Wait List data for St James Catholic Global Learning Centre Grade

advertisement
Wait List data for St James Catholic Global Learning Centre
Grade
2014 Enrolment
JK
SK
1
2
3
4
5
6
7
Total
23
28
28
28
23
23
23
14
11
201
# of students on the wait
list
28
14
20
11
15
4
2
0
0
94
Grade
October 31, 2015
Enrolment
23
23
27
26
28
23
20
23
14
10
217
# of students on the wait
list
8
12
10
16
4
10
0
2
5
2
69
JK
SK
1
2
3
4
5
6
7
8
Total
Capacity: 271 OTG
February 1, 2016
Flex Summary per School by Grade
School
FDK 1 FDK 2
GR01
GR02
GR03
GR04
GR05
GR06
GR07
GR08
UNG
Total
St Valentine
9
6
8
6
3
5
5
5
7
9
0
63
St Dunstan
3
0
1
8
4
6
8
5
10
7
0
52
St Herbert
1
4
7
3
3
5
3
4
6
10
1
47
St Bernadette
4
0
1
9
2
4
3
1
3
2
1
30
Our Lady of Good
Voyage
1
2
4
2
4
2
1
2
1
6
3
28
St Raymond
2
3
0
2
5
1
2
2
5
5
1
28
St Gertrude
Regular Track
4
1
1
2
4
2
1
3
4
3
1
26
St Gregory
1
1
2
2
5
1
5
0
3
3
0
23
Based on Oct 31, 2015 Enrolment Data
Flex Summary (Come From - Go To)
Our Lady of
Good
St
Voyage
Bernadette
Bishop Scalabrini
Canadian Martyrs
Corpus Christi
Divine Mercy
Father C.W. Sullivan
Father Daniel Zanon
Holy Cross
Mary Fix Catholic
Metropolitan Andrei
Our Lady of Good Voyage
Our Lady of Mercy
Our Lady of Peace
Pauline Vanier Catholic
Sacred Heart
San Lorenzo Ruiz
St. Aidan Catholic Elementary
St. Albert of Jerusalem
St. Angela Merici
St. Barbara
St. Bernadette
St. Bernard of Clairvaux Catholic ES
St. Catherine of Siena
St. Charles Garnier
St. David of Wales
St. Dunstan
St. Elizabeth Seton
St. Francis of Assisi
St. Gerard
St. Gertrude
St. Gregory
St. Herbert
St. Hilary
St. Jean-Marie Vianney
St. Joseph, Brampton
St. Joseph, Mississauga
St. Josephine Bakhita
St. Jude
St. Julia Catholic
St. Mark
St. Matthew
St. Raymond
St. Raphael
St. Richard
St. Sebastian Catholic Elementary
St. Teresa of Avila
St. Therese/Jesus
St. Valentine
St. Veronica (MV #2)
Sts. Peter and Paul
Unknown
Bram West 2 South
Bram West 3
Churchill Meadows 2 West
Credit Valley 4
Credit Valley 5
Mount Pleasant #1 South
Wellingdale 4C
Total
St Gertrude
Regular
Track
St Gregory
St Dunstan
St Herbert
St Raymond St Valentine
1
2
2
1
3
3
1
1
2
2
1
1
4
1
5
1
1
1
3
4
1
1
2
3
1
3
1
1
2
2
2
1
1
1
9
2
1
2
1
4
1
3
1
1
3
1
1
2
2
2
4
7
1
2
1
1
1
2
2
2
1
2
2
3
2
1
2
1
1
2
1
8
2
3
7
3
1
3
2
1
12
4
2
1
4
1
2
2
22
2
5
1
4
2
1
2
5
4
1
1
1
2
3
1
1
1
2
7
1
2
3
1
1
2
2
1
1
2
2
2
2
1
2
1
3
2
28
30
52
26
23
47
28
1
63
Based on Oct 31, 2015 Enrolment Data
Policy/Regulations 1.00:
Admissions
DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD
BOARD POLICY / REGULATIONS
Board Policy Number:
Subject:
Effective Date:
1.10
Admissions
Revised: (399) September 28, 1999;
(159) May 26, 2009; (143) April 26, 2011; January2012
A) DUFFERIN-PEEL RESIDENT STUDENTS
Elementary Schools i) Where Junior Kindergartens are in operation, students shall be admitted to Junior
Kindergarten in September of any school year provided that they reach the age of
four on, or before, December 31, in that same calendar year.
