INSTITUTIONAL AND COMMUNITY PLANNING EPCC does not discriminate on the basis of race, color, national origin, religion, gender, age or disability. 2002-2003 AREA PLAN SELF-ASSESSMENT Total Number of Plans for Fiscal Year (Duplicated if addressing two or more goals): 933 Plans for Executive Area (Duplicated if addressing 2 or more goals): 13 President Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Associate Vice President, Employee Relations Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 2 Objective's Status 7.1 1053 AVP Employee Relations To have a current Employee All full-time employees will have none Handbook for each full-time received updated pages for their Employee Handbook. employee. $5,000 (from Employee Relations Account #11000-11108). Cabinet decision to put Employee Handbook on EPCC Web-site. Preparing, updating revising Employee Handbook for Web-site. Not Met 7.1 1054 Employee Relations To have a current Employee All full-time employees will have none Handbook for each full-time received updated pages for their employee. Employee Handbooks. $5,000 Cabinet decision to put Employee Handbook on EPCC Web-site. Preparing, updating, revising Employee Handbook for Web-site. Not Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 1 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 13 President Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Associate Vice President. Marketing and External Affairs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 3 Objective's Status 8.1 1055 AVP Marketing Create strong, positive market image. none Implement a much more aggressive promotional and marketing campaign through advertising, radio, TV, print, electronic media, web page development, billboards, and creating relations with media entities and community organizations. -Marketing budget was allocated among several means of media including radio, TV, newspaper, publications, promotional material, cinema and billboards. -The college's new webpage was designed and implemented. -Continuous increase in enrollment. -Much more positive image in the community. -External awareness of the college as "The Best Place to Start." -Internal pride in the college as "The Best Place to Start." -Special community awareness of transfer courses and occupational programs. Met 8.1 1337 AVP Marketing Contribute to the District's Increase by 10% the proportion of none efforts to increase enrollment. the target audience that is aware of EPCC. Work closely with the recruitment office to ensure outreach to all school districts. Providing links to recruitment office regarding job and educational fairs as well as promotional materials, posters & resources. Enrollment increased by more than 10%. Met 8.1 1338 AVP Marketing Contribute to the District's efforts to increase retention and graduation rates. none -Promoting the services and programs of the college. -Promoting the college as "The Best Place to Start" and transfer to a 4-year university. -Continuous increase in semester and annual enrollment means students are returning. -Better community awareness of transfer courses and occupational degrees. Met Increase by 5% the proportion of the audience that feels favorably about EPCC. Increase by 10% the proportion of none the audience that understands the strengths and benefits of EPCC. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 2 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 13 President Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Foundation and Diversity Goal Plan 8.1 1051 Area Foundation Objective Increase the awareness and visibility of the El Paso Community College Foundation to the College and the El Paso Community. Measure Identification/listings of community contacts, presentations, and visible communication measures. Standard Identify listings and contacts from the previous year and identification of articles or publications that have been developed. Strategies Identify companies, corporations, alumni, and general donors that are sensitive to education and the Foundation's mission. Assessment Results Use of Results Met-Possibly exceeded by deadline. Marketing/publicity of Campaign and scholarships in various media venues. 2 Objective's Status In Progress Further development of Web-site identifying scholarships and other Foundation information. Dissemination of 100 scholarships as a result of donors efforts. Developed Campaign brochures and Foundation brochures to promote Foundation and it's exposure. Recruitment of approximately 8-10, new and active Board members in a variety of communities interest. Campaign provided a plan of action for future donations/donors. 1.1 1056 Diversity Programs To provide a mechanism by Identification of vehicles to promote diversity. which college employees, students, and the community can interact and become more aware of the many facets of diversity. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase diversity participation through activities by 5%. Identification of students for the A&E Leadership training session through faculty/staff referrals. -Hispanic Heritage Month activity -Black History Month activity -Other cultural activities rpt0203AreaPlansFinalResults -Development of College/Community Committee for Hispanic Heritage Month -Marketing tool for Diversity activities -Attracted large number of participants and can project larger numbers and community involvement Friday, November 21, 2003 Met Page 3 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 13 President Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Human Resources Development Goal Plan 5.1 1037 Area Human Resources Development Objective Measure To increase staff professional Number of staff attending new training. development opportunities by adding two new training sessions to the existing repertoire of HRD training. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Strategies A minimum of 30 staff will Training events will be publicized participate in these new district-wide and attendance will be training sessions. documented. Costs will be covered within the existing HRD budget. Assessment Results Implemented "Who Moved My Cheese" at annual staff retreat and is ongoing. Introduced the Fish program and is ongoing. rpt0203AreaPlansFinalResults Use of Results Improved employee morale and productivity. Friday, November 21, 2003 1 Objective's Status In Progress Page 4 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 13 President Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, International Education Goal Plan 8.1 1249 Area International Programs Objective Increase number of grants/programs awarded to International Education Program. Measure At least one additional international grant program for training international students at EPCC will be added in 20022003. Standard none Strategies Government agencies will be contacted to determine grant program availability. The Internet will be searched to identify possible grant programs. International education organizations will be contacted to determine possible international education program leads. If needed, a meeting will be scheduled for followup. At least one additional international education program with funding for I.E. students will begin by August, 2003. Assessment Results Use of Results 2 Objective's Status Received invitation to participate in Not traveling to Honduras could the Pre-Departure Orientation in imply diminished opportunities for Honduras. Unable to attend due to future international programs. lack of funds. A new 12-month CASS Program will begin August 2003. Not Met Received invitation to participate in Not traveling to Honduras could the Pre-Departure Orientation in imply diminished opportunities for Honduras. Unable to attend due to future international programs. lack of funds. A new 12-month CASS Program will begin August 2003. Not Met Projected Travel Cost: $2,500 2.1 1249 International Programs Increase number of grants/programs awarded to International Education Program. At least one additional international grant program for training international students at EPCC will be added in 20022003. none Government agencies will be contacted to determine grant program availability. The Internet will be searched to identify possible grant programs. International education organizations will be contacted to determine possible international education program leads. If needed, a meeting will be scheduled for followup. At least one additional international education program with funding for I.E. students will begin by August, 2003. Projected Travel Cost: $2,500 OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 5 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 13 President Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Public Relations Goal Plan 8.1 1050 Area Objective Measure Public Relations Support the College's Image and enrollment upgrades. marketing effort and continue to maintain successful community public relationships. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Image enhancement of EPCC in community. Strategies Assessment Results Support marketing and external affairs projects. Develop closer working relationship with the EPCC department of recruitment and school relations. In our support role, significant increase in Fall, Spring and Summer enrollment. Relationship with recruitment and school relations ongoing through information on P.R. Connection. rpt0203AreaPlansFinalResults Use of Results A better understanding as to marketing and advertisement avenues. 1 Objective's Status Met Increase information especially to interval EPCC departments, staff and faculty. Friday, November 21, 2003 Page 6 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 13 President Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): President Goal Plan Area Objective Measure Standard Strategies 8.1 1048 President's Office Build partnerships with area Number of contacts, agreements, universities, school districts, partnerships developed. business/industry and garner/foster external relationships with elected officials, chambers, and other external agencies in the community. Increase by 30%. Presidential involvement in the "decision making process" on issues affecting/impacting the College as a whole by attending regular local area key meetings/events and keeping abreast of important issues to meet the communities needs. 2.1 1049 President's Office Number of high school students Increase enrollment by enrolled at EPCC under the expanding the concurrent enrollment program between concurrent enrollment program. EPCC and local area high schools. Increase by 50%. Meet regularly with school superintendents to ensure goals are being met and needs identified. Disseminate information promoting the program to local area high school counselors. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Assessment Results Use of Results Friday, November 21, 2003 2 Objective's Status Page 7 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Grants Management Goal Plan Area Objective Measure Standard 7.1 1094 Grants Management Paper files Create an electronic research Information collected is appropriately categorized for easy library for Grants access and dissemination. Management. The library will contain information/articles/statistics regarding all aspects of education, El Paso, to include the information/statistics on Texas and the nation. 7.1 1095 Grants Management Provide Grants Newsletter for the EPCC community. 7.1 1096 Grants Management 7.1 1097 Grants Management Semester/email and insert in faculty newsletter. Strategies Assessment Results Grants Management team with timely, Electronic Library was developed accurate and comprehensive research. by researching the world wide web. Collect and store timely Projected Cost: Scanner and R/W information, articles, statistics CD: $400.00 regarding education focusing on Hispanic education, issues, data and statistics. Use of Results Library to support grant development for EPCC proposals. 7 Objective's Status Met Once a month Support and provide interesting and pertinent information regarding EPCC grants and rely information on upcoming grant applications. The newsletter will be interesting, informative and concise. Request for Proposals (RFP's) will be summarized for ease and convenience to the reader. Costs: Max $.03 a copy, $300 annual cost. (This is the full insert) When we have a few articles, the faculty newsletter will print at no cost. 2002-2003 Grants Management understaffed by two full-time members. Specialist and Manager. Childcare Program absorbed more time then anticipated. Newsletter was not addressed during this time because of grant funding priorities. Work began on newsletters April 2003; to be completed by August 2003. It is now believed that a monthly newsletter will be too much. More likely and more effectively the newsletter will be published 3 to 4 times per year. Provide Grants Workshops Annual Workshops to the Community of El Paso to include non-profits. Conduct at least three workshops per year. Partner with and support the El Paso Community. Assist with their pursuit of grant/foundation funding by lending our expertise and knowledge through providing these community grant workshops. $8.00 for Grant Writing Training Manual for participants Estimate: $960.00 Workshops have been designed and Community workshops are developed. Due to lack of Grants currently scheduled to begin by Management personnel for 2002September 1, 2003. 2003 and childcare services demand on time; delivery of workshops has been postponed. In Progress Create Curriculum and Design Grant Workshops instructional aides complete for focused on Management, Budgeting, and Reporting for all three subject areas. EPCC Coordinators and Create and distribute by November 2002. Research with other Community Colleges and Universities that currently provide this grant training. Enhance knowledge of grants Currently working development of faculty handwork to cover fiscal and program management, control, service, and program audits. In Progress OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Announce Grant receipts and give In Progress recognition to faculty who work on them. Crate synergy for grant development. Manual will be posted on Grants Management website and paper copies distributed to all - Deansdisciplines, Coordinators and Friday, November 21, 2003 Page 8 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Grants Management Goal Plan Area Objective Measure Standard Directors managing or responsible for a grant. Strategies Assessment Results requirements and hopefully provide Resulting manual and workshops quality management, fiscal control and will be implemented with the Fall services. 2003 faculty development. New Project-Projected Cost: 0 7.1 1098 Grants Management Provide Grant Writing Training for EPCC Faculty and Staff. Conduct Workshops Annually One Workshop per year. Support the continued efforts to search Workshops have been delivered to and secure additional outside resources faculty and staff two times a year. for our students, programs and faculty. Use of Results 7 Objective's Status Administrators. Assistant Program Managers and Budget heads. Managing federal and statistics, grants regulations procedures and policies. Faculty and Staff have demonstrated ongoing increase in developing grants for their programs and EPCC students. Met Met Projected Cost: $360.00 7.1 1099 Grants Management Improve Child Care Services, specifically verifying all files and reports are accurate, Child Care Service Policy and Procedure Manuals updated and Child Care Service in full compliance. 7.1 1100 Grants Management Continue to implement Carl Evaluation and Planning process Perkins planning process for in place. evaluation of all CP Allocation Program/Budget. Audit files and procedures for compliance. Survey students for quality of child care services management and support. Financial reporting is effective and accurate. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT EPCC and Child Care Services Policies & Procedures, Access and Carl Perkins grantee requirements, annually. Support and monitor the Child Care Services Program, to insure compliance, quality, effectiveness, and efficiency. Audit completed. CCS updated parent manual and website for students. Established a hotline and e-mail account. The childcare web site to be uploaded within the next 30 days. Areas of weakness were strengthened. Placement (timely), accurate invoices, handbook, efficient use of funds for direct services. Student use of e-mail and hotline to access CCS info and placement services. There has been a 25% increase in student parent placement with quality childcare. CCS in compliance with federal, EPCC regulations and procedures. By 8/31/03. Provide technical clarification expertise to managers. FY 01-02 plans were requested and collected from 99% of the Carl Perkins Budget Heads. FY 02-03 plans were not requested due to the pre-determined state mandated planning and evaluation process for Carl Perkins programming. FY 0102 plans provided a multi-year plan. FY 01-02 Plans were reviewed and In Progress evaluated. Results were available for use by the EPCC Vice Presidents in planning the FY 0102 and FY 02-03 Carl Perkins Allocation Annual Plan. rpt0203AreaPlansFinalResults The Grants Management Office will hold a Planning Process workshop for Carl Perkins and other grant funded programs by 8.31.03. Workshop participants will work on their 03-04 Area Plans. This planning process will provide technical clarification expertise to managers. The results will further the Grants Evaluation and Planning Friday, November 21, 2003 Page 9 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Grants Management Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 7 Objective's Status Process. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 10 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Institutional and Community Planning Goal Plan Area Objective Measure 7.1 1446 Institutional & Community Planning Facilitate annual Assessment and Use of Results reporting of College-wide Area Effectiveness Planning (operational planning) process for use by College decision-makers. 7.1 1447 Institutional & Community Planning Number of training sessions held Provide training and with College Areas and Budget assistance to all administrative areas in the El Heads. Paso Community College District regarding annual operational plans (Effectiveness Plans). 8.1 1448 Institutional & Community Planning Provide quality community/strategic planning sessions and training in support of EPCC's mission with: College constituency groups, other educational organizations, communitybased groups. Completion and distribution of Assessment and Use of Results report to all College administrators and budget heads. Sessions held with positive feedback and evaluations from participants with tangible outcomes as a result of sessions. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Use of Results Objective's Status Standard Strategies Self-assessments and Use of Results prepared by at least 95% of all District-wide administrators and budget heads. -Provide Area Effectiveness Plans to each administrative area District-wide. -Actively facilitate Assessment process for use by College decision-makers. -Train administrators and budget heads in Assessment reporting and uses of Results information. -Provide Technical assistance to budget heads as needed. -Prepare Assessment and Use of Results report to establish baseline for future fiscal years and to provide tracking of results of objectives. Met Meet with 100% of all College areas and at least 85% of all College budget heads to hold Planning training sessions. -Meet with each of the 5 Vice Presidential areas, the President's area, and budget heads assigned to each of these administrators to provide Planning training and assistance. -Follow-up with individuals meetings with budget heads in each of these areas to provide technical assistance in writing objectives, measures and standards, and in evaluating prior fiscal year's plans. -Hold a Planning meeting with each Instructional Dean and Instructional Coordinators reporting to each Dean. Met At least 3 community planning sessions per fiscal year, with written report/outcomes provided. -Work with educational organizations and community groups to provide technical assistance and support for planning initiatives. -Train others in facilitation techniques and planning strategies. -Promote EPCC programs in support of community initiatives. -Train and involve College personnel where appropriate to showcase expertise and talent of EPCC staff. Met rpt0203AreaPlansFinalResults Assessment Results 7 Friday, November 21, 2003 Page 11 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Institutional and Community Planning Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 7 Objective's Status -Draft reports and provide assistance in strategic planning efforts. -Facilitate El Paso Community College response to statewide "Closing the Gaps" college awareness/enrollment initiative. 7.1 1449 Institutional & Community Planning Facilitate College-wide operational planning for continuous improvement via Effectiveness Planning process. Annual planning process in February/March of fiscal year for coming year completed successfully. Completion of Effectiveness plans by all College areas and every Budget Head as part of annual planning process, with measurable objectives, standards, and viable strategies for each Area. -Meet with each College Area prior to formal planning period to discuss process, deadlines and concerns. -Provide an updated planning guide for fiscal year to each budget head and planning forms with clear instructions. -Schedule individual meetings with College budget heads to discuss their specific planning objectives and viable measures, standards, existing baselines, and potential realistic operational strategies. -Provide technical planning assistance wherever needed throughout college. 7.1 1450 Institutional & Community Planning Centralize current and previous planning information into documented continuum of College-wide planning efforts & timeline to demonstrate continuous improvement efforts. Assemble all existing planning documents, Area Effectiveness Plans, Unit Improvement Plans, background documentation from current and prior years, facilities planning documentation, Master plans, strategic planning efforts, etc. All of prior year and current planning materials (100%) will be consolidated and organized in Institutional & Community Planning Office for accessibility and ease of use by College decisionmakers. -Inventory all materials currently housed in Planning Office & in Research & Development Division. -Inventory all materials in storage in Inst. Effectiveness/Inst. Research storage cabinets. -Assemble binders and indexes of all pertinent materials. -Include previous facilities planning efforts & materials. -Scan and computerize pertinent information. -Provide comprehensive report on materials to Vice President for Research & Development. -House Planning library materials in Inst. & Community Planning office. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Met In Progress Friday, November 21, 2003 Page 12 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Institutional and Community Planning Goal Plan Area Objective Measure 7.1 1451 Institutional & Community Planning Facilitate annual review and Strategic plan goals reviewed and revised as necessary by College any necessary update of administration. College's Strategic Plan in cooperation with the President's Office. 7.1 1452 Institutional & Community Planning Facilitate the annual Unit Improvement Planning/competitive allocation of funds for Improvement projects to streamline distribution of necessary funds. Successful submission of Unit Improvement Plans by areas at each campus, with selection of top 3 plans by District-wide Institutional Effectiveness Committee. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Use of Results Objective's Status Standard Strategies Strategic plan review complete, with any necessary additional strategic goals adopted by College administration and inserted into strategic plan by end of fiscal year. -Plan and facilitate annual review of District-wide strategic goals by College administrators, in cooperation with the President's office. -Facilitate planning session hosted by the President for all College administrators to give input into strategic plan goals. -Coordinate discussion and adoption of strategic goals by the President and Cabinet. -Revise strategic plan goals and make available College-wide for awareness and operational planning action by budget heads. Met Streamline for standardization, ease of deadlines, openness and perceived fairness in process. -Establish timelines and calendar for ease of submission of Unit Improvement Plans. -E-mail to all Institutional Effectiveness Committee chairs and College administrators timelines, College procedures, and forms for submission of Unit Improvement Plans. -Distribute top 3 plans selected by Institutional Effectiveness Teams at each campus to District-wide Institutional Effectiveness Committee. -Coordinate notification of selected Plan applicants & processing of account to include assignment of budget account numbers and purchase orders. -Prepare assessment of prior fiscal year's plan outcomes. Met rpt0203AreaPlansFinalResults Assessment Results 7 Friday, November 21, 2003 Page 13 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 25 Director, Institutional Effectiveness Goal Plan 7.1 1101 Area Institutional Effectiveness Objective Ensure that the College's procedures are current and up-to-date. Measure Standard Complete a review of at least 50% Completion of Review by of the procedures. August, 2003. Strategies In consultation with senior administrators, I.E. shall identify procedures in need of revision and promote revision in accordance with College Procedure 2.01.03.14 (Procedures). Assessment Results Use of Results Objective's Status Eighteen percent of the College's procedures have been reviewed in conjunction with the President's Cabinet meetings. The review has led to revision of In Progress the procedure on procedures and to the creation of more sophisticated tracking documents. The plan was withdrawn because the President's Registration Task Force has undertaken a review of all aspects of the registration process. Withdrawn Projected Cost: To be covered by existing IE budget 7.1 1102 Institutional Effectiveness Promote the effectiveness of Counseling, Graduate Placement, Orientation of Students, and Recruitment of Students. Completion of Report indicating Completion of Review by the extent to which the processes August 2003. steps are identified, are sound, are approved through appropriate institutional channels, are described in policies and procedures, and implemented and enforced by the institution. Consulting with administrators, I.E. shall identify steps necessary to accomplish each of the processes, determine if the steps are addressed by College policies/procedures, and evaluate the effectiveness of the processes by satisfaction surveys, flow charts, and other means. Projected Cost: To be covered by existing IE budget. 7.1 1103 Institutional Effectiveness Identify indicator title, measure, Indicators to be identified Establish Performance Indicators for Administrative data source and standard for each by August 31, 2003. administrative area. areas. Review existing, proposed indicators and consult administrators to establish indicators applicable to each administrative area. Projected Cost: 0 7.1 1104 Institutional Effectiveness Ensure that the College has an archive of essential documents. Develop and implement an electronic and paper archive to which College areas would contribute essential documents. By August 1, 2003. Consult appropriate administrators to create a College procedure indicating the inventory of documents to be archived. Projected Cost: To be covered by existing IE Budget. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT The implementation of administrative indicators awaits the creation of administrative profiles by the IR area and the possible use of Area Plans to suggest unique performance indicators for each administrative area. Met The IE Office has assembled an electronic and paper archive of many essential documents, but has not yet completed a College procedure describing the description, development and maintenance of the database needed to manage the archives. In Progress rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 14 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 25 Director, Institutional Effectiveness Goal Plan Area Objective Measure Standard Strategies Assessment Results 7.1 1105 Institutional Effectiveness Ensure that the College Policies have enabling procedures. Create a report identifying those By November 1, 2002. College Policies lacking enabling procedures. The IE database of College policies Create an Access matrix of Policies with and without enabling procedures, and procedures has been configured to be reviewed by the administration. to indicate which policies lack procedures. Projected Cost: To be covered by I.E. Budget. 7.1 1106 Institutional Effectiveness Ensure that the College administrators annually select, critical battery of surveys for trend analysis, planning, and Annual Reports. Develop and implement a battery By February 1, 2003. of surveys to be administered annually. Review archival surveys and The plan awaits a possible performance indicators to determine reorganization of assessment and composition of select recurring surveys planning tools. to be undertaken. 1107 Institutional Effectiveness Ensure that the data from a selected Critical battery of surveys are available in Banner. Develop and implement a process By August 1, 2003. for placing survey data in Banner so that the Executive Briefing Center of Banner displays the data. Work with IT personnel to identify The plan may be rendered appropriate tables and user formats for unnecessary once Banner's module displaying data. "Banner for Executives" has been configured to allow individual Projected Cost: To be covered by administrators to access their own existing IE budget. personalized databases. 7.1 1108 Institutional Effectiveness Ensure that the College Policies and Procedures, within the body of each policy and procedure, contain the correct crossreference numbers to associated Policies and Procedures. Create and implement a process to By August 1, 2003. identify and correct crossreference numbers. Create an Access matrix of crossreference numbers in the Policies and Procedures, to be reviewed and corrected by IE Staff. Ensure that the College registration process is accurately described by a Develop and implement a process By February 1, 2003. to identify and correct discrepancies in the current 1109 Institutional Effectiveness The report has been created and will be made available to Vice Presidents interested in ensuring that each policy under his or her purview is carried out by a procedure. Objective's Status Met In Progress Projected Cost: To be covered by existing IE budget. 7.1 7.1 Use of Results Projected Cost: To be covered by existing IE Budget. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Withdrawn The College policies and procedures have been checked to ensure that numerical references in a policy or procedure to other policies or procedures are correct. It was not deemed useful to create a matrix of cross-referenced numbers, since the table of contents on the internet easily indicates the relationship between the procedures carrying out a policy. Also, policies or procedures frequently refer to other applicable policies and procedures, as necessary. Withdrawn Create an Access matrix indicating the The plan was withdrawn because registration steps contained in the the President's Registration Task current College procedure, to be Force has undertaken a review of rpt0203AreaPlansFinalResults Withdrawn Friday, November 21, 2003 Page 15 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 25 Director, Institutional Effectiveness Goal Plan 7.1 1110 Area Institutional Effectiveness Objective Measure Standard Strategies College procedure. College procedure on registration. reviewed by appropriate administrators. all aspects of the registration process. Projected Cost: To be covered by existing IE budget. Ensure that College Policies and Procedures refer to the correct College administrative areas. Develop and implement a process By August 1, 2003. to review and correct Policy and Procedure references to College offices. Create an Access Matrix of administrative offices referred to in the Policies and Procedures, to be reviewed by appropriate administrators. Projected Cost: To be covered by existing IE budget. 7.1 1111 Institutional Effectiveness Assessment Results Ensure that the IE Staff is familiar with the Access database program. Develop and implement a process By December 1, 2002. for training the IE Staff in Access. Create and assign Access tasks designed to ensure that all Staff can create and revise essential components of the program. The IE policy and procedure database has been configured to indicate Vice Presidential responsibility for policies and procedures. A report assigning policy responsibility has been prepared and is being reviewed by the Vice Presidents. The IE staff and many of the other Research & Development staff attended a private, semester-long class in Access during the Fall 2002 semester. Projected Cost: To be covered by existing IE budget. 7.1 1112 Institutional Effectiveness Develop and implement a process By August 1, 2003. Ensure that the review of Carl Perkins programs is part to Integrate Carl Perkins Program review into appropriate College of Program Review. procedures. Consult with the Program Review Committee and the office of Grants Management on performance measures and time lines. Projected Cost: To be covered by existing IE budget. 7.1 1113 Institutional Effectiveness Ensure that the administrative responsibility for the accuracy of College Policies and Procedures is defined. Develop and implement a process By August 1, 2003. to reorganize the IE College Policies and Procedures database so that Presidential and Vice Presidential responsibility is assigned. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Consult the appropriate Vice Presidents to determine for which policies and procedures a Vice President is responsible. Use of Results Objective's Status In Progress The success of the class has led to greater use of the program by the IR and IE areas, and it is contemplated that selected staff may attend formal, advanced credit, Access classes. Met The Program Review Committee has recommended that grant projects not be review through the Program Review process. It may be possible to review these programs through a type of District review which would include both a review of grants and Program Review. In Progress The plan has been subsumed by ongoing Presidential review of College policies and procedures, which include a determination of Vice Presidential responsibility. Withdrawn Projected Cost: To be covered by existing IE budget. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 16 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 25 Director, Institutional Effectiveness Goal Plan 7.1 1114 Area Institutional Effectiveness Objective Ensure timely hiring of College personnel. Measure Standard Develop and recommend a College Policy allowing the President to hire personnel pending Board of Trustees approved. By December 1, 2002. Strategies Consult with appropriate administrators on feasibility and components of the policy. Assessment Results Withdrawn In Progress Projected Cost: To be covered by existing IE budget. 1115 Institutional Effectiveness Ensure that the College has an ongoing performance report on major institutional performance indicators. Develop, implement, maintain and publish an ongoing, interim I.E. Annual Report. By February 1, 2003. Configure an Access database that The broad outlines of the report creates an on-going report based on the have been developed. The report is latest data. tentatively scheduled for review by the Vice President of Research and Projected Cost: To be covered by Development by May 31, 2003. existing IE budget. 7.1 1116 Institutional Effectiveness Ensure that current and previous Unit Improvement Planning data are entered into a database for trend analysis and planning. Develop and implement an Access database to store and report on Unit Improvement Planning data. By November 1, 2002. Work with the office of Institutional and Community Planning to obtain data for the academic years for which Unit Improvement Planning data exist. Data about Site Improvement Plans have been incorporated into a new Access database embracing Area Effectiveness Plans. Projected Cost: To be covered by existing IE budget. 1117 Institutional Effectiveness Ensure that the IE Committee makes recommendations that are incorporated into planning. Objective's Status The plan was pre-empted by a Presidential hiring taskforce which recommended increasing the President's hiring authority. 7.1 7.1 Use of Results Develop and implement a process By January 1, 2003. to integrate the I.E. Committee's proceedings with the creation of Area Effectiveness Plans. Revise the College Procedure "Institutional Effectiveness" to link I.E. Committee recommendations to the Planning Process. The knowledge gained through systematic storing of extensive planning information has led to a proposal to combine all assessment and planning into a single, integrated database. Met The plan awaits finalizing of a Presidential initiative to include the IE committee in discussions on reallocating the College budget. Met It was determined that the IE office does not now possess sufficient staff with sufficient experience to become a major database developer for the College, although various areas have been provided such databases as time permits. Withdrawn Projected Cost: To be covered by IE budget. 7.1 1118 Institutional Effectiveness Ensure that College offices make effective use of databases. Develop and implement a process By August 1, 2003 for identifying database needs by administrative area. Consult with appropriate Administrators to determine database need. Survey for existing database. Projected Cost: To be covered by IE budget. 7.1 1119 Institutional Ensure satisfactory Develop and implement a process By December 1, 2002. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Consult appropriate administrators on Consultations in concert with the rpt0203AreaPlansFinalResults The consultations have pointed out Friday, November 21, 2003 Met Page 17 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 25 Director, Institutional Effectiveness Goal Plan Area Effectiveness Objective administration of the Graduate Survey. Measure Standard to ensure proper administration. Strategies what must be done to ensure that all graduates receive and complete a graduate survey, which is transmitted to the appropriate personnel. Assessment Results Use of Results Vice President of Student Services have led to a simplified administration of the Graduate Survey. a need to record in some detail how surveys are administered and suggest that Research and Development create an omnibus document that fully describes the College's assessment efforts. Projected Cost: To be covered by existing IE budget. 7.1 1120 Institutional Effectiveness Ensure that standing Create, develop, and maintain a committees conduct focused planning process applicable to meetings that result in standing committees. recommendations applicable for the planning process. By September 1, 2002. Objective's Status The plan awaits a broad review by the Vice President of Research and Development of the structure and charges of the College's standing committees, with a view to ensuring that the Committees are committed to making recommendations to improve the College. In Progress The IE Office will learn to undertake and/or supplement the College's current efforts to maintain an accurate organization chart through the Vision Standard software before the end of the 20022003 academic year. In Progress In consultation with Institutional and The creation of a SWOT analysis Community Planning, identify those has been transferred to the Planning steps that integrate SWOTanalysis with Office. planning. Withdrawn Work with the Office of Institutional and Community Planning to adapt the 2002-2003 planning process to facilitate standing committee deliberations. Convene a meeting of standing committees in September 2002 to explain the process. Projected Cost: To be covered by existing IE budget. 7.1 1121 Institutional Effectiveness Accurate, updatable College Creating, developing and By October 1, 2002 maintaining a process for revising Organization Chart. and publishing a College Organization Chart. Utilize the Microsoft Vision Computer program to create the Organization Chart to be available on the internet in PDF format. Projected Cost: To be covered by existing IE budget. 7.1 1122 Institutional Effectiveness Ensure the existence of a SWOT College procedure linked to planning. Develop a procedure outlining the By January 1, 2003 SWOT process. Projected Cost: To be covered by existing IE budget. 7.1 1123 Institutional Effectiveness Ensure that a SWOT Component is incorporated into each data gathering investment. Identify, revise, and/or develop appropriate instruments. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT By January 1, 2003 Review the current battery of instruments and recommend appropriate elements, in consultation with the IR Office. The creation of a SWOT analysis has been transferred to the Planning Office; however, once the process is institutionalized, the IE Office may seek to add SWOT analysis to rpt0203AreaPlansFinalResults Withdrawn Friday, November 21, 2003 Page 18 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 25 Director, Institutional Effectiveness Goal Plan Area Objective Measure Standard Strategies Projected Cost: To be covered by existing IE budget. 7.1 1284 Institutional Effectiveness EPCC Operations Manual. 7.1 1285 Institutional Effectiveness Flexible, simplified reporting Create, develop and manage an Access database that can receive of survey data. and process survey data and which can use the processed data to generate a variety of reports. Creation, development and management of an operations manual. Completion of Manual Review by August 2003. Use of Results Completion of development Work with the IR Office to adapt IR by November 1, 2003. Access data programs to serve the needs of the Office of Institutional Effectiveness. Objective's Status its list of College performance indicators as part of Unit Review. Conflate College policies, procedures, The plan was withdrawn in the face the 2002 Self Study and the Employee of Presidential initiatives Handbook into a single document. concerning evaluation of employees, re-allocation of the Projected Cost: To be covered by budget and a greater roll for the IE existing IE budget. Committee. Projected Cost: To be covered by existing IE budget. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Assessment Results Withdrawn The Unit Review database has been configured to create multiple reports from tables containing planning, survey and other assessment data so that assessment and planning are integrated. rpt0203AreaPlansFinalResults Met Friday, November 21, 2003 Page 19 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 22 Director, Institutional Research Goal Plan 7.1 1124 Area Institutional Research Objective Measure All reports run from the Reports Complete testing of CBM Reports to Run CBM reports. Menu. Standard Accurate reports delivered on time. Strategies Coordinate with SCT, Texas Connection and College offices. Test the CBM report generation process. Assessment Results Use of Results Objective's Status Complete - except for testing of CBM008. This report will require testing by Personnel Services with Institutional Research assistance Phase II - Testing of CBM008. Meet Texas State mandates. Will be on-going for the next few years. Improve EDUC 1300; increase completion retention and graduation rates. In Progress Met Met Validate the CBM reports. 1.1 1125 Institutional Research Evaluate the Impact of EDUC 1300 on student completion, retention and graduation. Produce study results. Surveys administered and analyzed at the beginning and end of each semester. Coordinate with EDUC 1300 Development committee. Develop two survey instruments. Administer surveys. Evaluate survey results. Evaluate completion, retention and graduation outcomes. 7.1 1126 Institutional Research Develop and analyze surveys Produce survey results. for College community, and integrate data into college databases. 7.1 1127 Institutional Research Provide special population data for CBM reports and College community. Produce data. Produce results on time. Coordinate with College offices. All requested surveys have been developed and analyzed. Used throughout the College to meet College goals. Collect data from 70% of students each semester. Coordinate with instructional disciplines. Date is necessary for the CBM001, In Progress CBM00A and several grant proposals. Conduct and analyze Student Survey. Date is being collected, but program written by SCT needs revision. SCT has not set date for revision. Coordinate with College committees and offices. IRB and Institutional Research Procedures developed. Used to facilitate research efforts throughout the College District. Met 7.1 1128 Institutional Research Develop and update Institutional Research Procedures. Complete set of published Procedures for Institutional Research. Complete by August 2003 Revised Annually. 7.1 1129 Institutional Research Provide data required to facilitate grand proposals. Data is available. Data produced as needed on Coordinate with Grants Management time. Office. Provided requested data. Used in grant applications and reports. Met 7.1 1130 Institutional Develop and implement an Preparation of the report. Prepare report by August Survey completed and analyzed. Used to develop new instructional Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Coordinate survey process with credit rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 20 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 22 Director, Institutional Research Goal Plan 7.1 1131 Area Objective Research employers' training needs survey. Institutional Research Organize and report information on program review. Measure Program Review Information. Standard Strategies 2003. and non-credit administrators. Update data annually. Coordinate with Institutional Effectiveness committees and Institutional Effectiveness Office. Assessment Results Use of Results Objective's Status programs and improve existing programs. Complete for credit programs, will be completed for noncredit programs by May, 2004. Evaluate and improve all instructional programs. In Progress Develop data reports. 7.1 1132 Institutional Research Coordinate, organize and prepare reports to Federal and State agencies. Prepare reports. Reports prepared on schedule and with 100% accuracy. Identify data sources, extract All report completed on time. information, and generate reports after verifying accuracy. Required to meet Texas State and Federal mandates. Met Prepared IPEDS reports. Prepared LBB reports. 7.1 1133 Institutional Research Promote the effectiveness of Provide data for unit review. all College units. Update data annually. Provide performance data to the Office A plan for unit review has not been Used to evaluate all nonof Institutional Effectiveness and developed. instructional units throughout the Institutional Effectiveness committees. College District. 2.1 1134 Institutional Research Facilitate the recruitment of High School Student Interest and students and creation of new High School Graduates reports. programs. Update data annually. Conduct and analyze career/college interest surveys at local high schools. Will not be done by Institutional Research. Not Met Withdrawn Coordinate efforts with Office of Recruitment and School Relations. Produce names and ID's of High School graduates annually. 8.1 1135 Institutional Research Disseminate enrollment information. College enrollment trends and projections posted on College website. Update data each semester after each 12th class day of long term. Develop, revise and update reports on the College's website. Data ready to be placed on WEB. Provide data to the College community and external agencies. Completed April, 2003. Provide information about the In Progress Update enrollment by the 12th class and present as unofficial; at the end of each semester replace with official numbers. 8.1 1136 Institutional Disseminate information to Update Fact Book/Pocket Stats. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Update Annually. Revise the College Fact Book and rpt0203AreaPlansFinalResults Friday, November 21, 2003 Met Page 21 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 22 Director, Institutional Research Goal Plan Area Research Objective Measure Standard the community. Strategies Assessment Results publish it in print and electronically. Use of Results Objective's Status College to College community and external agencies. Revise, print and disseminate Pocket Stats. 7.1 1137 Institutional Research Ensure Faculty Evaluations are conducted. 7.1 1138 Institutional Research 1.1 1139 Institutional Research 2.1 1139 Institutional Research Faculty Evaluations reports. Reports prepared before the Coordinate process with credit and end of each long semester. non-credit administrators. All faculty evaluations conducted and reports disseminated. Student evaluation of instructor classroom performance. Met Develop ad-hoc data reports Reports developed. for the college community and external businesses/schools/agencies. Accurate reports delivered on time. Coordinate with Information Coordinating Council. Created reports as needed. Provide data to support the College Mission and Goals. Met Create program extracts from Build current semester file. Banner for Student tracking. Update active cohort files. Update each term. Coordinate with LONESTAR Group. Information Technology does not Used for longitudinal tracking of have personnel to complete this student cohorts. project. Project must be completed by Institutional Research personnel when time permits. In Progress Create program extracts from Build current semester file. Banner for Student tracking. Update active cohort files. Update each term. Information Technology does not Used for longitudinal tracking of student cohorts. have personnel to complete this project. Project must be completed by Institutional Research personnel when time permits. In Progress Applications run correctly and developed on time. Coordinate with College departments. Applications completed as requested. Provide processes to meet College Goals. Met Analysis conducted each semester. Coordinate with all counseling departments. Counseling Performance reports created and distributed. Evaluate counselor performance. Met Surveys completed and analyzed. Evaluate colleges progress toward Met 7.1 1140 Institutional Research Develop the applications. Develop applications for College departments for data collection relating to Institutional Research functions. 7.1 1141 Institutional Research Obtain results of counseling performance. Produce data. Coordinate with Information Technology. Coordinate with LONESTAR Group. Coordinate with Information Technology. Produce, conduct, analyze new student orientation, counselor performance and career planning surveys. 1.1 1142 Institutional Process Drop, Graduate and Conduct and analyze survey. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Conduct Drop survey each Coordinate with College offices. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 22 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 22 Director, Institutional Research Goal Plan Area Research Objective Measure Leavers surveys. Standard Strategies Assessment Results semester. Use of Results Objective's Status meeting Goals. Analyze results. Conduct Graduate and Leavers survey annually. 5.1 8.1 1143 1144 Institutional Research Institutional Research Process employee and supervisor evaluation surveys. Conduct and analyze survey. Facilitate CB116 collection of student outcome data. CB116 data provided to THECB. Accurate data provided on time annually. Conduct surveys annually. Distribute survey forms to employees. Completed and analyzed. Determining employee satisfaction with College functions. Met Analyze results. Coordinate with instructional deans. Coordinate with Office of Co-op Education and Job Placement. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Texas Higher Education Coordination Board has not sent the required information to collect CB116 student outcomes. rpt0203AreaPlansFinalResults Evaluate placement rate of our graduates. Friday, November 21, 2003 Not Met Page 23 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Self-Study Goal Plan 7.1 1093 Area Objective SACS Self-Study To facilitate El Paso County Community College's reaffirmation and accreditation in the Spring of 2003. Measure Standard To facilitate during the 2002 Twenty-three sections of the academic year the writing of all Self-Study document are twenty-three individual sections written and edited. of the Self-Study drafts composed by the Principal Committees. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Strategies Assessment Results To conduct regularly scheduled meetings of the Self-Study Committees for the purpose of providing a sense of unity and motivation towards completion of assigned drafts. Committee meetings were held and documented in the form of minutes and in twenty-four section drafts. The drafts were combined, edited and published at the EPCCD 2003 Self-Study Report. An addendum was also published. rpt0203AreaPlansFinalResults Use of Results The Self-Study Report was disseminated via the Intranet and Internet. Hard copies were sent to the Site Team Visit Members. Recommendations mentioned in the Self-Study were addressed in the Addendum. A follow-up report will address the SACS COC SITE Team's recommendations. Friday, November 21, 2003 1 Objective's Status Met Page 24 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 11 Vice President, Research and Development Goal Plan 1.1 1085 Area VP Research & Development Objective Support student learning activities. (2002-2003) Measure Identify, develop and support student learning activity. Standard One program/activity. Strategies Create and support public policy research institute for students. Assessment Results Program written and proposed. Use of Results Objective's Status SGA & Honors programs did not accept offer. Met Reports prepared and process was Will result in changed planning better defined, however, report was calendar, and designed month for not timely. conducting SWOT (November). Met Staff made change to Microsoft Office XP. Met Projected Costs: 0 Office Responsible: Institutional Research and Strategic Planning 2.1 1086 VP Research & Development Identify institutional strengths and opportunities. (2002-2003) Produce timely report. By September of each year. Reports are to be available and incorporated into the annual planning process. Office Responsible: Institutional and Community Planning Projected Cost: 0 5.1 1087 VP Research & Development Increase office personnel professional skills. (20022003) Demonstrated ability to utilize new software. Full usage in every day operation. In-house training opportunities as available. Staff better prepared to communicate via college standardized software. Projected Cost: 0 6.1 1088 VP Research & Development Improve grants process success. (2002-2003) Monetary volume awarded. $10 million awarded towards technological infrastructure. Support, facilitate planning sessions for each major area of the college to pursue grant opportunities involving technological improvements. College attempted via TIF Grant & EPCC used tuition increase to fund was not awarded. improvement to technological infrastructure ($1.5 million) Not Met Projected Cost: 0 Office Responsible: Grants Management 7.1 1089 VP Research & Development Facilitate re-accreditation by Awarded re-accreditation. SACS. (2002-2003) Full; with zero recommendations. Develop progress reports. Self report was excellent. Projected Cost: 0 Will follow through with success when the report from Site Team is received. In Progress Organize for rapid response to SelfStudy recommendations. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 25 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 11 Vice President, Research and Development Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status Projected Cost: 0 Office Responsible: Institutional SelfStudy 7.1 1090 VP Research & Development Define, identify and measure. Determine levels of organizational effectiveness. (2002-2003) Report on all administrative Review and refine administrative areas. quality indicators. Performance indicators were identified. Working through the IE office, In Progress EPCC will have a tangible product. Assessment report completed. College units able to assess objectives and evaluate performance. Met Planning Office worked with external entities. Primarily consideration was given to in-house planning; some valuable success was evident both internally and external. Met Office's ability to work on this reduced because of staff Will continue next year. Projected Cost: 0 Introduce the Baldridge Award Criteria. Projected Cost: 0 Office Responsible: Institutional Effectiveness 7.1 1091 VP Research & Development Strengthen the planning and Use of results evident. evaluation functions DistrictWide. (2002-2003) 100% of area plans can prove their effectiveness. Develop effective evaluation model. Implement immediately. Projected Cost: 0 Office Responsible: Institutional and Community Planning 8.1 1092 VP Research & Development Strengthen community ties utilizing planning services. (2002-2003) Increase the number of planning sessions. By 50% externally, 100% internally. Support the development of brochure and mailing lists. Projected Cost: 0 Support hiring planning facilitators (2) (Funding in Department account) Projected Cost: 0 Office Responsible: Institutional and Community Planning 7.1 1286 VP Research & Development Develop and Implement Carl Process in place. Perkins Planning process to OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT By November 2001 Utilize committee or team support to develop process and implement a rpt0203AreaPlansFinalResults Friday, November 21, 2003 Not Met Page 26 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 73 Research and Development Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 11 Vice President, Research and Development Goal Plan Area Objective Measure Standard include assessment and tracking. Strategies process. Assessment Results Use of Results Objective's Status resignations and retirements. Responsible Area: Director of Grants Management 7.1 1287 VP Research & Development Improve the operational administration of the Begin at Birth Grant. Purchasing and personnel issues. Reduce issues by 100%. Training and otherwise support administrative personnel. Issues addressed at program level. More efficient and effective program resulted. Met During year when state funding was cut, grants allowed College to continue at high level. Met Responsible Area: Director of Grants Management. 7.1 1288 VP Research & Development Expand the Grant Development Program. Grant Awards. 10% of Board approved operating budget. Develop process to better inform, and Exceeded target of 10%, $11.3 prepare faculty and staff participation. million or 13%. Target Instructional administrators. Rewrite procedures. Responsible Area: Director of Grants Management. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 27 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan 1.1 1222 Area Call Center Training Consortium Phase II Objective -Identify 250 individuals on public assistance and provide them with the skill and behaviors to secure and maintain employment. Measure -Number of students employed/hired. Standard 1223 AVP Workforce To provide quality and Development satisfaction to Business and Industry. 1224 Surveys to Managers and AVP Workforce Create a One Stop training center for the Apprenticeship Students about the services Development receive. program. 1225 Community Liaison Workforce Increase the number of business -To develop partnerships and industry that use the college with Business & Industry and the Community at large. for training and retraining, by 30%. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT The results will be used to maintain a high quality of delivery and to expand our program offering. Objective's Status -Weekly meetings with Directors and Coordinators -Weekly staff meetings -Review of Business and student evaluations -Monthly meeting with El Paso Chamber of Commerce -Add personnel to meet increased work load. As a result of Business and Industry feedback as well s student feedback and to rigors of the delivery process staff professionals were given a variety of roles such as scheduling, monitoring, program development, grant writing and customer relations. Quality of feedback from the businesses and industries served, will be 95% satisfied. Create a collaboration between Apprenticeship, Kilgore, Business, Industry & EPCC. Acquire donated materials and equipment to renovate space. Contracts signed by the Electrical Fire wall between the training area In Progress Apprenticeship programs as well as and the warehouse has been erected Carpenters & Sheet Metal. with classroom and office space to follow. Received the Certificate of Occupancy and construction will begin immediately. 28 -Fund a Community Relations Budget to accomplish strategies. -Revise CD disk & Video for distribution and presentation to local businesses. -Work with the El Paso Chamber of Commerce in disseminating information to new businesses and Video has been revised and distributed. Acquire 40,000sq/ft of space at the Viscount Bldg. 2.1 Use of Results Quality of feedback from the businesses and industries served, will be 95% satisfied. Acquire 4,000sq/ft of space at the Viscount Bldg. 7.1 Assessment Results -Extensive screening of applicants before enrollment into training program. -Assigning of Program Advisors to assist in completion of program, job placement and to assure job retention. -Weekly staff/instructors meetings. -Quarterly meetings with Partners. -Additional personnel to meet increased workload. -Mentor Program to ensure progress of students after completion of training. -Number of students/employees retained on the job for 90 days. Surveys to Managers and Students about the services received. Strategies none -Number of students trained overall. 7.1 Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 rpt0203AreaPlansFinalResults Met Greatly expanded our off the shelf course capacity. The video will be presented to the National Institute for Staff & Organizational Development (NISOD) International Conference on Teaching & Leadership Excellence. May of 2003. Withdrawn The community Liaison position Friday, November 21, 2003 Page 28 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Objective Measure Standard Strategies industries. -Increase the number of advertisements in: Spotlight & Thrifty Nickel. 1.1 8.1 1229 1240 ATC Tools and Books AVP Lifelong Learning Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 The tools and books fund assures that all students entering the classes at the ATC have the correct tools and books the first day of class regardless of their status as a sponsored student or a self pay. All students will have access to the tools and books required to succeed in the classes offered at the ATC. 100% of the students attending class at the ATC will have access to the books and tools required for class. To extend TPEG financial aid resources to CE/Lifelong Learning programs, in order for non-credit students to access short-term educational and training opportunities. The procedure for application and none awards of financial aid will be finalized in coordination with the Financial Aid department. Assessment Results Use of Results Objective's Status has been eliminated following the retirement of the individual holding the position. The fund is a stable one which allows students to repay the college for books or tools which the college bought for them during the semester. Credits equal debits, therefore, there is no cost to the college. The ATC VGA will screen the students and order the books to guarantee their arrival before class. Students in high cost programs such as Massage, Truck Driving, CNA, Material Handling, Computers, etc., will be eligible to access these funds for a percentage of program tuition and fees. Projected Costs: $60,000. 