan

Continuing engagement of Student Systems Data Stewards to transition off mainframe; identifying and working with dataset owners to transition off mainframe

Implementation Discussions

9.2.2013 8.31.2015

6.26.2014 9.30.2016

UPS Upgrade on hold pending funding

Project rescoped to include required information from

newly acquired grant funding; working with IBM to

generate scope documents, system requirements and

system mock-up; Note end date change….

Project Management Office Cont’d.

12.3.7 Firewall Conversion

14.4.8 Digital Media Management

15.3.11 Office 365Live for FacStaff

15.3.12 Wireless Upgrade

15.4.1 Alertus Emergency Notification

15.4.2 Windows10 Testing

15.3.10 Avaya Phone Switch Phase II

7.7.2012

10.28.2014

9.1.15

9.1.15

10.6.15

10.1.15

7.31.2015

10.31.2015

12.31.16

6.30.16

9.1.16

6.30.16

Conversions scheduled, communicated and in process per outlined timeline

Document pilot test results, projected costs of

support and maintenance, recommendations as to an

enterprise distribution model of management

software

Developing requirements, schedule, budget and scope

Developing scope, schedule, implementation and

Communication plan

Developing scope, requirements, vendor

implementation plan, schedule and UAT plan

Developing scope, schedule, and communication plan

9.1.2015 1.31.2016 Establish off campus survivable site; migrate to SIP

Trunks; discontinue PRI circuits; training

ID#

15.1.1

15.1.6

15.3.1

15.1.7

15.1.9

15.3.2

15.3.2

Implement New Model for Classroom

Technology Support

Develop New Rate Structure

COMMUNICATION INFRASTRUCTURE & COLLABORATIVE SERVICES

EXECUTIVE DIRECTOR: TODD MCSWAIN

Project/Initiative

Avaya Telephone System Upgrade – Phase 2

Starting Ending Notes

5.23.2015 11.20.2015 After initial upgrade and installation of Avaya Phone System, implement advanced feature sets along with SIP trunking and Co-location for DR site.

1.2.2015

7.1.2015

12.31.2015 Implement phased approach for classroom technology support model for renovation to include campus-wide embedded support staff. Plan includes 5 additional full-time positions.

10.30.2015 Develop new rate structure for services provided by CICS

Campus Wireless Infrastructure Refresh and

Remediation.

Campus Switch Infrastructure Refresh Plan and Installation

1.2.2015

1.2.2015

12.31.2015 Assess wireless deficiencies across Columbia campus and make necessary remediations with additional equipment to include additional APs, external antennas and cabling as needed. Based on 3800 APs to be installed.

12.31.2015 Installation of prioritized 10/100 switch locations throughout campus.

Based on 900 data switches to be installed

Upgrade Fiber Infrastructure

Develop Design for Network Core

Infrastructure Refresh

7.1.2015

7.1.2015

12.31.2015

Continue upgrade of buildings with Single-Mode fiber for outside plant and riser feeds. Estimated cost $10K per building.

9.30.2015 Develop design for enhanced 40GE/100GE network core to include plans for Research DMZ

TEACHING TECHNOLOGY SERVICES

DIRECTOR: MITCHELL WEST

ID# Project/Initiative

15.4.1 Blackboard Upgrade

Starting Ending Notes

12.17.2015 12.19.2015 Blackboard will be upgraded to the latest version

15.4.2 Explore the possibility of replacing Adobe

Connect w/ Blackboard Collaborate

15.4.3 Adobe Connect 9.3 Upgrade Evaluation

15.3.1 Law Center Training Room

ID#

DE-

13.3.1

DE-

15.1.2

DSI-

15.3.5

DSI-

15.2.1

10.6.2015 TBD

10.6.2015 TBD

9.1.2015 11.1.2015

We will begin testing Blackboard Collaborate.

UTS will start testing Adobe Connect release 9.3 in October. Connect 9.3 will provide screen sharing, whiteboard, in-meeting and other usability enhancements.

A training room is being built in the Law Center. Participant computers will be installed in the training room.

DATA CENTER SERVICES

EXECUTIVE DIRECTOR: STAN LAWRIMORE

Project/Initiative

Virtual Desktop Pilot Completion 9.27.2013 12.15.2015 The Virtual Desktop Infrastructure (VDI) testing and pilot phase has closed. Rates have been approved to the Board of Trustees. Infrastructure is full. Planning for expansion for new service offering.

Virtual image management for

Virtual Desktops

Starting

1.1.2015

Ending

12.15.2015

Notes

Migration to VMWare’s App Volumes with enterprise licensing will resolve management issues when we expand the service offering.

Windows 10 Rollout

PC Refresh for UTS

9.1.2015

5.1.2015

12.31.2015 Testing of Windows 10 for Enterprise support has been completed so we can support users starting to upgrade. A formal project to fully test impact of rolling out the OS in our SLA image is underway.

