G 10 Pg. 25 APPENDIX 2 Regular Board Meeting November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga Strategic Goal: Catholic Learning Environment, Stewardship of Our Physical Environment, Community Engagement Policy/Governance PURPOSE As required by the Ministry of Education, this report recommends to the Board of Trustees the commencement of a Pupil Accommodation Review in the East Credit review area in the City of Mississauga. The Pupil Accommodation Review will involve the review of scenarios that will affect the following elementary schools which will now be considered as the ‘Review Area’ (Map 1): Our Lady of Good Voyage St. Bernadette St. Dunstan St. Gertrude St. Gregory St. Herbert St. Raymond St. Valentine BACKGROUND On March 26, 2015 the Ministry of Education released the new Pupil Accommodation Review Guideline (PARG). On October 27, 2015 the Board of Trustees approved the amendment to Board Policy 6.51 Pupil Accommodation Review (Appendix 9), to reflect the changes to the new PARG, and following consultation with the Dufferin-Peel community. The approval of Board Policy 6.51 Pupil Accommodation Review now permits the Board of Trustees to consider and approve the commencement of a Pupil Accommodation Review. The Planning Department has conducted a review of all Education Service Areas against the Board approved 2013 Long Term Accommodation Plan. The Long Term Accommodation Plan identifies the 15 year enrolment needs of the Board in terms of new schools, additions to schools, boundary reviews, and areas that are significantly under capacity. Areas that are identified as significantly under capacity require a reduction in pupil places which would entail a Pupil Accommodation Review. The East Credit Education Service Area has been identified in the Long Term Accommodation Plan as being significantly under capacity in 2015/2016. A Pupil Accommodation Review is required. Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 26 APPENDIX 2 COMMUNITY PLANNING AND PARTNERSHIP CONSULTATION In June 2015 the Board of Trustees approved Policy 9.05 Community Planning and Partnerships which provides opportunities for school boards to work more closely with local municipal governments and other community partners when planning to address their underutilized school space, green space/ park planning prior to initiating a Pupil Accommodation Review. On October 20, 2015, the Planning Department held an open house to provide community partners an opportunity to review the list of schools with available space in which a community partnership could be considered. A list of schools was developed based on the short and long term needs of space in these schools. Of the eight schools listed in the subject review area, five schools were identified as having available space for a potential community partnership. The open house was advertised through the local newspapers, an email notification to current and potential community partners and on the Board’s website. It was attended by eight individuals from various organizations. Half of the individuals that attended the meeting were interested in evening use and were subsequently directed to the Board’s Permit Department. The remainder of the inquiries were from the City of Mississauga, Town of Caledon, Region of Peel and a local seniors group to get a better understanding of what a community partnership entailed. All interested parties were asked to further review the documentation on the Board’s Community Planning and Partnership website and submit a completed form which was available at the meeting and on line. The only group interested in actively pursuing a potential partnership at one of the available sites listed, which was not a site in the proposed Review Area, was the local senior group. To date no formal requests for space have been received. DISCUSSION The East Credit community has historically been an area of high growth. According to the Board’s 2003 long term enrolment projections it was anticipated that pupil yields in East Credit would continue to grow and peak in 2004/2005 at approximately 4600 pupils then slowly decline and stabilize at 3700 students by 2022/2023. Enrolment did in fact peak in 2004/2005 at 4642 pupils however the enrolment decline was greater than anticipated in subsequent years and enrolment dipped below 3700 by 2009. Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 27 APPENDIX 2 The graph below illustrates the total enrolment compared to the total capacity for the Review Area: Total Enrolment Versus Capacity 5000 Actual Projected 4500 4000 3500 3000 2500 2000 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Total Total OTG Historic and Projected Enrolment 900 Actual Projected 800 700 600 500 400 300 200 100 0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Our Lady of Good Voyage St. Bernadette St. Dunstan St. Gertrude St. Gregory St. Herbert St. Raymond St. Valentine Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 28 APPENDIX 2 The current number of pupil places is 4394. The current enrolment in the East Credit review area is 2776 pupils. There is an excess of 1618 pupil places in East Credit with schools operating between 45% and 90% utilization with OVERALL EXCESS CAPACITY of approximately 40%. Status quo projected enrolments illustrated below show further decline by 2025 to levels where schools would be operating at 36% to 84% utilization with an overall projected utilization of 59% and 1800+ excess pupil places. OTG O.L. Good Voyage 280 Utilization St Bernadette 487 Utilization St Dunstan 484 Utilization St Gertrude 752 St Gertrude FI Total St Gertrude Utilization St Gregory 556 Utilization St Herbert 533 Utilization St Raymond 651 Utilization St Valentine 651 Utilization Total Surplus Spaces Existing Utilization 4394 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 192 178 174 175 171 170 165 165 170 167 171 69% 64% 62% 63% 61% 61% 59% 59% 61% 60% 61% 215 205 201 196 198 200 201 203 206 215 217 44% 42% 41% 40% 41% 41% 41% 42% 42% 44% 45% 312 316 331 350 346 358 365 373 370 373 369 64% 65% 68% 72% 71% 74% 75% 77% 76% 77% 76% 367 361 347 336 334 326 312 314 315 322 322 279 309 309 303 304 303 301 302 302 302 302 646 670 656 639 638 629 613 616 617 624 624 86% 89% 87% 85% 85% 84% 82% 82% 82% 83% 83% 323 309 285 283 277 270 266 271 275 280 280 58% 56% 51% 51% 50% 49% 48% 49% 49% 50% 50% 264 247 237 230 227 230 232 237 239 239 242 50% 46% 44% 43% 43% 43% 44% 44% 45% 45% 45% 447 388 368 348 321 297 275 252 241 231 232 69% 60% 57% 53% 49% 46% 42% 39% 37% 35% 36% 377 388 394 403 416 419 429 432 443 454 449 58% 60% 61% 62% 64% 64% 66% 66% 68% 70% 69% 2776 2701 2646 2624 2594 2573 2546 2549 2561 2583 2584 1618 1693 1748 1770 1800 1821 1848 1845 1833 1811 1810 63% 61% 60% 60% 59% 59% 58% 58% 58% 59% 59% Outlined below are the current costs to operate these schools. Our Lady of School Good Voyage St. Bernadette St. Dunstan St. Gertrude St. Gregory St. Herbert St. Raymond St. Valentine Expenditures for School Utility & Snowplowing/Salting Costs ($) • Total Annually $91,708 $94,702 $81,321 $99,008 $112,845 $125,574 $109,011 $117,676 School Renewal Needs ($) • Outstanding Renewal Needs $3,087,760 $1,856,400 $1,786,720 $1,487,886 $1,317,680 $556,400 $866,320 $885,040 • Facility Condition Index (FCI) 53% 19% 18% 11% 12% 5% 7% 7% Annual Cost to Transport Students to School ($) $13,608 $11,307 $63,956 $16,329 $16,329 $13,568 $16,329 $16,329 *Cost are approximate Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 29 APPENDIX 2 It is important to note that a primary incentive from the Ministry of Education to induce boards to address excess capacity is the reduction of funding for that excess capacity and a reduction in declining enrolment as well. Accordingly, it becomes necessary for boards to address their excess capacity in an attempt to mitigate their financial (GSN) reductions. For the Dufferin-Peel Catholic District School Board that excess capacity funding reduction equates to $1.5 million per year which is comprised of a $1 million reduction in top-up funding related to excess capacity and $0.5 million of declining enrolment attributed to excess capacity. It is also anticipated that the reduction will continue for the next 3 years for a total of $4.5 million. A Pupil Accommodation Review is required in this area to increase utilization by reducing the number of excess pupil places, and reducing operating costs. PUPIL ACCOMMODATION REVIEW CONSULTATION Subject to approval of the commencement of the East Credit Pupil Accommodation Review by the Board of Trustees Planning staff, in cooperation with the Family of Schools Superintendents involved in the review, and others appointed by the Director of Education, will initiate the establishment of an Accommodation Review Committee (ARC) and commence the public consultation process to complete the review in accordance with the proposed timelines outlined below: November 24, 2015: Initiation of the Pupil Accommodation Review Process January – March 2016: Work of the Accommodation Review Committee (ARC) including public meetings (specific dates to be determined) January 20, 2016: Public Meeting #1 (location to be determined) April 26, 2016: Interim Staff Report to Trustees for Receipt May 9, 2016: Public Delegations at Administration and Finance Committee May 24, 2016: Final Staff Report with Recommendations and Action Required This proposed