ii) Students shall be admitted to Kindergarten in September of any school year
provided that they reach the age of five on, or before, December 31, in that same
calendar year.
iii) Students shall be admitted to Grade 1 in September of any school year, provided
that they reach the age of six on, or before, December 31, in that same calendar
year.
iv) If the child is baptized Roman Catholic or an Eastern Church in full communion
with the Holy See of Rome, the child is accepted into the school regardless of the
parent(s)/guardian(s) baptism. The child’s baptismal certificate is required. (If
the parent(s)/guardian(s) are also baptized Roman Catholic or an Eastern Church
in full communion with the Holy See of Rome, the school will also keep a copy of
the parent(s)/guardian(s) baptismal certificate.)
v) When a child is not baptized Roman Catholic or an Eastern Church in full
communion with the Holy See of Rome, one of the parent’s/guardian’s Roman
Catholic or an Eastern Church in full communion with the Holy See of Rome,
baptismal certificate, is required to register the child.
B) DUFFERIN-PEEL RESIDENT STUDENTS
Secondary Schools The policy of "open access" means that pupils of all faiths may attend Catholic secondary
schools, with the understanding that they respect the environment and traditions of the
Dufferin-Peel Catholic system.
A pupil shall be admitted if:
i) the pupil and the parent(s)/guardian(s) or adult pupil is resident in the DufferinPeel jurisdiction, and
ii) the pupil and the parent(s)/guardian(s) or adult pupil is a Canadian citizen or a
permanent resident.
1
Policy/Regulations 1.00:
Admissions
C) STUDENT REGISTRATION WHERE RESIDENCY IS OUTSIDE OF
DUFFERIN-PEEL
Elementary and Secondary Schools
Where a school principal certifies that there is sufficient needs and accommodation for
the pupil, the school principal must:
i) In elementary schools only - verify proof of Roman Catholic baptism, or baptism
in an Eastern Church in full communion with the Holy See of Rome, for either the
child or one of the parents/guardians;
ii) In elementary schools only – where one parent/guardian is a baptized Roman
Catholic or an Eastern Church in full communion with the Holy See of Rome,
verify that the parent(s)/guardian(s) direct their educational tax support to their
resident Catholic Board;
iii) notify the parent(s)/guardian(s)/adult student of their responsibility for the
transportation of the student;
iv) notify the parent(s)/guardian(s)/adult student of the requirement for re-application
on a yearly basis. (Reference GAP 105.06)
STUDENTS MAY BE CONDITIONALLY REGISTERED, UNTIL SUCH TIME AS
THE SCHOOL PRINCIPAL RECEIVES THE STUDENT'S "ONTARIO STUDENT
RECORD" FROM THE PREVIOUS SCHOOL ATTENDED.
REGULATIONS
1.10
ADMISSIONS
1. Students registering for the first time in an elementary school, in the DufferinPeel Catholic District School system, shall be required to produce proof of age and
Roman Catholic baptism or baptism in an Eastern Church in full communion with the
Holy See of Rome, for the child and/or one of the parents/guardians.
Members of an Orthodox Congregation will not be considered separate school
supporters. An Orthodox person who is formally received into the Catholic Church, is
given a formal letter (with a seal) from a Roman Catholic or Greek Catholic parish,
stating that they have been received into the Catholic Church. It should be noted that
the family is now Catholic, and as such have the legal right to enroll in Catholic
schools and to direct their taxes to the Catholic school system. These previously
Orthodox believers retain their Orthodox baptismal certificate. A letter from a pastor
certifying that the child has been baptized in, or received into, an Eastern Church in
full communion with the Holy See of Rome, will be accepted in lieu of a Baptismal
Certificate for admission to the Catholic school system.
2
Policy/Regulations 1.00:
Admissions
A student so qualified and so registered will be considered a student of the system
until such time as:
a) he/she graduates;
b) he/she moves out of the jurisdiction of the Dufferin-Peel Catholic District
School Board;
c) he/she is withdrawn through any legal process.
2. Students admitted from a school of a different system shall be placed by the
principal in the grade in which she/he believes most appropriate. Principals shall
secure the Ontario Student Record (OSR) and necessary records for all students
admitted from a different system.