1.1 1.1 1258 1259 ESL Vocational -Assist in developing Literacy curriculum content delivered via lecture or using technology. Incorporate or design technology-delivered material into lesson content for incumbent workers, families, and instructional staff. Teach instructors how to employ technology in their content delivery. Workforce Training -Construct a list of existing none content to be enhanced with technology-delivery; and convert the content. - 40% of holdings. Research the service needs of Survey 100% of manufacturing the community to incumbent consortiums. worker ESL training. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Convert the Coordinator, Customized Training vacancy to a Manager, Resource and Technical Support position in service with Literacy Programs and on behalf of Continuing Education and Lifelong Learning. Withdrawn Cost of new position: $34,466 Cost of CT Coord: $31,176 New funds req'd: $3,290 This also applies to plans #1359 & 1360. none Collect data using employee, supervisor and management focus groups for businesses and industries. rpt0203AreaPlansFinalResults Withdrawn Friday, November 21, 2003 Page 29 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Strategies Assessment Results Use of Results Objective's Status Interview and survey families in community service programs at community centers. Test and assess to determine educational level. Database results to support analysis. Develop specific recommendations for incumbent worker and family needs. Cost for surveying, testing, and travel: $8,000. This cost applies to also plan #1361 & 1362. 1.1 1260 Workforce Training Ensure that retention and exit levels of Workplace Literacy classes and students improves with the use of modern instructional delivery technology. Produce effective user guides for computer hardware and operating system software; web browsing instructions and a list of useful links that provide help for technical questions. Produce a list, with a content abstract, of useful literacy and ESL sites. Translate to Spanish. Produce and distribute all documentation to current students. Solicit feedback of the products' effectiveness. Hire the content developer for these products. Costs: $1,000. This cost also applies to plan #1363 1.1 1261 Workforce Training -Ensure that retention and exit levels of Workplace Literacy classes and students improves with the use of modern instructional delivery technology. Increase the percentage of incumbent workers completing their course at a higher level of achievement. 80% Procure and use a 16-computer wireless notebook cart at off-campus locations to facilitate delivery of ESL, GED, and vocation-specific education or training. Purchased 12 wireless notebooks. The notebooks are being used at various industry sites and deliver instruction. The demand for ESL/computer training is exceeding capacity. New ways of instructional delivery have been identified. Met Cost: $26,000 1.1 1262 Workforce Training -Develop a list of services Workplace Literacy is charged with providing to incumbent workers of specific businesses and industries and educational services for families. Develop the lists. Develop target none market-tailored brochures and other marketing materials and world-wide web page to advertise Workplace Literacy capability. Provide briefing and promotional materials to all EPCC administrators. Cost: $500 Develop the Workplace Literacy WWW page and provide for maintenance. Cost: $2000 These costs also pertain OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 30 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Strategies Assessment Results Use of Results Objective's Status to plan #'s 1365, 1366, 1367 8.1 1263 Project IDEA -Expand the capacity of the Adult Education Master Teacher Cadre. Successful completion of Teacher none Action Research Institutes, student-generated projects, action research, on-line book discussions, and state-wide teleconferences by 80% of IDEA participants who comprise the Adult Education Master Teacher Cadre. -Provide statewide professional development training. -Facilitate action research and projectbased learning. -Encourage critical reflection on practice. -Mentor participants. -Promote Cadre as experienced practitioners and instructional leaders. Cost of Project IDEA (funded by TEA $215,000). This cost also applies to plan #1368 2.1 1274 CE-Technology Develop new course or use Programs existing courses to meet industrial or technical needs of our business and industry community in El Paso. Number of students successfully completing courses. Increase the number of students served by 10%. Number of companies served during the year. Increase the number of companies served by 5 over previous years. -Rapidly respond to requests for training from El Paso's business and industry companies and develop courses to meet their needs. -Increase marketing and advertisements in the community to attract additional students to our courses. -Projected Costs: Instructional Supplies and materials = $5,500 2.1 1275 Material Number of students enrolled in Increase the marketing and Handling/Wareh advertising for this program. each Material ouse Ops Handling/Warehouse Operations (MH/WO) Program. Increase enrollment by an average of 5 students for each of the three classes held annually. -Develop information for release by the news and other media to provide program information to local high schools and the community. Projected Cost: $800 required for newspaper, joint ads with other Directors, and other media such as radio, INC newspaper, the monitor, and other media. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 31 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Objective 2.1 1276 Material Facilitate and enhance Handling/Wareh student development in the ouse Ops program. 2.1 1277 La Tuna 2.1 1278 CE-Office Technology Measure Standard Strategies Assessment Results Use of Results Objective's Status -Increase the quality of training Add an 18' racking systems Install an 18' racking system for available for students and enhance to further enhance the students to rack. their employability in this field. students racking skills. Projected cost: $2,000 for the racking system, pallet boxes and stack pallets. Number of students enrolled in Work with La Tuna educational staff to maintain each course. 15-18 students in each program i.e.. Automotive courses; HVAC courses; and Office Technology courses. Enhance the Office Technology Program by adding Microsoft Office XP to the new computers. Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Maintain 15-18 students in each course. Work with the La Tuna Education Director on a regular basis to insure continuing and new courses maintain the standard. $855 for instructional supplies. The number of students taking the Increase enrollment by 10% Office Technology open entry, over the previous 2 year self pace programs and the average. MOUS exam on OFFICE XP. Use OFFICE XP to increase marketing and advertising in our community to attract additional students to our Office Technology courses. Projected Cost: Purchase 6 computers to keep up with the OFFICE XP and other software needs of the students and community saved. Cost of this update is $9,000. 8.1 2.1 1279 1279 West Texas To provide an opportunity Truck and Auto for 6 local Trucking companies to train and retrain employees to meet new technologies in the diesel industry. -Number of students through the courses. -Number of new program offerings. -Follow-up evaluation forms the companies and students. -Increase company productivity. none West Texas To provide an opportunity Truck and Auto for 6 local Trucking companies to train and retrain employees to meet new technologies in the diesel industry. -Number of students through the courses. -Number of new program offerings. -Follow-up evaluation forms the companies and students. -Increase company productivity. none OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT -Consortium Meetings Withdrawn -Hire qualified instructors -Through industry partnership access to the most updated equipment and recent technology manuals. -Consortium Meetings Withdrawn -Hire qualified instructors -Through industry partnership access to the most updated equipment and recent technology manuals. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 32 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Strategies Assessment Results Use of Results Objective's Status 8.1 1280 El Paso Consumer Products -To develop training through Number of companies joining the none consortium. partnerships with business and industry. -To develop consortiums through industry commonalities. Program delivered 137% of training Will replicate this program model proposed. for future Texas Workforce Commission contracts. Audit from Texas Workforce Commission stated that the program was very good. Met 2.1 1280 El Paso Consumer Products -To develop training through Number of companies joining the none consortium. partnerships with business and industry. -To develop consortiums through industry commonalities. Program delivered 137% of training Will replicate this program model proposed. for future Texas Workforce Commission contracts. Audit from Texas Workforce Commission stated that the program was very good. Met 8.1 1281 Automotive Components To provide quality instruction for 8 companies to train and retrain employees to meet new technologies in the auto industry. -Number of students through the courses. none -Consortium Meetings. 2,101 unduplicated student count 4,171 duplicated student count -Secure companies' in-put on instructor New technology training in Six and instructional activities. Sigma, Lean Sigma, Crane, Franklin Covey Have developed curriculum for future customized training use based on the new technology. Met none -Consortium Meetings. Have developed curriculum for future customized training use based on the new technology. Met -Number of new program offerings. -Follow-up evaluation forms from the companies and students. 2.1 1281 Automotive Components To provide quality instruction for 8 companies to train and retrain employees to meet new technologies in the auto industry. -Number of students through the courses. -Number of new program offerings. 2,101 unduplicated student count 4,171 duplicated student count -Secure companies' in-put on instructor New technology training in Six and instructional activities. Sigma, Lean Sigma, Crane, Franklin Covey -Follow-up evaluation forms from the companies and students. 2.1 1282 SOS Program Outreach/Recruitment A minimum of 1125 youth will be none interviewed as potential candidates throughout the academic year. On-going participant interviews. A total of 2175 youth were interviewed a 52% increase of the objective measure. Met 8.1 1282 SOS Program Outreach/Recruitment A minimum of 1125 youth will be none interviewed as potential candidates throughout the On-going participant interviews. A total of 2175 youth were interviewed a 52% increase of the objective measure. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 33 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Strategies Assessment Results Use of Results Objective's Status academic year. 8.1 1.1 1354 1354 Call Center Training Consortium Phase II Call Center Training Consortium Phase II Provide our Call Center Partners with qualified and trained applicants. Provide our Call Center Partners with qualified and trained applicants. -Number of students employed/hired. -Number of students/employees retained on the job for 90 days. -Number of students trained overall. none -Number of students employed/hired. -Number of students/employees retained on the job for 90 days. -Number of students trained overall. none -Extensive screening of applicants before enrollment into training program. -Assigning of Program Advisors to assist in completion of program, job placement and to assure job retention. -Weekly staff/instructor meetings. -Additional personnel to meet increased workload. -Mentor Program to ensure progress of students after completion of training. 513 of students trained. -Extensive screening of applicants before enrollment into training program. -Assigning of Program Advisors to assist in completion of program, job placement and to assure job retention. -Weekly staff/instructor meetings. -Additional personnel to meet increased workload. -Mentor Program to ensure progress of students after completion of training. 513 of students trained. Grant ended in March and was not renewed. Met Grant ended in March and was not renewed. Met 248 of students placed workload. Mentor Program to ensure progress of students after completion of training. 248 of students placed workload. Mentor Program to ensure progress of students after completion of training. 8.1 1355 Community Liaison Workforce Publicize the workforce development area. Increase the number of business 28 and industry that use the college for training and retaining, by 30%. -Fund a Community Relations Budget to accomplish strategies. -Revise CD Video disk for distribution and presentation to local businesses. -Work with the El Paso Chamber of Commerce in disseminating information to new businesses and industries. -Increase the number of advertisements in: Spotlight & Thrifty Nickel. The Community Liaison position Withdrawn has been eliminated following the retirement of the individual holding the position (Jan 03). 2.1 1355 Community Liaison Workforce Publicize the workforce development area. Increase the number of business 28 and industry that use the college for training and retaining, by 30%. -Fund a Community Relations Budget to accomplish strategies. -Revise CD Video disk for distribution The Community Liaison position Withdrawn has been eliminated following the retirement of the individual holding OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 34 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Strategies and presentation to local businesses. -Work with the El Paso Chamber of Commerce in disseminating information to new businesses and industries. -Increase the number of advertisements in: Spotlight & Thrifty Nickel. Assessment Results Use of Results Objective's Status the position (Jan 03). 2.1 1356 Community Liaison Workforce Advertising. Increase the number of business none and industry that use the college for training and retaining, by 30%. -Fund a Community Relations Budget to accomplish strategies. -Revise CD Video disk for distribution and presentation to local businesses. -Work with the El Paso Chamber of Commerce in disseminating information to new businesses and industries. -Increase the number of advertisements in: Spotlight & Thrifty Nickel. 8.1 1356 Community Liaison Workforce Advertising. Increase the number of business none and industry that use the college for training and retaining, by 30%. -Fund a Community Relations Budget to accomplish strategies. -Revise CD Video disk for distribution and presentation to local businesses. -Work with the El Paso Chamber of Commerce in disseminating information to new businesses and industries. -Increase the number of advertisements in: Spotlight & Thrifty Nickel. 1.1 1359 ESL Vocational Enhance the content and Literacy availability of the resources in the Workplace Literacy Training and Technical Assistance Project Resource Library. Build and maintain a Literacy Program web presence for incumbent and profession (instructor) development - 60%. none Convert the Coordinator, Customized Training vacancy to a Manager, Resource and Technical Support position in service with Literacy Programs and on behalf of Continuing Education and Lifelong Learning. Withdrawn 1.1 1360 ESL Vocational Be a resource to all CE and Literacy LL departments. Develop institutes or workshops on topics of interest. -2 events. -Provide technical assistance for none Convert the Coordinator, Customized Training vacancy to a Manager, Resource and Technical Support Withdrawn OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 35 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Objective Measure Standard grant application; materials design and use of multi-media. -100% for each opportunity. 1.1 1361 Workforce Training Research the service needs of the community to incumbent worker English and Spanish GED preparation. 1.1 1362 Workforce Training Research the service needs of Survey other product-related business groups. the community to families living in the Empowerment Zone areas. 1.1 1363 Workforce Training Develop lesson materials to teach students of all Workplace Literacy programs how to use microcomputers from home, public libraries, area schools, community centers and other public access sites. Products should be produced in English and Spanish. 1.1 1364 Workforce Train instructors in notebook Increase the percentage of Survey 100% of Empowerment Zone Corporation managed areas through each area's Community Resource Council. Produce effective user guides for computer hardware and operating system software; web browsing instructions and a list of useful links that provide help for technical questions. Produce a list, with a content abstract, of useful literacy and ESL sites. Translate to Spanish. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Strategies Assessment Results Use of Results Objective's Status position in service with Literacy Programs and on behalf of Continuing Education and Lifelong Learning. none Collect data using employee, supervisor and management focus groups for businesses and industries. Interview and survey families in community service programs at community centers. Test and assess to determine educational level. Database results to support analysis. Develop specific recommendations for incumbent worker and family needs. Withdrawn none Collect data using employee, supervisor and management focus groups for businesses and industries. Interview and survey families in community service programs at community centers. Test and assess to determine educational level. Database results to support analysis. Develop specific recommendations for incumbent worker and family needs. Withdrawn Produce and distribute all documentation to current students. Solicit feedback of the products' effectiveness. Hire the content developer for these products. 80% Design and deliver professional Twelve wireless notebooks were rpt0203AreaPlansFinalResults The new venue for ESL, Math, Friday, November 21, 2003 Met Page 36 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Training 1.1 1.1 1.1 8 1365 1366 1367 1368 Workforce Training Workforce Training Workforce Training Project IDEA Objective Measure computer hardware, software incumbent workers completing and network features and their course at a higher level of how to integrate this achievement. instruction delivery tool into their teaching method. Standard Strategies development training for instructors. Cost: $1,000 Develop a list of services Workplace Literacy can provide EPCC departments and programs. Develop the lists. Develop target none market-tailored brochures and other marketing materials and a world-wide web page to advertise Workplace Literacy capability. Provide briefings and promotional materials to all EPCC administrators. Develop promotional materials to present Workplace Literacy to each target market. Develop the lists. Develop target none market-tailored brochures and other marketing materials and a world-wide web page to advertise Workplace Literacy capability. Provide briefings and promotional materials to all EPCC administrators. Gain EPCC designation as the in-house provider of choice for incumbent worker ESL education and GED preparation education. Develop the lists. Develop target none market-tailored brochures and other marketing materials and a world-wide web page to advertise Workplace Literacy capability. Provide briefings and promotional materials to all EPCC administrators. To work collaboratively with other members of the Adult Education Professional Development Consortium, adult education and literacy program administrators, TEA staff, and others to implement a comprehensive coordinated system of Successful completion of Teacher none Action Research Institutes, student-generated projects, action research, on-line book discussions, and state-wide teleconferences by 80% of IDEA participants who comprise the Adult Education Master Teacher Cadre. -Provide statewide professional development training. -Facilitate action research and projectbased learning. -Encourage critical reflection on practice. -Mentor participants. -Promote Cadre as experienced practitioners and instructional leaders. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Assessment Results Use of Results purchased. Eighty-four percent of the workers are completing their courses at a higher level of achievement when computers are used. Professional Development occurred for teachers with funds from TEA in collaboration with JHU. However, computer training needs and occur in the near future. GED for incumbent workers training is to use computers as an instructional tool. New instructional courses will be developed in order to integrate computers. Objective's Status Withdrawn Develop the Workplace Literacy WWW page and provide for maintenance. Withdrawn Develop the Workplace Literacy WWW page and provide for maintenance. Withdrawn Develop the Workplace Literacy WWW page and provide for maintenance. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 37 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Strategies Increase the (MH/WO) budget by $1,800 to purchase a forklift hydraulic lift jack and air compressor. Increase savings for the program by $1,200 each year after the equipment has been purchased. To reduce cost by increasing our service and repair of forklifts by training the lab assistant to accomplish these tasks. Assessment Results Use of Results Objective's Status professional development to meet the diverse professional development needs of adult education practitioners in Texas. 2.1 1374 Material Reduce the expense for Handling/Wareh outside forklift service. ouse Ops Projected costs: $1,500 for a hydraulic lift jack and $320 for an air compressor to blow out the filters and other compartments. 8.1 1375 El Paso Consumer Products Provide quality of training in Number of students registered and none retrained. a variety of targeted areas thus advancing the skills area. Secure company input on instructor selection. Company surveys in large part indicate that training was of good quality. Continue to assure and increase training quality. Met Continue to assure and increase training quality. Met Total of 1,108 students trained. 81,733 total contact hours generated. 2.1 1375 El Paso Consumer Products Provide quality of training in Number of students registered and none retrained. a variety of targeted areas thus advancing the skills area. Secure company input on instructor selection. Company surveys in large part indicate that training was of good quality. Total of 1,108 students trained. 81,733 total contact hours generated. 8.1 1376 SOS Program Intake/Eligibility Determination A minimum of 680 youth will be assessed for possible program enrollment. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 60% On-going participant assessments. There were 906 youth assessed (42%) for program enrollment. More students (226 or 75%) were assessed in order to identify those who met program enrollment requirements and were eligible for rpt0203AreaPlansFinalResults Met Friday, November 21, 2003 Page 38 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Strategies Assessment Results Use of Results Objective's Status enrollment. This did result in a lower standard. 2.1 1376 SOS Program Intake/Eligibility Determination A minimum of 680 youth will be assessed for possible program enrollment. 60% On-going participant assessments. There were 906 youth assessed (42%) for program enrollment. More students (226 or 75%) were assessed in order to identify those who met program enrollment requirements and were eligible for enrollment. This did result in a lower standard. Met 8.1 1377 SOS Program Enrollment/Assessment A minimum of 450 youth will be enrolled as program participants. 66% On-going participant enrollment. Approximately, 343 youth or 38% of the potential candidates were enrolled. Not Met This objective was not met as a result of youth not meeting minimum program requirements for enrollment (ex. TABE scores) and the uncertainty of continued funding. 2.1 1377 SOS Program Enrollment/Assessment A minimum of 450 youth will be enrolled as program participants. 66% On-going participant enrollment. Approximately, 343 youth or 38% of the potential candidates were enrolled. Not Met This objective was not met as a result of youth not meeting minimum program requirements for enrollment (ex. TABE scores) and the uncertainty of continued funding. 8.1 1378 SOS Program Service Strategy A minimum of 270 program participants will complete the Employability Skills Training Phase of the program. 60% On-going participant skills training. A total of 185 (54%) of program participants completed the employability skills training. Not Met A lower enrollment resulted in a lower completion of this measure. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 39 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan 2.1 1378 Area SOS Program Objective Service Strategy Measure A minimum of 270 program participants will complete the Employability Skills Training Phase of the program. Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Standard 60% Strategies On-going participant skills training. Assessment Results Use of Results A total of 185 (54%) of program participants completed the employability skills training. Objective's Status Not Met A lower enrollment resulted in a lower completion of this measure. 2.1 1381 SOS Program Participant Follow-up A minimum of 180 program graduates will complete the follow-up phase. none On-going student follow-up. 8.1 1381 SOS Program Participant Follow-up A minimum of 180 program graduates will complete the follow-up phase. none On-going student follow-up. 2.1 1382 SOS Program Obtain funding to continue the aforementioned objectives. Receive funding so as to continue none this successful programs. On-going resource development activities to ensure program continuation. An additional $70,000 was granted to continue the program through March 2003. Not Met Other funding opportunities were not supported. The program officially closed 3/31/03. 8.1 1382 SOS Program Obtain funding to continue the aforementioned objectives. Receive funding so as to continue none this successful programs. On-going resource development activities to ensure program continuation. An additional $70,000 was granted to continue the program through March 2003. Not Met Other funding opportunities were not supported. The program officially closed 3/31/03. 7.1 1383 AVP Workforce Office reorganization to provide additional support Development for all new grants secured. Surveys to Managers and Students about the services receive. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Quality of feedback from the businesses and industries served, will be 95% satisfied. -Weekly meetings with Directors and Coordinators -Weekly staff meetings -Review of Business and student Staff support was developed to the extent that 7 new positions were created and individuals cross trained giving the are the ability to rpt0203AreaPlansFinalResults -Create a 4 week instructional evaluation so that remediation of problem areas can take place prior to the end of class. Friday, November 21, 2003 Met Page 40 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Objective Measure Standard Acquire 4,000sq/ft of space at the Viscount Bldg. 7.1 7.1 1384 1385 AVP Workforce Develop a Construction Manager Program at the Development Lomaland site using home construction as the laboratory (2) homes per semester. Surveys to Managers and Students about the services receive. Quality of feedback from the businesses and industries served, will be 95% satisfied. Acquire 4,000sq/ft of space at the Viscount Bldg. Surveys to Managers and AVP Workforce Expand the computer class Students about the services offerings at the ATC by Development creating additional classroom receive. space. Acquire 4,000sq/ft of space at the Viscount Bldg. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Quality of feedback from the businesses and industries served, will be 95% satisfied. Strategies Assessment Results evaluations -Monthly meeting with El Paso Chamber of Commerce -Add personnel to meet increased work load. -Create a collaboration between Apprenticeship, Kigore, Business and Industry, & EPCC. -Acquire donated materials and equipment to renovate space. manage up to 8 million dollars of grants at any given time. This is approximately 8 times more than ever before. The additional hours added to the support staff for apprenticeship training gave the coordinator time to work on material donations. -Weekly meetings with Directors and Coordinators -Weekly staff meetings -Review of Business and student evaluations -Monthly meeting with El Paso Chamber of Commerce -Add personnel to meet increased work load. -Create a collaboration between Apprenticeship, Kigore, Business and Industry, & EPCC. -Acquire donated materials and equipment to renovate space. 9 houses have been built with approximately 130 students trained. -Weekly meetings with Directors and Coordinators -Weekly staff meetings -Review of Business and student evaluations -Monthly meeting with El Paso Chamber of Commerce -Add personnel to meet increased work load. -Create a collaboration between Apprenticeship, Kigore, Business and Industry, & EPCC. -Acquire donated materials and equipment to renovate space. 3 classrooms have been remodeled and the welding area expanded to double the capacity. Placement rate of 78% has been achieved. Tool room now capable of training twice the number. Use of Results Objective's Status -Materials to support the apprenticeship, construction is now being collected. The certificate of occupancy is secured and move in will start mid May 03. Presently writing for two grants (Self Sufficiency & Youth Built). Met Working on taking the training to Sanchez prison. Asked to submit the program to the Department of Labor as a Blue Ribbon program. New partner is providing the material for home construction. -Continued expansion to include another computer lab. Met -Movement of the electrical One computer lab had been Journeyman class to Building 2 and established in Building 1-called the separate it from building Network Academy. maintenance. Several new training offerings increased student enrollment. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 41 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan 7.1 1386 Area Objective Measure AVP Workforce Streamlining the registration Surveys to Managers and Development process to reduce lost contact Students about the services hours. receive. Standard 1387 AVP Workforce Video tape of ATC Development Surveys to Managers and Students about the services receive. 1388 AVP Workforce Presentations to area high Development schools. Surveys to Managers and Students about the services receive. Acquire 4,000sq/ft of space at the Viscount Bldg. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Assessment Results Use of Results -Weekly meetings with Directors and The result of the intervention is that Coordinators we have not lost any contact hours -Weekly staff meetings for the year. -Review of Business and student evaluations -Monthly meeting with El Paso Chamber of Commerce -Add personnel to meet increased work load. -Create a collaboration between Apprenticeship, Kigore, Business and Industry, & EPCC. -Acquire donated materials and equipment to renovate space. Quality of feedback from the businesses and industries served, will be 95% satisfied. -Weekly meetings with Directors and Coordinators -Weekly staff meetings -Review of Business and student evaluations -Monthly meeting with El Paso Chamber of Commerce -Add personnel to meet increased work load. -Create a collaboration between Apprenticeship, Kigore, Business and Industry, & EPCC. -Acquire donated materials and equipment to renovate space. Video tape recorded, documented, reproduced, and updated. Used as recruitment tool with a continuous loop. Video tape to be shown to students in classroom and at annual conferences to provide information about the ATC and its programs. -Weekly meetings with Directors and Coordinators -Weekly staff meetings -Review of Business and student evaluations -Monthly meeting with El Paso Chamber of Commerce -Add personnel to meet increased work load. -Create a collaboration between Apprenticeship, Kigore, Business and Partnered with Chamber of Because of outreach we have Commerce and went to each High decided to provide release time to School as well as outreach sessions. faculty to do outreach to High School students using the tape to Each interest student completed increase image and awareness of questionnaires that are submitted to ATC and Dual Credit course the ATC. offerings. Acquire 4,000sq/ft of space at the Viscount Bldg. 7.1 Strategies Quality of feedback from the businesses and industries served, will be 95% satisfied. Acquire 4,000sq/ft of space at the Viscount Bldg. 7.1 Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Quality of feedback from the businesses and industries served, will be 95% satisfied. Objective's Status We will continue to work with registration and continue to tweak and develop the process to assure continued success. In Progress Received phone calls and inquiries requesting information about the ATC. Met The next level will be showing the presentation tape to Civic Groups, Business and Industry. Has been shown at the Borderland Tradeshow. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Met Page 42 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 62 Associate Vice President, Workforce Development Goal Plan Area Objective Measure Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Standard Strategies Assessment Results Use of Results Objective's Status Industry, & EPCC. -Acquire donated materials and equipment to renovate space. 7.1 1389 AVP Workforce Updated CD presentation to companies. Development Surveys to Managers and Students about the services receive. Quality of feedback from the businesses and industries served, will be 95% satisfied. Acquire 4,000sq/ft of space at the Viscount Bldg. 7.1 1390 AVP Workforce Convert the classroom in BBuilding ATC and add data Development and power lines. Surveys to Managers and Students about the services receive. Acquire 4,000sq/ft of space at the Viscount Bldg. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Quality of feedback from the businesses and industries served, will be 95% satisfied. -Weekly meetings with Directors and Coordinators -Weekly staff meetings -Review of Business and student evaluations -Monthly meeting with El Paso Chamber of Commerce -Add personnel to meet increased work load. -Create a collaboration between Apprenticeship, Kigore, Business and Industry, & EPCC. -Acquire donated materials and equipment to renovate space. Burning of the CD was great idea but we found that Business and Industry did not have the equipment needed to play the CD. -Weekly meetings with Directors and Coordinators -Weekly staff meetings -Review of Business and student evaluations -Monthly meeting with El Paso Chamber of Commerce -Add personnel to meet increased work load. -Create a collaboration between Apprenticeship, Kigore, Business and Industry, & EPCC. -Acquire donated materials and equipment to renovate space. Classrooms 216, 217, & 218 added air condition to reduce noise level, connectivity to computers enhanced student learning, creating atmosphere for optimal learning experience. Will no longer be producing the CD but will focus on the Video presentation. Met Because of the overwhelming positive response form students and instructors regarding need for instructors to be available for conferences 3 instructor offices were built in Bldg. I, allowing student and administration to give input about their needs and concern created a win-win situation for all. Met Also the quality of the CD was lacking and did not produce the desired results. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 43 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Advanced Technology Center Goal Plan 5.1 1227 Area ATC Objective Meeting the manufacturing communities need for a trained workforce. Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Number of students completing programs. Percentage of students employed after completing the program. The completion rate across all programs will be above 85%. An effective means of tracking students as they enter the job market will be introduced. Strategies Match the college's training schedules with major companies work schedules so that more of their employees will have the opportunity to attend classes at the ATC. Assessment Results Electrical Journeyman Enrolled 102 Graduated 90 Retention Rate 88% Use of Results 3 Objective's Status Develop and create system to track students after graduation determine employment status after completing program. Met Demonstrate demand for continued support of program. Increase wages for apprentices. Met Assessment Results shows need for maintaining basic skills improvement in workforce development areas as means of Met Industrial Maintenance Institutionalize ten positions which are Enrolled 60 currently being funded through grants, Graduated 52 Retention Rate 87% self supporting classes, or part time pool funds. Cost: $181,000. Plastics Technology Enrolled 60 Graduated 48 Retention Rate 80% Precision Machining Enrolled 30 Graduated 26 Retention Rate 87% Quality Assurance Enrolled 15 Graduated 12 Retention Rate 80% 8.1 1.1 1230 1231 Chapter 133 Apprentice (ATC) CP Gloria and Cecilia (ATC) The percentage of students that Apprenticeship training, complete the four or five year sponsored by the El Paso apprenticeship programs. Community College will meet the needs of local employers for a well trained work force in a wide variety of industrial and commercial trades. Prepare students for the rigors of the math and reading requirements of the ATC programs. The number of students tested before being placed in an ATC program. The number of students completing programs. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Sixty five percent of all students beginning an apprenticeship program will complete that training. Funds required to sustain the apprenticeship program, payment of instructors and a 15% administration fee, are provided by the state through the Chapter 133 funding source. The college does not have a projected cost. The goal next year will be to build a one stop shop at the Tonka toy factory. No college money will be required. 408 students or 92.1% completed 4th year apprenticeships program. 100% of students entering ATC programs will be tested. 2% more of the students entering programs Each student entering a program at the ATC will receive testing and the results of those test before the beginning of the first class. Each Lab use for Sep 02 to Apr 03 1904 visits with duration of 1 to 4 hours each. Lab provided testing, tutoring, resume writing, job search 139 students or 95.21% completed 5th year apprenticeship program. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 44 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Advanced Technology Center Goal Plan Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Counsel students on their relative strengths and weaknesses as compared to the programs offered at the ATC. Achieve a match between the ATC programs and the students whom apply for those programs. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard at the ATC will complete those programs. Strategies student will discuss those test results with a counselor and receive the full weight of that counselor's experience so as to achieve a match between that student skills and desires, and the requirements of the programs offered at the ATC. Assessment Results Use of Results 3 Objective's Status for ATC, WFD, Call Center, SOS preparing students for workforce or and EPCC counseling center as per inception into academic areas. request. ATC retention rate 85% +/- with lab as integral part in improving basic skills in reading and math levels in order to maintain rate. Special populations: low literacy levels. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 45 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, CE Business Programs & Services Goal Plan 7.1 1264 Area Objective Measure N/C Business Programs Services To maintain and enhance the To have courses updated. N/C Business Programs and Services by Updating courses to better serve student needs. To upgrade and complete computer rooms for the CE Computer Programs in the areas of Update Computers. 7.1 1265 CE Computer Programs 2.1 1266 Customs To increase enrollment in the Increase number of enrollments Brokers/Purchase Customs Brokers Program. by 2%. At least 2 computer classrooms ready and working by Fall 2002. Standard 2% Strategies Input from instructors. 7.1 7.1 1370 1371 We are able to serve students in a more efficient manner. Met We are able to teach multiple classes in both classrooms we are teaching a full program of NCSE classes at VV and Graphic Arts at TM. Met none Newspapers Advertising We are holding steady at approximately 100 students a year. We reached our goal of a 2% increase in students. We are also doing some con-current work with the International Business Program. Results show us that using the advertising strategies indicated we can achieve our goals. The instructors for the program do a lot of "word to mouth" advertising. Met Programs and courses were reconstructed in the hope that we would better serve the students. In some instances this has worked. In other areas the results were not entirely successful. We learn that not all change is successful, and in one case we are going back to the old way of presenting a program. Met We are offering many more conWe are working more closely with current programs. In the area of Credit Deans and Coordinators. RE, we have had a 50% increase in students. We are having success with Management, Travel and Office Occupations. Met To maintain and enhance the New courses in schedule. N/C Business Programs & Services by promoting different methods of instruction. 2% N/C Business Programs Services To maintain and enhance the Increase in student enrollment in occupation skills area and N/C Business Programs & Services by doing more con- concurrent offerings. current programming. 2% CE Computer Programs To upgrade and complete computer rooms for the CE Computer Programs in the areas of Updated Software. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Objective's Status Computers were purchased. We Need to purchase 25-30 new computers with removable hard drives have 2 classrooms operating 1 at Valle Verde in the ATC and a for best possible usage. ($38,000) second one at TM. We have hired one (1) 35 hr. lab assistant who Need to hire part-time lab assistants. divides his time between VV and (2). TM. N/C Business Programs Services At least 2 computer classrooms ready and working by Fall 2002. Courses have been updated. Use of Results none Pre-Schedule Announcements 1369 Assessment Results 8 Strategically divided workload between department employees. Flyers 7.1 Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Input from instructors. Strategically divided workload between department employees. Input from instructors. Strategically divided workload between department employees. none Need to purchase 25-30 new This is a breakdown of Plan No. computers with removable hard drives 1265 objectives were met. New for best possible usage. ($38,000) software was installed in new computers. Other areas of the rpt0203AreaPlansFinalResults Able to serve the community better. Friday, November 21, 2003 Met Page 46 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, CE Business Programs & Services Goal Plan Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Strategies Assessment Results Use of Results 8 Objective's Status Need to hire part-time lab assistants (2). College were able to utilize our classrooms. 7.1 1372 CE Computer Programs 2.1 1373 Increase number of enrollments Research possibilities and Customs Brokers/Purchase practicalities for video taping by 2%. courses for out-of-town clients. To upgrade and complete computer rooms for the CE Computer Programs in the areas of New Course Offerings. At least 2 computer classrooms ready and working by Fall 2002. none Need to purchase 25-30 new Computers were purchased. We computers with removable hard drives have 2 classrooms operating 1 at for best possible usage. ($38,000) Valle Verde in the ATC and a second one at TM. We have hired Need to hire part-time lab assistants (2). one (1) 35 hr. lab assistant who divides his time between VV and TM. none Newspapers Advertising Flyers Pre-Schedule Announcements OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT We are still researching the possibilities of doing this; however, we are looking more seriously into doing the courses on-line. It is thought that this approach might be more successful. rpt0203AreaPlansFinalResults We are able to teach multiple classes in both classrooms we are teaching a full program of NCSE classes at VV and Graphic Arts at TM. We have learn that not all classes Withdrawn can be successfully video taped, but we have found a different source of improving the program. Friday, November 21, 2003 Page 47 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, CE Health Goal Plan Area Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Objective 7.1 1241 CE-Health 2.1 1242 Continuing Increase enrollment in Education/Messa Massage Therapy courses. ge Therapy 1.1 1243 2.1 Measure Standard Strategies Assessment Results Use of Results 8 Objective's Status 100% Compliance. none Maintain records and documentation 100% complaint. required by accrediting agencies. Keep abreast of new changes in regulations. Will be able to offer courses which require accreditation. Met Increase enrollment by 5%. none With the new building opening in Experienced more than a 50% January 2003, day and evening classes growth in enrollment. will be offered. Additional costs will be faculty salaries and instructional supplies. (Est. $30,000) Will continue to meet the public's demand for massage courses. Met Workshops/Conf Initiate procedure which will Procedure written and approved by cabinet officers. allow students to receive . Misc.. academic credit for continuing education courses taken concurrently with credit. none Work with Division Deans to write an effective procedure. CE Directors, Instructional Deans, Students successfully completing and VPs met. The Registrar drafted concurrent classes will be able to the procedure which will go to VPs convert CEUs to SCHs. for approval. Met 1244 CE Dental Increase enrollment in CE/Dental offerings. Increase enrollment by 5%. none Advertising and needs assessment survey. Decrease in enrollment. 2.1 1245 CE/EMT Increase enrollment in CE/EMT offerings. Increase enrollment by 5%. none Work with customized training to offer more courses to industry. Additional costs will be faculty salaries and instructional supplies. (Est. $25,000) Enrollment in EMT offerings has Continue marketing effort. Look grown more than 25%. We are for qualified instructors to meet servicing more companies with increased demand. CPR and first aid, and are providing ACLS and PALS to more hospitals. In addition, enrollment in CPR has increased. 2.1 1246 CE Radiology Increase enrollment in CE/Radiology offerings. Increase enrollment by 5%. none Offer more courses to meet CE requirements of radiographers. Additional costs will be faculty and instructional supplies. (Est. $10,000) Data not complete. Will continue offering NCT courses In Progress throughout the summer. 2.1 1247 CE Nursing Increase enrollment in CE/Nursing offerings. Increase enrollment by 5%. none Offer courses to meet local hospitals' needs. Create foreign nurse graduate program. Additional costs are faculty Enrollment grew over 25% primarily due to Del Sol grant. However, also offered courses to New courses are planned to assist credit nursing students be successful in their course of studies. Assure all courses eligible for accreditation maintain accreditation. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults State legislature is working on mandated education for dental assistants. New course offerings will be introduced in 2003-2004. Friday, November 21, 2003 Not Met Met Met Page 48 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, CE Health Goal Plan Area Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Objective Measure Standard Strategies Assessment Results Use of Results 8 Objective's Status salaries and instructional supplies (Est. assist credit nursing students. $30,000). 2.1 1248 Pharmacy Tech CE Increase enrollment by 5%. Increase enrollment in Pharmacy Tech CE offerings. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Offer more courses to meet CE Pharmacists have not registered for Will conduct needs assessment. requirements of pharmacists and pharm our courses. techs. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Not Met Page 49 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, CE Personal Enrichment Goal Plan Area Objective Measure 2.1 1267 CE-Personal Enrichment 7.1 1268 CE-Living Skills To maintain the Living Skills To be 100% in compliance with Lab county and state. Labs in the areas of: Standard To increase the number of funded none To maintain the Personal Enrichment courses offerings courses by 5% for the 2002-2003 and increase the number of year. funded courses. none 1269 Young People's College 5.1 1270 TX School Food Expand the Food Service course offerings. Service 5.1 1271 Enrichment Seminars To increase Young People's College class schedule. To increase the existing CE courses offering in Personal and Professional Development. Strategies Assessment Results Use of Results Convert all existing courses to meet CEU requirements. All adult classes offered in this Additional courses that were department were converted to meet revised to meet WECM guidelines CEU requirements. and submitted for funding generate revenue for EPCC. Courses that 15 courses were revised to meet were converted to CEU WECM guidelines for state contact requirements will enable students to hour funding. verify professional development. Need to increase the Lab Assistant work time by 50%. There is not a budget for this area. It has been collapsed into the CE Personal Enrichment Department. 5 Objective's Status Met Withdrawn Projected Cost: $5,000 -Sanitation -Function -Safety -Instruction Ready 2.1 Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 The enrollment for Young People's College class with increase by 2%. none Three Young People's College activities will be added to the 20022003 schedule. Two new areas of Food Service will be added to the 2002-2003 schedule. none The department is currently developing A grant from TWC ($94,599) was awarded to train 40 participants in classes in Food Service Training and Food Service Training. Those were Food Protection Management. TANIF recipients and homeless. We did graduate 36 students. Projected Cost: $1,000 Two new courses will be added Travel Career Training and Alterations for the Workplace. none The instructors are implementing a marketing plan to increase enrollment in this area. Projected Costs: $1,000 OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Young People's College enrollment did increase by 4%. With the addition of the Children's College Manager, the program has been taken to the next level and new curriculum has been implemented. The extra revenue that is generated is being used to create and develop state of the art academic and enrichment classes for children. Met We served a population in our community that have no resources and offered them the opportunity to be trained in a skill for employment. Met Due to reorganization within the We will drop Alterations for the CE area the Travel Career Training Workplace from the schedule. classes were assigned to Dee White. A course was developed and offered in alterations in the workplace. We did not have any success. We simply did not have enrollment. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Met Page 50 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 16 Director, CE Safety and Security Goal Plan 8.1 1250 Area Security/Sp Officer Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Increase enrollment by 5% per Increase enrollment of the Security and Special Officers annum. Course. Standard none Strategies Assessment Results Use of Results Increase the number and frequency of courses offered. Develop marketing plans through existing agencies and professional organizations. Objective's Status In Progress One to one contact with federal, state and local law enforcement agencies. 2.1 1250 Security/Sp Officer Increase enrollment by 5% per Increase enrollment of the Security and Special Officers annum. Course. none Increase the number and frequency of courses offered. Develop marketing plans through existing agencies and professional organizations. In Progress One to one contact with federal, state and local law enforcement agencies. 8.1 2.1 2.1 8.1 1251 1251 1252 1252 Defensive Driving Defensive Driving Increase enrollment by 5%. Increase enrollment of the Defensive Driving Program. Meet the community's need for classes to meet court referral. none Increase enrollment by 5%. Increase enrollment of the Defensive Driving Program. Meet the community's need for classes to meet court referral. none Defensive Increase capacity and Driving/Ft. Bliss enrollment of the Exp. Motorcycle Rider Program on Fort Bliss. Increase number of students by 5%. Defensive Increase capacity and Driving/Ft. Bliss enrollment of the Exp. Motorcycle Rider Program on Fort Bliss. Increase number of students by 5%. Evaluate current marketing strategies and seek improvements. In Progress Use new marketing strategies. Evaluate current marketing strategies and seek improvements. In Progress Use new marketing strategies. none Develop marketing plans suitable for military installations. In Progress Expand marketing plans at military sites. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Develop marketing plans suitable for military installations. In Progress Expand marketing plans at military sites. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 51 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 16 Director, CE Safety and Security Goal Plan 8.1 1253 Area Drivers Education Objective Increase enrollment throughout area school districts. Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Increase capacity and enrollment by 5% per annum. Standard none Strategies Assessment Results Use of Results Create more teaching positions and increase fleet. Objective's Status Withdrawn Create a new teaching assistant group; add four additional cars. $44,000. 2.1 1253 Drivers Education Increase enrollment throughout area school districts. Increase capacity and enrollment by 5% per annum. none Create more teaching positions and increase fleet. Withdrawn Create a new teaching assistant group; add four additional cars. $44,000. 2.1 8.1 8.1 2.1 1254 1254 1255 1255 Defensive Increase capacity and Driving/Ft. Bliss enrollment of the Defensive Driving Program on Fort Bliss. Increase number of students by 5%. Defensive Increase capacity and Driving/Ft. Bliss enrollment of the Defensive Driving Program on Fort Bliss. Increase number of students by 5%. Law Enforcement Academy Increase enrollment of the Basic Peace Officer course by 20% with each class until the optimal beginning class number is consistently reached. Consistently improve enrollment to the optimal number of 25 students with each Basic Peach Officer course. Increase enrollment of the Basic Peace Officer course by 20% with each class until the optimal beginning class number is consistently reached. Consistently improve enrollment to the optimal number of 25 students with each Basic Peach Officer course. Law Enforcement Academy none Develop marketing plans suitable for military installations. In Progress Expand marketing plans at military sites. none Develop marketing plans suitable for military installations. In Progress Expand marketing plans at military sites. none Maintain facilities with care to include new state of the art technology equipment. In Progress Interact and network with all area law enforcement agencies in an effort to increase beginning enrollment. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Maintain facilities with care to include new state of the art technology equipment. In Progress Interact and network with all area law enforcement agencies in an effort to increase beginning enrollment. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 52 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 16 Director, CE Safety and Security Goal Plan 8.1 2.1 1256 1256 Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Strategies Law Enforcement Academy-In Service Increase enrollment and/or use by none Increase agency use of the Law Enforcement Academy 5% each quarter from the previous quarter. Range through increased agency contacts and training initiatives. Direct marketing through direct contacts with the area agencies. Law Enforcement Academy-In Service Increase enrollment and/or use by none Increase agency use of the Law Enforcement Academy 5% each quarter from the previous quarter. Range through increased agency contacts and training initiatives. Direct marketing through direct contacts with the area agencies. Assessment Results Use of Results Objective's Status In Progress One to one contact with federal, state, and local law enforcement agencies. In Progress One to one contact with federal, state, and local law enforcement agencies. 5.1 1257 Defensive Meet the community's need Driving Tech Fee for driver education instructors. Track and analyze the employment of graduates from our course. None Increase the number of courses offered to meet the demand. Withdrawn 8.1 1257 Defensive Meet the community's need Driving Tech Fee for driver education instructors. Track and analyze the employment of graduates from our course. None Increase the number of courses offered to meet the demand. Withdrawn OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 53 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Center for Small Business Development Goal Plan Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Strategies Assessment Results Use of Results 7 Objective's Status 8.1 1232 Small Business Center Publicize the impact that the programs in the Center for Business Service programs have on our community. Establishment of an internal none publication. "CBS Report to Our Community" that speaks to the accomplishments of the business assistance programs of EPCC. Have directors and/or coordinators in EPCC Workforce Development programs to provide me with relevant data on the accomplishments of their programs and the economic impact they have on our community. 7.1 1233 Contract Oper Ctr PTAC Matching Increase in amount of government contracts obtained by clients of COC. Number and dollar amount of contracts that clients obtain. Meet goals established by DLA (grant source). Increase community awareness of SBDC via newspaper articles and further developing our partnerships with One Stop Capital Shop entities. In Progress 7.1 1234 Contract Opportunities Center Increase in amount of government contracts obtained by clients of COC. Number and dollar amount of contracts that clients obtain. Meet goals established by DLA (grant source). Increase community awareness of SBDC via newspaper articles and further developing our partnerships with One Stop Capital Shop entities. In Progress 2.1 1235 Small Business Center Increase amount of investment (loans and equity) in the business community. Number and dollar amount of loans obtained for clients. Increase by 5% over prior year's goals. Increase community awareness of SBDC via newspaper articles and further developing partnerships with One Stop Capital Shop entities. Previous Business Editor at El Paso Will use SBDC website to do what Withdrawn Times resigned; periodic articles, was originally intended with regular not regular articles, appear in El newspaper articles. Paso Times on SBDC activities, such as seminars, success stories on clients assisted. 7.1 1235 Small Business Center Increase amount of investment (loans and equity) in the business community. Number and dollar amount of loans obtained for clients. Increase by 5% over prior year's goals. Increase community awareness of SBDC via newspaper articles and further developing partnerships with One Stop Capital Shop entities. Previous Business Editor at El Paso Will use SBDC website to do what Withdrawn Times resigned; periodic articles, was originally intended with regular not regular articles, appear in El newspaper articles. Paso Times on SBDC activities, such as seminars, success stories on clients assisted. 7.1 1236 Small Business Development Center Increase participation in training program. Number of seminars and attendees Increase both by 5% over at seminars. last year. Increase community awareness of SBDC via newspaper articles and further developing partnerships with One Stop Capital Shop entities. In Progress 2.1 1236 Small Business Increase participation in Number of seminars and attendees Increase both by 5% over OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Due to budget situation, no funds available for this project. Alternate strategy will be used. With establishment of SBDC and COC web sites, this report will be done via web sites. Will also have a column for Dr. Rhodes to address EPCC involvement and contribution to local economic development efforts. Increase community awareness of rpt0203AreaPlansFinalResults Not Met In Progress Friday, November 21, 2003 Page 54 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Center for Small Business Development Goal Plan Area Development Center Objective training program. Measure at seminars. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Standard last year. Strategies Assessment Results Use of Results 7 Objective's Status SBDC via newspaper articles and further developing partnerships with One Stop Capital Shop entities. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 55 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Senior Adult Program Goal Plan Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Strategies Assessment Results Use of Results 4 Objective's Status 8.1 1272 Elderhostel Submit paperwork to the Continue to offer a Winter Session Elderhostel Program Elderhostel Headquarters for Winter Catalog and Register in 2003. Students. Maintain enrollment rates and match the success of March 2002 Program rates (29 plus students). Identify 2002 program strengths and weaknesses, make revisions and advertise Elderhostel Program for 2003 in other parts of the country. Enrollment low- 2nd Winter Program 2002 cancelled due to low enrollment. 1st Elderhostel program was held and was successful. Recruitment efforts will need to be heightened for 2004 Elderhostel Program. Continue offering one program per year. Met 2.1 1272 Elderhostel Submit paperwork to the Continue to offer a Winter Session Elderhostel Program Elderhostel Headquarters for Winter Catalog and Register in 2003. Students. Maintain enrollment rates and match the success of March 2002 Program rates (29 plus students). Identify 2002 program strengths and weaknesses, make revisions and advertise Elderhostel Program for 2003 in other parts of the country. Enrollment low- 2nd Winter Program 2002 cancelled due to low enrollment. 1st Elderhostel program was held and was successful. Recruitment efforts will need to be heightened for 2004 Elderhostel Program. Continue offering one program per year. Met 2.1 1273 SAP Love Conference Assess the feasibility of offering CEU's for professionals in aging services, students in social work programs and caregivers for participation in the Love Conference under a new Basic Gerontology course. Make an assessment to determine Maintain a record of interest need and interest in CEU's in and enrollment in the Love 2002. Conference workshops designed for professionals and students in the social work aging option fields. Identify students and professionals in aging that can benefit in the workplace from CEU's generated at the Love Conference. Contact potential participants and register them for the 2003 Conference. Determined sufficient interest in professionals attending the conference. Will use ANDA membership list to In Progress contact professional in Aging Services to enroll in conference. ANDA can issue CEU's or EPCC SAP can issue CEU's. Assess the feasibility of offering CEU's for professionals in aging services, students in social work programs and caregivers for participation in the Love Conference under a new Basic Gerontology course. Make an assessment to determine Maintain a record of interest need and interest in CEU's in and enrollment in the Love 2002. Conference workshops designed for professionals and students in the social work aging option fields. 