schedule would allow for the process to conclude prior to the end of the current (2015/16) school year, allow for transition planning throughout the 2016/2017 school year and align the Trustee decision with the next opportunity to apply for the Ministry’s Consolidated Capital Funding initiative to address any proposed capital improvements to the remaining facilities. Any deviation from the proposed timelines has the potential to impact any or all of the benefits associated with concluding the process by May 2016. Accommodation Review Committee The Accommodation Review Committee (ARC) will consist of at least one parent/guardian representative from each school under review and one alternate parent/guardian, chosen by their respective school communities. Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 30 APPENDIX 2 The ARC is an advisory committee that represents the school(s) affected by a pupil accommodation review and which acts as the official conduit for information shared between the Board and the affected school communities. The ARC provides feedback with respect to Staff Report(s) and the options set out therein and may also present alternative accommodation option(s), including rationale for the option(s), recognizing the principles outlined in the Background section. The overall goal of the ARC is to provide the local perspective of stakeholders impacted by the decision of the Board of Trustees, and to provide constructive feedback regarding the Initial Staff Report, School Information Profile (“SIP”), options, and preferred option. Board Planning staff will facilitate all meetings of the ARC and Public meetings and draw upon the expertise of various Board departments and other outside agencies as required and/or requested by the ARC. The Terms of Reference for ARC members is attached as Appendix 10. OPTIONS In consideration of the proposed Pupil Accommodation Review for the East Credit review area, and as a requirement of Policy 6.51 Pupil Accommodation Review, staff has considered a number of options to close various schools in the review area in an attempt to eliminate surplus pupil places. The proposed reduction in pupil places to increase overall utilization in the review area is a primary consideration for a PAR. Options which do not achieve an increase in overall utilization greater than 20% at each of the receiving schools in the first 5 years of the recommendation to consolidate are not identified as recommended options. The following options, including a preferred option, will be presented to the ARC and to the community upon approval to proceed with a Pupil Accommodation Review. Area maps, actual and projected enrolments for each option noted below, and School Information Profiles (SIPs) for each school in the review area are attached in Appendix 1 – 8 which is a requirement of the Pupil Accommodation Review Guideline. APPENDIX 1: APPENDIX 2: APPENDIX 3: APPENDIX 4: APPENDIX 5: APPENDIX 6: APPENDIX 7: APPENDIX 8: Our Lady of Good Voyage – School Information Profile St. Bernadette – School Information Profile St. Dunstan – School Information Profile St. Gertrude – School Information Profile St. Gregory – School Information Profile St. Herbert – School Information Profile St. Raymond – School Information Profile St. Valentine – School Information Profile Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 31 APPENDIX 2 Option 1: Close Our Lady of Good Voyage, St. Dunstan and St. Gertrude – PREFERRED OPTION OTG 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 215 152 367 75% 205 155 360 74% 201 160 361 74% 196 170 366 75% 198 167 365 75% 200 173 373 77% 201 178 379 78% 203 181 384 79% 206 178 384 79% 215 181 396 81% 217 179 396 81% 556 323 279 602 108% 309 309 618 111% 285 309 594 107% 283 303 586 105% 277 304 581 104% 270 303 573 103% 266 301 567 102% 271 302 573 103% 275 302 577 104% 280 302 582 105% 280 302 582 105% St Herbert 533 North St Dunstan St Herbert Utilization 264 160 424 80% 247 161 408 77% 237 171 408 77% 230 180 410 77% 227 179 406 76% 230 185 415 78% 232 187 419 79% 237 192 429 80% 239 192 431 81% 239 192 431 81% 242 190 432 81% St Raymond OLGV St Raymond Utilization 651 447 192 639 98% 388 178 566 87% 368 174 542 83% 348 175 523 80% 321 171 492 76% 297 170 467 72% 275 165 440 68% 252 165 417 64% 241 170 411 63% 231 167 398 61% 232 171 403 62% St Valentine St Gertrude St Valentine Utilization 651 377 367 744 114% 388 361 749 115% 394 347 741 114% 403 336 739 114% 416 334 750 115% 419 326 745 114% 429 312 741 114% 432 314 746 115% 443 315 758 116% 454 322 776 119% 449 322 771 118% 61% 2646 232 60% 92% 32% 2624 254 60% 91% 31% 2594 284 59% 90% 31% 2573 305 59% 89% 31% 2546 332 58% 88% 31% 2549 329 