3. A Catholic parent/guardian will be considered a separate school supporter
immediately upon receipt by the Board of a properly signed Application of
Direction of School Support and/or a Separate School Lease Agreement (when
required).
Participants enrolled in the rite of Christian Initiation of Adults (R. C. I. A.) will
not be considered separate school supporters until they have been formally
baptized by, or received into, the Roman Catholic Church.
4. Eligible students may be admitted immediately upon completion of all registration
procedures.
.....
3
OUR LADY OF GOOD VOYAGE
PROJECTED FIVE-YEAR RENEWAL NEEDS
Brief Description
Priority
Replacement [D302002 Hot Water Boilers - Original Building]
Replacement [B3010 Roof Coverings - Original Building]
Major Repair [B2020 Exterior Windows - Entire Building]
Replacement [G204001 Fencing & Gates - Chain Link Fence]
Replacement [D502002 Lighting Equipment - Interior Lighting - Entire Building]
Replacement [D3060 Controls & Instrumentation - BAS]
Replacement [G204002 Wooden Retaining Wall - Site]
Replacement [D2020 Domestic Water Distribution - Plumbing Piping Systems]
Replacement [C3020 Floor Finishes - Vinyl Floor Tile - Entire Building]
Replacement [C1030 Fittings - Original Building]
Replacement [D503004 Public Address Systems - Original Building]
Replacement [G2010 Roadways - Site]
Replacement [C303099 Other Ceiling and Ceiling Finishes - Underside of gym metal roof]
Replacement [C1010 Partitions - Moveable Partitions - Original Building]
Major Repair [G204007 Playing Fields - Asphalt Paved Playground - Site]
Major Repair [G204007 Playing Fields - Landscaped Playground - Site]
Major Repair [D1010 Elevators & Lifts - Original Building]
Replacement [D303099 Other Cooling Generating Systems - Rooftop HVAC Unit (Day care)]
Replacement [D3050 Terminal & Package Units - Terminal Heating Units]
Major Repair [A1010 Standard Foundations - Original Building]
Major Repair [B2010 Exterior Walls - Original Building]
Major Repair [G203002 Concrete Walkway]
Replacement [G204001 Fencing & Gates - Metal Fencing]
Replacement [D502002 Lighting Equipment - Emergency Lighting - Original Building]
Replacement [G2020 Parking Lots - Site]
Major Repair [C1020 Interior Doors - Original Building]
Replacement [C3010 Wall Finishes - Paint Wallcovering - Original Building
Replacement [C3020 Floor Finishes - Carpeting - Original Building]
Replacement [C3030 Ceiling Finishes - Suspended Acoustic Panel Ceiling - Entire Building]
Replacement [C1030 Fittings - Washroom Accessories - Entire Building]
Replacement [D2010 Plumbing Fixtures - Original Building]
Replacement [D304008 Air Handling Units- Original Building]
Replacement [D304007 Exhaust Systems]
High
High
High
High
High
High
High
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Replacement [B3010 Roof Coverings - RCM]
Major Repair [B201001 Exterior Walls - RCM]
Replacement [D305001 Unit Ventilators - RCM]
High
N/A
N/A
Plant Department
Total Capital Planning Solution - Feb 2, 2016
Cost
Cumulative Cost
$156,000
$468,000
$62,400
$36,400
$426,400
$249,600
$18,720
$20,800
$192,400
$36,400
$46,800
$26,000
$20,800
$46,800
$20,800
$48,880
$31,200
$10,400
$93,600
$20,800
$52,000
$20,800
$10,400
$15,600
$41,600
$57,200
$67,600
$46,800
$249,600
$41,600
$156,000
$31,200
$26,000
$156,000
$624,000
$686,400
$722,800
$1,149,200
$1,398,800
$1,417,520
$1,438,320
$1,630,720
$1,667,120
$1,713,920
$1,739,920
$1,760,720
$1,807,520
$1,828,320
$1,877,200
$1,908,400
$1,918,800
$2,012,400
$2,033,200
$2,085,200
$2,106,000
$2,116,400
$2,132,000
$2,173,600
$2,230,800
$2,298,400
$2,345,200
$2,594,800
$2,636,400
$2,792,400
$2,823,600
$2,849,600
$72,800
$15,600
$93,600
$72,800
$88,400
$182,000
Attachment 1
ST. DUNSTAN
PROJECTED FIVE-YEAR RENEWAL NEEDS
Brief Description
Priority