1.1 1273 SAP Love Conference Did not offer CEU's for the 2003 Conference. Although many professionals attended. Research ongoing on CEU's and Curriculum. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Identify students and professionals in aging that can benefit in the workplace from CEU's generated at the Love Conference. Contact potential participants and register them for the 2003 Conference. Determined sufficient interest in professionals attending the conference. Did not offer CEU's for the 2003 Conference. Although many professionals attended. Will use ANDA membership list to In Progress contact professional in Aging Services to enroll in conference. ANDA can issue CEU's or EPCC SAP can issue CEU's. Research ongoing on CEU's and Curriculum. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 56 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Workforce Development Goal Plan 2.1 1237 Area Workforce Development Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Increase seamless delivery of Student satisfaction. support services and training to WFD participants. Standard Student completion of training. Strategies Consistent and ongoing staff & professional development. Ensure that customer services and follow through are consistent throughout students' training. Assessment Results Staff & Professional development has been provided via workshops, meetings, seminars and faculty development. Use of Results 8 Objective's Status Contentious improvement for provision of support services to students. Met Contentious improvement for provision of support services to students. Met All WFD classes have had retention/competition rates above 75% Basic Skills 87% GED 88% Vocational Training 90% Average retention is 88% Continue assessing quality of support services and instruction provided. Met All WFD classes have had retention/competition rates above 75% Basic Skills 87% Continue assessing quality of support services and instruction provided. We were able to prepare bilingual offerings for expected student members. Staff worked closely with agencies handling services to WFD students. 1.1 1237 Workforce Development Increase seamless delivery of Student satisfaction. support services and training to WFD participants. Student completion of training. Consistent and ongoing staff & professional development. Ensure that customer services and follow through are consistent throughout students' training. Staff & Professional development has been provided via workshops, meetings, seminars and faculty development. We were able to prepare bilingual offerings for expected student members. Staff worked closely with agencies handling services to WFD students. 1.1 1238 Career Training Increase student graduation Number of students graduating. rate for all WFD Basic Skills Center and Vocational courses. 75% of total number of Provide support services that increase students completer training. the number of students graduating/completing training. These include tutoring and GED instruction in Spanish and English. Offer/introduce additional courses for training to students such as Construction Manager Program. 2.1 1238 Career Training Increase student graduation Number of students graduating. Center rate for all WFD Basic Skills and Vocational courses. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 75% of total number of Provide support services that increase students completer training. the number of students graduating/completing training. rpt0203AreaPlansFinalResults Results will assist recruiting efforts. Continue tracking for basic skills and vocational training. Friday, November 21, 2003 Met Page 57 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Workforce Development Goal Plan Area Objective Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Standard Strategies These include tutoring and GED instruction in Spanish and English. Assessment Results 1239 Workforce Development Develop and implement vocational training in new areas to meet local market demands. Completion of Construction Manager Course of Study Pilot classes by students. none Placement of graduates with local builders and unions and other businesses. -Recruit and register students from various agencies and in the community for one a.m. and one p.m. sixteen-week class. -Finalize curriculum, instructors, classrooms. Objective's Status GED 88% Vocational Training 90% Average retention is 88% Results will assist recruiting efforts. Out of 129 students in all completed classes from 1/22/02 to 2/31/03 69% of participants were placed with local business including builders. Use instructors assessment summary report to improve course and to improve any instructional area as needed. Met Use instructors assessment summary report to improve course and to improve any instructional area as needed. Met Offer/introduce additional courses for training to students such as Construction Manager Program. 2.1 Use of Results 8 Continue tracking for basic skills and vocational training. Classes were completed as scheduled. Change in instructor occurred mid year. Instructors are submitting assessment summary reports with recommendations and assessment of course strengths and weaknesses. 1.1 1239 Workforce Development Develop and implement vocational training in new areas to meet local market demands. Completion of Construction Manager Course of Study Pilot classes by students. Placement of graduates with local builders and unions and other businesses. none -Recruit and register students from various agencies and in the community for one a.m. and one p.m. sixteen-week class. -Finalize curriculum, instructors, classrooms. Out of 129 students in all completed classes from 1/22/02 to 2/31/03 69% of participants were placed with local business including builders. Classes were completed as scheduled. Change in instructor occurred mid year. Instructors are submitting assessment summary reports with recommendations and assessment of course strengths and weaknesses. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 58 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Workforce Development Goal Plan 1.1 1283 Area Workforce Development Objective Increase student retention and placement rates in vocational training. Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Measure Students who were retained and placed in vocational training. Standard Number of students entering WFD courses and vocational training who complete and are placed increased by 5%. Strategies Provide support services and placement services that increase retention and placement. These include tutoring and GED instruction in Spanish and English. Assessment Results Use of Results WFD has continued to develop Continue placement collaborations partnerships with MET, ACS, TWC with external agencies and internal & Veterans Office for recruitment departments. and placement collaboration. Continue to expand business and Average placement rate is 67%. industry contacts. 8 Objective's Status Met CMP has the highest placement at Continue to match initial student 85% the prior years placement rate assessment training offerings. was 63%. 2.1 1283 Workforce Development Increase student retention and placement rates in vocational training. Students who were retained and placed in vocational training. Number of students entering WFD courses and vocational training who complete and are placed increased by 5%. Provide support services and placement services that increase retention and placement. These include tutoring and GED instruction in Spanish and English. WFD has continued to develop Continue placement collaborations partnerships with MET, ACS, TWC with external agencies and internal & Veterans Office for recruitment departments. and placement collaboration. Continue to expand business and Average placement rate is 67%. industry contacts. Met CMP has the highest placement at Continue to match initial student 85% the prior years placement rate assessment training offerings. was 63%. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 59 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Vice President, Workforce Development and Lifelong Learning Goal Plan Area Objective Measure 5.1 1221 Number of professional VP Workforce To provide Professional Dev & Lifelong Development activities to 40 development activities provided and number of participants. Workforce and Lomaland Learning Staff. 5.1 1228 ATC Customized Training Expand the capacity for the instruction of computer related classes by adding 3 new classrooms. This will facilitate the increase of students receiving computer technology training. 2.1 1379 SOS Program 8.1 1379 2.1 1380 Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Standard Strategies Assessment Results Use of Results 6 Objective's Status none -Identify professional development activity. -Encourage participation. -Allocate budget can be accomplished within existing budgets. Fish Camp (7) PLC Training (1) El Paso Conf. for Women (20) New Horizons Sessions (50) NISOD (2) League for Innovation (1) COMTREX (1) Workforce staff from VP to faculty to administrative assistant participated in professional development activities. These activities led to new certifications, skill upgrades, and new experiences. Will improve operation, teaching, and customer service. Met Number of students enrolled in classes offering computer technology. Increase by 10% from last year. Develop new computer classes, such as Auto Cad, Introduction to computers for manufacturing and others. Work with partner companies to enroll more of their employees in computer related classes. Build three new computer classrooms. New computer labs installed at ATC, Helen of Troy and Leviton. Increase in computer classes at ATC Network Academy with enrollment for year of 410. Also, bought and implemented 2 portable laptop systems containing 15 laptops each. Using in Workplace Literacy and Customized Training. Will continue to expand lab capacity and increase offerings and enrollments. Portable laptops will allow us to take classes off site. Met Training A minimum of 137 program graduates will go on to further education or training. 51% On-going advisement and assistance for college/training enrollment. A total of 80 graduates (or 55% of the 145 graduates) went on to further education. That standard was exceeded although the total number was lower. Again this was a result of the number enrolled. Met SOS Program Training A minimum of 137 program graduates will go on to further education or training. 51% On-going advisement and assistance for college/training enrollment. A total of 80 graduates (or 55% of the 145 graduates) went on to further education. That standard was exceeded although the total number was lower. Again this was a result of the number enrolled. Met SOS Program Job Development/Placement A minimum of 93 program graduates will enter employment or the military. 34% On-going assistance for job placement A total of 87 graduates (60%) or entrance into the Armed Forces. entered employment or the military. The measure was not met but the standard was exceeded. Also, this is a duplicated headcount Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 60 of 212 Workforce Development and Lifelong Learning Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Vice President, Workforce Development and Lifelong Learning Goal Plan Area Objective Measure Plans for Executive Area (Duplicated if addressing 2 or more goals): 127 Standard Strategies Assessment Results Use of Results 6 Objective's Status as some graduates went on for further education and entered employment. 8.1 1380 SOS Program Job Development/Placement A minimum of 93 program graduates will enter employment or the military. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 34% On-going assistance for job placement A total of 87 graduates (60%) entered employment or the or entrance into the Armed Forces. military. The measure was not met but the standard was exceeded. Also, this is a duplicated headcount as some graduates went on for further education and entered employment. rpt0203AreaPlansFinalResults Met Friday, November 21, 2003 Page 61 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 43 Americana Language Program, Basic Skills, Communications, & Performing Arts Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 7.1 846 Dean-ALP, Improve the turn-around BASK, Comm., time needed to pay vendors & PA for licenses granting the College rights to play certain copyrighted music districtwide. Within one week of receiving approved invoices, the Division will authorize payment for the rights. none The College will add $5500 to this division's budget, the approximate annual cost of the licenses. The Division will authorize payment in accordance with College purchasing procedures. The objective and measure have The licenses will continue to get been met. The strategies was not paid in a timely manner. met. The additional $5,500 was not received. 6.1 847 El Conquistador- The equipment will allow the VV MACO lab to gear up for the expected growth arising from the state mandated creation of the Journalism Field of Study. The measures of the success of none this project will be twofold: 1Adding the needed equipment will increase our technological capability, as physical examination of facility will show; also, 2-enrollments will improve as we publicize the state mandate. Dell 8200 series (customized) $3,450 Dell 8200 series (3 ea. Customized) $7,500 Microtek 9600XL Scanner $1,050 Sony MVC-FD95 D-Mavica $ 800 Sony VPL-CX2 LCD Projector $2,500 Satellite Pro 4500/1000Mhz $2,500 Epson Stylus 3000-C203011B $ 995 Publications is continuing due to purchase of computers. Increase number of students interested in the newspaper. Objective's Status Met In Progress Total $18,795 8.1 848 Special Projects Include at least one for English-VV published work of a selected author in the annual EPCC publication Chrysalis. 8.1 849 Com. Ed. No less than 375 are recruited per none To recruit students that are Program (CEP)- not served by other programs semester and no less than 80% or VV 300 students complete CEP to attend CEP programs. classes every semester. Partnerships w/and presentations to community, door to door recruitment, word of mouth, flyers. During 2001-2002, 1,264 students Continue to recruit and serve enrolled and 80% of students students using existing strategies. completed a class in CEP Programs. 8.1 850 Special Projects Sets used in Revolucion will Each year Revolucion sets will be none for Perf Arts-VV be refurbished annually. painted and repaired or replaced as appropriate. Producer of Revolucion will use a maximum of $500.00 toward refurbishing sets. Revolucion is no longer offered. Therefore, objective is withdrawn. A minimum of one published short work authored by a well known writer will appear in the Chrysalis each year. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Chrysalis advisor will contact selected Objective, measure and strategies author's publisher to request and obtain were met. permission to print work. A maximum of $250.00 may be paid for the right. rpt0203AreaPlansFinalResults Chrysalis was published and distributed throughout EPCC. Met Met Withdrawn Friday, November 21, 2003 Page 62 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 43 Americana Language Program, Basic Skills, Communications, & Performing Arts Goal Plan Area Objective 85% of funds will be used for faculty attending conferences, symposiums or workshops directly related to instruction in one of the division's disciplines. 7.1 851 Faculty TravelVV 2.1 852 8.1 1.1 Measure Standard Strategies Assessment Results Use of Results Objective's Status At the end of the academic year none the total travel funds used during the academic year will be reviewed to assure that indeed 85% of the budget was utilized to attend discipline related instructional conventions, etc. Objective, measure and strategies Faculty will be informed that those requesting travel funding to attend were met. conferences, etc., dealing directly with instruction in their discipline will be given priority over requests for other purposes. In addition, upon the return from such a trip the faculty member will be required to make a presentation at a division meeting on a topic he/she heard at the conference. Mass Attract high school graduates Communication to communication program, VV to fully prepare EPCC students regardless of major, for transfer to 4 year schools, and take advantage of local media internship opportunities. Increase number of students who enroll. We will compare 2002/2003 and 2003/2004 numbers to the average of students in these classes over the previous five year. Mackie 1604 VLZ 16 Channel stereo The plan is in progress due to Equipment needs to be comparable In Progress mixer $1,800 equipment has not been received to state of the art in commercial media. Denon DN M-200R Microdisk Studio address the objective. Recorder $ 800 3 Portable Microdisk Recorders (Sony or Denon) $1,500 3 Electro Voice Professional unidirectional mics $1,200 Sound Ideas Music Production and SFX Library $2,000 Syntrillium Digital Editing Software $1,000 Mac G4 with 22' Cinema screen $4,000 Total $12,300 853 Chopin Festival- Festival will end fiscal year TM with in budget. Fiscal year end budget report will none show no deficit. Scrutinize expenditures more The budget was not increased by carefully. Increase budget by $500.00. $500.00. However, funds were available to cover the deficits that were incurred. Chopin Festival will continue each year. Met 854 English-VV Check-out list for materials, showing number of instructors using the materials and the number of students reached, and frequency of use. -Make all discipline instructors aware of the Multimedia Literacy Resource Library (MLRL) by publishing a list of the materials available in the MLRL and disseminating this list. A list of materials will be disseminated to discipline instructors. Expected completion date: Spring, 2004. In Progress Creating a Multimedia Literacy Resource Library (a free-standing cabinet with materials not found in any of the EPCC libraries, materials such as books and videotapes) will help in OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Have at least 50% of literature and composition instructors (per semester) using the Multimedia Literacy Resource Library. The completion of the Multimedia Lit. Resource Library is in progress. Materials are being collected. Faculty members who attended conferences presented at Division meetings. Met Projected Cost: $1,800.00; this cost rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 63 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 43 Americana Language Program, Basic Skills, Communications, & Performing Arts Goal Plan Area Objective Measure Standard meeting to enhance quality of teaching in composition/literature courses. Strategies Assessment Results Use of Results Objective's Status also applies to plans #1397 & 1398 1.1 855 Foreign Language VV Increase retention within the Number of students retained. Foreign Languages (Spanish, French and German). 2.1 856 Drama-VV Increase enrollment in Drama courses. 7.1 857 Music - VV To purchase four high quality studio pianos for instruction and student practice. Increase by 1%. -Identify at-risk students and provide Assessment results are ongoing with tutoring and teacher mentoring. using strategies listed to retain -Develop a series of faculty workshops students. related to instruction. Developing methods to measure progress and retention. In Progress Increase enrollment by 10 percent. none Promote Drama program among high Objective was met. Additional school students by means of brochures. sections were added in Fall 2002. Strategies is ongoing. Courses offered provide unique opportunities for theater students. Met The four pianos must be of high none quality, have god sound, play with relative ease, and remain in tune. Solicit prices from music stores, determine best values and purchase pianos. Objective was partially met. Two pianos were purchased. Strategies is ongoing until funds become available. Students have two high quality pianos for instruction. Met Dance sound system is updated. Met Cost: $3,000. Objective was met. Sound equipment was purchased. Strategies is ongoing until funds become available. none In October 2002, buy 14 new desktop computers through Purchasing Department. Have lab wired for internet by appropriate MIS area. Objective, measure and strategies Students have internet access. have been met. Information Technology Dept. will complete the internet wiring. none Purchase LCD Projector & Laptop Computer. Laptop - $2,000 LCD - $3,000 Objective is in progress. Funds did Continued fund resources are being In Progress sought. not become available through the Special Allocation process. Tech Fee funds have been requested to meet objective. Reduction in contact hours will cost approximately $165,000/year. This is Proposal was presented to the President and is under Cost: $3,500. Per piano, total $14,000. 6.1 858 Dance-VV The sound system must produce To purchase and have installed a high quality sound high quality sound and be relatively simple to operate. system for the Dance instruction room. 7.1 859 Language Lab Update student computer (VV/ B building) support of Valle Verde's language lab's. 6.1 860 Speech - VV 5.1 861 Americana Language By January 2003, 14 new computers wired for internet use will be installed in the lab for student use. To improve the opportunities LCD Projector and Laptop Computer. that the college provides students for employing technology in presentational speaking. Reduce ALP full-time faculty contact hour load none Reducing full-time faculty contact none hour load to a manageable level OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Solicit prices from sound equipment companies, determine best value. rpt0203AreaPlansFinalResults Not applicable. Friday, November 21, 2003 Met In Progress Page 64 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 43 Americana Language Program, Basic Skills, Communications, & Performing Arts Goal Plan Area Program Objective Measure from 25 hours/week to 20 hours/week. This will ensure ALP can retain quality fulltime faculty and will also allow these full-time faculty to serve on committees, etc. This will subsequently increase retention, completion, and transfer (to credit courses) rates. will help ALP retain highly qualified full-time faculty. Rather than spending 5 hours per day, Monday-Friday, in the classroom, a reduction in workload will allow ALP faculty to have the time to serve on College committees, maintain extended office hours, and will ensure that ALP will be able to retain its highly qualified faculty. Standard Strategies Assessment Results Use of Results Objective's Status the cost of placing part-time faculty in consideration. the classes now taught by full-time faculty. Dean will verify that faculty are more active with College committees and are contributing to overall area improvements. It is obvious that faculty satisfaction and retention will increase by putting ALP full-time faculty closer to par with their credit counterparts. 7.1 862 Developmental Education- 6.1 863 Media The equipment will allow the Production - VV Media Production to expand its offerings. It is estimated that we could double the present number of students by purchasing needed equipment. To replace a seven year old computer system. Purchase of new system. none $1,800.00 Objective has been met. Purchase of new system is complete. -Enrollments are expected to double once equipment is in place. The program now turns students away. -With an expanded lab, we will also objectively expand the technological capabilities. none 2 ea. Studio configured JVC digital cameras $20,350 1 ea. Sony digital special effects generator $ 8,030 15 ea. Dell computers $43,725 3 ea. Sony digital portable cameras $ 9,000 TOTAL $81,105 Objective is in progress. Carl Media Production students are Perkins allocated funds to purchase benefiting from the use of new cameras, special effect generator, equipment. and five computers. Requesting additional funds to complete converting Media Production to a state of art lab. Met In Progress Equipment needed for studio as well as Digital Imaging courses and field production courses which are five years behind in technology. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 65 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 43 Americana Language Program, Basic Skills, Communications, & Performing Arts Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 7.1 864 Music Special Project To have music for choral concert appropriate for Music majors. The music must be appropriate for none the chorus. Order music for special concerts. Objective, measure and strategies is Music for choral concerts will be continually purchased. in progress. Music has been purchased for choral concerts. Purchase of music is ongoing each year. In Progress 8.1 864 Music Special Project To have music for choral concert appropriate for Music majors. The music must be appropriate for none the chorus. Order music for special concerts. Objective, measure and strategies is Music for choral concerts will be in progress. Music has been continually purchased. purchased for choral concerts. Purchase of music is ongoing each year. In Progress 8.1 865 International Music Festival To provide quality programs The pianist for the Music Festival none are selected from the finest for students and the pianists in the United States. community. Many EPCC students cannot afford the high cost of other classical concerts, even though they are required in some music courses to attend concerts. Costs consist of: Pianist including stipends, travel, hotel, and per diem. Hall and piano rent; printing of programs, posters and advertising materials. Objective, measure and strategies have been met. However, this objective is ongoing. Music Festival is offered each year. In Progress 7.1 865 International Music Festival To provide quality programs The pianist for the Music Festival none are selected from the finest for students and the pianists in the United States. community. Many EPCC students cannot afford the high cost of other classical concerts, even though they are required in some music courses to attend concerts. Costs consist of: Pianist including stipends, travel, hotel, and per diem. Hall and piano rent; printing of programs, posters and advertising materials. Objective, measure and strategies have been met. However, this objective is ongoing. Music Festival is offered each year. In Progress 6.1 866 ALP Tech Fee Ten overheads will be replaced by none Improve ALP's in-class end of Spring 2003. technology to improve instruction by replacing 10 non-functioning overheads in classrooms. Submit P.O. to Purchasing Dept. $4000.00 Objective, measure and strategies have been met. Overheads were replaced. Continue to offer and expand The number of course offerings specialized ESL courses both will increase. in and outside the College. Advertise ALP's ability to develop courses to accommodate various programs. Classes were offered at Media Copy. Advertising accomplished: two billboards, Spanish language 8.1 867 ALP Language Campus OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none rpt0203AreaPlansFinalResults Met Determine effectiveness of advertising strategies. Friday, November 21, 2003 Met Page 66 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 43 Americana Language Program, Basic Skills, Communications, & Performing Arts Goal Plan Area Objective Measure Standard Strategies $500.00 for in-town travel. Assessment Results Use of Results Objective's Status radio programs, ads in El Paso Times and El Diario. 8.1 868 Drama Performance To showcase the students who are enrolled in Drama Courses. Reviews both printed and oral from those who attend such performances. none Sets, costumes, props, programs, travel Objective, measure and strategies and round trip transportation from have been met. Funds have been Valle Verde to Transmountain. allocated to complete strategies listed. Drama continues to perform each year. Met 6.1 869 Americana Testing Implement ACT test for all ESL placement testing. ACT will be fully operational by end of Spring 2002. none Contact IT to upload data to server. ACT is fully operational. ALP now offers ESL placement testing more frequently and at more convenient times for prospective students. Met 2.1 870 Teresiano The number of course offerings Expand course offerings at Prepa Chamizal and continue will increase and enrollment will increase. to advertise EPCC as an affordable alternative to UTEP or NMSU for those students who plan to attend college in the U.S. none Present parent conferences where the value of attending EPCC is explained. Courses terminated by Teresiano due to low enrollment. 1.1 871 Retention Increase enrollment of Action Program participants in Program. 1.1 872 P.A.S.S. Program To provide tutoring, skills development, academic and transfer advisement to 600 first generation, low-income and students with disabilities. Withdrawn $500.00 for in-town travel. Increase student enrollment by 10% in Fall 2002. Increase the number of -Work with instructors and counselors students completing courses to establish better referral system. by 5%. -Promote more aggressively during faculty development. -Monitor student process more closely with instructors. -Conduct student survey in mid semester to determine if additional strategies need to be introduced. RAP reached its projected goal of 10% increase in enrolled participants and surpassed it by an additional 10% more over the Fall of 2002. RAP will continue with its strategies and commitment to students. Met Ensure that 75% (45) of project participants remain in good standing with a 2.0 G.P.A., or better (on a 4.0 = A system), pass remedial courses and enroll in regular academic courses in their area of study. To meet grant requirements of tracking and monitoring student progress until they graduate and/or transfer to a four year institution. Space is needed to provide the activities outlined in the objectives of the original grant proposal. Plan name is incorrect. PASS provides tutoring to students who meet the grant's eligibility criteria. Objective, measure and strategies are in progress and will be met in August 2003. Once grades have been posted, strategies will be completed. In Progress OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT By the end of the year academic status reports, and course histories will be generated to monitor student academic progress. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 67 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 43 Americana Language Program, Basic Skills, Communications, & Performing Arts Goal Plan 2.1 2.1 873 874 Area Upward Bound Program ALP Prepa Chamizal Objective Measure Standard 60% of participants who -Total number of students graduate from high school enrolled. will enroll in a program of past secondary education for -Total number of seniors. the Fall term. -Maintain enrollment at 100% of allocated slots. The number of course offerings Expand course offerings at Prepa Chamizal and continue will increase and enrollment will increase. to advertise EPCC as an affordable alternative to UTEP or NMSU for those students who plan to attend college in the U.S. none none -Maintain attrition at less than 20%. Strategies Assessment Results Use of Results -Tutor, counsel and instruct student to assure high school graduation. -Offer financial-aid and career counseling to students. -Guide students in completing EPCC application. Objective, measure, standard, and strategies have been met. Upward Bound Program will continue to fulfill the requirements of the grant and complete objectives. Met Present parent conferences where the value of attending EPCC is explained. Full programs offered at Prepa Reviewing enrollment at EPCC by Chamizal. Parent conferences were Prepa Chamizal graduates. conducted. Met Effective instructional model-students improve language skills and awareness CEP's Five Step model and SCANS skills. Sixty-four percent of students Continue to find ways to improve assessed with CEP language students language and vocational assessment instrument skills. demonstrated at least one level increase in language and vocational skills awareness. Met Incorporate information about enrolling and succeeding in college and vocational careers (STEP model) One hundred sixty-three students transitioned into EPCC credit courses. Continue to increase number of students that transition to college. Met CEP will continue to increase the number of students that obtain a GED certificate. Met $500.00 for in-town travel. 8.1 1391 To improve language Com. Ed. Program (CEP)- communication, vocational skills, vocational awareness, VV career awareness and job readiness of participants. Students will demonstrate a one level increase in language skills according to the CEP assessment instrument, and will demonstrate vocational skills and awareness. 8.1 1392 Com. Ed. To transition students to Program (CEP)- EPCC credit vocational VV skills. At least, 80 students will none transition to EPCC credit courses every year. 8.1 1393 Increase academic skills, Com. Ed. At least 100 students will obtain none Program (CEP)- vocational awareness and their GED certificates every year. skills of students and prepare VV students to obtain a GED certificate. Effective vocational GED instructional 142 students obtained a GED model (CEP's Five Step model). certificate. 8.1 1394 Com. Ed. CEP will produce additional To produce additional Program (CEP)- monies to enhance programs funds. VV and services. Coordinator will write grant proposal For 2002/2003, CEP procured over CEP will continue to procure $174,426 budgeted for above $500,000 in grant funding. additional funds. objectives (1-5) The proposal amount also applies to plans #849, 1391, 1392, & 1393 OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Objective's Status none rpt0203AreaPlansFinalResults Friday, November 21, 2003 Met Page 68 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 43 Americana Language Program, Basic Skills, Communications, & Performing Arts Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 8.1 1395 A bilingual web site will be Com. Ed. none To create and maintain a Program (CEP)- bilingual health literacy web created, web site counter will VV site that will be available to indicate the usage of the web site. the entire college and anyone on the web. Develop a bilingual health literacy web A bilingual website was not created CEP will continue to seek funds for In Progress site using CEP's background in because of lack of funding. this objective. delivery of health literacy instruction, and train CEP staff to maintain and update it. Cost for this objective is $19,665. 8.1 1396 Com. Ed. A minimum of 60 students none To offer 6 adult literacy or Program (CEP)- GED classes annually, 2 per annually who live in colonias will VV attend adult literacy and GED session at colonias. classes. Establish partnership with Over 100 student residents of CEP will continue to offer literacy representatives from colonias to recruit colonias attended literacy and GED and GED classes. classes. students and identify space for instruction. Cost for this objective is $17,000. 1.1 1397 English-VV Creating a Multimedia Literacy Resource Library (a free-standing cabinet with materials not found in any of the EPCC libraries, materials such as books and videotapes) will help in meeting to increase student attention, interest, and assimilation of information taught in writing and literature courses. Check-out list for materials, showing number of instructors using the materials and the number of students reached, and frequency of use. Have at least 50% of literature and composition instructors (per semester) using the Multimedia Literacy Resource Library. Present a Faculty Development workshop explaining and describing the purpose, use, benefits, and maintenance of the MLRL. 1.1 1398 English-VV Creating a Multimedia Literacy Resource Library (a free-standing cabinet with materials not found in any of the EPCC libraries, materials such as books and videotapes) will help in meeting to increase enrollment in literature courses. Check-out list for materials, showing number of instructors using the materials and the number of students reached, and frequency of use. Have at least 50% of literature and composition instructors (per semester) using the Multimedia Literacy Resource Library. Have discipline coordinators supervise the use of the MLRL and maintain the check-out list of materials. -Purchase a free-standing cabinet to store library materials. 7.1 1399 Music - VV To enable discipline to purchase sufficient supplies and adequate maintenance Actual installation of new hardware and supplies. none Acquire needed materials from qualified vendors at total expense of $4,254.00 OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Met Page 69 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 43 Americana Language Program, Basic Skills, Communications, & Performing Arts Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status service. 1.1 1401 Retention Increase the percentage of Action Program student successfully completing courses. 1.1 1402 P.A.S.S. Program 1.1 1403 P.A.S.S. Program Increase student enrollment by 10% in Fall 2002. Increase the number of -Work with instructors and counselors students completing courses to establish better referral system. by 5%. -Promote more aggressively during faculty development. -Monitor student process more closing with instructors. -Conduct student survey in mid semester to determine if additional strategies need to be introduced. Connection for GroupWise and other computer accessibilities at Rio Grande and Mission del Paso Campuses. Ensure that 75% (45) of project participants remain in good standing with a 2.0 G.P.A., or better (on a 4.0 = A system), pass remedial courses and enroll in regular academic courses in their area of study. To meet grant requirements of tracking and monitoring student progress until they graduate and/or transfer to a four year institution. Space is needed to provide the activities outlined in the objectives of the original grant proposal. By the end of the year academic status reports, and course histories will be generated to monitor student academic progress. Need adequate working space with room capacity of 40-50 occupants at Rio Grande and Mission del Paso Campus. Ensure that 75% (45) of project participants remain in good standing with a 2.0 G.P.A., or better (on a 4.0 = A system), pass remedial courses and enroll in regular academic courses in their area of study. To meet grant requirements of tracking and monitoring student progress until they graduate and/or transfer to a four year institution. Space is needed to provide the activities outlined in the objectives of the original grant proposal. By the end of the year academic status reports, and course histories will be generated to monitor student academic progress. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 70 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 27 Architecture, Arts, Math and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 1.1 875 Engineering-VV Increase the number of students who major in Engineering. 2.1 876 Arch., Arts, Number of computes--4. To increase the technical Math & Science, skills of students by using VV state-of-the-art computers in the Advertising Graphics and Design program. Increase the number of state- To purchase 4 state-of-the-art Computers were purchased Fall of-the-art computers by computers to be used by students in the 2002. 20%. lab. Computers are now being used by students in the lab. Met 6.1 876 Arch., Arts, Number of computes--4. To increase the technical Math & Science, skills of students by using VV state-of-the-art computers in the Advertising Graphics and Design program. Increase the number of state- To purchase 4 state-of-the-art Computers were purchased Fall of-the-art computers by computers to be used by students in the 2002. 20%. lab. Computers are now being used by students in the lab. Met 1.1 876 Arch., Arts, Number of computes--4. To increase the technical Math & Science, skills of students by using VV state-of-the-art computers in the Advertising Graphics and Design program. Increase the number of state- To purchase 4 state-of-the-art Computers were purchased Fall of-the-art computers by computers to be used by students in the 2002. 20%. lab. Computers are now being used by students in the lab. Met 1.1 877 Dean Arts, Arch, Math & Science Improve student retention rate for the division. Increase in Student retention rate. Increase by 3% from the previous 2 year average. -Implement different retention strategies identified by division faculty during Spring 2002. 1.1 878 Biology-VV To increase the number of FT Biology instructors. Increase number of FT Biology instructors at the VV Campus from 5 to 6. Hire new FT instructor for 2002-2003; New instructor was hired for 2002- New instructor working full-time cost will be $30,000. 2003. during 2002-2003 academic year. Met 1.1 879 Chemistry-VV To provide Chemistry students more real world experience using up-to-date equipment. Replace equipment that is old and none obsolete and a potential safety hazard (I.e. eye safety stations, PH meters, hot place stirrers, spectrophotometer, etc. Purchase equipment during Fall 2002; cost will be $9,798. New full-time Chemistry Instructor was hired for 2002-2003; Also, old equipment was replaced in lab with new equipment. New instructor working full-time during 2002-2003; new equipment is now being used in the Chemistry lab. Met 1.1 880 Geology-VV To increase the number of FT Geology instructors. Increase number of Geology instructors at VV from 1 to 2. Hire new instructor for 2002- 2003; cost will be $30,000. New full-time Geology Instructor was hired for 2002-2003. New Instructor is working full-time in the Geology discipline. Met Number of students majoring in Engineering. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase the number of students majoring in Engineering by 20%. none none Advertise the availability of CSEMS Grants from NSF. In Progress In Progress rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 71 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 27 Architecture, Arts, Math and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 1.1 881 Math-VV To increase the number of FT Math instructors. Increase number of Math Instructors at VV from 10 to 11. Provide new and additional Hire new instructor for 2002-2003; New server and printer were Math tutorial programs for cost will be $30,000. purchased for the Math lab. students. Purchase new server and printer for use in Math Lab starting/Fall 2002; cost for server is $1,828 and for printer $1,462. 1.1 882 Physics-VV To increase number of FT Physics instructors. Increase number of FT Physics Instructors at the VV Campus from 2 to 3. none Hire new FT Instructor for 2002-2003; New full-time Physics Instructor cost will be $30,000. was not hired due to lack of funds. Not Met 1.1 883 Advertising Graphics-VV To upgrade the quality of instruction in the ArtC program. To hire a full-time instructor/Lab Assistant. none Hire Full-Time Lab Assistant Fall 2002; cost will be $24,000. Not Met 1.1 884 Kinesiology-VV To strengthen student enrollment in the Kinesiology program. Develop new 2 year degree in none Corporate Fitness; Develop 1 year certificate for personal trainer. 1.1 885 Architecture VV Improve student test scores in Architectural history. (Goal #3) Design and purchase lighted, and Allow students to view Purchase slide display case in lockable photo-slide display case. slides on their own schedule. architecture lab. Starting Fall 2002; $450.00. 1.1 886 Art - VV To increase the number of FT Art Instructors. Increase number of FT Art Instructors at the Valle Verde Campus from 2 to 3. 1.1 1300 Biology-VV To provide Biology students Replace equipment that is a more real world experience potential safety hazard as it is using up-to-date equipment. over 20 years old (i.e. autoclave, incubator, electronic balances, refrigerator, water distillation apparatus, etc.) 1.1 1301 Biology-VV New server and printer are now being used in Math lab. Full-time lab assistant was not hired due to lack of funds. Offer programs starting Fall 2002; cost Curriculum Committee did not will be $8,000 for course development. approve proposals for the two new programs; Needs Assessment Survey did not indicate a strong need for these two programs. Met Not Met In Progress none Hire new FT instructor for 2002-2003; 2 New full-time instructors were cost will be $30,000. hired for the Art Dept. for 20022003. The 2 new instructors are currently teaching full-time in the Department. Met none Purchase equipment during Fall 2002; cost will be $17,375. New full-time Biology Instructor was hired for 2002-2003; also, the old equipment was replaced with new equipment in the lab. New instructor is currently teaching full-time in the department; the new equipment is presently being used in the Biology lab. Met Provide quality instructional Increase number of Biology tutors none at the Valle Verde Campus. support. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Hire three more tutors for 2002-2003; projected cost is $16,200. Additional tutors have been hired for the Biology discipline. Tutors are presently working. Met rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 72 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 27 Architecture, Arts, Math and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 1.1 1302 Chemistry-VV To increase the number of FT Chemistry Instructors. 1.1 1303 Math-VV To upgrade the technology in Purchase new server and printer for lab. the Math lab. 1.1 1304 Physics-VV Provide students in Physics with access to adequate computer activities in connection with their classes. Upgrade old computers used for tutorial and other instructional activities. 1.1 1306 Architecture VV Strengthen and improve Direct communication with all nine schools and faculty. student's ability to achieve professional presentations for their portfolios (Goal #2). none Purchase foam cutter for use in architecture lab starting Fall 2002; cost $2,098.21. 1.1 1307 Architecture VV Strengthen and improve ties with the nine schools of Architecture in Texas (Goal #1). Enable EPCC Architecture students to better compete with other Texas Architect students. Faculty visits to a min. of 2 Architecture Schools including UTSA during 2002-03. Travel & accom. To UTSA San Antonio & Texas Tech, Lubbock. Accommodations $400. Time frame 4 days. 1.1 1310 Art - VV Compare student work and firing Introduce Art students to industrial technology and its tables to textbook quality and current local industry output. use in the Art. none To purchase an electric kiln with Electric Kiln with digital controller Electric Kiln now being used by digital controller for ramping, in order was purchased. Art students in the studio lab. to stay current with industry standards; cost is $3,000. 1.1 1311 Art - VV To expand the capabilities of To encourage students to advance none further into the study of ceramic the ceramics studio by Increase number of FT Chemistry none instructors at the VV campus from 2 to 3. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Met Provide new and additional Purchase new server and printer for Math tutorial programs for use in Math Lab starting/Fall 2002; students. cost for server is $1,828 and for printer $1,462. The number of students using the none computers in each class will be measured. The number of students completing classes will be taken. The number of classes using the computer facilities and frequency of use will be measured. Purchase foam board cutter. Hire new FT instructor for 2002-2003; New full-time Chemistry Instructor Instructor is presently working fullcost will be $30,000. was hired for 2002-2003. time in the discipline. Objective's Status To monitor the usage and age of the computers will be monitored so that computers can be replaced on a timely basis. 12 computers @ $1,500 = $18,000 The purchase of three new potters wheel would enhance the ceramics Approximately 12 new computers were purchased for use in the "CLIC" Lab (used by Physics, Geology, and Chemistry students). New computers are now being used by Physics students. Met In Progress Potters wheel not purchased due to lack of funds. rpt0203AreaPlansFinalResults Met Not Met Friday, November 21, 2003 Page 73 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 27 Architecture, Arts, Math and Science Goal Plan Area Objective Measure Standard providing the opportunity for arts. the students to learn a variety of techniques. Strategies 1312 Art - VV Provide access for student who cannot take the photography courses due to financial constraints. 1.1 1313 Art - VV Display system could be available none To purchase a mobile temporary display system to for special projects and events. accommodate the districts architecture and meet the academic program requirements for visual oriented disciplines. 1.1 1314 Art - VV Integrated district wide solution to purchase five laptop computers to improve the quality of education for the art appreciation and art history courses. The district is moving toward digital technology therefore for the art department needs to also move in this direction in order to stay current. none Convert the art department slide collection to a digital format access publisher on line services purchase new digital image; cost is $10,000. 1.1 1405 Dean Arts, Arch, Math & Science Improve student enrollment for the division. Increase in student enrollment. Increase by 3% from the previous 2 year average. Implement different marketing strategies to recruit more students. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Use of Results Objective's Status program by more participation by students learning wheel throwing techniques; cost is $3,600. 1.1 Survey the number of students enrolled that are not traditional visual art majors. Art photography is a core class. A present there is no formal exhibit or display area, such as a gallery. Assessment Results none To purchase a 35 mm camera for student use; cost is $4,050. Camera was not purchased due to a lack of funds. Set-up requests for display services may be made through district's design work request; cost is $12,000. Mobile temporary display system was set up, and it has already been used on two occasions at A.S.C. rpt0203AreaPlansFinalResults Not Met System is now in place. Met In Progress Friday, November 21, 2003 Page 74 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 34 Arts, Basic Skills, Communication and Social Sciences Goal Plan Area Objective Measure 1.1 922 Sociology TM Increase complete rates in Psychology classes. 1.1 923 History-TM Student enrollment. To formulate strategies to better recruit and secure local area high school graduates participate in College Student Recruitment. Standard Of all students on certified roster. none There will be an increase of 2% who received a passing grade (A, B, or D) and an equivalent reduction of 2% who receive a non-passing grade (F, W). To be determined after the final processing of incomplete grades and discounting students who are administratively withdrawn and who never attended. none Strategies -Select new text -Revise curriculum -Enhance instructor student/communication skills -Review/revise delivery of instruction Assessment Results Use of Results There was an approximate 2.5% in passing grades; however, there was no corresponding decrease in failing grades. Objective's Status Not Met Review (new) U.S. History 1301 & Goal met: New textbooks were 1302 Texts for possible new history adopted for both 1301 and 1302 in text(s) adoption for Fall Semester 2002. Fall 2002. Met Activity took part in college efforts to increase student enrollment by activity informing and explaining to local area (Northeast) high school students the names academic offerings in history its role and requirements in college academic, degree, etc. 6.1 924 Dean, Arts, BASK, Comm & SS The number of In Focus machines none To support instruction and available for faculty to check-out. faculty in the ABCS Division at TM in every way possible. To purchase a portable In Focus machine for faculty to use in the classroom with an existing notebook computer. The estimated cost is $4,095 based on the attached fax from DuMotion. 7.1 925 Faculty Travel Com-TM To support faculty requesting The number of faculty traveling to none meaningful conferences. travel funds to attend conferences or training which will enhance effectiveness in the classroom. Prioritize requests for travel which will All faculty requesting travel funds have the most impact on the greatest were granted the funds and we were amount of students. able to fund 1 more faculty travel than the previous year (from 5 to 6). Met 1.1 926 Music-TM Incorporate additional Make instructors aware of available Met Identification of additional OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Purchase completed. The In Focus machine is in use and available to all faculty at the Transmountain Campus. Met Faculty was informed of resources rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 75 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 34 Arts, Basic Skills, Communication and Social Sciences Goal Plan 1.1 927 Area Reading-TM Objective Measure multimedia teaching resources in Music classes. multimedia teaching resources used in Music classes. -Research Web sites for students use in ESL and regular Reading Courses. -Students use of the reading lab computers will be monitored and tallied. Standard Strategies resources and encourage the use of them. none Assessment Results Use of Results Objective's Status available and were able to use them in their classroom. The Instructional Coordinator and the This work is in progress and will be Reading Lab Assistant will collaborate completed during 2003-2004. on the research and lab activities. Other instructors will give their input on assignments for each course. In Progress Nor extra costs are projected. 1.1 928 ESL-TM 2.1 929 Philosophy-TM To offer more sections of philosophy by hiring of a full-time instructor. 1.1 930 ESAL-TM Will improve completion rates in Because tutoring ESL ESOL writing classes by 3% per students in writing is semester. completely different from tutoring native English speakers, the college's writing tutors are often perplexed by secondlanguage writing problems and do not know how to address them. This is not the fault of the Writing Center tutors. ESL writing tutors is needed. Preferably, the individual chosen will have been a former ESL student aware of ESL writing problems and dilemmas. The student's own experiences will be of great help in carrying out these duties. The number of sections of philosophy offered. none No additional funds are needed. Funds Work-study position funds were not for the work-study position for ESOL, reallocated for this position so it formerly employed at the was not filled. Speaking/Listening Lab, should be reallocated for this position. none Work on getting a full-time instructor for philosophy at our campus thus offering more sections. Objective met in Fall 2002 full-time tenure-track instructor hired. Also four additional sections added. Met Work on increasing the number of activities in the lab for the ESAL students. Two new lab assistants were hired. They developed level-specific oral grammar practice exercises. Also, Met To provide more The number of activities available none opportunities for oral for students in the ESAL lab. communication in ESAL for OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Not Met Friday, November 21, 2003 Page 76 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 34 Arts, Basic Skills, Communication and Social Sciences Goal Plan Area Objective Measure Standard Strategies students to use English. Assessment Results Use of Results Objective's Status level-specific groups were form to discuss current events. 1.1 931 Psychology-TM To offer a variety of courses The number of sections of psychology which are online and in a variety of delivery distance learning. modes to students. none Work on increasing the number of I have requested the district wide sections offered to students in a variety data. I was told that it would not be of delivery modes. available until May 20. I will respond to this goal in September when Speech faculty return. Each faculty member will assess his/her student success rates at that time. Withdrawn 2.1 931 Psychology-TM To offer a variety of courses The number of sections of psychology which are online and in a variety of delivery distance learning. modes to students. none I have requested the district wide Work on increasing the number of sections offered to students in a variety data. I was told that it would not be available until May 20. I will of delivery modes. respond to this goal in September when Speech faculty return. Each faculty member will assess his/her student success rates at that time. Withdrawn 1.1 932 Speech-TM Increase student success in all Speech classes by 7%. Using spring and fall 2001 district none wide data we will compare student success rate% letter grades of A,B,C. Share teaching strategies. No cost. Withdrawn 1.1 933 Dance-TM To increase enrollments in all Dance classes and increase offerings in the Dance discipline. The number of enrollments in none Dance and the number of sections offered. Work on strategies for recruitment and Enrollment was increased. Another retention. Advertise. class will be offered in the Fall 2003 semester. Met 1.1 934 Language LabTM Increase attendance at the language lab. Have attendance rosters. none Offering tutorial services. Getting new and modern educational materials like audio, video, and software at cost of $1,000. Attendance increased by about 2%. The lab was able to tutor about 3% of students enrolled in Spanish classes. Met 2.1 934 Language LabTM Increase attendance at the language lab. Have attendance rosters. none Offering tutorial services. Getting new and modern educational materials like audio, video, and software at cost of $1,000. Attendance increased by about 2%. The lab was able to tutor about 3% of students enrolled in Spanish classes. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 77 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 34 Arts, Basic Skills, Communication and Social Sciences Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 5.1 935 Art - TM Provide new faculty with the multimedia tools and the training opportunities to be successful in the College teaching environment. Provide the technology to support none classroom media needs, acquaint faculty with available teaching tools, invite new faculty to New Faculty Orientation training session. Existing and new faculty can share teaching approaches, new faculty will receive a thorough orientation and invitation to new faculty orientation sessions. 1.1 936 English-TM Improve Tutoring for students in our Writing Center by providing computers for students to write their assignments. Purchase of five computers. none Apply for area Improvement Plan $5,000 and/or 1,300 per computer X 5 = $6,500. 1.1 937 English-TM Designate a classroom just for English Composition classes, with 30 personal computers in the room. Obtain a classroom specifically for English students and have 30 PCs for students. none 30 PCs X 1,300 = 39,000 2 network printers 10,000 = $49,000 1.1 938 Language LabTM To increase completer rates Students will pass foreign language classes with more As with more students completing foreign language and Bs. classes and with higher scores. none The language lab is offering tutoring. Students will be encouraged to go to the language lab for tutoring. Incentives will be offered. Withdrawn 2.1 938 Language LabTM To increase completer rates Students will pass foreign language classes with more As with more students completing foreign language and Bs. classes and with higher scores. none The language lab is offering tutoring. Students will be encouraged to go to the language lab for tutoring. Incentives will be offered. Withdrawn 1.1 939 Drama-TM To increase enrollments in all Drama classes and increase offerings in the Drama discipline. The number of enrollments in none Drama and the number of sections offered. Work on strategies for recruitment and Offerings increased-extra film retention. Advertise. course added for Fall 2003. 8.1 940 Ft Bliss To increase the number of students in all Fort Bliss classes and to increase the The number of students enrolling none in courses at Fort Bliss and the number of sections offered. Advertise more and develop a plan to ensure all core courses are available during the year. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Faculty was able to share the media tools available. Dr. Rhodes suggested that the English Dept. contact the warehouse for used computers. Met The English Dept. will follow up on Dr. Rhodes' suggestion and pursue the use and implementation of used computers for word processing. Aggressive PR campaigns will likely increase enrollments in Drama classes. With 911 and the threat of war, the course offerings and enrollments decreased for all 3 semesters. rpt0203AreaPlansFinalResults Not Met In Progress Not Met Friday, November 21, 2003 Page 78 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 34 Arts, Basic Skills, Communication and Social Sciences Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status number of course offerings. 2.1 940 Ft Bliss To increase the number of students in all Fort Bliss classes and to increase the number of course offerings. The number of students enrolling none in courses at Fort Bliss and the number of sections offered. Advertise more and develop a plan to ensure all core courses are available during the year. With 911 and the threat of war, the course offerings and enrollments decreased for all 3 semesters. Not Met 1.1 941 Forensic Travel - TM To increase the number of students participating in the Forensics program. The number of students participating. Move the program to the Valle Verde Campus. The number of students participating has increased, the program has moved to the Valle Verde Campus and recruitment has taken place at several high schools. Met The number of students participating has increased, the program has moved to the Valle Verde Campus and recruitment has taken place at several high schools. Met The number of students participating has increased, the program has moved to the Valle Verde Campus and recruitment has taken place at several high schools. Met none Recruit at the high schools. 8.1 941 Forensic Travel - TM To increase the number of students participating in the Forensics program. The number of students participating. none Move the program to the Valle Verde Campus. Recruit at the high schools. 2.1 941 Forensic Travel - TM To increase the number of students participating in the Forensics program. The number of students participating. none Move the program to the Valle Verde Campus. Recruit at the high schools. 2.1 943 Young Scholars To increase the number of Bowl-TM schools participating in the Young Scholars Bowl. The number of schools participating in this years Bowl vs. last years Bowl. none Advertise and recruit. Create better communication with the area high schools. 32 schools are participating in Young Scholars Bowl this year. This is an increase in the number of schools. It is the largest number of schools that have ever participated (according to Kerri Harrison). Met 8.1 943 Young Scholars To increase the number of schools participating in the Bowl-TM Young Scholars Bowl. The number of schools participating in this years Bowl vs. last years Bowl. none Advertise and recruit. Create better communication with the area high schools. 32 schools are participating in Young Scholars Bowl this year. This is an increase in the number of schools. It is the largest number of schools that have ever participated (according to Kerri Harrison). Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 79 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 34 Arts, Basic Skills, Communication and Social Sciences Goal Plan Area Objective Measure Standard 2.1 944 Economics-TM The number of sections of To increase the number of sections being taught using a economics being taught in a different delivery mode. variety of delivery modes. 