58% 89% 31% 2561 317 58% 89% 31% 2583 295 59% 90% 31% 2584 294 59% 90% 31% St Bernadette 487 South St Dunstan St Bernadette Utilization St Gregory FI St Gregory Utilization Total 2878 Surplus Spaces Existing Utilization 63% Proposed Utilization Increased Utilization Resulting Accommodation (MAP 2): St. Gertrude all regular track student are directed to St. Valentine and the boundary is extended to capture the St. Gertrude boundary all French Immersion students are directed to St. Gregory St. Dunstan students south of Eglinton Avenue are directed to St. Bernadette students north of Eglinton Avenue are directed to St. Herbert Our Lady of Good Voyage all students are directed to St. Raymond The new overall capacity in the review area would be 2878 pupil places which is a reduction of 1516 pupil places. Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 32 APPENDIX 2 New Facility Requirements: St. Bernadette Relocation of the Ontario Early Years Centre to re-establish the space for FDK (TBD) The replacement of Toddler and Pre-school Child Care spaces will be required as a result of the closing of the St. Dunstan and Our Lady of Good Voyage Child Care Centers. Funding for the replacement of child care spaces would be requested through a submission of a Consolidated Capital Funding Business Case. Any additional improvements that do not involve the construction of program or child care spaces could be funded through Renewal Funding, Operational Funding or Proceeds of Disposition. Transportation: The increase in the number of students that would require bussing, based on the Board approved transportation distances, is approximately 260 at a projected cost of approximately $44,500 per year. Costs: The resulting approximate, annual costs of Option 1 are as follows: Option 1 Expenditures for School Utility & Snowplowing/Salting Costs ($) Outstanding Renewal Needs Transportation Costs Status Quo $831,845 $11,844,206 $167,755 New Costs Impact $559,808 ($272,037) $5,481,840 ($6,362,366) $212,282 $44,527 *Cost are approximate The approximate savings for this option with respect to utilities, snowplowing/salting is $272,000 per year, in addition to savings on the reduction in staffing and capital renewal needs which in some situations would no longer be required. There would however be an increase in bussing costs of approximately $44,500. Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 33 APPENDIX 2 Option 2: Close Our Lady of Good Voyage, St. Dunstan and St. Valentine OTG 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 487 215 152 367 75% 205 155 360 74% 201 160 361 74% 196 170 366 75% 198 167 365 75% 200 173 373 77% 201 178 379 78% 203 181 384 79% 206 178 384 79% 215 181 396 81% 217 179 396 81% 533 264 160 134 558 105% 247 161 138 546 102% 237 171 144 552 104% 230 180 145 555 104% 227 179 148 554 104% 230 185 150 565 106% 232 187 153 572 107% 237 192 155 584 110% 239 192 158 589 111% 239 192 161 592 111% 242 190 159 591 111% St Gertrude FI St Gertrude Utilization 752 367 279 646 86% 361 309 670 89% 347 309 656 87% 336 303 639 85% 334 304 638 85% 326 303 629 84% 312 301 613 82% 314 302 616 82% 315 302 617 82% 322 302 624 83% 322 302 624 83% St Gregory 556 323 243 566 102% 309 250 559 101% 285 250 535 96% 283 258 541 97% 277 268 545 98% 270 269 539 97% 266 276 542 97% 271 277 548 99% 275 285 560 101% 280 293 573 103% 280 290 570 103% 651 447 192 639 98% 388 178 566 87% 368 174 542 83% 348 175 523 80% 321 171 492 76% 297 170 467 72% 275 165 440 68% 252 165 417 64% 241 170 411 63% 231 167 398 61% 232 171 403 62% 61% 2646 333 60% 89% 29% 2624 355 60% 88% 28% 2594 385 59% 87% 28% 2573 406 59% 86% 28% 2546 433 58% 85% 28% 2549 430 58% 86% 28% 2561 418 58% 86% 28% 2583 396 59% 87% 28% 2584 395 59% 87% 28% St Bernadette South St Dunstan St Bernadette Utilization St Herbert North St Dunstan South St Valentine St Herbert Utilization North St Valentine St Gregory Utilization St Raymond OLGV St Raymond Utilization Total 2979 Surplus Spaces Existing Utilization 63% Proposed Utilization Increased Utilization Resulting Accommodation (MAP 3): St. Dunstan students south of Eglinton Avenue are directed to St. Bernadette students north of Eglinton Avenue are directed to St. Herbert Our Lady of Good Voyage all students are directed to St. Raymond St. Valentine students north of Bristol Road are directed to St. Gregory students south of Bristol Road are directed to St. Herbert The new overall capacity in the review area would be 2979 pupil places which is a reduction of 1415 pupil places. Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 34 APPENDIX 2 New Facility Requirements: St. Herbert 2 new FDK classes ($1 million) St. Gregory 1 new FDK class ($500,000) St. Bernadette Relocation of the Ontario Early Years Centre to re-establish the space for FDK (TBD) The replacement of Toddler and Pre-school Child Care spaces will be required as a result of the closing of the St. Dunstan and Our Lady of Good Voyage Child Care Centers. Funding for additional FDK classrooms and the replacement of child care spaces would be requested through a submission of a Consolidated Capital Funding Business Case. Any additional improvements that do not involve the construction of program or child care spaces could be funded through Renewal Funding, Operational Funding or Proceeds of Disposition. Transportation: The increase in the number of students that would require bussing, based on the Board approved transportation distances, is approximately 168 at a projected cost of approximately $28,200 per year. Costs: The resulting approximate, annual costs of Option 2 are as follows: Option 2 Expenditures for School Utility & Snowplowing/Salting Costs ($) Outstanding Renewal Needs Transportation Costs Status Quo $831,845 $11,844,206 $167,755 New Costs Impact $541,140 ($290,705) $6,084,686 ($5,759,520) $195,953 $28,198 *Cost are approximate The approximate savings for this option with respect to utilities, snowplowing/salting is $291,000 per year, in addition to savings on the reduction in staffing and capital renewal needs which in some situations would no longer be required. There would however be an increase in bussing costs of approximately $28,200. Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 35 APPENDIX 2 Option 3: Close St. Dunstan, St. Herbert and St. Gregory OTG 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 280 192 160 352 126% 178 161 339 121% 174 171 345 123% 175 180 355 127% 171 179 350 125% 170 185 355 127% 165 187 352 126% 165 192 357 128% 170 192 362 129% 167 192 359 128% 171 190 361 129% 487 215 152 153 520 107% 205 155 142 502 103% 201 160 141 502 103% 196 170 133 499 102% 198 167 134 499 102% 200 173 134 507 104% 201 178 134 513 105% 203 181 138 522 107% 206 178 139 523 107% 215 181 138 534 110% 217 179 140 536 110% St Gertrude FI St Gertrude Utilization 752 367 279 646 86% 361 309 670 89% 347 309 656 87% 336 303 639 85% 334 304 638 85% 326 303 629 84% 312 301 613 82% 314 302 616 82% 315 302 617 82% 322 302 624 83% 322 302 624 83% St Raymond St Gregory St Raymond Utilization 651 447 323 770 118% 388 309 697 107% 368 285 653 100% 348 283 631 97% 321 277 598 92% 297 270 567 87% 275 266 541 83% 252 271 523 80% 241 275 516 79% 231 280 511 78% 232 280 512 79% St Valentine 651 377 111 488 75% 388 105 493 76% 394 96 490 75% 403 97 500 77% 416 93 509 78% 419 96 515 79% 429 98 527 81% 432 99 531 82% 443 100 543 83% 454 101 555 85% 449 102 551 85% 61% 2646 175 60% 94% 34% 2624 197 60% 93% 33% 2594 227 59% 92% 33% 2573 248 59% 91% 33% 2546 275 58% 90% 32% 2549 272 58% 90% 32% 2561 260 58% 91% 32% 2583 238 59% 92% 33% 2584 237 59% 92% 33% OLGV North St Dunstan OLGV Utilization St Bernadette South St Dunstan West St Herbert St Bernadette Utilization East St Herbert St Valentine Utilization Total 2821 Surplus Spaces Existing Utilization 63% Proposed Utilization Increased Utilization Resulting Accommodation (MAP 4): St. Gregory All students are directed to St. Raymond St. Dunstan students south of Eglinton are directed to St. Bernadette students north of Eglinton are directed to Our Lady of Good Voyage St. Herbert students east of Fallingbrook Drive are directed to St. Valentine students west of Fallingbrook Drive are directed to St. Bernadette The new overall capacity in the review area would be 2821 pupil places which is a reduction of 1573 pupil places. Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 36 APPENDIX 2 New Facility Requirements: St. Bernadette Relocation of the Ontario Early Years Centre to re-establish the space for FDK (TBD) The replacement of Toddler and Pre-school Child Care spaces will be required as a result of the closing of the St. Dunstan and St. Herbert Child Care Centers. Funding for the replacement of child care spaces would be requested through a submission of a Consolidated Capital Funding Business Case. Any additional improvements that do not involve the construction of program or child care spaces could be funded through Renewal Funding, Operational Funding or Proceeds of Disposition. Transportation: The increase in the number of students that would require bussing, based on the Board approved transportation distances, is approximately 165 at a projected cost of approximately $28,200 per year. Costs: The resulting approximate, annual costs of Option 3 are as follows: Option 3 Expenditures for School Utility & Snowplowing/Salting Costs ($) Outstanding Renewal Needs