Area Effectiveness Assessment Report - Four Column El Paso Community College Internal - Planning Areas/Depts Objectives Planning - Academic Computing Services District-Wide Computing Support Services for Students and Faculty (2010-2011) Increase hours of operation to accommodate student demand. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2010 Actual Completion Date: 08/31/2010 Objective Status: In Progress Budget Account Number: 11000-52101 Person(s) Responsible: Raymundo Vilca Planning - Accounting - RG - Fill Rate for Accounting Courses (2010-2011) - To improve fill rate. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/08/2010 Objective Status: New Budget Account Number: 11000-55212 Person(s) Responsible: 03/05/2012 11:45 AM Measures & Standards and Baselines / Results Strategies Measure: Provide district-wide administrative support to all ACS labs; increase level of faculty and student support at all ACS labs. Data Source for Measure: Department/Area Report Standard and Baseline: Hire appropriate level staff. Baseline: Hire 3 full-time ACS Lab Assistants and 2 part-time ACS Lab Assistants. Action & Follow-Up Task Name: ACS Lab Manager Task Description: District-wide ACS Lab Manager will assist with planning and supervision of ACS labs. Additional part-time Lab Assistants will ensure for increased support to faculty and students. ACS Lab Manager continues to plan with ACS staff on ensuring appropriate support for labs and identify funding for PT staff. Also manager continues to monitor departmental budget on a monthly basis. Measure: 5% improvement. Data Source for Measure: Program Review Data Standard and Baseline: 75%, 80% full. Baseline: 62%. Task Name: Courses Offered Task Description: Monitor courses offered. Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 1 of 297 Objectives Measures & Standards and Baselines / Strategies Lee Cannell Projected Cost: 0.0000 Planning - Accounting - VV - Increase Class Fill Rate (2010-2011) - Increase class fill rate to 68% district-wide. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/20/2010 Objective Status: In Progress Budget Account Number: 11000-55210 Person(s) Responsible: Becky Hancock Planning - Administrative Assistant - VV Marketing Program (2010-2011) - Continue Marketing Administrative Assistant Program. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2010 Objective Status: New Budget Account Number: 11000-55246 Person(s) Responsible: Linda Silva 03/05/2012 11:45 AM Measure: Class fill rate is provided thru yearly program review report. Data Source for Measure: Program Review Data Standard and Baseline: Class fill rate is currently 64%. Results Action & Follow-Up 09/14/2011 - Class fill rate was increased to 66%. Progress: Unsatisfactory Action Plan Status: 2 - Action Plan Documented 09/14/2011 - Keep reducing the amount of classes until the class fill rate increases. Task Name: Less Classes Task Description: Offer less classes, better times. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: No. of individuals responding to ad. Data Source for Measure: Department/Area Report Standard and Baseline: Increase awareness to community, high schools and businesses. Task Name: Advertising Task Description: Advertise in the El Paso Times & Tejano Tribune. Budget Impact: Additional/New Funding Required Task Name: Deliver posters and brochures Task Description: Deliver AA program posters and brochures to area high schools and businesses. Generated by TracDat a product of Nuventive. Page 2 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: Additional/New Funding Required Task Name: High Scholl Articulation Task Description: Update articulation ageements with area high school districts. Budget Impact: Additional/New Funding Required Task Name: Marketing Students Task Description: Create new posters to showcase students who have passed the MOS exam certification exams. Budget Impact: Additional/New Funding Required Projected Cost: 1000.0000 Task Name: Web Presence Task Description: Update AA program website - AA Program faculty also update their web pages. Budget Impact: Additional/New Funding Required Planning - Administrative Assistant - VV Community Outreach (2010-2011) Participate in the 10th Annual Administrative Professional Conference and involve students to participate/volunteer. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2010 Objective Status: New 03/05/2012 11:45 AM Measure: No. of contacts made during conference. Data Source for Measure: Department/Area Report Standard and Baseline: Increase awareness to conference attendees on Administrative Assistant Program. No Baseline. Task Name: Conference Attendees Task Description: Generated by TracDat a product of Nuventive. Page 3 of 297 Objectives Budget Account Number: 11000-55246 Person(s) Responsible: Linda Silva Measures & Standards and Baselines / Strategies Action & Follow-Up Letters/flyers will be mailed to conference attendees. Invite potential student's oncampus for advising. Budget Impact: Additional/New Funding Required Projected Cost: 400.0000 Planning - Admissions and Registrar (2010-2011) Dual Credit Admissions and Enrollment - (2010-2011) Reorganize Admissions and Registration Department to provide capacity for Dual Credit/ECHS Department to meet its mission by providing staff and training support to the new department. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/21/2011 Actual Completion Date: 03/21/2011 Objective Status: Met Budget Account Number: 11000-62000 Person(s) Responsible: Daryle Hendry Measure: Provide staff needed to perform admissions and registration functions for Dual Credit and Early College High School students. Data Source for Measure: Budget Data Standard and Baseline: Department did not have any staff to provide these functions. Planning - Admissions and Registrar (2010-2011) Online Add/Drop Registration (2010-2011) Allow students to register Online during Add/Drop Registration periods. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/31/2011 Actual Completion Date: 05/31/2011 Measure: That online registration be active during add/drop registration periods. Data Source for Measure: Enrollment Data Standard and Baseline: Currently students must stand in line and register in-person during add/drop registration. 03/05/2012 11:45 AM Results 01/19/2012 - Completed. Transfered five employees to the DC/ECHS Department Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: (2010-1011)Transfer staff to new department Task Description: Transfer staff and supervisor already trained in performing the essential functions of the new department. Budget Impact: Rollover/Maintain Current Funding 01/19/2012 - Online registration is now available for students during Add/Drop registration. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Test internal controls to support online Generated by TracDat a product of Nuventive. Page 4 of 297 Objectives Measures & Standards and Baselines / Strategies Objective Status: Met Budget Account Number: 11000-62000 Person(s) Responsible: Daryle Hendry activation of enrollment system. Task Description: Revise internal controls in order to support online enrollment processing during add/drop registration. Budget Impact: No Funding Needed Planning - Admissions and Registrar (2010-2011)TREx High School Transcripts (2010-2011)Implement automation to support receipt of high school electronic transcripts for high school graduates. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-62000 Person(s) Responsible: Daryle Hendry Measure: That EPCC be able to accept electronic transcripts from public high schools and through automation post information into the EPCC student record. Data Source for Measure: Enrollment Data Standard and Baseline: Currently all high school transcripts for high school graduates are paper. Planning - Admissions and Registrar (2010-2011) Dual Credit/Early College High School Server - (2010-2011) Share current enrollment information for Dual Credit and Early College High School students with ISD's and High School administrators. Planning Year(s): 2010 - 2011 Expected Completion Date: Measure: High Schools should be able to directly access most current data available to verify enrollment status of their students. Data Source for Measure: Enrollment Data Standard and Baseline: High Schols are dependent upon reports generated by DC/ECHS staff to verify 03/05/2012 11:45 AM Results Action & Follow-Up 01/19/2012 - Testing completed. Certification completed. Currently receiving HS transcripts via TREx. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Form partnership with high schools to test transmission and receipt. Task Description: Test with individual high schools. Upon succful testing, certify that the high school can transmit TREx transcripts. Implement internal controls to automate entry of TREx data directly into EPCC student records. Budget Impact: Rollover/Maintain Current Funding 01/19/2012 - Secure Server operational with compartmentalized files for individual ISD's and ECHS. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 5 of 297 Objectives Measures & Standards and Baselines / Strategies 12/23/2011 Actual Completion Date: 12/23/2011 Objective Status: Met Budget Account Number: 11000-62000 Person(s) Responsible: Daryle Hendry admissions and enrollment status of their high school students into EPCC courses. This information is generally dated by the time the reports are run and transmitted to the ISD and HS. Planning - Advanced Technology Center Welding Technology (2010-2011) - Applied for grants in order to purchase new equipment for the Welding area. Planning Year(s): 2010 - 2011 Measure: Research equipment and cost for the equipment. Data Source for Measure: Department/Area Report Standard and Baseline: Research and apply for grants that will offset the cost of welding equipment. Baseline: Acquire new equipment and upgrade current equipment. Measure: Buy new equipment for the Welding Area. Data Source for Measure: Department/Area Report Standard and Baseline: Research and apply for grants that will offset the cost of welding equipment. Baseline: Acquire new equipment and upgrade current equipment. Actual Completion Date: 03/11/2010 Objective Status: In Progress Budget Account Number: 11000-42403 Person(s) Responsible: Dr. Olga Valerio Results Action & Follow-Up 10/17/2011 - No Grants available at this time to purchase equipment. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 10/17/2011 - Continue to research grants for equipment. Task Name: Provide secure access to enrollment information. Task Description: Provide secure server access to designated ISD personnel for purposes of obtaining limited enrollment information on their students. Budget Impact: Rollover/Maintain Current Funding 10/17/2011 - Received skills development money to purchase 10 each of welding hoods, helmets, gloves, and jackets. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Equipment Options and Funding 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 6 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Description: Research equipment options and funding sources to enhance the Welding program. Donations will also be looked for, in order to update the ATC. Planning - Advanced Technology Center Credit Diesel Program (2010-2011) Implement a new credit program. Use environmentally friendly products. Establish an advisory committee for Diesel Program. Increase enrollment numbers. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/11/2010 Objective Status: In Progress Budget Account Number: Pending Person(s) Responsible: Dr. Olga Valerio Measure: Introduction of the new credit courses. Data Source for Measure: Department/Area Report Standard and Baseline: New program. Baseline: First time credit program will be taught at EPCC 10/17/2011 - introduced 14 new credit course with 29 students in the program, 20 Credit and 9 CE ATC are concurrent courses. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Measure: Help improve the environment, and the health of the students and instructors. Data Source for Measure: Department/Area Report Standard and Baseline: New program. Baseline: First time credit program will be taught at EPCC Measure: The advisory committee will give us their input to ensure that we are teaching the latest technology in the program. Data Source for Measure: Department/Area Report Standard and Baseline: New program. Baseline: First time credit program will be taught at EPCC 10/17/2011 - Continuing to improve environmental conditions for the diesel students and instructors. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 10/17/2011 - Established an advisory committee who is working with the ATC. Will have a meeting with the committee once a year. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Committee Task Description: Host and find the right committee for this program. Task Name: Promote Credit Program Task Description: 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 7 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Meet with the community partners to promote the credit program as well as advertise in the media. Task Name: Research Companies Task Description: Research the different companies that offer green products . Planning - Advanced Technology Center Electrical Journeyman (2010-2011) - Create a partnership with the International Brotherhood of Electrical Workers (IBEW) Apprenticeship that allows the ATC students entering the apprenticeship program to skip the first year by using the education from the ATC as the 1st year. Find resources to purchase and update the equipment. Request a full time instructor. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/11/2010 Objective Status: Met Budget Account Number: 11000-42410 Person(s) Responsible: Dr. Olga Valerio 03/05/2012 11:45 AM Measure: Establish Partnership, update equipment, and hire a full time faculty. Data Source for Measure: Department/Area Report Standard and Baseline: Implementation of the 1 year curriculum with the IBEW apprenticeship, researching industry needs and advertise the faculty position. Baseline: Students must attend the 1st year of the IBEW apprenticeship program, meet standards in Electrical Journeyman area and currently there are only part-time instructors. 10/17/2011 - Partnership with IBEW was established. Fulltime instructor was hired. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Advisory Members Task Description: Host advisory members from IBEW as well as advisory committee meetings to assist in the developing and updated courses. Budget Impact: No Funding Needed Task Name: Frozen Positions Task Description: Request the 1 frozen positions that is in the ATC pool. Generated by TracDat a product of Nuventive. Page 8 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: No Funding Needed Task Name: Funding Sources Task Description: Research equipment training options and funding sources to enhance the Electrical Journeyman program. Budget Impact: No Funding Needed Task Name: Review Course Syllabi Task Description: Review the course syllabi and compare it with the IBEW program. Budget Impact: No Funding Needed Planning - Advanced Technology Center Machining Technology (2010-2011) Increase the number of students enrolled. Replace full-time faculty. Upkeep and upgrade lab area. Planning Year(s): 2010 - 2011 Measure: Increase enrollment. Data Source for Measure: Enrollment Data Standard and Baseline: 12 students will be enrolled. Baseline: Increase the number of graduates. 10/17/2011 - 12 students were enrolled in the program. Will continue to increase number of graduates. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Actual Completion Date: 03/11/2010 Objective Status: In Progress Budget Account Number: 11000-42403 Person(s) Responsible: Dr. Olga L. Valerio Measure: Hiring FT faculty. Data Source for Measure: Department/Area Report Standard and Baseline: Advertise position. Baseline: Only part time faculty is teaching at the moment. 10/17/2011 - In the process of hiring a full time faculty. Had to readvertise position to increase pool. The ATC will be hiring a full time faculty during the fall 2011 semster. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 10/17/2011 - Advertise position again for the full time faculty member Task Name: Advertise Task Description: Advertise the program: radio, newspaper, flyers etc. 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 9 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: Hire the Full Time Faculty. Task Description: Hire the Full Time Faculty. Task Name: Visit and Assist Task Description: Start to visit High Schools and assist at job fairs. Planning - Advanced Technology Center Training, Energy Systems (2010 - 2011). Received monies from a second energy grant for training in PV, Hot Water Systems and OSHA. Planning Year(s): 2010 - 2011 Expected Completion Date: 11/30/2011 Objective Status: In Progress Budget Account Number: 12322-S12322 Person(s) Responsible: Dr. Olga L. Valerio Measure: Training 68 students Data Source for Measure: Department/Area Report Standard and Baseline: new Planning - Advanced Technology Center Electrical Training Structure (2010 - 2011). Build a skeletal training structure Planning Year(s): 2010 - 2011 Expected Completion Date: 04/29/2011 Actual Completion Date: 07/29/2011 Objective Status: Met Measure: Skeletal training structure Data Source for Measure: Department/Area Report Standard and Baseline: No current structure 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 10 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Account Number: 11000-42410 Person(s) Responsible: Dr. Olga L. Valerio Planning - Advertising Graphics - VV - Web Design Course (2010-2011) - First time students will be required to take a web design course. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2010 Objective Status: Met Budget Account Number: 11000-55365 Person(s) Responsible: David Galatzan Measure: The Support of our Advisory Committee, made up of members from the advertising agencies and graphic arts community, will insure current equipment, technologies and program objectives meet graphic design industry standards. Graduation rates and updated communication with students in their professional graphic arts careers will provide measurable data. Data Source for Measure: Department/Area Report Standard and Baseline: The standard for success is student graduation upon successful completion of our Associates of Applied Science Degree in Advertising Graphics & Design. Baseline: Compiling data from student information in those working in professional design careers will mark standards for success and a measurable baseline. 10/05/2011 - We now have a web course. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Advisory Committee Task Description: Continue guidance from our Advisory Committee, relevant field trips to advertising agencies, billboard design businesses, etc. will give students a look at actual daily activities in graphic design. Budget Impact: No Funding Needed Projected Cost: 0.0000 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 11 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: Guest Speakers Task Description: Bringing guest speakers will offer students a question and answer forum to best explain industry expectations. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Lab Expansion Task Description: Funding for lab expansion, equipment or additional faculty or lab assistants will be provided by the existing budget or any other appropriate funding. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Advertising Graphics - VV Weekend Computer Graphics & Computer Illustration (2010-2011) - Offer a weekend intro to computer graphics class in Fall 2010 and a computer illustration class in Spring 2011. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2010 Objective Status: Met Budget Account Number: 11000-55365 Person(s) Responsible: David Galatzan 03/05/2012 11:45 AM Measure: The Support of our Advisory Committee, made up of members from the advertising agencies and graphic arts community, will insure current equipment, technologies and program objectives meet graphic design industry standards. Graduation rates and updated communication with students in their professional graphic arts careers will provide measurable data. Data Source for Measure: Department/Area Report Standard and Baseline: The standard for success is student graduation upon successful completion of our Associates of Applied Science Degree in Advertising Graphics & Design. Baseline: Compiling data from student information in 10/05/2011 - We now offer weekend computer graphics courses. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 12 of 297 Objectives Measures & Standards and Baselines / Results Strategies those working in professional design careers will mark standards for success and a measurable baseline. Action & Follow-Up Task Name: Advisory Committee Task Description: Continue guidance from our Advisory Committee, relevant field trips to advertising agencies, billboard design businesses, etc. will give students a look at actual daily activities in graphic design. Budget Impact: No Funding Needed Task Name: Guest Speakers Task Description: Bringing guest speakers will offer students a question and answer forum to best explain industry expectations. Budget Impact: No Funding Needed Task Name: Lab Expansion Task Description: Funding for lab expansion, equipment or additional faculty or lab assistants will be provided by the existing budget or any other appropriate funding. Budget Impact: No Funding Needed Planning - Advertising Graphics - VV - New Software Introduction (2010-2011) - New software will be introduced to keep up with industry needs. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2010 03/05/2012 11:45 AM Measure: The Support of our Advisory Committee, made up of members from the advertising agencies and graphic arts community, will insure current equipment, technologies and program objectives meet graphic design industry standards. Graduation rates and updated communication with students in 10/05/2011 - New updated software to meet industry needs has been met. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 13 of 297 Objectives Objective Status: Met Budget Account Number: 11000-55365 Person(s) Responsible: David Galatzan Measures & Standards and Baselines / Results Strategies their professional graphic arts careers will provide measurable data. Data Source for Measure: Department/Area Report Standard and Baseline: The standard for success is student graduation upon successful completion of our Associates of Applied Science Degree in Advertising Graphics & Design. Baseline: Compiling data from student information in those working in professional design careers will mark standards for success and a measurable baseline. Action & Follow-Up Task Name: Advisory Committee Task Description: Continue guidance from our Advisory Committee, relevant field trips to advertising agencies, billboard design businesses, etc. will give students a look at actual daily activities in graphic design. Budget Impact: No Funding Needed Task Name: Guest Speakers Task Description: Bringing guest speakers will offer students a question and answer forum to best explain industry expectations. Budget Impact: No Funding Needed Task Name: Lab Expansion Task Description: Funding for lab expansion, equipment or additional faculty or lab assistants will be provided by the existing budget or any other appropriate funding. Budget Impact: 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 14 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up No Funding Needed Planning - Advertising Graphics - VV Student Recruitment in High Schools (20102011) - Recruiting of students from area schools remains a goal and effort to increase enrollment numbers. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2010 Objective Status: In Progress Budget Account Number: 11000-55365 Person(s) Responsible: David Galatzan Measure: The Support of our Advisory Committee, made up of members from the advertising agencies and graphic arts community, will insure current equipment, technologies and program objectives meet graphic design industry standards. Graduation rates and updated communication with students in their professional graphic arts careers will provide measurable data. Data Source for Measure: Department/Area Report Standard and Baseline: The standard for success is student graduation upon successful completion of our Associates of Applied Science Degree in Advertising Graphics & Design. Baseline: Compiling data from student information in those working in professional design careers will mark standards for success and a measurable baseline. 10/05/2011 - Recruitment will continue to be an ongoing effort to increase enrollment. This should be a continuing goal for all EPCC programs. Any time you have a chance to meet with students from area schools helps the cause tremendously. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Advisory Committee Task Description: Continue guidance from our Advisory Committee, relevant field trips to advertising agencies, billboard design businesses, etc. will give students a look at actual daily activities in graphic design. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Guest Speakers Task Description: Bringing guest speakers will offer students a 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 15 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up question and answer forum to best explain industry expectations. Budget Impact: No Funding Needed Task Name: Lab Expansion Task Description: Funding for lab expansion, equipment or additional faculty or lab assistants will be provided by the existing budget or any other appropriate funding. Budget Impact: No Funding Needed Planning - Advertising Graphics - VV - New Funds Request (2010-2011) - The increasing need for a larger computer graphic arts lab and a full-time lab assistant remains. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2010 Objective Status: In Progress Budget Account Number: 11000-55365 Person(s) Responsible: David Galatzan Measure: The Support of our Advisory Committee, made up of members from the advertising agencies and graphic arts community, will insure current equipment, technologies and program objectives meet graphic design industry standards. Graduation rates and updated communication with students in their professional graphic arts careers will provide measurable data. Data Source for Measure: Department/Area Report Standard and Baseline: The standard for success is student graduation upon successful completion of our Associates of Applied Science Degree in Advertising Graphics & Design. Baseline: Compiling data from student information in those working in professional design careers will mark standards for success and a measurable baseline. 10/05/2011 - We still have a need/funds for a new and larger computer graphic arts lab and a full-time lab assistant to better serve our students. This request has been submitted and the Dean agrees that this is a priority for our program to grow. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Advisory Committee Task Description: Continue guidance from our Advisory 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 16 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 10/17/2011 - New name and curriculum changes to the ACHS program has shown signs of promise, however, not enough momentum has been seen to increase program enrollment yet. EPCC administration has shown great support towards new program ideas and plans, however, their involvement in the changes have not been enough to help promote these new changes to the community and EPCC students. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 10/17/2011 - There needs to be an increase in awareness of the new ACHS program direction among relevant program stockholders, i.e. Advisory Committee members, EPCC HCOP and Health Careers Program administration, and EPCC counseling dept. Committee, relevant field trips to advertising agencies, billboard design businesses, etc. will give students a look at actual daily activities in graphic design. Budget Impact: No Funding Needed Task Name: Guest Speakers Task Description: Bringing guest speakers will offer students a question and answer forum to best explain industry expectations. Budget Impact: No Funding Needed Task Name: Lab Expansion Task Description: Funding for lab expansion, equipment or additional faculty or lab assistants will be provided by the existing budget or any other appropriate funding. Budget Impact: No Funding Needed Planning - Allied Community Health Services - RG - Allied Community Health Services Program (2010-2011) - To enhance the community college image through increased community partnerships and collaborative initiatives to improve the health of the community through the utilization of the ACHS Program. Planning Year(s): 2010 - 2011 Expected Completion Date: 12/12/2011 Actual Completion Date: 12/12/2011 Objective Status: 03/05/2012 11:45 AM Measure: Development and implementation of an ACHS promotional plan that is supported and promoted by the EPCC administration to relevant community stockholders such as hospital employers, CBO's, school districts, and other profit and non-profit health and human services providers. Data Source for Measure: Department/Area Report Standard and Baseline: Formal development and presentation of plan. Baseline: Currently through HCOP and Health Careers Program. Generated by TracDat a product of Nuventive. There needs to be an increase in promotion of the program among these relevant stockholders. There needs to be an increase in recruitment efforts, by EPCC Page 17 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up counselors, ACHS program directors and other EPCC administration to expand the student pool and promote the importance of the new ACHS program. In Progress Budget Account Number: 11000-55150 Person(s) Responsible: Leticia Flores Task Name: ACHS Associate Degree Task Description: Develop an Allied Community Health Associate Degree. Budget Impact: No Funding Needed Task Name: Articulation Plan b/w EPCC and local high schools Task Description: Implement an articulation plan that provides easy transfer for graduates from local high schools into the ACHS program. Budget Impact: No Funding Needed Task Name: Articulation Plan b/w EPCC and UTEP Task Description: Implement articulation plan to transfer EPCC ACHS course credit to UTEP Health Promotion Program. Budget Impact: No Funding Needed Task Name: Increase ACHS job promotion and creation through EPCC contact with local employers Task Description: In order for an increase in ACHS awareness, and job promotion and creation among local area employers, EPCC administration needs to meet with employers at hospitals, clinics, 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 18 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up schools, CBO's, City Health departments and Health and Human Services. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Increase Employer Involvement Task Description: Increase employer involvement in ACHS Workforce Development. Budget Impact: No Funding Needed Task Name: Multimedia Program Campaign Task Description: Implement a multimedia program campaign, designed and supported by EPCC, to promote ACHS program. Budget Impact: No Funding Needed Task Name: Promote ACHS Employment Task Description: Develop and implement plan to promote ACHS Employment and Workforce Development. Budget Impact: No Funding Needed Task Name: Promote Dept. of Labor SOC Codes for ACHS related careers Task Description: Promote new U.S. Dept. of Labor SOC Code for ACHS related careers, such as social and community service jobs, education assistants, health education, and other health aide technicians, in order to increase job opportunities. Relevant SOC codes 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 19 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up include 11-9151; 19-4091; 21-1019; 211021; 21-1022; 21-1023; 21-1029; 21-1091; 21-1093; 21-1094; 21-1099; 25-9041; 292051; 31-1011; 31-9099. Budget Impact: No Funding Needed Planning - Americana Language Program VV - Increase ALP enrollment (2010-2011) Increase ALP enrollment by 5% Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-55320 Person(s) Responsible: Gail Mallinson Planning - Americana Language Program VV - UTEP/ALP Recruitment (2010-2011) Continue recruiting UTEP students who need ESL improvement. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-55320 Person(s) Responsible: Claude Mathis 03/05/2012 11:45 AM Measure: Increase enrollment by 5% in 2010-2011. Data Source for Measure: Enrollment Data Standard and Baseline: Baseline will be 2009-10 enrollment numbers. 09/12/2011 - ALP enrollment increased 27% in 2010-2011. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Gail Mallinson Task Description: Continue recruiting through El Diario, Ft. Bliss Monitor, and the El Paso Times. Budget Impact: No Funding Needed Task Name: Claude Mathis Task Description: Work with UTEP to offer ALP classes for students who need further language study. Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 20 of 297 Objectives Planning - Americana Language Program VV - Class Fill Rate (2010-2011) - To comply with college procedures regarding class fill rate. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Not Met Budget Account Number: 11000-55320 Person(s) Responsible: Gail Mallinson Planning - Anthropology - VV - Diversity in Department Course Offerings (2010-2011) Ensure students have choices in terms of course offerings and instructional formats in making course selections in Anthropology and Geography Planning Year(s): 2010 - 2011 Actual Completion Date: 05/13/2011 Objective Status: Not Met Budget Account Number: 11000-55310 Person(s) Responsible: 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Measure: 80% of classes will be at 75% fill rate. Data Source for Measure: Enrollment Data Standard and Baseline: 80% of classes will be at 75% fill rate. Results Action & Follow-Up 09/12/2011 - Although we did not meet this objective, ALP has been working diligently with the Registrar's Office to keep as many portable classrooms as possible for ALP classes so that we can use the smaller rooms for our smaller classes. We will continue to work with the Scheduling Dept. to stay within enrollment management guidelines. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Gail Mallinson Task Description: Program manager will work with Faculty Coordinators to move ALP classes into small classrooms to ensure program meets enrollment management standards. Program will offer staggered ESL levels to insure enrollment standards are met in each level. Budget Impact: No Funding Needed Measure: Schedule sections in Anthropology/Geography making use of all formats (face to face smart classrooms; online classes; mini-mester sections; and hybrid sections) and all course offerings. Data Source for Measure: Department/Area Report Standard and Baseline: The use of at least one section of each instructional format and the use of all courses listed in the Anthropology/Geography department during the 2010-2011 academic year. Baseline: We have offered face to face sections of all course offerings but have used only a portion 09/29/2011 - All formats were being used until the hybrid classes were changed back to face-to-face classes Spring 2011. This was due to the retirement of the instructor who developed and taught the hybrid. We continue to offer minimesters in anthropology. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. 09/29/2011 - Find/train an instructor to teach the hybrid classes that were lost. Page 21 of 297 Objectives Stacy Mayo Measures & Standards and Baselines / Results Strategies of other formats. We will try our first minimester section in Anthropology in Spring 2010. We tried hybrid sections of Geog 1302 and Anth 2351 in Fall 2009. And we have offered online sections of Geog 1302 and Anth 2351 in previous semesters. Action & Follow-Up Task Name: Recruit and Train Task Description: Recruit and train faculty to try new teaching formats and to be able to teach more than one course offering. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Architecture - VV - Increase Safety (2010-2011) - Increase safety in the architectural design studios and student work areas. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-55325 Person(s) Responsible: Ken Gorski 03/05/2012 11:45 AM Measure: Improve the safety and security aspects of the architectural studios for the students currently enrolled in architectural studio design studios and related courses by having an individual trained in equipment usage and safety. Data Source for Measure: Department/Area Report Standard and Baseline: Student feedback by means of in-studio surveys and discussion with other instructors and college personnel. Because of the nature of their education, architecture students require 24-7 access to the architectural design studios and workshop areas for project preparation. This is the norm throughout all accredited architecture programs whithin the U.S. Baseline: To hire two new adjunct/part time individuals whose responsibility it will be to maintain the design studio workshops and instruct the students on proper tool and machine equipment Generated by TracDat a product of Nuventive. Page 22 of 297 Objectives Measures & Standards and Baselines / Strategies usage after normal college hours. Results Action & Follow-Up Task Name: Provide Full Time Supervision Task Description: This stategy would be ultimately provide full time supervision within the architecture design studio areas and art department workshops utilized by the students within the discipline. Budget Impact: No Funding Needed Planning - Architecture - VV - Upkeep of Equipment (2010-2011) - Provide a trained individual responsible for the upkeep of equipment , including computer related equipment, and the facilities utilized by the properly validated architectural design student's for their usage of the design studios and work areas during off hours. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-55325 Person(s) Responsible: Ken Gorski Measure: Improve the safety and security aspects of the architectural studios for the students currently enrolled in architectural studio design studios and related courses by having an individual trained in equipment usage and safety. Data Source for Measure: Department/Area Report Standard and Baseline: Student feedback by means of in-studio surveys and discussion with other instructors and college personnel. Becasuse of the nature of their education, architecture students require 24-7 access to the architectural design studios and workshop areas for project preparation. This is the norm throughout all accredited architecture programs whithin the U.S. Baseline: To designate the existing lab assistant for classrooms A1512, 1511, and 1509 to be assigned part time to the architecture discipline during conventional college hours. Task Name: Provide Full Time Supervision Task Description: This stategy would be ultimately provide full 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 23 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up time supervision within the architecture design studio areas and art department workshops utilized by the students within the discipline. Budget Impact: Additional/New Funding Required Planning - Architecture - VV - Improve Interior Styling (2010-2011) - Improve the Graphics and Architectural Discipline interior styling and colors of the architectural studios more representational of an academic architectural interior. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-55325 Person(s) Responsible: Ken Gorski Measure: Improve the motivational atmosphere of the architectural studios for the students anticipating attending and currently enrolled in architectural studio design and drawing courses. Data Source for Measure: Department/Area Report Standard and Baseline: Student feedback by means of in-studio surveys and discussion with EPCC counselors. Baseline: Existing wall finishes are faded, marked, and include mixed colors. The existing lay-in ceiling is institutional in nature, and hides the exposed structural system of the building which is used as part of architectural technology lectures on facility. To improve the motivational character of the room for students entering the field of construction systems and architectural and interior design. Task Name: Ceiling Structure Task Description: Remove existing ceiling panels and spray paint flat black the exiting ceiling grid and existing exposed ceiling structure in order to expose it to use for usage as an example of architectural construction methods in an atmosphere conducive to architecture classroom learning situations. Budget Impact: 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 24 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Additional/New Funding Required Projected Cost: 1300.0000 Task Name: Complete Graphics Task Description: Complete graphics on masonry walls, column posts and partitions with student/faculty design and participation. Budget Impact: Additional/New Funding Required Projected Cost: 900.0000 Task Name: Repaint Room Task Description: Repaint entire room. Budget Impact: Additional/New Funding Required Projected Cost: 1300.0000 Planning - Architecture - VV - Construction, Remodeling, Maintenance and Renovation (2010-2011) - Construction, remodeling, maintenance, renovation of the existing service sink in A1518. Provide a new cabinet base, countertop of the size and profile to match existing with an intergral backsplash, edge and plastic laminate top. New "high profile faucet" with cold and hot water mixing valve handles that could be operated by lever action or the sidearm or elbow rather than hand turning, especially when students hands are badly soiled from water color or acrylic paints. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2012 11:45 AM Measure: Existing 2'-9" deep by 7'-1" long counter and sink cabinet, replacing with a new "extra deep" and "extra wide" double compartment stainless steel sink, swivel high-rise faucet and new controls. Data Source for Measure: Department/Area Report Standard and Baseline: Remove existing unsanitary and unhealthy work sink and replace with new unit. Baseline: Provide a new cabinet base, countertop of the size and profile to match existing with an integral backsplash, edge and plastic laminate top. New "high profile faucet" with cold and hot water mixing value handles that could be operated by levers Generated by TracDat a product of Nuventive. Page 25 of 297 Objectives 03/10/2010 Objective Status: New Budget Account Number: 11000-55325 Person(s) Responsible: Ken Gorski Planning - Art - VV - Replace Ventilation (2010-2011) - To replace ventilation for all Art Studios-starting with Print Making Lab (A1318). Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-55180 Person(s) Responsible: Don Cowan 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up action or the sidearm or elbow rather than hand turning, especially when students hands are badly soiled from water color or acrylic paints. Task Name: New Laminate Task Description: Provide new plastic laminate base cabinet and doors, 1 adj. shelf on KV standards and clips.; laminate clad 9" front "apron" and 6" backsplash, rolled integral edges front and back, having a 4" kick-space at bottom to match existing profile. Provide a 12" high laminate wainscot at back side of the cabinet. At the back wall provide 2-3/4" plywood adjustable plastic laminate clad 14" deep shelves on adjustable standards, full length of counter. New Faucet per above. Budget Impact: Additional/New Funding Required Projected Cost: 3900.0000 Measure: Objective will be met when fumes from solvents and chemicals are safely vented. Data Source for Measure: Department/Area Report Standard and Baseline: According to Rick Lobato (Physical Plant) Goal is 100% replacement for each studio. Baseline: Ventilation system is inadequate for safety needs, especially A1318 and A1325 (Sculpture Yard). Task Name: Installation of New Ventilation Task Description: Objective will be attained when new ventilation system is installed. Generated by TracDat a product of Nuventive. Page 26 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: Additional/New Funding Required Projected Cost: 100000.0000 Planning - Athletics - VV - Lights for Baseball and Softball Field (2010-2011) Addition of lights on the filed will allow for night games. It will allow for flexibility of games and coaches could hold baseball and softball tournaments. Practice times could be held later in the day allowing for student-athletes to take classes in the morning. Increase the ability of the general public and students to attend the night games, by not conflicting with work and class schedule. Planning Year(s): 2010 - 2011 2011 - 2012 Expected Completion Date: 08/30/2013 Objective Status: In Progress Budget Account Number: 32008-A32008 Person(s) Responsible: Felix Hinojosa Measure: The baseball and softball complex at Valle Verde needs lights. Data Source for Measure: Budget Data Standard and Baseline: Currently, there are no light poles in the baseball and softball compex. We need 8 light poles for baseball and 6 light poles for softball. Planning - Athletics - VV - Softball Dirt (2010-2011) - Softball dirt will need to be replaced with Stabilizer Solution dirt which would allow us to meet the standard requirement of a collegiate level playing field. Planning Year(s): 2010 - 2011 2011 - 2012 Expected Completion Date: 05/31/2012 Measure: The softball field dirt will be replaced with Stabilizer Solution dirt. Data Source for Measure: Budget Data Standard and Baseline: Currently, the dirt that is on the softball field makes it hard to hold practice or games when it rains. The dirt doesn't absorb the water enough so games and practices have to be delayed with the stabilizer solution dirt 03/05/2012 11:45 AM 12/09/2011 - Due to completion of project our funding will have to be increased by 80% due to inflation and cost of building materials. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Fundraising Task Description: Coaches will need to fundraise in order to complete this project. Budget Impact: Additional/New Funding Required Projected Cost: 750000.0000 Funding Justification: Improve safety on field, night games and allow students to take morning classes. 12/09/2011 - We are in the bidding stage and we will be informed by purchasing when to proceed to the next stage. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. Page 27 of 297 Objectives Objective Status: In Progress Budget Account Number: 32008-A32008 Person(s) Responsible: Felix Hinojosa Planning - Auxiliary Services - Quality and Efficiency in Mail Service Operations (20102011) - Identify, analyze, and determine cost containment to maximize efficiency, effectiveness and quality of mail service operations. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-72001 Person(s) Responsible: Juan Flores 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up the water is absorb automatically. By purchasing this dirt will alleviate us from having the purchase dirt each year due to our winds. Task Name: Fundraising Task Description: Coaches will need to fundraise in order to complete this project. Budget Impact: Additional/New Funding Required Projected Cost: 95000.0000 Funding Justification: Improve safety on softball field and allows for continuous play. Measure: Identify and maximize postal services discount. Data Source for Measure: Department/Area Report Standard and Baseline: Improvement and standardization of mail services operations. Baseline: Mail processing equipment leasing payback option, Operating procedures revisions Mailcourier services. Measure: Identify continuous improvement processes and standardize operating procedures Data Source for Measure: Department/Area Report Standard and Baseline: Improvement and standardization of mail services operations. Baseline: Mail processing equipment leasing payback option, Operating procedures revisions Mailcourier services. 11/23/2010 - Mail Service Operation has been restuctured to maximize operational efficiency and effectiveness. Revisions have been made to mail procedures manual. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Generated by TracDat a product of Nuventive. Page 28 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: Challenges and Opportunities Task Description: Identify challenges and opportunities in cost containment strategies, and revise operating procedures manual. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Auxiliary Services - Fuel Resource Allocation (2010-2011) - Obtain resource allocation to support customer needs operation, lower processing and support services costs. To meet fuel demands for vehicle departmental fleet. Planning Year(s): 2010 - 2011 Expected Completion Date: 12/31/2011 Actual Completion Date: 12/31/2011 Objective Status: In Progress Budget Account Number: 11000-72001 Person(s) Responsible: Juan Flores 03/05/2012 11:45 AM Measure: Increase fuel operational budget to meet operational demands. Data Source for Measure: Budget Data Standard and Baseline: 100% budget allocation for vehicle fuel operation. Baseline: Resource allocation running at 60% of Departmental gasoline consumption. Fuel increases impact on budget bottom line. 12/05/2011 - Restructure mail run operations to save on gasoline consumption. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 11/23/2010 - Partially completed. Restructuring of mail courier srvices to save fuel consumption. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Identify Opportunities Task Description: Identify opportunities to reduce fuel consumption. Budget Impact: Additional/New Funding Required Projected Cost: 4500.0000 Task Name: Identify Resources Task Description: Identify Institutional resources to face fuel consumption supply and demand. Budget Impact: Generated by TracDat a product of Nuventive. Page 29 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Additional/New Funding Required Planning - Auxiliary Services - Challenge of Future Mail Communication Technology Solutions (2010-2011) - Obtain resource allocation to support customer needs operation, lower processing and support services costs. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72001 Person(s) Responsible: Juan M. Lopez/Juan Flores Measure: To provide postal services discounts to district wide organizations. Data Source for Measure: Department/Area Report Standard and Baseline: 100% reduce allocation for leasing of mail processing equipment. Baseline: Mail processing equipment leasing payback option subsidized by surcharged applied from postal discounts. 12/05/2011 - Operational discounts being offered to district-wide organizations. Restructured lease agreement to subsidize mailing machine lease payment from postal discounts. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 12/05/2011 - Restructure lease agreement to operate within budget boundaries. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 10/25/2011 - Reduce operational cost by 50% by restructuring lease agreement and streamlining mail operations. Progress: Satisfactory Action Plan Status: 3 - Follow-Up Documented Task Name: Equipment and Lease Payment Plan Task Description: Identify equipment and lease payment plan to be institutionally funded to apply postal discounts District wide. Budget Impact: Additional/New Funding Required Task Name: Pitney Bowes Postal Lease Task Description: 1 ea Pitney Bowes Postal Lease Mailing Machines/Year $10,000.00 Supplies to operate Mailing Machines $1,000.00. Budget Impact: 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 30 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Additional/New Funding Required Projected Cost: 11000.0000 Planning - Auxiliary Services - FTE Shipping & Receiving Area/Electric Pallet Jack. Hydraulic Dock Leveler 2 ea. Dock Vinyl Strip Door (2010-2011) - Procure resources to ensure continuance of a quality service Department with cost Effectiveness in the Auxiliary Services Area. Allocation of funds to obtain electric pallet jack and hydraulic dock leveler to handle heavy items to continue safety plan. Vinyl strip door to conserve energy in security warehouse area. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72010 Person(s) Responsible: Juan M. Lopez/Juan Flores 03/05/2012 11:45 AM Measure: Resource allocation funds for FTE. Data Source for Measure: Department/Area Report Standard and Baseline: 100% funding for FY 2010-2011. Baseline: None existent at this time. 12/05/2011 - Equipment has been allocated to the area. FTE has been postponed due to budget constraints. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 08/31/2011 - Objective in Progress due to budget constraints. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Measure: Acquisition of equipment. Data Source for Measure: Department/Area Report Standard and Baseline: 100% funding for FY 2010-2011. Baseline: None existent at this time. 08/31/2012 - Objective in Progress due to budget constraints Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Equipment Task Description: Identify targeted electric pallet jack, hydraulic dock leveler, and dock vinyl strip door to address safety concerns of warehouse area. Budget Impact: Additional/New Funding Required Projected Cost: 9500.0000 Task Name: Fund Shipping and Receiving Task Description: To institutionally fund Shipping and Generated by TracDat a product of Nuventive. Page 31 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Receiving FTE. Budget Impact: Additional/New Funding Required Projected Cost: 19685.0000 Planning - Auxiliary Services - On-Line Public Sales (2010-2011) - Conduct OnLine Sales for District Surplus Property. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 1100-72002 Person(s) Responsible: Juan Flores Measure: District Surplus Property will be advertised and offered through designated approved Vendor's Website. EPCC Public Sales online. Data Source for Measure: Department/Area Report Standard and Baseline: District online sales will be conducted on availability of items for public auction designed to maximize District's steam of revenue. Baseline: Planning and implementation process. Planning - Auxiliary Services - Update Property Management Procedures Manual (2010-2011) - Update Departmental Procedures Manual. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Measure: Procedure is completed Data Source for Measure: Department/Area Report Standard and Baseline: Standardized departmental policies and procedures. Baseline: Procedures Manual to be updated. 03/05/2012 11:45 AM 07/01/2011 - Local Auctioneer hired to handle live and online pubic sales. Increase in revenue stream by 400% Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Surplus Equipment Task Description: Identify Online Sales of Government Surplus Equipment. Obtain Board Approval. Budget Impact: No Funding Needed Projected Cost: 0.0000 12/05/2011 - Procedure has been revised to include revised policies and procedures. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 32 of 297 Objectives Objective Status: Met Budget Account Number: 11000-72002 Person(s) Responsible: Juan Flores Planning - Auxiliary Services - Operation Forklift (2010-2011) - Operate Forklift. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72002 Person(s) Responsible: Juan Flores Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: Practices and Procedures Task Description: Revise, and implement processes, current businesses practices updated policies and procedures. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Forklift is functional and operational. Data Source for Measure: Department/Area Report Standard and Baseline: Department being able to operate and utilize forklift. Baseline: Forklift in need of electric batteries. 08/31/2012 - Operational objective in progress due to budget contraints. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented 10/27/2011 - Electrical forklif is operational. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 10/27/2011 - Electrical batteries in place and operational. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Replacement of Forklift Task Description: Obtain budget appropriation for replacement of forklift. Budget Impact: Additional/New Funding Required Projected Cost: 5500.0000 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 33 of 297 Objectives Measures & Standards and Baselines / Strategies Planning - Auxiliary Services - Tracking Management System (2010-2011) - Procure resources for an asset/inbound/outbound management tracking system. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: In Progress Budget Account Number: 11000-72002 Person(s) Responsible: Juan Flores Measure: Resource allocation is considered for this project. Data Source for Measure: Department/Area Report Standard and Baseline: Steamline processes, time management, technological approach, efficiency and effectiveness of operations-recordingreporting. Baseline: None existent at this time. Planning - Auxiliary Services - Testing Center Exam Labels (2010-2011) - To standardize Testing Center Exam Labels being handled through the ISC. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72003 Person(s) Responsible: Yolanda Aguilar/Juan Flores Measure: The new labels will be standardized and easily recognized. Data Source for Measure: Department/Area Report Standard and Baseline: The use of the standardized form will facilitate the handling Testing Center exams. Baseline: Form has been standardized and all Testing Center will begin to utilize this new form. 03/05/2012 11:45 AM Results Action & Follow-Up 08/31/2012 - Objective is being re-evaluated due to budget constraints. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Obtain Hardware Task Description: Obtain Hardware and software necessary to integrate Property Management, Shipping and Receiving, and ISC's. Budget Impact: Additional/New Funding Required Projected Cost: 16880.0000 12/05/2011 - Standardization of new form is in place for Testing Center exams. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: New Form Task Description: With the cooperation of the Testing Center staff and the ISC staff together we will Generated by TracDat a product of Nuventive. Page 34 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up assure that the new form is being used by all campuses. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Auxiliary Services - Faculty Evaluation Process (2010-2011) - Establish a Color Coded process to facilitate distribution of packets. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72003 Person(s) Responsible: Yolanda Aguilar/Juan Flores Measure: Evaluations will be color coded. Data Source for Measure: Department/Area Report Standard and Baseline: A smooth, error free distribution of all faculty evaluations. Baseline: Gathering information and contacting departments that need to be involved. Planning - Auxiliary Services - Revise Office Procedures Manual (2010-2011) - Update existing 2003 Office Procedures Manual to comply with SACS. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: Measure: Review of updates/changes on a semester basis. Data Source for Measure: Department/Area Report Standard and Baseline: 100% Office Procedures Manual will be upgraded on a continual basis as required. 2003 Procedures Manual is under review with changes/deletions/revisions. 03/05/2012 11:45 AM 12/05/2011 - Color coded for a smooth and error free distribution has been accomplished. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Cooperation and Retraining Task Description: With the cooperation of Institution Research Dept. and retraining of ISC staff. Budget Impact: No Funding Needed Projected Cost: 0.0000 08/31/2011 - Procedures Manual has been revised and upgraded. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Changes Generated by TracDat a product of Nuventive. Page 35 of 297 Objectives 11000-72004 Person(s) Responsible: Mary B. Suarez/Juan Flores Measures & Standards and Baselines / Strategies Action & Follow-Up Task Description: Review sections of manual and make appropriate changes. Meet/contact peers each week to assure established deadlines are met. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Auxiliary Services - Upgrade Color copier Equipment (2010-2011) Upgrade color copier to increase productivity and reduce cost. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72005 Person(s) Responsible: Elda Shahabi/Juan Flores Measure: Provide color copying services to faculty, students, and staff. Data Source for Measure: Department/Area Report Standard and Baseline: 100% resource allocation for equipment rental. Baseline: Faculty, students and staff are not meeting their needs with existing equipment. Planning - Auxiliary Services - Revise Office Procedures Manual-RG (2010-2011) Update existing 2003 Office Procedures Manual to comply with SACS. Planning Year(s): 2010 - 2011 Expected Completion Date: Measure: Review of updates/changes on a semester basis. Data Source for Measure: Department/Area Report Standard and Baseline: 100% Office Procedures Manual will be 03/05/2012 11:45 AM Results 12/05/2011 - Successfully negotiated color copy proposal with Canon Color Copiers for the VV and RG ISCs. Generated fifty percent savings in rental agreement. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Proposals Task Description: Contact vendors, request for proposals, compare and/or contrast results, submit paperwork for approval, and schedule for impementation in 2010-2011. Budget Impact: No Funding Needed Projected Cost: 0.0000 08/31/2011 - Successful Update of ISC's procedures manual. Met with peers on a regular basis and successfully produced a 2011 Instructional Services updated procedures manual Progress: Satisfactory Action Plan Status: Generated by TracDat a product of Nuventive. Page 36 of 297 Objectives 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72005 Person(s) Responsible: Elda Shahabi/Juan Flores Planning - Auxiliary Services - Promote ISC Services (2010-2011) - Increase advertising and marketing strategies to promote ISC services to faculty, students, and staff. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72005 Person(s) Responsible: Elda Shahabi/Juan Flores 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up 0 - No Action Plan Necessary upgraded on a continual basis as required. Baseline: 2003 Procedures Manual is under review with changes/deletions/revisions. Task Name: Review Task Description: Review sections of manual and make appropriate changes. Meet/contact peers each week to assure established deadlines are met. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Productivity reflected on charge-backs and production reports. Data Source for Measure: Department/Area Report Standard and Baseline: Increase productivity. 100% level of awareness of ISC services. Baseline: Limited marketing. 12/05/2011 - Charge backs increased by 8% and successful marketing strategies such as open house, faculty development and purchasing day were utilized to enhance the ISC's services to student, faculty and staff. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Participation Task Description: Active participation in College sponsored activities such as Purchasing Day, Faculty Development, and Student Resource Day. Utilize in-house resources such as Outlook and annual Open House, place posters and/ or signs in strategic areas. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 37 of 297 Objectives Measures & Standards and Baselines / Strategies Planning - Auxiliary Services - Professional Development (2010-2011) - Attend college sponsored professional development seminars. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72005 Person(s) Responsible: Elda Shahabi/Juan Flores Measure: Active participation of college sponsored seminars. Data Source for Measure: Department/Area Report Standard and Baseline: Will enhance or increase skills levels. Baseline: Limited attendance to professional development seminars. Planning - Auxiliary Services - Graphic and Abbyy Reader Software (2010-2011) Enhance the quality of word processing services by acquiring graphic and Abbyy Reader software. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72005 Person(s) Responsible: Elda Shahabi/Juan Flores Measure: Accessible to Health Related Programs' demands. Data Source for Measure: Department/Area Report Standard and Baseline: Increase quality and quantity of word processing services in Health Related programs. Baseline: Lacking software. 03/05/2012 11:45 AM Results Action & Follow-Up 12/05/2011 - Increased participation on college related sponsored seminars. Objective successfully achieved. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Workshop Opportunities Task Description: Register staff to attend workshop opportunities. Budget Impact: No Funding Needed Projected Cost: 0.0000 12/05/2011 - Objective no longer needed. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Purchase Software Task Description: Purchase software license and supplies, contact IT for installation, train staff. Budget Impact: Additional/New Funding Required Projected Cost: 1245.0000 Generated by TracDat a product of Nuventive. Page 38 of 297 Measures & Standards and Baselines / Strategies Results Planning - Auxiliary Services - Part-Time Pool Allocation (2010-2011) - Increase hours of operation to accommodate customer demand and be accessible for faculty teaching 6:00 a.m. classes. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: In Progress Budget Account Number: 11000-72005 Person(s) Responsible: Elda Shahabi/Juan Flores Measure: Provide support services to faculty teaching 6:00 a.m. classes. Data Source for Measure: Department/Area Report Standard and Baseline: Provide adequate level staff. Baseline: Nonexisting at this time. 12/05/2011 - Objective in Progress; budget constrains one of the primary reasons the objective has not been accomplished yet. Progress: Satisfactory Action Plan Status: 3 - Follow-Up Documented Planning - Auxiliary Services - Testing Center Exam Labels at TM (2010-2011) To standardize Testing Center Exam Labels being handled through the ISC. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72006 Person(s) Responsible: Maria B. Suarez/Juan Flores Measure: The new labels will be standardized and easily recognized. Data Source for Measure: Department/Area Report Standard and Baseline: The use of the standardized form will facilitate the handling Testing Center exams. Baseline: Form has been standardized and all Testing Center will begin to utilize this new form. Objectives 03/05/2012 11:45 AM Action & Follow-Up Task Name: Part-Time Task Description: Requesting allocation of funds to hire one Part-Time ISC Technician to work 19 hours per week @ $9.39 per houre for 52 weeks = $9,277.32 additional staff will ensure for increased support to faculty, students, and staff. Budget Impact: Additional/New Funding Required Projected Cost: 9278.0000 12/05/2011 - Testing labels standardization has been implemented. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: New Form Task Description: With the cooperation of the Testing Center staff and the ISC staff together we will Generated by TracDat a product of Nuventive. Page 39 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up assure that the new form is being used by all campuses. Budget Impact: Additional/New Funding Required Projected Cost: 0.0000 Planning - Auxiliary Services - Faculty Evaluation Process at TM (2010-2011) Establish a Color Coded process to facilitate distribution of packets. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72006 Person(s) Responsible: Maria B. Suarez/Juan Flores Measure: Evaluations will be color coded. Data Source for Measure: Department/Area Report Standard and Baseline: A smooth, error free distribution of all faculty evaluations. Baseline: Gathering information and contacting departments that need to be involved. Planning - Auxiliary Services - Testing Center Exam Labels-MDP (2010-2011) - To standardize Testing Center Exam Labels being handled through the ISC. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: Measure: The new labels will be standardized and easily recognized. Data Source for Measure: Department/Area Report Standard and Baseline: The use of the standardized form will facilitate the handling Testing Center exams. Baseline: Form has been standardized and all Testing Center will begin to utilize this new form. 03/05/2012 11:45 AM 12/05/2011 - Color coded process implemented form smooth-error free distribution of all faculty evaluations. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Retraining Task Description: With the cooperation of Institutional Research Dept. and retraining of ISC staff. Budget Impact: No Funding Needed Projected Cost: 0.0000 12/05/2011 - Objective met and implemented standardization of form and labels. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 40 of 297 Objectives 11000-72007 Person(s) Responsible: Yolanda Aguilar/Juan Flores Measures & Standards and Baselines / Strategies Action & Follow-Up Task Name: New Form Task Description: With the cooperation of the Testing Center staff and the ISC staff together we will assure that the new form is being used by all campuses. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Auxiliary Services - Faculty Evaluation Process-MDP (2010-2011) Establish a Color Coded process to facilitate distribution of packets. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: 03/24/2010 Objective Status: Met Budget Account Number: 11000-72007 Person(s) Responsible: Yolanda Aguilar/Juan Flores Measure: Evaluations will be color coded. Data Source for Measure: Department/Area Report Standard and Baseline: A smooth, error free distribution of all faculty evaluations. Baseline: Gathering information and contacting departments that need to be involved. Planning - Auxiliary Services - Front Counter ISC (2010-2011) - To enhance customer service and work functionality. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/24/2010 Actual Completion Date: Measure: Front counter built and in placed. Data Source for Measure: Department/Area Report Standard and Baseline: Ergonomically customer service oriented. Baseline: Limited counter functionality. 03/05/2012 11:45 AM Results 12/05/2011 - Standardization and streamline of color coded for all campuses. Distribution process has improved the processes. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Retraining Task Description: With the cooperation of Institutional Research Dept. and retraining of ISC staff. Budget Impact: No Funding Needed Projected Cost: 0.0000 03/31/2012 - Project on hold by the Physical Plant Department. Progress: Satisfactory Action Plan Status: 3 - Follow-Up Documented 10/27/2011 - Front Counter has been built and customer services accessibility and functionality Generated by TracDat a product of Nuventive. Page 41 of 297 Objectives 03/24/2010 Objective Status: In Progress Budget Account Number: 11000-72007 Person(s) Responsible: Yolanda Aguilar/Juan Flores Planning - Biology - NW - NW Biology Online Wimba Recordings (2010-2011) Expand the College's technological capabilities. The two full time Biology faculty, Hilda Taylor and Sandra Perez, will become trained on the new standard EPCC program for recording lectures. Our goal is to complement the PowerPoint lectures we already make available to students online through the smart start system and through our own web pages. Ultimately, we hope to offer hybrid sections of our Biology classes. Planning Year(s): 2010 - 2011 Objective Status: In Progress Budget Account Number: 11000-55333 Person(s) Responsible: Hilda Taylor/Sandra Perez 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up has been improved. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Design Task Description: Design-Work request and obtain funding. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Review website of NW Biology faculty for recorded lectures. Data Source for Measure: Department/Area Report Standard and Baseline: Expect 25-50% of our lectures to be available as recorded lectures by the end of 2010. Baseline: Currently, <1% of our recorded lectures are available online. Task Name: Training on the Blackboard and Wimba Systems Task Description: We will be receiving training on the Blackboard and Wimba Systems, which are the standard software packages used at EPCC for Distance Education. Wimba will be used to record our lectures in lieu of Camtasia as funding for this program, which we proposed using last year, was not available. Sandra Perez has already completed training on the Blackboard System which is a prerequisite for receiving training on the Wimba system. Andy Generated by TracDat a product of Nuventive. Page 42 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Lawrence from Distance Education will be training her on the Wimba system in the coming months. Hilda Taylor will work closely with Sandra Perez in order to also complete her training. We plan to practice the recording process with our classes during the summer semester of 2010 and be ready to record more of our lectures during the Fall of 2010. Budget Impact: No Funding Needed Planning - Biology - NW - New BIOL/CHEM Lab (2010 - 2011). - The Biology Department at the Northwest campus was awarded the College Cost Reduction and Access Act (CCRAA) Grant. This funding will support its STEM Programs and will further enhance the addition of a new Biology/Chemistry Lab, renovate the existing Prep Room and existing Biology/Chemistry Lab. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/31/2011 Actual Completion Date: 08/12/2011 Objective Status: Met Budget Account Number: 1100055333 Person(s) Responsible: Hilda S. Taylor Planning - Biology - NW - SMARTBIOL/CHEM Lab (2010 - 2011). - The CCRAA Grant will make it possible for the Northwest campus to add a new Biology/Chemistry lab C223, renovate the original Biology Lab C229, and make the 03/05/2012 11:45 AM Task Name: Make New BIOL/CHEM Lab a SMART State of the Art LAB Task Description: The funding from the CCRAA Grant has Generated by TracDat a product of Nuventive. Page 43 of 297 Objectives necessary adaptations and renovations to the existing Biology Prep room C230 in order to offer Microorganisms and Disease and Chemistry courses. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/30/2011 Actual Completion Date: 09/29/2011 Objective Status: Met Budget Account Number: 11000-55333 Person(s) Responsible: Hilda S. Taylor Measures & Standards and Baselines / Strategies Results Action & Follow-Up made it possible for the BIOLOGY and CHEMISTRY departments at the Northwest campus to purchase state of the art electronic equipment such as: computers for students in labs C229 and C223; purchase projecting electronic microscopes for each lab; 3-D projectors and 3D software; and all the necessary models, videos, and lab supplies required to teach the courses indicated above. Funding Justification: The addition of this new lab will permit the increase of the number of courses we offer at the Northwest campus during the spring, fall and summer 2010 semesters and thus increase the number of students enrolled in Science Majors and Non-Science Majors courses. The CCRAA Grant will allow the Northwest Biology Department to added Microorganisms and Disease BIOL 2420 and Chemistry 1407 and 1411courses. This funding will also allow us to increase the number of classes offered in BIOL 1406, BIOL 2401, and BIOL 2402. Budget Impact: Rollover/Maintain Current Funding Planning - Biology - TM - Biology Laboratories Renovation and Installation (2010-2011) - Biology laboratories renovation and installation of equipment security devices. Planning Year(s): 2010 - 2011 Objective Status: New 03/05/2012 11:45 AM Measure: Laboratories renovated. Data Source for Measure: Department/Area Report Standard and Baseline: Completion within the year. Baseline: Outdated (kitchen- top grade, small sinks.) Unsafe (facing wall no biosafety hood), and inappropriate laboratory facilities. Generated by TracDat a product of Nuventive. Page 44 of 297 Objectives Budget Account Number: 11000-55331 Person(s) Responsible: Dr. Maria Alvarez Planning - Biology - VV - Replace Dissecting Microscopes (2010-2011) Upgrade the equipment utilized by the General Biology classes. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: Not Met Budget Account Number: 11000-55330 Person(s) Responsible: Glenda Hill Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: Renovate and Install Task Description: Renovate labs and install security devices in rooms 1535 and 1540. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Increase the number of dissection microscopes available for BIOL 1407 and BIOL 1407 students. (This equipment could also be used in our non-majors course 1408). Data Source for Measure: Department/Area Report Standard and Baseline: Curriculum will be improved by providing the Freshman Biology classes access to this equipment. Baseline: Currently the dissecting microscopes we have are more than twenty years old and we do not have enough for one lab section. This causes problems since at Valle Verde many times we have 1406/1407 labs running concurrently. 12/05/2011 - Not met. The Biology department at VV has decided to change the lab curriculum to one that is more inquiry-bases and for this reason this equipment need has been temporarily tabled. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Purchase Task Description: Purchase 16 new dissecting. Budget Impact: Additional/New Funding Required Projected Cost: 3184.0000 Planning - Biology - VV - Equipment for Microbiology Laboratories (2010-2011) 03/05/2012 11:45 AM Measure: Our Microbiology labs at present do not 12/05/2011 - Met. Progress: Generated by TracDat a product of Nuventive. Page 45 of 297 Objectives Obtain the equipment necessary for our Microbiology laboratories. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: Met Budget Account Number: 11000-55330 Person(s) Responsible: Glenda Hill Measures & Standards and Baselines / Strategies Results Action & Follow-Up Satisfactory possess an appropriate microbiological Action Plan Status: freezer or refrigerator which is needed to maintain certain cultures and is also needed 0 - No Action Plan Necessary for some experiments. Bacti-Cinerators are needed to sterilize inoculating loops that students use for their experiments and to transfer cultures. The equipment is needed to update our microbiology labs and to meet the needs of our expanding Micro. Program. Data Source for Measure: Department/Area Report Standard and Baseline: The equipment that the Biology department wishes to purchase will provide students with access to appropriate lab equipment in their Microbiology classes. The equipment is safer to use and by up-grading our lab equipment in the future, we hope to be able to provide students enrolled in other Biology course with the ability to do research activities. (The equipment could also be used to reach Research Techniques) Baseline: The equipment will bring our Micro. Prep. Area current as for as equipment is concerned. Task Name: Purchase Bacti-Cinerators Task Description: Purchase 16 Bacti-Cinerators, one undercabinet freezer and one microbiology refrigerator. Budget Impact: Additional/New Funding Required Projected Cost: 15954.0000 Planning - Budget Office - Upload Budget Into Banner (2009-2012) - Investigate the use of spreadsheet budgeting to upload the budget into Banner by creating a more efficient method of uploading the budget 03/05/2012 11:45 AM Measure: Work with Information Technology department to devise a way to upload the budget into Banner automatically. 02/23/2012 - Even though we have improved and become more efficient in the method of uploading the budget, we continue to look for ways to improve the process. Generated by TracDat a product of Nuventive. Page 46 of 297 Objectives Measures & Standards and Baselines / Strategies Results into the budget module. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 2012 - 2013 Expected Completion Date: 08/31/2012 Objective Status: In Progress Budget Account Number: 11000-73100 Person(s) Responsible: Jerry Fulton Progress: Data Source for Measure: Satisfactory Department/Area Report Action Plan Status: Standard and Baseline: 1 - Action Plan Needed This project will probably do three quarters of the total budget, but it will be an improvement of having to manually input all data. Planning - Budget Office - Expand the Office Area (2009-2012) - Expand the office area to provide ample working space for our employees. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Measure: Meetings between the Budget Director and members of physical plant and external contractors are taking place to plan out remodeling. Data Source for Measure: Department/Area Report Standard and Baseline: Baseline: We do not have sufficient working space for our personnel. We hope to improve working conditions. Actual Completion Date: 11/28/2011 Objective Status: Met Budget Account Number: 11000-73100 Person(s) Responsible: Jerry Fulton 03/05/2012 11:45 AM Action & Follow-Up Task Name: Work with the IT Department Task Description: Work with the Information Technology Department on developing a way of uploading spreadsheets into Banner by finding a software that has this capability. Budget Impact: No Funding Needed Projected Cost: 0.0000 11/28/2011 - Maintenance completed remodeling. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Expansion of Office Area Task Description: The expansion will allow us to do training in our office and ease the burden of over crowdedness. Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 47 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Projected Cost: 0.0000 Planning - Budget Office - Develop Reports to Analyze Expenditures (2010-2011) - Use Argos to generate the reports to analyze expenditures . Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2010 Objective Status: Met Budget Account Number: 11000-73100 Person(s) Responsible: Jerry Fulton Measure: Generate Reports that are easy to create and simple to use. Data Source for Measure: Department/Area Report Standard and Baseline: Create reports with multi functions. Baseline: Access reports require a programmer to write them. 08/31/2011 - Created an Argos report to easily identify employees that have access to the different orgs, have access to create requisitions, and helps maintain the approval queues. Created report to identify employee by ID number and group. Budgets were separated for 11000 and 13000 funds. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Network Task Description: Network at the SunGard Summit to find out how other people are using Argos. Also use ListServ. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Budget Office - Investigate the use of Self-Service Budgeting (2010-2012) Have Budget Heads input their budget(s) into Banner. Planning Year(s): 2010 - 2011 2011 - 2012 Expected Completion Date: 08/31/2012 Objective Status: 03/05/2012 11:45 AM Measure: Complete the evaluation for 2011-2012 budget. Data Source for Measure: Budget Data Standard and Baseline: Reduce the time to input the budget into Banner. Baseline: Budget Heads supply budget, President & VP's approve it & the Budget Office inputs the data into Banner. 08/31/2012 - We are still looking at how we can use self-service budgeting. We have gotten some ideas, but we need to change our set-up to implement them. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. Page 48 of 297 Objectives In Progress Budget Account Number: 11000-73100 Person(s) Responsible: Jerry Fulton Measures & Standards and Baselines / Strategies Measure: Approval of new course. Data Source for Measure: Department/Area Report Standard and Baseline: Approval. Baseline: No such course. Actual Completion Date: 03/08/2010 Objective Status: New Budget Account Number: 11000-55232 Person(s) Responsible: Lee Cannell Task Name: Unique Course Task Description: Apply to state for unique needs course. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Business Management - RG - Fill Rate for Business Courses (2010-2011) To improve fill rate. Planning Year(s): 2010 - 2011 Measure: 5% improvement. Data Source for Measure: Program Review Data Standard and Baseline: 75%, 80% full. Baseline: 62%. 03/05/2012 11:45 AM Action & Follow-Up Task Name: Network Task Description: Network at the SunGard Summit to find out how other people are using Argos. Also, use ListServ. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Business Management - RG Transfer ACGE Prefix for Bus Stat Course (2010-2011) - To improve transferability of stat course. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/08/2010 Objective Status: New Budget Account Number: 11000-55232 Person(s) Responsible: Results Task Name: Courses Offered Task Description: Monitor courses offered-cancel low sections. Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 49 of 297 Objectives Measures & Standards and Baselines / Strategies Lee Cannell Projected Cost: 0.0000 Planning - Business Management - VV Increase Class Fill Rate (2010-2011) Increase class fill rate to 66% district-wide. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/20/2010 Objective Status: Met Budget Account Number: 11000-55235 Person(s) Responsible: Becky Hancock Planning - CE Business Programs - VV Re-organize Office Technology Program (2010-2011) - Assess the most efficient way to offer classes in the Office Technology Program. Redesign the schedule to serve the students in a manner suited to their needs, utilizing space and personnel to maximize efficiency Planning Year(s): 2010 - 2011 Actual Completion Date: 03/09/2010 Objective Status: In Progress Budget Account Number: 11000-42204 Person(s) Responsible: Deirdre White 03/05/2012 11:45 AM Measure: Class fill rate provided by program review report. Data Source for Measure: Program Review Data Standard and Baseline: Class fill rate currently at 63%. Results Action & Follow-Up 09/19/2011 - Class fill rate currently at 69% per the 2010-2011 program review report for business. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Offer Less Classes Task Description: Offer less classes, better times. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Office Technology Program re-organized Data Source for Measure: Department/Area Report Standard and Baseline: More efficient use of facilities and staff. Baseline: On-going process results should be reflected by Spring 2011 10/18/2010 - This is only partially completed. We are working on further re-organization which we do not anticipate completing until Summer, 2011. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 10/18/2010 - Further planning is underway with input from the Vice President of Workforce, Economic Development and Continuing Education. This will be completed during the 2011/12 planning year. Task Name: Rescheduling Task Description: Work with current staff on rescheduling times to offer classes Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 50 of 297 Objectives Planning - CE Business Programs - VV Assess need for new business classes (2010-2011) - Assess need for new classes in the business area Planning Year(s): 2010 - 2011 Actual Completion Date: 03/09/2010 Objective Status: New Budget Account Number: 11000-42601 Person(s) Responsible: Deirdre White Planning - CE Business Programs - VV Add more Technology courses (2010-2011) - To add to and improve current technology courses (Latest MCSE's, Firewall Technology, Open Source Telephony, etc.) Planning Year(s): 2010 - 2011 Actual Completion Date: 03/09/2010 Objective Status: New Budget Account Number: 12195- S12195 Person(s) Responsible: Deirdre White 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Measure: Research for additional classes that would enhance the business programs Data Source for Measure: Department/Area Report Standard and Baseline: New classes are available if they are deemed necessary. Baseline: On-going process. New objective for 2010/2011 Task Name: Classes Task Description: Work with instructors to determine what, if any classes should be added to the current schedule Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: New courses added to CE computer programs Data Source for Measure: Department/Area Report Standard and Baseline: New courses available for student use. Baseline: On-going process. New objective for 2010/2011. Task Name: Work with AVI Instructor Task Description: Work with AVI instructor to develop and offer new courses to offer in CE schedule Budget Impact: No Funding Needed Projected Cost: Generated by TracDat a product of Nuventive. Page 51 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 0.0000 Planning - CE Business Programs - VV Offer More CORE Real Estate Classes (2010-2011) - Offer more CORE real estate classes so that students have more variety with which to obtain their license and continue toward a Broker's license. Planning Year(s): 2010 - 2011 Measure: New courses offered. Data Source for Measure: Department/Area Report Standard and Baseline: Courses offered in CE class schedule by Spring 2011. Baseline: On-going process. New objective for 2010/2011. Objective Status: New Budget Account Number: 12170-S12170 Person(s) Responsible: Dee White Task Name: Estate Classes Task Description: Work with real estate instructors to determine which CORE real estate classes would be most beneficial for students. Budget Impact: No Funding Needed Planning - CE Health - RG - Phlebotomy (2010-2011) - Obtain accreditation from NCCALS for the Phlebotomy course. Planning Year(s): 2010 - 2011 Measure: Approval granted with no conditions. Data Source for Measure: Department/Area Report Standard and Baseline: Completion of application and site visit. .Baseline: The program is currently not accredited by any national organization Actual Completion Date: 03/08/2010 Objective Status: In Progress Budget Account Number: 11000-42301 Person(s) Responsible: Marta de la Fuente Planning - CE Health - RG - Nail Tech (2010-2011) - Increase Enrollment 03/05/2012 11:45 AM 10/07/2011 - Still in process Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Self-Study and Accreditation Task Description: Complete self-study. Apply for accreditation. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Additional students enrolled. 10/07/2011 - Enrollment has increased by 50%. Currently there are 16 students enrolled. Generated by TracDat a product of Nuventive. Page 52 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 03/08/2010 Objective Status: Met Budget Account Number: 12287-S12287 Person(s) Responsible: Marta de la Fuente Planning - CE Industrial Training, Personal Enrichment - VV - HVAC Technician Course (2010-2011) - To offer a HVAC Technician short term training course at Valle Verde. Planning Year(s): 2010 - 2011 Expected Completion Date: 01/18/2011 Objective Status: In Progress Budget Account Number: 11000-42202 Person(s) Responsible: Kathleen Lopez Measures & Standards and Baselines / Strategies Data Source for Measure: Enrollment Data Standard and Baseline: 20% increase in enrollment. Baseline: Current enrollment is 8 students. Results Action & Follow-Up Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Advertising campaign. Task Description: Advertising campaign. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: This course will be developed and scheduled for Fall 2010. Data Source for Measure: Department/Area Report Standard and Baseline: It is the request from the business community to offer a HVAC Technician course. Due to the job demand. Baseline: At this time, we do not have a short term training course for HVAC technician. 12/02/2011 - The HVAC program has been transferred to the Advanced Technology Center. No longer in CE Industry Training. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Develop Curriculum Task Description: An instructor will be identified, and this person will develop the curriculum. The course will be held at the Advanced Technology Center. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - CE Industrial Training, Personal 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 53 of 297 Objectives Enrichment - VV - Dance Floors (20102011) - Install dance floors at the Valle Verde Campus. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/08/2010 Objective Status: Met Budget Account Number: 11000-42102 Person(s) Responsible: Kathleen Lopez Planning - CE Industrial Training, Personal Enrichment - VV - Fine Arts Summer Camps (2010-2011) - To increase awareness in the Fine Arts. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/08/2010 Objective Status: Met Budget Account Number: 11000-42111 Person(s) Responsible: Melissa Sanchez 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Measure: Old floors are a safety hazard. When new ones are installed, dance classes will continue as part of the C.E. area-should be complete by Summer 2011. Data Source for Measure: Department/Area Report Standard and Baseline: New dance lab floors will allow us to keep C.E. dance classes as first rate and affordable. Baseline: The floors at present time are a safety hazard. Results Action & Follow-Up 12/02/2011 - Three dance studio floors were installed in two campuses and completed in 2010. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Specs and Quotes Task Description: Identify specs and quotes for cost of dance lab floors. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Two Fine Arts camps will be added to summer 2011 schedule. Data Source for Measure: Department/Area Report Standard and Baseline: Due to the limited Fine Arts programs in the public schools, C.E. will offer Fine Arts classes to the children of our community. Baseline: Ongoing program development. 12/02/2011 - Two Fine Art courses/camps were added to the summer 2011 schedule. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Faculty Task Description: Identify faculty in the Fine Arts area to teach the camps. Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 54 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Projected Cost: 0.0000 Task Name: New Camps Task Description: Two new day camps will be included in the summer 2011 schedule. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Center for Students with Disabilities - Paperless and Space Used (2010 - 2011). - To eliminate as much paper and space used for printing and storing documents Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: In Progress Budget Account Number: 11000-64001 Person(s) Responsible: Jan Lockhart Measure: By having forms imaged or scanned Data Source for Measure: Department/Area Report Standard and Baseline: 0 100% Planning - Center for Students with Disabilities - Accessibility (2010 - 2011). Ensure new or existing construction are renovated or built accessible to disabled individuals. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: In Progress Measure: Use ADA guidelines and physically inspect sites Data Source for Measure: Department/Area Report Standard and Baseline: 0 100% 03/05/2012 11:45 AM 11/01/2011 - Have met with department in charge of scanning documents and have been placed on a waiting list. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Meet with Records Management office Task Description: Begin to plan and process department documents and forms Budget Impact: No Funding Needed 11/01/2011 - On-going. On the committee for reviewing of usage for the Stanton building. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: CSD involvement Task Description: Have CSD involve in all campuses IE Generated by TracDat a product of Nuventive. Page 55 of 297 Objectives Measures & Standards and Baselines / Strategies Budget Account Number: 11000-64001 Person(s) Responsible: Jan Lockhart Committees and attend as many meetings regarding renovation and new construction. Continue with the Accessibility Committee. Budget Impact: No Funding Needed Results Planning - Center for Students with Disabilities - CSD Procedure Book (2010 2011). - Ensuring procedures are being followed and changing procedures that need to be updated. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: In Progress Budget Account Number: 11000-64001 Person(s) Responsible: Jan Lockhart Measure: Meet with each CSD staff that procedures pertain to and review them Data Source for Measure: Department/Area Report Standard and Baseline: 0 100% Planning - Center for Students with Disabilities - Faculty Handbook (2010 2011). - Describe faculty roles in providing support services to disabled students. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: In Progress Budget Account Number: 11000-64001 Person(s) Responsible: Jan Lockhart Measure: Completion of handbook Data Source for Measure: Department/Area Report Standard and Baseline: 0 100% Planning - Center for Students with Disabilities - Summer Tutoring (2010 - Measure: 11/01/2011 - Have implemented Summer I and II Implementing new summer tutor schedule at 2011 03/05/2012 11:45 AM Action & Follow-Up 11/01/2011 - On-going. About 1/3 completed. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Reviewing procedures Task Description: Reviewing and revising procedures by eliminating, changing or adding new ones Budget Impact: No Funding Needed 11/01/2011 - In the planning process Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Develop handbook Task Description: Handbook will contain information regarding classroom accommodations and what is the instructor's role Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 56 of 297 Objectives 2011). - Keep within budget and continue providing tutoring services. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: In Progress Budget Account Number: 11000-64001 Person(s) Responsible: Jan Lockhart Planning - Chemistry - VV - Install Framed Glass Door Wall Cases (2010-2011) - Install Framed Glass Door Wall Cases in the Chemistry Laboratory for storage of glassware. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-55335 Person(s) Responsible: Dr. Enrique Olivas Measures & Standards and Baselines / Strategies all CSD offices Data Source for Measure: Department/Area Report Standard and Baseline: 0 100% Action & Follow-Up Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Walk-in tutoring Task Description: Provide walk-in tutoring all CSD offices during summer sessions Budget Impact: No Funding Needed Measure: It will increase flexibility in the Chemistry Laboratory along with proper organization & storage. Data Source for Measure: Department/Area Report Standard and Baseline: It's very unsafe to keep glassware in open exposure in the laboratory. Baseline: Currently, approximately 25% of glassware is stored in cardboard boxes. Task Name: Purchse Framed Glass Door Wall Cases Task Description: Purchase ten Framed Glass Door Wall Cases (48"). Budget Impact: Additional/New Funding Required Projected Cost: 7900.0000 Planning - College Readiness - High School Measure: Visits (2009-2012) - Visit all area high 2009-2010 Visit all area high schools in the school to give assessment orientation to Region 19 high school seniors. Data Source for Measure: 03/05/2012 11:45 AM Results 02/22/2012 - Visit with all 40 area high school seniors. Progress: Satisfactory Generated by TracDat a product of Nuventive. Page 57 of 297 Objectives Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Expected Completion Date: 04/27/2012 Objective Status: In Progress Budget Account Number: 12023 Person(s) Responsible: Cynthia Aguilar Measures & Standards and Baselines / Strategies Results Department/Area Report Action Plan Status: 0 - No Action Plan Necessary Measure: 2010-2011 Visit all area high schools in the Region 19 Data Source for Measure: Department/Area Report Action & Follow-Up 02/22/2012 - Visit with all 40 area high school seniors Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Measure: 2011-2012 Visit all area high schools in the Region 19 Data Source for Measure: Department/Area Report Task Name: Visit in person with high school seniors to promote a college going culture Task Description: Meet in town hall meeting style with students Budget Impact: No Funding Needed Planning - College Readiness - Visit school district administration (2009-2012) - Work with district administration to see how we can bridge the gaps for entering post secondary. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Expected Completion Date: 04/27/2012 Objective Status: In Progress Budget Account Number: 12023 Person(s) Responsible: 03/05/2012 11:45 AM Measure: 2009-2010 Visit all area school districts in the Region 19 to meet with administration Data Source for Measure: Department/Area Report Measure: 2010-2011 Visit all area school districts in the Region 19 to meet with administration Data Source for Measure: Department/Area Report 02/22/2012 - Visit with all 12 area school districtict administration Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 02/22/2012 - Visit with all 12 area school districtict administration Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Measure: 2011-2012 Visit all area school districts in the Region 19 to meet with administration Generated by TracDat a product of Nuventive. Page 58 of 297 Objectives Cynthia Aguilar Measures & Standards and Baselines / Strategies Results Action & Follow-Up Data Source for Measure: Department/Area Report Task Name: Visit with area superintentents to discuss policy pertaining to College Readiness Task Description: Conference type meetin with administration at each school district Budget Impact: No Funding Needed Planning - College Readiness - Gateway to College (2010-2011) - Plan for the Gateway to College implementation. Planning Year(s): 2010 - 2011 Objective Status: Met Budget Account Number: P20353 Person(s) Responsible: Veronica Gallegos Planning - College Readiness - High School Counselor Visits (2009-2012) - Visit with high school counselors to explain the importance of placement testing. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Expected Completion Date: 04/27/2012 03/05/2012 11:45 AM Measure: Ensure contract compliance based on student results. Data Source for Measure: External Report 02/22/2012 - Two school districts, Canutillo and EPISD, signed contract pertaining to Gateway to College Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Meet with school districts/ THECB/TEA to negotiate MOU for Gateway to College Task Description: Meet with school districts/ THECB/TEA to negotiate MOU for Gateway to College Budget Impact: No Funding Needed Measure: 2009-2010 Visit all area high schools in the Region 19 to meet with counselors with issues pertaining to College Readiness Data Source for Measure: Department/Area Report 02/22/2012 - Visit with all 40 area high school counselors Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Measure: 2010-2011 Visit all area high schools in the Region 19 to meet with counselors with 02/22/2012 - Visit with all 40 area high school counselors Progress: Generated by TracDat a product of Nuventive. Page 59 of 297 Objectives Objective Status: In Progress Budget Account Number: 12023 Person(s) Responsible: Cynthia Aguilar Measures & Standards and Baselines / Strategies Results issues pertaining to College Readiness Data Source for Measure: Department/Area Report Satisfactory Action Plan Status: 0 - No Action Plan Necessary Action & Follow-Up Measure: 2011-2012 Visit all area high schools in the Region 19 to meet with counselors with issues pertaining to College Readiness Data Source for Measure: Department/Area Report Task Name: Meet with Counselors to discuss college readiness policy/produce Task Description: Group meeting with high school counselors at each high school. Budget Impact: No Funding Needed Planning - College Readiness - Gateway to College Implement (2010-2013) - Assess and Monitor the Gateway to College program Planning Year(s): 2010 - 2011 2011 - 2012 2012 - 2013 Expected Completion Date: 05/31/2012 Objective Status: In Progress Budget Account Number: 20353 Person(s) Responsible: Cynthia Aguilar Measure: 2010-2011 50% of Students entering the Gatewaya to College program will graduate with a high school diploma and some college credit. Data Source for Measure: Student Related Data (Tracking/Performance) 02/22/2012 - Selected 50 students to participate in the Gateway to College program Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Measure: 2011-2012 50% of Students entering the Gatewaya to College program will graduate with a high school diploma and some college credit. Data Source for Measure: Student Related Data (Tracking/Performance) Measure: 2012-2013 50% of Students entering the Gatewaya to College program will graduate with a high school diploma and some 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 60 of 297 Objectives Measures & Standards and Baselines / Strategies college credit. Data Source for Measure: Student Related Data (Tracking/Performance) Results Action & Follow-Up Task Name: Meet with National network and school districts to discuss student progress Task Description: Monthly conference calls to update student progress Budget Impact: No Funding Needed Planning - College Readiness - Pathways Project (2010-2011) - Negotiate MOU with school districts Planning Year(s): 2010 - 2011 Objective Status: Met Budget Account Number: 22657 Person(s) Responsible: Cynthia Aguilar Planning - Comptroller - Accounts Payable Direct Deposit to Vendors (2010-2011) Utilize Banner system direct deposit capability to disburse Accounts Payable funds to vendors. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2012 11:45 AM Measure: ensure all school districts sign Pathways MOU 02/22/2012 - Area school districts: Canutillo, EPISD, YISD, SISD, Clint ISD, San Elizario ISD, Fabens ISD, Tornillo ISD, Dell City ISD, Fort Hancock, signed MOU for Pathways project Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Negotiate MOU with region 19 school districts Task Description: Meet with school district cabinet members to discuss MOU Budget Impact: No Funding Needed Measure: Accounts Payable remittances to vendors are remitted via direct deposit Data Source for Measure: Department/Area Report Standard and Baseline: 25% of vendors are being paid via direct deposit. Baseline: Vendors are not currently 10/27/2011 - More than 25% are participating in Direct Deposit. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 61 of 297 Objectives 03/26/2010 Objective Status: Met Budget Account Number: 11000-73200 Person(s) Responsible: Fernando Flores 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up being paid via direct deposit. Task Name: Coordinate with Purchashing Task Description: Coordinate with Purchasing to capture bank routing/account no. information from vendors. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Monitor and Refine Task Description: Monitor and refine the process and adjust system change as is necessary. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: New Payment Method Task Description: Roll out the new payment method. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Test Vendor Direct Deposit Task Description: Test the vendor direct deposit capability to assure the payment, notification, and transmission process is refined. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 62 of 297 Objectives Planning - Comptroller - Implement TouchNet- Marketplace (2010-2011) - Make the Marketplace feature of TouchNet available. This feature will allow certain departments to host a cashiering session on the Web for sales of goods and services and also make services available beyond the normal hours of operation. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/26/2010 Objective Status: Not Met Budget Account Number: 11000-73206 Person(s) Responsible: Fernando Flores Planning - Contract Opportunities - Contract Opportunities Center (2010-2011) - Provide effective and quality Procurement Technical Assistance in accordance with specifications of cooperative agreement SP4800-04-2-0888, section VIII. Planning Year(s): 2010 - 2011 Expected Completion Date: 12/31/2010 Objective Status: In Progress Budget Account Number: 11000-41001 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Measure: TouchNet-Marketplace is available for use. Data Source for Measure: Department/Area Report Standard and Baseline: Individual cashier sessions using Marketplace may be utilized. Baseline: TouchNet-Marketplace is currently not implemented and the capabilities that this feature would bring are currently not available through our existing cashiering . Results Action & Follow-Up 10/27/2011 - Since the Bursar's focus was redirected from TouchNet-Marketplace to implementing Banner Flex Registration Module, therefore this objective was not met. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Implementation Team Task Description: Coordinate an implementation team consisting of staff from Information Technology, Bursar's area, and TouchNet to proceed with an implementation and test the software. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Customer satisfaction and number of clients receiving contract awards Data Source for Measure: Department/Area Report Standard and Baseline: Increased level of competitiveness of clients being served and increase the number of contract awards being to 30% of active clients. Baseline: Currently there are 518 active clients and 24% are performing or have performed on contractual awards. Task Name: Strategic Locations Generated by TracDat a product of Nuventive. Page 63 of 297 Objectives Person(s) Responsible: Joseph R. Conway Planning - Counseling - NW - Enhance Counseling Dept. Space (2010-2011) Create a larger reception area and office space for future Counselor. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-65004 Person(s) Responsible: Willard Satterfield Planning - Counseling - NW - Increase Counseling Office Staff (2010-2011) Employ additional full-time Student Assistant I to support student intake and counseling mission. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-65004 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Description: Position counselors at strategic locations throughout the county to maximize accessibility; Identify areas of low understanding and specifically target such areas in the delivery of training; Extend outreach to outlying areas of the county. Budget Impact: Additional/New Funding Required Projected Cost: 34000.0000 Task Name: Enrollments Increased Task Description: Current office space designed to accommodate minimal staffing and smaller student enrollments. New enrollments have increased. Budget Impact: No Funding Needed Task Name: Student Demand Task Description: Current staffing is minimal; NW enrollment has increased resulting in greater student demand. Budget Impact: Additional/New Funding Required Projected Cost: 25000.0000 Generated by TracDat a product of Nuventive. Page 64 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Person(s) Responsible: Willard Satterfield Planning - Counseling - NW - Increase Counseling Faculty (2010-2011) - Employ 35-hr faculty counselor. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-64004 Person(s) Responsible: Willard Satterfield Planning - Counseling - RG - Counseling Rio Grande (2010-2011) - With the College going to the Electronic Catalog and Class Schedules, available only through the Internet, it is imperative that the Counseling Center have the resources to give New Student Orientations and Registration capability to student through the use of computers. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-65003 Person(s) Responsible: Ruben Villalobos 03/05/2012 11:45 AM Task Name: Student Enrollment Task Description: NW student enrollment has increased resulting in greater student demand. Budget Impact: Additional/New Funding Required Projected Cost: 50000.0000 Measure: A wireless computer lab on wheels will be purchased (40 PC Notebooks; HP Computers on-wheel cart; Software Academic Microsoft Office Pro Edition). Data Source for Measure: Department/Area Report Standard and Baseline: 100% of all needed computer equipment will be purchased by January, 2011. Baseline: The visual computer equipment does not exist at the present time. Task Name: Counselor to Work with Administration Task Description: Counselor Coordinator to work with the VP of Instruction, Campus Dean, and Supervisory Dean to identify resources. Budget Impact: Additional/New Funding Required Projected Cost: 26000.0000 Generated by TracDat a product of Nuventive. Page 65 of 297 Objectives Planning - Counseling - RG - Counseling RG (2010-2011) - The Student Services is completely isolated from the Main Campus; an Electronic Moving Message Sign is needed in order to keep students informed of Financial Aid, Registration, Ranking, and Graduation Deadlines. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-65003 Person(s) Responsible: Ruben Villalobos Planning - Counseling - VV - Administer Strong Campbell Inventory to Undecided Students. (2010-2011) - Over 33% of new students entering EPCC are undecided as to their specific majors. This pilot intends to assist at least 1% of undecided students to choose an academic major by their second semester at EPCC. Planning Year(s): 2010 - 2011 Actual Completion Date: 11/29/2010 Objective Status: Not Met Budget Account Number: 11000-65001 Person(s) Responsible: Jose Baltazar & Carlos Armendariz 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Measure: A LED Electronic Moving Sign will be purchased (7 x 120 Pixels; #451459; USS3527). Data Source for Measure: Department/Area Report Standard and Baseline: 100% of equipment to be purchased by May, 2011. Baseline: Equipment needed does not exist at the present time. Task Name: Identify Resources Task Description: Counselor Coordinator to work with Supervisory Dean to identify resources. Budget Impact: Additional/New Funding Required Projected Cost: 575.0000 Measure: Number of student going through the Career Guidance process will be 1000. Data Source for Measure: Department/Area Report Standard and Baseline: Assist 1% (1000) students who are undecided to go through the Career Guidance process at VV so they can choose a major. Baseline: There are approximately 5,000 undecided students per semester at EPCC. 09/30/2011 - Meetings and discussions with Career Center to plan pilot. Unable to implement pilot as per Career center, due to lack of funding. Unable to implement pilot as per Career Center, lack of funding prevented pilot from being implemented. Counselors will do individual Career Guidance at student request. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Work with Career Services Task Description: Generated by TracDat a product of Nuventive. Page 66 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 01/02/2012 - Meetings and discussions with Career Center to plan pilot. Unable to implement pilot as per Career center, due to lack of funding. Unable to implement pilot as per Career Center, lack of funding prevented pilot from being implemented. Counselors will do individual Career Guidance at student request. 01/03/2012 - Implement an automating early alert, student tracking system district-wide. Implement an intervention program for students in academic probation. Work cooperatively w/Career Services. Identify 1000 students who are undecided. Contact them. Offer Career Guidance. Track and monitor their career decisions. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Counseling - VV - Transfer Process Pilot (2010-2011) - Most students attending EPCC are planning to transfer to a four year institution. This pilot will target 1000 students and will help them go through the transfer process of obtaining requirements from the universities they select. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2012 Actual Completion Date: 08/31/2012 Objective Status: In Progress Budget Account Number: 11000-65001 Person(s) Responsible: Jose Baltazar/Carlos Armendariz Measure: 1000 students will be assisted, monitored and tracked through the fall transfer process. Data Source for Measure: Department/Area Report Standard and Baseline: 1000 students will complete a through process for obtaining transfer information from their selected universities. Baseline: Over 60% of students attending EPCC Credit programs are planning to transfer to a 4 year University. In the summer 2011, the Early program was initated at the VV Campus with the assistance of a state grant. Two cohorts were identified for the Early Alert Program. (206 and 300 students)/ A case load of student was assigned to an advisor at the New Student Orientation. This approach proved effective; it created a strong connection between the student and the advisor. Students felt more confident knowing who their advisor was. Instructors identified students who are in need of support and discussed the possibilities of a referral with these students. Drop-out rate is very small among students who we have been working with. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Follow-Up: 01/03/2012 - Implement an automating early alert, student tracking system district-wide. Implement an intervention program for students in academic probation. Task Name: Identify 30 instructors to work with 1000 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 67 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Early Alert student. Task Description: Students will be referred by Counselor to the Early Alert system to work with 30 identified instructors to implement early interventions to prevent dropping out as much as possible and help students succeed in their courses. Funding Justification: 1 software support tech. at 15hrs./week at 17.35/hr = 6,246.00 Budget Impact: Additional/New Funding Required Projected Cost: 6246.0000 Planning - Court Reporting - NW - Recruit and Retain Quality Faculty (2010-2011) Proposing to hire an additional full-time faculty member. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/14/2010 Objective Status: New Budget Account Number: 11000-55222 Person(s) Responsible: Lucretia Thomas Planning - Court Reporting - NW - Increase Enrollment (2010-2011) - Proposing to get the Court Reporting Program accredited by 03/05/2012 11:45 AM Measure: Graduation and retention rates will improve. Data Source for Measure: Department/Area Report Standard and Baseline: 4 graduates per year of 75 enrollment for optimum capacity. Baseline: Number of graduates is met and enrollment is at 60 at the present time. Task Name: Instructional Assignments Task Description: A new instructor will help perform additional instructional assignments for students who are in need of additional dictation and/or speedbuilding activities on a daily basis. Budget Impact: Additional/New Funding Required Projected Cost: 45000.0000 Measure: Enrollment will increase. Data Source for Measure: Generated by TracDat a product of Nuventive. Page 68 of 297 Objectives the National Court Reporters Association. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/14/2010 Objective Status: New Budget Account Number: 11000-55222 Person(s) Responsible: Lucretia Thomas Planning - Court Reporting - NW - Expand the College's Technological Capability (2010-2011) - Proposing to buy (10) new stenographic machines for the beginning students so we are keeping abreast of the technological advances in court reporting. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/14/2010 Objective Status: New Budget Account Number: 11000-55222 Person(s) Responsible: Lucretia Thomas 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Enrollment Data Standard and Baseline: 4 graduates per year or 75 enrollment for optimum capacity. Baseline: Number of graduates is met and enrollment is at 60 at the present time. Results Action & Follow-Up Task Name: Court Reporting Program is Accredited Task Description: If the Court Reporting Program is accredited by NCRA then our program would be marketed in the Journal of Court Reporting, we would receive a seal of their approval, and we would receive world-wide recognition for providing outstanding services to students. Will help recruitment. Budget Impact: Additional/New Funding Required Projected Cost: 1500.0000 Measure: Students will be progressing quicker and will have more quality practice at home and in the lab. Data Source for Measure: Department/Area Report Standard and Baseline: Most students do progress from Machine Shorthand I & II but I think they can progress quicker with new machines. Baseline: Beginning students use 200 or 400 SRT machines which are antiquated. Task Name: Practice on New Machines Task Description: Beginning students will be able to practice on new machines that have a light touch to them and will be able to practice more Generated by TracDat a product of Nuventive. Page 69 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up effectively and will also be able to do practice exercises at home with the global tutorials that are made available to them. Budget Impact: Additional/New Funding Required Projected Cost: 17000.0000 Planning - Criminal Justice - VV - Increase Fill Rate (2010-2011) - Manage course offerings on each campus to assure that Criminal Justice courses reach the 80% fill standard. With special emphasis on the Deans from the smaller campuses to take class fill rate into consideration before making Criminal Justice courses on their respective campuses. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/13/2011 Actual Completion Date: 09/30/2011 Objective Status: Met Budget Account Number: 55380 Person(s) Responsible: Michelle C. Watkins Measure: Increase fill rate on each campus offering Criminal Justice courses to optimum level. Data Source for Measure: Department/Area Report Standard and Baseline: 80% standard. Baseline: 64% District-Wide. Planning - Criminal Justice - VV - Increase FT Staffing (2010-2011) - Increase the percentage of course sections taught by full time faculty. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/13/2011 Measure: Consult the Master Class Schedule and Faculty Employment databases to compute a percentage of course sections taught by full time faculty. Data Source for Measure: Program Review Data Standard and Baseline: 03/05/2012 11:45 AM 10/03/2011 - District: 73%, Fort Bliss: 0%, Mission del Paso: 53%, Northwest: 43%, Rio Grande: 66%, Transmountain: 75%, Valle Verde: 80%. Because the Criminal Justice Planning has been broken out by campus, and this section is for the Valle Verde campus only, the standard has been met. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Course Management Task Description: Continue recruiting strategies for recruitment of new students as discussed last year. Begin course management, especially on the smaller campuses, that uses smaller classrooms when available and takes class fill rate into consideration before allowing classes to make. 10/03/2011 - Districtwide: 34%; Valle Verde: 47%. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. 10/03/2011 - The criminal justice discipline has hired a lecturer for the 2011-2012 school year, and hopes to increase this percentage to an acceptable standard. However, additional assistance is needed in procuring another full time faculty, Page 70 of 297 Objectives Actual Completion Date: 09/30/2011 Objective Status: Not Met Budget Account Number: 55380 Person(s) Responsible: Michelle C. Watkins Measures & Standards and Baselines / Strategies Results because the discipline is growing exponentially. 60%. Baseline: 34% district wide, 50% at Valle Verde, 0% at Ft. Bliss, 0% at Mission del Paso, 3% at Northwest, and 0% at Transmountain. Task Name: Hire FT Tenure Track Faculty Member Task Description: Hire a full time, tenure track faculty member for the Valle Verde campus. Begin a discussion of the feasibility of adding a fifth full time, tenure track faculty member if trends in enrollment continue to increase. Planning - Criminal Justice - VV - Student Satisfaction (2010-2011) - To increase the level of student satisfaction with the program as measured by the student survey. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/13/2011 Actual Completion Date: 09/30/2011 Objective Status: Met Budget Account Number: 55380 Person(s) Responsible: Michelle C. Watkins Measure: Student satisfaction survey Data Source for Measure: Program Review Data Standard and Baseline: 80% 10/03/2011 - Districtwide: 92%; Valle Verde: 91% Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Planning - Customized Training Customized Training (2010-2011) Continue delivery of Skills Development and private Contract Programs. Planning Year(s): 2010 - 2011 Measure: Skills Development Programs delivered. Data Source for Measure: Department/Area Report Standard and Baseline: Achieve Program Plan Metrics. Baseline: Energy Efficiency/ Renewable Energy funded award was received in the amount of 02/21/2012 - Program delivered and completed. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Actual Completion Date: 03/12/2010 03/05/2012 11:45 AM Action & Follow-Up Generated by TracDat a product of Nuventive. Page 71 of 297 Objectives Objective Status: Met Budget Account Number: 11000-41003 Person(s) Responsible: James Coe Planning - Customized Training Customized Training 2 (2010-2011) Develop two (2) Skills Development Funding Proposals adhering to strict TWC guidelines. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: Met Budget Account Number: 11000-41003 Person(s) Responsible: James Coe Planning - Customized Training Customized Training 3 (2010-2011) Develop Private Training Contracts as requested by companies. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up $518,199. Task Name: Implementation Task Description: On-going implementation, planning, and execution with resources and partners pertinent to each program. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Number of Proposals developed. Data Source for Measure: Department/Area Report Standard and Baseline: Achieve Program Plan Metrics. Baseline: Pending award for a Construction Energy Technical Trades 02/21/2012 - Award received and program implemented. Program continuing into 2011-2012. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Implementation Task Description: On-going implementation, planning, and execution with resources and partners pertinent to each program. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Number of private Contracts implemented. Data Source for Measure: Department/Area Report Standard and Baseline: Achieve Program Plan Metrics. Baseline: One (1) Private Contract Program is still in progress with a completion date of June 02/21/2012 - Contract Electronics program for AT&T completed June 2010. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 72 of 297 Objectives 03/12/2010 Objective Status: Met Budget Account Number: 11000-41003 Person(s) Responsible: James Coe Planning - Customized Training Customized Training 4 (2010-2011) Continue Delivery of Apprenticeship Program. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: Met Budget Account Number: 11000-41003 Person(s) Responsible: James Coe Planning - Dance - VV - Improving Facilities (2010-2011) - We are striving to continue to improve facilities for dance at EPCC. Planning Year(s): 2010 - 2011 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies 2010. Results Action & Follow-Up Task Name: Implementation Task Description: On-going implementation, planning, and execution with resources and partners pertinent to each program. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Number of Apprenticeship Partners and Trainees. Data Source for Measure: Department/Area Report Standard and Baseline: Achieve Program Plan Metrics. Baseline: Apprenticeship program has eight (8) partners. 02/21/2012 - Program completed with receuitment of one (1) additional partner company for 20112012. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Implementation Task Description: On-going implementation, planning, and execution with resources and partners pertinent to each program. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: We will know that the plan is progressing as we are able to find funding and partnerships to acquire these necessary improvements. Data Source for Measure: Department/Area Report Standard and Baseline: 10/25/2011 - This plan has almost been met. We have acquired sprung floors in rooms A1215 and A1332. A costume closet has also been added. However, we have not been able to purchase a vinyl dance floor for our performances at the Transmountain Forum Theatre. Progress: Generated by TracDat a product of Nuventive. Page 73 of 297 Objectives Actual Completion Date: 03/12/2010 Objective Status: In Progress Budget Account Number: 11000-55205 Person(s) Responsible: Amy Slater Measures & Standards and Baselines / Strategies Results Action & Follow-Up Satisfactory The plan will be met when there are sprung Action Plan Status: 0 - No Action Plan Necessary floors with vinyl dance floors installed in all dance studios, a costume closet in A1216, and a vinyl dance floor available to EPCC for performances at the Transmountain Forum. Baseline: The floors in A1215 and A1332 at EPCC are very hard, slick, and in some cases cracked. They are dangerous for many reasons to our instructors and dancers. There is limited space in a cabinet in A1216 to store costumes. We perform on a floor that is not suitable and often dangerous to dancers at the Transmountain Forum Theater. Task Name: Committee for the Arts Task Description: There is a committee for the arts which will meet to discuss necessary changes to the Transmountain Forum Theater and I will be discussing the dance floor option. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Costume Closet Task Description: There will be a work order created for the costume closet in A1216. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Sprung and Vinyl Floors Task Description: The EPCC Dance Discipline is working with 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 74 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 10/25/2011 - There are now approximately 20 dance majors. There has been progress, but the goal has not been met. More activities that involve the community and local high schools need to be held. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented 10/25/2011 - EPCC students in our dance performance classes will attend local high schools to demonstrate and teach movement high school students. They will also verbally deliver information about the dance program at EPCC. Continuing Education and Physical Plant to provide quotes for sprung and vinyl floors in our studios. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Dance - VV - EPCC Visibility in the Dance Community (2010-2011) Increasing El Paso Community College visibility in the El Paso dance community as well as the national dance community. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: In Progress Budget Account Number: 11000-55205 Person(s) Responsible: Amy Slater Measure: We will know the plan is progressing with rising numbers of declared majors through Institutional Research data. Data Source for Measure: Department/Area Report Standard and Baseline: We hope to achieve a growing number of dance majors by recruiting in the high schools. Baseline: Currently, there are approximately 15 declared dance majors. I would like to see this number at 25. Task Name: DIscipline Reach Out Task Description: The Dance Discipline needs to reach out to high school dance programs by offering a master dance class by a EPCC instructor and an informational session about the EPCC Dance Discipline. We might also offer a "High School Day" when perspective dance majors can come to take a few classes, meet with faculty, tour the facilities and get information about the Dance program at EPCC. Budget Impact: No Funding Needed Projected Cost: 0.0000 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 75 of 297 Objectives Planning - Dance - VV - Dance Performances and Visibility in the El Paso Community (2010-2011) - Increasing El Paso Community College visibility through presenting dance performances at the college. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: Met Budget Account Number: 11000-55205 Person(s) Responsible: Amy Slater Measures & Standards and Baselines / Strategies Measure: We will know that the plan is progressing by the completion of these performances and the size of our audiences. Data Source for Measure: Department/Area Report Standard and Baseline: We want to continue to produce an informal and formal concert each semester of high quality dance. Baseline: We have just begun producing a formal performance and an informal performance each semester. We have often included our students and guests from other institutions of higher education (NMSU and UTEP) and other performing groups. Results Action & Follow-Up 10/25/2011 - Our audiences are continuing to grow at our informal and formal dance concerts. In the spring semester our informal show sold out. Our audience for the formal concerts have also increased over the last two semesters. UTEP and NMSU participated in our Fall and Spring formal dance concerts. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 10/25/2011 - Continue to bolster our audience by advertising our formal concerts through multiple modes of media. 10/25/2011 - The students did not participate in a community performance in the Fall semester, but they did participate in a performance at NMSU in the Spring semester. Only half of this goal as been achieved. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented 10/25/2011 - Students and instructors need to seek out performance venues in our community. Ideas involving cite specific and improvisational performances also need to be considered and utilized. Task Name: Organize Dance Performances Task Description: We will continue to organize these dance performances through funding from Salute to the Arts and the Spring Arts Festival. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Dance - VV - Participation in Dance Performances in the El Paso Community (2010-2011) - Increasing El Paso Community College visibility through participating in dance performances in the community. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: 03/05/2012 11:45 AM Measure: We will know that the plan is progressing if EPCC dance students are involved in one performance in the greater El Paso community each semester. Data Source for Measure: Department/Area Report Standard and Baseline: We would like to organize opportunities for our students to participate in performances in the greater El Paso community. Baseline: Generated by TracDat a product of Nuventive. Page 76 of 297 Objectives In Progress Budget Account Number: 11000-55205 Person(s) Responsible: Amy Slater Planning - Dance - VV - American College Dance Festival (2010-2011) - Continued participation in ACDF to develop the national reputation of the EPCC dance program and to expose EPCC students to the wider world of dance outside of El Paso. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: Met Budget Account Number: 11000-55205 Person(s) Responsible: Amy Slater Measures & Standards and Baselines / Strategies Results Action & Follow-Up There have been several opportunities for students to perform in the greater El Paso community, perhaps one or two a year. Task Name: Outside Organizations Task Description: Outside organizations will be contacted for opportunities for EPCC dance students to perform in the community. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: We will know that the plan is progressing with the continued presence of EPCC Dance discipline at this conference, our participation in the adjudicated concerts, and the informal concerts. Data Source for Measure: Department/Area Report Standard and Baseline: We want to create a tradition for EPCC students and faculty to attend the American College Dance Festival (ACDF) and participate in classes and present dances for adjudication in the spring semesters. Baseline: This spring will be the second year that we have attended ACDF. Funding is always an issue. 10/25/2011 - We were able to send faculty and students to the American College Dance Festival. We participated in both the adjudicated and informal concerts. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Sending Students to ACDF Task Description: Funds will continue to be raised from various sources in order to support sending several students to ACDF each year. Budget Impact: No Funding Needed 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 77 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 10/13/2011 - The student retention rate increased by more than 3% in the division. The retention rate for Fall 2010 was 78.7% and for Spring 2011 was 75.6%. Math continues to have the lowest retention rate; the retention rate for developmental math was 66.9% in Fall 2010 and 61.3% in Spring 2011. The retention rate for transfer math was 68.5% in Fall 2010 and 66% in Spring 2011. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Related Documents: Fall 2010-Spring 2011 Charts.docx 02/15/2012 - Monitor retention in the division for the 2011-2012 school year by discipline. Work with disciplines to identify strategies to increase retention rates. Have a meeting with the division coordinators to share retention rates and to discuss strategies. Conduct focus groups with faculty and students to identify other factors impacting retention and grade distribution challenges. Projected Cost: 0.0000 Planning - Dean, Architecture, Arts, Math and Science at VV - Student Retention (2009-2012) - Improve student retention rate/student success rate in the division. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Expected Completion Date: 08/31/2012 Objective Status: In Progress Budget Account Number: 11000-13003 Person(s) Responsible: Bobby Ortega, Tonie Badillo, and division faculty coordinators Measure: Student retention in the division will be tallied at the end of the 2009-2010 academic year. Data Source for Measure: Program Review Data Standard and Baseline: Student retention will improve by approximately 3% in the division. Baseline: Currently, student retention is approximately 71% in the division. 02/01/2012 - We will continue exploring options implemented through projects such as the Math Emporiums, Statway, and Complete College America. We will conduct focus groups with faculty and staff to identify other possible strategies to increase success in math courses in the division. Task Name: Retention Strategies Task Description: Faculty will be encouraged to develop effective retention strategies and implement them in their classrooms during 2009-2010. Faculty will also be asked to attend workshops dealing with improving student retention. 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 78 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Dean, Architecture, Arts, Math and Science at VV - 2+2 articulation plans with UTEP (2010-2011) - To increase 2+2 articulation plans with UTEP. Planning Year(s): 2010 - 2011 Actual Completion Date: 10/28/2010 Objective Status: In Progress Budget Account Number: 11000Person(s) Responsible: bobby ortega Planning - Dean, Arts, Comm., & Social Sciences at TM - Professional Development (2010-2011) - To increase skills base. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: Met Budget Account Number: 11000-13005 Person(s) Responsible: Joyce Richey 03/05/2012 11:45 AM Measure: Meetings will be held with UTEP as well as with the Curriculum Office. Data Source for Measure: Department/Area Report Standard and Baseline: Standard: The number of 2+2 articulation plans with UTEP will increase by at least one or two. Baseline: Currently, there is only one 2+2 articulation plan with UTEP in engineering. 10/10/2011 - Regular Articulation Meetings have 10/10/2011 - Meet with Curriculum been established; EPCC and UTEP have held Director to determine the steps to joint meetings. In Fall 2012, it was decided that the take to accomplish our goal. meetings would be held separately with representatives from the other institution in attendance as liaisons. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: 2+2 articulation plan Task Description: The art departments from EPCC and UTEP will schedule meetings during Spring 2011 to develop the 2+2 articulation plan. Budget Impact: No Funding Needed Measure: 100% of FT staff in Division office will go to some training. Data Source for Measure: Department/Area Report Standard and Baseline: 100% Baseline: 33% 10/04/2011 - Office staff attended two workshops during fiscal year 2010 - 2011: Active Shooter FERPA Training Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Professional Development Activity Task Description: Each full-time staff will sign up and attend one professional development activity to Generated by TracDat a product of Nuventive. Page 79 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up improve skills. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Dean, Arts, Comm., Career & Tech. Education & Social Science at RG NO PLANS (2010 - 2011). - Enter Plan for 2010 - 2011 here. Planning Year(s): 2010 - 2011 Budget Account Number: 11000 Person(s) Responsible: ?? Planning - Dean, Communications & Performing Arts at VV - Performing Arts Programs: Music, Dance & Drama (20092013) - Development and implementaton of a "Two Plus Two" transfer agreement between El Paso Community College and the University of Texas at El Paso in Music, Dance and Drama. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 2012 - 2013 Actual Completion Date: 06/30/2009 Objective Status: In Progress Budget Account Number: 11000-13001 Person(s) Responsible: Claude Mathis 03/05/2012 11:45 AM Measure: The measure will be met when transfer agreements between EPCC and UTEP for Music, Dance, and Drama are complete. Data Source for Measure: Department/Area Report Standard and Baseline: Transfer agreements between EPCC and UTEP for Music, Dance and Drama be completed in Fall 2010. Baseline: There are no transfer agreements between EPCC and UTEP in Music, Dance and Drama. 02/29/2012 - This plan is ongoing. Each area has been meeting with counterparts at UTEP to enhance the transferability of their programs. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Transfer Agreement Task Description: Strategy is to meet with District-Coordinator and UTEP Department Heads for Music, Dance, and Drama to develop and implement transfer agreements. Budget Impact: No Funding Needed Projected Cost: Generated by TracDat a product of Nuventive. Page 80 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 0.0000 Planning - Dean, Communications & Performing Arts at VV - Recruitment Scholarships for Music, Dance and Drama (2009-2013) - To obtain funding for talent recruitment scholarships for each area: Music ($15,000 x 2 semesters), Dance ($15,000 x 2 semesters), and Drama ($15,000 x 2 semesters). Total: $90,000.00 Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 2012 - 2013 Actual Completion Date: 06/30/2009 Objective Status: In Progress Budget Account Number: 11000-13001 Person(s) Responsible: Claude Mathis Planning - Dean, Communications & Performing Arts at VV - Music, Dance and Drama Performances (2009-2013) - To obtain funding for Music ($10,000), Dance ($10,000) , and Drama ($24,000) disciplines for performances. Planning Year(s): 2009 - 2010 03/05/2012 11:45 AM Measure: Measure will be determined when Music, Dance and Drama disciplines can offer talent recruitment scholarships to their students. Data Source for Measure: Department/Area Report Standard and Baseline: Standard will be determined when funding is allocated to Music, Dance and Drama disciplines and objective will be met. Expected completion date: Fall 2010. Baseline: At present, there are no funds allocated for Music, Dance, and Drama disciplines for talent recruitment scholarships. 02/29/2012 - We met with the Present requesting that the EPCC Foundation help raise monies that are specifically dedicated to recruitment for the performing arts. We are in the process of setting up a meeting with the Foundation Chair to attempt to make our case for these dedicated schollarships. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Offer Scholarships for each of the Areas Task Description: Each discipline: Music, Dance, and Drama have revenue accounts. These areas will provide performances to generate revenue to offer scholarships for each of their areas. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: The measure will be determined once funding in the amount of $44,000.00 is established for Music, Dance, and Drama performances. Data Source for Measure: Department/Area Report Standard and Baseline: The standard will be met once Music, Dance, 02/29/2012 - Overall budget for performing arts has been increased from $16,000 to $21,000. We are in the process of putting together a proposal for a fee that would generate significant increases to the budgets for these programs, finding which would increase automatically with enrollments. We will also be pursuing grant funding for specific performing-arts related projects and objectives. Progress: Generated by TracDat a product of Nuventive. Page 81 of 297 Objectives 2010 - 2011 2011 - 2012 2012 - 2013 Actual Completion Date: 06/30/2009 Objective Status: In Progress Budget Account Number: 11000-13001 Person(s) Responsible: Claude Mathis Planning - Dean, Communications & Performing Arts at VV - Student/Faculty Travel to Regional Competitions/Workshops (2009-2013) - To obtain funding for student/ faculty travel to regional competitions/workshops for Music, Dance and Drama. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 2012 - 2013 Actual Completion Date: 06/30/2009 Objective Status: In Progress Budget Account Number: 11000-13001 Person(s) Responsible: Claude Mathis 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Satisfactory Action Plan Status: and Drama disciplines have the funding to provide performances. Expected completion 0 - No Action Plan Necessary date: Fall 2010. Baseline: At present, Music, Dance, and Drama disciplines have minimal revenue and are not generating enough funds to provide performances. Task Name: New Funds for Music, Dance and Drama Task Description: Request performance funding for Music ($10,000), Dance ($10,000), and Drama ($24,000) through new funds during budget building in October, 2009. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Measure will be determined when Music, Dance and Drama students/faculty are able to travel to compete at regional competitions or attend workshops. Data Source for Measure: Department/Area Report Standard and Baseline: Standard will be determined when Music, Dance, and Drama attend a regional competition. Expected completion: Fall 2010. Baseline: At present, Drama discipline has travel in the amount of $4,400.00. However, it is not sufficient to cover travel for approximately 10 persons. Music and Dance have no travel funds. 02/29/2012 - Annually, the Mariachi Ensemble has a fundraiser to generate monies to sponsor student participation at a Marriachi Conference at New Mexico State University in Las Cruces, New Mexico. I have dedicated some funds from institutional budget and fundraising, $7,600, to send Dance students to the annual conference of the American College Dance Festival Association. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Request Additional Funds Task Description: Music, Dance and Drama will provide Generated by TracDat a product of Nuventive. Page 82 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up performances to generate revenue for student/faculty travel to regional competitions/workshops as well as request additional funds through the budget building process in October, 2009. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Dean, Communications & Performing Arts at VV - Music, Dance and Drama Miscellaneous Development Expenses (2009-2013) - To obtain miscellaneous development expenses funds in the amount for Music, Dance, and Drama. Development expenses include but not limited to the purchase of music, musical instruments, and costumes. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 2012 - 2013 Actual Completion Date: 06/30/2009 Objective Status: In Progress Budget Account Number: 11000-13001 Person(s) Responsible: Claude Mathis 03/05/2012 11:45 AM Measure: Measure will be determined when Music, Dance, and Drama supply pools have increased to cover miscellaneous development expenses. Data Source for Measure: Department/Area Report Standard and Baseline: Standard will be met when an increase in Music, Dance, and Drama supply pools have increased to an additional $5,000 for each discipline. Expected completion date: Fall 2010. Baseline: At present, Music, Dance, and Drama do not have sufficient funds in the supply pools to cover miscellaneous development expenses. 02/29/2012 - We are in the process of putting together a proposal for a fee that would generate significant increases to the budgets for these programs, finding which would increase automatically with enrollments. We will also be pursuing grant funding for specific performing-arts related projects and objectives. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Generate Revenue Funds Task Description: Music, Dance and Drama will continue to generate revenue funds to cover miscellaneous development expenses. Request additional supply pool funds for the disciplines through the budget building process in October, 2009. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 83 of 297 Objectives Planning - Dean, Communications & Performing Arts at VV - Faculty Development Training for the Dual Credit Program (2010-2013) - Conduct Faculty Develpment training for faculty teaching dual credit courses Planning Year(s): 2010 - 2011 2011 - 2012 2012 - 2013 Objective Status: In Progress Budget Account Number: 11000 Person(s) Responsible: Claude Mathis Measures & Standards and Baselines / Strategies Results Action & Follow-Up Measure: Offer at least one workshop during faculty development week during fall and spring semesters Data Source for Measure: Faculty Evaluation Standard and Baseline: Continue offering these workshops on a semester basis 02/29/2012 - Workshops were held in each of the long semesters, Fall and Spring in academic year 2010 - 2011 for dual credit faculty to better assist those addressing issues and chalenges in teaching dual credit courses. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented 02/29/2012 - Based upon participation and positive feedback received from faculty, additional workshops targeted toward dual credit faculty will be offered at faculty development each semester in the future. Task Name: Work with dual credit faculty and instructional coordinators to identify needs. Task Description: Work with dual credit faculty and instructional coordinators to identify needs of dual credit faculty and plan and staff workshops relevant to their needs specific to dual credit. Budget Impact: Rollover/Maintain Current Funding Planning - Dean, Communications & Performing Arts at VV - Dual Credit Progam Assessment (2010 - 2013) - Research best practices and challenges faced by dual credit faculty teaching for EPCC Planning Year(s): 2010 - 2011 2011 - 2012 2012 - 2013 Measure: Qualitiative research will be conducted and documented Data Source for Measure: Focus Group Standard and Baseline: Based on the growth of the program, baseline data is needed to determine best practices and current status. Objective Status: In Progress Budget Account Number: 11000 Person(s) Responsible: Claude Mathis Task Name: Conduct Focus Groups Task Description: Work with Institutional and Community Planning Office to plan and staff at least one dual credit faculty focus group to determine needs, issues, and possible best practices. 03/05/2012 11:45 AM 02/29/2012 - Focus groups were conducted. Faculty indicated that they wanted more training opportunities. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 84 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: Rollover/Maintain Current Funding Planning - Dean, Education & Career & Technical Education at VV - Achieve Texas/Career Cluster Initiative (2010-2011) - Establish 9th - 14th Degree Plans (Programs of Study) for Career and Technical Education with the local ISDs that are EPCC's service area. Planning Year(s): 2010 - 2011 Actual Completion Date: 05/11/2012 Objective Status: In Progress Budget Account Number: 11000-13004 Person(s) Responsible: Dr. Jaime Farias Measure: By the number of Degree Plans established. Data Source for Measure: Department/Area Report Standard and Baseline: 4 degree plans with three school districts. Baseline: 2 degree plans with one school district. 11/23/2010 - Aggie Becker attended the following training workshops June 14-16, 2010, 8th Annual National Career Clusters Institute: Using Career Pathways to Reach New Heights, Denver, CO. Creating Pathways to Success: High School Redesign Meets the 21st Century Mrs. Crystal Leu, Director of Curriculum Lakeland School Corporation Indiana A Conversation with Kelly Green Ms. Kelly Green, Academic Program Manager Microsoft Corporation Washington Building Partnerships with Business and Industry to Advance America's Workforce Mr. Kent Schescke, National FFA Washington District of Columbia North Carolina Career Clusters Guide Ms. Felicia Gray-Watson, Section Chief, CTE Support, CTE Support Services North Carolina Department of Public Instruction North Carolina Mr. Douglas Long, Coordinator, Federal Vocational Education North Carolina Community College System North Carolina Increasing Student Success Dr. Michelle Walker, Director of Education, DECA, Inc. Virginia Mr. Shane Thomas, Director of Competitive Events, DECA, Inc. Virginia A New Vision for Career Clusters and Career Technical Education 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 85 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Dr. Melissa Lomax, Bureau Chief, Career Technical and Workforce Education New Mexico Public Education Department New Mexico Mrs. Kimberly Green, Executive Director, NASDCTEc/NCTEF Maryland Also, attended Monday, June 14 Opening Session by Mr. Don Henderson, Senior Manager, Creative Expressions, Apple, Inc., AND Tuesday, June 15 General Session by Ms. Kelly Green, Academic Program Manager U.S. Innovation and Business Development, Microsoft Corporation Presented June 14 Making That Career Cluster Fit: Matching College Programs with Multiple Independent School Districts Dr. Karen Alexander presentation in August during Faculty Development Week Attended Shannon Weaver's presentation to various ISDs and EPCC representatives April 13, 2010, at the ASC. Progress: Unsatisfactory Action Plan Status: 3 - Follow-Up Documented 11/09/2010 - Meetings with ISDs, Achieve Texas 11/09/2010 - Develop and print 25% Facilitator, Aggie Becker has attended several of the 9th through 14th degree plans conferences making important contacts, Dr. Karen (Programs of Study) by May 2011. Alexander the state wide director of Achieve Texas presented at the Fall 2010 division meeting. Dr. Farias was elected to serve on the Texas Association of College Technical Educators. Progress: 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 86 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Part-Time Consultant Task Description: With the Aide of a Part-time consultant meet with School District Representatives: to write degree plans, to identify potential Dual/Articulated credit courses and to credential high school CTE Faculty. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 13000.0000 Funding Justification: Administrative cost Planning - Dean, ESL, Reading & Social Sciences at VV - Establish EPCC/UTEP Engineering Advising Partnership Program (2010 - 2011). - To establish an EPCC/UTEP Engineering Advising Partnership Program to help EPCC Engineering majors to graduate and transfer smoothly into the Engineering Program at UTEP. Planning Year(s): 2010 - 2011 Objective Status: Met Budget Account Number: 11000-13002 Person(s) Responsible: Susana Rodarte 03/05/2012 11:45 AM Measure: The number of graduates and tranfer rates will increase. Data Source for Measure: Department/Area Report Standard and Baseline: Engineering majors receive only general advising at EPCC. For specific concerns students are referred to UTEP advisor. 10/07/2011 - Two advisors were hired to provide academic advising to students and promote Engineering Programs at EPCC district wide. They established rotation schedules to advise student among the five EPCC campuses and UTEP. In addition to providing individual academic advising services, they participated on outreach Students will be better advised and retention activities such as: New Student Orientation, rates will improve. transfer and career fairs, class presentations, etc... Monthly reports indicate that they had more than 1600 student contacts at EPCC and more than 700 student contacts at UTEP. If the grant is renewed and allowed to continue, this program will provide a solid base for future Engineering students to successfully graduate and transfer from EPCC to UTEP. Generated by TracDat a product of Nuventive. Page 87 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Discuss proposal and program benefits with parties involved. Task Description: Meet with UTEP School of Engineering, EPCC administrators, and Counseling Department to create Advisors job duties. Budget Impact: Additional/New Funding Required Funding Justification: UTEP School of Engineering will provide funds to EPCC to hire two FT Academic Advisors for the academic year (20102011). Planning - Dean, ESL, Reading & Social Sciences at VV - Review of Memorandum of Understanding UTEP-EPCC and Department of the Army (2010 - 2011). - To review and update the Memorandum of Understanding (MOU) regarding the Military Science courses we offer at UTEP to meet SACS requirements. Planning Year(s): 2010 - 2011 Expected Completion Date: 12/20/2011 Objective Status: In Progress Budget Account Number: 11000-13002 Person(s) Responsible: Susana Rodarte 03/05/2012 11:45 AM Measure: Approval of Memorandum of Understanding by UTEP/EPCC and Department of the Army. Data Source for Measure: Department/Area Report Standard and Baseline: Faculty Credentials documentation. 01/02/2012 - In progress (MOU) will be finalized in Fall 2011. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Student Evaluations and Administrative Evaluations. Course syllabus official format. Task Name: Update required official documentation. Task Description: Meet with UTEP and Department of the Army (ROTC) representatives. Work with the Curriculum Office to review proposals. Budget Impact: Generated by TracDat a product of Nuventive. Page 88 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 09/21/2011 - Held focus group in preparation for Dept. of Labor grant submission in Spring 2011. They identified Biotech, Cardiovascular Tech, Electronic Medical Records (both health and computer professional focus) and Polysomnography as critical needs in the El Paso area. Biotech was also identified during community session conducted by the Medical Centers of the Americas in Spring 2011. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 10/03/2011 - Waiting on DOL grant status to be determined after Sept. 30, 2011 regarding initiation of programs. If we receive the grant, we will enter the development phase. If we do not receive the grant, we seek to identify other sources of funding and continue additional needs assessments. No Funding Needed Planning - Dean, Health, Career & Tech. Educ., Math and Science at RG - Health Career, Math and Science (2010-2011). Identify potential new programs in allied health for future development. Planning Year(s): 2010 - 2011 Expected Completion Date: 11/30/2011 Actual Completion Date: 12/01/2011 Objective Status: Met Budget Account Number: 11000-13008 Person(s) Responsible: Dr. Paula Mitchell, Dolores Arellano Measure: Analysis of survey results and data from external sources has been completed to identify a list of potential new allied health programs for development. Data Source for Measure: External Report Standard and Baseline: Survey is completed. Prioritized list is completed. Old list from 2000 exists and will be updated. 09/21/2011 - Await outcomes from DOL grant. Follow-Up: 09/28/2011 - DOL Grant was not funded. Waiting on later comments. 09/21/2011 - Will continue next year. Task Name: Create a Taskforce Task Description: Create a task force to review community needs in allied health. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: List of Programs Task Description: 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 89 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 09/28/2011 - DOL Grant submitted based on focus group and other advisory committee recommendations. Did not receive DOL grant funding. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 02/13/2012 - Continue to research and submit proposals for additional funding to implement projected new programs. WOrking with WOrkforce Solutions on potential regional grant to develop selected new programs previously identified. Prepare list of recommended programs to submit to merging programs committee. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 1000.0000 Funding Justification: Survey cost and mailing Planning - Dean, Health, Career & Tech. Educ., Math and Science at RG - Identify potential new programs in allied health for future development (2010-2011). - Conduct survey of employers to identify needs for new allied health professionals for the next 5 -10 years. Planning Year(s): 2010 - 2011 Expected Completion Date: 09/29/2011 Actual Completion Date: 09/29/2011 Objective Status: Not Met Budget Account Number: 11000-13008 Person(s) Responsible: Paula Mitchell/Dolores Arellano/Souraya Hajjar Measure: Survey completed. Emerging programs in allied health identified (yes or no). Need to expand existing programs in allied health identified. Data Source for Measure: Survey Data Standard and Baseline: Baseline data: current program enrollment and graduation data; local, regional, and state employment data. Projected changes based on survey data. 09/28/2011 - Continue to assess program needs. Assess other potential sources of grant funding. 09/21/2011 - Focus group with employers held in Spring 2011 to identify priority programs. Five programs submitted as a part of DOL grant. Grant to be awarded in September 2011. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Related Documents: 0 -- TAACCCT -- TEXAS BEST Consortium -- FULL PROPOSAL.PDF Task Name: Survey Task Description: 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 90 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Develop and mail survey Budget Impact: Rollover/Maintain Current Funding Projected Cost: 1000.0000 Funding Justification: duplication and postage Planning - Dean, Health, Career & Tech. Educ., Math and Science at RG - New Initiatives (2010 - 2011). - Initiate new curriculum strategy for at least one allied health, math, or science discipline (block scheduling, powerpack, on-line training, etc.) Planning Year(s): 2010 - 2011 Expected Completion Date: 08/13/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-55444 Person(s) Responsible: Paula Mitchell and faculty 03/05/2012 11:45 AM Measure: Course syllabus and/or schedule reflect changes. Data Source for Measure: Department/Area Report Standard and Baseline: Course syllabus and schedule from academic year 2010-11 02/13/2012 - Allied Community Health Services is working with Workforce Development to implement a Career Pathways Initiative in second minimester 2012. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 09/21/2011 - A hybrid on-line course with Video conferencing was conducted as a pilot for a dual credit class with Bowie high school. A small class of students (10) were enrolled. Class performance was successful but coordination of the A/B class schedules for video-conferencing was difficult. Decision was made to only do face-to-face or 100% on-line. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 09/21/2011 - A contract for training Paramedics from the El Paso Fire Department was awarded to EPCC in Fall 2010. Classes started in November 2011. Scheduling was done based on a 40 hour work-week for the FIRE employees. Block scheduling was utilized. Of 22 students entering the program, only 1 student was unsuccessful. Second class to start in September 2011. Progress: Satisfactory Action Plan Status: Generated by TracDat a product of Nuventive. Page 91 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 0 - No Action Plan Necessary Task Name: Assess program enrollment and grade distribution reports from 2010-2011 Task Description: Assess data. Identify a need for change. Meet with program faculty to discuss options and gain their support. Budget Impact: Rollover/Maintain Current Funding Planning - Dean, Instructional Programs at MdP - Faculty/Staff designated parking (2010-2011) - Add signs designating certain parking spaces as reserved for Faculty/Staff. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/15/2011 Actual Completion Date: 06/01/2011 Objective Status: Met Budget Account Number: 11000 Person(s) Responsible: Santiago Rodriguez, EPCC Police Measure: To have a specified number of parking spaces reserved for EPCC Faculty/Staff. Data Source for Measure: Department/Area Report Standard and Baseline: Prior to this plan, there were no parking spaces reserved for Faculty/Staff. 08/01/2011 - Several signs designating reserved parking for Faculty and Staff have been installed in multiple parking lots on campus. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Planning - Dean, Instructional Programs at MdP - Permanent EPCC Bookstore (20102011) - To have a permanent campus bookstore presence, rather than having bookstore come for a few days the first week of each semester. Planning Year(s): 2010 - 2011 Expected Completion Date: 01/02/2012 Measure: A permanent campus bookstore will be open on the MDP campus. Data Source for Measure: Department/Area Report Standard and Baseline: Currently, the EPCC bookstore is a temporary presence at MDP, with bookstore staff coming to campus the first few days of Fall, Spring, and Summer semesters. 01/02/2012 - EPCC Bookstore staff have come to campus to begin set-up of permanent bookstore space. MDP Bookstore is now open 5 days a week (6 days a week during the first week of the semester). Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 92 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Objective Status: Met Budget Account Number: 11000 Person(s) Responsible: Santiago Rodriguez, Dr. Julie Penley, Patricia Rodriguez Planning - Dean, Instuctional Programs at NW - Provide quality instructional support and innovative technology (2010 - 2011). The Dean of Instructional Programs strives to provide quality instructional support and innovative technology Planning Year(s): 2010 - 2011 Expected Completion Date: 09/01/2010 Objective Status: New Budget Account Number: 11000-13009 Person(s) Responsible: Dr. Lydia Tena Measure: Work closely with campus faculty to maintain high standard and quality instructors Data Source for Measure: Student Related Data (Tracking/Performance) Standard and Baseline: Continue to provide quality instructional support and increase the innovative ideas to increase faculty and student interest. Planning - Dean, Math, Career & Tech, Educ. & Science at TM - Professional Development (2010-2011) - Provide relevant faculty development activities. Planning Year(s): 2010 - 2011 Measure: A minimum of 3 relevant faculty development activities/trips have been funded through this account. Data Source for Measure: Department/Area Report Standard and Baseline: 3 trips funded. Baseline: 0 trips currently planned for next year. Actual Completion Date: 02/20/2010 Objective Status: Met Budget Account Number: 11000-13012 Person(s) Responsible: Steve Smith 03/05/2012 11:45 AM 09/28/2011 - Numerous professional development efforts occurred. All objectives met. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Submit Proposals Task Description: Ask faculty to research and submit proposals to attend relevant faculty development activities. Generated by TracDat a product of Nuventive. Page 93 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Dean, Nursing at RG Simulation lab 2010-11 - 1. To develop a medium- to high-fidelity nursing simulation lab. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/06/2011 Actual Completion Date: 05/30/2011 Objective Status: Met Budget Account Number: 11000-55005 Person(s) Responsible: Dean of Nursing Planning - Dean, Nursing at RG - Practice Lab Instructors 2010-11 - To formalize the Practice Lab Instructor position for the nursing program. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/30/2011 Actual Completion Date: 11/30/2011 Objective Status: In Progress 03/05/2012 11:45 AM Measure: The simulation lab will be fully functional with a control room and audio-visual recording capabilities. Data Source for Measure: Department/Area Report Standard and Baseline: Started out with mannequins stored in a closet and no faculty member willing to take a lead role in this ara. 12/14/2011 - The simulation lab has been completed. There are just a few things that need to be ironed out. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Obtain and Utilize grant money to fund the development of the simulation lab. Task Description: Obtain money from the THECB NSRP Regular grant program to fund the development of the simulation lab. Budget Impact: Additional/New Funding Required Projected Cost: 250000.0000 Measure: The Practice lab Insturctor position will be an actual position with a position description, criteria, a credential field for it, and the attached budget Data Source for Measure: Budget Data Standard and Baseline: The position does not exist. 12/14/2011 - The Practice Lab Instructor position has been created. Banner has been changed to reflect the new position. The credential process reflects the change. HR now has it listed as a regular position as of fall 2011. It took longer than initially anticipated. Full-time and part-time employees had been hired into the position. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 94 of 297 Objectives Budget Account Number: 11000-55005 Person(s) Responsible: Dean of Nursing Planning - Dental Assisting - RG Accreditation (2010-2011) - Maintain national accreditation of program Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2010 Actual Completion Date: 08/11/2011 Objective Status: Met Budget Account Number: 11000-55125 Person(s) Responsible: Sharon Dickinson 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: submit proposal to Dr. Brown and add to credentialing information. Task Description: Develop and submit proposal. Present information about position and governing agency regulations that permit the position. Budget Impact: Additional/New Funding Required Projected Cost: 50000.0000 Funding Justification: Students have to practice skills before they are able to perform them for a check off. They need guidance and support during the practice. Measure: Accreditation status. Data Source for Measure: Program Review Data Standard and Baseline: Full accreditation. Baseline: Full accreditation. 11/05/2010 - Received full accreditation August, 2011 next site visit scheduled for 2016. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Annual Fees Task Description: Pay annual fee to accred-agency. Budget Impact: Additional/New Funding Required Projected Cost: 0.0000 Task Name: Annual Reports Task Description: Submit annual reports to accred-agency. Budget Impact: No Funding Needed Projected Cost: Generated by TracDat a product of Nuventive. Page 95 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 0.0000 Task Name: Self-Studies Task Description: Submit self-studies when scheduled. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Dental Assisting - RG - Dental Assisting-1 (2010-2011) - Maintain American Dental Association Commission on Dental Accreditation (CODA) of the program. Planning Year(s): 2010 - 2011 Measure: Accreditation status. Data Source for Measure: Department/Area Report Standard and Baseline: Full accreditation. Baseline: Full accreditation. Actual Completion Date: 08/11/2011 Objective Status: Met Budget Account Number: 11000-55125 Person(s) Responsible: Sharon Dickinson Task Name: Annual Reports Task Description: Submit annual reports to accreditation agency. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Progress Report Task Description: Submit Progress Report from June Site Visit by May, 2010. Budget Impact: No Funding Needed Planning - Dental Assisting - RG - Dental Assisting-2 (2010-2011) - Maintain licensure board scores at or above state and/or national average. Measure: Licensure or certification pass scores. Data Source for Measure: Department/Area Report 03/05/2012 11:45 AM 10/27/2011 - Program received full accreditation August 2012. Next site visit 2016. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 10/27/2011 - 100% pass rate May 2011 at above state and maintained national average Progress: Satisfactory Generated by TracDat a product of Nuventive. Page 96 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 05/06/2011 Objective Status: Met Budget Account Number: 11000-55125 Person(s) Responsible: Sharon Dickinson Planning - Dental Assisting - RG - Area Plan (2010-2011) - Increase marketing and recruit more students into the Dental Assisting program. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/04/2012 Actual Completion Date: 05/07/2012 Objective Status: In Progress 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Standard and Baseline: 90%. No baseline. Results Action & Follow-Up Action Plan Status: 0 - No Action Plan Necessary Task Name: Areas of Weakness Task Description: Evaluate areas of weakness of past graduates and need for curriculum changes or changes in admission criteria. Budget Impact: No Funding Needed Task Name: Licensure Results Task Description: Track licensure result of graduates yearly. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Pass Scores Task Description: Investigate standardized exit exams or review courses to strengthen pass scores. Budget Impact: No Funding Needed Measure: Number of students enrolled in the program increase. Data Source for Measure: Enrollment Data Standard and Baseline: 10 students per year. No baseline. 10/27/2011 - Program resturcture will include increased marketing and recruiting of students into the Dental Assisting Program. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Increase Awareness Task Description: Increase awareness through increase in Generated by TracDat a product of Nuventive. Page 97 of 297 Objectives Budget Account Number: 11000-55125 Person(s) Responsible: Sharon Dickinson Measures & Standards and Baselines / Strategies Action & Follow-Up career day activities in high and middle schools in the district. Budget Impact: No Funding Needed Task Name: Marketing/Recruiting Materials Task Description: Increase awareness of the program in the community through increased marketing/recruiting materials. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Program Awareness Task Description: Increase program awareness of the program through participation in EPCC Health Careers Orientation presentations. Budget Impact: No Funding Needed Planning - Dental Hygiene - RG Accreditation (2010-2011) - Maintain American Dental Association Commission on Dental Accreditation (CODA) of the program. Planning Year(s): 2010 - 2011 Measure: Dental Hygiene program to maintain CODA accreditation. Actual Completion Date: 09/01/2010 Objective Status: Met Budget Account Number: 11000-55141 Person(s) Responsible: William Ekvall Task Name: Annual Reports Task Description: Submit annual reports to accreditation agency. Budget Impact: No Funding Needed Projected Cost: 03/05/2012 11:45 AM Results Standard and Baseline: full accrediation 10/27/2011 - Dental Hgyiene program received full accreditation status in August 2010. Next site visit 2016. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 98 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 0.0000 Task Name: Progress Report Task Description: Submit Progress Report from June Site Visit by May, 2010. Budget Impact: No Funding Needed Planning - Dental Hygiene - RG - Area Plan (2010-2011) - Maintain licensure board scores at or above state and/or national average. Planning Year(s): 2010 - 2011 Actual Completion Date: 08/01/2011 Objective Status: Met Budget Account Number: 11000-55141 Person(s) Responsible: William Ekvall Measure: Licensure or certification pass scores. Data Source for Measure: Department/Area Report Standard and Baseline: 90%. No baseline. Measure: Maintain licensure/board scores for state/regional and national board examinations pass scores. Standard and Baseline: 90% 10/27/2011 - May 2010 graduates had a 100% pass rate on state and regional examinations and 90% pass rate on national board. One to retake national board Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Exit Exams Task Description: Investigate standardized exit exams or review courses to strengthen pass scores. Budget Impact: No Funding Needed Task Name: Licensure Result Task Description: Track licensure result of graduates yearly. Budget Impact: No Funding Needed Projected Cost: 0.0000 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 99 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 09/13/2011 - As per the last update with Dr. Mitchell the DMS lab is still waiting for space for the DMS lab to move within the health building. Progress: Unsatisfactory Action Plan Status: 2 - Action Plan Documented 09/13/2011 - Move this plan to 2011-2012 Task Name: Past Graduates Task Description: Evaluate areas of weakness of past graduates and need for curriculum changes or changes in admission criteria. Budget Impact: No Funding Needed Planning - Diagnostic Medical Sonography RG - Increase DMS Lab Space (2009-2012) - DMSO program has out grown the lab space. The students are already split into multiple lab days and have to wait to scan patients. The outpatient waiting list is over 2 months and turning patients away. Increasing the lab space from 987 sq. feet to approx. 2828 sq. feet will allow at least 2 to 3 more scanning stations increasing students hands on practice and still providing an excellent community service. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Expected Completion Date: 12/07/2012 Objective Status: In Progress Budget Account Number: 11000-55130 Person(s) Responsible: Nora Balderas Measure: The plan will be progressing when the DMSO lab starts moving to a larger area within R.G. Health building. Data Source for Measure: Department/Area Report Standard and Baseline: At this time the DMS lab area is waiting for the nursing classes to move to another area at FT. Bliss 09/13/2011 - Move this plan to 2011-2012 11/03/2010 - Have moved this plan to 2010-2011 09/13/2011 - Move this plan to 2011-2012 Progress: Unsatisfactory Action Plan Status: 2 - Action Plan Documented 09/13/2011 - This plan is in process need to move to 2011-2012 Progress: Unsatisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Move th DMSO Lab Task Description: To move the (DMSO) lab to another area in the health building at 1001 El Paso St. or increase the sq. feet area on the Lab H158. 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 100 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Funding Justification: To increase DMS lab space. Budget Impact: Additional/New Funding Required Projected Cost: 4000.0000 Task Name: Move this plan to 2011-2012 Budget Impact: Additional/New Funding Required Planning - Diagnostic Medical Sonography RG - Purchase Another Ultra Sound Machine and Add a Scanning Station in the Lab (2009-2012) - The outpatient waiting list is over 2 months and turning patients away. Increasing the scanning stations in the DMS lab will allow the students more hands on practice and increase the volume of an excellent community service. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Expected Completion Date: 02/14/2011 Actual Completion Date: 04/18/2011 Objective Status: Met Budget Account Number: 11000-55130 Person(s) Responsible: Nora Balderas Measure: Acquire different quotes from companies that will give an educational discount. Data Source for Measure: Department/Area Report Standard and Baseline: No standard or baseline. 09/13/2011 - Plan met received the new ultrasound machine April 18,2011 Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 09/13/2011 - Plan met received the new ultrasound machine April 18, 2011 Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 11/03/2010 - Equipment replacement committee from IT funded 179,000.00 for a new ultrasound machine for the DMS lab at R.G campus. Progress: Unsatisfactory Action Plan Status: 2 - Action Plan Documented 09/13/2011 - This action plan was met we received the new ultrasound machine April 18, 2011 11/03/2010 - If for any reason the ultrasound machine is not in the DMS lab by 02/14/2011, I plan to move this plan to 2010-2011. Task Name: Increase Sound Scanning Stations Task Description: 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 101 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 12/06/2011 - Move this plan to 2012 Progress: Unsatisfactory Action Plan Status: 2 - Action Plan Documented 12/06/2011 - Did not accomplish this plan need to move it to 2012-2013 12/06/2011 - Move to 2012 Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 12/06/2011 - Need to move plan to academic year 2012-2013. Increase the ultra sound scanning stations in the DMS lab by purchasing a new ultra sound machine by fall 2010. Budget Impact: Additional/New Funding Required Projected Cost: 58000.0000 Planning - Diagnostic Medical Sonography RG - Increase DMS Lab Space (2010-2013) - DMS Program has out grown the lab space. The students are already split into multiple lab days & have to wait to scan patients. The outpatient waiting list is over 2 months and turning patients away. Increasing the lab space from 987 sq. feet to approx. 2828 sq. feet will allow at least 2 or 3 more scanning stations increasing students hands on practice & still provide an excellent community service. Planning Year(s): 2010 - 2011 2011 - 2012 2012 - 2013 Actual Completion Date: 03/09/2010 Objective Status: In Progress Budget Account Number: 11000-55130 Person(s) Responsible: Nora Balderas Planning - Diagnostic Medical Sonography RG - Part-time Assistant or DMS Lab Assistant (2010-2013) - Person needed to assist in the DMS Lab with filing students records, grading exams, computing clinical hours, assisting patients, compiling program data for distribution, answering incoming 03/05/2012 11:45 AM Measure: Have plans and funds to start moving the DMS lab by Summer 2010. Data Source for Measure: Department/Area Report Standard and Baseline: Have a larger DMS Lab by Fall 2013. Baseline: Fall, 2010. Task Name: Move DMS Lab Task Description: To move the DMS lab to another area in the health building at 1001 El Paso Street or increase the sq. feet area in the lab in H158 by adding H157 to the DMS lab area. Budget Impact: Additional/New Funding Required Projected Cost: 5000.0000 Measure: Hire a part-time assistant by Fall 2011. Data Source for Measure: Department/Area Report Standard and Baseline: Hire a part-time assistant by Fall 2011. Baseline: Fall 2010. Generated by TracDat a product of Nuventive. Page 102 of 297 Objectives Measures & Standards and Baselines / Strategies calls helping program coordinator maintain an easy flow lab environment assisting students with maintenance of their paper trail, maintain post graduate survey records & all other things that may be required to assist the students, coordinator or DMS faculty. Planning Year(s): 2010 - 2011 2011 - 2012 2012 - 2013 Task Name: Hire a Person Task Description: Hire a person for Fall 2011, annual costs per position @ nine dollars hour per week = a total Cost of $9,000.00. Budget Impact: Additional/New Funding Required Projected Cost: 9000.0000 Results Action & Follow-Up 12/06/2011 - Plan met received the ultrasound machine on April 18, 2011 Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 12/06/2011 - The new ultrasound machine needs to have an isolated outlet. The DMS lab needs to upgrade the electrical in the lab to prevent blowing of the circuit breakers which in turn will damage these machines. Actual Completion Date: 03/09/2010 Objective Status: In Progress Budget Account Number: 11000-55130 Person(s) Responsible: Nora Balderas Planning - Diagnostic Medical Sonography RG - Purchase an Ultrasound Machine and Add a Scanning Station to the DMS Lab (2010-2011) - The outpatient waiting list is over 2 months and turning patient away. Purchasing an ultrasound machine and adding a scanning station to the DMS lab will allow the students more hands on practice and increase the volume of an excellent community service. Planning Year(s): 2010 - 2011 Expected Completion Date: 12/03/2010 Actual Completion Date: 04/18/2011 Objective Status: Met Budget Account Number: 11000-55130 Person(s) Responsible: 03/05/2012 11:45 AM Measure: Purchase an ultrasound machine by Fall 2011. Data Source for Measure: Department/Area Report Standard and Baseline: Buy an ultrasound machine by Fall 2011. Baseline: Spring 2010 acquire different quotes from companies that will give educational discounts. Task Name: Purchase an Ultrasound Machine Task Description: Purchase an ultrasound machine and increase DMS lab stations by adding more sq. ft. Budget Impact: Additional/New Funding Required Projected Cost: 67000.0000 Generated by TracDat a product of Nuventive. Page 103 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Nora Balderas Planning - Diagnostic Medical Sonography RG - Purchase Modular Desks Workstations for the DMS Lab (2010-2011) - The DMS lab is in desperate need to replace the old broken desks with new modular workstations. The old desks are used as student evaluation desk, work areas, & a reception work area. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/09/2010 Objective Status: Withdrawn Budget Account Number: 11000-55130 Person(s) Responsible: Nora Balderas Planning - Distance Education - Distance Education Program Support (2010-2011) Improve student retention in Distance Education courses. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: In Progress Budget Account Number: 11000-52113 Person(s) Responsible: Bob Jones Measure: Purchase new modular workstations by Fall 2011. Data Source for Measure: Department/Area Report Standard and Baseline: Buy new modular workstations by Fall 2011. Baseline: Acquire different quotes from several companies. 12/06/2011 - Delete this plan as of 12/06/2011 Progress: Unsatisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Brown Interior Solutions Task Description: Contact Brown Interior Solutions for modular office furniture for a floor plan that will fit the area in the DMS lab. Budget Impact: Additional/New Funding Required Projected Cost: 4500.0000 Measure: Increase the number of students who complete distance education courses. Data Source for Measure: Student Related Data (Tracking/Performance) Standard and Baseline: Improve student retention in distance education courses by 10%. Baseline: Distance Education Student Retention Data for Academic Year 2008/2009 provided by Institutional Research. A baseline is available to measure retention and identify improvement. 12/13/2011 - These measurements reflect a subset of EPCC course offerings and are intended to be used to be one of the factors used to guide planning for improving online course completion. Comparison of student course completion of on campus and online courses offered in: 2008/2009 On Campus 77.88% Online 65.41 % 2009/2010 On Campus 81.92% Online 69.00% The comparison is not an exact match due to 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 104 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up different course offerings and the number of courses offered betweeen 2008/2009 and 2009/2010. Although the desired increase in online completers of 10% was not met, the increase in online completers shows improvement and indicates satisfactory progress for this time period. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Conduct Orientations Task Description: Conduct orientations for students enrolled in online courses. Budget Impact: No Funding Needed Task Name: Increase Student Retention Task Description: Assist faculty in identifying "Best Practices" to improve distance education instruction to increase student retention. Budget Impact: No Funding Needed Task Name: Online Course Development Task Description: Assist faculty in online course development with the Curriculum Office. Budget Impact: No Funding Needed Task Name: Online Tutorials Task Description: Create "How To" online tutorials for online students. Budget Impact: 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 105 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up No Funding Needed Task Name: Student Program Survey Task Description: Conduct an end-of term student program survey to assess and improve the effectiveness of support provided by the Distance Education Office. Budget Impact: No Funding Needed Task Name: Student Retention Data Task Description: Student retention data provided to the Instructional Leadership Team Annually. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Support Instructional Initiatives Task Description: Research, identify, evaluate, and deploy software and technology to support instructional initiatives to improve student retention. Budget Impact: No Funding Needed Planning - Diversity Programs - Expansion of Diversity (2010-2011) - To provide clerical support needed in the expansion of Diversity district wide and major activities. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 03/05/2012 11:45 AM Measure: To provide more activities each semester. Data Source for Measure: Department/Area Report Standard and Baseline: To hire 2 FT Clerk III for office support and development of documentation. Baseline: Current staff consists of 1 FT admin. Asst. and 2 temps from the Ysleta del Sur Pueblo WIA program. 08/31/2011 - Hired 1 part-time Clerk III and 2 parttime YDSP temporary office clerks to assist through the end of the fiscal year. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 106 of 297 Objectives Objective Status: Met Budget Account Number: 11000-52500 Person(s) Responsible: Olga Chavez Measures & Standards and Baselines / Strategies Results Task Name: Hiring Task Description: Hiring of two individuals to produce and disseminate necessary paperwork for various meetings, activities, projects in support of district wide Diversity. Budget Impact: Additional/New Funding Required Projected Cost: 36935.0000 Planning - Diversity Programs - Promote Diversity (2010-2011) - To promote the concept of Diversity among all facets of the College community. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-52500 Person(s) Responsible: Olga Chavez Measure: To develop a document that reflects all the activities, projects, functions and meetings presented to the College and community. Data Source for Measure: Department/Area Report Standard and Baseline: One activity/project monthly. Baseline: Currently provide 1-2 major activities per semester. Planning - Drafting and Design - VV Increase Enrollment (2010-2011). - To Measure: 02/13/2012 - Enrollment was not increased Student enrollment in drafting classes will be Progress: 03/05/2012 11:45 AM Action & Follow-Up 08/31/2011 - Staffing increase-despite temporaryfacilitated doubling projects planned and completed per semester. A facebook page was created to reach the online audience. A Diversity Diary was created to document and promote all activities at campus activities in which the department participates in or hosts. Action plan in progress; Diversity Council to reconvene and finalize plan. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Plan of Action Task Description: To follow the plan of action that has been developed; and to adhere to recommendations presented by the Diversity Council. Budget Impact: Additional/New Funding Required Projected Cost: 5000.0000 Generated by TracDat a product of Nuventive. Page 107 of 297 Objectives increase student enrollment in the Drafting discipline. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: Not Met Budget Account Number: 11000-55390 Person(s) Responsible: Bobby Ortega Measures & Standards and Baselines / Strategies Results tallied for 2010-2011 Academic Year. Unsatisfactory Data Source for Measure: Action Plan Status: Student Related Data 1 - Action Plan Needed (Tracking/Performance) Standard and Baseline: Student enrollment in drafting classes will increase by 10% for the 2010-2011 Academic Year. Baseline: Student enrollment for the 2009-2010 academic year was 165 students in the drafting discipline. Measure: Student enrollment in drafting classes will be tallied for 2010-2011 Academic Year. Data Source for Measure: Student Related Data (Tracking/Performance) Standard and Baseline: Student enrollment in drafting classes will increase by 10% for the 2010-2011 Academic Year. Baseline: Student enrollment for the 2009-2010 academic year was 165 students in the drafting discipline. Action & Follow-Up 02/13/2012 - Plan for 2011-12 will be set up Task Name: Advertisement Task Description: A strong advertisement program will be set up to recruit more students into the drafting discipline (i.e. billboards, articles, etc.) Budget Impact: Additional/New Funding Required Projected Cost: 500.0000 Planning - Dual Credit Programs - Dual Credit Procedure (2010-2011) - Review and update the existing procedure ( 6.00.01.30 High School Dual Credit Program Requirements) 03/05/2012 11:45 AM Measure: Have committee members and major players review/revise the procedure and work on a final draft. Data Source for Measure: Committee Recommendation 10/18/2010 - The Dual Credit Standing Committee 04/20/2011 - The procedure will reviewed and revised the Procedure. The need to be revisited and finalized in Procedure was submitted for review and approved 2011. by Cabinet members as a working draft. Progress: Satisfactory Generated by TracDat a product of Nuventive. Page 108 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 10/18/2010 Objective Status: Met Budget Account Number: 11000-12012 Person(s) Responsible: Martina Arriaga Planning - Dual Credit Programs - Schedule Meetings with Dual Credit Representatives from ISDs (2010-2011) - Schedule and meet with ISD representatives and their high school dual credit contacts to review processes, forms and answer questions and improve working relationships/partnerships and communication. Planning Year(s): 2010 - 2011 Objective Status: In Progress Budget Account Number: 11000-12012 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Standard and Baseline: Have a working procedure that can be shared with ISD's/private institutions participating. Procedure has not been reviewed/revised since 2007. Results Action & Follow-Up Action Plan Status: 1 - Action Plan Needed Task Name: Annual Review Task Description: Have the DC Standing Committee review the working draft procedure and finalize. Budget Impact: No Funding Needed Funding Justification: Not applicable Task Name: Review Dual Credit Procedure Task Description: Convene with EPCC Dual Credit Committee and departments directly involved with dual credit to review the final draft procedure before submitting for approval. Budget Impact: No Funding Needed Measure: Meetings will be held at least twice a year and the information shared with the district reps will be shared with the high schools. As a result, the processing of forms will be smoother and lines of communication open. Data Source for Measure: Department/Area Report Standard and Baseline: Meetings have been scheduled with EPISD, CISD, SISD YISD representatives. A meeting with all EPISD high schools was held in March 2011. Information was presented by the District Representative and 06/30/2011 - Meetings have been effective and as a result EPCC DC/ECHS has improved communications with the high schools participating in Dual Credit. Stronger partnerships exist. Meetings were held with EPISD (3/28/11); CISD (6/7/11); SISD (5/2/11) and YISD 5/25/11) to present Fall Calendar. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. 04/20/2011 - Continue holding meetings with the District representatives and with the high schools. Page 109 of 297 Objectives Person(s) Responsible: Martina M. Arriaga, Griselda Hermosillo Measures & Standards and Baselines / Strategies Results Action & Follow-Up EPCC representatives were available to answer questions. Meetings with high school representatives from YISD, SISD and CISD have been tentatively scheduled. Task Name: Meetings Held Prior to Each Semester to Create Calendar Guide Task Description: Hold meetings with the Dual Credit District Representative to review processes, changes, and finalize semester calendar guide by district. Once the calendar is finalized, hold meetings with the individual high schools from each district with their District Representative giving the presentation. Have EPCC representatives present to answer questions. Budget Impact: No Funding Needed Task Name: Met with EPISD Task Description: All forms were reviewed along with a calendar guide for Spring 2011. All G&Is and one counselor were present. Budget Impact: No Funding Needed Planning - Dual Credit Programs - Meetings with Dual Credit/Early College High School staff (2010-2011) - Hold weekly meetings with DC/ECHS staff to improve external and internal communications. Focus on communication, trust, and close working relationship building. Planning Year(s): 2010 - 2011 03/05/2012 11:45 AM Measure: Have open lines of communication with staff during meetings. Ask members to share their thoughts about the program, processes, provide feedback,share ideas. Data Source for Measure: Unit Review Standard and Baseline: Staff will feel comfortable sharing ideas, concerns, and part of a team. Currently, staff 06/30/2011 - Our communication with the ECHS has been established. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. Page 110 of 297 Objectives Objective Status: Met Budget Account Number: 11000-12012 Person(s) Responsible: Martina Arriaga Measures & Standards and Baselines / Strategies Action & Follow-Up was recently transferred from Admissions/Registrar to DC/ECHS. New changes may be harder to adapt to for staff is new to Dual Credit. Task Name: Meet with staff weekly Task Description: Weekly meetings will allow staff to share information, ideas, concerns with all present. Keeping notes of the meetings will also help the office stay on track and/or go back to revisit any repeat concerns/pending issues. Budget Impact: No Funding Needed Planning - Dual Credit Programs - Dual Credit Handbook (2010-2011) - To update the Dual Credit Handbook Planning Year(s): 2010 - 2011 Expected Completion Date: 05/11/2011 Objective Status: In Progress Budget Account Number: 11000 12012 Person(s) Responsible: Martina M. Arriaga Measure: Provide each department with their section of the handbook for their review and update assigning deadlines. Data Source for Measure: Unit Review Standard and Baseline: The Dual Credit Handbook has not been reviewed since 2007. All but 2 sections have been submitted. Planning - Dual Credit Programs Student/Parent Handbook (2010-2011) Review and update the Student/Parent Handbook Measure: Have departments review and provide updates. Data Source for Measure: Unit Review Standard and Baseline: 03/05/2012 11:45 AM Results 12/31/2010 - The Dual Credit Handbook has been reviewed, updated and posted on DC webpage. A portion of the handbook is still under construction. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Pending DC Handbook Sections Task Description: Follow up with the departments who have not submitted their section weekly. Budget Impact: No Funding Needed 04/20/2011 - Improved communication between EPCC and ISDs and high schools. Stronger partnerships between EPCC and ISDs Progress: Satisfactory Generated by TracDat a product of Nuventive. 04/20/2011 - Continue to meet with the districts and high schools at least twice a year to review processes, forms and share any new information. Page 111 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 11/12/2010 Objective Status: Met Budget Account Number: 11000 12012 Person(s) Responsible: Martina M. Arriaga Measures & Standards and Baselines / Strategies Update the Student/Parent Handbook to use at New Student Orientations Student/Parent Handbook had not been reviewed since 2007 Results Action Plan Status: 1 - Action Plan Needed 04/20/2011 - The Dual Credit Handbook is very close to being updated. Missing 2 sections that should be submitting updates by the end of April 2011. Progress: Unsatisfactory Action Plan Status: 3 - Follow-Up Documented 11/30/2010 - Student/Parent Handbook was completed and is distributed at New Student Orientations. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 11/01/2010 - The Student/Parent Handbook was reviewed and updated. Copies have been printed and provided to students at New Student Orientations. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Action & Follow-Up 07/01/2011 - Review on a yearly basis. Task Name: Department Review and Update Task Description: Provide departments with their section of the Student/Parent Handbok for review Budget Impact: No Funding Needed Funding Justification: Copies printed were covered by the Curriculum Office Planning - Dual Credit Programs - Create a Dual Credit Brochure (2010-2011) 03/05/2012 11:45 AM Measure: The DC Brochure was shared with 04/13/2011 - Printed 3,000 brochures at $400. Recruitment is requesting 5,000 Generated by TracDat a product of Nuventive. Page 112 of 297 Objectives Replace a one page flyer with the new Brochure Planning Year(s): 2010 - 2011 Expected Completion Date: 03/03/2011 Objective Status: Met Budget Account Number: 11000 12012 Person(s) Responsible: Martina M. Arriaga Measures & Standards and Baselines / Strategies interested parties for information updates, feedback and input. Data Source for Measure: Unit Review Standard and Baseline: Use the Brochure to recruit and promote Dual Credit An outdated flyer had been used Results Action & Follow-Up Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 10/28/2011 - May need to order additional brochures this year. Will need to review and update the brochure at least once a year. 11/30/2010 - The DC Brochure was completed and is distributed at high school presentations, high school parent nights and community events. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Distribution of Dual Credit Brochure Task Description: Distribute the DC Brochure at High School Night, College Week, Parent Night, during opportunities presented for promotional purposes Budget Impact: Rollover/Maintain Current Funding Funding Justification: As the program grows and printing costs increase, it is possible that additional funding may be necessary Planning - Dual Credit Programs - Review and Update Dual Credit Agreements (20102011) - Update the agreements with all Dual Credit participating districts / private and parrochial high schools Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2010 Actual Completion Date: 09/13/2010 Objective Status: 03/05/2012 11:45 AM Measure: Obtain signature from the district superintendent and/or high school administrator. Dual Credit Partnership Agreements were delivered to each district and/or high school administrator. Data Source for Measure: Unit Review Standard and Baseline: Update 5 - 9 year old Dual Credit Agreements that had not been revised since their date of origin. 04/15/2011 - All Dual Credit Partnership Agreements were signed with the exception of EPISD (pending EPISD District Board approval) EPISD signed on Dual Credit Partnership Agreement on 4/12/11 Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. 04/12/2011 - Follow up at the end of April 2011 with EPISD district representative. Agreements will be updated every 3 years. EPISD signed agreement on 4/12/11 Page 113 of 297 Objectives Met Budget Account Number: 11000 12012 Person(s) Responsible: Martina M. Arriaga Planning - Dual Credit Programs - Cords and Certificates for Graduating Seniors (2010-2011) - Provide cords and certificates to all seniors who meet the requirement Planning Year(s): 2010 - 2011 Expected Completion Date: 05/27/2011 Actual Completion Date: 05/27/2011 Objective Status: Met Budget Account Number: 11000 12012 Person(s) Responsible: Martina M. Arriaga 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies All but 1 has been signed pending district board approval. We have been informed that the agreement will be signed by May 2011. Results Action & Follow-Up Task Name: Update Agreements and obtain signatures Task Description: A draft agreement was presented to the larger school districts (EPISD, SISD, YISD), VP-Student Services and VP-Instruction for review. Agreements were finalized accordingly. Budget Impact: No Funding Needed Measure: Reports were run and sent to each HS listing the names of students who met the requirements set by the DC Standing Committee Data Source for Measure: Committee Recommendation Standard and Baseline: Cords and Certificates issued to students with a 2.0 gpa and at least 6 credits completed as of Fall 2010. Certificates only for students with a 2.0 and less than 6 credits completed as of Fall 2010. 06/30/2011 - Cords and Certificates were delivered to high schools. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Reports for HS Task Description: In April the DC office will request a report to identify all high school seniors expected to graduate in May who will receive a certificate only OR a certificate and a cord. The report will be sent to each HS for review and information. Budget Impact: Generated by TracDat a product of Nuventive. Page 114 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Additional/New Funding Required Projected Cost: 8000.0000 Funding Justification: Monies have been transferred from the President's account for the purchase of cords and certificates. Planning - Economics - VV - Diversity in Department Course Offerings (2010-2011) Ensure students have choices in terms of course offerings and instructional formats in making course selections in economics. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/22/2010 Objective Status: Met Budget Account Number: 11000-55305 Person(s) Responsible: Gail Shipley Measure: Schedule sections in Economics making use of all formats (face to face smart classrooms; online classes; mini-mester sections; and hybrid sections) and all course offerings. Data Source for Measure: Department/Area Report Standard and Baseline: The use of at least one section of each instructional format and the use of all courses listed in the Economics department during the 2010-2011 academic year. Baseline: In terms of formats we have offered all except for hybrid sections. In terms of the Economics curriculum we have offered all three courses, Issue, Macro, and Micro. 10/03/2011 - Courses scheduled in Smart Classrooms. Increase use of Smart Classrooms. Encourage Hybrid Course Development. District-Wide adoption of course delivery through Textbook Publisher's online portal. Encourage use of Textbook Publishers online assets. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Recruit and Train Task Description: Recruit and train faculty to try new teaching formats and to be able to teach more than one course offering. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Employee Relations - Tenure Review Records Management (2010-2011) 03/05/2012 11:45 AM Measure: Employees needing access to these 02/25/2010 - Records were obtained from all departments and placed in storage. A database Generated by TracDat a product of Nuventive. Page 115 of 297 Objectives - 1) Collect and organize all tenure records for storage in one location (Employee Relations). 2) Determine type (tenured/non-tenured) of each record. 3) Properly label and store each record in the appropriate category. 4) Create a database that lists information needed for reference and easy retrieval. Planning Year(s): 2010 - 2011 Expected Completion Date: 02/25/2010 Actual Completion Date: 02/25/2010 Objective Status: Met Budget Account Number: 11000-11107 Person(s) Responsible: Nancy Nelson Planning - Engineering - VV - Obtain Proper Materials (2010-2011) - Obtain digital probes for the Digitals class, robots for the intro to engineering class, and licenses for the NX4 software. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: Met Budget Account Number: 11000-55355 Person(s) Responsible: Mariano Olmos 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies documents will be able to retrieve everything from one location. Data Source for Measure: Department/Area Report Standard and Baseline: Any issues regarding the tenure process will be able to be resolved more quickly with easy access to the documents and/or review of the database. Baseline: Tenure records were stored in various departments throughout the district and a database for easy access and information was not in place. Results Action & Follow-Up was created listing each record and its location. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Communication with Department Heads Task Description: Communicate with department heads currently storing tenure materials to release them to Employee Relations. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Increase the intrumentation, so that the students will have the same tools that are available at a four year institution. Data Source for Measure: Department/Area Report Standard and Baseline: The students will have access to the latest instrumentation developed. Baseline: Currently, we have limited amount of equipment that will help the engineering department develop a good pedagogic approach in most of the classes. 12/31/2011 - The engineering department acquired ten Mega 2560 Arduino microcontroller boards and two Field Programmable Gate Arrays digilent boards. The students will complete lab assignments that will enable them to learn, create, and design specific projects. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Purchase Licenses Generated by TracDat a product of Nuventive. Page 116 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Description: Purchase licenses for the NX4 software, so that the engineering graphics class can be complemented. Budget Impact: Additional/New Funding Required Projected Cost: 8000.0000 Task Name: Purchase Probes Task Description: Purchases digital probes for the Digitals class. Budget Impact: Additional/New Funding Required Task Name: Purchase Robots Task Description: Purchase robots for the intro to engineering class. Budget Impact: Additional/New Funding Required Planning - English - NW - Computer Classrooms (2010-2011) - To increase the number of English 1301 and English 1302 courses taught in computer classrooms. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/13/2011 Actual Completion Date: 05/13/2011 Objective Status: Met Budget Account Number: 11000/55188 Person(s) Responsible: Tony Procell 03/05/2012 11:45 AM Task Name: Transfer of English courses into computer classrooms Task Description: Make case that English is ideally taught in computer classrooms. Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 117 of 297 Objectives Planning - English - RG - Attend Four Cs Conference (2010 - 2011). - Conference for Composition and Literature Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: New Budget Account Number: 11000Person(s) Responsible: Hector Padilla L. Measures & Standards and Baselines / Strategies Measure: Apply and attend the conference. Data Source for Measure: Committee Recommendation Action & Follow-Up Task Name: Conference Funding Justification: Attend annual conference for faculty development Budget Impact: Additional/New Funding Required Projected Cost: 5000.0000 Planning - English - VV - Conference in Las Vegas (2010-2011) - Attending conference to acquire knowledge Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-55185 Person(s) Responsible: Robin Russell Measure: To attend and bring back report. Data Source for Measure: Committee Recommendation Standard and Baseline: January 2011. Planning - English - VV - Attend ALP 2011 Conference (2010-2011) - To learn from experts in developmental education Planning Year(s): 2010 - 2011 Expected Completion Date: 06/17/2011 Objective Status: Met Measure: The faculty who attend the conference will report back to the discipline. Data Source for Measure: Department/Area Report Standard and Baseline: The discipline will learn new instructional strategies from the faculty who attend the conference from the report and meetings. 03/05/2012 11:45 AM Results 12/02/2010 - I attended the conference in January. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Attend Conference. Funding Justification: To attend mandatory conference. Budget Impact: Additional/New Funding Required Projected Cost: 3000.0000 10/11/2011 - Faculty attended at their own expense and reported back to the discipline. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 118 of 297 Objectives Measures & Standards and Baselines / Strategies Budget Account Number: 11000-55185 Person(s) Responsible: Margie Nelson Currently most of the discipline's developmental instructors cannot attend this conference. Planning - English as a Second Language (ESOL) - VV - Recruitment (2010-2011) Continue to work with district wide ESL Recruitment efforts. Planning Year(s): 2010 - 2011 Measure: Continue to monitor enrollment numbers. Data Source for Measure: Enrollment Data Standard and Baseline: Increase in enrollment. Baseline: We are watching our enrollment figures from 2006 to the present. The 2006 enrollment figures would be the baseline. Actual Completion Date: 02/22/2010 Objective Status: Met Budget Account Number: 11000-55270 Person(s) Responsible: Myshie Pagel Planning - English as a Second Language (ESOL) - VV - Group Grading of Exit Exam (2010-2011) - To calibrate expectations on the Exit Exam. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/22/2010 Objective Status: Met Budget Account Number: 11000-55270 Person(s) Responsible: 03/05/2012 11:45 AM Results Action & Follow-Up 09/28/2011 - Enrollment numbers continue to increase. Fall 2010 enrollment for the ESOL writing and grammar courses was 680. Spring 2011 enrollment for the ESOL writing and grammar courses was 834. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Marketing Task Description: A district wide committee with representation from all the campuses has worked on a brochure, posters, as well as participation in EPCC marketing events. Budget Impact: Additional/New Funding Required Measure: Develop a scoring guide for the Mock Exams. Data Source for Measure: Department/Area Report Standard and Baseline: To give diagnostic feedback to students on the Mock Exam. No baseline. 09/28/2011 - The scoring guides used in group grading sessions for the Mock and Exit Exams at VV. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Related Documents: Scoring Guides for Writing ESOL.doc 09/29/2011 - Scoring guides were developed and in related documents Task Name: Group Grading Generated by TracDat a product of Nuventive. Page 119 of 297 Objectives Myshie Pagel Planning - English as a Second Language (ESOL) - VV - Embedded Questions in the ACCUPLACER (2010-2011) - To test the use of embedded questions to help identify students who would benefit form ESL. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/22/2010 Objective Status: Met Budget Account Number: 11000-55270 Person(s) Responsible: Myshie Pagel 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up 09/28/2011 - The questions were drafted and submitted to Testing. There were embedded from July 2010 to June 2011. The results of the questions were tabulated and a chart was created to help identify students who may benefit from ESL courses rather than developmental education courses. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Related Documents: ACCUPLACER ESOL Survey 2010 2011.docx 09/28/2011 - The District Wide Coordinator for ESOL approached the English discipline to discuss the develop of a procedure that would allow students to move from developmental education to an ESL writing course at the beginning of the semester. The procedure is being drafted. Task Description: Group grading for the Mock and Exit exams was started in Fall 2009. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Draft questions to be tested. Data Source for Measure: Department/Area Report Standard and Baseline: Look at questions that have been used by other institutions. Baseline: The questions will be reviewed by all three disciplines. Task Name: Embed Questions Task Description: Embed the questions in the ACCUPLACER to see if they can be used as indicators. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Pilot Task Description: A pilot would be run for two semesters in order to compare the answers to the questions and the ACCUPLACER scores. Budget Impact: Generated by TracDat a product of Nuventive. Page 120 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up No Funding Needed Projected Cost: 0.0000 Planning - English Speaking and Listening (ESAL) - MDP - ESAL Speech Mission del Paso (2010-2011) - To improve class fill rate, seat count, and revenue sufficiency for the ESAL discipline at Mission del Paso. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-55278 Person(s) Responsible: Tracy VonMaluski Planning - English Speaking and Listening (ESAL) - RG - RG Effectiveness Plan (2010-2011). - Increase visits to the RG Language Lab. 03/05/2012 11:45 AM Measure: 80% of our classes should be at least 75% full. Data Source for Measure: Program Review Data Standard and Baseline: 80% of our classes should be at least 75% full (27 is our cap X .75 = at least 21 students per class). Baseline: As of 20082009, 42% of the classes at Mission del Paso met this criteria. Task Name: Develop a Recruitment Plan Task Description: Each campus has developed a recruitment plan for the Credit ESL sequence. At Mission del Paso, ESAL Coordinator Tracy vonMaluski is the contact person for the MdP recruitment plan. Our recruitment plan includes outreach to the surrounding public schools, parent centers at those schools, community centers, Socorro Community Education Department, Rio Vista Community Center, and the Socorro and Clint School District bilingual/ESL student program teachers and administrators. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: I will compare number of visits from one semester to another. Data Source for Measure: Generated by TracDat a product of Nuventive. Page 121 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 03/11/2010 Objective Status: New Budget Account Number: 11000-55276 Person(s) Responsible: Janine Rudnick Planning - English Speaking and Listening (ESAL) - VV - Recruitment of New Faculty (2010-2011) - To recruit new quality faculty. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/22/2010 Objective Status: Met Budget Account Number: 11000-55277 Person(s) Responsible: Andrea Rico-Elizondo 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Department/Area Report Standard and Baseline: By the end of Spring 2011, we want at least 50% of the students to visit/use the ESAL lab. Baseline: The Lab is new, so the visit rate is approximately .5%. Results Action & Follow-Up Task Name: Orientation to Students Task Description: Students will be given an orientation to the ESAL labs in their classes. The Language Lab will be promoted to the teachers, too, so they can in turn encourage students to attend. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Recruitment of new quality faculty Data Source for Measure: Department/Area Report Standard and Baseline: 3 new P/T faculty members will be recruited for the ESAL discipline. Baseline: In Spring 2010 the ESAL discipline had 9 P/T faculty. 09/30/2011 - 2 (instead of 3) new P/T ESAL faculty were recruited. At this point, it is unknown as our English as a Second Language program is currently being cut back. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Recruitment of New Faculty Task Description: Recruitment efforts of new quality faculty will be intensified. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 122 of 297 Objectives Planning - Enrollment Managment Instructional Area Databases Area Plan (2010-2011) - To continue to develop and maintain the databases created by the Enrollment Management Office for the use of the Area of Instruction under the supervision of the Vice-President of Instruction, Dr. Dennis Brown. This includes the improvement of databases with the Dual Credit/Early College High School, Distance Education, and Divisional Instructional Offices (Deans' Offices). As Banner, and curriculum change along with requests for new data and analysis, so does the need to maintain these databases. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/22/2010 Objective Status: Met Budget Account Number: 11000-52160 Person(s) Responsible: Dale Hougham Planning - Enrollment Managment Schedule Management Area Plan (20102011) - To maintain the management of the schedule building process for the Area of Instruction. To maintain the effectiveness of schedule management in the offering of Instructional credit sections for the upcoming Academic Year. The Schedule for any given term is created at a minimum of nine (9) months in advance. Since this is the first step in the process, it is important to continue to develop and maintain the process of schedule building. 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Measure: The databases remain functional and up-todate for the programs within instruction. Data Source for Measure: Department/Area Report Standard and Baseline: Yes/No. Baseline: Databases are current and functional. Results Action & Follow-Up 12/02/2011 - Yes. Databases are current and functional. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Maintain Communication between Curriculum Task Description: Maintain communication between Curriculum, Registrar, Distance Education, and Dual Credit/Early College High School offices to ensure changes which are made are incorporated into the databases. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: The schedule building files are submitted to the Registrar's Office for entry into Banner in the appropriate timelines for the Fall, Spring, and Summer terms. Data Source for Measure: Department/Area Report Standard and Baseline: Yes/No. Baseline: Deadlines for schedule building files are met. 12/02/2011 - Yes. Deadlines for schedule building files are met. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Conduct Schedule Building Meetings Task Description: Generated by TracDat a product of Nuventive. Page 123 of 297 Objectives Measures & Standards and Baselines / Strategies Actual Completion Date: 03/22/2010 Objective Status: Met Budget Account Number: 11000-52160 Person(s) Responsible: Dale Hougham Continue to conduct schedule building meetings with the Deans and forward completed schedule to the Registrar's office for entry into Banner. Incorporate any changes in building the schedules into the process of schedule building. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Fashion Technology - TM Apparel Design Hardware (2010-2011) Update the computer aided apparel design hardware in order to meet the demands of greater student use of the system. Planning Year(s): 2010 - 2011 Measure: New hardware will be purchased. Data Source for Measure: Department/Area Report Standard and Baseline: Hardware will meet demand. Baseline: Current hardware is in disrepair. Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-55400 Person(s) Responsible: Trish Winstead Task Name: Identify Needed Hardware Task Description: T. Winsted will identify needed hardware and request funds. Budget Impact: Additional/New Funding Required Projected Cost: 20000.0000 Planning - Fashion Technology - TM Fashion Laboratory (2010-2011) - Add more printers/scanners to fashion laboratory. Planning Year(s): 2010 - 2011 Measure: New printers will be purchased. Data Source for Measure: Department/Area Report Standard and Baseline: No Standard. There are currently not enough printers/scanners. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-55400 03/05/2012 11:45 AM Results Action & Follow-Up Task Name: Request Funds Task Description: Generated by TracDat a product of Nuventive. Page 124 of 297 Objectives Person(s) Responsible: Trish Winstead Planning - Financial Aid Office - Automation of Processes and Reports 2010-2011 Work with IT to automate more processes and reports including use of Appworks (UC4) to schedule financial aid and possibly VA jobs. Planning Year(s): 2010 - 2011 Measures & Standards and Baselines / Strategies Objective Status: In Progress Budget Account Number: 03/05/2012 11:45 AM Action & Follow-Up T. Winstead will identify printers and request funds. Budget Impact: Additional/New Funding Required Projected Cost: 4000.0000 Measure: Jobs on calendar run according to schedule. Elimination of failures to run appropriate jobs. Reduction in comp time. Data Source for Measure: Department/Area Report Standard and Baseline: Utilize UC4 for all jobs currently on master calendar for financial aid and VA. Objective Status: In Progress Budget Account Number: Task Name: 11000-71120 Joint effort with IT Person(s) Responsible: Ines Lopez, Gloria Corona, Roberto Morrow Task Description: Work with IT to become completely familiar with UC4. Need to identify all financial aid and possibly VA job/processes that can be scheduled on UC4 Budget Impact: Rollover/Maintain Current Funding Planning - Financial Aid Office - Efficient and Paperless Processes 2010-2011 Continue to evaluate procesess for efficiency and possibility of making them paperless. Planning Year(s): 2010 - 2011 Results Measure: Timely processing of applications. Earlier award notifications. Reduction in postage costs Data Source for Measure: Department/Area Report Standard and Baseline: "Green" Office More efficient office 09/26/2011 - Project still in progress. Continued working with IT on getting "chains" for Appworks (UC4) to be in place for possibly spring 2012. New version will be available late October which will allow for automating more processes/jobs. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 09/26/2011 - Office continues to look at processes for efficiency and making them paperless. Continued to make Entrance Counseling registration process easier for student and more efficient for loan staff as far as automatically capping attendance and getting roster. Students now receive a confirmation email with session information. Progress: Satisfactory Action Plan Status: Generated by TracDat a product of Nuventive. Page 125 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 0 - No Action Plan Necessary 11000-71120 Person(s) Responsible: Raul Lerma; Gloria Corona; Ines Lopez; Roy Tuberville; Norma Urias; Frank Guerra Planning - Financial Aid Office - Expansion of Student Service Web Room 2010-2011 Work with IT and STS program to expand ability for students to use Academic Labs for Student Services to accommodate increasing student traffic. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: In Progress Budget Account Number: 11000-71120 Person(s) Responsible: Linda Gonzalez, Daryle Hendry 03/05/2012 11:45 AM Task Name: "Green Office" Task Description: Reduce cost of printing and postage through review of processes to make them more efficient and paperless. Encourage students to use on line tools. Budget Impact: No Funding Needed Measure: Increase in student useage. Positive comments of visit to Web Room. Repeat useage of on line options. Data Source for Measure: Department/Area Report Standard and Baseline: Assure room is adequately staffed and trained. Equipment is available and user friendly. 09/26/2011 - With cooperation of IT was able to utilize STS student to assist at 7 student computer labs during "peak" time before the beginning of classes. Greatly helped to alleviate overflow student traffic at VV Financial Aid Web Room. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Joint effort between FA Office and Admissions/Registrar's Office. Task Description: Cooperative effort to determine needs of students and reason for increase in student traffic. Once determined, efforts to put as many processes on line and provide the adequate space. Budget Impact: Additional/New Funding Required Projected Cost: 20000.0000 Funding Justification: Generated by TracDat a product of Nuventive. Page 126 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Additional equipment, possible remodeling costs and staffing. Planning - Financial Aid Office - Expand Imaging 2010-2011 - Expand use of imaging for all areas especially VA Planning Year(s): 2010 - 2011 Actual Completion Date: 01/29/2010 Objective Status: Met Budget Account Number: 11000-71120 Person(s) Responsible: Roy Tuberville, Frank Guerra Planning - Financial Aid Office - Customer Service Improvement 2010-2011 - Seek out methods/training to improve Customer Service skills of all staff. Planning Year(s): 2010 - 2011 Objective Status: In Progress Budget Account Number: 11000-71120 Person(s) Responsible: Raul Lerma; Roy Tuberville; Ines Lopez 03/05/2012 11:45 AM Measure: Identify areas that need imaging capacities. 09/26/2011 - Office purchased additional equipment to cover all Financial Aid and VA Offices. All FA/VA Office staff have received Data Source for Measure: scanners and were trained in its use. As far as Department/Area Report documents almost 95% paperless now. Standard and Baseline: Progress: Purchase necessary equipment and provide Satisfactory training. Action Plan Status: 0 - No Action Plan Necessary Task Name: 100% Imaging Task Description: Assure all areas of the office are capable of imaging documents. This goal will include the VA area. Budget Impact: Additional/New Funding Required Projected Cost: 13000.0000 Funding Justification: New equipment and upgrade on current equipment. Includes maintenance. Measure: Reduction of student complaints. High morale. Positive office image by community. Data Source for Measure: Department/Area Report Standard and Baseline: Seek training through electronic means such as webinars. Presentations by trained professionals. 09/26/2011 - On going training on Customer Service include a webinar all student services was invited to attend as well as office annual staff meeting (retreat). Saw decline student complaints. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 127 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: Provide Excellent Customer Service Task Description: Seek ways through electronic and personal means to train staff on providing exemplary customer service. The goal is to make the Finacial Aid Office the example for all other offices. Budget Impact: Rollover/Maintain Current Funding Planning - Financial Aid Office - Reduce Manual Workload 2010-2011 - Evaluate processes to improve efficiency while reducing manual workload. Planning Year(s): 2010 - 2011 Objective Status: In Progress Budget Account Number: 11000-71120 Person(s) Responsible: Raul Lerma; Roy Tuberville; Ines Lopez; Gloria Corona; Norma Urias; Frank Guerra Measure: An increase and expansion of BANNER applications. Automation of more processes in FA and VA. Reduction in comp time/overtime Data Source for Measure: Department/Area Report Standard and Baseline: BANNER access and training need to be available to FA staff to reduce dependency on IT. 09/26/2011 - Conducted regularly scheduled meetings with IT. Continued to work with IT on reports for VA and Scholarships as well as Appworks to automate daily processes. Still need to work with IT on what other BANNER applications FA can be given access to run own jobs done currently only by IT. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Automate Processes Task Description: Evaluate processes in order to streamline and automate as many of them as possible. Utilize BANNER and any other available system such as UC4 to reduce and or eliminate manual work. Budget Impact: Rollover/Maintain Current Funding Planning - Fire Technology - VV - No. of 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 128 of 297 Objectives Graduates (2010-2011) - Increase the number of graduates within the discipline. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/22/2011 Actual Completion Date: 12/09/2011 Objective Status: In Progress Budget Account Number: 11000-55387 Person(s) Responsible: Richard Bahena Measures & Standards and Baselines / Strategies Measure: 15/<10 in a three year period. Data Source for Measure: Program Review Data Standard and Baseline: 15/<10 in a three year period. Baseline: 62%. Results Action & Follow-Up Task Name: Encourage Students Task Description: Will continue to encourage and guide students to achieve their goals. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Track students in completing certificates and degrees within the discipline Task Description: Evaluate the courses needed by the students to complete certificates and degrees by developing a questionnaire of those students who are needing specific classes. Promote faculty and counselor intervention each semester to determine student needs. Budget Impact: No Funding Needed Planning - Fire Technology - VV - Student Success (2010-2011) - Monitor the student success/employment within the industry. Planning Year(s): 2010 - 2011 Expected Completion Date: 12/01/2011 03/05/2012 11:45 AM Measure: Employer/student surveys. Data Source for Measure: Student Related Data (Tracking/Performance) Standard and Baseline: Above 90%. Baseline: 96%. Generated by TracDat a product of Nuventive. Page 129 of 297 Objectives Measures & Standards and Baselines / Strategies Actual Completion Date: 12/09/2011 Objective Status: In Progress Budget Account Number: 11000-55387 Person(s) Responsible: Richard Bahena Task Name: Tracking Task Description: The discipline will internally track student success with employment with the local stakeholders thru surveys and e-mail. Funding Justification: Student success with the discipline. Budget Impact: Additional/New Funding Required Planning - Foreign Language - VV - Course Materials Development (2010-2011) - A. To identify short stories in the WEB in order to use them in the classroom. B. To develop ancillary materials (i.e. exercises) for Objective A. Planning Year(s): 2010 - 2011 Expected Completion Date: 09/01/2011 Actual Completion Date: 09/01/2011 Objective Status: Met Budget Account Number: 11000-55190 Person(s) Responsible: Fidel de Leon Measure: Objectives will be met when the short stories and the materials are completed and offered to the students. Data Source for Measure: Department/Area Report Standard and Baseline: To use inexpensive discipline-developed instructional materials for classroom instruction. Baseline: No materials have yet been developed. Planning - Geology -VV - Hire Full-Time Lab Assistant (2010-2011) - To hire a full-time lab assistant for the Geology discipline. Planning Year(s): 2010 - 2011 Measure: Full-time Geology Lab Assistant will be hired during 2010-2011 academic year. Data Source for Measure: Department/Area Report Standard and Baseline: Full-time Lab Assistant is needed to set Actual Completion Date: 03/10/2010 03/05/2012 11:45 AM Results Action & Follow-Up Task Name: Develop Materials Task Description: The discipline faculty will develop these materials. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 130 of 297 Objectives Objective Status: New Budget Account Number: 11000-55340 Person(s) Responsible: Dr. Suliman Abushagur Measures & Standards and Baselines / Strategies Action & Follow-Up up/assist with Geology labs; there are more than 30 Geology labs at Valle Verde. Baseline: Currently, there is no full-time lab assistant in the Geology discipline. Task Name: Submit Request Task Description: Request will be submitted for the 2010-2011 budget year. Budget Impact: Additional/New Funding Required Projected Cost: 24000.0000 Planning - Government - MDP - Conference in Las Vegas (2010 - 2011). - Attend conference in Las Vegas Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000Person(s) Responsible: Blayne Primozich Measure: Acquire knowledge and make a million dollars. Data Source for Measure: Focus Group Standard and Baseline: Make over a million dollars. Planning - Government - NW - Government NWC-Enhancing and Diversifying Classroom Tools and Instruction (20102011) - To diversify and improve methods of instructional delivery. Measure: Offer more courses that make use of latest technological and qualitative tools. Data Source for Measure: Department/Area Report Standard and Baseline: 03/05/2012 11:45 AM Results 12/03/2010 - I attended the conference and I made $1,200,000 for the district. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Attend Conference Task Description: Make a trip to Las Vegas. Funding Justification: Acquire knowledge and make a million dollars for the college. Budget Impact: Additional/New Funding Required Projected Cost: 20000.0000 10/20/2011 - Three more sections of Government courses were added and more instructors are now using smart classrooms, Blackboard, Smartstart and the Connect system. Progress: Generated by TracDat a product of Nuventive. Page 131 of 297 Objectives Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2010 Actual Completion Date: 01/28/2011 Objective Status: Met Budget Account Number: 11000-55298 Person(s) Responsible: Daniel Gutierrez Planning - Government - VV - GOVT Discipline Web Page (2010-2011) - The development and launch of a Web Page for the GOVT discipline to inform students, other college depts., and the public. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/22/2010 Objective Status: Met Budget Account Number: 11000-55295 Person(s) Responsible: Sue Pratt 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Increase number of students exposed to state-of-the-art tools and advanced methodologies. Baseline: We currently offer one video conference course and have no instructors trained on Blackboard. Results Action & Follow-Up Satisfactory Action Plan Status: 0 - No Action Plan Necessary 10/20/2011 - Some instructors are now actively using several advanced technologies which include smart classrooms, Blackboard, Smartstart and McGraw-Hill's Connect system. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Train Existing Personnel Task Description: Train existing personnel in state-of-the-art methods/technologies and hire new personnel with same skills. Budget Impact: No Funding Needed Measure: The completion of the GOVT discipline web page with information about discipline and links to other college resources. Data Source for Measure: Department/Area Report Standard and Baseline: Launch of GOVT web page to EPCC website addition of significant related information and links to other academic resources. Baseline: Currently, no district-wide website exists for government. 09/30/2011 - Move GOVT discipline webpage from concept through development to launch. Rough drafts exist; distribute among full-time and adjunct GOVT faculty for review and feedback; edit, as appropriate; then launch. Maintenance of the GOVT webpage must remain timely and appropriately respresent the professionalism of the discipline. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Complete and Preview Task Description: Have committee complete and preview Generated by TracDat a product of Nuventive. Page 132 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up website for submission to EPCC. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Government - VV - GOVT Discipline Plan (2010-2011) - Increase number of Full-time Faculty. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/22/2010 Objective Status: Met Budget Account Number: 11000-55295 Person(s) Responsible: Sue Pratt Measure: Insure that 1 FT Tenure Track faculty position is filled this year and determine future development. Data Source for Measure: Department/Area Report Standard and Baseline: Meet needs of growing student population. Baseline: Currently 4 FT faculty Tenure Track; have hired FT lecturer for 1 year in the past year and full-time lecturer for a semester based on critical need of discipline to serve students. 09/30/2011 - 2 full-time GOVT tenure track were hired this fall semester. One position for MDP Campus and One position for TM Campus. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Hire and Seek Funding Task Description: Interview and hire new part-timers and seek funding for full-time. Budget Impact: Additional/New Funding Required Planning - Grants Management - External Funding Plan/Report (2009-2011) - Develop a comprehensive EPCC priority external funding plan. Planning Year(s): 2009 - 2010 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: Met 03/05/2012 11:45 AM Measure: Priority external funding plan developed and reported to Cabinet at least four times per year. Data Source for Measure: External Report Standard and Baseline: Grant proposals and awards will be in line with the established external fund plan which is consistent with the College's strategic plan, mission and vision for current and future development. Plan to be reviewed by 08/04/2010 - External funding plan developed and provided for cabinet use at least quarterly. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 133 of 297 Objectives Budget Account Number: 11000-32200 Person(s) Responsible: Al Lawrence Planning - Grants Management - Grant Development Workshops (2010-2011) Provide grant development workshops (One Fall and one Spring) for faculty and staff on a mid-semester basis as a follow up to regular presentations provided at faculty development. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: Met Budget Account Number: 11000-32200 Person(s) Responsible: Al Lawrence 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up President and Cabinet. Baseline: Development of a priority external funding plan: available funding; applications in progress; and applications filed. Task Name: Develop an EPCC External Funding Priorities Plan Task Description: Based on identification of funding needs. Priorities established by the College President, Vice-Presidents, Deans, faculty, and staff. The Office of Grants Management will develop an "EPCC External Funding Priorities Plan and Report" for review by the Cabinet for information and input at least quarterly. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: No less than two workshops will be scheduled and provided during the semester in addition to regular faculty development workshops. Data Source for Measure: Department/Area Report Standard and Baseline: Plan to achieve greater faculty awareness and involvement in grant development whether individually or as part of a team. Baseline: Through regular Faculty Development workshops, there is a group faculty and staff who regularly work on grants; and we will increase the number by targeting new faculty (10 per semester). 08/04/2010 - Workshops sessions held during Faculty Development week in Spring and Fall semesters. Good attendance at each workshop and participants track via training repository database and sign in sheets. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Marketing Announcements Generated by TracDat a product of Nuventive. Page 134 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Description: Recruitment throughout the District by word of mouth and Marketing Announcements. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Health Information Technology RG - Program Accreditation (2010 - 2011). Maintain national accreditation of Program through CAHIIM. (2010-2011) Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-55143 Person(s) Responsible: J. Garrison Task Name: 1. Task Description: Pay annual accreditation fee. Budget Impact: Rollover/Maintain Current Funding 10/07/2011 - Annual accreditation fee was submitted/processed. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 10/07/2011 - Accreditation fee paid to AHIMA/CAHIIM. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: 2. Task Description: Submit Program Assessments when scheduled. Budget Impact: No Funding Needed Task Name: 3. Task Description: Adhere to accreditation guidelines, per CAHIIM requirements. Budget Impact: No Funding Needed 10/07/2011 - Program assessments completed and submitted in March, as scheduled. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Planning - Health Professions & Related Sciences - RG - Plan, develop and offer Dual credit courses to Independent School 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 135 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Districts (2010 - 2012). - CCTE and Austin HS to be offered HPRS1205, Medical Law and Ethics for the first time in Spring 2011 as an online course. In addition HPRS1208 has been developed and will be offered at Silva Magnet HS as traditional classroom dual credit course. Planning to offer these and other courses to other Independent School Districts is ongoing. Planning Year(s): 2010 - 2011 2011 - 2012 Expected Completion Date: 05/07/2012 Objective Status: New Budget Account Number: 55115 Person(s) Responsible: Elaine Olsakovsky/ HPRS Coordinator Planning - Heating, Ventilation & Air Conditioning - ATC - Skelton House (20102011) - To build skelton house for students so they can practice installations. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/20/2010 Objective Status: New Budget Account Number: 11000-55416 Person(s) Responsible: Manny Torres 03/05/2012 11:45 AM Measure: Skelton built. Data Source for Measure: Department/Area Report Standard and Baseline: Skelton built and in use. Baseline: No current structure. Task Name: Build House. Task Description: Ask EPCC constuction program to build house. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 136 of 297 Objectives Planning - History - NW - History NWC New and Diversified Offerings in History (20102012) - To increase and diversify methods for instructional presentations. Planning Year(s): 2010 - 2011 2011 - 2012 Actual Completion Date: 03/12/2010 Objective Status: In Progress Budget Account Number: 11000-55293 Person(s) Responsible: Manfred Silva Measures & Standards and Baselines / Strategies Measure: Offer additional methods using latest technology. Data Source for Measure: Department/Area Report Standard and Baseline: Increase student enrollment in History offerings. Baseline: Increase online offerings in U.S. History and world History by 50%. Action & Follow-Up 02/15/2012 - Successfully met increased offerings in both World and U.S. History Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Student Needs Task Description: Assessment of student needs and develop those required changes and additions. Budget Impact: No Funding Needed Planning - History - RG - Conference in Las Vegas (2010 - 2011). - Conference for History Professors Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: New Budget Account Number: 11000Person(s) Responsible: Mark Norbeck Measure: Doubled my knowledge Data Source for Measure: Committee Recommendation Standard and Baseline: 50% of professors double their knowledge Planning - History - VV - Additional FT Faculty Member (2010-2011) - Hire one New Full-Time Tenure Track Faculty Member. Measure: Insure the FT Faculty is filled. Data Source for Measure: Department/Area Report 03/05/2012 11:45 AM Results Task Name: History Conference Task Description: Jeffersonian democracy Funding Justification: mandatory continuing education Budget Impact: Additional/New Funding Required Projected Cost: 5000.0000 09/27/2011 - Action denied. Progress: Satisfactory Action Plan Status: Generated by TracDat a product of Nuventive. Page 137 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 02/22/2010 Objective Status: Not Met Budget Account Number: 11000-55290 Person(s) Responsible: Richard Baquera Planning - History - VV - Provide Tutoring in History (2010-2011) - Provide effective tutoring History for any EPCC student who needs it. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/22/2010 Objective Status: In Progress Budget Account Number: 11000-55290 Person(s) Responsible: Richard Baquera Planning - Human Resources Development - Staff Training and Development (20102011) - Facilitate two staff development programs per month. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up 0 - No Action Plan Necessary Standard and Baseline: Increase number of FT Faculty by one. Baseline: Currently have 4 Tenure, 2 Probationary and 1 Lecturer. Task Name: Out-to-get New Full-time Faculty Task Description: With budget adoption position will be filled. Budget Impact: Additional/New Funding Required Measure: Work with Tutorial Services to provide this for students. Data Source for Measure: Department/Area Report Standard and Baseline: Availability of History tutoring for students. Baseline: Students have been requesting History tutoring. 09/27/2011 - In Progress/Not completed. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Task Name: How to help HIST students. Task Description: Survey student needs and discipline will work with Tutorial Services. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Twenty four 3 1/2 hour sessions to 70 percent of EPCC employees. Data Source for Measure: Department/Area Report Standard and Baseline: 600 EPCC employees. Baseline: 70 Percent of EPCC employees. 10/18/2011 - Facilitated 31 workshops to 433 employees. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 08/31/2011 - Facilitated 31 workshops to 433 Generated by TracDat a product of Nuventive. Page 138 of 297 Objectives 08/31/2011 Objective Status: Met Budget Account Number: 11000-52149 Person(s) Responsible: Alex Hernandez Planning - Human Resources Development - Effective Management Series (2010-2011) - Facilitate two staff development programs per month for supervisors. Planning Year(s): 2010 - 2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-52149 Person(s) Responsible: Alex Hernandez Planning - Human Resources Development - Annual Staff Retreat (2010-2011) 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up employees. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Training Task Description: Develop a training schedule. Announce sessions via e-mail. Coordinate with media and conference room availability. Roll out training session/s. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Twelve four 3 hour sessions to 20 percent of EPCC supervisors. Data Source for Measure: Department/Area Report Standard and Baseline: 42 EPCC supervisors. Baseline: 20 percent of EPCC supervisors. 10/18/2011 - Conducted nine, 3 hours sessions of the Effective Management Series to 121 supervisors. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Training Task Description: Develop a training schedule. Announce sessions via e-mail. Coordinate with media and conference room availability. Roll out training session/s. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: One three day event for 60 EPCC 08/31/2011 - Facilitated one offsite educational Generated by TracDat a product of Nuventive. Page 139 of 297 Objectives Facilitate one off site educational training experience. Planning Year(s): 2010 - 2011 Actual Completion Date: 04/11/2011 Objective Status: Met Budget Account Number: 11000-52149 Person(s) Responsible: Alex Hernandez Measures & Standards and Baselines / Strategies employees. Data Source for Measure: Department/Area Report Standard and Baseline: 60 EPCC employees. Baseline: Analysis of Program Evaluations. Results Action & Follow-Up staff training to 60 employees. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Training Task Description: Develop a training schedule. Announce sessions via e-mail. Coordinate with media and conference room availability. Roll out training session/s. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Human Resources, Risk Management, & Safety - Reclassification Project (2010 - 2011). - Conduct a district wide evaluation of job descriptions for title, grade and classification status Planning Year(s): 2010 - 2011 Expected Completion Date: 03/11/2011 Objective Status: New Budget Account Number: 11000-71000 Person(s) Responsible: Liz Ryan, Nora Servin, Melissa Laibinis Planning - Information Technology Systems - VV - Information Technology Systems Discipline (2010-2011) - All of the degree plans and certificates should be reviewed by the discipline at least once this year. 03/05/2012 11:45 AM Measure: 11/02/2011 - The ITSC Discipline reviewed the The Instructional Coordinator(s) will keep a plans for the upcoming 2 year catalog cycle. We written record of the progression of this plan. removed a course from the Programming Degree. We also created a Health Technology certificate. Standard and Baseline: All four degrees and associated certificates Progress: Generated by TracDat a product of Nuventive. Page 140 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: New Budget Account Number: 11000-55215 Person(s) Responsible: Charles Crawford Planning - Institutional and Community Planning (Testing Unit) - Budget Head Training (2010 - 2013). - Train budget heads on how to use new software. Planning Year(s): 2010 - 2011 2011 - 2012 2012 - 2013 Actual Completion Date: 10/14/2010 Objective Status: In Progress Budget Account Number: 11000-55000 Person(s) Responsible: Ralph Silva 03/05/2012 11:45 AM Measures & Standards and Baselines / Strategies will be reviewed and approved by a majority vote in the discipline meetings. Baseline: The degrees and certificates have not been reviewed in several years. Results Action & Follow-Up Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Monthly Discipline Meetings Task Description: The Instructional Coordinator(s) will present the various degrees and certificates for review as an agenda item during the disciplines monthly discipline meetings. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Have everyone trained. Data Source for Measure: Department/Area Report Standard and Baseline: No training was needed before. All budget heads should know how to use software by the end of this academic year. Measure: Effectiveness of training. Data Source for Measure: Department/Area Report Standard and Baseline: See how well the training went with a follow up servey on how effective we were. Task Name: Training Task Description: Have multiple days of training for budget heads to attend. Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 141 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 08/31/2011 - The first pilot round of SLO results were entered into the TracDat system, and the first complete round of SLO results for the initial twoyear cycle (ended August 31, 2011) were entered into the TracDat system. All information was cross-checked by the SLO facilitators, and faculty throughout the District were trained in how to enter their SLO information into TracDat. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented 08/31/2011 - Training in SLO input for faculty representatives will continue throughout 2011-2012, and into 2012-2013. New representatives and faculty discipline coordinators will be provided technical assistance by the Planning Office and Assessment Programs Manager to ensure faculty is skilled and comfortable using the online system. 08/31/2011 - All District Area Effectiveness Plans were input into TracDat system for academic year 2009-2010, and in academic year 2010-2011, training was provided District-wide for faculty and staff on use of the system for planning. Follow-up 08/31/2011 - Work will continue in 2011-2012 and 2012-2013 to increase faculty and staff comfort level with the software, encourage timely input of results, and to train Projected Cost: 0.0000 Planning - Institutional and Community Planning Department - TracDat Student Learning Outcome Data Input & System Implementation (2010-2011) - Oversee input of data for Student Learning Outcomes (SLOs) for accreditation purposes & work with Manager of Assessment Programs, to ensure full system implementation. Planning Year(s): 2010 - 2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-33010 Person(s) Responsible: Dr. Dolores Gross Planning - Institutional and Community Planning Department - Area Effectiveness Planning Migration to TracDat Software (2010-2011) - Work to ensure that EPCC Area Effectiveness Plans (annual 03/05/2012 11:45 AM Measure: Input of SLOs- from first, second, and thirdyear implementation of Student Learning Outcomes. Data Source for Measure: Department/Area Report Standard and Baseline: At least three years of SLO data by end of 2010-2011 inputted into TracDat data tracking software and accessible to academic faculty within the disciplines. Baseline: Initial upload of disciplines and courses into Trac Dat is taking place at end of FY '09-2010, as well as first round of Student Learning Outcomes; second year SLOs should be completed & inputted by end of summer 2010. Task Name: Inputting SLOs Task Description: Work with staff to include new Manager of Assessment Programs, the SLO faculty coordinator, and faculty participating in the development and inputting of SLOs in the completion of inputting SLOs into the TracDat data tracking software. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Design method to input all budget heads & academic instructional coordinators into system, & the input of 2010-2011 plans into TracDat software. Generated by TracDat a product of Nuventive. Page 142 of 297 Objectives operational plans) are captured and inputted into new TracDat software. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-3010 Person(s) Responsible: Dr. Dolores Gross Measures & Standards and Baselines / Strategies Data Source for Measure: Department/Area Report Standard and Baseline: Area Effectiveness Plans input into TracDat Software; with Reports and Report formats needed for data reporting designed and built into system. Baseline: Area Effectiveness Plans have been tracked using ACCESS database for several fiscal years. For the 2010-2011, plans were captured via hardcopy or MS Word forms during software transition. Measure: Design method to input all budget heads & academic instructional coordinators into system, & the input of 2010-2011 plans into TracDat software. Data Source for Measure: Department/Area Report Standard and Baseline: Work to see if TracDat can be programmed to perform basic calculations such as # of plans addressing each District Goal, etc. Baseline: Area Effectiveness Plans have been tracked using ACCESS database for several fiscal years. For the 2010-2011, plans were captured via hardcopy or MS Word forms during software transition. Results Action & Follow-Up was provided via trainings at each campus and in faculty development sessions, as well as via individual hands-on sessions for budget heads and faculty instructional coordinators. All areas headed by budget heads and instructional disciplines were input into TracDat and made available for use in planning and assessing results. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented new system users as needed to ensure an accurate and timely reporting of plans and results. Task Name: Reports and Training on TracDat Task Description: Learn all strengths & limitations of software. Design desired reports & identify all new academic instructional coordinators & budget heads & their administrative assistants that will need file permission into system. Work with staff to import whatever electronic plan information is available into TracDat & Conduct training sessions for budget heads 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 143 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 02/27/2012 - Work continued throughout 20102011 with faculty and area budget heads to ensure results were entered into TracDat system for District-wide tracking and reporting purposes. It was determined that currently the software cannot perform calculations, but that using Summary Reports was helpful for monitoring and reporting purposes. Work will continue throughout 20112012 to refine Assessments (Results) and reports reflecting District-wide results. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented 02/27/2012 - Continue faculty and staff training and provided individulized support throughout 2011-2012 and 2012-2013 to assist District personnel in tracking and reporting their progress. Continue working toward enhanced and improved reporting tools via the TracDat software. and faculty personnel on system. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Institutional and Community Planning Department - Assessment of Area Effectiveness Plans Migration to TracDat Software (2010-2011) - Work to ensure that EPCC annual Assessment of Area Effectiveness Plans (annual operational plans) is conducted and a system designed to capture assessments in new TracDat software Planning Year(s): 2010 - 2011 Expected Completion Date: 01/31/2012 Actual Completion Date: 02/29/2012 Objective Status: Met Budget Account Number: 11000-33010 Person(s) Responsible: Dr. Dolores Gross Measure: Design method to input Assessments into TracDat sofware & work to see if calculations from Assessments can be performed by software. Data Source for Measure: Department/Area Report Standard and Baseline: Assessment of Area Effectiveness Plans input into TracDat software; with Reports & Report formats needed for data reporting designed & built into system. Work to see if calculations such as # and % of plans Met, Not Met, Withdrawn, In-Progress & Expected Completion Dates can be tracked via software. Baseline: Assessments of Area Effectiveness plans have been tracked using ACCESS databases for several fiscal years. For the 2010-2011, plans were captured via hardcopy or MS Word forms during software transition. Task Name: TracDat Inputting Task Description: Emphasize importance of capturing operational assessment information to college personnel & conduct training sessions for budget heads & faculty instructional coordinators. Design desired new assessment reports for use by college decision-makers. Work with staff to import whatever electronic assessment information is available into TracDat. Oversee input of 03/05/2012 11:45 AM Generated by TracDat a product of Nuventive. Page 144 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 08/31/2011 - Training opportunities were provided for District faculty and staff via Faculty Development week in the Spring and Fall semesters, as well as via sessions with individual College areas. In addition faculty and staff in need of technical assistance with either content or software were provided support by the Planning Office staff to ensure that all appropriate personnel were knowledgeable of the Planning process and software for tracking and reporting purposes. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented 08/31/2011 - Training will continue with area budget heads and faculty instructional coordinators to ensure competency and use of TracDat software for monitoring and tracking plans and results. The Planning Office will continue to present sessions in conjunction with the Budget Office for area budget heads each academic year, as well as provide sessions for major areas of the College and at Faculty Development week twice annually. information. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Institutional and Community Planning Department - Training on Planning & Assessment using New Software (20102011) - Plan and execute training opportunities for faculty and staff to gain hands-on experience inputting their Planning, Assessment, Program Review, and Student Learning Outcomes information into TracDat software. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-33010 Person(s) Responsible: Dr. Dolores Gross 03/05/2012 11:45 AM Measure: Multiple trainings held throughout fiscal year for employee groups conducting Planning and Assessment to use and gain further training in concepts of Planning and Assessment, as well as software usage. Data Source for Measure: Department/Area Report Standard and Baseline: At least two major training opportunities each semester for employees to Plan, Assess, and work with software in a training environment. Baseline: Current training is provided on a case-by-case basis, working with new budget heads, academic instructional coordinators as they become coordinators, and periodic offerings at faculty development. Task Name: College-Wide Participation Task Description: Encourage budget heads, Deans & academic instructional coordinators, as well as administrative assistants to Deans to participate actively in preparing their Planning and Assessment documents using training opportunities on software as a vehicle to increase college-wide participation. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 145 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 08/31/2011 - The Planning Office conducted multiple focus groups and provided qualitative research support for EPCC programs and projects. Among the programs assisted, the EPCC summer bridge program, Project Dream, was assisted with focus groups at each campus site-with an outcomes report prepared and provided to program administrators. In addition, the Planning Office provided research support to the Quality Enhancement Plan Task Force and provided a training in focus group process for Task Force members and members of Student Leadership and Campus Life. The Planning office assited the EPCC Diversity program in its program planning efforts, the Green Campus Committee, coordinated the District United Way campaign and assisted in the EPCC Literary Fiesta planning. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented 08/31/2011 - The Planning Office will continue to provide qualitative research support, as needed, to EPCC programs and projects, and assist in District-wide program planning efforts. Task Name: Follow-Up and Support Task Description: Continue to provide follow-up & support in development of plans & assessments & with software support. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Institutional and Community Planning Department - Community Planning & Qualitative Research (2010-2011) Provide community planning support for EPCC programs & department in their planning efforts. Assist with focus groups & qualitative research as needed. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-33010 Person(s) Responsible: Dr. Dolores Gross Measure: Successful completion of planning initiatives in support of EPCC programs or qualitative research support. Data Source for Measure: Department/Area Report Standard and Baseline: At least two major initiative providing progammatic planning support or qualitative research support. Baseline: Currently conduct several large planning initiatives and focus group qualitative research projects each fiscal year. Task Name: Planning and Focus Group Task Description: Conduct planning sessions, identify & train facilitators, prepare stuctured questions, secure needed facilities & materials, and conduct focus group research as needed. 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 146 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 11/08/2011 - The Institutional Effectiveness Committee will be consulted in Fall 2011 on whether to re-structure the committee. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 11/08/2011 - The I.E. office will assist in streamlining the process. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Planning Sessions and Research Task Description: Work with College administratiors, budget heads and progam personnel to assist them in their planning efforts-to include planning sessions and focus group research or other progam research efforts to gain useful data about their program effectiveness. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Institutional Effectiveness Reconstitution of the Institutional Effectiveness Committee (2010-2011) Reconstituting the Institutional Effectiveness Committee so that the committee can facilitate the pre-planning aspect of Area Effectiveness Planning. Planning Year(s): 2010 - 2011 Expected Completion Date: 09/30/2011 Objective Status: In Progress Budget Account Number: 11000-34000 Person(s) Responsible: Dr. Ron Stroud Measure: The reconstitution of the Institutional Effectiveness Committee to include new membership categories so that the committee can further the pre-planning portion of the Area Effectiveness Planning process. Data Source for Measure: Department/Area Report Standard and Baseline: Completion of the restructuring by August 31, 2011. Baseline: The Institutional Effectiveness Committee as it is currently configured is unsuited to facilitate Area Effectiveness Pre-planning because of its uncertain membership and short terms of service. Task Name: Consultation with the Institutional Effectiveness Committee chair and members. 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 147 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 11/08/2011 - The I.E. office has worked with Vice President of Research & Development to finalize revised policies and procedures. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 11/08/2011 - The I.E. office will post the revised documents during Spring 2012. 11/08/2011 - The I.E. office worked with the office of Institutional Research to incorporate the data into the 2011-2012 report. 11/08/2011 - The report will be published in November, 2011. Task Description: The IE Office will consult with the chair of the Institutional Effectiveness Committee and its members to reorganize the committee as needed so that the committee can meet as frequently as needed and can sustain the charge of facilitating the pre-planning of Area Effectiveness Plans while also addressing the concerns of the Campus/Site IE Teams with respect to facilities improvements. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Institutional Effectiveness Policy and Procedure Review (2010-2011) The IE Office will review Board Policies and College Procedures to recommend corrections and consolidations. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2012 Objective Status: In Progress Budget Account Number: 11000-34000 Person(s) Responsible: Dr. Ron Stroud Measure: Whether the review is completed. Data Source for Measure: Department/Area Report Standard and Baseline: The documents will be reviewed by August 31, 2012. Baseline: The Board Policies and College Procedures have not been thoroughly reviewed since 1996. Planning - Institutional Effectiveness Restoring Graduate Survey and Faculty Development to Program Review (2010- Measure: Whether the Graduate Survey and the Faculty Development data are re- 03/05/2012 11:46 AM Task Name: Reviewing policies and procedures on the College web page Task Description: The policies and procedures will be reviewed and deficiencies and suggestions for consolidation will be noted. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 148 of 297 Objectives 2011) - Using improved data gathering to re-incorporate the Graduate Survey and the Faculty Development participation into the Program Review Report Planning Year(s): 2010 - 2011 Expected Completion Date: 09/30/2011 Objective Status: In Progress Budget Account Number: 11000-34000 Person(s) Responsible: Dr. Ron Stroud Planning - Institutional Effectiveness Broadening the Database for Standing Committee Deliberations (2010-2011) Standing committee use of the previous chair's recommendations Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Not Met Budget Account Number: 11000-34000 Person(s) Responsible: Dr. Ron Stroud 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies incorporated Data Source for Measure: Department/Area Report Standard and Baseline: The data will appear in the Fall 2011 Program Review Report Baseline: The data has been omitted for several years due to missing or unreliable data. Results Action & Follow-Up Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Verify the trustworthiness of the data Task Description: The Institutional Effectiveness Office will work with the Institutional Research Office to ensure that the data are trustworthy. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Whether current committee chairs try to act on the recommendations of previous chairs Data Source for Measure: Department/Area Report Standard and Baseline: 100% of the current chairs indicate an attempt to act on the recommendations of the previous chair as indicated on the May 2011 Standing Committee Chair Improvement Report Baseline: The information has not been required of previous standing committee chairs. 08/31/2011 - The standard was not met. The Integrated Technology Committee and the Program Review Committee did not indicate follow-up to the previous year's chair's recommendations. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 09/09/2011 - The Office of Institutional Effectiveness will contact the chairs of the 2011-2012 standing committees to emphasize the importance of responding to the recommendations of the previous year's chair. Task Name: Reminding chairs of the revised Standing Committee Chair Improvement Report Task Description: The IE Office will inform chairs that a comment box on acting on the recommendations of the previous chair has Generated by TracDat a product of Nuventive. Page 149 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up been incorporated into the Standing Committee Chair Improvement Report. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Institutional Effectiveness Updating photocopier capabilities (20102011) - Minimizing the cost of students' evaluating all instructors in all classes Planning Year(s): 2010 - 2011 Expected Completion Date: 09/01/2010 Actual Completion Date: 12/17/2010 Objective Status: Met Budget Account Number: 11000-34000 Person(s) Responsible: Dr. Ron Stroud Measure: Securing an economical photocopier Data Source for Measure: Department/Area Report Standard and Baseline: The securing of the copier Baseline: The Research and Development Division does not have photocopiers that support the greatly increased printing needs of the State requirement that every instructor be evaluated by students in every class. Planning - Institutional Effectiveness Simplified access to Board Policies and College Procedures on the College Web Page (2010-2011) - Simplified access to Board Policies and College Procedures on the College web page so that individual policies and procedures can be accessed individually Planning Year(s): 2010 - 2011 Measure: The posting of the revised listing on the College web site Data Source for Measure: Department/Area Report Standard and Baseline: The revised listing will be posted to the College web site in Spring 2011 Baseline: The current listing of the Board Policies and College procedures consists of a single, 03/05/2012 11:46 AM 09/30/2010 - The IE Office rented a photocopier that meets the printing needs of the Institutional Research Office at a reasonable cost. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Securing an economical photocopier Task Description: Contacting photocopier dealers to locate and rent a photocopier that meets the printing needs of the Institutional Research Office. Budget Impact: No Funding Needed Projected Cost: 0.0000 11/08/2011 - The policies and procedures were posted individually to the College webpage in Spring 2011. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. 11/08/2011 - The I.E. office will continue the individual links as necessary. Page 150 of 297 Objectives Measures & Standards and Baselines / Strategies Expected Completion Date: 05/31/2011 Actual Completion Date: 05/31/2011 Objective Status: Met Budget Account Number: 11000-34000 Person(s) Responsible: Dr. Ron Stroud lengthy PDF document that must be accessed by scrolling. Planning - Institutional Effectiveness Revised Institutional Effectiveness Committee charge (2010-2011) - Facilitating the role of the Institutional Effectiveness Committee as reviewer of Area Effectiveness Pre-planning Planning Year(s): 2010 - 2011 Expected Completion Date: 05/31/2011 Objective Status: In Progress Budget Account Number: 11000-34000 Person(s) Responsible: Dr. Ron Stroud Measure: Whether the Institutional Effectiveness Committee acts as the reviewer of Area Effectiveness Pre-planning Data Source for Measure: Department/Area Report Standard and Baseline: Institutional Effectiveness Committee will act as the reviewer of Area Effectiveness Preplanning in Spring 2011 Baseline: The College has no mechanism for broad-based review of Area Effectiveness Planning 03/05/2012 11:46 AM Results Action & Follow-Up 11/08/2011 - The I.E. office worked with the 20102011 chair of the I.E. Committee on re-structuring. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 11/08/2011 - The 2011-2012 I.E. Committee will be consulted on restructuring. Task Name: Working with the College webmaster to improve access to the policies and procedures Task Description: The IE Office will work with the College webmaster to list the policies and procedures separately on the College web site by providing the documents themselves. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Working with the Planning Office and with the chair of the Institutional Effectiveness Committee Task Description: The IE Office will work with the Planning Office and with the chair of the Institutional Effectiveness Committee to modify the committee's charge and re-structure the membership of the committee as needed. Budget Impact: Generated by TracDat a product of Nuventive. Page 151 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up No Funding Needed Projected Cost: 0.0000 Planning - Institutional Effectiveness Board Policy and College Procedure Style Sheet (2010-2011) - Creating a style sheet to guide the writing and revision of Board Policies and Procedures Planning Year(s): 2010 - 2011 Expected Completion Date: 01/03/2011 Actual Completion Date: 05/31/2011 Objective Status: Met Budget Account Number: 11000-34000 Person(s) Responsible: Dr. Ron Stroud Measure: Whether the style sheet is posted to the College web page Data Source for Measure: Department/Area Report Standard and Baseline: The IE Office will create and post the style sheet to the College web site by Spring 2011 Baseline: The College has no style sheet for the writing of Board Policies and College Procedures Planning - Institutional Effectiveness - IE Office Calendar (2010-2011) - Creating and maintaining an IE Office calendar to ensure that all IE tasks and initiatives are addressed in a timely matter Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Measure: Whether the calendar is created Data Source for Measure: Department/Area Report Standard and Baseline: The calendar will be created during or before Summer 2011 Baseline: The IE Office does not have a detailed calendar of tasks and initiatives to be completed 03/05/2012 11:46 AM 04/04/2011 - The style sheet was incorporated into College Procedure 2.01.03.14, Policies and Procedures, and the procedure was posted to the College web site. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Incorporating a style sheet into College Procedure 2.01.03.14, Policies and Procedures Task Description: The IE Office will gather guidelines from its files to create the style sheet. The style sheet will be incorporated into College Procedure 2.01.03.14, Policies and Procedures. Budget Impact: No Funding Needed Projected Cost: 0.0000 11/08/2011 - The I.E. office is awaiting the conclusion of the SACS re-affirmation of accreditation process. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. 11/08/2011 - Action will resume in Summer 2012. Page 152 of 297 Objectives Objective Status: In Progress Budget Account Number: 11000-34000 Person(s) Responsible: Dr. Ron Stroud Measures & Standards and Baselines / Strategies Action & Follow-Up Task Name: Surveying the magnitude of IE Office tasks and initiatives Task Description: The IE Office will create a calendar that takes into account current and foreseen tasks. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Institutional Effectiveness - PrePlanning Database (2010-2011) - Tracking pre-planning data submitted to the Planning Office by College administrators Planning Year(s): 2010 - 2011 Expected Completion Date: 05/01/2011 Actual Completion Date: 05/16/2011 Objective Status: Met Budget Account Number: 11000-34000 Person(s) Responsible: Dr. Ron Stroud Measure: Whether the database is created. Data Source for Measure: Committee Recommendation Standard and Baseline: Creation of the database. Baseline: No such database exists. Planning - Institutional Effectiveness Shakespeare on the Rocks Attendance (2010-2011) - Increased Shakespeare on the Rocks attendance on Sunday during the September 2011 season. Planning Year(s): 2010 - 2011 Expected Completion Date: 09/11/2011 Actual Completion Date: 09/11/2011 Measure: Whether the average Sunday attendance during the September 2011 season is increased over that during August 2010. Data Source for Measure: External Report Standard and Baseline: Standard: An increase in average Sunday attendance during the September 2011 season. Baseline: The average Sunday attendance during the August 2010 season 03/05/2012 11:46 AM Results 05/27/2011 - The database was created and given to the Planning Office for use. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Access Database Creation Task Description: The IE Office will consult with the Planning Office on the creation of the database. Budget Impact: No Funding Needed 09/13/2011 - The average Sunday attendance in 2011 increased over that during August 2010; while the 2010 attendance average was 84, the 2011 attendance average was 115, suggesting that the institution of matinées be continued during future performance seasons. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 153 of 297 Objectives Objective Status: Met Budget Account Number: 11000-34000 Person(s) Responsible: Dr. Ron Stroud Planning - Institutional Research - On-line Surveys (2010-2011) - Develop an efficient method of administrating on-line surveys. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2010 Objective Status: New Budget Account Number: 11000-34002 Person(s) Responsible: Dr. Carol Kay Planning - Institutional Research - WEB Data Retrieval System (2010-2011) Continue development of data warehouse and SAS data management system. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2010 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up was 84. Task Name: Introduction of matinee performances on Sunday Task Description: The Shakespeare on the Rocks Company will introduce matinee performances on Sunday for the first time in its history to boost Sunday attendance. Budget Impact: No Funding Needed Measure: System in place and functional correctly. Data Source for Measure: Department/Area Report Standard and Baseline: Functional on-line survey system. Baseline: Using SNAPS but this software constantly causes problems. Task Name: Research On-Line Survey Task Description: Research on-line survey software available. Obtain demos of software. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Timely, ongoing WEB delivery of student data used to improve services to students. Data Source for Measure: Department/Area Report Standard and Baseline: Required WEB reports available. Baseline: A number of SAS report exist but many still need to be developed. Generated by TracDat a product of Nuventive. Page 154 of 297 Objectives Objective Status: New Budget Account Number: 11000-34002 Person(s) Responsible: Dr. Carol Kay Planning - Instructional Media Services District-wide Media Support Services for Faculty, Students, and Staff (2010- 2011). To provide increased instructional media services District-wide to meet faculty, students, and District needs. Planning Year(s): 2010 - 2011 Objective Status: In Progress Budget Account Number: 11000-52115 Person(s) Responsible: Nancy Gamez Planning - Instructional Media Services Improve Technology for Classroom Use and Special Events (2010-2011) - Research and coordinate the implementation of technology-enhanced classrooms with 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up 11/09/2011 - One part-time employee was hired for the Rio Grande Campus. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 11/09/2011 - Ask for funding to add more staff to cover College operation hours. Task Name: Data Warehouse and Reports Task Description: Continue development of data warehouse and reports in SAS. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Provide District-wide support to IMS Centers Data Source for Measure: Department/Area Report Standard and Baseline: Hire appropriate level staff. Baseline: Hire 6 full-time Audiovisual Assistants. Task Name: Supervision of the IMS Centers District Wide Task Description: District-wide IMS Manager will assist with planning and supervision of IMS Centers; additional Audiovisual Assistants will ensure for increased support to faculty and students. Budget Impact: Additional/New Funding Required Projected Cost: 126426.0000 Funding Justification: Additional staff needed to cover the additional hours of operation, increased number of the equipment for delivery, and events district wide. Measure: Increase the number of classrooms converted to technology-enhanced classroom, and replace old outdated equipment. 11/09/2011 - This year we converted 78 classrooms district wide to technology-enhanced classrooms, five of those are designated as ADA compliant classrooms one per campus. Progress: Generated by TracDat a product of Nuventive. Page 155 of 297 Objectives emerging instructional technologies, and functional equipment for classroom or special event use Planning Year(s): 2010 - 2011 Objective Status: In Progress Budget Account Number: 11000-52115 Person(s) Responsible: Nancy Gamez Planning - Instructional Media Services Provide Training to Faculty and Staff on Technology Equipment (2010-2011) Provide ongoing training to faculty and staff utilizing technology to achieve their objectives, and policy and procedures for use of media equipment. Planning Year(s): 2010 - 2011 Objective Status: In Progress Budget Account Number: 11000-52115 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Satisfactory Data Source for Measure: Action Plan Status: Department/Area Report 0 - No Action Plan Necessary Standard and Baseline: Increase the number of classrooms converted to technology-enhanced classroom. Improved and replace old outdated equipment to support events district wide. Task Name: Improve media equipment tehnology Task Description: Request funding to convert regular classrooms into technology-enhanced classrooms. Request funding to upgrade event equipment to support all the special events district wide. Budget Impact: Additional/New Funding Required Projected Cost: 400.0000 Funding Justification: There is a list of 22 classrooms that need to be converted. With a goal to have all the rooms converted. Measure: Develop training on the use of media equipment. Data Source for Measure: Department/Area Report Standard and Baseline: Develop training on the use of media equipment in technology-enhanced classrooms, media equipment for classroom use, and policy and procedures for faculty and IMS staff. 11/09/2011 - Training was conducted throughout the year with a concentration during faculty development weeks. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Training of faculty and staff in the use of Generated by TracDat a product of Nuventive. Page 156 of 297 Objectives Person(s) Responsible: Nancy Gamez Planning - Instructional Resources and Technology - Increase In-House Productions (2010 - 2011). - Increase inhouse productions for the weekly television programming; increase of three programs by the end of 2009. Planning Year(s): 2010 - 2011 Expected Completion Date: 09/01/2008 Actual Completion Date: 08/13/2010 Objective Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Dr. Jenny Giron 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up technology. Task Description: Develop workshops during faculty development week, one-to-one training, providing hand-outs on step-by-step on how to use technology-enhanced classrooms. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 3500.0000 Funding Justification: Materials need to give facutly and staff to help them remember how to use the equipment and how to contact the IMS Center for assistance. Measure: The objective will be met with the completion of one pilot program per series and a production calendar for each of the three series. Data Source for Measure: Department/Area Report Standard and Baseline: Complete the pilot programs and production calendar to be ready for full production by the end of 2009. Baseline: Make needed modifications to be prepared for full production. Task Name: Identify Faculty and Staff Task Description: Identify faculty and staff to develop TV show ideas and work with EPCC-TV staff. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 157 of 297 Objectives Measures & Standards and Baselines / Strategies Planning - Instructional Resources and Technology - EPIC Cable Collaborative Membership Participation (2010 - 2011). Increase the EPIC Cable Collaborative membership participation on scheduled productions. Schedule two programs in the new EPCC television studio by the end of 2009. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/14/2008 Actual Completion Date: 03/11/2011 Objective Status: In Progress Budget Account Number: 11000-52146 Person(s) Responsible: Jenny Giron Measure: Present project to the Cable Collaborative group for approval. Data Source for Measure: External Report Standard and Baseline: Completion of two programs as a collaborative venture. Baseline: Broadcast two EPIC TV collaborative programs. Planning - Instructional Resources and Technology - Review and Assess the Relevancy or Currency of Leased TV Programs (2010 - 2011). - Review and assess the leased TV programs by the end of 2009. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/29/2008 Actual Completion Date: 11/05/2010 Objective Status: Met Budget Account Number: 11000-52136 Person(s) Responsible: Dr. Jenny Giron Measure: Conduct a study to identify outdated programs. Data Source for Measure: Department/Area Report Standard and Baseline: Complete study and identify needed programming. Baseline: Current programs have shown poor playback and broadcast quality due to age and content. New programs will be identified to provide updated and current information. 03/05/2012 11:46 AM Results Action & Follow-Up Task Name: EPIC TV Collaborative Group Task Description: Provide the EPIC TV Collaborative group the opportunity to meet regularly and jointly produce two television programs. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: TV Program Committee Task Description: EPCC-TV staff and AVP, Instructional Resources & Technology have reviewed and assessed the leased programs to ensure for Generated by TracDat a product of Nuventive. Page 158 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up current information. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 30000.0000 Planning - Instructional Resources and Technology - Staff Trained in Digital Equipment (2010 - 2011). - To have the EPCC-TV staff fully trained by 2009 in the use of digital equipment. Planning Year(s): 2010 - 2011 Expected Completion Date: 12/12/2008 Actual Completion Date: 09/17/2010 Objective Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Dr. Jenny Giron Measure: Once the new digital equipment is installed at the new TV studio, a study will be done to determine training needs for the design of a digital equipment training plan. Data Source for Measure: Department/Area Report Standard and Baseline: The production staff will be cross-trained to increase and improve their digital equipment operation knowledge. The production staff will be sent out-of-town for training as needed. The Digital Equipment Plan will identify the staff member's strengths and weaknesses. Baseline: Each one of the producers will have a specialized area and conduct his own training. Task Name: Training Task Description: Identify appropriate training for EPCC-TV staff and encourage participation in relevant conferences and seminars. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Interior Design Technology - TM - Curriculum Revision (2010-2011) - Revise existing INDS-2364 Practicum- Internship course to be a required course in the program. This new feature will allow 03/05/2012 11:46 AM Measure: Class has been revised and implemented. Data Source for Measure: Department/Area Report Standard and Baseline: 10/25/2010 - The students are currently placed in the industry for the internship program. They are receiving hands on experience that is thorough and complete. The experience in the industry allows the student and the employer to evaluate Generated by TracDat a product of Nuventive. Page 159 of 297 Objectives students to get real world experience and an opportunity for employment. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/10/2010 Objective Status: Met Budget Account Number: 11000-55420 Person(s) Responsible: Maria Prospero Planning - International Education International Education Program (20102011) - Development of a more extensive PowerPoint presentation for the CASS. Stengthening Basic Education Program. These Presentations will be given to the CASS Program Officers at Georgetown University and the CASS In-Country Coordinators, during the annual conference. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/25/2010 Objective Status: Met Budget Account Number: 11000-42801 Person(s) Responsible: Dr. Miguel A. Martinez-Lasso 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Students will participate in an Internship course as required by the program. Baseline: Course not required. each other. This is great training. 90% of our students receive job offers. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Action & Follow-Up Task Name: Revise Course Task Description: Revise course, coordinate positions available with the industry, implement into the curriculum. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: A total of ten copies will be made of the Power Point presentation and it will be distributed to the following manner: 1-for the USAID Program Officer, 1-for the CASS Program Officer at Georgetown University, 6 for the In-Country Coordinators. 1-for Dr. Ernst Roberts and 1 will be kept in the department to be used as needed. Data Source for Measure: Department/Area Report Standard and Baseline: 100% dissemination of the presentation will be made. Baseline: Presentation will be made at the Annual conference in Washington, D.C. Measure: Same measure. Data Source for Measure: Department/Area Report Standard and Baseline: Baseline: A Presentation will be made at the 10/05/2011 - Copies of the powerpoint presentations were distributed to Program Officials, In-Country Coordinators and graduating participants. These powerpoint presentations were utilized during the in-country orientation sessions in all four countries. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 160 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up CASS Graduation in El Paso. Measure: Same measure. Data Source for Measure: Department/Area Report Standard and Baseline: Baseline: Presentations will be made in each country participating by the CASS graduating students during their orientation session. Measure: Same measure. Data Source for Measure: Department/Area Report Standard and Baseline: Baseline: Presentation will be personally made by Dr. Martinez-Lasso at one of the incountry orientation sessions. Task Name: Increase Marketing Task Description: Increase marketing with funding sources. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - IT Security - Red Flag Rule Compliance Program (2009-2012) - Achieve complete compliance with the Red Flag Rule as part of the Fair and Accurate Credit Transactions Act (FACT Act) of 2003; integrate actions with other EPCC information security awareness initiatives; and promote departmental awareness programs. Planning Year(s): 2009 - 2010 2010 - 2011 03/05/2012 11:46 AM Measure: Incorporate exisiting policies and procedures Data Source for Measure: Department/Area Report Standard and Baseline: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Generated by TracDat a product of Nuventive. Page 161 of 297 Objectives 2011 - 2012 Expected Completion Date: 12/10/2011 Objective Status: In Progress Budget Account Number: 11000-75205 Person(s) Responsible: Richard Buller 03/05/2012 11:46 AM Measures & Standards and Baselines / Results Strategies Measure: Identify relevant red flags. Data Source for Measure: Department/Area Report Standard and Baseline: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Measure: Procedures to detect red flags Data Source for Measure: Department/Area Report Standard and Baseline: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Measure: Appropriate responses to red flags Data Source for Measure: Department/Area Report Standard and Baseline: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Generated by TracDat a product of Nuventive. Action & Follow-Up Page 162 of 297 Objectives Measures & Standards and Baselines / Strategies Measure: Periodic updating of the program Data Source for Measure: Department/Area Report Standard and Baseline: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Measure: Administering the Program Data Source for Measure: Department/Area Report Standard and Baseline: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Results Action & Follow-Up 11/23/2009 - Efforts to achieve a successful start to the program, to find a functional area (Student Services - Admissions, Financial Aid, Personnel or all) to take responsibility for the implementation and operation (including training of staff) for this identity theft program, did not produce an area willing to participate. Progress: Unsatisfactory Action Plan Status: 2 - Action Plan Documented 11/23/2010 - First and second attempts did not develop a functional area administrator to take ownership of the program. Action: Refresh all areas with the requirements and encourage an administrator to take the lead in marketing the program and developing the "Red Flags"; then developing the training program and implementing it within their area. Measure: Other legal requirements Data Source for Measure: Department/Area Report Standard and Baseline: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 163 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: Adapt the Program Task Description: Adapt the program to provide oversight to new threats as business process change. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Funding Justification: August 2010 Task Name: Approved Policy Task Description: Produce a Board of Trustee-approved policy and monitoring plan for the ongoing program. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Task Name: Assess Effectiveness Task Description: Assess effectiveness with supervisors via an annual audit of practices and training provided. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Task Name: Find a functional area sponsor Task Description: Information Security is not to be in the lead for the Red Flags Rule Program. Functional areas where face-to-face service to customers must take ownership and operate the program. 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 164 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: No Funding Needed Task Name: Possible Identity Theft Task Description: Determine which indicators of possible identity theft are available to alert employees. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Task Name: Potential Points Task Description: Identify all potential points of vulnerability in work processes in every department and program. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Task Name: Training Task Description: Train all staff to recognize the red flags and provide continuous awareness training. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Planning - IT Security - Microsoft SharePoint Platform Environment - (20102012) - Develop instruction on Permissions Management for Site and Site Collection Owners. Provide policy for governance and then monitoring to ensure compliance. 03/05/2012 11:46 AM Measure: Progress will be measured on a project basis. Success is achieved when serviceable enhancements are released to users, placed into service and value is added to the business process. Data Source for Measure: 05/19/2011 - All governance documentation is drafted and reading for staffing/comment. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 165 of 297 Objectives Planning Year(s): 2010 - 2011 2011 - 2012 Expected Completion Date: 10/31/2011 Objective Status: In Progress Budget Account Number: 11000-75205 Person(s) Responsible: Richard Buller Planning - IT Systems Application - Banner Upgrade 8.2 to 8.3 (2010-2011) - Upgrade Banner in order to be compatible with the latest version of SCT, Financial Aid, and TCC software versions. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/20/2011 Actual Completion Date: 03/20/2011 Objective Status: Met Budget Account Number: 11000-75006 Person(s) Responsible: IT systems applications staff and Banner functional users 03/05/2012 11:46 AM Measures & Standards and Baselines / Results Strategies Department/Area Report Standard and Baseline: Projects are delivered and implemented and the using customer declared the new product to be beneficial to their mission. Baseline: Phase 1 developed MS SharePoint for the EPCC instructional area. Phase II enhanced the environment with Microsoft LIVE@edu and a basic administrative configuration Action & Follow-Up Task Name: EPCC Information Technology Task Description: Present the Goverance policies to the SharePoint Administrator for distribution to all users. Build a Permissions Management FAQ and knowledge base for customers. Budget Impact: Additional/New Funding Required Measure: Test all Banner modules with Department users and satisfy any discrepancies with testing outcomes. Data Source for Measure: Department/Area Report Standard and Baseline: Comply with the latest version of student and staff reporting requirements and enhance the Banner functionality through a version upgrade with minimal interruption of service to the college community. 12/06/2011 - Banner 8.3 was implemented with minimal service interruption and met its go live production timelines. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Banner Upgrade Plan Task Description: Setup a test environment for testing. Coordinate user testing and resolve any discrepancies in a timely manner. Upon stakeholder approval, the conversion will be Generated by TracDat a product of Nuventive. Page 166 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up scheduled and implemented. Budget Impact: Rollover/Maintain Current Funding Planning - IT Systems Application - Banner System Hardware Upgrade (2010 - 2011). Install and convert to new server hardware in order to continue to stay current with Oracle software database upgrades and ERP Banner upgrades. Planning Year(s): 2010 - 2011 Expected Completion Date: 10/31/2011 Actual Completion Date: 10/31/2011 Objective Status: Met Budget Account Number: 75207 Person(s) Responsible: Gary Chacon IT Systems Executive Director Measure: Hardware will provide efficient performance for EPCC Banner users. Data Source for Measure: Student Related Data (Tracking/Performance) Standard and Baseline: The standard will be to provide EPCC Banner users with the highest quality of service and response time. The Baseline for this project is in test phase. Servers are up and our database administrators are loading test databases for user testing. Planning - Kinesiology - TM - Facilities Upgrade (2010-2011) - Provide music for #1405 and provide projector and screen for #1405. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: In Progress Budget Account Number: 11000-55431 Measure: Yes/no. Data Source for Measure: Department/Area Report Standard and Baseline: Equipment installation. Baseline: Instructors must bring their own boom box, IMS delivers projector & screen when requested. 03/05/2012 11:46 AM 11/30/2011 - The conversion from old servers to new servers was successful and the new hardware provides a much improved response time. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Banner System Hardware Upgrade Task Description: Servers will be purchased and installed. Data base administrators will load test database for EPCC users to throughly test. Signoff from stake holders on test results. Budget Impact: Rollover/Maintain Current Funding 07/13/2011 - Equipment was not installed, no official notification was provided. Progress: Unsatisfactory Action Plan Status: 3 - Follow-Up Documented 10/27/2010 - IT approved funding, waiting on installation Progress: Unsatisfactory Action Plan Status: 2 - Action Plan Documented Generated by TracDat a product of Nuventive. Page 167 of 297 Objectives Person(s) Responsible: Stephanie Martinez Planning - Kinesiology - VV - Replace Outdated Equipment/Machines (2010-2011) - Replace worn out and outdated equipment/machines in the VV weightroom. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-55430 Person(s) Responsible: Bob Femat Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: IT Committee Task Description: Application to IT committee for peripherals has been submitted Spring '10. Budget Impact: Additional/New Funding Required Projected Cost: 10620.0000 Measure: Increase the number of stations available for student use during classtime with state of the art Smith machines. Data Source for Measure: Department/Area Report Standard and Baseline: Students will have access to new Smith machines for use in weightlifting classes for the 2010-2011 academic year. Baseline: Currently, students are working out on Smith machines that were purchased in 1990. Machines are in disrepair and use outdated weight systems. Task Name: Purchase 4 New Machines Task Description: To purchase four (4) new Smith machines by the end of 2010-2011 academic year. Budget Impact: Additional/New Funding Required Projected Cost: 7000.0000 Planning - Kinesiology - VV - AP (20102011) - Purchase new First Aid equipment for Transmountain campus. 03/05/2012 11:46 AM Measure: The purchase of new mannequins, AEDs, breathing bags and pocket masks. Generated by TracDat a product of Nuventive. Page 168 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 03/04/2010 Objective Status: New Budget Account Number: 11000-55430 Person(s) Responsible: Bob Femat Measures & Standards and Baselines / Strategies Data Source for Measure: Department/Area Report Standard and Baseline: 5 new Adult Mannequins, 5 new Junior mannequins, 5 new Baby mannequins, 5 new AEDs, and 50 new pocket masks. Baseline: 4 adult, 2 junior, 2 baby mannequins Action & Follow-Up Task Name: Request Funds Task Description: Request funds from Division Dean at TM. Budget Impact: Additional/New Funding Required Projected Cost: 15000.0000 Planning - Law Enforcement Training Security & Special Officers (2010-2011) Introduce Level IV Training and increase overall enrollments. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-42501 Person(s) Responsible: Barry Bogle Measure: This training is new to the program. Data Source for Measure: Department/Area Report Standard and Baseline: This training capability is new but will increase enrollments by a projected 10%. Baseline: FY 2008-2009 enrollments. Planning - Law Enforcement Training Defensive Driving (2010-2011) - Increase student enrollments. Planning Year(s): 2010 - 2011 Expected Completion Date: Measure: Compare the current total number of student enrollments with the previous fiscal year. Data Source for Measure: Enrollment Data Standard and Baseline: 03/05/2012 11:46 AM Results Task Name: Security Industry Task Description: Offer the new training through established contacts in the security industry. Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 169 of 297 Objectives 01/31/2011 Actual Completion Date: 01/31/2011 Objective Status: Withdrawn Budget Account Number: 11000-42501 Person(s) Responsible: Barry Bogle Measures & Standards and Baselines / Strategies Increase enrollments by 10% from the previous fiscal year. Baseline: FY 20082009 enrollments. Action & Follow-Up Task Name: Advertising Task Description: Increase Advertising. Budget Impact: No Funding Needed Planning - Law Enforcement Training Driver's Education (2010-2011) - Maximize student enrollments within current resources. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-42511 Person(s) Responsible: Barry Bogle Measure: Compare the current total number of student enrollments with the previous fiscal year(s). Data Source for Measure: Enrollment Data Standard and Baseline: Increase enrollments by 10% from the previous fiscal year. Baseline: FY 20082009 enrollments. Planning - Law Enforcement Training Truck Driving (2010-2011) - Increase student enrollments. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Not Met Budget Account Number: Measure: Compare the current total number of student enrollments with the previous fiscal year(s). Data Source for Measure: Enrollment Data Standard and Baseline: Increase enrollments by 10% from the previous fiscal year. Baseline: FY 20082009 enrollments. 03/05/2012 11:46 AM Results Task Name: Local High Schools Task Description: Continue recruitment at the local high schools, job corps and other youth centers. Budget Impact: No Funding Needed Task Name: External Funding Generated by TracDat a product of Nuventive. Page 170 of 297 Objectives Measures & Standards and Baselines / Strategies 12107-S12107 Person(s) Responsible: Barry Bogle Task Description: Continue to explore external funding (grant) opportunities. Budget Impact: No Funding Needed Planning - Law Enforcement Training Motorcycle Rider (2010-2011) - Increase student enrollments. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 12110-S12110 Person(s) Responsible: Barry Bogle Measure: Compare the current total number of student enrollments with the previous fiscal year(s). Data Source for Measure: Department/Area Report Standard and Baseline: Increase enrollments by 10% from the previous fiscal year. Baseline: FY 20082009 enrollment Planning - Law Enforcement Training Driver Ed Teaching Assistant Training (2010-2011) - Conduct one (1) course as needed. Planning Year(s): 2010 - 2011 Measure: Determine internal and external instructor needs. Data Source for Measure: Department/Area Report Standard and Baseline: This course is offered only as needed. Baseline: Needs assessment for the current fiscal year. Actual Completion Date: 03/11/2010 Objective Status: Withdrawn Budget Account Number: 12201-S12201 Person(s) Responsible: Barry Bogle 03/05/2012 11:46 AM Results Action & Follow-Up Task Name: Civilian Population Task Description: Continue to advertise for the civilian population. Budget Impact: No Funding Needed Task Name: Proprietary Schools Task Description: Contact proprietary schools to determine need. Budget Impact: Generated by TracDat a product of Nuventive. Page 171 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up No Funding Needed Planning - Law Enforcement Training - Law Enforcement In-Service Firearms (20102011) - Increase student enrollments. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 12198-S12198 Person(s) Responsible: Barry Bogle Measure: Compare the current total number of student enrollments with the previous fiscal year(s). Data Source for Measure: Enrollment Data Standard and Baseline: Increase enrollments by 10% from the previous fiscal year. Baseline: FY 20082009 enrollments. Planning - Learning Community Program VV - Learning Community Program (20092012) - The main objective for 2009-10 will be to increase the number of Learning Communities offered at each campus, increase the number of faculty teaching in Learning Communities, and work towards all in coming freshman enrolling in and experiencing a learning community class. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Measure: The easiest way to measure if objectives were met would be to compare the numbers of learning communities offered, faculty teaching and students enrolled during the semesters and at each campus. Data Source for Measure: Enrollment Data Standard and Baseline: 10-15% improvement would show some growth in the program. Baseline: The baseline right now is approximately 14 communities being offered at 2 campuses. With 12 faculty members. Objective Status: Met Budget Account Number: 11000-55447 Person(s) Responsible: Susan Trueblood Silva Task Name: Additional Personnel Task Description: Work-study or part-time clerk to run copies, attend New Student Orientation, and other 03/05/2012 11:46 AM Task Name: Civilian Shooters Task Description: Continue to market with civilian shooters and clubs. Budget Impact: No Funding Needed 08/01/2010 - 16 Learning Community were offered in Spring 2010. There were approximately 25 instructors teaching those communities. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 172 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up clerical duties. Budget Impact: Additional/New Funding Required Projected Cost: 4500.0000 Funding Justification: Minimum wages, 19 hours a week maximum, 32 weeks a year. Task Name: Prepare Students for College Level Courses Task Description: Strategies include proposing to EDUC 1300 and READ 0309 programs that all their courses should be paired with credit courses to enhance the freshman experience and prepare students for college level readiness. Also, more advertising to students during new student orientations and in the student paper. A larger budget is also needed to cover copy cost of flyers, posters used at NSOs, and stipends for faculty and coordinator. Currently Dean Mathis is paying for most everything through his dean's budget. Budget Impact: Additional/New Funding Required Projected Cost: 1000.0000 Funding Justification: $500 per semester for supplies and copies would be sufficient, but that does not include faculty stipends and payment for coordinator. Planning - Learning Community Program VV - Learning Community Program (20102012) - The primary objective is to show an institutional commitment to growing the Learning Community Progam by establishing an institutional budget for 03/05/2012 11:46 AM Measure: Data collection of class pairs that "made" compared academic year to academic year. Data Source for Measure: Department/Area Report Standard and Baseline: 12/06/2011 - There was an increase in the offering of Learning Communities, especially in the field of Development English. Also there is a Learning Community now offered at the Northwest Campus and in Spring at the Transmountain campus Generated by TracDat a product of Nuventive. Page 173 of 297 Objectives continued faculty stipends every semester and marketing of Learning Community to students, as well as staff and faculty. Learning Communities promote direct transfer of academic skills and cooperative learning and working talents. These skills are sought by businesses of their employees at every level. Therefore, another objective would also include increasing the number of Learning Communities offered at every campus so that all incoming freshmen could enroll in and experience learning community classes. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Objective Status: Met Budget Account Number: 11000-55447 Person(s) Responsible: Susan Trueblood Silva 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Progress: Increase of 10% from year to year. Baseline: Satisfactory Action Plan Status: Currently there is no budget for the LC 0 - No Action Plan Necessary Program. In 2008/09 there were Learning Communities offered and Learning Communities that made at the Valle Verde Campus. In 2009/10 there were 18 Learning Communities officer and 15 Learning Communities that made at the Valle Verde Campus. In Fall 2010 we are offering 19 Learning Communities at 3 campuses. Task Name: Advertise Task Description: Poster for advertise at campuses offering Learning Communities. Budget Impact: Additional/New Funding Required Projected Cost: 500.0000 Task Name: Coordinator-LC Task Description: Coordinator-LC faculty member meeting every semester for review and assessment. Budget Impact: Additional/New Funding Required Projected Cost: 100.0000 Task Name: Copies Task Description: Copies of LC offering to be given at NSO. Budget Impact: Additional/New Funding Required Projected Cost: 2000.0000 Task Name: Presentation Generated by TracDat a product of Nuventive. Page 174 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Description: Presentation to counselors at semester district-wide counselors' meeting. Budget Impact: Additional/New Funding Required Projected Cost: 100.0000 Task Name: Presentation Task Description: Informational presentation to Leadership. Budget Impact: Additional/New Funding Required Projected Cost: 100.0000 Task Name: Proposal Task Description: Proposal to Reading discipline and Education 1300 disciplines that many of their courses be offered in pairings with content courses. Budget Impact: Additional/New Funding Required Projected Cost: 100.0000 Task Name: Schedules Task Description: Card stock schedules for counselors. Budget Impact: Additional/New Funding Required Projected Cost: 400.0000 Task Name: Testimonials Task Description: Testimonials from current LC faculty in Faculty Development Newsletter. 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 175 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: Additional/New Funding Required Projected Cost: 0.0000 Task Name: Training Task Description: Training workshops presented every semester for any personnel currently working with or interested in working with Learning Communities. Budget Impact: Additional/New Funding Required Projected Cost: 200.0000 Task Name: Video Development Task Description: Video development for on-line catalog page, kiosk advertising, and New Student Orientation presentations. Budget Impact: Additional/New Funding Required Projected Cost: 500.0000 Task Name: Workshops Task Description: Workshops presented every semester during Faculty Development Week for any staff or faculty member to attend Budget Impact: Additional/New Funding Required Projected Cost: 200.0000 Planning - Library - MDP - MDP Library Webpage Migration (2010-2011) - To migrate the current MDP Library website to 03/05/2012 11:46 AM Measure: MDP Library website will be compliant with district Web page standards. 02/21/2011 - Migration of the MDP Library website was completed by the target date of December 2010. Project was accomplished with the help of Generated by TracDat a product of Nuventive. Page 176 of 297 Objectives a format compliant with the requirements for EPCC District pages. Planning Year(s): 2010 - 2011 Expected Completion Date: 11/16/2010 Actual Completion Date: 11/16/2010 Objective Status: Met Budget Account Number: 11000-52127 Person(s) Responsible: Norma Ballenger Planning - Library - NW - Northwest Community Literacy Center (2010-2011) To plan and equip by June 2011 the new library extension funded by the HUD grant and EPCC matching fund to serve as a community and student information and cultural center - to be opened September 2011. The multipurpose center will provide 1) a public space for a) Internet information access and computer use b) study and multi-use for Early College and teens, c) children's corner with age appropriate technology, d) meeting & training facilities, e) shelving for children and young adult collection of materials, f) moveable stage facilities for performances. 2) An academic space for 200 student gatherings (3 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Data Source for Measure: Department/Area Report Standard and Baseline: Website will be fully migrated by the end of December 2010. Baseline: The MDP Library website will migrate from the current Dot Net Nuke (DNN) webpage format to the new Microsoft SharePoint Web format. Results Action & Follow-Up AJ Navarro (IT Dept.), Raymundo Vilca (IT Dept.), and Norma Ballenger (MDP Head Librarian). Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Migrate the Site Content Task Description: MDP Head Librarian, in conjunction with AJ Navarro & Raymundo Vilca from the office of the EPCC Webmaster, will make the necessary changes to migrate the site content. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: We will provide service & programs 20112012: 1) youth after school and summer academic and literacy enrichment activities, and family educational programs. 2) Bilingual (English/Spanish) technical assistance. 3) Seminars to low and moderate income individuals to encourage self-sufficiency, first time home ownership and entrepreneurship. Data Source for Measure: Department/Area Report Standard and Baseline: To learn and integrate specific skills into personal life and to continue coming to the college to use the library resources and EPCC academic or continue education 02/24/2012 - the construction started in June 2011 02/24/2012 - Seek funding for and due to lack of funding for equipment and computer equipment and funding for security camera, the completion date has been security cameras postpond. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. Page 177 of 297 Objectives classes) such as when hearing a panel or lecture. 3) Keep the library and the center open for 64 hours during the week. Planning Year(s): 2010 - 2011 2011 - 2012 Objective Status: In Progress Budget Account Number: 11000-52126 Person(s) Responsible: Monica Wong Planning - Library - NW - Enhancing Family Literacy and Technology Skills (2010-2012) - To provide technology and family literacy activities for ESL, Child Development and International CASS students. 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up programs. Baseline: Continue 1) existing youth and family programs, 2) create and add new programs for adults. Task Name: Multi-Purpose Community Center Task Description: Maximize the use of the multi-purpose community center and fulfill stated grant obligations. Collaborate with community partners, EPPL, CISD, YWCA, Head Start. Collaborate with EPCC ESL, Child Development faculty and CASS International Program and continue to look for grants to support programs and purchase materials and equipment. Funding Justification: Staffing, $55,000 two FT Library Assistants positions, to provide 64 hours a week service for the multi-purpose center, i.e. to assist and supervise, and provide security for children, teens and families using the center. Annual program budget $17,000 to support 500 plus youth, family and student activities at Northwest Community Literacy Center. Equipment, $90,000 40 multi-media computer workstations. 3 Electrical screens with LCD projectors, 1 Smartboard with LCD projector, 2 e-learning stations, 5 laptops for student use in the library. Budget Impact: Additional/New Funding Required Projected Cost: 55000.0000 Measure: Three workshops to increase students' skills with technology and complete activities from 6 early literacy modules. Data Source for Measure: 02/24/2012 - we provided four workshops using the 6 modules devoloped by Dr. Cristina Gonzalez, Early Childhood Education for ESL and NW students majoring in Education. Two workshops were provided for the International Generated by TracDat a product of Nuventive. Page 178 of 297 Objectives Planning Year(s): 2010 - 2011 2011 - 2012 Expected Completion Date: 08/31/2012 Objective Status: In Progress Budget Account Number: 22667-E22667 in 2010 22677-E22677 in 2012 Person(s) Responsible: Monica Wong Planning - Library - NW - Northwest Library Service-Academic Support (2010-2013) To improve library collection by weeding outdated library material, replace missing materials in a timely manner. Planning Year(s): 2010 - 2011 2011 - 2012 2012 - 2013 Expected Completion Date: 08/31/2013 Objective Status: In Progress Budget Account Number: 11000-52126 Person(s) Responsible: Monica Wong Measures & Standards and Baselines / Strategies Results Department/Area Report Standard and Baseline: Each student will gain the ability to work independently with the technology. Baseline: Continue pilot projects. CASS students. 67 students volunteered to help the library's Toddler Tech program in 2011. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Action & Follow-Up Task Name: Child Development Task Description: Collaborate with ESL, Child Development and CASS faculty and coordinators. Develop modules with Child Development faculty. Use Smartboard Technology and library's book collection and computers. Apply for a grant. Budget Impact: No Funding Needed Measure: Librarians will be given a section of the collection to weed and reorder during a 6 month period. They will remove materials from their section and order at least $300 worth of books weekly. List of materials ordered are filed by month and initialed by librarian. I will review completed order monthly. Data Source for Measure: Department/Area Report Standard and Baseline: Increase recent publication (2009 and newer) to 5% of the library collection. The weeding will decrease the percentage of materials older than 2005 decrease at least 2%. 02/24/2012 - Weeding is an on going process. We are going to replace and update the collection with the extra $20,000 book budget in 2012. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Conduct Inventory Task Description: Assign librarians subject areas to review and 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 179 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up weed collections systematically. Input material orders weekly and encumber book budget before April 2011. Conduct inventory every two years. Print report by publication date and review periodically. Budget Impact: No Funding Needed Planning - Library - NW - Northwest Library Service - Community Service (2010-2013) To maintain the level of programming for the families of sudents and community in the summer. Planning Year(s): 2010 - 2011 2011 - 2012 2012 - 2013 Expected Completion Date: 08/31/2013 Objective Status: In Progress Budget Account Number: 11000-52126 Person(s) Responsible: Monica Wong 03/05/2012 11:46 AM Measure: Maintain number of programs offered, collect statistics of community users, and survey community users on whether programs are meeting the needs of their families. Data Source for Measure: Department/Area Report Standard and Baseline: Maintain same level of last year's programs in the summer. Baseline: Provide 400 + programs in the summer. 02/24/2012 - Due to budget restrains, community programming in the summer was reduced by 50%. We provided 47 classes in June. 398 programs were implemnted and over 7700 patrons attended. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Grants Task Description: Apply for grants to support the programming and continue to seek appropriate funding from College. Funding Justification: Since 2003, this library became the 1st and only community library in EPCC serving Canutillo and Westside. A new budget line item "Community Services" with $15,000 for community programming is needed. The library has been holding back book orders and using supply budget for its community programming. Budget Impact: Additional/New Funding Required Projected Cost: 15000.0000 Generated by TracDat a product of Nuventive. Page 180 of 297 Objectives Planning - Library - RG - How to Care for Library Materials (2010 - 2011). - To educate library users on proper care of library materials. Planning Year(s): 2010 - 2011 Expected Completion Date: 11/01/2010 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-52125 Person(s) Responsible: Charlotte Hollis Planning - Library - RG - Part-Time Library Clerks (2010 - 2011). - Hire 2 part-time classified staff employees to work at service point in computer area. This would provide the additional necessary assistance with computer programs (such as Word and PowerPoint) as well as with printing and 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Task Name: Purchase Materials to Encourage Awareness of Book Care Task Description: Purchase book marks to encourage proper handling of library materials. Funding Justification: Educating users in how to handle materials may decrease number of materials lost because of damage. Budget Impact: No Funding Needed Projected Cost: 25.0000 Task Name: Workshop on book care Task Description: Present a workshop on book care by someone trained in this area. Items to be covered: how to deal with mold, mildew, wet materials, etc. Funding Justification: Over $23,000 of materials from the Rio Grande Library collection have been found damaged due to improper care - wet, stains, etc. Budget Impact: No Funding Needed Projected Cost: 10.0000 Results Action & Follow-Up 04/12/2011 - Purchased book marks to be distributed during National Library Week and and book care workshop on April 12th. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 04/12/2011 - Laura Hollingshed of the UTEP Special Collections presented a workshop to approximately 10 people on book care. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Measure: Have 2 part-time employees. Data Source for Measure: Department/Area Report Standard and Baseline: Employees working in computer hub area would provide approximately 36 hours of Generated by TracDat a product of Nuventive. Page 181 of 297 Objectives other general functions. Planning Year(s): 2010 - 2011 Expected Completion Date: 11/01/2010 Actual Completion Date: 08/31/2011 Objective Status: Not Met Budget Account Number: 11000-52125 Person(s) Responsible: Charlotte Hollis Planning - Library - RG - New Library Books and Materials (2010 - 2011). - Update library collection with newer materials to support instruction. Purchase new books (both physical and electronic), dvds and other materials to increase size of library collection to ultimately provide 10 books or library material items per student. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/30/2012 Actual Completion Date: 08/31/2012 Objective Status: Not Met Budget Account Number: 11000-52125 Person(s) Responsible: Charlotte Hollis Measures & Standards and Baselines / Results Strategies student services in Circulation department or in computer hub area. Baseline: Currently providing 20 hours of service in this area. Action & Follow-Up Task Name: Hire 2 Part-Time Employees Task Description: Hire 2 part-time employees to work in library computer hub area. Measure: Purchase at least 2000 new items (not over 5 years old), (books, dvd, multimedia, ebooks) for library collection in science, health related, technology and social sciences fields. Data Source for Measure: Department/Area Report Standard and Baseline: Number of titles with copyright date greater than 2005 . Goal is to provide at least 10 books or library material items per student. Baseline: Fall 2010 RG library had ?? items which provided 4.6 books or library material items per student of which approximately 75% of the health, science, technology and social science related books were published prior to 2000. Many materials have been weeded due to damage, especially liquid, and need to be replaced. Task Name: RG Library Books and Equipment Task Description: RG library book/equipment budget needs to be increased to equal that of Transmountain library since both campuses serve approximately the same number of students. 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 182 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up In addition an allowance for specialty materials in the health fields needs to be added. A 4% inflationary figure needs to be built into library budgets. The average price for health materials for 2007 was $109,20/item. In order to equal the Transmountain Campus library's current 2008-09 book/equipment budget of $79,270, the RG library's book budget needs to be increased by $52,561 from $26,709, if 1/2 the RG materials to be purchased are health related an additional $60,113 would be needed. This, combined with the 4% for inflation, would mean that the RG library would need an additional $115,844 for 20092010 . We could then purchase an adequate number of current items to replace outdated materials in the collection. Planning - Library - TM - TM Library Reference Book Collection Assessment Project (2010-2011) - To identify and remove outdated, obsolete, or damaged reference material from the TM Library collection. And, if appropriate, to replace the withdrawn items with newer editions. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/11/2010 Objective Status: Met Budget Account Number: 11000-52124 Person(s) Responsible: Alberto A. Villegas 03/05/2012 11:46 AM Measure: Identify and remove (withdraw) a mininum of 5% of the reference collection for a total of 300 items. Data Source for Measure: Department/Area Report Standard and Baseline: Standard best academic library practice recommends that removal of 3% to 5% of a library collection will ensure that a collection remains relevant and current. Baseline: The TM Library reference collection has 5831 items as of March 2010. It is anticipated that 300 items will be withdrawn. This project will begin September 2010 and end August 2011. 03/01/2012 - 194 outdated or superceded reference items were withdrawn, or 3% of the total reference collection. Newer editions, where applicable, were purchased with existing funds. Project completed. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: New Material Task Description: New reference material will be selected and purchased in affected Library of Congress Generated by TracDat a product of Nuventive. Page 183 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up areas. Funding Justification: No new funds are expected to needed as the current book budget can support this project cost. Budget Impact: No Funding Needed Task Name: Withdrawn Items Task Description: Reference type items will be withdrawn if they are: (1) generally older than 10 years old, (2) damaged beyond repair, (3) superseded, (4) or they no longer support the current curriculum. The Library's Innopac (Telnet) will be used to identify these items. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Library - VV - A. MontesReserves (2010-2011) - To create a uniform process for inputting reserve items in district-wide catalog. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/31/2012 Actual Completion Date: 07/02/2012 Objective Status: In Progress Budget Account Number: 11000-52153 Person(s) Responsible: Luis Chaparro 03/05/2012 11:46 AM Measure: Monthly meetings are taken place. Data Source for Measure: Department/Area Report Standard and Baseline: Reserve items will be easier to access. Baseline: There is no uniform process for managing the reserve items in the college libraries. 10/11/2011 - In progress. The committee is still meeting Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Monthly Meetings Task Description: Meetings with staff members from other libraries are being held monthly. Budget Impact: No Funding Needed Projected Cost: Generated by TracDat a product of Nuventive. Page 184 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 0.0000 Planning - Library - VV - Liz Loya- Staff Check Machine (2010-2011) - Purchase and install a self check machine at the circulation desk. Planning Year(s): 2010 - 2011 Actual Completion Date: 07/02/2010 Objective Status: Not Met Budget Account Number: 11000-52153 Person(s) Responsible: Luis Chaparro Planning - Library - VV - Liz Loya- Inventory (2010-2011) - To revisit the inventory process and develop a plan for its improvement. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/31/2012 Actual Completion Date: 07/31/2012 Objective Status: Not Met Budget Account Number: 11000-52153 Person(s) Responsible: Luis Chaparro 03/05/2012 11:46 AM Measure: Funding to purchase self check machine are approved. Data Source for Measure: Department/Area Report Standard and Baseline: 90% of library circulation items will be processed using this new technology. Baseline: Currently VV library does not have this technology. 10/11/2011 - No funding was obtained to purchase this machine Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Training Task Description: Library staff will be trained to use it. Budget Impact: Additional/New Funding Required Projected Cost: 20000.0000 Measure: Inventory procedures are reviewed and compared to the ones used in other campus libraries. Data Source for Measure: Department/Area Report Standard and Baseline: Inventory process will be operational by Spring semester of academic year 2011-12. Baseline: Inventory process is cumbersome inefficient and unreliable. 10/11/2011 - No results yet. Unsure if the project has started at all. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Monthly Meetings Task Description: Monthly meetings with Public Service Supervisor will indicate level of progress. Budget Impact: Generated by TracDat a product of Nuventive. Page 185 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up No Funding Needed Projected Cost: 0.0000 Planning - Library - VV - Alma - Valle Verde Library Work Flow Analysis (2010-2011) Obtain objective data of daily library work and patron flow; to identify peak hours and staff the circulation desk accordingly. Planning Year(s): 2010 - 2011 Actual Completion Date: 10/11/2011 Objective Status: In Progress Budget Account Number: 11000-52153 Person(s) Responsible: Luis Chaparro Measure: Numbers of library work flow is going to be taken daily in periods of four hours from the computers use, reserve forms, reference questions and the gate counter. Daily information is logged in a specific form. Each month this information is going to be analyzed to determine peak hours. Data Source for Measure: Department/Area Report Standard and Baseline: Work-studies working schedules and availability of equipment are going to be established according to the data generated from this project. Baseline: No such information is available. 