2.1 945 AnthropologyTM To increase the number of sections being taught in anthropology. 1.1 946 Developmental Education-VV Keep students passing rate of Number of students passing. Bask Math classes. 1.1 947 Political Science - TM The number of sections of none To increase the number of sections being taught using a political science being taught in a different delivery mode. variety of delivery modes. 1.1 1317 Reading-TM Develop Internet assignments and lab activities for all ESL and regular Reading courses. 1.1 1318 Reading-TM Increase students' familiarity none and use of the Internet to access information. The number of sections of anthropology. A survey will be conducted to determine students satisfaction with Web sites and assignments. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Strategies Assessment Results Use of Results Objective's Status none Work on getting additional course offerings via the internet and/or distance learning. none Work on getting additional course offerings which will meet the needs of students. 70% or higher on average based on the number of students who don't miss more than one test or who take the final exam. To encourage students to do their homework and see instructor or tutor for extra help. Credit will be given for students to do so. Fall 2002, average passing rate for all Bask Math classes is 64.8% which is lower than 70%. But, is based on all students administered in classes. The goal of 70% average passing rate was set based on students who didn't miss more than one test or take the final exam. Not Met Work on getting additional course offerings via the internet and/or distance learning. Goal met: Six online courses in Government 2305 and 2306 added beginning Fall 2002. Met Added: -Econ online 2302 -Econ DLC 2302 @ Cathedral -Added Basic Survey 1301 @ VV -Econ ITV 2302 Met Withdrawn none The Instructional Coordinators and the This work is in progress and will be Reading Lab Assistant will collaborate completed during 2003-2004. on the research and lab activities. Other instructors will give their input on assignments for each course. No extra costs are projected. In Progress none The Instructional Coordinators and the This work is in progress and will be Reading Lab Assistant will collaborate completed during 2003-2004. on the research and lab activities. Other instructors will give their input on assignments for each course. No extra costs are projected. In Progress rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 80 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 35 Arts, Basic Skills, Communications, Occupational Education and Social Sciences Goal Plan Area Objective Measure Standard Strategies 7.1 770 Dean Arts, Provide support and services Number of staff network BASK, Occ Ed, to the instructional connections. & SS disciplines. Increase by 5% the number of network connections. 6.1 771 Arts, Basic Provide professional Skills, development/training Communications opportunities for faculty. , Occ. Ed. Increase by 50% the number Identify the number of faculty of professional requiring specialized training (I.e. development/training certification, CEUs, and others) activities. Identify the number of faculty requesting professional development activities (i.e., conferences, seminars and others) Number of professional development/training activities. Assessment Results Use of Results Identify staff computers not connected Objective of providing staff Continue to support instructional to network. network support was met. 100% of disciplines. the staff is supported. Current budget will be used. Objective's Status Met Opportunities have been provided Continue to support professional for all faculty to obtain professional development activities for faculty. development/training activities. Met Opportunities have been provided Continue to support professional for all faculty to obtain professional development activities for faculty. development/training activities. Met Opportunities have been provided Continue to support professional for all faculty to obtain professional development activities for faculty. development/training activities. Met The art instruction has indicated Met Current budget will be used. 7.1 771 Arts, Basic Provide professional Skills, development/training Communications opportunities for faculty. , Occ. Ed. Number of professional development/training activities. Increase by 50% the number Identify the number of faculty of professional requiring specialized training (I.e. development/training certification, CEUs, and others) activities. Identify the number of faculty requesting professional development activities (i.e., conferences, seminars and others) Current budget will be used. 8.1 771 Arts, Basic Provide professional Skills, development/training Communications opportunities for faculty. , Occ. Ed. Number of professional development/training activities. Increase by 50% the number Identify the number of faculty of professional requiring specialized training (I.e. development/training certification, CEUs, and others) activities. Identify the number of faculty requesting professional development activities (i.e., conferences, seminars and others) Current budget will be used. 7.1 772 Art - RG To insure that the student Number of art forms. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase the variety of art Introduce more examples of art to the rpt0203AreaPlansFinalResults Future exposure to art. Friday, November 21, 2003 Page 81 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 35 Arts, Basic Skills, Communications, Occupational Education and Social Sciences Goal Plan Area Objective Measure receives a variety of art forms to study. Standard forms by 5%. We are talking about a grant project to help students to bridge from ESL/ESAL to regular English. We're also working on techniques in our classes to get students more involved in English. Increase class activities by 5%. Introduce more situations in which to practice speaking Spanish. The Spanish instructor provides This is to allow the student to time during class for all students to become comfortable using Spanish. practice speaking Spanish to the whole class or in small groups. Increase the variety of examples of theater by 5%. Introduce more examples of drama to the student. Unable to ascertain whether any more were included. Increase the examples of music played in the classroom by 5%. Introduce more examples of music. Another course was added to what if offered at RG. MUSI 1310 (Jazz to Rock) off music forms that are not covered in MUSI 1306. Met Have instructors speak to beginning accounting classes when registration time is near. Enrollment has increased this Spring and enrollment is looking good for Summer. Part time instructors have taken a lead role in speaking to ESL students in order to generate more interest. In Progress -To increase pass rate in ENGL 0310 at RG 7.1 774 Foreign Language-RG To insure that the student be Number of class activities. given the opportunity to practice Spanish in the classroom. 7.1 775 Drama-RG To insure that the student receive a larger sample of drama/theater. 7.1 776 Music/Dance-RG To insure that the student be Number of music examples. given the opportunity to listen to a larger variety of Music. 1.1 777 Accounting - RG To increase graduation rates Compare the number of graduates A 10% increase. from year to year. for the Accounting Discipline. Number of students successfully Increase from 50% to 66 completing ENGL 0310 (based on 2/3%. 12th day report) Have instructors designate special office time to help students choose classes for the next semester. Computer Increase student graduation Information - RG rate for the CIS Program. Number of students graduating and/or attaining a certificate. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Objective's Status Develop greater use of Academic Resource Center and Writing Center and coordinate better with ESOL program. English-RG 778 Use of Results that new pieces of art are introduced each semester. 773 8.1 Assessment Results student. 1.1 Number of a theater. Strategies In Progress Not Met Increase by 10% from Identify students who lack less than 12 There are seven CIS students that previous three year average. hours for graduation. are scheduled to graduate as of: May 9th, 2003. In progress: will Identify students who need less than complete (3) students Fall, 2003. six hours to successfully attain certification. rpt0203AreaPlansFinalResults Met In Progress Friday, November 21, 2003 Page 82 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 35 Arts, Basic Skills, Communications, Occupational Education and Social Sciences Goal Plan 2.1 779 Area Objective Measure Business To increase enrollment in the Number of students enrolling. Administration - Business Discipline. RG Standard Increase all courses to a maximum capacity; varies depending on room. Strategies Publicize the program in the media-newspaper, TV, and radio. Cost: varies with kind of media, frequency, and time. Assessment Results Use of Results Objective's Status Due to budget wide spread media coverage is not possible. We have put up flyers to help enrollment. Part-time instructor is also helping with marketing classes. In Progress Withdrawn 1.1 780 Management RG Track students through the semesters as well as upon graduation. Number of student tracked. Increase the number of students by 100%. Have information forms filled out at the beginning of each semester. Prior to graduation, have an appointment with each graduate. No longer offered at RG. 2.1 781 Office Information Systems - RG To increase enrollment for the POCT Discipline. Number of students enrolling. Increase all courses to a maximum of 14 from the current number of 7-10. Speak to area high school classes and to ESL classes on campus. Held sessions in Spring 2003 with ESL students. Distribute flyers when speaking and place in new student orientation packets. Sustained Met Cost: $150 6.1 782 Speech-RG Use of technology. To insure that the students are given the opportunity to use PowerPoint and other programs for giving speeches. 5.1 783 ESL -RG Provide technological staff development and training to ESOL Faculty at the Rio Grande campus. 1.1 784 ESAL -RG Number of students attending the Increase speaking and ESAL lab. listening skills for ESAL students by offering listening and speaking practice opportunities in a lab setting. Increase the use of technology by 100%. Provide PowerPoint capability. Equipment was received too late for Continue to use PowerPoint in all students to use. Approx. 75% Speech 3101 classes. usage. To provide staff development and Increase the passing rate of Provide Internet resources and training -A total of 3 workshops were given training in technology. to ESOL instructors. the ESOL Exit Exam by 3%. to ESOL Faculty. -Our publisher (Pearson) provided Sponsor a workshop and involve part- the division with an ESL-Internet Guide (Teacher's Manuel) time instructors in the planning -Publisher Rep (Penny Gee) will sessions. sponsor 2 additional, future Establish a follow-up session for part- workshops -Passing rate increased 3% time instructors. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 95% of on-campus ESAL students will attend the ESAL Lab during each semester. Provide tutors who will guide students Approximately 95% of students in conversation; provide opportunities attended the Speaking Activities Center (new name). for ESAL students to practice both listening and speaking. rpt0203AreaPlansFinalResults Not Met -Excellent faculty evaluations of workshops -Very positive feedback by instructors on the website (for future workshops selection) -Each workshop is scheduled for the beginning of each semester -97% exit exam passing rate overall in discipline Met Continuation of speaking activities for ESAL students. Teachers need to have more information on the lab. Met Friday, November 21, 2003 Page 83 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 35 Arts, Basic Skills, Communications, Occupational Education and Social Sciences Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status Records of student attendance will need to be kept to see if the standard is being met. 1.1 785 Psychology-RG Attract better prepared students. 1.1 786 Philosophy-RG 1.1 787 1.1 Number of students. 5% more students are TASP Stress Honors participation, exempt. scholarships, recruitment-talk to principals, get information about top 20% of graduates. Increase student retention. Number of students completing courses. Increase of 5% of students completing courses based on previous three-year average. History-RG Increase student retention. Number of students completing courses. 788 Political Science - RG Increase student retention. 1.1 789 Sociology -RG 1.1 790 1.1 791 This objective has been approached, but more work needs to be done, particularly in making contact with recruitment and getting information to monitor top 20% of high school graduates. Complete attainment of this objectives will help build on Psychology program, with an emphasis on quality. Met Use of appropriate teaching/mentoring methodologies. Semester grade distribution reports will help us monitor. Met Increase of 5% of students completing courses based on previous three-year average. Use of appropriate teaching/mentoring methodologies. Semester grade distribution reports will help us monitor. Met Number of students completing courses. Increase of 5% of students completing courses based on previous three-year average. Use of appropriate teaching/mentoring methodologies. Semester grade distribution reports will help us monitor. Met Increase student retention. Number of students completing courses. Increase of 5% of students completing courses based on previous three-year average. Use of appropriate teaching/mentoring methodologies. Semester grade distribution reports will help us monitor. Met Economics-RG Increase student retention. Number of students completing courses. Increase of 5% of students completing courses based on previous three-year average. Use of appropriate teaching/mentoring methodologies. Semester grade distribution reports will help us monitor. Met Developmental Education-RG To maintain good retention and passing rates. Number of students enrolled at census date and receiving grades of CR. 50% retention 80% completion 70% passing Referrals to tutoring when warranted. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Adequate communication between Data is being collected for the academic year to determine students are passing. rpt0203AreaPlansFinalResults In Progress Friday, November 21, 2003 Page 84 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 35 Arts, Basic Skills, Communications, Occupational Education and Social Sciences Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status students, instructors, and tutors. 5.1 792 TRVM Increase student enrollment for the Travel and Tourism Program. Number of student enrolling. Increase all courses to maximum capacity of 14. Develop a marketing brochure to advertise the program, speak at schools, and involve myself and students in community functions. Utilize web page and free advertisements. Use flyers posted at all campuses. Spoke at EPISD active in the El Paso Hospitality Club for networking purposes. Met 7.1 792 TRVM Increase student enrollment for the Travel and Tourism Program. Number of student enrolling. Increase all courses to maximum capacity of 14. Develop a marketing brochure to advertise the program, speak at schools, and involve myself and students in community functions. Utilize web page and free advertisements. Use flyers posted at all campuses. Spoke at EPISD active in the El Paso Hospitality Club for networking purposes. Met 8.1 792 TRVM Increase student enrollment for the Travel and Tourism Program. Number of student enrolling. Increase all courses to maximum capacity of 14. Develop a marketing brochure to advertise the program, speak at schools, and involve myself and students in community functions. Utilize web page and free advertisements. Use flyers posted at all campuses. Spoke at EPISD active in the El Paso Hospitality Club for networking purposes. Met 6.1 792 TRVM Increase student enrollment for the Travel and Tourism Program. Number of student enrolling. Increase all courses to maximum capacity of 14. Develop a marketing brochure to advertise the program, speak at schools, and involve myself and students in community functions. Utilize web page and free advertisements. Use flyers posted at all campuses. Spoke at EPISD active in the El Paso Hospitality Club for networking purposes. Met 1.1 792 TRVM Increase student enrollment for the Travel and Tourism Program. Number of student enrolling. Increase all courses to maximum capacity of 14. Develop a marketing brochure to advertise the program, speak at schools, and involve myself and students in community functions. Utilize web page and free advertisements. Use flyers posted at all campuses. Spoke at EPISD active in the El Paso Hospitality Club for networking purposes. Met 2.1 792 TRVM Increase student enrollment for the Travel and Tourism Program. Number of student enrolling. Increase all courses to maximum capacity of 14. Develop a marketing brochure to advertise the program, speak at schools, and involve myself and students in community functions. Utilize web page and free advertisements. Use flyers posted at all campuses. Spoke at EPISD active in the El Paso Hospitality Club for networking purposes. Met 1.1 793 Education -RG To ensure that the number of Section numbers and times. All the sections of EDUC Alerting counseling about these We have offered more sections and In Progress OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 85 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 35 Arts, Basic Skills, Communications, Occupational Education and Social Sciences Goal Plan Area Objective Measure Standard Strategies Assessment Results TECA 1354, EDUC 1300 and 1301 sections meet RG student demand. 1300 offered have an 80% fill rate and all sections of EDUC 1301 and TECA 1354 have a 50% fill rate. courses and the requirements they fulfill, putting up announcements around campus, and close monitoring to add sections as needed. found excellent instructors to staff them. Increase by 5% from previous year average. Focus on continued review of course objectives attainment. This is an ongoing comparison between the numbers of students passing the Level I final exam from one semester to the next. The objective was met the last two semesters. We're waiting to see the results of this semester to compare it with last. Develop more ideas for utilizing the Writing Center. A new tutor has been added to the Writing Center Utilization is at an all time high. Use of Results Objective's Status 1.1 794 Reading-RG Number of students passing exit Increase the number of students passing the Reading exams. Exit Exams. 1.1 1290 English-RG Number of students successfully Increase to 80%. To increase retention in ENGL 1301 and 1302 at RG. completing ENGL 1301 and 1302 (based on 12th day report). 1.1 1291 English-RG To develop sufficient offerings and enrollment in literature class offerings at RG. Number of students enrolling in literature offerings. Sufficient numbers of students to keep the classes rather than canceling them. Promote the literature classes in 1302, advertise the classes with fliers and with announcements in Engl 1302 classes, and sponsor Art Festival activities at RG. We announce the classes and put up fliers, but it's still a problem. In Progress 1.1 1292 Education -RG To provide quality instruction with qualified instructors. Instructor Pool. Enough instructors with proper credentials and good evaluations and recommendations. Advertise as needed, personally interview all qualified candidates, follow up on recommendations and past evaluations, re-evaluate. We have found great instructors. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Met Retention is improving slowly in English 1301 & 1302. Friday, November 21, 2003 In Progress Page 86 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 15 Associate Vice President, Instructional Services Goal Plan Area Objective Measure Standard Use of Results Objective's Status Strategies Assessment Results -Faculty and staff development activities. -Technology training sessions for faculty and staff. -Distance education program offerings. -Student activities. -ACS lab services. 60% increase in students enrolled in distance education offerings. Increased participation in faculty development activities which include teaching effectiveness workshops, seminars and retreats. Increased faculty and staff training in the faculty Resource Center. The procurement of a TIF grant allowed for the implementation of WEBCT, on online course management system, together with the purchase of laptops and projectors for use by faculty in the classrooms. Instructional Services activities are providing opportunities to increase the participation, of faculty, staff and students in areas of integrating technology in their classrooms, work environment and in distance education. Met Honors Membership was increased by 2%. Honors Program Continue extensive recruitment efforts of both faculty. Met 1.1 1018 AVP, Instructional Services 1.1 1021 Increase Honors membership by Honors Program To increase Honors faculty/students participation 2%. during academic year. none Recruitment/membership drive workshops. 5.1 1027 Faculty Development To recognize the achievement of outstanding faculty and staff. none Schedule, advertise and conduct an Recognition Dinner was held in awards dinner. Projected cost $1,000 - Spring to recognize faculty and $2,000. staff. Recognition of faculty and staff. Met 5.1 1028 Faculty Development Numbering of faculty attending Maintain faculty (full-time and part-time) participation retreat. at 45-50 in the college retreat. none Advertise retreat and involve faculty in Faculty are involved in the planning of retreat. Planning of the Spring retreat and Projected costs $12,000 - $14,000. 50-60 faculty participated in Faculty Retreat in Bisbee, Arizona. Participants evaluate the retreat each year for improvement. The following year's retreat is also scheduled, location identified together with the retreat theme. Met 5.1 1029 Faculty To maintain faculty none Advertise the program, involve faculty Due to budget constraints, the Will have to wait until the end of In Progress Increase instructional services for College faculty, staff and students. To increase instructional services none by 5%. We will hold an annual recognition dinner. At this event we will recognize outstanding faculty and staff. Number of faculty OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 87 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 15 Associate Vice President, Instructional Services Goal Plan Area Objective Measure Development participation in the Spanish participating/use of Spanish while Immersion at 15-17 in Mexico. participants and to improve the immersion element of the program via more activities which require the use of Spanish while in Mexico. 5.1 1030 Faculty Development To stabilize institutional To have a minimum of 20 EPCC support for the Southwest faculty attend the 2002 seminar. Seminar for Great Teaching. 5.1 1031 Faculty Development Increase participation in oncampus wellness activities. 7.1 1038 Publications 8.1 1038 Publications Standard Strategies in the planning. Develop more immersion activities while in Mexico. Projected costs $10,000 -$12,000 Assessment Results Use of Results Faculty Development Office will not fund the Spanish Immersion Program. The Faculty Development office has coordinated the program, but each participant will have to pay their own costs. Summer to assess the participation level. Objective's Status none To have $6,000 allocated to the $6,000 have been added to the EPCC participation in SW Seminar Faculty Development budget to pay the Faculty Development Office to has increased and given faculty an ensure for increased participation in opportunity to attend Seminars. cost for 20 participants. the SW Seminar. Increase number of employees participating in the program. none Advertise wellness activities and involve faculty/staff in the planning of these activities. Develop a plan for a wellness program. Cost approximately $1,500. Coordinated a wellness weekend with speakers and activities for faculty and staff. 30 participants attended. The format for this activity was well received and contributed to increased participation. To produce high quality printed materials districtwide that adhere to College standards and procedures. 90% of publication consistent with standard. As per new publications procedure and standards. -Revise procedure to include Publications role in out-sourcing Documents. -Have district-wide workshops re: Publications standards & new Process for printing jobs. -Develop document with standards and "help sheet" included. -District-wide dissemination of standards and posting on the web. -District-wide review of materials. -Continued research on ed. Inst.'s Publication standards and trends to keep current in our publications. Est. cost: $5,000; brochures that are revised are charged to each dept & therefore not included in our budget. -Procedure was revised. -Workshops conducted at Faculty Development. -Developed brochure on Publications Dept. disseminated to admin. Offices. -Coordinator integrating students program activities with critical thinking activities. -Procedure approved and on web. -Need to provide more workshops on design; need to disseminate more info re: Publications Dept. -Saw increase in orders. Met To produce high quality printed materials districtwide that adhere to College 90% of publication consistent with standard. As per new publications procedure and standards. -Revise procedure to include Publications role in out-sourcing Documents. -Procedure was revised. -Workshops conducted at Faculty Development. -Procedure approved and on web. -Need to provide more workshops on design; need to disseminate Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Met Page 88 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 15 Associate Vice President, Instructional Services Goal Plan Area Objective Measure Standard standards and procedures. 1.1 1041 Service Learning Increase retention, Increase the number of students none that participate in Service graduation, and completer rates by helping students feel Learning by 50% from the Spring 2002 semester. a sense of purpose by providing community service. Strategies Assessment Results Use of Results -Have district-wide workshops re: Publications standards & new Process for printing jobs. -Develop document with standards and "help sheet" included. -District-wide dissemination of standards and posting on the web. -District-wide review of materials. -Continued research on ed. Inst.'s Publication standards and trends to keep current in our publications. Est. cost: $5,000; brochures that are revised are charged to each dept & therefore not included in our budget. -Developed brochure on Publications Dept. disseminated to admin. Offices. -Coordinator integrating students program activities with critical thinking activities. more info re: Publications Dept. -Saw increase in orders. Invite interested faculty to participate in a special reception organized to encourage them to join the project. Student and faculty participation has increased due to recruitment efforts. Continue to recruit faculty and students. Objective's Status Met Coordinate faculty activities to more effectively integrate service hearing into curriculum. Plan and implement a faculty development workshop for the Fall 2002 semester to encourage other faculty to join. Promote Service Learning opportunities to students. 1.1 1043 State Leadership -Frame state system of professional development. Consortium -Program has statewide impact. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none -Workshops The assessment process for the activities of this project are built around focus groups, subjective questioning and input from association and agency personnel. The overall goal of the Consortium is to identify, develop, and disseminate strategies in key topical areas for Texas CTC personnel, particularly faculty and administrators. The assessment process yielded we-based training and statewide workshops. rpt0203AreaPlansFinalResults The same assessment process is being used for Project Year 2004. The key use of assessment data is for the project to provide more webbased program delivery. Friday, November 21, 2003 Met Page 89 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 15 Associate Vice President, Instructional Services Goal Plan Area 1.1 1044 Teacher Collaborative 1.1 1045 5.1 1.1 Objective -Frame state system of professional development. Measure Standard Strategies Assessment Results Use of Results Objective's Status -Workshops During the past two years, an assessment process was implemented that yielded the topical priorities of Texas CTC faculty and the delivery modes of preference. In the order of importance, the area of interest are: 1. Discipline-specific activities 2. Teaching and Learning 3. Classroom Technology 4. Internet Teaching 5. Personal and Career Development In preparation for the 2003-2004 program year, the assessment process was initiated. The programming focus areas are the same as 2002-2003. Met Phi Theta Kappa To increase Phi Theta Kappa Phi Theta Kappa membership will none membership during academic increase by 2%. year. Recruitment/membership drive workshops. Recruitment of approximately 160 students orientation workshops held during the Fall & Spring for recruitment. Continued development of program and fulfilling of officer vacancies. Leadership development of students but attending Regional, State and National Conferences. Met 1046 Professional Development To review the applications of staff requesting professional development leaves and make recommendations. Professional Development Leave Procedure. 1047 Tenure Committee To review the applications of To grant tenure to faculty based on established guidelines and tenure candidates and provide recommendations on criteria. the granting of tenure of faculty. -Program has statewide impact. none To grant professional none development leaves to non-faculty based on established guidelines, criteria and funding. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none College Procedure 1.08.01, Tenure Review and Recommendations. Tenure Committee made Tenure-track Faculty were notified recommendations to College by College President of Tenure President on the granting of Tenure Committee's recommendation. to Faculty. Tenure procedure was revised. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Met Page 90 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Coordinator, Curriculum Development Office Goal Plan 1.1 1033 Area Curriculum Office Objective Increase retention, graduation, and completer rates. Measure % of all degree and certification seeking students enrolled in the fall return in the spring, college wide. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard 80% Strategies Assessment Results Improve WECM Programs by doing DACUMs for programs that have not done a DACUM within five years; develop new WECM programs and courses for both WECM and academic areas; revise outdated courses; create new Crosswalks; promote the Core Curriculum and the new Fields of Study; and coordinate efforts with UTEP and NMSU to increase transferability. The Curriculum Office conducted 13 DACUMs, funded the development of 41 new courses or course revisions, supervised the revision of all college syllabi created a new crosswalk and promoted a new Fields of Study and core curriculum. rpt0203AreaPlansFinalResults Use of Results All college instructors had a clearer syllabi and all support personnel who work with Curriculum Issues had better information to work with. Friday, November 21, 2003 1 Objective's Status Met Page 91 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Center for Instructional Telecommunications Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 9 Objective's Status 8.1 1024 Instructional Media Centers To replace current curtains, chairs and carpet at the TM Lecture Forum. 6.1 1025 Instructional Media Centers To provide equipment needs Completion of Equipment Requests. for direct classroom instruction. Have equipment needed on Identify equipment needs district-wide No Budget. hand as requested by faculty. for the IMS areas - purchase sufficient equipment. Not Met 7.1 1026 Instructional Media Centers Operation, maintenance and Update existing equipment software used for managing record keeping of activities. equipment (faculty) requests district-wide by IMS. Decrease the number of requests not completed. Not Met 5.1 1035 Ctr for Instructional Telecom. Provide Avid training for existing production staff. Number of staff attending training. Improvement in the use and Identify staff needing training and Due to budget constraints no speed of the editing process. contact AVID training center for costs. budget allocation for this task. Not Met 8.1 1036 Ctr for Instructional Telecom. Increase production of locally produced "Inside EPCC" shows. Number of programs produced. Increase to 3 programs per month from 1 per month. Insufficient staff and non-available host. Task not completed due to budget limitations. Not Met 6.1 1039 CIT (KCCR) To provide KCCR air time on the Internet. Number of hours on the air. Provide at lease 5-hours per Purchase equipment needed and day with a repeat cycle. allocate Fiber (Band width) required for Broadcast. No budget allocation for this task. Not Met 8.1 1040 Cablecast To broadcast and produce instructional programs enhancing the College Mission in terms of community education. Evaluate current program none inventory in terms of content and age. Identify replacement programs in digital format. Not possible due to budget cuts. Not Met 1.1 1040 Cablecast To broadcast and produce instructional programs enhancing the College Mission in terms of community education. Evaluate current program none inventory in terms of content and age. Identify replacement programs in digital format. Not possible due to budget cuts. Not Met Existing curtains and chairs have Enhance college image. been in use for over 15 years. Curtains are in need of repair and parts are not available. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Contact vendor to determine cost and time frame. Not a priority Budget. Not Met Maintain record keeping of all No Budget. activities for the coming year and provide equipment needs for next year. Identify the program that needs to be promoted on "Inside EPCC" per semester. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 92 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Center for Instructional Telecommunications Goal Plan 6.1 1040 Area Cablecast Objective To broadcast and produce instructional programs enhancing the College Mission in terms of community education. Measure Evaluate current program none inventory in terms of content and age. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Strategies Identify replacement programs in digital format. Assessment Results Use of Results Not possible due to budget cuts. rpt0203AreaPlansFinalResults 9 Objective's Status Not Met Friday, November 21, 2003 Page 93 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Distance Learning Goal Plan Area Objective Measure Standard Strategies 5.1 1019 Each workshop taught by each Each staff member will be Faculty Resource Center able to teach every workshop staff member. offered by the Faculty Resource Center. Each staff member will Each staff member will use currently conduct at least one section available resources to develop skills of every developed necessary to lead the workshops. workshop on the Faculty Resource Center Course Inventory during the Fall 2001 and Spring 2002 semesters. 7.1 1020 Academic Computing Services User satisfaction. 5% increase in user satisfaction after training. 7.1 1022 Improve communications Instructional Support Services between the ISS staff and supported staff members. Meetings are regularly held. 85% of scheduled meetings Regularly scheduled informational, held during the year. planning and objective(s) setting meetings with all supported areas. 1.1 1023 Distance Education / Online 5% increase in student retention from previous semester. 1.1 1032 Instructional TV Improve communication with faculty and students. 5% increase from baseline at the end of the reporting period. Improve user satisfaction. Increase student retention in Increase student retention in Distance Education/Online Distance Education/Online classes. program. Improved communication. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Assessment Results 1. Each staff member has been trained to deliver each developed workshop. 2. Improved customer service. Use of Results 5 Objective's Status Each staff member will continue to be trained to deliver each developed workshop. Met Improved customer service. Met 85% of scheduled meetings were held during the year. Use a group calendar to insure attendance at meetings. Met Improve faculty training and provide enhanced student services. 3% increase in student retention. Continue faculty development workshops. Continue monthly faculty meetings to share information and strategies to improve student retention. Met Provide written, telephonic and email notification prior to and after educational events. Published orientation schedules. Published review sessions. Letters provided to students and faculty of scheduled events. Improved communication with faculty and students. Met Lab assistants will complete MS Office Better qualified assistance. 2000 training courses. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 94 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Library Technical Services Goal Plan 6.1 1034 Area Library Technical Services Objective To adequately fund vacant position of Serial Clerk. Measure Position is filled. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard none Strategies Administration will consider this a valid position for department and will agree to fund this position. Assessment Results Use of Results Position was not funded; therefore, N/A no assessment results are available. rpt0203AreaPlansFinalResults 1 Objective's Status Not Met Friday, November 21, 2003 Page 95 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 6.1 708 Dean Occ EDVV Bring the Business lab and the POCT labs up to a level of quality that will adequately support student work. Purchase 47 computers of 1996 and 1995 vintage. Replace computers on a three year turn around whereas the oldest computers are only three years old. Purchase 46 computers for $1,050 each for a total of $49,350. Division was able to replace all computers that were older than 2 years old due to President's decision to increase tuition for technology for the students. Met 1.1 708 Dean Occ EDVV Bring the Business lab and the POCT labs up to a level of quality that will adequately support student work. Purchase 47 computers of 1996 and 1995 vintage. Replace computers on a three year turn around whereas the oldest computers are only three years old. Purchase 46 computers for $1,050 each for a total of $49,350. Division was able to replace all computers that were older than 2 years old due to President's decision to increase tuition for technology for the students. Met 7.1 708 Dean Occ EDVV Bring the Business lab and the POCT labs up to a level of quality that will adequately support student work. Purchase 47 computers of 1996 and 1995 vintage. Replace computers on a three year turn around whereas the oldest computers are only three years old. Purchase 46 computers for $1,050 each for a total of $49,350. Division was able to replace all computers that were older than 2 years old due to President's decision to increase tuition for technology for the students. Met 8.1 708 Dean Occ EDVV Bring the Business lab and the POCT labs up to a level of quality that will adequately support student work. Purchase 47 computers of 1996 and 1995 vintage. Replace computers on a three year turn around whereas the oldest computers are only three years old. Purchase 46 computers for $1,050 each for a total of $49,350. Division was able to replace all computers that were older than 2 years old due to President's decision to increase tuition for technology for the students. Met 2.1 708 Dean Occ EDVV Bring the Business lab and the POCT labs up to a level of quality that will adequately support student work. Purchase 47 computers of 1996 and 1995 vintage. Replace computers on a three year turn around whereas the oldest computers are only three years old. Purchase 46 computers for $1,050 each for a total of $49,350. Division was able to replace all computers that were older than 2 years old due to President's decision to increase tuition for technology for the students. Met 2.1 709 Dean Occ EDVV To increase enrollment in the Number of students enrolled in Increase enrollment of Occupational Education Programs division students by 1% Occupational Education at VV. Programs. over previous 3-year average. 1. Recruit high school seniors through a. Mail out information b. Student conference c. High school classroom presentations 2. Expand certification programs 3. Recruit from community through: a. Newspaper advertisements brochures and flyers b. Prepare & distribute program Division experienced a growth in total. The increase was due to the addition of transfer courses and not within pure occupational courses. Many of the strategies were implemented and seems to have stopped the decrease but was not sufficient to bring in growth in those areas. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 96 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status brochures and flyers 4. Consider offering power pack minimester courses 5. Expand program web sites 6. Do an analysis of competition from other schools 7. Review curriculum for program needs of students 8. Contact industry for perspective students and program needs 9. Develop on-line courses when appropriate 10. Conduct DACUMS as needed 11. Update Advisory Boards yearly 12. Start a faculty mentoring program 13. Review class schedules to facilitate student graduation 1.1 710 Dean Occ EDVV 5.1 711 7.1 711 Number of students retained. To increase retention of students in the Occupational Education Programs. Increase retention of division students by 1%. -Consider remediation for students when applicable. -Provide faculty advising for program majors. -Maintain, upgrade software, hardware, and network equipment to meet technological demands through grants and college budget. Division was unable to get the data to evaluate this goal. Our goal is to evaluate retention on-going. In Progress VV Faculty Train at least 5% of full time Increase and maintain Travel OCC ED technological and industry faculty on expand skills. related knowledge of faculty. none -Increase certification levels for CISCO courses. -Increase certification level for Microsoft courses. -Support MOUS certification of OIS faculty. -Send faculty to industry related conferences when appropriate. Due to increased Carl Perkins funds, 20% of our faculty was able to go to training this year. Met VV Faculty Train at least 5% of full time Increase and maintain Travel OCC ED technological and industry faculty on expand skills. related knowledge of faculty. none -Increase certification levels for CISCO courses. -Increase certification level for Microsoft courses. Due to increased Carl Perkins funds, 20% of our faculty was able to go to training this year. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 97 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status -Support MOUS certification of OIS faculty. -Send faculty to industry related conferences when appropriate. 2.1 712 Fire Recruit Training -VV 2.1 713 6.1 1.1 Offer a full-time schedule for basic firefighter certification so that student can complete the training within one semester. none -Obtain and develop an alternative training site that can be utilized on a full-time basis. -Obtain firefighting equipment and apparatus necessary to provide training. Have obtained approximately 52% of required equipment. Began offering a full-time schedule in Fall 02. Have obtained a comparency alternative site to offer approximately 75% of hands-on training. Met CISCO Systems- To train students in CISCO VV Networks and Hardware, Design and wire the Network, Program and Configure Router, Switches and Hubs. 6% increase in graduates. CISCO Certificate of Completion as CISCO Certified Network Associates (CCNP) UNIX Administration Cert. Maintain, upgrade software, hardware and network equipment in the classrooms. To ensure state-of-the-art technology and instruction. Solicit software and hardware donations from industry. (I.e. Microsoft Windows 2000 and CISCO and Sun Hardware for our CISCO Certified Network Professional Lab and UNIX Lab such as switches, routes. Increase of 22% graduates. Goal has been met with on going recruitment efforts that have been set forth at the high schools and industry. Met 713 CISCO Systems- To train students in CISCO VV Networks and Hardware, Design and wire the Network, Program and Configure Router, Switches and Hubs. 6% increase in graduates. CISCO Certificate of Completion as CISCO Certified Network Associates (CCNP) UNIX Administration Cert. Maintain, upgrade software, hardware and network equipment in the classrooms. To ensure state-of-the-art technology and instruction. Solicit software and hardware donations from industry. (I.e. Microsoft Windows 2000 and CISCO and Sun Hardware for our CISCO Certified Network Professional Lab and UNIX Lab such as switches, routes. Increase of 22% graduates. Goal has been met with on going recruitment efforts that have been set forth at the high schools and industry. Met 713 CISCO Systems- To train students in CISCO Networks and Hardware, VV Design and wire the Network, Program and 6% increase in graduates. CISCO Certificate of Completion as CISCO Certified Network Associates (CCNP) UNIX Maintain, upgrade software, hardware and network equipment in the classrooms. To ensure state-of-the-art technology and instruction. Solicit Increase of 22% graduates. Goal has been met with on going recruitment efforts that have been set forth at the high schools and Met Increase Fire Technology's capability to offer basic firefighter certification training courses that meet the needs of El Paso area fire departments, e.g. volunteer fire departments in El Paso County. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 98 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Configure Router, Switches and Hubs. Standard Strategies Assessment Results Administration Cert. software and hardware donations from industry. industry. (I.e. Microsoft Windows 2000 and CISCO and Sun Hardware for our CISCO Certified Network Professional Lab and UNIX Lab such as switches, routes. Use of Results Objective's Status 5.1 713 CISCO Systems- To train students in CISCO VV Networks and Hardware, Design and wire the Network, Program and Configure Router, Switches and Hubs. 6% increase in graduates. CISCO Certificate of Completion as CISCO Certified Network Associates (CCNP) UNIX Administration Cert. Maintain, upgrade software, hardware and network equipment in the classrooms. To ensure state-of-the-art technology and instruction. Solicit software and hardware donations from industry. (I.e. Microsoft Windows 2000 and CISCO and Sun Hardware for our CISCO Certified Network Professional Lab and UNIX Lab such as switches, routes. Increase of 22% graduates. Goal has been met with on going recruitment efforts that have been set forth at the high schools and industry. Met 6.1 714 CISCO Systems- Designate to train students in 6% increase in graduates. VV CISCO Networks and Hardware, Design and wire the Network, Program and Configure Router, Switches and Hubs. CISCO Certificate of Completion as CISCO Certified Network Associates (CCNP) UNIX Administration Cert. Maintain, upgrade software, hardware and network equipment in the classrooms. To ensure state-of-the-art technology and instruction. Solicit software and hardware donations from industry. I.e.. Microsoft Windows 2000 and CISCO and Sun Hardware for our CISCO Certified Network Professional Lab and UNIX Lab such as switches, routes. Increase of 22% graduates. Goal met with strong on going recruitment at local high schools and private industry. Met 5.1 714 CISCO Systems- Designate to train students in 6% increase in graduates. VV CISCO Networks and Hardware, Design and wire the Network, Program and Configure Router, Switches and Hubs. CISCO Certificate of Completion as CISCO Certified Network Associates (CCNP) UNIX Administration Cert. Maintain, upgrade software, hardware and network equipment in the classrooms. To ensure state-of-the-art technology and instruction. Solicit software and hardware donations from industry. I.e.. Microsoft Windows 2000 and CISCO and Sun Hardware for our CISCO Certified Network Professional Lab and UNIX Lab such as switches, routes. Increase of 22% graduates. Goal met with strong on going recruitment at local high schools and private industry. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 99 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 2.1 714 CISCO Systems- Designate to train students in 6% increase in graduates. CISCO Networks and VV Hardware, Design and wire the Network, Program and Configure Router, Switches and Hubs. CISCO Certificate of Completion as CISCO Certified Network Associates (CCNP) UNIX Administration Cert. Maintain, upgrade software, hardware and network equipment in the classrooms. To ensure state-of-the-art technology and instruction. Solicit software and hardware donations from industry. I.e.. Microsoft Windows 2000 and CISCO and Sun Hardware for our CISCO Certified Network Professional Lab and UNIX Lab such as switches, routes. Increase of 22% graduates. Goal met with strong on going recruitment at local high schools and private industry. Met 1.1 714 CISCO Systems- Designate to train students in 6% increase in graduates. CISCO Networks and VV Hardware, Design and wire the Network, Program and Configure Router, Switches and Hubs. CISCO Certificate of Completion as CISCO Certified Network Associates (CCNP) UNIX Administration Cert. Maintain, upgrade software, hardware and network equipment in the classrooms. To ensure state-of-the-art technology and instruction. Solicit software and hardware donations from industry. I.e.. Microsoft Windows 2000 and CISCO and Sun Hardware for our CISCO Certified Network Professional Lab and UNIX Lab such as switches, routes. Increase of 22% graduates. Goal met with strong on going recruitment at local high schools and private industry. Met 2.1 715 Accounting - VV Increase enrollment in advanced courses. 5.1 716 Comp Information VV Increase enrollment to 10 for first none semester first year classes. 3% increase in graduates. To enroll, retain and graduate students in the Computer Information Systems Arena, such as Computer Programming, Microcomputers in Business, Data Entry, Computer Operations, Telecommunications and OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT A.A.S. Degree Computer Programming Telecommunication/ Networking Microcomputers in Business and Computer Repair Technician A+ -Do presentations at local high schools. -Send brochure to local high schools grad seniors. -Make presentation to EPCC students (ex. Project Arriba & ESL students). -Advising students currently in program. -Participate in student conferences. Maintain and upgrade software, hardware and curriculum to ensure state-of-the-art technology and instruction. Solicit software and hardware donations from industry. (i.e. Microsoft Windows 2000 and Front Page 2000). rpt0203AreaPlansFinalResults Met Friday, November 21, 2003 Page 100 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status Networking. 6.1 716 Comp Information VV 3% increase in graduates. To enroll, retain and graduate students in the Computer Information Systems Arena, such as Computer Programming, Microcomputers in Business, Data Entry, Computer Operations, Telecommunications and Networking. A.A.S. Degree Computer Programming Telecommunication/ Networking Microcomputers in Business and Computer Repair Technician A+ Maintain and upgrade software, hardware and curriculum to ensure state-of-the-art technology and instruction. Solicit software and hardware donations from industry. (i.e. Microsoft Windows 2000 and Front Page 2000). Met 1.1 716 Comp Information VV 3% increase in graduates. To enroll, retain and graduate students in the Computer Information Systems Arena, such as Computer Programming, Microcomputers in Business, Data Entry, Computer Operations, Telecommunications and Networking. A.A.S. Degree Computer Programming Telecommunication/ Networking Microcomputers in Business and Computer Repair Technician A+ Maintain and upgrade software, hardware and curriculum to ensure state-of-the-art technology and instruction. Solicit software and hardware donations from industry. (i.e. Microsoft Windows 2000 and Front Page 2000). Met 2.1 716 Comp Information VV 3% increase in graduates. To enroll, retain and graduate students in the Computer Information Systems Arena, such as Computer Programming, Microcomputers in Business, Data Entry, Computer Operations, Telecommunications and Networking. A.A.S. Degree Computer Programming Telecommunication/ Networking Microcomputers in Business and Computer Repair Technician A+ Maintain and upgrade software, hardware and curriculum to ensure state-of-the-art technology and instruction. Solicit software and hardware donations from industry. (i.e. Microsoft Windows 2000 and Front Page 2000). Met 2.1 717 Recruit students from area Business Administration- high schools. VV Number of new students enrolled Increase new student in the Fall/Spring semesters. enrollment by 2%. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Identify high schools and students who The DACUM was held on May 7, 2002. are interested in the Business/Management program. Conduct a DACUM to meet the needs On file at the Curriculum Office. of the businesses in El Paso/Juarez rpt0203AreaPlansFinalResults Advisory Committee was also updated in November of the same year. Friday, November 21, 2003 Met Page 101 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status area. Last DACUM conducted for General Business 11-7-98. List high schools and instructor who will be the contact person. Monthly reports should be given at meetings. This should occur during spring the semester. 2.1 718 Business Recruit former students from Number of returning students who Increase by 3%. Administration- EPCC. are EPCC employees. VV 2.1 719 Increase community Business Administration- awareness. VV Number of businesses responding none to ad. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Identify staff members who are employed full-part-time at the College. Host an event inviting all support staff to mentor until graduation. Advertise in the El Paso Times. Submitted request to advertise in the El Paso Times in the Spring 2002- denied by Marketing Director. Submitted request to advertise in the Twin Plant News (Spring 2003)-due to budget constraints, no monies available. rpt0203AreaPlansFinalResults Cannot move forward with this Not Met objective without advertising funding. Here is a listing of activities that the disciplines completed: June 23, 2003 - Met with UTEP to establish and strengthen partnership on transfer courses (Peter Phung & Linda E. Silva) Summer, 2003 - Once new brochures are completed, these will be distributed to counselors for the New Student Orientations Spring, 2003 - Began process for updating brochure for the Business program (John Mastriani, Peter Phung, & Linda E.Silva) Continued to offer concurrent courses in Continuing Education in the fall, spring and summer sessions. March 6, 2003 - Texas Society of Certified Public Accountant (TSCPA-participant (Linda E. Silva) February 5, 2003 - Wells Fargo Bank in El Paso - "How Will Geopolitics Affect Economic Outlook" - (John Mastriani) Friday, November 21, 2003 Page 102 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan 7.1 720 Area Objective Prepare SWOT Analysis for Business Administration- Business/Management program. VV Measure Number of competitors in the El Paso area. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard none Strategies Assessment Results Identified strengths, weaknesses, Prepare a competitive analysis to compare our program with those in the opportunities, and threats of the program. surrounding community. Strengths: - Degreed Faculty, small classes for individualized learning, using current applications presently being used by business/industry, the merging of the business discipline and management discipline into one discipline, one degree plan and two certificates of completion with new courses development. Weaknesses: Some of the faculty may not be working in the industry in the recent years, lab assistants do an excellent job to assist students, out-dated hardware, budget does not support the development and marketing of new courses and certificates. Opportunities: Faculty may be on internship programs, we have opportunities to attend local seminars and meetings, such as economic council offered by the Federal Bank, mentor students to complete program, increase enrollment through aggressive marketing - target population (internal/external), establish partnership with high schools local businesses. We need to make contacts across the bridge to recruit more students. Threats: UTEP, Phoenix, and Parks College offer Bachelor degree, there is no coordination among business programs (Accounting, Office Management, Computers) within the division, Dona Ana Community rpt0203AreaPlansFinalResults Objective's Status Use of Results SWOT Analysis will be shared with Advisory Committee at the next meeting which will be held Summer 2003. Friday, November 21, 2003 Met Page 103 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status College, Las Cruces. 7.1 721 Evaluate students while in Business Administration- the work experience course. VV Number of employers responding none to evaluation. Spring 2003, 6 students enrolled in Students enrolled in the work experience course would be evaluated. BUSG 2380 & BUSG 2381. Six employers completed evaluation on students. A mid-term & final evaluation and final report will be provided to Job Placement by the p/t faculty members. This information is used to evaluate EPCC's student's job performance and determine if they are able to carry forward their skills learned in the classroom environment. Met Met Fall 2002, nine students enrolled in BMGT 2382-11136; seven students enrolled in BUSG 2380-11168. 16 employers completed evaluation on students. A mid-term and final evaluation report was submitted to Job Placement. 2.1 722 Business Offer Power Pack or miniAdministration- mester courses. VV Number of students enrolled in courses. none Identify potential students, staff, students, outside agencies who may want to upgrade skills while earning a certificate or associates. Minutes of faculty meetings reflect discussion on course offerings to meet community needs. Additional courses will be identified for future offerings for this objective. BUSG 1301 - Introduction to Business was offered as an on-line course in the Spring 2003 semester and BCIS 1305 was also added. BUSG 1301 will continue as an online class. 2.1 723 Business Partner with businesses and Administration- offer courses on site. VV Number of students enrolled in Business/Management courses. none International Businesses who may be interested in offering courses on site. For the past couple of years, ELCOM has partnered with EPCC's Business area to offering courses on their premises. Two courses were offered in the Fall 2002. Spring 2003, ELCOM was not able In Progress to offer courses but may be offering again in Fall 2003. Other businesses are also being explored. 1.1 724 Business Increase student graduation Administration- rate for the VV Business/Management. Number of students graduating in Increase by 2-4% from the certificate and associates previous three year average. degree program in the Fall & Spring semesters. Identify students who are 12 hours or less away from graduation. This process should take place at the beginning of the Fall semester. The information provided on the number of graduates does not reflect graduates for the period of 2002-03. Cannot compute percent increase or In Progress decrease until corrected data is received. Since program is recommended for closure, data can still be gather for trend purposes. 1.1 725 Management-VV Increase student graduation rate for the Business/Management. Number of students graduating in Increase by 2-4% from Identify students who are 12 hours or the certificate & associates degree previous three year average. less away from graduation. This program in the Fall & Spring process should take place at the The information provided on the number of graduates does not reflect graduates for the period of Cannot compute percent increase or decrease until corrected data is received. The program was OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Not Met Page 104 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results 2002-03. semesters. beginning of the Fall semester. Number of new students enrolled Increase new student in the Fall/Spring semesters. enrollment by 2%. Identify high schools and students who The DACUM was held on May 7, Advisory Committee was also are interested in the 2002. On file at Curriculum Office. updated in November of the same Business/Management program. year. Conduct a DACUM to meet the needs of the businesses in El Paso/Juarez area. Last DACUM conducted for General Business 11-7-98. List high schools and instructor who will be the contact person. Monthly reports should be given at meetings. This should occur during the spring the semester. 2.1 726 Management-VV Recruit students from area high schools. 2.1 727 Management-VV Recruit former students from Number of returning students who Increase by 3%. are EPCC employees. EPCC. 2.1 728 Management-VV Increase community awareness. Number of businesses responding none to ad. Advertising in the El Paso Times. 7.1 729 Management-VV Prepare SWOT Analysis for Business/Management program. Number of competitors in the El Paso area. Prepare a competitive analysis to Identified strengths, weaknesses, compare our program with those in the opportunities, and threats of the surrounding community. program. 7.1 730 Management-VV Evaluate students while in the work experience course. Number of employers responding none to evaluation. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none This objective was not completed. Identify staff members who are A request for the Research is being employed full-part-time at the submitted to provide specific College. Host an event inviting all support staff to mentor until graduation. information on employees who started the program but did not complete. Submitted request to advertise in the El Paso Times in the Spring 2002- denied by Marketing Director. Submitted request to advertise in the Twin Plant News (Spring 2003).. Due to budget constraints, no monies available. Objective's Status Use of Results recommended for revamping by the Coordinating Board site visit held Feb. In Progress Once information is received from the Research department, employees will be invited to an Advising session. Not Met Cannot move forward with this objective without advertising funding. Not Met SWOT Analysis will be shared with Advisory Committee at the next meeting which will be held Summer 2003. Met Students enrolled in the work Fall 2002, nine students enrolled in This information is used to evaluate experience course would be evaluated. BMGT 2382-11136; seven students EPCC's student's job performance enrolled in BUSG 2380-11168. 16 and determine if they are able to Met rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 105 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status employers completed evaluation on carry forward their skills learned in students. A mid-term and final the classroom environment. evaluation report was submitted to Job Placement. 2.1 731 Management-VV Offer Power Pack or minimester courses. Number of students enrolled in courses. none Identify potential students, staff, students, outside agencies who may want to upgrade skills while earning a certificate or associates. Minutes of faculty meetings reflect discussion on course offerings to meet community needs. Additional courses will be identified for future offerings for this objective. BUSG 1301 - Introduction to Business was offered as an on-line course in the Spring 2003 semester and BCIS 1305 was also added. BUSG 1301 will continue as an online class. 