Transportation Costs Status Quo $831,845 $11,844,206 $167,755 New Costs $512,106 $8,183,406 $195,953 Impact ($319,739) ($3,660,800) $28,198 *Cost are approximate The approximate savings for this option with respect to utilities, snowplowing/salting is $320,000 per year, in addition to savings on the reduction in staffing and capital renewal needs which in some situations would no longer be required. There would however be an increase in bussing costs of approximately $28,200. FUNDING REQUEST FOR CONSOLIDATED SITES The Ministry of Education allocated $750 million in funding, announced in the 2014/2015 GSN, for the School Consolidation Capital (SCC) program to assist boards in reducing excess capacity. The funding can be requested through a SCC capital project business case to address a variety of items including but not limited to rightsizing of underutilized space, program improvements, and accessibility and/or energy efficiency. SECONDARY SCHOOL FEEDER INFORMATION In all options the recommendation is to maintain the secondary school boundaries for St. Joseph Secondary, St. Marcellinus Secondary and St. Francis Xavier Secondary notwithstanding that in all options students from the same elementary feeder school will be directed to different secondary schools. The intent is to maintain status quo enrolments at all three (3) secondary schools. Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 37 APPENDIX 2 It is not uncommon for a feeder school to have students directed to more than one secondary school based on physical boundaries not the school boundary. This is true for both regular track and specialty programs (EF, FI, IB). TIMELINE & TRANSITION In all options the recommendation is to close schools at the end of June 2017, subject to completion of the Pupil Accommodation Review and approval of the recommendation to close schools no later than June 2016. Following the decision to consolidate and/or close a school, the Board will establish a separate committee to address the transition for students and staff, who will work in consultation with parents/guardians and staff. CONCLUSION The Board of Trustees approved Policy 6.51 Pupil Accommodation Review on October 27, 2015 to comply with the Ministry of Education Pupil Accommodation Review Guideline. The approval of the policy enables the Board to proceed with a Pupil Accommodation Review. The 2013 Long Term Accommodation Plan identifies the East Credit review area as significantly under capacity in 2015/2016. A review and update of current and projected enrolment in this area confirms the necessity to commence Pupil Accommodation Review to reduce capacity. The Planning Department held an open house to provide community partners an opportunity to review the list of schools with available space in which a community partnership could be considered. Five (5) of the eight schools in the review area were identified as having available space for a potential community partnership. To date no community partnership interest has been received for these schools. Three options have been identified for review and consideration for the East Credit review area. The PREFERRED OPTION, prior to consultation with the community, is OPTION 1: Close Our Lady of Good Voyage, St. Dunstan and St. Gertrude and redistribute students as follows: Our Lady of Good Voyage: All students directed to St. Raymond St. Dunstan: All students north of Eglinton directed to St. Herbert All students south of Eglinton directed to St. Bernadette St. Gertrude: All Regular track students directed to St. Valentine All French Immersion students directed to St. Gregory Subject to approval by the Board of Trustees to commence a Pupil Accommodation Review on November 24, 2015, it is anticipated the review will be complete no later than June 2016. Following the decision to close a school(s), the Board will establish a separate committee to address the transition for students and staff that will work in consultation with parents/guardians and staff. Any schools approved to close would close by June 30, 2017. Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga G 10 Pg. 38 APPENDIX 2 RECOMMENDATIONS 1. THAT THE REPORT, INITIAL STAFF REPORT, PUPIL ACCOMMODATION REVIEW 2015 – EAST CREDIT, MISSISSAUGA, BE RECEIVED. 2. THAT THE BOARD OF TRUSTEES APPROVE THE COMMENCEMENT OF THE EAST CREDIT MISSISSAUGA PUPIL ACCOMMODATION REVIEW Prepared by: S. Cox, Manager of Planning J. Rogers, Senior Planner K. Koops, Planner Submitted by: S. Cox, Manager of Planning D. Del Bianco, Superintendent of Planning & Operations Date: November 18, 2015 Regular Board Meeting – November 24, 2015 Initial Staff Report, Pupil Accommodation Review 2015 – East Credit, Mississauga