Replacement [B3010 Roof Coverings - Original Building]
Major Repair [B2020 Exterior Windows - Entire Building]
Replacement [B2030 Exterior Doors - Original Building]
Major Repair [A1010 Standard Foundations - Entire Building]
Replacement [D3030 Cooling Generating Systems - RCM and Addition 1]
Replacement [D3050 Terminal & Package Units -Terminal Heating Units]
Replacement [D502002 Lighting Equipment - Emergency Lighting - Original Building]
Replacement [D304008 Air Handling Units - Original Building]
Replacement [D305001 Unit Ventilators - RCM and Addition 1]
Major Repairs [D2020 Domestic Water Distribution - Plumbing Piping System - Original Building]
Replacement [D304007 Exhaust Systems - Entire Building]
Replacement [C1030 Fittings - Millwork - Original Building]
Replacement [C3030 Ceiling Finishes - Original Building]
Major Repair [C101001 Fixed Partitions]
Replacement [C3010 Wall Finishes - Original Building - Core school]
Replacement [C3020 Floor Finishes - Vinyl Floor Tile - Original Building]
Replacement [D2020 Domestic Water Distribution - Water Heaters - Original Building]
Replacement [D502002 Lighting Equipment - Addition 1]
Major Repair [G204007 Playing Fields - Asphalt Paved Playground - Site]
Replacement [G2030 Pedestrian Paving - Site]
Major Repair [G204007 Playing Fields - Landscaped Playground - Site]
Replacement [D3030 Cooling Generating Systems - Original Building]
Major Repair [D4010 Sprinklers - Original Building]
Major Repair [B2010 Exterior Walls - Entire Building]
High
High
High
High
High
High
High
High
High
Medium
Medium
Medium
Medium
Medium
Medium
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Plant Department
Total Capital Planning Solution - Feb 1, 2016
Cost
Cumulative Cost
$468,000
$72,800
$49,920
$20,800
$67,600
$93,600
$10,400
$31,200
$187,200
$20,800
$15,600
$43,680
$93,600
$15,600
$57,200
$143,520
$14,560
$15,600
$56,160
$28,080
$46,800
$52,000
$20,800
$83,200
$468,000
$540,800
$590,720
$611,520
$679,120
$772,720
$783,120
$814,320
$1,001,520
$1,022,320
$1,037,920
$1,081,600
$1,175,200
$1,190,800
$1,248,000
$1,391,520
$1,406,080
$1,421,680
$1,477,840
$1,505,920
$1,552,720
$1,604,720
$1,625,520
$1,708,720
Attachment 1
ST. GREGORY
PROJECTED FIVE-YEAR RENEWAL NEEDS
Brief Description
Priority
Major Repair [C201001 Interior Stair Construction - Original Building]
Replacement [B2030 Exterior Doors - Original Building]
Replacement [C3020 Floor Finishes - Carpeting - Original Building]
Major Repair [B3010 Roof Coverings - 2002 Building Addition]
Major Repair [G2010 Roadways - Site]
Major Repair [G2020 Parking Lots - Site]
Major Repair [B2010 Exterior Walls - Brick Walls - Entire Building]
Replacement [B2020 Exterior Windows - Window Sealants - Entire Building]
Replacement [D3050 Terminal & Package Units - Original Terminal Heating Units]
Replacement [G204001 Fencing & Gates - Chain Link Fence - Site]
Replacement [D3060 Controls & Instrumentation - Original Building]
Major Repair [B301099 Other Roofing - Skylight - Original Building]
Major Repair [G204002 Retaining Walls - Site]
Major Repair [C3020 Floor Finishes - Vinyl Floor Tile - Original Building]
Replacement[D304007 Exhaust Systems - Exhaust Fans]
Replacement [C3030 Ceiling Finishes - Suspended Acoustic Panel Ceiling - Original Building]
Major Repair [C1020 Interior Doors - Original Building]
Major Repair [G203099 Other Walks, Steps & Terraces - Concrete Walkways - Site]
Major Repair [C101001 Fixed Partitions - Entire Building]
Replacement [C3010 Wall Finishes - Paint Wallcovering - Original Building]
Major Repair [G204007 Playing Fields - Asphalt Paved Playgrounds - Site]
Major Repair [G204007 Playing Fields - Landscaped Playground - Site]
Major Repair [G2050 Landscaping - Site]
Major Repair [C101003 Movable Partition - Stage(Gymnasium) - Original Building]