10.30.2015 Updated inventory and refresh spreadsheet to include items received back from IBM employees and what is already in stock. (Assuming no reuse and replacement of all out of warranty)

Data Center Services Cont’d.

MF-

14.2.1

SI-

15.1.5a

Mainframe Decommission

ServiceNow CMDB

SI-

15.1.5

DNS Refresh

SI-

15.1.10

Office 365 Transition

SI-

15.1.11

UPS Project

SI-

15.1.13

Enterprise Storage Upgrade

SI-

15.2.18

Backup Strategy

SI-

15.2.28

POD Compute and Storage

6.1.2014

6.30.2016 The completion of OneCarolina project phase 1 and phase 2 will remove the use of the mainframe for Student, HR, Finance and Payroll software. As we continue to implement Banner and PeopleSoft, we will be phasing out the mainframe. During this period the project team is executing the communication plan as well as identifying enterprise replacement solutions and consultation for departments that need to migrate function and data.

1.1.2015 6.30.2016 The coordination of planning, design, and implementation of a configuration management database (CMDB) within our ServiceNow software. A CMDB is a repository that is intended to hold a collection of IT assets that are commonly referred to as configuration items (CI), as well as descriptive relationships between such assets. Having this in place will help identify problems in our critical systems and their relationship to other systems.

1.15.2015

10.30.2015 This is a project to replace the 8 Physical servers that operate our internal DNS and

TIME services. These servers are 5+ years old.

1.1.2015 6.30.2016 We have begun the project planning for the migration to Office 365 in the cloud. This will allow the merging of faculty, staff and students as well as open the use of many online products Microsoft Offers. Part of this project will be to evaluate our SPAM systems that are in place. (Estimated from Microsoft Scope of work)

1.15.2015

12.31.2015 Install 3 new UPS systems and replace existing PDU’s – connect remainder of Annex on generator

1.20.2015

11.30.2015 We have installed the new storage options with EMC’s XtremeIO, VNX 5600, and

Isilong. We are currently migrating from old storage to new.

6.1.2015

3.30.2015 We are reviewing our backup strategy for the enterprise and will be determining the most cost effective and flexible approach. This will evaluate additional products as well as a review of our existing use of Commvaut.

6.15.2015

10.31.2015 This project is the combination of the XIO and UCS Server upgrade and storage upgrade project. This has been undertaken to bring needed storage and server capacity online. It is a new “Converged” architecture that will help us better define storage and compute resources. 1 POD estimated, but if PeopleSoft truly doubles and we expand VDI it would be Times 2 or $1,400,000.

Data Center Services, Cont’d.

SI-

15.2.31

SI-

15.2.32

Purchase UCS Servers to Replace

DELL servers going out of maintenance.

Tape Library Upgrade

6.15.2015

10.31.2015 These new servers will replace servers that run PRODVC (OC Production Servers)

6.15.2015

9.30.2015 This solution will either replace the current LTO3 drives with LTO6 drives or we might go to IBM 3592 10TB Library and Drives

SD-

15.1.2

Knowledge Base Project 1.2.2015

12.22.2015 Scope of project has changed. We are looking at completely overhauling the current

KB and implementing a new ITIL/KCS based KB structure within Service Now taking advantage of some of the new features available within Fuji. The next project meeting is scheduled for mid-September.

BO – DCO Business Office

DE – Desktop Engineering

DSI – Desktop Support and iCare

SI – Server Infrastructure

SD – Service Desk

ID#

15.2.1

ENTERPRISE APPLICATIONS

EXECUTIVE DIRECTOR: RANDY SHELLEY

Project/Initiative Starting Ending

Student System & Reporting Updates

Year over Year Reporting (Admissions, AR,

Financial Aid) - Provide the functionality to compare historical data snapshots

6/1/2015 12/1/2015

Plan for Quarter:

Testing and cutover

OneCarolina Phase II

Notes

15.1.2

Highland On-Base Implementation (Imaging solution for PeopleSoft)

1/1/2015 1/1/2016

Plan for Quarter:

Final testing for 1/1/16 cutover

15.3.11

15.3.14

15.2.11

Other Initiatives/Projects

25 Live Implementation (Space and Scheduling via (CollegeNet)

Adobe Connect Upgrade - Upgrade Adobe

Connect to the latest version

9/1/2015 5/1/2016

7/11/2015 1/1/2016

Plan for Quarter:

UTS Managed Project

Plan for Quarter:

Testing

Need to coordinate activities/schedules with Blackboard. Either

Thanksgiving or Christmas holiday cutover to be up by 1/1/16

Beyond the Classroom Matters - This project will provide a means for faculty, administrative staff and students to track student involvement beyond the classroom, enhance their ability to facilitate the overall success of each student’s university experience, and provide student engagement data

4/1/2015 that will inform university strategic initiatives. This project will have multiple Phases.

Plan for Quarter:

Continued refinement of requirements and design in preparation of prototyping additional functions for a pilot group of student engagement events