2.1 732 Management-VV Partner with businesses and offer courses on site. Number of students enrolled in Business/Management courses. none International Businesses who may be interested in offering courses on site. For the past couple of years, ELCOM has partnered with EPCC's Business area to offering courses on their premises. Two courses were offered in the Fall 2002. Spring 2003, ELCOM was not able In Progress to offer courses but may be offering again in Fall 2003. Other businesses are also being explored. 1.1 733 TRVM Increase student graduation rate for the Professional Office Computer Technology (POCT) Discipline. Number of students graduating in Increase by 2-4% from the certificate(s) and associate's previous three-year average. degree program in the fall and spring semesters. Identify students who are 12 hours or less away from graduation. This process should take place at the beginning of the spring semester. Continue with marketing of program and working with students to complete degree plan and certificates. In Progress 2.1 734 POCT Explore Certificate Professional Secretary (CPS) program from the International Association of Administrative Professionals (IAA). Community enrollment in the none pursuit of the CPS designation has diminished over the past six years. EPCC is a testing center for applications. This is a nationally recognized certification program and further exploration in providing this to our graduates could be beneficial to those working as admin assistants and secretaries. Review the feasibility of providing this Local IAAP chapter disbanded. No exam to our graduates in keeping with support available to continue this the standards, policies, and procedures objective. of IAAP. Two POCT faculty members attained this designation while in the private sector. One POCT faculty member is the proctor for the exam at EPCC. Withdrawn Met The CPS exam consists of three parts: Finance and Business Law (Economics, Accounting, Business Law); Office Systems and Administration (Office OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 106 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status Technology, Office Administration, Business Communications); and Management (Behavioral Science in Business, Human Resources Management, Organizations and Management). The exam could be used as a marketing tool for the graduates and students pursuing further certifications. Recertification is required every five years after receiving the designation. Recertification is obtained through workshops, additional course work, and assessment. 2.1 735 POCT Recruit former students from Number of returning students who Increase by 3%. El Paso Community College are EPCC employees. (EPCC) staff. Identify staff members who are employed full-part time at EPCC. Host an event inviting all support staff to upgrade their skills and earn their certificate/AAS degree. Evaluate credits and mentor until graduation. Event could take place during Administrative Professionals Week. Support from the administrative team will be required. 2.1 736 POCT Prepare marketing strategies Identify number of potential students by high school locations based on campus location. businesses. Identify high schools and businesses in On-going activity and objective for the Valle Verde area. every semester for discipline. 2.1 737 POCT Increase community awareness. none Place ad(s) in newspaper and none identify the number of businesses responding. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT In Progress Met Advertise in the El Paso Times on "Re- Funding source in doubt for this inventing Your Skills." objective. rpt0203AreaPlansFinalResults Withdrawn Friday, November 21, 2003 Page 107 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies 1.1 738 POCT Evaluate students while in the co-op course (POCT 2380). 1.1 739 POCT Increase MOUS Certification Number of faculty passing MOUS Increase number of MOUS- Faculty must be committed to Certification. for faculty. certified faculty by 3. attending workshops and taking the MOUS Certification Exams for the Microsoft Office Suite. This action by faculty will show students that the POCT discipline is "state of the art." This action will also demonstrate leadership standards for students. Number of employers responding none to evaluation. Students enrolled in the co-op (work experience) course would be evaluated. Technical skills and soft skills will be evaluated. Assessment Results Objective's Status Students and employers are evaluated during co-op course. (Coop is taught in Spring semester, therefore, this remains a top priority for the discipline.) Met Two faculty have become MOUS Certified- Linda E. Silva, MS Word and Aggie L. Becker, MS Word MS EXCEL. In Progress Remaining faculty need to work toward certification for completing MS Word by December 2003. 2.1 740 POCT MOUS Certification for students. Number of students passing MOUS Certification. none Identify students upon completing POFI 1341 (Word, Expert) POFI 1349 (Excel, Core) POFI 2301 (Word, Core) POFT 1319 (Access, Core) POFT 1393 (PowerPoint, Core) After completion of these courses, students should be ready and strongly encouraged to take the core or expert exam. 2.1 741 POCT Acquire dedicated computer and on-line software for MOUS Certification testing of POCT students. Grant proposal for necessary equipment and other incidentals to test students for MOUS Certification. none Write grant proposal to include Discipline chooses to withdraw this necessary costs of equipment and other objective at this time. testing requirements for MOUS certification at the Valle Verde Campus. 2.1 742 POCT Offer PowerPack or minimester courses. Number of students who are enrolled in courses. none Identify potential students, staff, students, outside agencies who may want to upgrade their skills while earning a certificate or associate's degree. Use POFI 2301 and 1341 as pilot for two-eight week work processing courses. Other courses could follow. POFT 1349: OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Use of Results This is a continuing objective because of the curriculum. Will continue this after each appropriate semester for course. Met Withdrawn PowerPack courses are included in curriculum Fall 2003. ITSW 1310 Intro Presentation Media Software , IMED 1316 WEB Page Design I. Met (Note: will continue offering PowerPack courses in other subject areas) rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 108 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status Spreadsheets; POFT 1319, Rec & Info Mgt I(DB); POFT 1393; Special Topics would adapt well to this. 2.1 743 POCT Explore Office Proficiency Assessment Certification (OPAC) from International Association of Administrative Professionals (IAAP). OPAC discussed during advisory meeting April 26, 2001. 2.1 744 POCT Prepare and distribute flyers Number of students enrolled in POCT courses and other for advertisement. prospective students already on campus. 2.1 7.1 745 746 International Trade and Business-VV International Recruit students from local businesses. Prepare SWOT Analysis for Evaluate and identify the OPAC program as an additional tool to prepare students in the "soft" skills for use in the business world. none Review the OPAC program package to Local IAAP Chapter disbanded. determine feasibility of implementing No support available to continue program at EPCC. this objective. Continue with preparation and distribution of flyers. Identify target group population: English, History, Political Science, etc. Students enrolled in these courses need typing skills as well as word processing skills. Learning these skills prior to their enrolling in other courses will help them in completing and formatting their research papers. Flyers distributed by instructors/lab staff. Place ad in school paper and in official publication. Flyers are continually distributed to advertise POCT courses to all student populations. Advertise in the local newspapers and magazines, El Paso and Juarez. The course schedule will be faxed to all maquilas. Develop and offer more online courses to accommodate nonconventional classroom student population. (due to the low enrollment in the night classes, this strategy is needed) Conduct a DACUM to meet the needs of the businesses in El Paso/Juarez area. Last DACU97 conducted 10-2297. Faxing to maquilas advertising courses, advertise in El Conquistador. Partner with Bowie and America's High School. Contact was made with Bowie High School. Establish a partnership to have student attend and major in the International Trade program. Participated in the Quality of Life on the Border (April 9-15, 2003) Contact made with employers. Prepare a competitive analysis to We desperately need real Number of new students enrolled Increase new student in the Fall/Spring semesters. enrollment by 2%. Completion of Analysis OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Withdrawn Met (Note: will continue distribution on campuses and in classrooms and to Non-POCT-faculty.) Met June 24, 2003 Completed DACUM rpt0203AreaPlansFinalResults Shared information in Advisory Friday, November 21, 2003 Not Met Page 109 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Trade and Business-VV the International Trade & Business program. Measure Standard Strategies Assessment Results compare our program with those in the advertising money to compete. At surrounding community. least $5,000 a year. Also, requested funds to advertise in the Twin Plan News. No funding was allowed. Objective's Status Use of Results Meeting held on April 16, 2003. 7.1 747 International Trade and Business-VV Evaluate students while in the work experience course. Number of employers responding none to evaluation. Zero students were enrolled in the Follow-up with employers to Students enrolled in the work experience course would be evaluated. fall 2002 semester while only 1 was ensure we are graduating our enrolled in the spring 2003. students with skills needed in the workforce. Documentation is at the Job Placement Center. Met 2.1 748 International Trade and Business-VV Offer Power Pack or minimester courses. Number of students enrolled in courses. Identify potential students, staff, outside agencies who may want to upgrade skills while earning a certificate or associates. We have a total of four on-line courses with an average enrollment of 10. Need additional money to develop certificate program to get these courses on-line. Met 2.1 749 International Trade and Business-VV Increase student graduation Number of students graduating in Increase by 2-4% from the certificate & associates degree previous three year average. rate for the International Trade & Business Discipline. program in the Fall & Spring semesters. Identify students who are 12 hours or less away from graduation. This process should take place at the beginning of the Fall semester. In the Spring and Fall 2002, the Monitor student enrollment and advertise to recruit new students. IBUS program graduated 18 students compared to 12 in 2002. The increase was not as significant as we would have liked it to be. 2.1 750 Automotive Tech - VV Increase night-time enrollment. Increase enrollment to 7 for first semester-first year classes. none -Do presentations at local high schools. -Send brochure to local high schools grad seniors. -Make presentation to EPCC students (ex. Project Arriba & ESL students.) -Advising students currently in program. -Participate in student conferences. 1.1 751 Child Development VV Increase retention rate of students in Child Development Program. Retention rate of Child Development Students over previous three year period. Maintain retention rate of CD program and increase rate be 1% over previous three year average. Child Development Faculty will continue to conduct student advising for all Child Development majors. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none rpt0203AreaPlansFinalResults By having the program totally online, will allow students the flexibility and choice to take classes at their convenience. Not Met Met Friday, November 21, 2003 Page 110 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan 1.1 752 Area Criminal Justice - VV Objective Improve retention and graduation. The Criminal Justice program is one with high retention numbers but there is always room for improvement. Measure Standard Strategies Assessment Results Use of Results Objective's Status Maintain our enrollment at VV, especially in light of TM and FB dropping Criminal Justice courses. Explore PowerPak courses in selective courses. Faculty should train for on-line courses. none Move forward in the issues outlined. On-line course developed and implemented. Two faculty trained for on-line courses. Met Increase enrollment 2-3% from previous three year. none Field of study in Criminal Justice realized with implementation of first FOS classes Fall, 2003. Currently, discipline has three FOS credentialed faculty (1 full-time and 2 part-time) - search continuing for credentialed FOS faculty. Met Articulation agreement to be completed August 2003 with Sheriff's Academy. Completers: Discipline also ranks high with completers. (Need to verify numbers.) 2.1 753 Criminal Justice - VV Research field of study and work toward enrollment increase. Determine educational levels of current and future faculty to insure ability to teach in the field of study and WECM areas. 2.1 754 Criminal Justice - VV Increased marketing of program through local area independent school districts and student conference. In addition, work with other entities for articulation/partnership agreements. Faculty to work with local ISDs none to promote Criminal Justice program(s) and insure articulation and partnerships are current throughout. none 8.1 755 Draft/Design Tech - VV Offer the current technology to train students and to attract more DFTG program majors. Align the DFTG Dept. to potential development of Engr. Technology. Rate of software advancement and none WECM offerings necessitate that hardware must keep pace with software development. Compare EPCC software to that in use in the region. The DFTG Dept. has 3 lecture/labs. Goals met with the purchase of Replace hardware at the end of the software to enhance DFTG program. third year from date of purchase. Replace 15 ea. Computers and 1 ea. Plotter per year. (One lab per yearestimated cost for 15 is 33,000 to meet desired specs.) 2.1 756 Fire Technology Provide students with the Certify 20 students as Fire Inspector with the TCFP. opportunity to obtain certification as Fire Inspector with the Texas Commission OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none In Progress Met 1.1 Obtain approval as a Basic Fire Inspector facility from the TCFP. 1.2 Develop FIRT 1305, 1307, and 1338 curriculum to comply with rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 111 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard on Fire Protection. Strategies Assessment Results 757 Hotel/Motel Increase enrollment. Management VV Increase enrollment to 10 for first none semester-first year classes. -Do presentations at local high schools. -Send brochure to local high schools grad seniors. -Make presentation to EPCC students (ex. Project Arriba & ESL students). -Advising students currently in program. -Participate in student conferences. 1.1 758 Social Work Program-VV Number of student graduating. Increase by 5% from previous three yr. Average. Implement student mentoring systems, Student mentoring system i.e.. Assign faculty mentor to each implemented to improve student student in the program. graduation rate. (This will be an ongoing project for Social Work majors). Increase 3% from previous three year average. Actively recruit high school students in their senior year and employees in the Legal field without degrees. 2.1 759 Legal Assistance Increase enrollment in the Legal Assistant program. Objective's Status TCFP's curriculum requirements for Fire Inspector. 2.1 Increase student graduation rate for the Social Work Program. Use of Results Number of Social Work majors at EPCC. Number of Legal Assistant Majors at EPCC. Met Make presentation to student conference. Obtain list of graduating seniors from local high schools and send them program information. 1.1 760 Legal Assistance Increase student graduation rate for the Legal Assistant program. Number of students graduating. 1.1 761 Sign Increase the number of Lang/Interpreter- students who pass the VV TCD/HH Exam to exceed the state average by 25% to assist meet the Texas workforce demand. 100% of all the Interpreting III none (capstone class) students apply for and take the TCD/HH exam for Level I and 60% or better pass the exam. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase 5% from previous three year average. Continue student mentoring system, I.e., insure that faculty mentors are assigned to each student in the program. Students complete the applications in Goals has been met. An increase of class. Students attend special mentor 50% of the students has passed the sessions with successful previous TCD/HH exam. students. Students form a peer support group to meet outside class to prepare. Student are recognized with a rpt0203AreaPlansFinalResults Met Friday, November 21, 2003 Page 112 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status "interpreting pin" at graduation. Instructional materials - $1000.00. Kron upgrade for digitized vocabulary practice. 1.1 762 Real Estate - VV Increase student graduation Number of students graduating in Increase by 2-3% from previous three-year average. rate for the Real Estate (RE) the certificate and associate's degree program in the fall and discipline. spring semesters. Identify students who are 12 hours or less away from graduation. This process should take place at the beginning of the spring semester. 2.1 763 Real Estate - VV Work closely with prospective Real Estate Employers and GEPAR to promote and emphasize education for qualified realtors. Interview 5 to 10 potential realtors with respect to local company needs. Compile information to determine required educational needs. Use with Advisory/DACUM results. Meet with local realtors/brokers to promote program. Continue to market program through GEPAR and their Web site. Emphasize positives of receiving associate's degree as well as CE availability to licensed individuals. 2.1 764 Real Estate - VV Increase community awareness. Number of ads placed. none Advertise in the El Paso Times on selling real estate and "Becoming Your Own Boss." Place emphasis on the future of real estate and the need for quality, qualified, and highly-trained real estate agents in the community and what EPCC can offer. Venture into the community; speak to organizations; contact real estate companies, etc. Become visible within the RE field. 2.1 765 Computer Information Systems To train students in CISCO Networks and Hardware, Design and wire the Network, Program and Configure Router, Switches and Hubs. 6% increase in graduates. CISCO Certificate of Completion as CISCO Certified Network Associates (CCNP) UNIX Administration Cert. Maintain, upgrade software, hardware and network equipment in the classrooms. To ensure state-of-arttechnology and instruction. Solicit software and hardware donations from industry. (i.e. Microsoft Windows 2000 and CISCO and Sun Hardware for our CISCO Certified Network Professional Lab and UNIX Lab such as switches, routes. Met 1.1 765 Computer Information To train students in CISCO Networks and Hardware, 6% increase in graduates. CISCO Certificate of Completion as CISCO Maintain, upgrade software, hardware and network equipment in the Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 113 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Systems Design and wire the Network, Program and Configure Router, Switches and Hubs. Measure Standard Strategies Certified Network Associates (CCNP) UNIX Administration Cert. classrooms. To ensure state-of-arttechnology and instruction. Solicit software and hardware donations from industry. (i.e. Microsoft Windows 2000 and CISCO and Sun Hardware for our CISCO Certified Network Professional Lab and UNIX Lab such as switches, routes. Assessment Results Use of Results Objective's Status 6.1 765 Computer Information Systems To train students in CISCO Networks and Hardware, Design and wire the Network, Program and Configure Router, Switches and Hubs. 6% increase in graduates. CISCO Certificate of Completion as CISCO Certified Network Associates (CCNP) UNIX Administration Cert. Maintain, upgrade software, hardware and network equipment in the classrooms. To ensure state-of-arttechnology and instruction. Solicit software and hardware donations from industry. (i.e. Microsoft Windows 2000 and CISCO and Sun Hardware for our CISCO Certified Network Professional Lab and UNIX Lab such as switches, routes. Met 5.1 765 Computer Information Systems To train students in CISCO Networks and Hardware, Design and wire the Network, Program and Configure Router, Switches and Hubs. 6% increase in graduates. CISCO Certificate of Completion as CISCO Certified Network Associates (CCNP) UNIX Administration Cert. Maintain, upgrade software, hardware and network equipment in the classrooms. To ensure state-of-arttechnology and instruction. Solicit software and hardware donations from industry. (i.e. Microsoft Windows 2000 and CISCO and Sun Hardware for our CISCO Certified Network Professional Lab and UNIX Lab such as switches, routes. Met 6.1 766 Occupational Education Division To train students in MCSE environment of different operating systems, system and switch configurations. 3% increase in graduates. MCSE certificate of completion as Microsoft Certified Systems Engineer (MCSE) Maintain, upgrade software, hardware and systems configurations in the classroom. To ensure state-of-the-art technology and instruction. 2.1 766 Occupational Education Division To train students in MCSE environment of different operating systems, system and switch configurations. 3% increase in graduates. MCSE certificate of completion as Microsoft Certified Systems Engineer (MCSE) Maintain, upgrade software, hardware and systems configurations in the classroom. To ensure state-of-the-art technology and instruction. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 114 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 2.1 767 Increase enrollment by Student Conference Fees continuing to offer a student conference to all local area ISDs, promoting the different areas of the collegeacademic and occupational education. Number of students at the local none area ISDs who would attend the student conference. (2001 had 618 students participate. Maintain this number until the location of a "place" conducive to an increase in conference attendees.) Identify students who are high school No student conference planned due juniors and seniors and getting ready to to funds shortage and Tech Prep graduate and move on to higher Consortium non-participation. education in the academic and occupational education areas. Note: This year's conference budget (2002) comes from a URG Consortium grant of $5,372. A registration fee of $4 is charged, which is not included in the grant. 1.1 768 Education -VV Add at least one full-time faculty member to this discipline by fall 2002. Hire at least 1 FT faculty member. none Goal met. Faculty hired. Open the position internally for qualified faculty to apply. If the appropriate faculty member can move (Hiring one more faculty for to this discipline with their budget then August, 2003). there will be no additional costs. If no then there would need to be a budget transfer to this budget from some other budget. Met 2.1 768 Education -VV Add at least one full-time faculty member to this discipline by fall 2002. Hire at least 1 FT faculty member. none Open the position internally for Goal met. Faculty hired. qualified faculty to apply. If the appropriate faculty member can move (Hiring one more faculty for to this discipline with their budget then August, 2003). there will be no additional costs. If no then there would need to be a budget transfer to this budget from some other budget. Met 6.1 768 Education -VV Add at least one full-time faculty member to this discipline by fall 2002. Hire at least 1 FT faculty member. none Open the position internally for Goal met. Faculty hired. qualified faculty to apply. If the appropriate faculty member can move (Hiring one more faculty for to this discipline with their budget then August, 2003). there will be no additional costs. If no then there would need to be a budget transfer to this budget from some other budget. Met 7.1 768 Education -VV Add at least one full-time Hire at least 1 FT faculty member. none Open the position internally for Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Withdrawn Goal met. Faculty hired. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 115 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 85 Education and Occupational Programs Goal Plan Area Objective Measure Standard faculty member to this discipline by fall 2002. Strategies Assessment Results Use of Results Objective's Status qualified faculty to apply. If the appropriate faculty member can move (Hiring one more faculty for to this discipline with their budget then August, 2003). there will be no additional costs. If no then there would need to be a budget transfer to this budget from some other budget. 8.1 768 Education -VV Add at least one full-time faculty member to this discipline by fall 2002. 1.1 887 Library - VV Increase library book budget Reallocate from CD-ROM databases. (71472). (73400). Hire at least 1 FT faculty member. none 5% Open the position internally for Goal met. Faculty hired. qualified faculty to apply. If the appropriate faculty member can move (Hiring one more faculty for to this discipline with their budget then August, 2003). there will be no additional costs. If no then there would need to be a budget transfer to this budget from some other budget. Met Reallocate from the CD-ROM databases (71472) to Books (73400). Projected Cost: $1,000. 2.1 1404 Fire Technology Increase the number of Fire Develop FIRT 1355, Methods of Teaching for online format. Technology courses available for online offering. Online courses provide students who are firefighters that work 24-hour shift schedules and have difficulty coming to class the ability to take courses from their home computer. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none -Develop course lectures into multimedia presentations. -Develop course activities for online format. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 116 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 26 ESL, Reading and Social Sciences Goal Plan Area Objective Measure 7.1 948 CD/Dean, ESL Read/SS Office To conduct an internal audit of faculty files. 2.1 949 Philosophy-VV To increase part-time Faculty To increase the number of sections offered at VV. Pool. 2.1 950 ESAL SpeechVV To increase enrollment in ESL/RESL population. 6.1 951 5.1 Incomplete files will be updated. Standard Strategies Assessment Results Use of Results Objective's Status none Files will be reviewed individually. All files were reviewed. none To expand recruitment efforts. On-going Recruitment efforts. none To develop a day-long activity plan we On-going recruitment and retention will work with office of Recruitment to activities with ESOL, ESAL and bring area high school ESL students to RESL faculty assistance. the campus and expose them to (VV) community college activities/programs. RESL Faculty will participate in the activities: Lab Visits and class visits by student speakers. Psychology-VV Connect computer in VV A- Have internet access at these locations. 1118 & A-1120 to the internet. Software and wiring are needed to accomplish this task. none Forward work order to IT projected cost is $0 at this time. 952 Psychology-VV Hire at least 1 FT Faculty for Enrollment in PSYC has VV campus in Psychology. increased 29%. The number of sections that made increase 24%. The QI had decreased to 36% from 44%. none Hire at least 1 new FT Faculty. Cost is One additional FT faculty was hired Fall 02. However, another approx. $32,000 plus benefits. instructor retired May 2003 and was not replaced. Not Met 1.1 953 History-VV Enhance presentation through video tapes. Use of video tapes by instructors. none Purchase of 15 new video tapes = $750. Due to budget cuts, video tapes were not purchased. Not Met 1.1 954 History-VV Enhance presentations through use of multi-media equipment. Use of multimedia equipment by instructors. none Purchase of laptop and projection Due to budget cuts, equipment was device that makes possible power point not purchased. presentations. Not Met 1.1 955 History-VV Use of maps by instructors. Enhance presentation through use of maps. Replace worn, obsolete maps. none none Not Met To improve enrollment figures (statistics). OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Met Not Met In Progress No funds available. Not Met Due to budget cuts, maps were unable to be replaced. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 117 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 26 ESL, Reading and Social Sciences Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 8.1 956 Sociology -VV Review and revise as needed % of all course syllabi to conform standardized syllabus/office to Coordinating Board. course descriptions for all sociology courses. Number of faculty using/contributions to department website and number of faculty creating and submitting cyber classes for use in their courses. Project completed. Coordinate with Sociology faculty district-wide. Discipline meeting workshops and/or mentoring of adjunct faculty. Faculty Development workshops, discipline meeting workshops, and/or mentoring. Met 7.1 956 Sociology -VV Review and revise as needed % of all course syllabi to conform standardized syllabus/office to Coordinating Board. course descriptions for all sociology courses. Number of faculty using/contributions to department website and number of faculty creating and submitting cyber classes for use in their courses. Project completed. Coordinate with Sociology faculty district-wide. Discipline meeting workshops and/or mentoring of adjunct faculty. Faculty Development workshops, discipline meeting workshops, and/or mentoring. Met 6.1 956 Sociology -VV Review and revise as needed % of all course syllabi to conform standardized syllabus/office to Coordinating Board. course descriptions for all sociology courses. Number of faculty using/contributions to department website and number of faculty creating and submitting cyber classes for use in their courses. Coordinate with Sociology faculty Project completed. district-wide. Discipline meeting workshops and/or mentoring of adjunct faculty. Faculty Development workshops, discipline meeting workshops, and/or mentoring. Met 1.1 957 Economics-VV Replace green boards in "B" Improve students ability to follow none Instructor's presentation. bldg. At VV with black or brown boards. $5,000 remove green boards. This plan was accomplished Summer 2002. Met none Submit appropriate proposals to core curriculum committee. ANTH 2346 included in Core Curriculum. Effective Fall, 03. Met none I don't think it would be costNo funds available. prohibitive to install tile on the ceiling, on the pillars, and on the copper which bounces sound. There are acoustic tiles which are quite lovely and it would provide this campus with usable space. Install boards in all classrooms. 2.1 958 AnthropologyVV Have ANTH 2346 included in Core Curr. 7.1 959 ESOL-VV Better use of facility. The cafeteria annex is the only place available for having large group activities. Those activities are a waste of time since anything which is said is impossible to understand unless one is directly in front of the speaker. 7.1 960 ESAL Speech- Update the ESAL Lab at the Number of students satisfied with 95% of ESAL students will Sit in on conversation sessions; Successful addition of courses to EPCC's Core Curriculum. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT After being surveyed 96% of rpt0203AreaPlansFinalResults Not Met Student satisfaction shows that Friday, November 21, 2003 Met Page 118 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 26 ESL, Reading and Social Sciences Goal Plan Area Objective VV VV campus and improve services provided. Measure the services provided by the ESAL Lab. Standard express satisfaction. Strategies Assessment Results Objective's Status Use of Results updated material used; develop new students expressed satisfaction, services should continue as they are. activities; and use existing space more materials have been updated; ESAL productively. space is being shared with ESOL Lab. 1.1 960 ESAL SpeechVV Update the ESAL Lab at the Number of students satisfied with 95% of ESAL students will Sit in on conversation sessions; VV campus and improve the services provided by the express satisfaction. updated material used; develop new services provided. ESAL Lab. activities; and use existing space more productively. 7.1 1319 Sociology -VV Reviewed and revise SCANS % of all course syllabi to conform none to Coordinating Board. for all sociology courses. Coordinate with Sociology faculty Project completed. district-wide. Discipline meeting workshops and/or mentoring of adjunct faculty. Faculty Development workshops, discipline meeting workshops, and/or mentoring. Met 6.1 1319 Sociology -VV Reviewed and revise SCANS % of all course syllabi to conform none to Coordinating Board. for all sociology courses. Coordinate with Sociology faculty Project completed. district-wide. Discipline meeting workshops and/or mentoring of adjunct faculty. Faculty Development workshops, discipline meeting workshops, and/or mentoring. Met 8.1 1319 Sociology -VV Reviewed and revise SCANS % of all course syllabi to conform none to Coordinating Board. for all sociology courses. Coordinate with Sociology faculty Project completed. district-wide. Discipline meeting workshops and/or mentoring of adjunct faculty. Faculty Development workshops, discipline meeting workshops, and/or mentoring. Met 6.1 1320 Sociology -VV Increase use of Sociology Dept. website by adjunct faculty. % of all course syllabi to conform Number of adjunct faculty to Coordinating Board. attending technology workshops; gaining experience teaching a course in electronic formats; and/or developing instructional modules using cyber technologies. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Coordinate with Sociology faculty district-wide. Discipline meeting workshops and/or mentoring of adjunct faculty. Faculty Development workshops, discipline meeting workshops, and/or mentoring. After being surveyed 96% of Student satisfaction shows that students expressed satisfaction, services should continue as they are. materials have been updated; ESAL space is being shared with ESOL Lab. We have two adjunct instructors who are taking the WebCT course provide by faculty development office. This represents an increase of two instructors available for distance learning classes. We have three adjunct instructors with experience teaching Sociology rpt0203AreaPlansFinalResults Met Met Friday, November 21, 2003 Page 119 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 26 ESL, Reading and Social Sciences Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status courses in electronic formats. 7.1 1320 Sociology -VV Increase use of Sociology Dept. website by adjunct faculty. % of all course syllabi to conform Number of adjunct faculty to Coordinating Board. attending technology workshops; gaining experience teaching a course in electronic formats; and/or developing instructional modules using cyber technologies. Coordinate with Sociology faculty district-wide. Discipline meeting workshops and/or mentoring of adjunct faculty. Faculty Development workshops, discipline meeting workshops, and/or mentoring. We have two adjunct instructors who are taking the WebCT course provide by faculty development office. This represents an increase of two instructors available for distance learning classes. We have three adjunct instructors with experience teaching Sociology courses in electronic formats. Met 8.1 1320 Sociology -VV Increase use of Sociology Dept. website by adjunct faculty. % of all course syllabi to conform Number of adjunct faculty to Coordinating Board. attending technology workshops; gaining experience teaching a course in electronic formats; and/or developing instructional modules using cyber technologies. Coordinate with Sociology faculty district-wide. Discipline meeting workshops and/or mentoring of adjunct faculty. Faculty Development workshops, discipline meeting workshops, and/or mentoring. We have two adjunct instructors who are taking the WebCT course provide by faculty development office. This represents an increase of two instructors available for distance learning classes. We have three adjunct instructors with experience teaching Sociology courses in electronic formats. Met 8.1 1321 Sociology -VV % of all course syllabi to conform Increase expertise among to Coordinating Board. adjunct faculty in SOCI Dept. in use of technology in the classroom. Increase of one adjunct faculty learning to use, gaining experience in, and/or developing teaching modules using cyber technologies each semester. Coordinate with Sociology faculty district-wide. Discipline meeting workshops and/or mentoring of adjunct faculty. Faculty Development workshops, discipline meeting workshops, and/or mentoring. We paired instructors for purpose of providing new instructors with a mentor. We also organized informal gatherings each semester for purposes of improving morale and communication. Met 6.1 1321 Sociology -VV % of all course syllabi to conform Increase expertise among to Coordinating Board. adjunct faculty in SOCI Dept. in use of technology in the classroom. Increase of one adjunct faculty learning to use, gaining experience in, and/or developing teaching modules using cyber technologies each semester. Coordinate with Sociology faculty district-wide. Discipline meeting workshops and/or mentoring of adjunct faculty. Faculty Development workshops, discipline meeting workshops, and/or mentoring. We paired instructors for purpose of providing new instructors with a mentor. We also organized informal gatherings each semester for purposes of improving morale and communication. Met 7.1 1321 Sociology -VV % of all course syllabi to conform Increase expertise among to Coordinating Board. adjunct faculty in SOCI Dept. in use of technology in the classroom. Increase of one adjunct faculty learning to use, gaining experience in, and/or developing teaching Coordinate with Sociology faculty district-wide. Discipline meeting workshops and/or mentoring of adjunct faculty. Faculty Development We paired instructors for purpose of providing new instructors with a mentor. We also organized informal gatherings each semester Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 120 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 26 ESL, Reading and Social Sciences Goal Plan 2.1 1322 Area AnthropologyVV Objective Have ANTH 2351 included in Core Curr. Measure Successful addition of courses to EPCC's Core Curriculum. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Strategies Assessment Results modules using cyber workshops, discipline meeting technologies each semester. workshops, and/or mentoring. for purposes of improving morale and communication. none Proposal will be submitted next academic year. Submit appropriate proposals to core curriculum committee. rpt0203AreaPlansFinalResults Use of Results Objective's Status Not Met Friday, November 21, 2003 Page 121 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan 6.1 795 Area Objective CD/Health/Math/ Replace outdated radiology Science equipment. Measure Equipment installed. Standard Equipment is 100% operational. Strategies Submit requisition for bid process. Assessment Results Use of Results Complete Objective's Status Met Obtain TDH license on machine once installed. 1.1 796 CD/Health/Math/ Evaluate effectiveness of Science RETAIN sessions. Student retention and grade distribution. Retention of students Conduct RETAIN sessions in selected Complete. participating in RETAIN programs. sessions is 10% higher than In Progress. those not participating. Create tracking process to measure course grades and attrition rate. 5.1 797 Physical Therapist Assistant-RG Hire a minimum of one additional full time PTAP faculty member on tenure track. Reduce costs of hiring part-time faculty. Faculty must be Masters level and able to work summers. 5.1 798 Physical Therapist Assistant-RG Hire a minimum of one additional full time PTAP faculty member on tenure track. Reduce costs of hiring part-time faculty. Faculty can be a PTA Advertise in: local paper, district Ad placed in paper in Spring 2003. Accreditation Report Advisory preferable to work summers. newsletter, letter to qualified PT's in A few PTA's applied for the Committee Report. town; assistance of advisory committee. position. Position not funded by Board. Cost: $35,000 for faculty $1000 for advertising 5.1 799 Physical Therapist Assistant-RG PTAP faculty member will Each full time faculty member will attend a minimum of one attend a minimum of one state or national conference. conference that enhances their knowledge to teach in their content area and prepare for accreditation site visit. 1.1 800 Physical Therapist Assistant-RG Provide greater access for students to the PTA lab, for independent student. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Advertise in: local paper, district Ad placed in paper in Spring of Accreditation report Advisory newsletter, letters to qualified PT's in 2003, but Board did not approve Committee Report. town; assistance of advisory committee. the money, due to state budget cuts. No masters level PT's applied Cost: $54,000 - $1000 for advertising for the position. (shared with objective two) Conference must be related Submit travel request for conference. to content taught in courses or support teaching and Cost: $3000 learning/re-accreditation training. Hire a lab assistant who can Person must be familiar supervise lab, answer student with PT equipment and questions about equipment, have computer skills. maintain equipment and expendable instructional materials inventory. Met One faculty attended state level conference. State budget cuts resulted in no-funding for other faculty travel, even though, travel request was submitted. Accreditation Report Advisory Committee Report. Advertise in: local paper, district Position to advertise was not Accreditation Report Advisory newsletter, letters to qualified PT's in approved by Dr. Brown. However, Committee Report. town; assistance of advisory committee. funding was provided for mentoring which increased student Cost: $25,000 for lab assistant access to lab. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Not Met Not Met In Progress Not Met Page 122 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan 8.1 8.1 7.1 801 802 803 Area Objective Measure Attend summer meeting of TX Alliance of PTA educators. Standard One PTA faculty member. Strategies Physical Therapist Assistant-RG Participate in State level PTA educators meeting. Submit travel request. Physical Therapist Assistant-RG Attend APTA Dept. of Education none Keep faculty aware of national issues which impact faculty development conferences. on accreditation, curriculum, and teaching strategies. Submit travel request. Physical Therapist Assistant-RG Less time is spent waiting for hard 1 quality laser printer. Purchases one laser printer for Instructional Coordinator. copies of printed material to be completed. Submit requisition. Assessment Results Use of Results Objective's Status Not submitted due to budget cuts. Accreditation Report Advisory Committee Reports. Not Met Travel not submitted due to late notification. Accreditation Report Advisory Committee Report. Not Met Information gathered, but not Accreditation Report Advisory submitted, due to lack of money in Committee Report. $3,000 fund. Request submitted as a Special Allocation but was not funded. Not Met Cost: $800 Cost: $800 Cost: $900 1.1 804 Health Occupations -To assist the academically and economically disadvantaged students. To identify at least 150 high school seniors and to select and enroll in a Summer Institute program of 40 students from an economically disadvantaged background. none Same as Measure. Successful, recruited 500 students into the pool. Of the spot, we selected HD to be in our HCOP Summer Institute. Met 2.1 804 Health Occupations -To assist the academically and economically disadvantaged students. To identify at least 150 high school seniors and to select and enroll in a Summer Institute program of 40 students from an economically disadvantaged background. none Same as Measure. Successful, recruited 500 students into the pool. Of the spot, we selected HD to be in our HCOP Summer Institute. Met 1.1 805 Health Evaluate effectiveness of Occupations, RETAIN sessions. Math & Science Student retention and grade distribution. Retention of students Conduct RETAIN sessions selected participating in RETAIN programs. sessions is 10% higher than those not participating. Create tracking process to measure course grades and attrition rate. Retain sessions are being conducted. Tracking process developed but import not up to date. Met 6.1 806 Health Replace outdated radiology Occupations, equipment. Math & Science Equipment installed. Equipment is 100% operational. Completed Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Submit requisition for bid process. Obtain TDH license on machine once installed. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 123 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure 1.1 807 Community Health Advocacy RG Assure that the fall to spring 80% of all degree and certificate retention rate of first time in seeking students enrolled in the college degree and certificate fall return in the spring. seeking students meets the following. 2.1 808 Community Health Advocacy RG Increase Enrollment. 1.1 808 Community Health Advocacy RG Increase Enrollment. Standard none Develop an effective and attractive recruitment system. Total enrollment for each admitted class will increase. Increase advertisement through health clinics, health agencies via electronic media, newspaper, health fairs, and through EPCC. Assure that the CHA Program Exceed previous class total enrollment increases yearly. enrollment. Develop an effective and attractive recruitment system. Total enrollment for each admitted class will increase. Increase advertisement through health clinics, health agencies via electronic media, newspaper, health fairs, and through EPCC. 809 Chemistry RG 8.1 810 Dental Hygiene- Enhance the College's image Improve Dental Hygiene National Motivating and challenging RG Board Exam scores. students to become more in the community. focused in their preparation to take the National Board Exam by 80%. At least 3 full-time EPCC chemistry faculty will participate in a joint work-shop to explore opportunities. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Assessment Results Keep students informed on their grade 90% retention. status early in semester and offer them options to continue with the course like remedial education, referrals to other EPCC resources. Assure that the CHA Program Exceed previous class total enrollment increases yearly. enrollment. 5.1 Provide opportunity for EPCC chemistry faculty to participate with UTEP chemistry faculty for exchange of ideas and to look for opportunities for collaborative projects involving faculty from both schools. Strategies Use of Results Currently met but will continue to monitor for future trends. Objective's Status In Progress -Program doubled in size. -Increased enrollment. -Students demand for day classes at -Need instructional support (one RG Campus. full-time position). -90% retention. In Progress -Program doubled in size. -Increased enrollment. -Students demand for day classes at -Need instructional support (one RG Campus. full-time position). -90% retention. In Progress Organize a workshop at an off-campus Completed. site during faculty development week. Invite chemistry faculty from EPCC and UTEP to attend. -Increase individual instruction. Results from National Board have -Utilize counselors to present not been released as May 7, 2003. motivational and time management Will report when arrives. seminars. -Provide academic reviews in a timely manner. rpt0203AreaPlansFinalResults Met Faculty meetings will schedule to discuss results and necessary program improvements. Friday, November 21, 2003 In Progress Page 124 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 2.1 811 Increase Diet Tech Program Dietetic Technology-RG Enrollment. Number of students enrolled in the program. 2.1 812 CD/Health/Math/ Improve the academic year Science enrollments in health occupations, math, and science courses. Enrollments in division courses Exceed previous duplicated for academic year, by semester as enrollment head count. compared to the prior academic year enrollments, by semester for the same disciplines. -List open-enrollment health occupations courses in printed schedules. -Update the division web page to include discipline information. -Develop/update a division brochure. -Develop/update brochures for each discipline. 1. 2. 3. 4. 8.1 813 CD/Health/Math/ Implement health clinic within new building at the Science RG Campus. Clinic operational with positive client evaluations. none -Complete schedule for implementation of multidisciplinary clinic for Spring 2003. -Print clinic flyers for client recruitment. Est. Cost: $3000 -Hire clinic manager and receptionist. Est. cost: $30,000 -Develop and implement client satisfaction survey. -Order clinic operational supplies and set up clinic. Est. Cost: $15,000. 1. In progress building not complete until Fall 2003 2. Draft completed 3. Pending approval of 2003-04 budget 4. In progress 5. Pending approval of 2003-04 budget In Progress 7.1 813 CD/Health/Math/ Implement health clinic within new building at the Science RG Campus. Clinic operational with positive client evaluations. none -Complete schedule for implementation of multidisciplinary clinic for Spring 2003. -Print clinic flyers for client recruitment. Est. Cost: $3000 -Hire clinic manager and receptionist. Est. cost: $30,000 -Develop and implement client satisfaction survey. -Order clinic operational supplies and set up clinic. Est. Cost: $15,000. 1. In progress building not complete until Fall 2003 2. Draft completed 3. Pending approval of 2003-04 budget 4. In progress 5. Pending approval of 2003-04 budget In Progress 1.1 814 CD/Health/Math/ Move into new Health and Implementation plan completed Science Science Laboratory building and coordinated with other none 1. Equipment list finalized and equipment ordered to allow for 1. In progress 2. In progress In Progress OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase by 5% from Market program benefits within the previous three year average. College, the community, and health and food related organizations. The number of declared majors remains the same program admissions for Spring 2003 is the same as 2002. Identify other strategies to increase enrollment, CE offering and health career fair. Completed In progress Completed Completed rpt0203AreaPlansFinalResults Met Met Friday, November 21, 2003 Page 125 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard in Spring 2003 to include departments. updated equipment and furniture in classrooms and laboratories in new building. Strategies Assessment Results Use of Results Objective's Status installation during Fall 2002. 3. In progress 2. Budget planning for 2003-2004 includes plan for new staffing needs, if applicable. 3. Renovation plans completed. 5.1 814 CD/Health/Math/ Move into new Health and Implementation plan completed Science Science Laboratory building and coordinated with other departments. in Spring 2003 to include updated equipment and furniture in classrooms and laboratories in new building. none 1. Equipment list finalized and 1. In progress equipment ordered to allow for 2. In progress installation during Fall 2002. 3. In progress 2. Budget planning for 2003-2004 includes plan for new staffing needs, if applicable. 3. Renovation plans completed. In Progress 6.1 814 CD/Health/Math/ Move into new Health and Implementation plan completed Science Science Laboratory building and coordinated with other departments. in Spring 2003 to include updated equipment and furniture in classrooms and laboratories in new building. none 1. Equipment list finalized and 1. In progress equipment ordered to allow for 2. In progress installation during Fall 2002. 3. In progress 2. Budget planning for 2003-2004 includes plan for new staffing needs, if applicable. 3. Renovation plans completed. In Progress 7.1 814 CD/Health/Math/ Move into new Health and Implementation plan completed Science Science Laboratory building and coordinated with other departments. in Spring 2003 to include updated equipment and furniture in classrooms and laboratories in new building. none 1. Equipment list finalized and 1. In progress equipment ordered to allow for 2. In progress installation during Fall 2002. 3. In progress 2. Budget planning for 2003-2004 includes plan for new staffing needs, if applicable. 3. Renovation plans completed. In Progress 8.1 814 CD/Health/Math/ Move into new Health and Implementation plan completed Science Science Laboratory building and coordinated with other departments. in Spring 2003 to include updated equipment and furniture in classrooms and laboratories in new building. none 1. Equipment list finalized and 1. In progress equipment ordered to allow for 2. In progress installation during Fall 2002. 3. In progress 2. Budget planning for 2003-2004 includes plan for new staffing needs, if applicable. 3. Renovation plans completed. In Progress 2.1 814 CD/Health/Math/ Move into new Health and Implementation plan completed Science Science Laboratory building and coordinated with other none 1. Equipment list finalized and equipment ordered to allow for In Progress OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 1. In progress 2. In progress rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 126 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard in Spring 2003 to include departments. updated equipment and furniture in classrooms and laboratories in new building. 2.1 815 CD/Health/Math/ Implement new program in Radiation Therapy. Science New program approval from THECB achieved. Strategies Assessment Results Use of Results Objective's Status installation during Fall 2002. 3. In progress 2. Budget planning for 2003-2004 includes plan for new staffing needs, if applicable. 3. Renovation plans completed. none -Complete curriculum development. EST COST: $10,000 -Hire program coordinator to meet accreditation guidelines: $40,000. -Hire additional part-time faculty: $40,000. -Complete affiliation agreements and special agreements with affiliates for use of facilities. -Order initial supplies for program: Est. Cost: $15,000. -Initiate specialized accreditation for program: Est. Cost: $5,000. 1. 2. 3. 4. 5. 6. Complete Complete; hired Jan. 2003 Complete Complete Complete In progress Met 1. 2. 3. 4. 5. 6. Complete Complete; hired Jan. 2003 Complete Complete Complete In progress Met Est. Total Cost: $110,000 8.1 815 CD/Health/Math/ Implement new program in Science Radiation Therapy. New program approval from THECB achieved. none -Complete curriculum development. EST COST: $10,000 -Hire program coordinator to meet accreditation guidelines: $40,000. -Hire additional part-time faculty: $40,000. -Complete affiliation agreements and special agreements with affiliates for use of facilities. -Order initial supplies for program: Est. Cost: $15,000. -Initiate specialized accreditation for program: Est. Cost: $5,000. Est. Total Cost: $110,000 8.1 816 CD/Health/Math/ -Expand the existing 5 year Science plan to a 10 year strategic BHI Plan developed and approved by Board of Trustees. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none -Provide regular updates on BHI status Complete to EPCC Board of Trustees. rpt0203AreaPlansFinalResults Met Friday, November 21, 2003 Page 127 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status plan for EPCC's health occupations programs, both credit and non-credit, including EPCC's role and involvement in the Border Health Institute. This plan should also incorporate strategic plans for other programs relating to the Border Health Institute mission. 7.1 816 CD/Health/Math/ -Expand the existing 5 year Science plan to a 10 year strategic plan for EPCC's health occupations programs, both credit and non-credit, including EPCC's role and involvement in the Border Health Institute. This plan should also incorporate strategic plans for other programs relating to the Border Health Institute mission. BHI Plan developed and approved by Board of Trustees. none -Provide regular updates on BHI status Complete to EPCC Board of Trustees. Met 5.1 816 CD/Health/Math/ -Expand the existing 5 year Science plan to a 10 year strategic plan for EPCC's health occupations programs, both credit and non-credit, including EPCC's role and involvement in the Border Health Institute. This plan should also incorporate strategic plans for other programs relating to the Border Health Institute mission. BHI Plan developed and approved by Board of Trustees. none -Provide regular updates on BHI status Complete to EPCC Board of Trustees. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 128 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results 2.1 816 CD/Health/Math/ -Expand the existing 5 year plan to a 10 year strategic Science plan for EPCC's health occupations programs, both credit and non-credit, including EPCC's role and involvement in the Border Health Institute. This plan should also incorporate strategic plans for other programs relating to the Border Health Institute mission. BHI Plan developed and approved by Board of Trustees. none -Provide regular updates on BHI status Complete to EPCC Board of Trustees. 1.1 817 Diagnostic Med. Improve retention, Sonography-RG graduation, and completer rates. Percent of all degree and certificate seeking students enrolled in the fall return in the spring. 80% Meet the 80% Standard by assuring the Met 100% retention. Rate of 1st fall to spring retention rate of first time time DMSO Alas and certificate. in college degree and certificateStudents Fall to Spring 2003. seeking student is met. 2.1 818 Dental Assisting- Increase enrollment. RG Assure that the Dental Assisting program total enrollment increases annually. Exceed the previous class head count. -Develop a innovative and effective system for recruitment of students. -Increase advertising via media presentations, flyers, career fairs, and Internet. Each admitted class's total enrollment will increase. Use of Results Objective's Status Met Fall 2002 Graduation 100% completed rate. DMSO certificate students. Did not meet due to CB visit and SACS. Need to develop advisory media and awareness campaigns. Need to include new state regulations as occur. Met In Progress -Increase awareness at the Academy of Science and Technology and develop further articulation agreements. 2.1 819 Dental Assisting- Enhance the College's image Improve the Dental Assisting RG National Board Examination in the community. scores. Motivating and challenging students to become more focused in their preparation to take the National Board Exam by 80%. -Increase individual instruction. -Utilize counselors to present motivational and time management seminars. Board scores to date from 2003 class are 100% reminder of class will take during Summer. Schedule faculty meetings discuss program needs. Met -Provide academic reviews in a timely manner. 1.1 820 Emergency To increase enrollment and By comparing the number of OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Attending more community career fairs. Attend info session to high schools Continue to provide information. rpt0203AreaPlansFinalResults Friday, November 21, 2003 In Progress Page 129 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Medical Services-RG Objective improve retention. Measure Standard student enrollment over the previous 3 years. 820 Emergency Medical Services-RG To increase enrollment and improve retention. By comparing the number of student enrollment over the previous 3 years. 821 Health Information Technology Provide adequate resources Number of computers/printers in for student learning activities. lab which specializes software. Use of Results Objective's Status none Attending more community career fairs. Attend info session to high schools articulating student on degree plan. Increase in individual tutoring and Identifying students that may need additional help earlier and providing target instruction. remedial education in the form of computer tutorials, extra labs, targeted handouts and referrals to other resources. Continue to provide information. Provide for advancement within program while promoting nursing and fire technology. Increase available equipment and specialized software to meet accreditation agency expectations. Purchase 4 additional student computers, provide appropriate work stations and connect lab terminals to network. ($8000) Partially completed. 12 new computers were purchased In Progress by the College for the HIT lab. Initial approval of funds for software purchases during the 20032004 budget year. Partially completed. 12 new computers were purchased In Progress by the College for the HIT lab. Initial approval of funds for software purchases during the 20032004 budget year. Also by comparing the number of students that continue with the program over the last 3 years. 6.1 Assessment Results articulating student on degree plan. Provide for advancement within Identifying students that may need Increase in individual tutoring and program while promoting nursing additional help earlier and providing target instruction. and fire technology. remedial education in the form of computer tutorials, extra labs, targeted handouts and referrals to other resources. Also by comparing the number of students that continue with the program over the last 3 years. 2.1 Strategies In Progress Purchase additional specialized HIT' software. ($3500) 8.1 821 Health Information Technology Provide adequate resources Number of computers/printers in for student learning activities. lab which specializes software. Increase available equipment and specialized software to meet accreditation agency expectations. Purchase 4 additional student computers, provide appropriate work stations and connect lab terminals to network. ($8000) Purchase additional specialized HIT' software. ($3500) 8.1 822 Health Profess & Related SciRG Expand enrollment in online Expand enrollment by 5% in onMedical Terminology Course. line course during 2002-2003. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none First on-line section was offered Spring 2002. Fall 2003 a second section was opened and both sections filled (online medical Currently several optional curriculums terminology). Currently other curriculums are being evaluated for are being evaluated. online courses. Course development is anticipated in Fall 2001 with the first course being offered Spring 2002. rpt0203AreaPlansFinalResults Met Friday, November 21, 2003 Page 130 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 6.1 822 Health Profess & Related SciRG Expand enrollment in online Expand enrollment by 5% in onMedical Terminology Course. line course during 2002-2003. none Course development is anticipated in Fall 2001 with the first course being offered Spring 2002. First on-line section was offered Spring 2002. Fall 2003 a second section was opened and both sections filled (online medical Currently several optional curriculums terminology). Currently other curriculums are being evaluated for are being evaluated. online courses. Met 2.1 822 Health Profess & Related SciRG Expand enrollment in online Expand enrollment by 5% in onMedical Terminology Course. line course during 2002-2003. none Course development is anticipated in Fall 2001 with the first course being offered Spring 2002. First on-line section was offered Spring 2002. Fall 2003 a second section was opened and both sections filled (online medical Currently several optional curriculums terminology). Currently other curriculums are being evaluated for are being evaluated. online courses. Met 1.1 823 Kinesiology-RG Develop a plan for increased class offerings in Kinesiology for 2002-2003 academic year. The Fall 2002 draft schedule for none RG Campus will have an increase of number of sections as compared to Fall 2001. -Identify room for courses. No new classes were offered at -Evaluate program on renovation of the R.G. Enrollment number did not Little Temple. justify adding new sections. -Identify student interest in courses. -Recruit faculty to teach new sections. In Progress 2.1 823 Kinesiology-RG Develop a plan for increased class offerings in Kinesiology for 2002-2003 academic year. The Fall 2002 draft schedule for none RG Campus will have an increase of number of sections as compared to Fall 2001. -Identify room for courses. No new classes were offered at -Evaluate program on renovation of the R.G. Enrollment number did not Little Temple. justify adding new sections. -Identify student interest in courses. -Recruit faculty to teach new sections. In Progress 1.1 824 Medical Assisting TechRG Increase graduation. Increase retention. Start 24 students, have 12 graduate with certificates and 6 with degrees. Need to upgrade computers ($12,000). none Offer classes more often. Establish a comfortable enrollment. Need (12,000) to upgrade computer equipment and software. By the end of the 2002-03, we had Continue to same course. 