Major Repair [D1010 Elevators & Lifts - Original Building - Hyd. elevator]
Replacement [D302099 Other Heat Generating Systems - Rooftop HVAC Unit for the Main Offices]
High
High
High
High
High
High
High
High
High
High
High
High
High
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
N/A
N/A
Plant Department
Total Capital Planning Solution - Feb 1, 2016
Cost
Cumulative Cost
$20,800
$74,880
$62,400
$31,200
$31,200
$67,600
$26,000
$52,000
$22,000
$46,800
$249,600
$10,400
$10,400
$67,600
$15,600
$109,200
$26,000
$20,800
$10,400
$88,400
$88,400
$36,400
$31,200
$26,000
$10,400
$52,000
$20,800
$95,680
$158,080
$189,280
$220,480
$288,080
$314,080
$366,080
$388,080
$434,880
$684,480
$694,880
$705,280
$772,880
$788,480
$897,680
$923,680
$944,480
$954,880
$1,043,280
$1,131,680
$1,168,080
$1,199,280
$1,225,280
$1,235,680
$1,287,680
Attachment 1
ST. RAYMOND
PROJECTED FIVE-YEAR RENEWAL NEEDS
Brief Description
Priority
Major Repair [B301099 Other Roofing - Skylights - Original Building]
Replacement [C3020 Floor Finishes - Carpeting - Original Building]
Major Repair [B2030 Exterior Doors - Original Building]
Replacement [D3050 Terminal & Package Units - Terminal Heating Units]
Replacement [D3060 Controls & Instrumentation - BAS]
Replacement [D2020 Domestic Water Distribution - Domestic Water Heaters]
Replacement [D304007 Exhaust Systems - Exhaust Fans]
Major Repair [G2030 Pedestrian Paving - Paved Walkways - Site]
Major Repair [G2020 Parking Lots - Site]
Major Repair [G2010 Roadways - Site]
Major Repair [G204007 Playing Fields - Asphalt paved playground - Site]
Major Repair [G204007 Playing Fields - Landscaped Playground - Site]
Major Repair [C101001 Fixed Partitions - Original Building]
Replacement [C3010 Wall Finishes - Paint Wallcovering - Original Building]
Major Repair [D303001 Chilled Water Systems - Cooling Tower]
Replacement [B202099 Other Exterior Windows - Failed Glazing Units & Window Sealants - Original
Building]
Replacement [C3030 Ceiling Finishes - Painted Ceiling Structures - Original Building]
High
High
High
High
High
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
N/A
$10,400
$31,200
$20,800
$31,200
$249,600
$18,720
$20,800
$26,000
$52,000
$31,200
$36,400
$31,200
$10,400
$88,400
$10,400
$10,400
$41,600
$62,400
$93,600
$343,200
$361,920
$382,720
$408,720
$460,720
$491,920
$528,320
$559,520
$569,920
$658,320
$668,720
N/A
N/A
$119,600
$15,600
$788,320
$803,920
Plant Department
Total Capital Planning Solution - Feb 1, 2016
Cost
Cumulative Cost
Attachment 1
AUTOMATIC REPLY TO THE PARINFO@DPCDSB.ORG MAILBOX
Thank you for your email which will be shared with the Accommodation Review Committee in
its entirety for consideration as part of this review. A copy shall also be posted on the board
website; however to respect personal privacy, any personal information (i.e. name, email
address, contact information, personal story) shall be (blacked out) redacted prior to posting.
Correspondence received between January 5 and January 12 will be reflected in ARC Working
Group Meeting #2 minutes including any discussion that took place, and will be available on the
Board website on February 4. Additional correspondence received up to and including January
22 will be reviewed and discussed at ARC Working Group Meeting #3 and posted on the Board
website after ARC Working Group Meeting #4.
Should you wish to become further engaged in the process, please contact your principal for
more information. Please note that all information pertaining to the Pupil Accommodation
Review for the East Credit Review Area including meeting dates, agendas, minutes and all
information shared with the ARC is available on the Board’s
website. http://www.dpcdsb.org/CEC/News/Pupil+Accommodation+Review.htm
February 2, 2016
Download