46 students enrolled in 12 different classes, most students were taking multiple MDCA classes. In Spring 2003, we had 5 AAS degree graduates. Met 1.1 825 Medical Laboratory-RG Improve retention, graduation, and completer rates. Assure that the fall to spring retention rate of first Percent of all degree and certificate seeking students enrolled in the fall and return in the spring. 80% Increase individual and instructional. Maintain students of grades every 4 weeks. 93% retention. Would have been 100%. One very bright student was called up to active duty for the war. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 131 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective time in college degree and certificate-seeking students meets the following: 7.1 826 Optical Practicum 8.1 827 2.1 828 2.1 829 Measure Standard Strategies Assessment Results Use of Results Objective's Status 13 of 14 students who began Fall 2002 remain. Compare graduating numbers to the numbers of students accepted. Continue to provide eyeglass none services to EPCC students, faculty and staff. Through eyeglass services and products by the 20/20 optical. Expand the advertising of such services through e-mail, flyers, and health fairs throughout the College. Continue to provide eyeglass products and services to EPCC students and other area walls-ins. Advertised those e-mails, EPCC TV spots, EPCC and UTEP papers. Met Lions for Vision Enhance the College's and OPTS image in the community. Continue to work with Lions for none Vision and other agencies to provide eyeglasses and screening service to the community. Community affiliation with Lions for Vision. Process new affiliation with Prevent Blindness and other agencies and schools. Have added EP Light House for the Blind, Planned Brenthood of EP, Mesilla Valley Christina Church as partners in providing eyeglassed. Also provide free eyeglasses for Opportunity Center for the homeless, Rescue Mission, Coronado Nursing Home. Met Ophthalmic Tech-RG Each year's total enrollment will increase more than 10 students per class section. Work with Texas Work Commission to Total enrollment has declined. TANF students did not succeed as obtain TANF students through grant they are not prepared nor fundings. motivated. Do not plan to work with TANF in the future. Will await Grant Proposal be written to obtain funds for future students. Not Met Enhance quality and effectiveness of services provided to EPCC students. Increase enrollment. Pharmacy Tech- Increase Enrollment RG Each year's total duplicated enrollment will increase. none Exceed previous duplicated -Faculty recruit actively. year head count. -Provide support to pharmacist and technicians in the workplace. New opticians association in Texas (ROATx) has indicated willingness to promote the profession and to acknowledge the OPTS program as the learning site for optimism in the future. Faculty interested in teaching has increased. In Progress Letter written to state 3 national agency supporting local efforts to -Support salary increases for pharmacy create career ladder, and stabilize pay at a competitive rate. technicians. -Define a career ladder for pharmacy technicians. 5.1 830 Physics-RG Provide opportunity for At least 2 full-time EPCC physics none OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Added second Tech Student Scholarship of $500 from American Society of Health System Pharmacist. Organize a workshop at an off-campus Withdrawn rpt0203AreaPlansFinalResults Withdrawn Friday, November 21, 2003 Page 132 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard EPCC physics faculty to faculty will participate in a joint participate with UTEP work-shop to explore physics faculty for exchange opportunities. of ideas and to look for opportunities for collaborative projects involving faculty from both schools. 6.1 831 Radiologic Replace outdated radiology Technology-RG equipment. Equipment installed. Strategies Assessment Results Use of Results Objective's Status site during faculty development week. Invite physics faculty from EPCC and UTEP to attend. Equipment is 100% operational. Submit requisition for bid process. Completed. Met Completed. Met 1. Partial completion, 3 new 1. Continue faculty orientation. faculty hired; orientation in 2. Continue to improve test progress. development. 2 & 3. Completed 4. Partial completion, annual pass rate for 2002 at 84% 2003 pass rate to be determined October 2003. Met 1. Partial completion, 3 new faculty hired; orientation in progress. 2 & 3. Completed 4. Partial completion, annual pass Met Obtain TDH license on machine once installed. Estimated cost: $60,000 8.1 831 Radiologic Replace outdated radiology Technology-RG equipment. Equipment installed. Equipment is 100% operational. Submit requisition for bid process. Obtain TDH license on machine once installed. Estimated cost: $60,000 7.1 832 Nursing-RG Increase student success on NCLEX-RN exam. Number of students passing NCLEX-RN on first attempt. Annual pass rate of 80% or better. -Orient all new faculty to course and program. -Review/revise curriculum threads. -Revise course packets to ensure that curriculum threads are included as appropriate. -Revise tests to incorporate NCLEXtest plan. 8.1 832 Nursing-RG Increase student success on NCLEX-RN exam. Number of students passing NCLEX-RN on first attempt. Annual pass rate of 80% or better. -Orient all new faculty to course and program. -Review/revise curriculum threads. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults 1. Continue faculty orientation. 2. Continue to improve test development. Friday, November 21, 2003 Page 133 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard Strategies -Revise course packets to ensure that curriculum threads are included as appropriate. Assessment Results Use of Results Objective's Status rate for 2002 at 84% 2003 pass rate to be determined October 2003. -Revise tests to incorporate NCLEXtest plan. 1.1 833 Nursing-RG Ensure that the course to course retention rate of students enrolled in core nursing courses meets the following measure and standard. % of students enrolled in a course 80% that progress to the subsequent course on the degree plan in the next semester/mini-mester. -Post scholarship information on student bulletin boards. -Continue with faculty mentoring. -Continue to counsel students on first failure. -Continue with new student orientation, covering the following topics: time management, the brain & how it functions, personality, communication skills, and learning styles. -Adhere to the specialized admissions procedure for health occupations. -Emphasis test taking skills in all nursing courses. -Obtain state of the art equipment and supplies (Beds, IV pumps, mannequins, syringe pumps, suction machines, feeding pumps). NEW MONEY: $50,000 -Review course evaluation tools and make revisions as appropriate. -Hold students accountable for prior knowledge. #1 to 6 Complete #7 Partial pending completion of labs August, 2003. #8 Partial - to be complete on August 2003 implementation #9 In progress Date from IR is pending to measure retention to anticipate cont. tracking. 1.1 834 Nursing-RG Ensure that the course to course retention rate of students enrolled in core nursing courses meets the following measure and standard. Percent of students enrolled in a course that progress to the subsequent course on the degree plan in the next semester/minimester. -Purchase 500 NLN exams by Fall 2002. -Purchase 500 NLN exams by Spring 2003. -Purchase 60 NLN Comprehensive PN exams by Spring 2003. -Purchase 45 Mosby Assessment tests by Fall 2002. -Purchase 45 Mosby Assessment tests The program has purchased approximately 8 clinical simulation exams and have incorporated them into course work. Effectiveness will not be known until post graduation. We will evaluate pass rates on CSE In Progress annually. Also will evaluated students at the end of the school year (May, 03) during a registry review course planned for the last week of school. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT 80% rpt0203AreaPlansFinalResults Friday, November 21, 2003 Met Page 134 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status by Spring 2003. -Purchase 300 Critical Thinking exams by Fall 2002. 8.1 835 Respiratory Care-RG Establish a large pool of Respiratory Care Technology Major candidates to fill vacant seats in this program. A significant increase in the number of candidates who have declared Respiratory Care Technology as their major. A minimum of 24 students meeting specialized admissions criteria in January of each calendar year. -Develop Media promoting R.C. Technology. -Increase # of career day presentations by faculty at area junior and high schools. -Update EPCC & High School counselors' materials. The program has purchased approximately 8 clinical simulation exams and have incorporated them into course work. Effectiveness will not be known until post graduation. We will evaluate pass rates on CSE In Progress annually. Also will evaluate students at the end of the school year (May, 03) during a registry review course planned for the last week of school. 2.1 835 Respiratory Care-RG Establish a large pool of Respiratory Care Technology Major candidates to fill vacant seats in this program. A significant increase in the number of candidates who have declared Respiratory Care Technology as their major. A minimum of 24 students meeting specialized admissions criteria in January of each calendar year. -Develop Media promoting R.C. Technology. -Increase # of career day presentations by faculty at area junior and high schools. -Update EPCC & High School counselors' materials. The program has purchased approximately 8 clinical simulation exams and have incorporated them into course work. Effectiveness will not be known until post graduation. We will evaluate pass rates on CSE In Progress annually. Also will evaluate students at the end of the school year (May, 03) during a registry review course planned for the last week of school. 1.1 836 Surgical TechRG Increase the level of instructional resources and materials to meet program needs. No deficit. Sufficient funds to cover instructional resources. Acquire additional monies to increase instructional resources. ($3000) Budget deficit. Not sufficient funds Re-submit objective for 2002-2003. to cover instructional resources. Not Met 6.1 836 Surgical TechRG Increase the level of instructional resources and materials to meet program needs. No deficit. Sufficient funds to cover instructional resources. Acquire additional monies to increase instructional resources. ($3000) Budget deficit. Not sufficient funds Re-submit objective for 2002-2003. to cover instructional resources. Not Met 1.1 837 Math-RG Begin planning for math lab at RG to be implemented when classroom building is completed. Plan is developed. none Develop plan for furniture, equipment, No furniture has been ordered. staffing, and schedule for services for 2003-2004 implementation. In progress. Not Met 6 837 Math-RG Begin planning for math lab at RG to be implemented when classroom building is completed. Plan is developed. none Develop plan for furniture, equipment, No furniture has been ordered. staffing, and schedule for services for 2003-2004 implementation. In progress. Not Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 135 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 5.1 838 Math-RG Provide opportunity for EPCC math faculty to participate with UTEP math faculty for exchange of ideas and to look for opportunities for collaborative projects involving faculty from both schools. At least 6 full-time EPCC math faculty will participate in a joint work-shop to explore opportunities. none Organize a workshop at an off-campus Math faculty attended meetings at site during faculty development week. UTEP. Invite math faculty from EPCC and UTEP to attend. Faculty participated in workshop with UTEP people to explore new opportunities. 8.1 839 Physical Therapist Assistant-RG Create new affiliation sites for PT students. 3 Initial affiliation site. -Develop affiliation sites in Southern New Mexico area. Accreditation Report Advisory Committee Report. Not Met Coordinator time not increased to work on this objective. Met -Implement new pilot PT clinic. 7.1 840 Physical Therapist Assistant-RG Write and receive grants to fund personnel for the new PT clinic. none One Get help with grants division of college to write the grant. Insufficient Coord. Release time to Accreditation Report Advisory accomplish this project. Committee Report. Not Met 5.1 840 Physical Therapist Assistant-RG Write and receive grants to fund personnel for the new PT clinic. none One Get help with grants division of college to write the grant. Insufficient Coord. Release time to Accreditation Report Advisory accomplish this project. Committee Report. Not Met 6.1 840 Physical Therapist Assistant-RG Write and receive grants to fund personnel for the new PT clinic. none One Get help with grants division of college to write the grant. Insufficient Coord. Release time to Accreditation Report Advisory accomplish this project. Committee Report. Not Met 1.1 841 Physical Therapist Assistant-RG Increase first time pass rate of graduates on state licensure exam. Passing licensure exam in one year. none -Continue mentoring program. -Hire additional full time faculty. -Hire lab assistant to increase access to lab instructional materials by students. 1. 100% pass rate for 2002 graduating class. 2. Mentoring offered for all lab courses. Accreditation Report Advisory Committee Report. Met 5.1 841 Physical Therapist Assistant-RG Increase first time pass rate of graduates on state licensure exam. Passing licensure exam in one year. none -Continue mentoring program. -Hire additional full time faculty. -Hire lab assistant to increase access to lab instructional materials by students. 1. 100% pass rate for 2002 graduating class. 2. Mentoring offered for all lab courses. Accreditation Report Advisory Committee Report. Met 5.1 842 Biology RG Provide opportunity for EPCC biology faculty to participate with UTEP At least 5 full-time EPCC biology none faculty will participate in a joint work-shop to explore OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Organize a workshop at an off-campus In progress. site during faculty development week. Invite biology faculty from EPCC and rpt0203AreaPlansFinalResults In Progress Friday, November 21, 2003 Page 136 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard biology faculty for exchange opportunities. of ideas and to look for opportunities for collaborative projects involving faculty from both schools. 1.1 843 Library - RG Increase book/equipment budget to upgrade Rio Grande Library collection. Weed and replace outdated materials. 843 Library - RG Increase book/equipment budget to upgrade Rio Grande Library collection. Weed and replace outdated materials. 843 Library - RG Increase book/equipment budget to upgrade Rio Grande Library collection. Use of Results Objective's Status Number of library materials to update collection and number of outdated materials removed from collection. ACRL (Association of College and Research Libraries) recommends that three to five percent of the collection should be replaced annually. No budget allocations. RG Library book/equipment budget needs to be increased to at least $78,000. Regular book costs averaged $25 while Health book costs averaged $72.05 in 2000. Health videos average $300. In order to purchase 1 new book per student RG would need approximately $144,000. Not Met Number of library materials to update collection and number of outdated materials removed from collection. ACRL (Association of College and Research Libraries) recommends that three to five percent of the collection should be replaced annually. No budget allocations. RG Library book/equipment budget needs to be increased to at least $78,000. Regular book costs averaged $25 while Health book costs averaged $72.05 in 2000. Health videos average $300. In order to purchase 1 new book per student RG would need approximately $144,000. Not Met Number of library materials to ACRL (Association of RG Library book/equipment budget No budget allocations. update collection and number of College and Research needs to be increased to at least outdated materials removed from Libraries) recommends that $78,000. Regular book costs averaged Not Met Current library collection is extremely old and budget is insufficient to keep up with replacement of materials. Example: Of more than 287 books in the dental area, only 67 have publication dates since 1995. 7.1 Assessment Results UTEP to attend. Current library collection is extremely old and budget is insufficient to keep up with replacement of materials. Example: Of more than 287 books in the dental area, only 67 have publication dates since 1995. 8.1 Strategies OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 137 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Weed and replace outdated materials. Measure Standard 843 Library - RG Increase book/equipment budget to upgrade Rio Grande Library collection. Weed and replace outdated materials. 843 Library - RG Increase book/equipment budget to upgrade Rio Grande Library collection. Weed and replace outdated materials. Use of Results Objective's Status three to five percent of the collection should be replaced annually. $25 while Health book costs averaged $72.05 in 2000. Health videos average $300. In order to purchase 1 new book per student RG would need approximately $144,000. Number of library materials to update collection and number of outdated materials removed from collection. ACRL (Association of College and Research Libraries) recommends that three to five percent of the collection should be replaced annually. No budget allocations. RG Library book/equipment budget needs to be increased to at least $78,000. Regular book costs averaged $25 while Health book costs averaged $72.05 in 2000. Health videos average $300. In order to purchase 1 new book per student RG would need approximately $144,000. Not Met Number of library materials to update collection and number of outdated materials removed from collection. ACRL (Association of College and Research Libraries) recommends that three to five percent of the collection should be replaced annually. RG Library book/equipment budget No budget allocations. needs to be increased to at least $78,000. Regular book costs averaged $25 while Health book costs averaged $72.05 in 2000. Health videos average $300. In order to purchase 1 new book per student RG would need approximately $144,000. Not Met Current library collection is extremely old and budget is insufficient to keep up with replacement of materials. Example: Of more than 287 books in the dental area, only 67 have publication dates since 1995. 2.1 Assessment Results collection. Current library collection is extremely old and budget is insufficient to keep up with replacement of materials. Example: Of more than 287 books in the dental area, only 67 have publication dates since 1995. 6.1 Strategies Current library collection is extremely old and budget is insufficient to keep up with replacement of materials. Example: Of more than 287 books in the dental area, only 67 have publication dates since 1995. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 138 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan 5.1 843 Area Library - RG Objective Increase book/equipment budget to upgrade Rio Grande Library collection. Weed and replace outdated materials. Standard Number of library materials to update collection and number of outdated materials removed from collection. ACRL (Association of College and Research Libraries) recommends that three to five percent of the collection should be replaced annually. RG Library book/equipment budget No budget allocations. needs to be increased to at least $78,000. Regular book costs averaged $25 while Health book costs averaged $72.05 in 2000. Health videos average $300. In order to purchase 1 new book per student RG would need approximately $144,000. Not Met Functioning variable lighting. Install recessed lighting with dimmer switch to provide variable light levels in conference room. Not Met Current library collection is extremely old and budget is insufficient to keep up with replacement of materials. Example: Of more than 287 books in the dental area, only 67 have publication dates since 1995. 6.1 5.1 844 845 Library - RG Library - RG Installation of lighting. Renovate lighting in RG Library Conference Room (E100E) to provide varying levels of lighting. This room is frequently used for teleconferences and viewing videos. Frequently occupants need to take notes while these activities are occurring and current lighting is conducive to this. Installation of two (2) thermostats. Add thermostats to Rooms E100H and E100J in Rio Grande Library. The heating and cooling in the office/workroom areas of the Rio Grande Library is controlled by the thermostat in the exterior hallway of the Oregon Center. Therefore, the offices and workroom are affected by the external temperatures in the hallway. These rooms are consistently OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Strategies Assessment Results Use of Results Objective's Status Measure No budget allocations. Projected Cost: $1,210. Ability to set temperatures Install thermostats in these areas. Cost estimate: $5,500. in the office/workroom areas at a comfortable level. Less sick leave used by employees who don't become ill due to temperature extremes. No budget allocations. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 139 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status too hot or too cool because of this. 1.1 1293 Health Occupations To promote the representation of minorities and the disadvantaged in the health care work force. To provide financial aid information to 110 High School seniors who are planning health careers and assist them to complete the necessary forms. none same as measure Almost all 41/42 HCOP students are Hispanic and enrolled in HO major. Achieved Promotion of HO in minorities. Met 2.1 1293 Health Occupations To promote the representation of minorities and the disadvantaged in the health care work force. To provide financial aid information to 110 High School seniors who are planning health careers and assist them to complete the necessary forms. none same as measure Almost all 41/42 HCOP students are Hispanic and enrolled in HO major. Achieved Promotion of HO in minorities. Met 1.1 1294 Health Occupations To promote the health care education at EPCC. To provide an 8-week Summer Institute selected as HCOP participants. none same as measure Good outcome-14000 contacts in school careers, health fairs, etc. Outreach Met 2.1 1294 Health Occupations To promote the health care education at EPCC. To provide an 8-week Summer Institute selected as HCOP participants. none same as measure Good outcome-14000 contacts in school careers, health fairs, etc. Outreach Met 2.1 1295 Health Occupations To upgrade the minority students academic skills. To identify and enroll a minimum none of 70% of HCOP participants in the 2-year health occupations program. same as measure Feedback of instructors helps in contacting students who need academic help. Tutoring saves almost all students from flunking. 10/42 23.8% Met 1.1 1295 Health Occupations To upgrade the minority students academic skills. To identify and enroll a minimum none of 70% of HCOP participants in the 2-year health occupations program. same as measure Feedback of instructors helps in contacting students who need academic help. Tutoring saves almost all students from flunking. 10/42 23.8% Met 1.1 1296 Health Occupations To provide the students with To improve the graduation and/or none financial aid and assistance. transfer rate of disadvantaged students from the college's health occupations program. same as measure 78% of our HCOP students are on Financial Aid. Financial aid helps in academic success of HCOP students. Met 2.1 1296 Health To provide the students with To improve the graduation and/or none same as measure 78% of our HCOP students are on Financial aid helps in academic Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 140 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Occupations Objective Measure financial aid and assistance. transfer rate of disadvantaged students from the college's health occupations program. Standard Strategies Assessment Results Financial Aid. Use of Results Objective's Status success of HCOP students. 8.1 1297 CD/Health/Math/ Plan for renovation of Implementation plan completed Science and coordinated with other vacated spaces to expand campus classroom and other departments. needs, e.g. bookstore completed. none 1. Equipment list finalized and #'s 1 thru 3 are in progress. equipment ordered to allow for installation during Fall 2002. 2. Budget planning for 2003-2004 includes plan for new staffing needs, if applicable. 3. Renovation plans completed. In Progress 7.1 1297 CD/Health/Math/ Plan for renovation of Implementation plan completed Science and coordinated with other vacated spaces to expand campus classroom and other departments. needs, e.g. bookstore completed. none 1. Equipment list finalized and #'s 1 thru 3 are in progress. equipment ordered to allow for installation during Fall 2002. 2. Budget planning for 2003-2004 includes plan for new staffing needs, if applicable. 3. Renovation plans completed. In Progress 5.1 1297 CD/Health/Math/ Plan for renovation of Implementation plan completed Science and coordinated with other vacated spaces to expand campus classroom and other departments. needs, e.g. bookstore completed. none 1. Equipment list finalized and #'s 1 thru 3 are in progress. equipment ordered to allow for installation during Fall 2002. 2. Budget planning for 2003-2004 includes plan for new staffing needs, if applicable. 3. Renovation plans completed. In Progress 6.1 1297 CD/Health/Math/ Plan for renovation of Implementation plan completed Science and coordinated with other vacated spaces to expand campus classroom and other departments. needs, e.g. bookstore completed. none 1. Equipment list finalized and #'s 1 thru 3 are in progress. equipment ordered to allow for installation during Fall 2002. 2. Budget planning for 2003-2004 includes plan for new staffing needs, if applicable. 3. Renovation plans completed. In Progress 1.1 1297 CD/Health/Math/ Plan for renovation of Implementation plan completed Science and coordinated with other vacated spaces to expand campus classroom and other departments. needs, e.g. bookstore none 1. Equipment list finalized and equipment ordered to allow for installation during Fall 2002. 2. Budget planning for 2003-2004 In Progress OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT #'s 1 thru 3 are in progress. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 141 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard completed. Strategies Assessment Results Use of Results Objective's Status includes plan for new staffing needs, if applicable. 3. Renovation plans completed. 2.1 1297 CD/Health/Math/ Plan for renovation of Implementation plan completed Science and coordinated with other vacated spaces to expand campus classroom and other departments. needs, e.g. bookstore completed. none 1. Equipment list finalized and #'s 1 thru 3 are in progress. equipment ordered to allow for installation during Fall 2002. 2. Budget planning for 2003-2004 includes plan for new staffing needs, if applicable. 3. Renovation plans completed. In Progress 8.1 1298 CD/Health/Math/ Determine the role of El Science Paso Community College within the Border Health Institute other than the educational role. BHI Plan developed and approved by Board of Trustees. none Conduct a planning workshop with the Withdrawn Board of Trustees. Withdrawn 7.1 1298 CD/Health/Math/ Determine the role of El Science Paso Community College within the Border Health Institute other than the educational role. BHI Plan developed and approved by Board of Trustees. none Conduct a planning workshop with the Withdrawn Board of Trustees. Withdrawn 2.1 1298 CD/Health/Math/ Determine the role of El Science Paso Community College within the Border Health Institute other than the educational role. BHI Plan developed and approved by Board of Trustees. none Conduct a planning workshop with the Withdrawn Board of Trustees. Withdrawn 5.1 1298 CD/Health/Math/ Determine the role of El Science Paso Community College within the Border Health Institute other than the educational role. BHI Plan developed and approved by Board of Trustees. none Conduct a planning workshop with the Withdrawn Board of Trustees. Withdrawn 2.1 1299 CD/Health/Math/ Meet the health care needs of BHI Plan developed and Science approved by Board of Trustees. El Paso though quality educational programming none Develop written plan of action with 10 year plan completed. 2003projected budget implications for 2003- 2004 budget submitted. 2004 implementation. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Met Friday, November 21, 2003 Page 142 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 103 Health Occupations, Math and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status and community service programs to meet the community's needs. 5.1 1299 CD/Health/Math/ Meet the health care needs of BHI Plan developed and Science approved by Board of Trustees. El Paso though quality educational programming and community service programs to meet the community's needs. none Develop written plan of action with 10 year plan completed. 2003projected budget implications for 2003- 2004 budget submitted. 2004 implementation. Met 8.1 1299 CD/Health/Math/ Meet the health care needs of BHI Plan developed and Science approved by Board of Trustees. El Paso though quality educational programming and community service programs to meet the community's needs. none Develop written plan of action with 10 year plan completed. 2003projected budget implications for 2003- 2004 budget submitted. 2004 implementation. Met 7.1 1299 CD/Health/Math/ Meet the health care needs of BHI Plan developed and Science approved by Board of Trustees. El Paso though quality educational programming and community service programs to meet the community's needs. none Develop written plan of action with 10 year plan completed. 2003projected budget implications for 2003- 2004 budget submitted. 2004 implementation. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 143 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 27 Instructional Programs: Mission Del Paso Goal Plan Area Objective Measure Standard Strategies 2.1 961 CD/Dean Inst Prog - MdP 7.1 962 Faculty Travel - Faculty will be reimbursed Provide Mission del Paso Faculty .30 cents per mile for In-Town Travel and MdP In-Town Travel. when funds are available for Out-of-Town Travel. 1.1 963 Art-MdP Increase completer rate in Art class. Number of students completing Art class. 70% of students enrolled in none Art classes will complete the course. 1.1 964 English-MdP Increase completer rate in English class. Number of students completing English class. 70% of students in English class will complete the course. none 1.1 965 Foreign Language-MdP Increase completer rate in Foreign Languages class. Number of students completing Foreign Languages class. 70% of students in Foreign Languages class will complete the course. none 1.1 966 Music/DanceMdP Increase completer rate in Music class. Number of students completing Music class. 70% of students in Music class will complete the course. none 1.1 967 Accounting MdP Increase completer rate in Accounting class. Number of students completing Accounting class. 70% of students in Accounting class will complete the course. none 1.1 968 Computer Information MdP Increase completer rate in CIS class. Number of students completing CIS class. 70% of students in CIS class will complete the course. none 1.1 969 Reading Increase completer rate in Reading class. Number of students completing Reading class. 70% of students in Reading none class will complete the course. 1.1 Increase student enrollment at MdP. Number of students enrolled at MdP. 970 Speech-MdP Number of students completing Increase completer rate in OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Increase enrollment by 5% from previous academic year. 70% of students in Speech Assessment Results Use of Results Objective's Status none none none rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 144 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 27 Instructional Programs: Mission Del Paso Goal Plan Area Objective Measure Standard Speech class. Speech class. class will complete the course. Strategies 1.1 971 ESL-MdP Increase completer rate in ESL class. Number of students completing ESL class. 70% of students in ESL class will complete the course. none 1.1 972 ESAL-MdP Increase completer rate in ESL Speech class. Number of students completing ESL Speech class. 70% of student in ESL Speech will complete the course. none 1.1 973 Psychology-MdP Increase completer rate in Psychology class. Number of students completing Psychology class. 70% of students in Psychology class will complete the course. none 1.1 974 History-MdP Increase completer rate in History class. Number of students completing History class. 70% of students in History class will complete the course. none 1.1 975 Political Science - MdP Increase completer rate in Political Science class. Number of students completing Political Science class. 70% of students in Political none Science class will complete the course. 1.1 976 Sociology -MdP Increase completer rate in Sociology class. Number of students completing Sociology class. 70% of students in Sociology class will complete the course. 1.1 977 Developmental Increase completer rate in Education-MdP Developmental Education class. Number of students completing Dev. Ed. Class. 70% of students in Dev. Ed. none Class will complete the course. 1.1 978 Chemistry MdP Increase completer rate in Chemistry class. Number of students completing Chemistry class. 70% of students in none Chemistry will complete the course. 1.1 979 Math-MdP Number of students completing Math class. 70% of students in Math class will complete the course. Increase completer rate in Math class. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Assessment Results Use of Results Objective's Status none none rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 145 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 27 Instructional Programs: Mission Del Paso Goal Plan Area Objective Measure Standard Strategies 1.1 980 KinesiologyMdP Increase completer rate in Kinesiology class. Number of students completing Kinesiology class. 70% of students in Kinesiology class will complete the course. none 1.1 981 Biology - MdP Increase completer rate in Biology class. Number of students completing Biology class. 70% of students in Biology class will complete the course. none 1.1 982 Education -MdP Increase completer rate in Education class. Number of students completing Education class. 70% of students in Education class will complete the course. none 1.1 983 Economics-MdP Increase completer rate in Economics class. Number of students completing Economics class. 70% of students in Economics class will complete the course. none 1.1 984 Increase completer rate in Information Number of students completing Processing MdP Information Processing class. Information Processing class. 70% of students in Info Processing class will complete the course. none 1.1 985 Office Information Systems 1.1 986 Philosophy-MdP Increase completer rate in Philosophy class. 1.1 987 Library- MdP Increase completer rate in O Number of students completing O 70% of students in O I S I S class. class will complete the I S class. course. Number of students completing Philosophy class. 70% of students in Philosophy class will complete the course. Increase student retention by Number of students using library. Increase collection by 2%. increasing current library Average weekly patron count: collection which will help 1,783. students with research. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Assessment Results Use of Results Objective's Status none none Identify high demand areas through faculty recommendations. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 146 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 40 Instructional Programs: Northwest Goal Plan Area Objective Measure To create a campus advisory committee to provide information to help determine the needs of the Northwest Campus constituents and the local community. Include members on the committee representing schools, businesses, and elected officials as well as Northwest Campus faculty, staff and students. Create committee and conduct two advisory committee meeting during the 2001 - 2002 academic year. Standard Strategies Assessment Results Objective's Status Use of Results 8.1 888 CD/Dean Inst Prog - NW 2.1 889 Faculty Travel - Continue to increase amount Number of faculty trained or NW participating in professional of training for faculty. development activities. Increase by 5% from Encourage faculty participation in previous three year average. professional development activities and continue to support travel expenses based on funding available. Using the data compiled by the Dean's office, the Faculty Travel discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 890 Art - NW Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Art discipline has met the 5% standard during the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 891 English - NW To offer one or more literature courses every semester. Literature courses that actually make and enrollment figures for those classes. none Using the data compiled by the Dean's office, the English discipline has met the 5% standard during the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met Several literature courses have been approved to count as the humanities requirement in the core curriculum. As we open classrooms and begin offering education fields of study, we should be able to offer more second year courses. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Create committee and conduct two advisory committee meetings during the 2001- 2002 academic year. Discussion with counselors for fall enrollment to offer students additional options for humanities requirement; flyers posted on bulletin boards and classrooms at NW; flyers given to ENGL 1302 students before beginning of fall registration in spring and summer. Campus Advisory - Committee was No advisory committee was formed. not created. Potential Community members were not available. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Not Met Page 147 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 40 Instructional Programs: Northwest Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 2.1 892 Music - NW Continue to increase enrollment. Enrollment Figures. Participate in recruitment activities Increase by 5% from previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Music discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 893 Accounting NW Continue to increase enrollment. Enrollment Figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's Office, the Accounting discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 5.1 894 Computer Information NW To maintain microcomputer classrooms capable of running the software being taught. Three classrooms at the Northwest Campus are equipped with computers running at 200 Mhz or less and hard drives of 3 GB or less. Pentium based computers running at 600 Mhz or faster and with at least 10 GB hard drives. Upgrade the equipment in one classroom to the current standard. Replace on classroom (25 computers) each year at a cost between $30,000 and $40,000 by requesting funding from institutional and federal funds. The computers in the three classrooms were purchased through the Lab upgrade. The cut dated computers were replaced with Pentium IV's. Students have greatly benefited by the use of this technology. The upgrade providers more up-to-date software for students to use. Met 6.1 894 Computer Information NW To maintain microcomputer classrooms capable of running the software being taught. Three classrooms at the Northwest Campus are equipped with computers running at 200 Mhz or less and hard drives of 3 GB or less. Pentium based computers running at 600 Mhz or faster and with at least 10 GB hard drives. Upgrade the equipment in one classroom to the current standard. Replace on classroom (25 computers) each year at a cost between $30,000 and $40,000 by requesting funding from institutional and federal funds. The computers in the three classrooms were purchased through the Lab upgrade. The cut dated computers were replaced with Pentium IV's. Students have greatly benefited by the use of this technology. The upgrade providers more up-to-date software for students to use. Met 2.1 895 Business Continue to increase Administration - enrollment. NW Enrollment Figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Business Administration discipline has me the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 896 Management NW Continue to increase enrollment. Enrollment Figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Management discipline did not meet the 5% standard for the last three years. The data gathered will be used to identify areas needing concentration during the on going recruitment efforts at the Northwest Campus. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Not Met Page 148 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 40 Instructional Programs: Northwest Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 6.1 897 Office Information Systems - NW To maintain microcomputer classrooms capable of running the software being taught. Three classrooms at the Northwest Campus are equipped with computers running at 200 Mhz or less and hard drives of 3 GB or less. Pentium based computers running at 600 Mhz or faster and with at least 10 GB hard drives. Upgrade the equipment in one classroom. Replace on classroom (25 computes) each year at a cost between $30,000 and $40,000 by requesting funding from institutional and federal funds. The computers in the three classrooms at the NW campus were purchased through the lab upgrade. The outdated computers were replaced with Pentium IV's. Students have greatly benefited by the use of this technology. The upgraded provides more up-to-date software to use. Met 5.1 897 Office Information Systems - NW To maintain microcomputer classrooms capable of running the software being taught. Three classrooms at the Northwest Campus are equipped with computers running at 200 Mhz or less and hard drives of 3 GB or less. Pentium based computers running at 600 Mhz or faster and with at least 10 GB hard drives. Upgrade the equipment in one classroom. Replace on classroom (25 computes) each year at a cost between $30,000 and $40,000 by requesting funding from institutional and federal funds. The computers in the three classrooms at the NW campus were purchased through the lab upgrade. The outdated computers were replaced with Pentium IV's. Students have greatly benefited by the use of this technology. The upgraded provides more up-to-date software to use. Met 2.1 898 Reading - NW To fill the present sections of Enrollment Figures. reading and open new ones, especially in the evening. none To participate in recruitment activities Using the data compiled by the at NW. Dean's office, the Reading discipline has met the 5% standard for the last three years. The data gathered will be used to plan for the growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 899 Speech - NW To fill the present sections of Enrollment Figures. speech and open new ones, especially in the evening. none To participate in recruitment activities at NWC. Speech is a requirement in the core curriculum, so as enrollment at NW increases, enrollment in speech classes is sure to increase. Using the data compiled by the Dean's office, the Speech discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth need in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 900 ESL - NW 1-To increase the enrollment Enrollment and retention figures. in daytime classes and open evening ESOL classes at NW, starting with one section of level one in the Fall semester, 2001. none We had a very successful ESOL open house in March where Mr. Juan Casas of the office of recruitment was able to talk directly to approximately 100 interested people and many more attended. We plan to have more similar activities in the future, not only with our own students but also with other organizations like Gear Up, Dona Branch, and the Women's Intercultural Center which are directed to the Hispanic community area. Using the data compiled by the Dean's office, the ESL discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 901 ESAL-NW Continue to increase Increase by 5% from Participate in recruitment activities Using the data compiled by the The data gathered will be used to Met Enrollment figures. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 149 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 40 Instructional Programs: Northwest Goal Plan Area Objective Measure enrollment. Standard Strategies Assessment Results Use of Results previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Dean's office, the ESAL discipline plan for growth needed in the has met the 5% standard for the last courses offered in this discipline. three years. This will impact the plan for facilities and funding. Objective's Status 2.1 902 Psychology NW Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Psychology discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 903 Philosophy - NW Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Philosophy discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 904 History - NW Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the History discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 905 Political Science - NW Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Political Science discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 906 Sociology -NW Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Sociology discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 907 Economics - NW Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to Using the data compiled by the Dean's office, the Economic discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 150 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 40 Instructional Programs: Northwest Goal Plan Area Objective Measure Standard Strategies Assessment Results improve retention in program. Use of Results Objective's Status facilities and funding. 2.1 908 Anthropology NW Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Anthropology did not meet the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Not Met 2.1 909 Developmental Continue to increase Education - NW enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Developmental Education discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 910 Geology-NW Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Geology discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 911 MATH - NW Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Math discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 912 Physics-NW Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Physics discipline did not meet the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Not Met 2.1 913 Education -NW Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Education discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 914 Borderlands Continue to increase Enrollment figures. Increase by 5% from Not an appropriate plan for OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Continue to participate in student rpt0203AreaPlansFinalResults Not Met Friday, November 21, 2003 Page 151 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 40 Instructional Programs: Northwest Goal Plan Area Objective Measure enrollment. Standard Strategies Assessment Results Use of Results Objective's Status previous three year average. activities to produce the Borderlands student publication. Borderlands. This is a student publication. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. Using the data compiled by the Dean's office, the Biology discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met Replace 18 microcomputers in one electronic classroom at the Northwest Campus in order to run the software being taught in the Computer Information Systems discipline. The computers in the three classrooms at the campus were purchased. Students have greatly benefited by the use of this technology. Met 2.1 915 Biology - NW Continue to increase enrollment. Enrollment figures. 6.1 916 Instructional Programs -NW To maintain microcomputer classrooms at the Northwest Campus capable of running the software being taught. To upgrade microcomputers in none one electronic classroom in order to efficiently run the software being taught. 8.1 917 Court Provide hands-on training on To provide a laptop with Reporting - NW court reporting software for captioning and CArt to 100% of students' and instructors' use the students in the program. to provide captioning of EPCC classes (CArt) and meetings. This would provide experience for the students and also market and promote the court reporting program. none Purchase laptop and install with complimentary software provided by Stenograph Corporation, and provide instruction and training on captioning to 100% of the students in the program. Four laptops were purchased with Carl Perkins monies for $8,988.00 total. Complimentary software was provided by stenograph Corporation. Laptops were put into use by the CRTR lab during SP 2003 semester. They are being utilized for recruitment presentations, instruction and student use. Met 5.1 917 Court Provide hands-on training on To provide a laptop with Reporting - NW court reporting software for captioning and CArt to 100% of students' and instructors' use the students in the program. to provide captioning of EPCC classes (CArt) and meetings. This would provide experience for the students and also market and promote the court reporting program. none Purchase laptop and install with complimentary software provided by Stenograph Corporation, and provide instruction and training on captioning to 100% of the students in the program. Four laptops were purchased with Carl Perkins monies for $8,988.00 total. Complimentary software was provided by stenograph Corporation. Laptops were put into use by the CRTR lab during SP 2003 semester. They are being utilized for recruitment presentations, instruction and student use. Met 6.1 917 Court Provide hands-on training on To provide a laptop with Reporting - NW court reporting software for captioning and CArt to 100% of students' and instructors' use the students in the program. none Purchase laptop and install with complimentary software provided by Stenograph Corporation, and provide Four laptops were purchased with Laptops were put into use by the Carl Perkins monies for $8,988.00 CRTR lab during SP 2003 total. Complimentary software was semester. They are being utilized Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 152 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 40 Instructional Programs: Northwest Goal Plan Area Objective Measure Standard to provide captioning of EPCC classes (CArt) and meetings. This would provide experience for the students and also market and promote the court reporting program. Strategies Assessment Results instruction and training on captioning provided by stenograph to 100% of the students in the program. Corporation. Use of Results Objective's Status for recruitment presentations, instruction and student use. 7.1 918 Library - NW To plan, oversee and Inventory all items in objectives implement a new library and strategies to ensure facility providing quality compliance. services and resources to the NW students and community in order to establish an attractive and conducive environment for research and study at NW campus. none Facilities: work closely with all departments involved (architect, construction, vendors, etc.) Collections: input from faculty. Orders ready 10 months before opening. Staffing/Budgeting seek parity and equity in funding. Moving/Installation: procedures/training in place. The northwest campus built a new library facility that accommodates a larger amount of student flow. The library has the most advanced modern technology and partners with the city of El Paso's Public Library. The library has been able to acquire a higher volume of magazines, books and a children's section. Staff students and faculty and community members are now able to utilize the New library facility. Met 2.1 919 Reading - NW To increase the enrollment in Enrollment and retention figures. daytime classes and open evening ESOL classes at NW, starting with one section of level one in the Fall semester, 2001. none We had a very successful ESOL open house in March where Mr. Juan Casas of the office of recruitment was able to talk directly to approximately 100 interested people and many more attended. We plan to have more similar activities in the future, not only with our own students but also with other organizations like Gear Up, Dona Branch, and the Women's Intercultural Center which are directed. Using the data compiled by the Dean's office, the Reading discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 920 NW Graphing Calculators Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Advise students in class in order to improve retention in program. This is not an appropriate plan. Budget is for machine rental. Not Met 2.1 921 CCPR Machine Rental Continue to increase enrollment. Enrollment figures. Increase by 5% from Participate in recruitment activities previous three year average. such as Career Days, High School visits and serve as speaker for classes. Not an appropriate plan. Budget is for machine rental. Not Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 153 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 40 Instructional Programs: Northwest Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status Advise students in class in order to improve retention in program. 2.1 1315 ESL - NW To continue to improve our Enrollment and retention figures. program especially in the lab area, by offering more updated lab materials, computer activities, and speech activities. none We had a very successful ESOL open house in March where Mr. Juan Casas of the office of Recruitment was able to talk directly to approximately 100 interested people and many more attended. We plan to have more similar activities in the future, not only with our own students but also with other organizations like Gear Up, Dona Branch, and the Women's Intercultural Center which are directed to the Hispanic community area. Using the data compiled by the Dean's office, the ESL discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met 2.1 1316 Reading - NW To continue to improve our Enrollment and retention figures. program especially in the lab area, by offering more updated lab materials, computer activities, and speech activities. none We had a very successful ESOL open house in March where Mr. Juan Casas of the office of recruitment was able to talk directly to approximately 100 interested people and many more attended. We plan to have more similar activities in the future, not only with our own students but also with other organizations like Gear Up, Dona Branch, and the Women's Intercultural Center which are directed. Using the data compiled by the Dean's office, the Reading discipline has met the 5% standard for the last three years. The data gathered will be used to plan for growth needed in the courses offered in this discipline. This will impact the plan for facilities and funding. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 154 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 49 Math, Occupational Education and Science Goal Plan 6.1 942 Area Library - TM Objective Measure To maintain the scope of the Number of book & other TM collection by acquiring materials per FTE student (currently at 10.88). material that adequately support all of the TM instructional program as per the collection development policy. 5.1 988 Dean/Math Occ Add quality faculty in the Ed Sci critical area of Math and Science. Hire I new Full-Time Faculty Member. 5.1 989 Faculty Travel - Provide travel resources for TM faculty development activities. 2.1 990 6.1 2.1 Standard Increase the number of items per students to 13. ACRL standard is 10 for minimum and 19 for excellent. Strategies Assessment Results 1897 Items identified as outdated, Conduct bibliometrical strategies to identify needs, and weed outdated and worn or missing and were worn materials. Purchase a variety of withdrawn from collection: new materials to enhance the collection. Books - 1819, Videos - 54, Cassettes - 15, Computer File - 9 Use of Results 2527 New items purchased for TM: Books - 2281, Cassettes - 14, CDROM - 22, Videos - 149, DVD - 57, Map - 4 Use as a baseline for future hiring. Provide training/travel for at least none 3 faculty members to enhance skills. -Solicit faculty interest. -Identify key training needs. -Provide support for travel arrangements and substitutes. Cost: $4,325 Withdrawn Accounting - TM Increase enrollments in business, management, and accounting by attracting area high school students into the programs. Count of area high school none students in business, management, and accounting classes determined by information gathered on student information sheet. -Participate in high school career days. -Contact area schools to set up tour. 991 Computer Info Systems-TM Replace 100% of Ft. Bliss computers. Identify various funding sources such as Carl Perkins, unit improvement plans and CISC Budget. 992 Business Increase enrollments in Administration- business, management, and TM accounting by attracting area high school students into the programs. none none Count of area high school none students in business, management, and accounting classes determined by information gathered on student information sheet. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Withdrawn Total collection: 36,598 using 2002 FTE of 2267 the student is now 16.14. -Recruit and hire faculty. Fully implemented. -Mentor faculty focusing on retention. -Identify budget support for new faculty. $38,000 Acquire new technology at Ft. Bliss. Objective's Status Withdrawn due to budget issues. Met Withdrawn -Participate in high school career days. -Contact area schools to set up tour. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 155 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 49 Math, Occupational Education and Science Goal Plan Area Objective Measure Standard Strategies 2.1 993 Management-TM Increase enrollments in business, management, and accounting by attracting area high school students into the programs. Count of area high school none students in business, management, and accounting classes determined by information gathered on student information sheet. -Participate in high school career days. -Contact area schools to set up tour. 6.1 994 Office Information Systems-TM Acquire new technology at the TM OIS Lab. Upgrade 1/3 of Lab computers. Identify various funding sources such as: Carl Perkins unit improvement plans, and OIS Budget. 1.1 995 Biology-TM Increase student retention rate. Percentage of students completing Increase retention by 5% each course in the discipline. from previous three year average. none Assessment Results Use of Results Incorporate investigate learning into each course offered by the discipline to increase critical thinking skills. Objective's Status In Progress Incorporate interactive computer exercises into the curriculum. 1.1 996 Chemistry-TM Increase student retention rate. Percentage of students completing Increase retention by 5% each course in the discipline. from previous three year average. Incorporate investigate learning into each course offered by the discipline to increase critical thinking skills. In Progress Incorporate interactive computer exercises into the curriculum. 1.1 997 Geology-TM Increase student retention rate. Percentage of students completing Increase retention by 5% each course in the discipline. from previous three year average. Incorporate investigate learning into each course offered by the discipline to increase critical thinking skills. Incorporate interactive computer exercises into the curriculum. 1.1 998 Math-TM To increase retention, by increasing the student success rate in Mathematics courses. Count student usage of the Math Lab. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Look at the % pass rates in remedial Math courses. -Make the Math Lab more accessible to students. Larger space, internet connections, more tutoring hours available. -Set up peer study groups. -Encourage math faculty (full and parttime) to remain current in math pedagogy. (By attending conferences, rpt0203AreaPlansFinalResults Met Friday, November 21, 2003 Page 156 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 49 Math, Occupational Education and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status and possibly having "workshops" to share ideas) 7.1 999 Physics-TM Provide TM students a quality education in physics courses by purchasing laboratory equipment. 2.1 1000 Child Development TM Increase joint efforts of Child Build the link between the Child Development program Development program and Daycare Center. and the Daycare program. none Set up meetings for discussion with representatives from both groups. 6.1 1001 Draft/Design Tech - TM Update software in the Drafting Lab. Move to Autocad 2000. none Arrange for new software in the DFTG lab. $0 - Work with VV to acquire licenses at no cost. 2.1 1002 Electronics-TM Increase enrollment. Increase in the number of new students. none Advertising. Recruit Employers. Minimal release time. 5.1 1003 Fashion TechTM Work to have full time Laboratory Assistant monies put back into the Fashion Technology budget so that the laboratory can be open for students to use equipment and facilities. Students have access to laboratory none equipment and facilities at least 30 hours per week during the Fall and Spring semesters. Appeal to the Administration to reinstate monies removed from the budget when the Fashion laboratory assistant was transferred in 1999. 1.1 1004 Culinary ArtsTM Increase enrollment. Increase enrollment by 5%. none -Market to HS students. -Coordinate dual credit with Canutillo. -Guest lectures at local HS. 6.1 1005 Heat/Vent/ACTM none Keep current with Technology and Industry. none 2 door module refrigerator Model No. KR-2 $2142.25 Vendor: RSI Students will show proficiency with equipment in the laboratory exercises that are pertinent to the physics/astronomy courses. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Students will have access to Purchase of items needed for labs: the lab resources used Celestron telescope $895 district wide. Solar filter for telescope $100 Induction coil $200 4 gas tubes $30 ea. Pasco Digital timers $500 Air track with gliders $450 misc. items ($300) Total $2,565 Equipment purchased. rpt0203AreaPlansFinalResults Met Withdrawn In Progress Friday, November 21, 2003 Page 157 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 49 Math, Occupational Education and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 3524 Gateway East El Paso, TX 79905 Ph: (915) 533-1677 8.1 1005 Heat/Vent/ACTM none Keep current with Technology and Industry. none 2 door module refrigerator Model No. KR-2 $2142.25 Vendor: RSI 3524 Gateway East El Paso, TX 79905 Ph: (915) 533-1677 In Progress 2.1 1005 Heat/Vent/ACTM none Keep current with Technology and Industry. none 2 door module refrigerator Model No. KR-2 $2142.25 Vendor: RSI 3524 Gateway East El Paso, TX 79905 Ph: (915) 533-1677 In Progress 2.1 1006 Interior Design- Increase enrollment in the TM INDS Discipline. Increase enrollment by 5%. none -Recruit all areas of El Paso County. Objectives met. Many classes are -Redo Recruitment Brochure. at or above capacity. -Keep current job opportunities posted in lab. 6.1 1007 Environmental Tech-TM Update Video library for ENVT. Acquire new videos that reflect current safety regulations. none Purchase new tapes ($500). 6.1 1008 CosmetologyNorthpark Mall Acquire new nail technology Acquisition of new equipment. equipment. none -Identify appropriate equipment -Purchase equipment 1.1 1009 Kinesiology-TM To provide safe and effective instruction and environment for the physical fitness pursuits of students, faculty/staff, and community. Daily headcount: Credit classes none continuing ed. Classes recreation activities in Weight Room, Dance Room and Gym. -Upgrade to air refrigerator system the swamp cooler is inefficient. -Get the basketball goals mounted on the walls the present free standing ones get pulled down when players dunk. 5.1 1010 Education -TM Hire 1 new Full-Time Faculty Member. -Recruit and hire faculty. All objectives met. -Mentor faculty focusing on retention. -Identify budget support for new faculty. Add quality faculty in the area of Education. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none rpt0203AreaPlansFinalResults Will use similar methods in other disciplines. Met Will expand EDUC offerings resulting in increased enrollment. Met Friday, November 21, 2003 Page 158 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 49 Math, Occupational Education and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status $38,000 1.1 1011 Culinary Arts Increase number of graduates Increase total program graduation none rate by 5%. in program. -Revised curriculum. -Add more hands-on instruction. -Develop student professional instruction. -Awareness of industry needs. 1.1 1012 Cosmetology Increase student retention and graduation rate for the Cosmetology Program. Orientate and search perspective students during introduction phase. Number of students graduating. Increase by 15% from previous years average. In Progress Establish a mentoring program, student to student with faculty leadership. 1.1 1013 Culinary Arts Update Video/Book library for CULA. Acquire new videos and books for none the Culinary Arts Library. Purchase new videotapes. Purchase new books/periodicals. 6.1 1014 RISE Grant Biology Student Development: 1. Current average retention rate none of first year students in Biology, Chemistry, Psychology is 61.5%. 1. College survival Mini-courses *Tutoring and Mentoring *Biomedical Support Center (BSC) enrichment activities (See no. 4 below) *Exposure innovative pedagogy in biomedical science courses. This is a four-year grant funded project. Objectives are in progress college survival minicourses have been delivered. Tutoring and mentoring activities take place every semester with a total of 8 tutor/mentor students working 19 hrs/week students in Biology microbiology and Chemistry classes have been exposed to the investigative approach to teaching science. In Progress 1. Current average retention rate none of first year students in Biology, Chemistry, Psychology is 61.5%. 1. College survival Mini-courses *Tutoring and Mentoring *Biomedical Support Center (BSC) enrichment activities (See no. 4 below) *Exposure innovative pedagogy in biomedical science courses. This is a four-year grant funded project. Objectives are in progress college survival minicourses have been delivered. Tutoring and mentoring activities take place every semester with a total of 8 tutor/mentor students working 19 hrs/week students in Biology microbiology and Chemistry classes have been exposed to the In Progress -To increase the first year retention rate of EPCC RISEBSEP students by 20%. 8.1 1014 RISE Grant Biology Student Development: -To increase the first year retention rate of EPCC RISEBSEP students by 20%. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 159 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 49 Math, Occupational Education and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status investigative approach to teaching science. 1.1 1014 RISE Grant Biology Student Development: -To increase the first year retention rate of EPCC RISEBSEP students by 20%. 1.1 1015 RISE Grant Biology Faculty Development: -Increase the number of faculty exposed to research. 6.1 1015 RISE Grant Biology Faculty Development: -Increase the number of faculty exposed to research. 8.1 1015 RISE Grant Biology Faculty Development: -Increase the number of faculty exposed to research. 1. Current average retention rate none of first year students in Biology, Chemistry, Psychology is 61.5%. 1. College survival Mini-courses *Tutoring and Mentoring *Biomedical Support Center (BSC) enrichment activities (See no. 4 below) *Exposure innovative pedagogy in biomedical science courses. This is a four-year grant funded project. Objectives are in progress college survival minicourses have been delivered. Tutoring and mentoring activities take place every semester with a total of 8 tutor/mentor students working 19 hrs/week students in Biology microbiology and Chemistry classes have been exposed to the investigative approach to teaching science. In Progress -Currently, 3 EPCC Faculty members have independent research projects. none 1. *Release time for faculty to conduct research. *Research seminars *Travel to scientific meeting. Objectives are in progress for this item as well. Faculty in Biology, Chemistry, Geology, Environmental Science & Dental Hygiene have conducted research and traveled to scientific meetings and internships (to the 8 Faculty members). In Progress -Currently, 3 EPCC Faculty members have independent research projects. none 1. *Release time for faculty to conduct research. *Research seminars *Travel to scientific meeting. Objectives are in progress for this item as well. Faculty in Biology, Chemistry, Geology, Environmental Science & Dental Hygiene have conducted research and traveled to scientific meetings and internships (to the 8 Faculty members). In Progress -Currently, 3 EPCC Faculty members have independent research projects. none 1. *Release time for faculty to conduct research. *Research seminars *Travel to scientific meeting. Objectives are in progress for this item as well. Faculty in Biology, Chemistry, Geology, Environmental Science & Dental Hygiene have conducted research and traveled to scientific meetings In Progress OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 160 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 49 Math, Occupational Education and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status and internships (to the 8 Faculty members). 1.1 1016 RISE Grant Biology To increase the biomedical science literacy of EPCCRISE-students' family members and the community in general. The science literacy of entering none RISE student family members is rated weak since most EPCC student are the first ones to attend college in their family. -Scientist Fair Competition -Science at the Cinema series -TV/Radio shows in Science Objectives are in progress as well. We have featured a total of five Science at the Cinema events at TM Campus. Our RISE website is fully operational and students are applying online for RISE positions. In Progress 6.1 1016 RISE Grant Biology To increase the biomedical science literacy of EPCCRISE-students' family members and the community in general. The science literacy of entering none RISE student family members is rated weak since most EPCC student are the first ones to attend college in their family. -Scientist Fair Competition -Science at the Cinema series -TV/Radio shows in Science Objectives are in progress as well. We have featured a total of five Science at the Cinema events at TM Campus. Our RISE website is fully operational and students are applying online for RISE positions. In Progress 8.1 1016 RISE Grant Biology To increase the biomedical science literacy of EPCCRISE-students' family members and the community in general. The science literacy of entering none RISE student family members is rated weak since most EPCC student are the first ones to attend college in their family. -Scientist Fair Competition -Science at the Cinema series -TV/Radio shows in Science Objectives are in progress as well. We have featured a total of five Science at the Cinema events at TM Campus. Our RISE website is fully operational and students are applying online for RISE positions. In Progress 8.1 1017 Rio Grande Research SCIENTIFIC GRANT OBJECTIVE: none none -Students will be trained in appropriate laboratory and field techniques. -Students will collect and manipulate data using statistical software. -Student will present research results out scientific meetings. -EPCC Faculty will collaborate with faculty at other institutions to enhance their scientific skills and their ability to teach science using the investigative approach. Students and Faculty participated in research on water quality, presented their results at six scientific meetings and established collaboration. With university of Arizona, NMSU and IBWC. One publication was submitted and two grant proposals are pending. Met none none -Students will be trained in appropriate Students and Faculty participated in laboratory and field techniques. research on water quality, presented Met Determine the extent of microbial contamination and chemical toxicity of the Rio Grande. RELATED OBJECTIVE: Expose students and faculty to current scientific methodology. 1.1 1017 Rio Grande Research SCIENTIFIC GRANT OBJECTIVE: OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 161 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 49 Math, Occupational Education and Science Goal Plan Area Objective Measure Determine the extent of microbial contamination and chemical toxicity of the Rio Grande. RELATED OBJECTIVE: Expose students and faculty to current scientific methodology. Standard Strategies Assessment Results -Students will collect and manipulate data using statistical software. -Student will present research results out scientific meetings. -EPCC Faculty will collaborate with faculty at other institutions to enhance their scientific skills and their ability to teach science using the investigative approach. their results at six scientific meetings and established collaboration. With university of Arizona, NMSU and IBWC. One publication was submitted and two grant proposals are pending. Use of Results Objective's Status 1.1 1323 RISE Grant Biology Average GPA of EPCC Biology, and To improve the academic Chemistry, Psychology students is performance of RISE students. GPA will increase 2.76. by 0.5. Tutoring and Mentoring *BSC enrichment activities *Exposure to science courses using innovative pedagogy. *Research Internships. Objective is in progress with support from all the activities described before. In Progress 6.1 1323 RISE Grant Biology Average GPA of EPCC Biology, and To improve the academic Chemistry, Psychology students is performance of RISE students. GPA will increase 2.76. by 0.5. Tutoring and Mentoring *BSC enrichment activities *Exposure to science courses using innovative pedagogy. *Research Internships. Objective is in progress with support from all the activities described before. In Progress 8.1 1323 RISE Grant Biology Average GPA of EPCC Biology, and To improve the academic Chemistry, Psychology students is performance of RISE students. GPA will increase 2.76. by 0.5. Tutoring and Mentoring *BSC enrichment activities *Exposure to science courses using innovative pedagogy. *Research Internships. Objective is in progress with support from all the activities described before. In Progress 8.1 1324 RISE Grant Biology To increase the transfer rate Average transfer rate for Biology, none of EPCC-RISE students to a Chemistry, Psychology students is four-year institution by 60%. 17%. none Objective is in progress with support from all activities described before. In Progress 1.1 1324 RISE Grant Biology To increase the transfer rate Average transfer rate for Biology, none of EPCC-RISE students to a Chemistry, Psychology students is four-year institution by 60%. 17%. none Objective is in progress with support from all activities described before. In Progress 6.1 1324 RISE Grant Biology To increase the transfer rate Average transfer rate for Biology, none of EPCC-RISE students to a Chemistry, Psychology students is four-year institution by 60%. 17%. none Objective is in progress with support from all activities described before. In Progress OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 162 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 49 Math, Occupational Education and Science Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 1.1 1326 RISE Grant Biology Three sections of one course To increase the number of none (BIOS 4101) are taught using the Biology, Chemistry or investigate approach. Psychology courses taught using active learning strategies or other innovative pedagogy. *Release time and resources for faculty Objective is in progress with to modify biomedical science courses. support from all activities described *Faculty will document class average before. of course taught in the traditional way. *Science Education seminars *Travel to Science Education meetings or workshops. In Progress 8.1 1326 RISE Grant Biology Three sections of one course none To increase the number of (BIOS 4101) are taught using the Biology, Chemistry or investigate approach. Psychology courses taught using active learning strategies or other innovative pedagogy. *Release time and resources for faculty Objective is in progress with to modify biomedical science courses. support from all activities described *Faculty will document class average before. of course taught in the traditional way. *Science Education seminars *Travel to Science Education meetings or workshops. In Progress 6.1 1326 RISE Grant Biology Three sections of one course none To increase the number of (BIOS 4101) are taught using the Biology, Chemistry or investigate approach. Psychology courses taught using active learning strategies or other innovative pedagogy. *Release time and resources for faculty Objective is in progress with to modify biomedical science courses. support from all activities described *Faculty will document class average before. of course taught in the traditional way. *Science Education seminars *Travel to Science Education meetings or workshops. In Progress OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 163 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 34 Vice President, Instruction Goal Plan Area Objective Measure Standard Strategies 7.1 700 Vice President of Instruction To expedite the processing of requests and signature documents. Documents not requiring research none will be processed within 48 hours of receipt. An internal office electronic tracking system will be designed and implemented. No cost to manage requests and signature documents. 1.1 701 Inst Grant Matching To attract a greater number of externally funded grants by offering dollar matches. One new matching grant will be awarded to the College. Develop competitive grant proposals. Cost will be the existing matching dollars. 1.1 702 New Horizons To link the outcomes of the Outcomes reported from the New none New Horizons sessions with Horizons sessions appear in College's Academic Master Plan. the College's Academic Master Plan. The Academic Master Plan Task Force will assimilate the outcomes into the Plan. No cost. 2.1 702 New Horizons To link the outcomes of the Outcomes reported from the New none New Horizons sessions with Horizons sessions appear in College's Academic Master Plan. the College's Academic Master Plan. The Academic Master Plan Task Force will assimilate the outcomes into the Plan. No cost. 6.1 702 New Horizons To link the outcomes of the Outcomes reported from the New none New Horizons sessions with Horizons sessions appear in the College's Academic College's Academic Master Plan. Master Plan. The Academic Master Plan Task Force will assimilate the outcomes into the Plan. No cost. 2.1 703 Academic To offer cost-effective Hospitality - VV hospitality services. Critically evaluate hospitality events and competitively select hospitality providers. none Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 5.1 703 Academic To offer cost-effective Hospitality - VV hospitality services. Critically evaluate hospitality events and competitively select hospitality providers. none Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 1.1 703 Academic To offer cost-effective Hospitality - VV hospitality services. Critically evaluate hospitality events and competitively select hospitality providers. none Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 7.1 703 Academic To offer cost-effective Hospitality - VV hospitality services. Critically evaluate hospitality events and competitively select none Establish criteria for assessing the need for and level of hospitality services. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none rpt0203AreaPlansFinalResults Assessment Results Use of Results Friday, November 21, 2003 Objective's Status Page 164 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 34 Vice President, Instruction Goal Plan Area Objective Measure Standard Strategies hospitality providers. Use existing funds. 1.1 704 Academic To offer cost-effective Hospitality - RG hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 5.1 704 Academic To offer cost-effective Hospitality - RG hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 2.1 704 Academic To offer cost-effective Hospitality - RG hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 7.1 704 Academic To offer cost-effective Hospitality - RG hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 1.1 705 Academic To offer cost-effective Hospitality - TM hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 7.1 705 Academic To offer cost-effective Hospitality - TM hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 2.1 705 Academic To offer cost-effective Hospitality - TM hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 5.1 705 Academic To offer cost-effective Hospitality - TM hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 1.1 706 Academic Hospitality Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services. Use existing funds. To offer cost-effective hospitality services. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Assessment Results Use of Results Friday, November 21, 2003 Objective's Status Page 165 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 34 Vice President, Instruction Goal Plan Area Objective Measure Standard Strategies 2.1 706 Academic Hospitality To offer cost-effective hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 5.1 706 Academic Hospitality To offer cost-effective hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 7.1 706 Academic Hospitality To offer cost-effective hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services. Use existing funds. 7.1 707 Academic Hospitality To offer cost-effective hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services, Use existing funds. 5.1 707 Academic Hospitality To offer cost-effective hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services, Use existing funds. 1.1 707 Academic Hospitality To offer cost-effective hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services, Use existing funds. 2.1 707 Academic Hospitality To offer cost-effective hospitality services. Critically evaluate the hospitality none events and competitively select hospitality providers. Establish criteria for assessing the need for and level of hospitality services, Use existing funds. 1.1 769 Enrollment Management Increase the overall fill rate for courses throughout the district to facilitate the optimization of courses offered for the students pursuit of their degree plans. Correlation of enrollment fillrates through multi-year comparisons to optimize course offerings. none Statistical analysis of enrollment data from student entry to graduation. Costs include salaries and office equipment to perform the tasks at hand. 1.1 1328 State Leadership Coordinate program Consortium activities across Texas. Improves career and technical education. none Courses OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Assessment Results Use of Results Friday, November 21, 2003 Objective's Status Page 166 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 534 Instruction Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 34 Vice President, Instruction Goal Plan Area Objective Measure Standard Strategies 1.1 1329 State Leadership Deliver professional Consortium development. Program activities improve state professional development. none Manuals 1.1 1330 State Leadership Disseminate strategies. Consortium none none CD-ROM 1.1 1331 State Leadership Evaluate program impact. Consortium none none Empower local colleges. Recruit faculty. Cost - $115,000 1.1 1332 Teacher Collaborative Coordinate program activities across Texas. Improves career and technical education. none Courses 1.1 1333 Teacher Collaborative Deliver professional development. Program activities- improve state none professional development. Manuals 1.1 1334 Teacher Collaborative Disseminate strategies. none none CD-ROM 1.1 1335 Teacher Collaborative Evaluate program impact. none none Assist local colleges. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Assessment Results Use of Results Friday, November 21, 2003 Objective's Status Page 167 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Admissions Goal Plan 7.1 1081 Area Admissions Objective Streamline admissions department processes while operating within approved budget. Measure -Reduce duplication/printing costs none from previous year (less inflation). -Eliminate duplication of effort from various sections within the department. -Align section functions and tasks with BANNER generated requirements. Standard Strategies No additional costs anticipated for FY2003/4. Conduct workflow analyses in Admissions. TASP/International Students, Specialized Admissions and Evaluations pertaining to admissions process involving document acceptance, review, evaluation, duplication, processing and filing. 1083 Admissions Department Convert an externally funded full-time position to an institutionally-funded position. Enrollment numbers are expected none to increase. This department has lost two (2) equivalent positions. It is expected that the external funding source for this position will be phased out. The work accomplished by this position will remain a requirement and is vital to meeting student service demands (GOALS). OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Convert position funding to institutional money effective 9-1-02. Objective's Status Assessment Results Use of Results -Students were waiting extend periods of time being rotated between work areas increasing time required to complete Admissions Process. -Multiple copies of documents were required due to redundancy of functions in separate work areas. -Workflow was based upon restraints created by constraints of previous computer system. Reorganized TASP/I-20 office into the International Student Office. Eliminated TASP office by transferring TASP functions to appropriate positions throughout Admissions broadening jobs. Separated secondary & postsecondary transcript acceptance, review and evaluation. Eliminated applicant filing, system which duplicated Student Records functions. Assigned all admissions functions for foreign students to International Student Office. Enrollment continues to increase each term. Enrollment is not anticipated to In Progress decrease. Demand for position remains in effect. Continue request for conversion to institutional funding. Current Budgetary restraints prevent transfer of funding source. Implement changes to processes as needed. 7.1 2 Cost for salary and benefits @ $37,233. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Met Page 168 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Center for Students with Disabilities Goal Plan 6.1 1063 Area Center for Students with Disabilities Objective Increase availability and usage of assistive/augmentative technology for students with disabilities at EPCC. Measure Time spent training and using special assistive/adaptive technology by students with disabilities at all campuses. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard 15% increase in use at all campuses. Strategies 1. Track training time for each piece/area of assistive/adaptive technology. 2. Track usage time for each piece/area of assistive/adaptive technology and person responsible Director/Lab Tech staff. 3. Cost; 5% of Director's time; 10% of Lab Tech III time. Assessment Results Use of Results In the process of developing a baseline for future comparison. rpt0203AreaPlansFinalResults 1 Objective's Status In Progress Friday, November 21, 2003 Page 169 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Co-op Education & Job Placement Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 2 Objective's Status 5.1 1064 Cooperative Educ/Job Placement All district wide co-op and job placement offices will follow the same procedures in communicating job and other opportunities to their students, preparing reports, and hosting on-campus recruiters. All offices will display or have none available the same job and other opportunities as listed or available at the VV campus. Ensure that the campus recruiters are scheduled and given publicity in the same manner. Each campus will report placements, activities, workshop attendance, etc. in the same manner. Director will periodically check each office to determine if all opportunities are listed or available as those at VV. Written procedures will be developed to host recruiters. Internal reporting will be reviewed by the director to assure compliance and accuracy. This plan was difficult to complete Will take more staff training than originally perceived. due to long illnesses at one staff campuses. The plan has been presented again as an Effectiveness Plan for FY 2003-04. In Progress 5.1 1308 Cooperative Educ/Job Placement Provide one-stop counselors, staff, and supervisors information on EPCC vocational, technical, and special programs so that student referral process for paid training is effective, efficient, and timely. A streamlined student referral process for paid training will be developed and maintained beginning January 2003. none Not funded by Carl Perkins. Withdrawn OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 170 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 45 Director, Counseling Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 1.1 1070 Counseling - VV Provide Quality Student Services-work with counselors. Minimum of one student service program will be ask to present information to counselors per month. none Increase opportunities for information sharing between counselors and college service components. 1.1 1071 Counseling - TM Provide Quality Student Services - work with Counselors. Minimum of one student service program will be ask to present information to counselors per month. none Increase opportunities for information sharing between counselors and college service components. 1.1 1072 Counseling - RG Provide Quality Student Services - Work with Counselors. Minimum of one student service program will be ask to present information to counselors per month. none Increase opportunities for information sharing between counselors and college service components. 1.1 1073 Counseling - NW Provide Quality Student Services - Work with Counselors. Minimum of one student service program will be ask to present information to counselors per month. none Increase opportunities for information sharing between counselors and college service components. 1.1 1074 Counseling MdP Minimum of one student service program will be ask to present information to counselors per month. none Increase opportunities for information sharing between counselors and college service components. 1.1 1075 Counseling/Care Provide Quality Student er Center Services - Expand Developmental Education inclass presentations. A minimum of 15 in-class presentations will be made to Developmental Education classes each semester. Will meet or exceed 15 presentations to Developmental Education classes. Increase student retention by being 132 BASK Career presentations aware of Career Center Services for were made. interest assessment, career exploration and college planning. Students in the BASK classes became more aware of the importance of career exploration and educational planning. These presentations resulted in 50% of the BASK students in these classes to come into the Career Center. Met 1.1 1076 Counseling/Care Provide Quality Student Services - Expand er Center Developmental Education inclass presentations. A minimum of 15 in-class presentations will be made to Developmental Education classes each semester. Will meet or exceed 15 presentations to Developmental Education classes. 132 BASK Career presentations Increase student retention by being were made. aware of Career Center Services for interest assessment, career exploration and college planning. Students in the BASK classes became more aware of the importance of career exploration and educational planning. These presentations resulted in 50% of the Met Provide Quality Student Services - Work with Counselors. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 171 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 45 Director, Counseling Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status BASK students in these classes to come into the Career Center. 1.1 1077 Counseling/Care Provide Quality Student er Center Services - Expand Developmental Education inclass presentations. A minimum of 15 in-class presentations will be made to Developmental Education classes each semester. 1.1 1082 Transfer Center Recognize the academic achievements of students meeting the minimum GPA required as set forth by national programs. Mail @ 12,000 - 18,000 letters none inviting students to apply for nomination to Outstanding Transfer Students and Who's Who. 1.1 1345 Transfer Center Conduct transfer activities to Host campus visits of universities none provide transfer information to conduct transfer advising at all for students transferring to a campuses. university. 1.1 1409 Counseling - VV Provide Quality Student Services - increase student retention. 1.1 1410 Counseling - VV Provide Quality Student Services - Improve personal counseling referral. Will meet or exceed 15 presentations to Developmental Education classes. Increase student retention by being 132 BASK Career presentations aware of Career Center Services for were made. interest assessment, career exploration and college planning. Conduct a certificate presentation ceremony honoring the nominated students. Postage @ $600-$700 Ceremony @ $2,900 Students in the BASK classes became more aware of the importance of career exploration and educational planning. These presentations resulted in 50% of the BASK students in these classes to come into the Career Center. In progress, baseline data not met due to unavailability of criteria for nominees. Met In Progress Coordinate Transfer Fairs (Invitations, Transfer activities were provided mailings, posters, refreshments, misc.) for four area universities, and advising district-wide UTEP @ $400. present 2 times per week. NMSU University of Phoenix WNMU one transfer fair per semester. Met Student retention will increase by Standard could not be met 1% during 2001-2002 academic as baseline is not available. year. *(Pending - Carol Kay, Director of Research) Continue to promote documental college student retention and success thru academic advising, career exploration, personal adjustment counseling, Personal Development workshops and teaching and/or participating in EDUC 1300. Student retention is DW effort by Specific statistics on semester or the college. The counseling center annual student retention is not has an integral role through available. academic advising educational planning career exploration and personal counseling. Met Personal Counseling & Referral Will meet or exceed programs will be implemented utilizing this service. during the Fall 2001 semester with a minimum of 50 students utilizing services during the 20012002 academic year. Of these students a minimum of 80% reported satisfaction for the Develop a program of short-term intervention activities, personal adjustment counseling and continue to enhance student retention success internal/external communities. Non traditional students must deal with a wide variety of academic personal educational financial and family concerns in attending EPCC. Personal counseling services area provided to assist students in adjusting to new college experiences, resolving a wide Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Students are able to access PC services through all counseling staff. This counseling directly aids the student in his/her retention at EPCC and students reports a 80% degree of satisfaction with this service. Friday, November 21, 2003 Page 172 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 45 Director, Counseling Goal Plan Area Objective Measure Standard Strategies service they received. Assessment Results Use of Results Objective's Status variety of personal issues, and enabling them to overcome obstacles that significantly interfere with academic and career success. 6,000 students received some manner of personal counseling during their reporting period. 1.1 1411 Counseling - VV Provide Quality Student Services - require counselors serving special populations to implement one activity and monitor these. Counselors serving ESOL, disabled, NAFTA International, Health Career Majors, GEAR UP & other special populations will submit one specific activity per area or group to be implemented during 2002-2003 academic year. Records of these activities will be maintained. Will meet or exceed each specialized counseling area providing one activity for students. Propose, develop and implement counseling support activities to meet the needs of special populations. 1.1 1412 Counseling - VV Provide Quality Student Services-Increase or maintain student satisfaction evaluations of Counseling. Student/Counselor Performance Evaluations Reports distributed by the Office of Instructional Research will reflect a DistrictWide mean 3.0 to 4.0 responses of students satisfaction of overall counseling sessions based on 4.0 scale. none 1.1 1413 Counseling - VV Provide Quality Student Services - Increase or maintain student satisfaction evaluations of New Student Orientations. 1.1 1414 Counseling - TM Provide Quality Services increase student retention. With special populations, CSD and grant funded programs a variety of counseling and support programs are continually provided to aid in registration retention, and graduation. During the reporting period 429 works, and presentations were provided. The benefit of these presentations has enable educationally disadvantage, financially disadvantage, returning adults, and displaced workers the opportunity for retraining, advanced college training and new employment opportunities. Met Promote continuous success thru Academic Advising, Career Exploration, and Personal Adjusting Counseling to identify student needs thru internal/external referrals. Use to refined counseling student retention strategies. Not Met New Student Orientation none Counselors Evaluations Reports distributed by the Office of Instructional Research will reflect a District-Wide mean 3.0 to 4.0 responses of student satisfaction of overall NSO's sessions based on 4.0 scale. Provide an on-going New Student Orientation process for the transition of new students to EPCC. Use to refined counseling student retention strategies. Met Student retention will increase by Standard could not be met 1% during 2001-2002 academic as baseline is not available. year. *(Pending - Carol Kay Director of Research) Continue to promote documental college student retention and success thru academic advising, career exploration, personal adjustment OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Student retention is DW effort by Specific statistics on semester or the college. The counseling center annual student retention is not has an integral role through available. academic advising educational rpt0203AreaPlansFinalResults Friday, November 21, 2003 Met Page 173 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 45 Director, Counseling Goal Plan Area Objective Measure Standard Strategies Assessment Results counseling, Personal Development workshops and teaching and/or participating in EDUC 1300. planning career exploration and personal counseling. Use of Results Objective's Status 1.1 1415 Counseling - TM Provide Quality Student Services - improve personal counseling referral. Personal Counseling & Referral Will meet or exceed programs will be implemented utilizing this service. during the Fall 2001 semester with a minimum of 50 students utilizing services during the 200102 academic year. Of these students a minimum of 80% reported satisfaction for the service they received. Develop a program of short-term intervention activities; personal adjustment counseling and continue to enhance student retention success internal/external communities. Non traditional students must deal with a wide variety of academic personal educational financial and family concerns in attending EPCC. Personal counseling services area provided to assist students in adjusting to new college experiences, resolving a wide variety of personal issues, and enabling them to overcome obstacles that significantly interfere with academic and career success. 6,000 students received some manner of personal counseling during their reporting period. Students are able to access PC services through all counseling staff. This counseling directly aids the student in his/her retention at EPCC and students reports a 80% degree of satisfaction with this service. Met 1.1 1416 Counseling - TM Provide Quality Student Services - Require counselors serving special populations to implement 1 activity and monitor these. Counselors serving ESOL, disabled, NAFTA International, Health Career Majors, GEAR-UP & other special populations will submit one specific activity per area or group to be implemented during 2002-2003 academic year. Records of these activities will be maintained. Will meet or exceed each specialized counseling area providing one activity for students. Propose, develop and implement counseling support activities to meet the needs of special populations. With special populations, CSD and grant funded programs a variety of counseling and support programs are continually provided to aid in registration retention, and graduation. During the reporting period 429 works, and presentations were provided. The benefit of these presentations has enable educationally disadvantage, financially disadvantage, returning adults, and displaced workers the opportunity for retraining, advanced college training and new employment opportunities. Met 1.1 1417 Counseling - TM Provide Quality Student Services - Increase or maintain student satisfaction evaluations of Counseling. Student/Counselor Performance Evaluations Reports distributed by the Office of Institutional Research will reflect a DistrictWide mean 3.0 to 4.0 responses of students satisfaction of overall counseling sessions based on 4.0 scale. none Promote continuous success thru Academic Advising, Career Exploration, and Personal Adjusting Counseling to identify student needs thru internal/external referrals. 1.1 1419 Counseling - RG Provide Quality Student Student retention will increase by none OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Continue to promote documental rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 174 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 45 Director, Counseling Goal Plan Area Objective Services - Increase student retention. Measure Standard Strategies 1% during 2002-02 academic year. *(Pending - Carol Kay Director of Research) college student retention and success thru academic advising, career exploration, personal adjustment counseling, Personal Development workshops and teaching and/or participating in EDUC 1300. Assessment Results Use of Results Objective's Status 1.1 1420 Counseling - RG Provide Quality Student Services - Improve personal counseling referral. Personal Counseling & Referral Will meet or exceed programs will be implemented utilizing this service. during the Fall 2001 semester with a minimum of 50 students utilizing services during the 200102 academic year. Of these students a minimum of 80% reported satisfaction for the service they received. Develop a program of short-term intervention activities, personal adjustment counseling and continue to enhance student retention success internal/external communities. Non traditional students must deal with a wide variety of academic personal educational financial and family concerns in attending EPCC. Personal counseling services area provided to assist students in adjusting to new college experiences, resolving a wide variety of personal issues, and enabling them to overcome obstacles that significantly interfere with academic and career success. 6,000 students received some manner of personal counseling during their reporting period. Students are able to access PC services through all counseling staff. This counseling directly aids the student in his/her retention at EPCC and students reports a 80% degree of satisfaction with this service. Met 1.1 1421 Counseling - RG Provide Quality Student Services - Require counselors serving special populations to implement 1 activity and monitor these. Counselors serving ESOL, disabled, NAFTA International, Health Career Majors, GEAR-UP & other special populations will submit one specific activity per area or group to be implemented during 2002-03 academic year. Records of these activities will be maintained. Will meet or exceed each specialized counseling area providing one activity for students. Propose, develop and implement counseling support activities to meet the needs of special populations. With special populations, CSD and grant funded programs a variety of counseling and support programs are continually provided to aid in registration retention, and graduation. During the reporting period 429 works, and presentations were provided. The benefit of these presentations has enable educationally disadvantage, financially disadvantage, returning adults, and displaced workers the opportunity for retraining, advanced college training and new employment opportunities. Met 1.1 1422 Counseling - RG Provide Quality Student Services - Increase or maintain student satisfaction evaluations of Counseling. Student/Counselor Performance Evaluations Reports distributed by the Office of Institutional Research will reflect a DistrictWide mean 3.0 to 4.0 responses of students satisfaction of overall counseling sessions based on 4.0 none Promote continuous success thru Academic Advising, Career Exploration, and Personal Adjusting Counseling to identify student needs thru internal/external referrals. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 175 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 45 Director, Counseling Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status scale. 1.1 1423 Counseling - RG Provide Quality Student Services - Increase or maintain student satisfaction evaluations of New Student Orientations. New Student Orientation none Counselors Evaluations Reports distributed by the Office of Institutional Research will reflect a District-Wide mean 3.0 to 4.0 responses of student satisfaction of overall NSO's sessions based on 4.0 scale. Provide an on-going New Student Orientation process for the transition of new students to EPCC. 1.1 1424 Counseling - NW Provide Quality Student Services - Increase student retention. Minimum of one student service program will be ask to present information to counselors per month. Increase opportunities for information sharing between counselors and college service components. 1.1 1425 Counseling - NW Provide Quality Student Services - Improve personal counseling referral. Personal Counseling & Referral Will meet or exceed programs will be implemented utilizing this service. during the Fall 2001 semester with a minimum of 50 students utilizing services during the 200102 academic year. Of these students a minimum of 80% reported satisfaction for the service they received. Develop a program of short-term intervention activities, personal adjustment counseling and continue to enhance student retention success internal/external communities. Non traditional students must deal with a wide variety of academic personal educational financial and family concerns in attending EPCC. Personal counseling services area provided to assist students in adjusting to new college experiences, resolving a wide variety of personal issues, and enabling them to overcome obstacles that significantly interfere with academic and career success. 6,000 students received some manner of personal counseling during their reporting period. Students are able to access PC services through all counseling staff. This counseling directly aids the student in his/her retention at EPCC and students reports a 80% degree of satisfaction with this service. Met 1.1 1426 Counseling - NW Provide Quality Student Services - Require counselors serving special populations to implement 1 activity and mentor these. Counselors serving ESOL, disabled, NAFTA International, Health Career Majors, GEAR-UP & other special populations will submit one specific activity per area or group to be implemented during 2002-03 academic year. Records of these activities will be Propose, develop and implement counseling support activities to meet the needs of special populations. With special populations, CSD and grant funded programs a variety of counseling and support programs are continually provided to aid in registration retention, and graduation. During the reporting period 429 works, and presentations were provided. The benefit of these presentations has enable educationally disadvantage, financially disadvantage, returning adults, and displaced workers the opportunity for retraining, advanced college training and new employment opportunities. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Will meet or exceed each specialized counseling area providing one activity for students. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 176 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 45 Director, Counseling Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status maintained. 1.1 1427 Counseling - NW Provide Quality Student Services - Increase or maintain student satisfaction evaluations of Counseling. Student/Counselor Performance Evaluations Reports distributed by the Office of Instructional Research will reflect a DistrictWide mean 3.0 to 4.0 responses of students satisfaction of overall counseling sessions based on 4.0 scale. 1.1 1429 Counseling MdP Provide Quality Student Services - Increase student retention. Student retention will increase by Standard could not be met 1% during 2001-2002 academic as baseline is not available. year. *Pending Carol Kay Director of Research) Continue to promote documental college student retention and success thru academic advising, career exploration, personal adjustment counseling, Personal Development workshops and teaching and/or participating in EDUC 1300. Student retention is DW effort by Specific statistics on semester or the college. The counseling center annual student retention is not has an integral role through available. academic advising educational planning career exploration and personal counseling. Met 1.1 1430 Counseling MdP Provide Quality Student Services - Improve personal counseling referral. Personal Counseling & Referral Will meet or exceed programs will be implemented utilizing this service. during the Fall 2001 semester with a minimum of 50 students utilizing services during the 200102 academic year. Of these students a minimum of 80% reported satisfaction for the service they received. Develop a program of short-term intervention activities, personal adjustment counseling and continue to enhance student retention success internal/external communities. Non traditional students must deal with a wide variety of academic personal educational financial and family concerns in attending EPCC. Personal counseling services area provided to assist students in adjusting to new college experiences, resolving a wide variety of personal issues, and enabling them to overcome obstacles that significantly interfere with academic and career success. 6,000 students received some manner of personal counseling during their reporting period. Students are able to access PC services through all counseling staff. This counseling directly aids the student in his/her retention at EPCC and students reports a 80% degree of satisfaction with this service. Met 1.1 1431 Counseling MdP Provide Quality Student Services - Require counselors serving special populations to implement 1 activity and monitor these. Counselors serving ESOL, disabled, NAFTA International, Health Career Majors, GEAR-UP & other special populations will submit one specific activity per Propose, develop and implement counseling support activities to meet the needs of special populations. With special populations, CSD and grant funded programs a variety of counseling and support programs are continually provided to aid in registration retention, and The benefit of these presentations has enable educationally disadvantage, financially disadvantage, returning adults, and displaced workers the opportunity Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none Will meet or exceed each specialized counseling area providing one activity for students. Promote continuous success thru Academic Advising, Career Exploration, and Personal Adjusting Counseling to identify student needs thru internal/external referrals. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 177 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 45 Director, Counseling Goal Plan Area Objective Measure Standard Strategies area or group to be implemented during 2002-03 academic year. Records of these activities will be maintained. Assessment Results Use of Results graduation. During the reporting period 429 works, and presentations were provided. for retraining, advanced college training and new employment opportunities. Objective's Status 1.1 1432 Counseling MdP Provide Quality Student Services - Increase or maintain student satisfaction evaluations of Counseling. Student/Counselor Performance Evaluations Reports distributed by the Office of Institutional Research will reflect a DistrictWide mean 3.0 to 4.0 responses of students satisfaction of overall counseling sessions based on 4.0 scale. none Promote continuous success thru Academic Advising, Career Exploration, and Personal Adjusting Counseling to identify student needs thru internal/external referrals. 1.1 1433 Counseling MdP Provide Quality Student Services - Increase or maintain student satisfaction evaluations of New Student Orientations. New Student Orientation none Counselors Evaluations Reports distributed by the Office of Institutional Research will reflect a District-Wide mean 3.0 to 4.0 responses of student satisfaction of overall NSO's sessions based on 4.0 scale. Provide an on-going New Student Orientation process for the transition of new students to EPCC. 1.1 1434 Counseling/Care Provide Quality Student er Center Services - Increase Student referrals and direct service at Career Center. Student referrals and direct none service contacts will increase by 10% over last year's district career center contact. Improve and student educational planning through assistance of positive and productive career exploration services. 1.1 1435 Counseling/Care Provide Quality Student Services - Provide training er Center for Career Center staff on Discover Career Exploration Software. Consultant training from the One consultant training Provide Career Center staff Discover Corporation, will be from ACT will be provided. development for use of the update provided for Career Center staff Discover Software. to better utilize and assist student use of career exploration with Discover software. Dr. Richard Pyle of ACT, Southwest Coordinator, provided training for Career staff on new graphics for Window update of Discover software. Spring Semester. Career Staff became more proficient in the use of new segments of the software and were able to provide more detail interpretations of the Discover programs to students. Met 1.1 1436 Counseling/Care Provide Quality Student er Center Services - Ensure Career Center presentations are made at New Student Orientations. A Career presentation will be made at 80% of all New Student Orientations provided. Presentations were made or career assessments complete for Career Center follow-up at all NSO's. With each student assessing the degree of his/her career choice preparedness, each student was more able to make realistic educational planning goals. Also, Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT A minimum of 80% of NSO's will feature career presentations. Student orientation will be improved by increasing student awareness or career decision-making as foundation of educational planning. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 178 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 45 Director, Counseling Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status the follow-up from the Career Center of these assessments resulted in a significant number of NSO students requesting use of the Discover program to assess other choices and complete information exploration. 1.1 1437 Counseling/Care Provide Quality Student One district-wide career fair will er Center Services - Provide a District- be planned and conducted annually. Wide Career Fair. 1.1 1438 Counseling/Care Provide Quality Student er Center Services - Increase student referrals and direct service at Career Center. Student referrals and direct none service contacts will increase by 10% over last year's district career center contact. 1.1 1439 Counseling/Care Provide Quality Student Services - Provide training er Center for Career Center staff on Discover Career Exploration Software. Consultant training from the One consultant training Provide Career Center staff Discover Corporation will be from ACT will be provided. development for use of the updated provided for Career Center staff Discover Software. to better utilize and assist student use of career exploration with Discover software. 1.1 1440 Counseling/Care Provide Quality Student Services - Ensure Career er Center Center presentations are made at New Student Orientations. A Career presentation will be made at 80% of all New Student Orientations provided. 1.1 1441 Counseling/Care Provide Quality Student One district-wide career fair will er Center Services - Provide a district- be planned and conducted OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT One Career Fair will be provided. Promote and provide district student contact with area professionals for career information and employment opportunities. A Career Fair was conducted at Rio Students had direct access to career Grande Campus - Spring semester. and employment information. Met Dr. Richard Pyle of ACT, Southwest Coordinator, provided training for Career staff on new graphics for Window update of Discover software. Spring Semester. Career Staff became more proficient in the use of new segments of the software and were able to provide more detail interpretations of the Discover programs to students. Met With each student assessing the degree of his/her career choice preparedness, each student was more able to make realistic educational planning goals. Also, the follow-up from the Career Center of these assessments resulted in a significant number of NSO students requesting use of the Discover program to assess other choices and complete information exploration. Met A Career Fair was conducted at Rio Students had direct access to career Grande Campus, Spring semester. and employment information. Met Improve student educational planning through assistance of positive and productive career exploration services. A minimum of 80% of NSO's will feature career presentations. Student retention will be improved by Presentations were made or career increasing student awareness of career assessments complete for Career Center follow-up at all NSO's. decision-making as foundation of educational planning. One Career Fair will be provided. Promote and provide district student contact with area professionals for rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 179 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 45 Director, Counseling Goal Plan Area Objective wide career fair. Measure Standard Strategies annually. career information and employment opportunities. Improve student educational planning through assistance of positive and productive career exploration services. 1.1 1442 Counseling/Care Provide Quality Student er Center Services - Increase student referrals and direct service at Career Center. Student referrals and direct none service contacts will increase by 10% over last year's district career center contact. 1.1 1443 Counseling/Care Provide Quality Student Services - Provide training er Center for Career Center staff on Discover Career Exploration Software. Consultant training from the One consultant training Provide Career Center staff Discover Corporation will be from ACT will be provided. development for use of the update provided for Career Center staff Discover Software. to better utilize and assist student use of career exploration with Discover software. 1.1 1444 Counseling/Care Provide Quality Student er Center Services - Ensure Career Center presentations are made at New Student Orientations. A Career presentation will be made at 80% of all New Student Orientations provided. 1.1 1445 Counseling/Care Provide Quality Student One district-wide career fair will er Center Services - Provide a District- be planned and conducted annually. wide Career Fair. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Assessment Results Dr. Richard Pyle of ACT, Southwest Coordinator, provided training for Career staff on new graphics for Window update of Discover software. Spring Semester. Use of Results Objective's Status Career Staff became more proficient in the use of new segments of the software and were able to provide more detail interpretations of the Discover programs to students. Met With each student assessing the degree of his/her career choice preparedness, each student was more able to make realistic educational planning goals. Also, the follow-up from the Career Center of these assessments resulted in a significant number of NSO students requesting use of the Discover program to assess other choices and complete information exploration. Met A Career Fair was conducted at Rio Students had direct access to career Grande Campus - Spring Semester. and employment information. Met A minimum of 80% of NSO's will feature career presentations. Student retention will be improved by Presentations were made or career increasing student awareness or career assessments complete for Career Center follow-up at all NSO's. decision-making as foundation of educational planning. One Career Fair will be provided. Promote and provide district student contact with area professionals for career information and employment opportunities. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 180 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Financial Aid Services Goal Plan Area Objective 6.1 1079 Financial Aid Office 6.1 1080 Veterans Affairs Participate in DVA internet certification. Measure Improve services for student Maintain logs of students using our new service. applying for financial aid. Ready for implementation when the DVA makes it available. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Strategies Assessment Results Use of Results 2 Objective's Status none Provide a financial aid resource center Requiring students to sign up to use in SSC-107 so students can apply on- the "Financial Aid on the Web" line plus scholarship search. proved restrictive and was discontinued shortly after the center opened. Unrestricted access is available with personal assistance provided as requested. It was decided that we could better measure our success by monitoring the number of students that apply electronically through the ED website. Met none Prepare by ensuring software/hardware DVA Internet Certification still on upgrades are ready and staff is trained. hold. Keep staff up-to-date on status. Researching hardware upgrade requirements and availability. Staff development provided in preparation for internet certifications. Gain knowledge of system capabilities and requirements. In Progress rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 181 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Police Department Goal Plan 8.1 1059 Area Police Department Objective Increasing Officer involvement and participation with local educational institutions and law enforcement agencies. Measure Number of educational and training involvement; coordination and participation in local law enforcement group efforts. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Strategies Assessment Results Use of Results Increase educational, training, coordination, and liaison by 5% from previous year. Track each participation/involvement with each agency, by assessing gains and accomplishments towards positive measure, directed towards the department. 31 Presentations - FY 2001-02 - 44 Presentations-FY 2002-2003 translates into a 41% increase in presentations from 2001-2002 to 2002-2003, exceeding standard set. Exponentially increasing presentations every year will serve to further increase the professionalism of our police officers. rpt0203AreaPlansFinalResults Friday, November 21, 2003 1 Objective's Status Met Page 182 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Recruitment and School Relations Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 2 Objective's Status 8.1 1084 Recruitment & Ensure that the College's School Relations duplicated total enrollment increases annually. Each year's total duplicated none enrollment will increase: Exceed previous duplicated year head count. -Implement Dual Credit Programs in each of the area school districts. -Conduct EPCC hospitality workshops for H.S. graduates & ESL Programs. -Visit Juarez (Mexico) high schools to recruit. -Enhance video library of current EPCC programs. -Establish profiles of program handouts, I.e., pamphlets, brochures, flyers. -Establish annual EPCC "Mall Recruitment Fairs". -All signed Interlocal Agreements are on file and all Districts have participation in Dual Credit Program. -High School graduates are scheduled to attend workshop in June to include ESL programs. -Visited over twenty (20) High Schools and Universities in Juarez, Mexico for recruitment purposes. -Did not have funds to enhance video library of current EPCC programs; establish profiles of program handouts, i.e., pamphlets. -Participated in annual EPCC "Mall Recruitment Fair". Met 2.1 1084 Recruitment & Ensure that the College's School Relations duplicated total enrollment increases annually. Each year's total duplicated none enrollment will increase: Exceed previous duplicated year head count. -Implement Dual Credit Programs in each of the area school districts. -Conduct EPCC hospitality workshops for H.S. graduates & ESL Programs. -Visit Juarez (Mexico) high schools to recruit. -Enhance video library of current EPCC programs. -Establish profiles of program handouts, I.e., pamphlets, brochures, flyers. -Establish annual EPCC "Mall Recruitment Fairs". -All signed Interlocal Agreements are on file and all Districts have participation in Dual Credit Program. -High School graduates are scheduled to attend workshop in June to include ESL programs. -Visited over twenty (20) High Schools and Universities in Juarez, Mexico for recruitment purposes. -Did not have funds to enhance video library of current EPCC programs; establish profiles of program handouts, i.e., pamphlets. -Participated in annual EPCC "Mall Recruitment Fair". Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 183 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Testing Services Goal Plan 7.1 1065 Area Objective Measure Testing Services Increase computerized testing capabilities. -New student placement testing -Instructor Testing (Internet courses, CLEP, Virtual College of Texas testing needs) Number of computers available for computerized testing. Standard Increase by 50% (currently have 23 computers for computerized testing; need 12 more) Strategies Request additional institutional funds to purchase needed equipment for all campuses district wide. Projected Costs: $25,140 Assessment Results Use of Results Funds were approved for the purchase of 25 computers/stations at the VV campus. Special Allocation Plans were approved for 5 computers each for MP & TM test centers. All computers were set and operational by January 30, 2003. Increased computer testing capability will allow us to decrease. Reliance on paper/pencil test formats which are more costly (time, effort, supplies) for EPCC. We plan to continue to increase our computer testing capability in the next year. 9 Objective's Status Met 7.1 1066 ACCUPLACER The purpose of this Test budget/account is to support the Accuplacer Testing mission and the financial needs associated with this testing component. Expenses at budget year end do not exceed income generated from the test administration fees collected. Funds were used for their Monitor testing activities, operations intended purpose and the and expenses to insure that they are testing operations are in used only for the purpose intended. compliance with test agency guidelines and TASP policy. See notes for plan #1067 See notes for plan #1067 7.1 1067 The purpose of this Alternative Testing/Accuplac budget/account is to support the Alternative TASP er Testing mission and the financial needs associated with this testing component. Expenses at budget year end to not exceed income generated by the test administration fees collected. Funds were used for their intended purpose and the Alternative TASP testing operations are in compliance with test agency guidelines and TASP policy. Monitor Alternative TASP testing activities, operations and expenses to insure that they are used only for the purpose intended. The six month expenditure report (from Budget Office) shows that this budget has used 32.3% of the total approved budget. Funds have been used for their intended purposes and comply with test agency guidelines. We will continue to use and In Progress increase our computer testing capability to decrease reliance on paper/pencil test formats. This will result in further cost savings in the next year. 7.1 1068 GED Testing Expansion Funds were used for their intended purpose and the GED Testing Center operations are in compliance with GED Testing Services (Wash. DC) and Texas Education Agency guidelines. Monitor GED Testing Center operations and expenses to insure that they are used only for the purpose intended. The six month expenditure report (from Budget Office) shows that expenses are on target (47.6% of total approved budget. Funds have been used for their intended purposes. The GED Test Center received an excellent rating from TEA. We will continue to find ways to streamline operations to accommodate the increased test volume and insure that the GED Test Center retains TEA/GEDTS authorization to provide GED testing services. In Progress Funds were used for their intended purpose and the QT operations are in compliance with test agency guidelines. Monitor Quick TASP testing activities, operations and expenses to insure that they are used only for the purpose intended. The six month expenditure report (from Budget Office) shows that expenses are well under expected. Funds have been used for their intended purpose. We will continue to make the QT available on a more flexible schedule to better serve our students and teacher certification clients. In Progress 7.1 1069 Quick TASP Expenses at budget year end do The purpose of this budget/account is to support not exceed income generated by the GED testing mission and the GED Testing Center. financial needs associated with this testing component. The purpose of this budget/account is to support the Quick TASP testing mission and the financial needs associated with this testing component. Expenses at budget year end do not exceed income generated by the test administration fees collected. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Projected Income: $447,500.00 and Projected Costs: $388,770.00 In Progress Projected Income: $37,500.00 and rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 184 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Testing Services Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 9 Objective's Status Projected Costs: $15,212.00 7.1 7.1 7.1 7.1 1339 1340 1341 1342 ACCUPLACER Accuplacer is a Test computerized testing format utilized for student assessment for placement, alternative TASP testing and ability to benefit testing needs of EPCC students. Alternative TASP GED Testing Expansion Quick TASP All new students entering EPCC who plan to enroll in credit course must take the TASP test or an "alternative test" approved for TASP purposes. Expenses at budget year end do not exceed income generated from the test administration fees collected. Expenses at budget year end to not exceed income generated by the test administration fees collected. Expenses at budget year end do The GED Testing Center provides a full range of GED not exceed income generated by testing services (in English the GED Testing Center. and Spanish) for adult Texas residents who did not complete high school and need to obtain their Texas Certificate of High School Equivalency. EPCC uses the Quick TASP to test students who need to take the TASP Test but did not during one of the regularly scheduled test dates offered two times each semester. The QT is offered on a schedule that best meets the needs of EPCC students. Expenses at budget year end do not exceed income generated by the test administration fees collected. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Funds were used for their intended purpose and the testing operations are in compliance with test agency guidelines and TASP policy. Monitor testing activities operations and expenses to insure that they are used only for the purpose intended. Funds were used for their intended purpose and the Alternative TASP testing operations are in compliance with test agency guidelines, and TASP policy. Monitor Alternative TASP testing activities, operations and expenses to insure that they are used only for the purpose intended. Funds were used for their intended purpose and the GED Testing Center operations are in compliance with GED Testing Services (Wash. DC) and Texas Education Agency guidelines. Monitor GED Testing Center operations and expenses to insure that they are used only for the purpose intended. Funds were used for their intended purpose and the QT operations are in compliance with test agency guidelines. Monitor Quick TASP testing activities, operations and expenses to insure that they are used only for the purpose intended. Projected Income: $27,200.00 and Projected Costs: $22,000.00 also applies to plan# 1066 Projected Income: $173,000.00 and Projected Costs: $170,293.00 for also plan #1067 Projected Income: $447,500.00 and Projected Costs: $388,770.00 also applies for plan #1068 Projected Income: $37,500.00 and Projected Costs: $15,212.00 also applies to Plan #1069. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 185 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Interim Director, Student Activities Goal Plan 1.1 1042 Area Student Activities Objective Measure Increase student participation Document the number of participants at all activities. in activities by 5%. Standard none Strategies Better promotion higher quality programming. Assessment Results Use of Results 1 Objective's Status Student Activities increased the quality and the number of programs provided at each campus between 40% to 100% and attendance as well. Below are the percentages per respective campus. Valle Verde Campus - 50%, Rio Grande 50%, Northwest Campus - 100%, Transmountain - 40%, Mission del Paso - 100% Surveys were introduced this year for each program to determine whether students enjoyed the programs. The surveys are being used for future bookings at the different campuses. The quality of programs was increased by bringing in speakers, programs for specific topics, conferences, etc. Intramural programming was increased by 100% at all campuses. Open Rec. hours were increased at Valle Verde Campus and equipment was placed at Northwest and Mission del Paso for weightlifting, cardio and fitness testing. Additional intramural programs were introduced at all campuses, except Rio Grande, because there are no available facilities for intramurals at this campus. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 186 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Registrar Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 8 Objective's Status 1.1 1060 Graduation Expenses This account is used to pay for the Graduation Ceremonies, brochures, rental facilities, video equipment, floral arrangements, Balloon drop and Color Guard, and printing. none none $41,000 Met 8.1 1060 Graduation Expenses This account is used to pay for the Graduation Ceremonies, brochures, rental facilities, video equipment, floral arrangements, Balloon drop and Color Guard, and printing. none none $41,000 Met 7.1 1061 Catalogs/Schedul This account is used to pay es for the printing of Catalogs and Schedules. none none $190,000 Met 1.1 1061 Catalogs/Schedul This account is used to pay es for the printing of Catalogs and Schedules. none none $190,000 Met 2.1 1061 Catalogs/Schedul This account is used to pay es for the printing of Catalogs and Schedules. none none $190,000 Met 8.1 1061 Catalogs/Schedul This account is used to pay es for the printing of Catalogs and Schedules. none none $190,000 Met 8.1 1062 Registrar 75% WEB 20% Phone 5% In-Person none $1,446,223 Met To continue improving registration process and customer services with courteous friendly staff. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 187 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Registrar Goal Plan 2.1 1062 Area Registrar Objective To continue improving registration process and customer services with courteous friendly staff. Measure 75% WEB 20% Phone 5% In-Person OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard none Strategies Assessment Results Use of Results $1,446,223 8 Objective's Status Met rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 188 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Research Associate, GEAR UP Program Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 2 Objective's Status 2.1 1408 GEAR UP Program Support and enhance parental involvement within each partner. Cohort students will experience more success in college. none Strategy: The program will utilize a systematic approach to increase academic success by including students, parents, district teachers, college staff, business and community based groups. No additional costs anticipated. Provided computer use, Web access, and computer purchase workshops for parents at partner schools. Will provide college admission & financial aid workshops. Surveys suggested that parents need In Progress additional/continue workshops. 1.1 1408 GEAR UP Program Support and enhance parental involvement within each partner. Cohort students will experience more success in college. none Strategy: The program will utilize a systematic approach to increase academic success by including students, parents, district teachers, college staff, business and community based groups. No additional costs anticipated. Provided computer use, Web access, and computer purchase workshops for parents at partner schools. Will provide college admission & financial aid workshops. Surveys suggested that parents need In Progress additional/continue workshops. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 189 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Vice President, Student Services Goal Plan 2.1 1057 Area VP Student Services Objective Insure that students are provided the best possible customer service district wide. Measure Standard Refine and provide better none customer service with the Banner System through the implementation of additional Banner products. Strategies Assessment Results Use of Results For the first time, early registration Determined success and desirability for Fall 2003 took place during of this Registration process. Spring 2003 Semester because of Banner Registration Program, TBA 4,000 students took advantage of this process. none 9 Objective's Status Met Automated Degree Plan (CAPP) to be brought on for Fall 2003. 6.1 1057 VP Student Services Insure that students are provided the best possible customer service district wide. Refine and provide better none customer service with the Banner System through the implementation of additional Banner products. For the first time, early registration Determined success and desirability for Fall 2003 took place during of this Registration process. Spring 2003 Semester because of Banner Registration Program, TBA 4,000 students took advantage of this process. none Met Automated Degree Plan (CAPP) to be brought on for Fall 2003. 7.1 1057 VP Student Services Insure that students are provided the best possible customer service district wide. Refine and provide better none customer service with the Banner System through the implementation of additional Banner products. For the first time, early registration Determined success and desirability for Fall 2003 took place during of this Registration process. Spring 2003 Semester because of Banner Registration Program, TBA 4,000 students took advantage of this process. none Met Automated Degree Plan (CAPP) to be brought on for Fall 2003. 1.1 1058 GEAR UP Program To develop and implement effective intervention strategies. Cohort students will make better grades and improve standardized exam scores. Fewer cohort students will drop out. none The program will utilize a systemic approach to increase academic success by including, students, parents, district teachers, college staff, business and community based groups. Student grades increased between 2001-02 & 2002-03 school years. Science increased, and Math & English/language arts increased statistically significantly. Will continue to provide tutoring/mentoring at schools. In Progress Student grades increased between Will continue to provide In Progress No additional costs anticipated. 2.1 1058 GEAR UP To develop and implement Cohort students will make better OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none The program will utilize a systemic rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 190 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Vice President, Student Services Goal Plan Area Program Objective effective intervention strategies. Measure Standard Strategies approach to increase academic success by including, students, parents, district teachers, college staff, business and community based groups. grades and improve standardized exam scores. Fewer cohort students will drop out. Assessment Results Use of Results 2001-02 & 2002-03 school years. Science increased, and Math & English/language arts increased statistically significantly. tutoring/mentoring at schools. 9 Objective's Status No additional costs anticipated. 1.1 1406 GEAR UP Program Integrate the "college culture" into the public school and family environment. Cohort Students will be more likely to enroll in Tech Prep, AP courses and dual enrollment courses. none Strategy: The program will utilize a systematic approach to increase academic success by including students, parents, district teachers, college staff, business and community based groups. No additional costs anticipated. Continue to provide positive input via tutors/mentors regarding value of college. 2002 Summer Camp provided 4 days, 3 nights of educational experience at UTEP. Students attended classes & stayed in dorms. Parents were invited to attend last day to see results of experience & spend time on campus. Determined need to provide In Progress workshops on college admissions & financial aid procedures. 2.1 1406 GEAR UP Program Integrate the "college culture" into the public school and family environment. Cohort Students will be more likely to enroll in Tech Prep, AP courses and dual enrollment courses. none Strategy: The program will utilize a systematic approach to increase academic success by including students, parents, district teachers, college staff, business and community based groups. No additional costs anticipated. Continue to provide positive input via tutors/mentors regarding value of college. 2002 Summer Camp provided 4 days, 3 nights of educational experience at UTEP. Students attended classes & stayed in dorms. Parents were invited to attend last day to see results of experience & spend time on campus. Determined need to provide In Progress workshops on college admissions & financial aid procedures. 1.1 1407 GEAR UP Program Provide cohort teachers with Cohort student will enroll in college in greater numbers. training and professional development opportunities to improve teaching and learning. none Strategy: The program will utilize a systematic approach to increase academic success by including students, parents, district teachers, college staff, business and community based groups. No additional costs anticipated. Continued Glasser Quality Schools Need to continue providing training In Progress training for teachers and opportunities. administrators. Provided other training opportunities for teachers. 2.1 1407 GEAR UP Program Provide cohort teachers with Cohort student will enroll in college in greater numbers. training and professional development opportunities to none Strategy: The program will utilize a systematic approach to increase academic success by including Continued Glasser Quality Schools Need to continue providing training In Progress training for teachers and opportunities. administrators. Provided other OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 191 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 84 Student Services Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Vice President, Student Services Goal Plan Area Objective Measure improve teaching and learning. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Strategies students, parents, district teachers, college staff, business and community based groups. No additional costs anticipated. Assessment Results Use of Results 9 Objective's Status training opportunities for teachers. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 192 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 13 Associate Vice President, Auxiliary Services Goal Plan Area Objective Measure 7.1 1149 AVP Auxiliary Services Provide Auxiliary Services to students and employees. 7.1 1150 Mail Services Equipment replaced. Upgrade package tracking and delivery system utilizing new technology. 7.1 1151 Property Control Industrial Warehouse Racking System. 7.1 1152 Instr Svc Ctr. VV 7.1 1153 7.1 7.1 Promote a customer friendly environment. Standard Strategies Assessment Results Use of Results Objective's Status none Vendors operations are providing quality services. Weekly meetings with vendors on services provided has decreased the amount of complaints. Vendors quickly resolve complaints to the customer satisfaction. -Customer satisfaction -Quick response from vendors for repairs and stocking of product/merchandise Purchase of equipment for District. Budget for system replacement. Funds not in budget. Need to reassess budget and request funds for FY 2003-04. Not Met none $13,500.00 Obtain racks from Print Shop Operation and negotiating for transfer of racks from Warehousing operation Program. Funding has been requested through the budgetary process FY 2003-04. Print Shop racks will be utilized in District Warehouse. Immediately, warehousing racks (negotiating), if obtained will serve the same objective. In Progress Upgrade technology of copy Number of equipment upgraded. machines to digital and network equipment. Purchase of equipment for District. Budget for equipment replacement. A 48 month lease with Canon (State Contact) for 1 each IR 8500 & IR 105 digital copiers. A savings approx. of $49,000 per year from previous copiers. -Customer satisfaction -Meet Customer's needs without outsourcing -Faster output -Copy quality -College savings Met Instr Svc Ctr. TM Upgrade technology of copy Number of equipment upgraded. machines to digital and network equipment. Purchase of equipment for District. Budget for equipment replacement. 48-month lease with Xerox (State Contract) for 1 each Xerox DC555H and DC 480A. Savings of $2,081 per month with upgraded equipment. -Customer satisfaction -Meet customer's needs without outsourcing -Faster output -Copy quality -College savings In Progress 1154 Instr Svc Ctr. RG Upgrade technology of copy Number of equipment upgraded. machines to digital and network equipment. Purchase of equipment for District. Budget for equipment replacement. 48-mth lease with Canon (State Contract) for two digital copiers. One with networking and the other 3-hole puncher. -Customer satisfaction -Meet customer's needs without outsourcing -Faster output -Copy quality Met 1155 Instr Svc Ctr. - Upgrade technology of copy Number of equipment upgraded. Purchase of equipment for Budget for equipment replacement. 48-month lease with Xerox (State -Customer satisfaction Provide accessibility, safety, accuracy, efficiency and effectiveness on warehousing storage. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Met In Progress Page 193 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 13 Associate Vice President, Auxiliary Services Goal Plan Area Objective Measure Standard NW machines to digital and network equipment. District. Strategies Assessment Results Use of Results Contract) for 1 Xerox DC 555H with network capabilities. -Meet customer's needs without outsourcing -Faster output -Copy quality Objective's Status 7.1 1156 Instr Svc Ctr. MdP Upgrade technology of copy Number of equipment upgraded. machines to digital and network equipment. Purchase of equipment for District. Budget for equipment replacement. 48-month lease with Xerox (State Contract) 1 Xerox DC555H. -Customer's satisfaction -Meet customer's needs without outsourcing -Faster output -Copy quality 7.1 1157 Safety Office Provide quarterly mandatory None available at this time. Ergonomics Management Training courses for El Paso Community College Supervisors. none Hold the training at four different locations in the District. Two Ergonomics Mgmt. training were conducted, this is not mandatory. Two will be conducted during the Summer. Supervisors suggested to attend this In Progress training, this would give them the knowledge & experience in noticing unsafe working conditions for their employees. 7.1 1158 Hazardous Waste Disposal To find a suitable and reputable waste disposal company through the bid process. 7.1 1159 Shipping & Receiving Equipment replaced. Upgrade package tracking and delivery system utilizing new technology. 7.1 1208 Facilities Provide quality education facilities. To evaluate costs through past purchase orders and increase in costs due to the generation of more hazardous waste. Cost $200.00 for training materials. none none Post of waste disposals at 1/2 of allotted budget. Three pickups by vendor are scheduled during the year. -College savings -Safer working areas for faculty, employees and students Purchase of equipment for District. Budget for system replacement. Funds not in Budget. Need to reassess budget and request funds for FY 2003-04. Requestor satisfaction and EPCC none employee survey. Departmental assessment of facilities, Will look at results of college-wide and by requestor's expectations employee survey for facilities and determined thru a design work request. construction concerns. In Progress In Progress Not Met In Progress Facilities Policies and procedures. Will be determined on a project to project basis. 8.1 1208 Facilities Provide quality education facilities. Requestor satisfaction and EPCC none employee survey. Departmental assessment of facilities, Will look at results of college-wide and by requestor's expectations employee survey for facilities and determined thru a design work request. construction concerns. In Progress Facilities Policies and procedures. Will be determined on a project to project basis. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 194 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Associate Vice President, Budget and Financial Services Goal Plan 7.1 1160 Area AVP Budget & Finance Objective Refine Budget and Accounting Reporting on Banner. Measure Reliable and Timely information is available to Budget heads. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard none Strategies Timely monthly accounting closings based on adequate resources.7 Assessment Results Monthly closing calendar was established and timelines have been followed in order to issue timely reports to Budget Heads. Reports are going out to budget heads usually the 1st week following month end. rpt0203AreaPlansFinalResults Use of Results Budget heads receive "More timely information regarding their monthly expenditures, and account budget status. Friday, November 21, 2003 1 Objective's Status Met Page 195 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 28 Comptroller Goal Plan 7.1 1162 Area Comptroller Objective Train new Assistant Comptrollers and Administrative Assistant in their duties. Measure Assistant Comptrollers & Administrative Assistant become more knowledgeable. Standard None Strategies Meet, explain and mentor. Objective's Status Assessment Results Use of Results New Assistant Comptrollers have both become more knowledgeable in performing their duties. The Assistant Comptroller-General Accounting had become adept at coordinating the monthly closings aware of the many factors necessary to successfully close the accounting month, prepare financial statements, and adjust the Banner system as necessary. Training is still ongoing. In all three cases the results have been used to improve the quality of service provided to the District in each of their three areas of specialization. Met Budget will cover appraisal fees. Met The Assistant Comptroller-Bursar Services has also become painfully aware, and knowledgeable of the many tuitions, registration, and accounts receivables issues confronted on a daily basis. She has spent many hours evaluating balances, accounts, Banner system with the Comptroller and AVP Budget and Financial Services. Training is still ongoing. The Administrative Assistant has developed a good sense of prioritization of duties in support of the Comptroller's Office. In particular, researching depository bank issues, follow up on Accounting Services requests for goods, services, and recruitment, selection, and processing of hiring documentation related to recruiting staff. 7.1 1163 County Reappraisal Provide adequate funds to cover projected annual expense. Actual expense is equal to or less none than budget. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Project estimate based upon historical expenditures and other factors. Budget appears adequate to cover annual expenditures. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 196 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 28 Comptroller Goal Plan Area Objective Measure Standard Strategies Assessment Results Objective's Status Use of Results 7.1 1164 Elections Provide adequate funds to cover projected annual expense. Actual expense is equal to or less none than budget. Project expenditures based upon historical expenditures and other factors. No budget required for 2002-2003. Also, this budget has been moved under the President. 7.1 1165 Tax Collection Fees Provide adequate funds to cover projected annual expense. Actual expense is equal to or less none than budget. Project expenditures based upon historical expenditures and other factors. Budget appears adequate to cover expenditures. Budget used to cover property tax collections. Met 7.1 1166 Attorneys Fees Provide adequate funds to cover projected annual expense. Actual expense is equal to or less none than budget. Project expenditures based upon historical expenditures and other factors. Budget appears adequate to cover expenditures. Budget used to cover attorneys fees. Met 7.1 1167 External Audit Provide adequate funds to cover projected annual expense. Actual expense is equal to or less none than budget. Project expenditures based upon historical expenditures and other factors. Budget appears adequate to cover expenditures. Budget used to cover cost of annual audit and related fees. Met 7.1 1168 Accounting Services Accounts Receivable and Pursue extracting reports from Banner that are needed Financial Aid reports are developed. to perform duties. Submit requests to develop such reports. Accounts Receivable reports created are the Fort Bliss billing report and Financial Aid checks on hold report. Financial Air reports have been deferred since the system has been utilized to provide information thought to have been needed or we have changed the way we record transactions so now a report is not needed. Much more is needed in the creation of reports to make work more efficient in the Accounts Receivable area. Accounts Receivable reports are In Progress used to bill Fort Bliss and the financial aid report is used to identify students that are scheduled to receive a financial aid check who also owe the District money. 7.1 1169 Bad Debt Ex Inact Rec Provide adequate funds to cover projected annual expense. Actual expense is equal to or less none than budget. Project estimate based upon historical expenditures and other factors. Budget appears adequate to cover annual expenditures. Budget used to cover bad debit expenses. 7.1 1170 Bank Service Charges Provide adequate funds to cover projected annual expense. Actual expense is equal to or less none than budget. Project estimate based upon historical expenditures and other factors. Expenditures projected to exceed the Budget by $19,000. Due to the rise in the anticipated number of students that will pay using credit cards, credit card fees are going to This budget is used to cover credit card fees, bank service charges, and cash pickup and delivery services. Budget for next year will be increased to cover deficit. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none rpt0203AreaPlansFinalResults Withdrawn Friday, November 21, 2003 Met Not Met Page 197 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 28 Comptroller Goal Plan Area Objective Measure Standard Strategies Assessment Results Objective's Status Use of Results increase. 7.1 1171 Receivable Collections Provide adequate funds to cover projected annual expense. Actual expense is equal to or less none than budget. Project estimate based upon historical expenditures and other factors. Budget appears adequate to cover annual expenditures. 7.1 1172 Non-Mandated Tran Admin/Equip Transfer actual amount budget $563,500. Transfer $563,500. none Transfer budgeted amount. This budget is not active. 7.1 1173 Mandatory Transfer - Debt Transfer actual amount based Actual transfer is equal to or less upon student enrollment and than budget. tech fees collected. none Project estimate based upon historical transfer and other factors. No transfer will occur. N/A Met 7.1 1174 Provide adequate funds to Mandatory Transfer - TPEG cover projected annual expense. Actual transfer is equal to or less than budget. none Project estimate based upon historical transfer and enrollment projection. Budget is adequate to cover the transfer. Transfer funds to a scholarships. Met 7.1 1175 Non-Mandatory Transfer actual amount Transfer - Plant budgeted $187,689. Transfer $187,689. none Transfer budgeted amount. Budget will be adequate to cover the transfer. Transfer will be used to fund plant fund projects. Met 7.1 1176 Non-Mandatory Transfer actual amount Tran - Ren Rep budgeted $110,000. Transfer $110,000. none Transfer budgeted amount. This budget was not active for 2002/2003. 7.1 1177 Group Life Insurance Provide adequate funds to meet insurance needs. All applicable employees have coverage. none Project estimate based upon historical expenditures and reflect projected change. 7.1 1178 Group Health Insurance Provide adequate funds to meet insurance needs. All applicable employees have coverage. none Project estimate based upon historical expenditures and reflect projected change. Due to a reduction in the health appropriation, expenditures are projected to exceed the budget by $136,923. Funds are used to cover the excess cost over the health insurance appropriation. Not Met 7.1 1179 Group Disability Provide adequate funds to Insurance meet insurance needs. All applicable employees have coverage. none Project estimate based upon historical expenditures and reflect projected change. Budget appears adequate to cover annual expenditures. Funding provides payment for staff group disability insurance. Met 7.1 1181 State Provide adequate funds to All applicable employees have none Project estimate based upon historical Budget appears adequate to cover Provides payment of unemployment Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Budget is used to pay for collection of delinquent Accounts Receivable collections. Met Withdrawn Withdrawn No longer active. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Withdrawn Page 198 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 28 Comptroller Goal Plan Area Objective Measure Unemployment meet insurance needs. coverage. Standard Strategies Assessment Results Use of Results expenditures and reflect projected change. projected annual expenditures. amounts. Objective's Status 7.1 1182 Other Staff Benefits Provide adequate funds to meet insurance needs. All applicable employees have coverage. none Project estimate based upon historical expenditures and reflect projected change. The budget appears adequate to cover annual projected expenditures. Used to cover annual sick leave accrual increase if necessary. 7.1 1183 Medicare Tax Provide adequate funds to meet insurance needs. All applicable employees have coverage. none Project estimate based upon historical expenditures and reflect projected change. Expenditures are projected to exceed the budget by $37,775. Funds are used to provide the employer matching related to Medicare insurance. Next years budget will increase accordingly. Not Met 7.1 1184 OASDI Employer Tax Provide adequate funds to meet insurance needs. All applicable employees have coverage. none Project estimate based upon historical expenditures and reflect projected change. Expenditures are projected to exceed the budget by $2,627. Funds are used to pay the employer cost of FICA. Next years budget will be increased accordingly. Not Met 7.1 1185 ORP Retirement Provide adequate funds to Program meet insurance needs. All applicable employees have coverage. none Project estimate based upon historical expenditures and reflect projected change. Expenditures are projected to exceed the budget by $39,348. Funds are used to provide ORP matching funds. Next years budget will be increased accordingly. Not Met 7.1 1186 Alternate Provide adequate funds to Retirement Plan meet insurance needs. All applicable employees have coverage. none Project estimate based upon historical expenditures and reflect projected change. Expenditures are projected to exceed the budget by $1,802. Funds are used for the employer matching portion of this retirement plan. Next years budget will be increased accordingly. Not Met 7.1 1187 Dental Indemnity Plan Provide adequate funds to meet insurance needs. All applicable employees have coverage. none Project estimate based upon historical expenditures and reflect projected change. Expenditures are projected to exceed the budget by $1,923. Funds pay for the employer portion of this dental plan. Next years budget will be increased accordingly. Not Met 7.1 1188 Dental HMO EPCC Contract Provide adequate funds to meet insurance needs. All applicable employees have coverage. none Project estimate based upon historical expenditures and reflect projected change. Expenditures are projected to exceed this budget by $579. Funds pay for the employer portion of this dental plan. Next years budget will be increased accordingly. Not Met 7.1 1189 TRS Employer Matching Provide adequate funds to meet insurance needs. All applicable have coverage. none Project estimate based upon historical expenditures and reflect projected change. Budget appears adequate to cover the projected expenditures. Funds provide the employer TRS matching for physical plant and Security Departments employees. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Met Met Page 199 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 28 Comptroller Goal Plan 7.1 1190 Area Insurance Replacement Objective Provide adequate funds to cover projected annual expense. Measure Actual expense is equal to or less none than budget. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Strategies Project estimate based upon historical expenses. Assessment Results Budget appears adequate to cover projected expenditures. rpt0203AreaPlansFinalResults Use of Results Funds are used to cover 50% of the cost of stolen property. Friday, November 21, 2003 Objective's Status Met Page 200 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Budget Goal Plan Area Objective Measure 6.1 1161 Budget Office Refine the budget process on Budget heads submit budget requests on line. Banner software. 6.1 1346 Budget Office Obtain better control of the Banner modules. Workshops on Banner to help budget heads facilitate the preparation of their budget. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Standard Strategies Assessment Results none Budget and Finance Training Workshops for budget heads. The following activities were conducted to further refine the budget process on Banner. Four workshops were held this year to train budget heads and staff to assist them in reviewing and interpreting budget and expenditure activity on the Budget Module. none Update Budget and Finance Training Workshops in the Fall. The following activities were conducted to further refine the budget process on Banner. Four workshops were held this year to train budget heads and staff to assist them in reviewing and interpreting budget and expenditure activity on the Budget Module. Use of Results 2 Objective's Status Our goal is to fully implement the In Progress Position Control Module for better control of personnel information and more accurate salary data. The Budget Office is interacting with Personnel Services and Information Technology to resolve position control issues causing erroneous salary detail. Once these issues are After we assessed that the "preresolved and Budget Form 2 data is designed or canned" budget reports accurate and fully automated, we were unsuitable for our needs, the plan to proceed with Budget and Budget Office worked with IT to Finance workshops. Agenda for design and refine Budget Form 1 the workshops will be designed to (Expenditure Detail) and Budget train and prepare budget heads and Form 2 (Salary Detail). Budget support staff to (1) enter annual Form 1 results were satisfactory, departmental budget requests in the however, Budget Form 2 data Budget Module, and (2) monitor proved inaccurate and needed their budgets and expenditures further refinement. more effectively. Our goal is to fully implement the In Progress Position Control Module for better control of personnel information and more accurate salary data. The Budget Office is interacting with Personnel Services and Information Technology to resolve position control issues causing erroneous salary detail. Once these issues are After we assessed that the "preresolved and Budget Form 2 data is designed or canned" budget reports accurate and fully automated, we were unsuitable for our needs, the plan to proceed with Budget and Budget Office worked with IT to Finance workshops. Agenda for design and refine Budget Form 1 the workshops will be designed to (Expenditure Detail) and Budget train and prepare budget heads and Form 2 (Salary Detail). Budget support staff to (1) enter annual Form 1 results were satisfactory, departmental budget requests in the however, Budget Form 2 data Budget Module, and (2) monitor proved inaccurate and needed their budgets and expenditures rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 201 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Budget Goal Plan Area Objective Measure Standard Strategies Assessment Results further refinement. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Use of Results 2 Objective's Status more effectively. Friday, November 21, 2003 Page 202 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Personnel Services Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results 8 Objective's Status 7.1 1180 Workers Compensation To provide adequate financial coverage to support proper compensation for employees under workers' compensation protection. Sufficient funds to address individual claims without exceeding authorized spending limits. none Through employee awareness and training, seek to reduce institutional exposure. 7.1 1191 Personnel Services Improve recruitment process by reducing the administrative processing time to deliver draft announcement to supervisor for review. Reduce the turn-around time to supervisor by 15% over the time currently required to produce draft announcement for review. By August 31, 2003 time required for Employment Services to provide draft announcement will be 103 hours from the time of initial receipt in Employment Services. Employment Services will assess their processing strategy and where appropriate, initiate substantive change to improve customer response time. Careful attention will be addressed to other section functions to ensure no degradation of quality is sacrificed in other areas just to improve one function. 5.1 1192 Employment Services. Support To provide adequate financial coverage to support the recruitment process for vacant positions. Sufficient funds to address applicant travel needs without exceeding authorized spending limits. none Encourage supervisors to plan interviews and travel requirements in sufficient time to obtain best travel prices from airlines. Withdrawn 7.1 1193 ADA Assistance To provide necessary support Faculty & Staff to staff members with disabilities in the delivery of their services to student and staff. Those employees who request valid services are provided appropriate support to enable job accomplishment. none Information to supervisors to assist them in posing the correct questions to requesting employees in order for us to provide timely and accurate response. Withdrawn 7.1 1194 PCAC When PCAC meets in early morning, during noon period, or full day meetings, adequate food or beverage support is available. none Schedule PCAC sessions to efficiently use time. Evaluate efficiency vs. effectiveness on long sessions vs. multiple short sessions. Withdrawn 7.1 1195 Early Retirement To provide necessary financial support to the retirement/resignation incentive program. Use historical data plus current employee demographics to establish annual requirements for this fund. Withdrawn To provide necessary support to Position Classification Appeals Committee in the conduct of their business. Sufficient financial resources are none available to pay incentives when employees separate or retire under the provisions of the plan document. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Withdrawn Process time was reduced by 265.66%. Average time to produce a draft announcement for a supervisor in April 2003 was 1.25 hours. These results will be used to address other functions within the department to ascertain if processing functions may be shortened to provide better customer service. Friday, November 21, 2003 Met Page 203 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Personnel Services Goal Plan Area Measure To provide necessary financial support to incentive program for educational achievement. Sufficient financial resources are available to pay incentives when employees successfully pursue and complete degrees or course work beyond the requirement for their jobs. none Establish a process that permits the institution to project financial resource needs in advance. Withdrawn Sufficient financial resources are available to fund positions that are determined to be under classified for the level of responsibility required. none Continue the audit process that permits the institution to review all positions in a 5-year cycle. Withdrawn 1196 Educational Advance 5.1 1197 Ongoing To provide necessary Position Reclass financial resources to support the classification of positions. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Strategies rpt0203AreaPlansFinalResults Assessment Results Use of Results Objective's Status Objective 5.1 Standard 8 Friday, November 21, 2003 Page 204 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 24 Director, Physical Plant Goal Plan 8.1 1207 Area Maintenance Non-Personnel Objective Provide Quality Education Facilities Measure Requestor satisfaction and EPCC none employee survey. Facilities inspections. Standard Use of Results Objective's Status Strategies Assessment Results Departmental assessment of facilities and by requestor expectations determined thru a design work request or work order. Will look at results of college-wide employee survey for maintenance custodial issues. Implemented preventative maintenance program. In Progress Will look at results of college-wide employee survey for maintenance custodial issues. Implemented preventative maintenance program. In Progress Will be determined on a project to project basis. 7.1 1207 Maintenance Non-Personnel Provide Quality Education Facilities Requestor satisfaction and EPCC none employee survey. Facilities inspections. Departmental assessment of facilities and by requestor expectations determined thru a design work request or work order. Will be determined on a project to project basis. 8.1 1209 Facilities Construction Provide quality education facilities. Requestor satisfaction and EPCC none staff survey. Facilities Inspections. 7.1 1209 Facilities Construction Provide quality education facilities. Facilities Policies and Procedures. Will be determined on a project to project basis. Requestor satisfaction and EPCC none staff survey. Departmental assessment of facilities, and by requestor's expectations determined thru a design work request or work order. Facilities Inspections. 8.1 1210 Maintenance Personnel Provide quality education facilities. Departmental assessment of facilities, and by requestor's expectations determined thru a design work request or work order. Facilities Policies and Procedures. Will be determined on a project to project basis. Requestor satisfaction and EPCC none employee survey. Departmental assessment of Payroll and Performance evaluation. Working with Human Resources on job audits and upgrades where needed and budget allows. Not Met Departmental assessment of Payroll Working with Human Resources on Not Met Survey employee retention and performance. 7.1 1210 Maintenance Provide quality education Requestor satisfaction and EPCC none OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 205 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 24 Director, Physical Plant Goal Plan Area Personnel Objective facilities. Measure employee survey. Standard Strategies Assessment Results Use of Results Objective's Status and Performance evaluation. job audits and upgrades where needed and budget allows. Departmental assessment of facilities, and by requestor's expectations determined thru a design work request or work order. Work orders are monitored on a daily basis. Problems are discussed with the outside vendor ABM Janitorial, on a daily basis. In Progress Work orders are monitored on a daily basis. Problems are discussed with the outside vendor ABM Janitorial, on a daily basis. In Progress Survey employee retention and performance. 8.1 1211 Custodial Provide quality education facilities. Requestor satisfaction and EPCC none employee survey. Facilities and grounds inspections. 7.1 1211 Custodial Provide quality education facilities. Facilities Policies and Procedures. Will be determined on a project to project basis. Requestor satisfaction and EPCC none employee survey. Departmental assessment of facilities, and by requestor's expectations determined thru a design work request or work order. Facilities and grounds inspections. 8.1 7.1 8.1 1212 1212 1213 Ground Maintenance Personnel Ground Maintenance Personnel Ground Maintenance Non-Personnel Facilities Policies and Procedures. Will be determined on a project to project basis. Provide quality education facilities. Requestor satisfaction and EPCC none employee survey. Departmental assessment of Payroll and Performance Evaluation. Working with Human Resource on job audits and upgrades where needed and budget allows. In Progress . Survey employee retention and performance. Provide quality education facilities. Requestor satisfaction and EPCC none employee survey. Departmental assessment of Payroll and Performance Evaluation. Working with Human Resource on job audits and upgrades where needed and budget allows. In Progress . Survey employee retention and performance. Provide quality education facilities. Requestor satisfaction and EPCC none employee survey. Facilities and grounds inspections. Facilities Policies and Procedures. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Departmental assessment of facilities, Will look at results of college-wide and by requestor's expectations employee survey for grounds issues. determined thru a design work request or work order. In Progress Will be determined on a project to project basis. rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 206 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 24 Director, Physical Plant Goal Plan 7.1 1213 Area Ground Maintenance Non-Personnel Objective Provide quality education facilities. Measure Requestor satisfaction and EPCC none employee survey. Facilities and grounds inspections. 7.1 1214 Electricity Provide Quality Education Facilities. Standard Strategies Assessment Results Use of Results Departmental assessment of facilities, Will look at results of college-wide and by requestor's expectations employee survey for grounds issues. determined thru a design work request or work order. Facilities Policies and Procedures. Will be determined on a project to project basis. Requestor satisfaction and EPCC none staff survey. Departmental assessment of Usage by Facilities, and by energy supplier's billing. Objective's Status In Progress Facilities Polices and Procedures. 8.1 1214 Electricity Provide Quality Education Facilities. Requestor satisfaction and EPCC none staff survey. Departmental assessment of Usage by Facilities, and by energy supplier's billing. Facilities Polices and Procedures. 8.1 1215 Gas Provide quality education facilities. Requestor satisfaction and EPCC none staff survey. Departmental assessment of Usage by Facilities, and by Energy supplier's billing. Facilities Policies and procedures. 7.1 1215 Gas Provide quality education facilities. Requestor satisfaction and EPCC none staff survey. Departmental assessment of Usage by Facilities, and by Energy supplier's billing. Facilities Policies and procedures. 7.1 1216 Water/Sewage Provide quality education facilities. Requestor satisfaction and EPCC none staff survey. Departmental assessment of Usage by Facilities, and by Water supplier's billing. Facilities Policies and Procedures. 8.1 1216 Water/Sewage Provide quality education facilities. Requestor satisfaction and EPCC none staff survey. Departmental assessment of Usage by Facilities, and by Water supplier's billing. Facilities Policies and Procedures. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 207 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 24 Director, Physical Plant Goal Plan 8.1 1349 Area Electricity Objective Provide Effective and Efficient Energy Conservation. Measure Standard Survey Energy Consumption and none Cost. Strategies Assessment Results Use of Results Objective's Status Departmental assessment of Usage by Facilities, and by Energy supplier's billing. Facilities Policies & procedures. 7.1 1349 Electricity Provide Effective and Efficient Energy Conservation. Survey Energy Consumption and none Cost. Departmental assessment of Usage by Facilities, and by Energy supplier's billing. Facilities Policies & procedures. 7.1 1350 Gas Provide Effective and Efficient Energy Conservation. Survey Energy Consumption and none Cost. Departmental assessment of Usage by Facilities, and by Energy supplier's billing. Facilities Policies & procedures. 8.1 1350 Gas Provide Effective and Efficient Energy Conservation. Survey Energy Consumption and none Cost. Departmental assessment of Usage by Facilities, and by Energy supplier's billing. Facilities Policies & procedures. 7.1 1351 Water/Sewage Survey Water Consumption and Provide Effective and Efficient Water Conservation. Cost. none Departmental assessment of USAGE BY Facilities, and by WATER supplier's billing. none Departmental assessment of USAGE BY Facilities, and by WATER supplier's billing. Facilities Policies & procedures. 8.1 1351 Water/Sewage Survey Water Consumption and Provide Effective and Efficient Water Conservation. Cost. Facilities Policies & procedures. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 208 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): Director, Purchasing Goal Plan Area Objective 7.1 1217 Purchasing/Contr Maximize use of current act Mgmnt resources within the department. 7.1 1218 Insurance Property Measure Standard Strategies Assessment Results Use of Results 5 Objective's Status Cross training, multi-task approach to improve speed and efficiency of tactical operations. none Maintain current resources$15,450.00. Cost also applies to plans #1352 & #1353 Staff has been cross trained in their area of responsibility regardless of whether an employee is absent or several employees - processes are taken over by other staff members. Purchasing processes are not interrupted due to a staff member being out. In spite of increases in work load no additional staff has been added. Met Provide adequate and timely insurance protection for the College as well as cost containment and minimized liability exposure. Continued communication with insurance underwriter. none none Through planning and analysis the college has been able to minimize the impact of changes in the Insurance Industry which resulted from the 9/11 events. Additional communication with Insurance Agent and Claims Representative has allowed the College to have a proactive role in the Risk Management process. In spite of increases to Insurance Rates the College was able to maintain rates at under mark et conditions. Met Ensure availability of space rentals for instructional purposes on an as needed basis. Support College programs and staff by providing logistical and planning resources for off-site instruction. none none Prior to the Budget Development Process calls are placed to all entities utilizing off-site space rentals for Instructional PurposesStaff Members and Vendors provide information on next FY Use of Space. A better organized Planning Process has provided an Accurate Assessment of Space Utilization. Met Implementation of programs to minimize losses. 7.1 1219 Space Rentals 7.1 1352 Purchasing/Contr Increase automation in the act Mgmnt procurement process. Maintain accurate Webpage none information, conduct additional ecommerce transactions. Maintain current resources. A combination of the Banner Overall Improvement of efficiency System, the Purchasing Web Page in the Purchasing Process in benefit and email has provided the of College departments. departments throughout the College with timely information through the use of automation. Met 7.1 1353 Purchasing/Contr Conduct efficient and act Mgmnt effective sourcing of goods and services to attain cost savings. Ongoing review of commodities and commodity distribution to seek contracts conducive to best value Maintain current resources. Increased knowledge of utilization of Purchasing Cooperatives by buyers. Utilizing existing source of supply has expedited the Purchasing Cycle. Met OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none rpt0203AreaPlansFinalResults Increased efficiency in the sourcing process has allowed the department to incur cost savings, save considerable time and conduct processes in an expeditious manner. Friday, November 21, 2003 Page 209 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 21 Vice President, Resource Management Goal Plan Area Objective Measure Standard 7.1 1052 AIMS Project Provide coordination of necessary training and consulting for Banner functional area teams. Attendance records and trip reports. 7.1 1145 Plant Oper/Maint Supp Auxiliary Provide quality education facilities. Requestor satisfaction and EPCC none staff survey. Gather for 90% of training/consulting. Strategies Assessment Results Use of Results Coordinate with internal and external training and consulting providers. Objective's Status Met Departmental assessment of Usage by Facilities, and by Energy supplier's billing. Facilities Policies & procedures. 6.1 1146 VP Resource Mgmnt Update technology available Complete replacements at to students in classrooms and campuses. labs with latest technology available. none Request Board approval for increase in the tuition rate for resident and nonresident credit students. Met 7.1 1146 VP Resource Mgmnt Update technology available Complete replacements at to students in classrooms and campuses. labs with latest technology available. none Request Board approval for increase in the tuition rate for resident and nonresident credit students. Met 7.1 1147 Hospitality To raise employee morale and foster better work relationships by promoting food and fun at occasional Resource Management department gatherings. none Demonstrate to employees that they are valuable to the college. Met Adequate food is available at department special events. Schedule special social events to coincide with times when employees would most benefit from gatherings, yet would be least disruptive in work schedules. 7.1 1148 Memberships/Du Renew and subscribe to es institutional memberships that help the college keep abreast of information on trends, changes, and opportunities in education. Faculty, administration, staff, and none board members are able to take advantage of lower conference and seminar rates because of institutional memberships. Monitor cost/benefit of institutional memberships. Met 6.1 1198 Space Rentals none none Met none OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT none rpt0203AreaPlansFinalResults Friday, November 21, 2003 Page 210 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 21 Vice President, Resource Management Goal Plan 6.1 1199 Area Information Center Objective Improve services of the Information Center. Measure Standard Train current staff in the effective none utilization of the current software tools for reporting needs. Strategies Assessment Results Use of Results Select two employees for training so Bringing in SCT consultants to they can train other Information Center train. employees: Estimated cost: $6,000. Objective's Status In Progress Train two employees for the effective use of the reporting software. 6.1 1200 Telephone Utility Improve service to the student telephone system (EPOS). 6.1 1201 Hardware Install mirroring technology that Purchase license for the Maintenance/Sup mirroring of data on Pontiac will protect against data plies corruption. alpha-server (Banner). none Purchase license and install mirroring software for real-time data backup. $9,000 7.1 1202 Software Maintenance Purchase and install the program on 25% of the computers that are not protected. Identify those computers that have antiquated and/or no anti-virus software and install it on those systems. Estimated cost: $25,000 7.1 1203 Telecommunicati Improve services of the ons Telecommunication Department Staff. 6.1 1204 Networking Allow the College to utilize a Remove collisions on the network Remove 40% of the hubs to improve system response. and replace them with switched network. intelligent switches. 7.1 1205 Records Management Improve quality of service produced by records management. Improve turnaround and quality of reproduced items. 6.1 1206 Information Technology Systems Improve services of the Information Technology Department Staff. Train current staff in the effective Train two employees in utilization of the current software SQL and ProCobol. tools. Purchase and install a district-wide anti-virus program. Improve access to the telephone system for registration and student service issues. Install an anti-virus software program that will protect the personal computers. Expand the number of Replace T-1 lines going into CSC with telephone lines available for Fiber Optic cable to allow enhanced access to the Telephone services: Estimated cost: $12,000 Registration System. Train current staff in the effective Train two employees for the Select two employees for training so utilization of the current effective utilization of the they can train other equipment. equipment. Telecommunication employees. Estimated cost: $6,000. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Purchase new reproducer unit. Additional lines were added. Met Met Complete at PC level and server level. Still need some investment on telephone system. Met Not Met Identify those areas that are currently utilizing hubs and replace them with switches: Estimated cost: $40,000. Replaced all hubs with network switches. Met Replace outdated equipment with new reproducer: 12,000. OTG cold storage replaces micro fiche. Met Select two employees for training so they can train other Information Technology employees: Estimated cost $6,000. rpt0203AreaPlansFinalResults Not Met Friday, November 21, 2003 Page 211 of 212 Plans for Executive Area (Duplicated if addressing 2 or more goals): 102 Resource Management Number of Plans per Budget Head (Duplicated if addressing 2 or more goals): 21 Vice President, Resource Management Goal Plan Area Objective Measure Standard Strategies Assessment Results Use of Results Objective's Status 7.1 1220 AVP Info Technology & Sys Ensure that BANNER functional area teams are meeting regularly and progressing. 7.1 1343 Plant Oper/Maint Supp Auxiliary Survey Energy Consumption and none Provide Effective and efficient energy conservation. cost. Facilities Policies and Procedures. Departmental assessment of Usage by Facilities, and by Energy supplier's billing. 6.1 1344 VP Resource Mgmnt Replace worn out and broken Complete replacements at VV, furniture in classrooms and RG, and TM Campuses. labs. none Assessment of chairs, stools, desks, and tables to determine replacement needs. Use plant funds set aside for renewals and replacements. Met 7.1 1344 VP Resource Mgmnt Replace worn out and broken Complete replacements at VV, furniture in classrooms and RG, and TM Campuses. labs. none Assessment of chairs, stools, desks, and tables to determine replacement needs. Use plant funds set aside for renewals and replacements. Met 6.1 1347 Hardware Install additional drives and none Purchase additional drives Maintenance/Sup and memory for both memory to improve speed and plies Pontiac/Aztec AlphaServers. storage capacity for future growth and expansion on the Banner production Database and Datamart area. Purchase (4) memory boards and (20) disc drives. $33,000 Memory boards and disk drives were purchased and installed. 6.1 1348 Hardware Purchase (2) laptops for Maintenance/Sup Traveling/On-call plies programming staff. Two laptop units. $3,000 Not met due to budget contingencies. Numbers of meetings held. 80% of milestones met. Improve access capability for the none programming/DBA when they are away from the office. OFFICE OF THE VICE PRESIDENT OF RESEARCH AND DEVELOPMENT Attend and facilitate team meetings. Banner has been implemented with all main modules functioning. LoanStar program was approved by the Board of Trustees April 2002. This program is a partnership between LoanStar & EPCC for the purpose of planning, funding & implementing energy savings measures, which ultimately reduces colleges utilities bills. rpt0203AreaPlansFinalResults Met -Installation of motion sensors In Progress district wide. -Other pending projects are the following: Modify TSS; replace cooling tower; update EMS; install EMS at Small Business Center; install heat pumps. Friday, November 21, 2003 Met Not Met Page 212 of 212