10/11/2011 - No results yet but the research is ongoing Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Analyze Data Task Description: Generate a form to log the activities every four hours. Obtain the information daily. Analyze the data. Establish which are the busiest days and hours in the VV library. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Library - VV - Astrid & Alma Work Study Manual (2010-2011) - Generate a Work-Study Manual to: Transform the work-studies training into an objective, standardized and positive process. Speed the process of training work-studies. Optimize the work-studies labor. Implement 03/05/2012 11:46 AM Measure: A list of work-studies duties rules and regulations is going to be used to train each work-study. Work-study procedures will be described fully in a written document. Each new work-study is going to be trained following the work-study manual. Each 10/11/2011 - Completed with excellent results. Workstudy Training Plan is operational and is being constantly updated. Staff working on this objective did a superb job! Progress: Satisfactory Action Plan Status: Generated by TracDat a product of Nuventive. Page 186 of 297 Objectives an objective mechanism to evaluate workstudies. Guide to VV library work-studies through the training process. Develop a friendly guide to answer work-study questions about library procedures, rules and regulations. Improve the quality of the library services. Planning Year(s): 2010 - 2011 Actual Completion Date: 07/02/2010 Objective Status: Met Budget Account Number: 11000-52153 Person(s) Responsible: Luis Chaparro Planning - Library - VV - Liz Loya-Laptop (2010-2011) - Offer laptop for student use in the library. Planning Year(s): 2010 - 2011 Actual Completion Date: 07/02/2010 Objective Status: Met Budget Account Number: 11000-52153 Person(s) Responsible: 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up 0 - No Action Plan Necessary work-study is going to be provided with a training manual. Data Source for Measure: Department/Area Report Standard and Baseline: Work-studies are going to have a clear idea of their duties; mastering the procedures needed to develop their job and following the rules and regulations they are under when working at VV library. Baseline: There is no systematic process to train the work-studies. Task Name: Work-Studies Duties and Regulations Task Description: Keep implementing the work-studies duties and rules and regulation lists as guides to retraining the actual work-studies to continuing updating both documents. Generate the written description of the processes the work-studies work with in the library. Print a final version of the work-study manual. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Procedure is initiated, revised and completed by Fall 2010. Data Source for Measure: Department/Area Report Standard and Baseline: Students will be able to check in laptops for use at VV library. Baseline: VV library has no such service. 10/11/2011 - Laptops are available for student use. Procedure needs final tune-up. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Appropriate Documentation Task Description: Generated by TracDat a product of Nuventive. Page 187 of 297 Objectives Luis Chaparro Measures & Standards and Baselines / Strategies Action & Follow-Up Creation of procedure by compiling appropriate documentation from ACS labs and NW library. Purchase laptop storage cart. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Library - VV - Liz Loya Circulation Procedure Manual (2010 2011). - To complete a circulation procedure manual. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/12/2012 Actual Completion Date: 07/02/2012 Objective Status: In Progress Budget Account Number: 11000-52153 Person(s) Responsible: Luis Chaparro Measure: The circulation procedure will be completed at the beginning of the fall semester 2010. Data Source for Measure: Department/Area Report Standard and Baseline: The circulation staff will use and adhere to this new process for 95% of circulation actions. Baseline: There is no logical and standardized circulation procedure manual. Planning - Library Technical Services (IT) Spanish Language Equivalent Catalog 2009 & 2011 - With guidance of Librarians and help of Web Development Team, construct a Spanish language catalog that is equivalent to the current catalog which is in English Planning Year(s): 2009 - 2010 Measure: Vet the Spanish language catalog through Spanish speaking librarians until it is ready for presentation to students and library patrons. 03/05/2012 11:46 AM Results 10/11/2011 - Ongoing. Process has been suspended until next semester at the request of the Public Service Supervisor Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Circulation Procedure Task Description: Staff will revisit and upgrade the circulation procedure in a systematic manner. Budget Impact: No Funding Needed Projected Cost: 0.0000 11/09/2011 - Students and patrons have option to utilize Spanish language OPAC - On-line Public Access Catalog Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Coordinate Efforts with Web Development Generated by TracDat a product of Nuventive. Page 188 of 297 Objectives 2010 - 2011 Actual Completion Date: 06/01/2010 Objective Status: Met Budget Account Number: 75405 Person(s) Responsible: Hoefner, Hollis, Vilca Planning - Library Technical Services (IT) Overhaul Library Catalog (OPAC - Online Public Access Catalog) 2009 & 2011 Update catalog to EPCC web standards and latest version available from Library Automation Vendor (Innovative Interfaces, Inc. or III) Planning Year(s): 2009 - 2010 2010 - 2011 Actual Completion Date: 01/08/2010 Objective Status: Met Budget Account Number: 75405 Person(s) Responsible: Hoefner, Hollis, Vilca Planning - Literacy Programs - Beyond the Basics for MET (2010-2011) - In support of the farm workers' learners' and the sponsoring organization (MET), Literacy Programs seeks to improve student involvement and continuous training. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Staff and Librarians Task Description: Regular meetings to request changes, evaluate changes, further refine. Budget Impact: Rollover/Maintain Current Funding Measure: Coordinate efforts with Web Development staff and Librarian before presentation to students and library patrons. 11/09/2011 - Revised, more modern OPAC now available for students and library patrons Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Coordinate Web Development Staff and Librarian for Appropriateness and Efficacy Task Description: Meet regularly to request and evaluate modifications to OPAC Budget Impact: Rollover/Maintain Current Funding Measure: Initiative a farm workers alumni association. Data Source for Measure: Department/Area Report Standard and Baseline: Association will be formed. Baseline: To be determined by the accomplishment of the standards mentioned . Generated by TracDat a product of Nuventive. Page 189 of 297 Objectives Objective Status: In Progress Budget Account Number: 11000-42402 Person(s) Responsible: Sara Martinez Measures & Standards and Baselines / Strategies Measure: Conduct workshops for farm workers in the areas of self-employment and parenting. Data Source for Measure: Department/Area Report Standard and Baseline: At least two workshops will be implemented during 2010-2011. Baseline: To be determined by the accomplishment of the standards mentioned. Results Action & Follow-Up Measure: Publish a newsletter for farm workers. Data Source for Measure: Department/Area Report Standard and Baseline: Publish one newsletter. Baseline: To be determined by the accomplishment of the standards mentioned. Task Name: Call a meeting Task Description: Call a meeting Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Conduct Workshops Task Description: Contact employers to conduct workshops in areas of interest Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Contact former MET students Task Description: 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 190 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Contact former MET students Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Form an alumni association Task Description: Form an alumni association Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Publish Newsletter Task Description: Publish the newsletter at Literacy Programs Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Workshops Task Description: Ask members of the alumni association to submit information for a newsletter and survey the areas of interest for workshops Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Marketing and Community Relations - Military 2010-2011 - Increase awarness of degrees and certificates in military through Military Marketing Initative (MMI). Planning Year(s): 2010 - 2011 03/05/2012 11:46 AM Measure: Concentrate on areas which are heavily populated by military. Data Source for Measure: Department/Area Report Standard and Baseline: Standard year-to-year enrollment figures. 11/24/2010 - Military Marketing Initiative (MMI) formed and successfully improved conditions at the existing Fort Bliss center. Services such as testing and counseling are in place to accommodate soldiers and their dependents. An MOU with UTEP has been drafted and in negotiation. Military-targeted marketing collateral Generated by TracDat a product of Nuventive. Page 191 of 297 Objectives Objective Status: Met Budget Account Number: 11000-14001 Person(s) Responsible: Joyce Cordell Measures & Standards and Baselines / Strategies Baseline: Advertising using all forms of media. Results Action & Follow-Up created and distributed at relevant community events. Advertising placed in Freedom Crossing Mall theater. Military enrollment has noticeably increased. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Marketing Task Description: Strategic, targeted marketing campaigns directed to the military population. Budget Impact: Additional/New Funding Required Projected Cost: 25000.0000 Planning - Marketing and Community Relations - Green or Energy Saving 20102011 - Increase awareness of college's "green" efforts through promotions and articles, TV/radio stories. Planning Year(s): 2010 - 2011 Objective Status: Met Budget Account Number: 11000-14001 Person(s) Responsible: Joyce Cordell 03/05/2012 11:46 AM Measure: Continue awareness of recycling program and energy efficient facilities. Data Source for Measure: Department/Area Report Standard and Baseline: Collection of various articles on energy savings. Baseline: Article submission and internal promotion of recycling program. 11/24/2010 - Recycling at all campuses promoted throughout district and on news and events of the EPCC homepage. Created "going green" advertisement to support paperless catalog. Participated in community events such as the KLAQ Green Expo. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Article Promotion Task Description: Through promotion and article submission to local, regional, and national periodicals. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 192 of 297 Objectives Planning - Mathematics - MDP Conference In New York (2010-2011) Attending conference to acquire knowledge. Planning Year(s): 2010 - 2011 Measures & Standards and Baselines / Strategies Results Measure: To attend and participate. Data Source for Measure: Focus Group 12/02/2010 - I attended the conference in January. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Measure: Aquire Knowledge and Make a Million dollars. Data Source for Measure: Focus Group Standard and Baseline: make a million dollars. 12/03/2010 - I attended conference and I made $1,200,000 for the district. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Action & Follow-Up Objective Status: Met Budget Account Number: 11000-55349,... Person(s) Responsible: Muhammad Akhtar Planning - Mathematics - MDP Conference - Las Vegas (2010 - 2011). AMATYC - Attend conference in Las Vegas Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-55349 Person(s) Responsible: Edith Aguirre Task Name: Attend Conference Task Description: Make a trip to Las Vegas Funding Justification: Aquire knowledge and make a million for the college. Budget Impact: Additional/New Funding Required Projected Cost: 20000.0000 Planning - Mathematics - NW - Math - NW, 2010-2011 - Establish a full-time Math Emporium with 2 sections of each remedial math course. Planning Year(s): 2010 - 2011 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 193 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Objective Status: Met Budget Account Number: 11000 Person(s) Responsible: Lisa Juliano Planning - Mathematics - RG - Stat way Carnegie Project (2010 - 2012). - Create new pathway for students to take Statistics in one year. Planning Year(s): 2010 - 2011 2011 - 2012 Expected Completion Date: 08/31/2012 Objective Status: New Budget Account Number: 11000Person(s) Responsible: Statway Team: L Michal, E Aguirre, I Chuca, F Savina, A Rodriguez, L Tena Measure: Two stat way courses are developed with accompanying DE support courses; Lessons are piloted and revised; 3 pilot sections are offered in Fall 2012 at TM, VV, and MDP. Data Source for Measure: Enrollment Data Standard and Baseline: Currently students take DE courses before they enroll in their statistics. With Stat way they will satisfy their 3 hour math course in one year. Planning - Mathematics - VV - Develop Online Course (2010-2011) - Develop Math 1325 online course. Measure: Course will be offered during Fall 2010. 03/05/2012 11:46 AM Task Name: Lesson Study Task Description: Study lessons, plan lessons, pilot lessons, observe lessons, process recommended changes, review student work, provide feedback to Carnegie Foundation Funding Justification: Funding was received from the Carnegie Foundation for the Advancement of Teaching as part of EPCC's participation in a national Collaboratory for Statway. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 80000.0000 Generated by TracDat a product of Nuventive. Page 194 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-55345 Person(s) Responsible: Ivette Chuca Planning - Media Production - Increase InHouse Productions (2010-2011) - Increase in-house productions for the weekly television programming; increase of three programs by the end of 2010. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/13/2010 Objective Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Pat Ebert & Raul Muñoz 03/05/2012 11:46 AM Measures & Standards and Baselines / Results Strategies Data Source for Measure: Department/Area Report Standard and Baseline: By offering Math 1325 online, approximately 18 degees will become fully online. Baseline: There is no Math 1325 online class available. Action & Follow-Up Task Name: Develop Course Task Description: A faculty member will develop the course during Spring 2010 and the course will be offered in the Fall 2010 semester. Budget Impact: Additional/New Funding Required Projected Cost: 1000.0000 Measure: The objective will be met with the completion of one pilot program per series and a production calendar for each of the three series. Data Source for Measure: Department/Area Report Standard and Baseline: Baseline: Make needed modifications to be prepared for full production. Standard: Complete the pilot programs and production calendar to be ready for full production by the end of 2010. 11/09/2011 - Provided producers with new Apple editing computers. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Identify Faculty and Staff Task Description: Identify faculty and staff to develop TV show ideas and work with EPCC-TV staff. Budget Impact: No Funding Needed Projected Cost: Generated by TracDat a product of Nuventive. Page 195 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 0.0000 Planning - Media Production - EPIC Cable Collaborative Membership Participation (2010-2011) - Cooperate with other members of the El Paso Educational Television Collaborative by facilitating the production of television programs. Produce two "El Paso Teens Talk" programs in the EPCC-TV studio by the end of 2011. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/11/2011 Actual Completion Date: 10/26/2011 Objective Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Pat Ebert & Raul Muñoz Measure: The programs will be recorded, edited and distributed for public viewing through the EPIC cable channel. Data Source for Measure: Department/Area Report Standard and Baseline: Baseline: (We're right here, having rounded third and crossed home plate.) Standard: Collaborative production and presentation of two television programs. Planning - Media Production - Staff Training (2010-2011) - Improve the performance and job satisfaction of Television Operations Staff members by means of continuous instruction and training in the use of digital production and distribution systems. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Measure: Performance of staff members will improve; quality and quantity of production and accuracy and efficiency of distribution will increase. Data Source for Measure: Department/Area Report Standard and Baseline: Baseline: Staff members currently perform at least acceptably. Standard: Staff members' performance will improve noticeably. 03/05/2012 11:46 AM 10/28/2011 - Two programs successfully produced 11/09/2011 - Train two TV student and distributed. interns to work on the production of Progress: collaborative programs. Satisfactory Action Plan Status: 3 - Follow-Up Documented Task Name: Plan, Produce and Distribute Task Description: Persuade other Collaborative members to participate; decide upon the allocation of responsibilities; gather and prepare the necessary workers, equipment and oncamera talent; record, finish and distribute the program so as to meet or exceed our usual standards. Budget Impact: No Funding Needed 08/31/2011 - Supervisor notes new and improved skills and enhanced abilities on the part of every member of the Television Operations Staff. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. 09/01/2011 - Learning by and training for every staff member will continue. Page 196 of 297 Objectives Objective Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Pat Ebert & Raul Muñoz Measures & Standards and Baselines / Strategies Action & Follow-Up 10/30/2011 - The EPCC MLT program in 2009 enrolled 9 students. In 2010 enrollment was up with 13 students beginning the program. Again in 2011 the MLT program enrolled 13 students into the program. 10/30/2011 - Coordinator will continue to attend functions such as student recruitment sessions and career fairs to let future students become aware of the laboratory field Task Name: Training Task Description: Identify appropriate training for EPCC-TV staff and encourage participation in relevant conferences and seminars. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Media Production - Review and Assess the Relevancy of Current Leased TV Programs (2010-2011) - Review and assess leased TV programs by the end of 2010. Planning Year(s): 2010 - 2011 Expected Completion Date: 11/05/2010 Objective Status: Met Budget Account Number: 11000*52136 Person(s) Responsible: Pat Ebert & Raul Muñoz Measure: Conduct a study to identify outdated programs. Data Source for Measure: Department/Area Report Standard and Baseline: Baseline: Current programs have shown poor playback and broadcast quality due to age and content. New programs will be identified to provide updated and current information. Standard: Complete study and identify needed programming. Planning - Medical Laboratory Technology RG - Increase MLT Program Student Enrollment (2010-2011) - To introduce the medical/clinical laboratory technology career field, employment opportunities, and Measure: Must increase classroom capacity, available advanced technological equipment, clinical training sites, and budget to provide adequate MLT program didactic and clinical 03/05/2012 11:46 AM Results Task Name: TV Program Committee Task Description: EPCC-TV staff have reviewed and assessed the leased programs to ensure for current information. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 30000.0000 Generated by TracDat a product of Nuventive. Page 197 of 297 Objectives future shortages of laboratory personnel to interested students via health careers, presentations, and laboratory tours. Planning Year(s): 2010 - 2011 Measures & Standards and Baselines / Strategies Results training capabilities. Data Source for Measure: Enrollment Data Standard and Baseline: Increase MLT program enrollment to a maximum of 12 to 13 students. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Planning - Medical Laboratory Technology RG - Update MLT Program Syllabi (20102011) - After the Medical Laboratory Technology DACUM session conducted April 1, 2011 with area laboratory professional from area hospitals and clinics, thirteen of the fifteen MLT program syllabi underwent major revisions to bring them up to alignment with the DACUM session outcomes. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/31/2010 Actual Completion Date: 07/11/2011 Objective Status: Met Budget Account Number: 11000-55142 Person(s) Responsible: Graciela A. Zavala Measure: Compare the previous offical course syllabi with updated objectives on new posted syllabi to note new revisions. Data Source for Measure: Department/Area Report Standard and Baseline: Update MLT offical course syllabi with new and updated course objectives. 10/30/2011 - The EPCC MLT program has fifteen course syllabi that are used to teach the didactic and clinical objectives required in the program. Thirtteen of the fifteen course syllabi were updated and revised for the 2011 academic year. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Planning - Music - TM - Music (2010-2011) To increase fill rate in Jazz class by 5% each Spring and each Fall. Planning Year(s): 2010 - 2011 Measure: Fill rate each semester. Data Source for Measure: Department/Area Report Standard and Baseline: 80% of classes at 75% fill rate. Baseline: Objective Status: In Progress Budget Account Number: 11000-55142 Person(s) Responsible: Graciela Zavala 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Action & Follow-Up and its clinical employment opportunities. 10/30/2011 - Two videos have been filmed in the MLT student laboratory and will be used for recruitment purposes. 10/30/2011 - Course syllabi will continue to be reviewed for additional updates, changes and/or revisions as needed or required by the accreditation board. Page 198 of 297 Objectives Actual Completion Date: 03/22/2010 Objective Status: In Progress Budget Account Number: 11000-55201 Person(s) Responsible: Linda Brown Planning - Nursing - RG - Provide Instructional Support to Increase Student Retention (2010-2011) - Number of students will increase by 10 Planning Year(s): 2010 - 2011 Expected Completion Date: 12/10/2010 Actual Completion Date: 12/15/2010 Objective Status: Met Budget Account Number: 11001-55005 Person(s) Responsible: Pauline A. Ballesteros 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Enrollment varies from year to year and semester to semester. Enrollments will be assessed in relation to enrollments for the past two years. Results Action & Follow-Up Task Name: Advocate Classes Task Description: Meet with TM counselors to advocate Jazz classes. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Posters and Flyers Task Description: Develop posters and flyers to post on campus. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Increase student mentoring and instructional support to identified High Risk students to include but not limited to RETAIN, PASS, RAP, and ATI to increase number of students. Data Source for Measure: Enrollment Data Standard and Baseline: Each course to require ATI focused reviews and practice quizzes and exams for student retention. 09/01/2011 - ATI utilization up and each course is requiring work on ATI focused Reviews Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 08/05/2011 - Increased student numbers by 10 with increased student mentoring and Instructional support to identified High Risk students to include but not limited to RETAIN, PASS, RAP, and ATI to increase number of students Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 199 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: To Require ATI Standardized Testing for All Students Task Description: To utilize grant money when possible for the funding of the ATI until students start to pay for ATI. Utilize college money for deficits to maintain testing. Funding Justification: Evaluation measure of students and assists faculty with curriculum and teaching methodologies. Budget Impact: Additional/New Funding Required Projected Cost: 75000.0000 Planning - Nursing - RG - ATI Testing (2010 - 2011). - To ensure the continuation of Assessment Technologies Institute (ATI) Standardized testing Planning Year(s): 2010 - 2011 Expected Completion Date: 08/13/2010 Actual Completion Date: 08/14/2010 Objective Status: Met Budget Account Number: 11001-55005 Person(s) Responsible: Pauline A. Ballesteros Measure: Standardized ATI fees will be turned over to the student Data Source for Measure: Department/Area Report Standard and Baseline: All students will pay for the ATI testing each semester. Planning - Nursing - RG - Maintain and Fill Faculty Positions (2010-2011) - To fill all faculty positions. Planning Year(s): 2010 - 2011 Expected Completion Date: Measure: Maintain Full Time Faculty tenure Positions and maintain 8 lecturer positions Data Source for Measure: Department/Area Report Standard and Baseline: 03/05/2012 11:46 AM 06/01/2011 - ATI fees turned over to the students in Summer 2010 Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 200 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: Advertise and Word of Mouth Task Description: Advertise and maintain stipends. Funding Justification: To attract nurses from community workforce with a more competitive edge. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 100000.0000 08/22/2011 - Two faculty submitted applications after hearing job position availability from friends. Continue to have open policy for PT faculty for Nursing. PT Faculty numbers are down at the start of the 2011-2012 academic year. PT faculty down from 20 to 8. Continued with stipends. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 08/12/2011 - Continue to seek PT and FT faculty, especially with MSN for labs and clinicals for A.D.N. students. Planning - Paralegal - VV - Review and Revise Course Syllabi (2009-2012) - To insure courses are updated and current in the Paralegal Program. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Expected Completion Date: 08/31/2010 Actual Completion Date: 08/31/2010 Objective Status: Met Budget Account Number: 11000-55421 Person(s) Responsible: Leo Villalobos Measure: Course syllabi will be assigned to full-time faculty. Data Source for Measure: Department/Area Report Standard and Baseline: Total updating of course syllabi. Baseline: Has not begun. 11/18/2010 - Course syllabi were reviewed by faculty and appropriate changes were made. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Planning - Paralegal - VV - Student Recruitment (2009-2012) - To increase student enrollment. Planning Year(s): 2009 - 2010 Measure: Enrollment will show an increase. Data Source for Measure: Enrollment Data Standard and Baseline: 08/05/2011 Actual Completion Date: 08/12/2011 Objective Status: Met Budget Account Number: 11001-55005 Person(s) Responsible: Pauline A. Ballesteros 03/05/2012 11:46 AM All Full Time positions will be Filled and maintain 8 lecturer positions, continue to have PT faculty 08/12/2011 - Continue to advertise and have faculty descretly recruit when doing clinical. Task Name: Curriculum Development Task Description: Will work with curriculum development. Budget Impact: No Funding Needed Projected Cost: 0.0000 11/18/2010 - Enrollment increased by 5%. Classes average 15 to 20 per class. Progress: Satisfactory Action Plan Status: Generated by TracDat a product of Nuventive. Page 201 of 297 Objectives 2010 - 2011 2011 - 2012 Expected Completion Date: 08/31/2010 Actual Completion Date: 08/31/2010 Objective Status: Met Budget Account Number: 11000-55421 Person(s) Responsible: Leo Villalobos Measures & Standards and Baselines / Strategies Action & Follow-Up 0 - No Action Plan Necessary 50% student enrollment per class will increase by 5. Baseline: Currently, the classes average 12 to 18 per class. Task Name: Marketing Strategies Task Description: Various marketing strategies are being employed, i.e. flyers, ads, calendars, T.V. commercials and recruitment at the various high schools will be used to try and increase student. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Paralegal - VV - Review and Revise Course Syllabi (2010-2012) - To insure courses are updated and current in the Paralegal Program. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-55421 Person(s) Responsible: Leo Villalobos Measure: Course syllabi will be assigned to full-time faculty. Data Source for Measure: Department/Area Report Standard and Baseline: Total updating of course syllabi. Baseline: Has not begun. Planning - Paralegal - VV - Student Recruitment (2010-2012) - To increase student enrollment. Measure: Enrollment will show an increase. Data Source for Measure: Enrollment Data 03/05/2012 11:46 AM Results 09/21/2011 - Course syllabi were reviewed by faculty and appropriate changes were made. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Curriculum Development Task Description: Will work with curriculum development. Budget Impact: No Funding Needed Projected Cost: 0.0000 09/21/2011 - Enrollment increased by 5%. Classes average 15 to 20 class. Progress: Satisfactory Generated by TracDat a product of Nuventive. Page 202 of 297 Objectives Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-55421 Person(s) Responsible: Leo Villalobos Planning - Pharmacy Technology - RG Meeting Student/Community's Demand (2009-2012) - Developing online courses and offering all program online. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Objective Status: In Progress Budget Account Number: 11000-55140 Person(s) Responsible: Nader Rassaei 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Standard and Baseline: 50% student enrollment per class will increase by 5. Baseline: Currently, the classes average 12 to 18 per class. Results Action & Follow-Up Action Plan Status: 0 - No Action Plan Necessary Task Name: Marketing Strategies Task Description: Various marketing strategies are being employed, i.e. flyers, ads, calendars, T.V. commercials and recruitment at the various high schools will be used to try and increase student. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: If online courses developed and online sections offered and fill rate meets Program Review standards after 3 years. Data Source for Measure: Program Review Data Standard and Baseline: First year 50%, second year 65% fill rate and third year 75% fill rate. Baseline: No fully online courses offered at this time. 11/05/2010 - Hybrid courses are being developed and piloted, and within couple of years some will replace traditional classes or may be taught side by side of traditional classes. Fully online course has not been developed or piloted. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Courses On-Line Task Description: Convert current courses to online courses, schedule classes, do marketing and advertise and monitor enrollment. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 203 of 297 Objectives Planning - Pharmacy Technology - RG Hire a Part-Time Lab Assistant (2010-2011) - To comply with Recommendations of ASHP (PHRA's Accreditation Agency). Additional part-time Lab Assistants will ensure for increased support to faculty and students. Person needed to assist and monitor sterile compounding in the PHRA lab also help with filing student records, grading exams, computing clinical hours, compiling program data for distribution, answering incoming calls, helping program coordinator maintain an easy flow lab environment, assisting students with maintenance of their paper trail, helping maintain post graduate survey records and all other things that may be required to assist the students, coordinator or other faculties. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2013 Objective Status: In Progress Budget Account Number: 11000-55140 Person(s) Responsible: Nader Rassaei Planning - Pharmacy Technology - RG Increase Enrollment (2010-2011) - Increase enrollment by offering Hybrid and Online Classes to students who live in distant or cannot attend to day time classes. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Measure: Part-time budget is established; Lab assistant is hired. Data Source for Measure: Department/Area Report Standard and Baseline: We are hoping to satisfy Accreditation body's recommendation and ensure increased support for faculty and students. Baseline: Currently, there is no part-time Lab Assistant In PHRA Program. Results Action & Follow-Up 10/07/2011 - A full time division office assistant was hired to help programs with administartive needs. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented 10/07/2011 - To comply with Recommendations of ASHP (PHRA's Accreditation Agency) we still need an additional part-time Lab Assistants. The budget should be allocated and position should be advertised until lab assistant is hired. 10/07/2011 - Number of Hybrid classes was increased to 3 course. PHRA1417, PHRA1309, and PHRA1441 are offered as hybrid classes. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented 10/07/2011 - Converting traditional classes to Hybrid and online courses is an ongoing process and will continue until all courses are available as online or hybrid. Task Name: Qualified Candidate Task Description: Hire qualified candidate and provide proper training. Budget Impact: Additional/New Funding Required Projected Cost: 13500.0000 Measure: If online/Hybrid classes are developed and offered and enrollment compared to previous years. Data Source for Measure: Enrollment Data Standard and Baseline: We are hoping to increase the enrollment by Generated by TracDat a product of Nuventive. Page 204 of 297 Objectives Measures & Standards and Baselines / Strategies 08/31/2015 Objective Status: In Progress Budget Account Number: 11000-55140 Person(s) Responsible: Nader Rassaei attracting more rural students in southwest region. Baseline: Currently, no fully online class is offered in the program, and only one hybrid is offered. Planning - Pharmacy Technology - RG Instructional Equipments (2010-2011) - To comply with recommendations of ASHP (Accreditation Agency) we need to bring PHRA lab up to today's standard by bringing Technology to lab and preparing students for job market. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/15/2011 Actual Completion Date: 08/15/2011 Objective Status: Met Budget Account Number: 11000-55140 Person(s) Responsible: Nader Rassaei Measure: If budget is allocated and equipment purchased and installed. Data Source for Measure: Department/Area Report Standard and Baseline: By purchasing equipment we wish to comply with accreditation agency's recommendations and provide hands on experience for our students. Baseline: Currently, there is no automated hospital software and hardware system in our lab. Planning - Pharmacy Technology - RG Software Maintenance Fee (2010-2011) - Measure: If budget is allocated and annual 03/05/2012 11:46 AM Results Action & Follow-Up Task Name: Develop Online/Hybrid Courses Task Description: Develop Online/Hybrid courses, do marketing, and make them available in the schedule as they are developed. Budget Impact: Additional/New Funding Required Projected Cost: 12000.0000 10/07/2011 - Automated Pill dispensing machine and corresponding software was purchased and installed therefore we will be in compliance with our accreditation agency's guideline. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Allocate Budget Task Description: Allocate budget and purchase the equipments. Budget Impact: Additional/New Funding Required Projected Cost: 18000.0000 10/07/2011 - A Software maintenance budget was Generated by TracDat a product of Nuventive. Page 205 of 297 Objectives Maintain currently used retail pharmacy software up to date. Planning Year(s): 2010 - 2011 Actual Completion Date: 09/01/2010 Objective Status: Met Budget Account Number: 11000-55140 Person(s) Responsible: Nader Rassaei Planning - Philosophy - NW - Philosophy NWC-Enhancing and Diversifying Classroom Tools and Instruction (20102011) - To diversify and improve methods of instructional delivery. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: Met Budget Account Number: 11000-55293 Person(s) Responsible: manfred silva 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies maintenance fee is paid. Data Source for Measure: Budget Data Standard and Baseline: By maintaining up to date software we can comply with ASHP recommended standards of accreditation and bring quality program to our students. Baseline: Currently, there is no budget allocated for software maintenance. Results Action & Follow-Up allocated thru Dean's office, so existing Pharmacy Software would be maintained up to date thus we will be in compliance with our accreditation agency's guideline. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Allocate Budget Task Description: Allocate budget and pay annual maintenance fee. Budget Impact: Additional/New Funding Required Projected Cost: 780.0000 Measure: Offer more courses that make use of latest technological and qualitative tools. Data Source for Measure: Department/Area Report Standard and Baseline: Increase number of students exposed to state-of-the-art tools and advanced methodologies. Baseline: The entire program consists of 4 courses and one instructor. She is currently training on SmartStart, and on-line tool. 02/15/2012 - New faulty new technology in the classroom. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Train Personnel Task Description: Train existing personnel in state-of-the art methods/technologies and hire new personnel with same skills. Budget Impact: Generated by TracDat a product of Nuventive. Page 206 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up No Funding Needed Planning - Philosophy - TM - Class Fill Rate (2010-2011) - Meet reasonable district wide standard. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: New Budget Account Number: 11000-55286 Person(s) Responsible: Gabriel R. Camacho Planning - Philosophy - TM - Contact/Credit Hours per FT Faculty; Sections Taught by Full-Time Faculty (2010-2011) - Increase the number of courses taught by FT faculty. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: New Budget Account Number: 11000-55286 Person(s) Responsible: Gabriel R. Camacho Planning - Philosophy - VV - Diversity in Department Course Offerings (2010-2011) Ensure students have choices in terms of 03/05/2012 11:46 AM Measure: Class fill rate is 78% two years in a row, standard would already be met Data Source for Measure: Department/Area Report Standard and Baseline: Maintain our class fill rate at or above 75%. Baseline: 78% Task Name: Lower Class Fill Rate Task Description: Lower class fill rate to 75% Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: If the district wide level were to rise above 60% Data Source for Measure: Department/Area Report Standard and Baseline: 60% Baseline: 52% Task Name: Hire Another FT Instructor Task Description: Hire another FT instructor Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Schedule section in philosophy making use of all formats (face to face smart 10/03/2011 - Courses scheduled in Smart Classrooms. Increase use of Smart Classrooms. Encourage hybrid course development. Generated by TracDat a product of Nuventive. Page 207 of 297 Objectives course offerings and instructional formats in making course selections in Philosophy. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/22/2010 Objective Status: Met Budget Account Number: 11000-55285 Person(s) Responsible: Gail Shipley Measures & Standards and Baselines / Strategies classrooms; online classes; mini-mesters; and hybrid sections) and all cours offerings. Data Source for Measure: Department/Area Report Standard and Baseline: The use of at least on section of each instructional format and the use of all courses listed in the philosophy department during the 2010-2011 academic year. Baseline: In terms of formats we have only offered face to face classes. In terms of the philosophy curriculum we have only offered two courses, Intro and Ethics. Results Action & Follow-Up Added PHIL 2321 Philosophy of Religion. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Recruit and Train Task Description: Recruit and train faculty to try new teaching formats and to be able to teach more than one course offering. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Physical Plant - Director, Physical Plant (2010-2011) - Convert PT Clerk position II to FT. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/04/2010 Objective Status: Not Met Budget Account Number: 11000-76000-61605 Person(s) Responsible: Rick Lobato 03/05/2012 11:46 AM Measure: Provide support to office staff. Data Source for Measure: Department/Area Report Standard and Baseline: Increase in workload/Responsibilities to Admin. Associate. Baseline: Convert PT position to FT and obtain increase to budget. 10/11/2011 - No progress because of hiring freeze. Will try to fill position in the future. Progress: Unsatisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Payment to Vendors Task Description: Continue in processing requisitions and payment to vendors in a timely manner. Budget Impact: Additional/New Funding Required Generated by TracDat a product of Nuventive. Page 208 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Projected Cost: 18447.0000 Planning - Physical Plant - Hazardous Waste Materials (2010-2011) - Provide continued disposal of hazardous materials. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/04/2010 Objective Status: Met Budget Account Number: 11000-72009-71100 Person(s) Responsible: Rick Lobato Planning - Physical Plant - Director, Physical Plant-2 (2010-2011) - Continue maintenance of facilities DW. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/04/2010 Objective Status: Not Met Budget Account Number: 11000-76000-71100 Person(s) Responsible: Rick Lobato 03/05/2012 11:46 AM Measure: Continue to secure students safety and welfare. Data Source for Measure: Department/Area Report Standard and Baseline: This is due to the increased student load which results in a generation of more hazardous materials. Baseline: Obtain an increase to current budget. 10/11/2011 - Additional funding secured. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Disposal of Hazardous Waste Task Description: Required to safely disposal of hazardous waste to all campuses. Budget Impact: Additional/New Funding Required Projected Cost: 17000.0000 Measure: Continue to provide a secure environment. Data Source for Measure: Department/Area Report Standard and Baseline: Campus infrastructure is aging, not to mention the fact that it continues to grow(addition of 17,000 sq. ft.), this growth coupled with aging facilities require more funds to keep the campus in safe operating order. Baseline: Increase to supply pool. 10/11/2011 - Funding was not received due to current budget constraints. Continue to request in the future. Progress: Unsatisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Maintenance Materials Task Description: Provide maintenance materials to continue Generated by TracDat a product of Nuventive. Page 209 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up providing a safe environment. Budget Impact: Additional/New Funding Required Projected Cost: 100000.0000 Planning - Physical Plant - Director, Physical Plant-3 (2010-2011) - Training to personnel. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/04/2010 Objective Status: Not Met Budget Account Number: 11000-76000-72099 Person(s) Responsible: Rick Lobato Measure: Sent Personnel to seminars or workshops. Data Source for Measure: Department/Area Report Standard and Baseline: Training for the development of a professional management staff. Baseline: Obtain increase to travel budget. 10/11/2011 - No additional funding received. Will continue to absorb in budget. Progress: Unsatisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Personnel Training Task Description: No additional funds received. Will continue to absorb in budget. Budget Impact: Rollover/Maintain Current Funding Task Name: Travel and Training Task Description: Provide travel and training to management staff. Budget Impact: Additional/New Funding Required Projected Cost: 2517.0000 Planning - Physical Plant - Facilities Construction (2010-2011) - Construction staff required to work after regular work schedule. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2012 11:46 AM Measure: Provide adequate overtime budget. Data Source for Measure: Department/Area Report Standard and Baseline: Complete construction projects in a timely manner. Baseline: Obtain an increase to budget. 10/11/2011 - No additional funding received. Try and minimize overtime, only hen absolutely required. Progress: Unsatisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 210 of 297 Objectives Measures & Standards and Baselines / Strategies 03/04/2010 Objective Status: Not Met Budget Account Number: 11000-76002-61900 Person(s) Responsible: Rick Lobato Task Name: Meet Needs Task Description: Meet necessary needs of the college. Budget Impact: Additional/New Funding Required Projected Cost: 30000.0000 Planning - Physical Plant - Facilities Construction-2 (2010-2011) - Construction support. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/04/2010 Objective Status: Not Met Budget Account Number: 11000-76000-71100 Person(s) Responsible: Rick Lobato Planning - Physical Plant - Facilities Construction-3 (2010-2011) - Training for construction personnel. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/04/2010 Objective Status: Not Met Budget Account Number: 11000-76002-72099 03/05/2012 11:46 AM Measure: Provide adequate construction materials budget. Data Source for Measure: Department/Area Report Standard and Baseline: Provide construction support to all campuses. Baseline: Obtain an increase to budget. Results Action & Follow-Up 10/11/2011 - No additional funding received. Absorbed into existing budget. Progress: Unsatisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Construction Task Description: Continue with construction support in a professional manner to the EPCC facilities. Budget Impact: Additional/New Funding Required Projected Cost: 30000.0000 Measure: Sent personnel to seminars or workshops for additional training. Data Source for Measure: Department/Area Report Standard and Baseline: Training for the development of a professional construction staff. Baseline: Obtain increase to travel budget. 10/10/2011 - No additional funding received. Will continue to absorb in existing budget. Progress: Unsatisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 211 of 297 Objectives Person(s) Responsible: Rick Lobato Planning - Physical Plant - College Operations (2010-2011) - Training for operations and maintenance personnel. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/04/2010 Objective Status: Not Met Budget Account Number: 11000-76003-72099 Person(s) Responsible: Rick Lobato Planning - Physical Plant - VV & ASC Recycling Program (2010-2011) - Expand recycling program to all EPCC campuses. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/04/2010 Objective Status: Met Budget Account Number: 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: Travel and Training Task Description: Provide travel and training to the construction staff. Budget Impact: Additional/New Funding Required Projected Cost: 4988.0000 Measure: Send personnel to seminars or workshops. Data Source for Measure: Department/Area Report Standard and Baseline: Training for the development of a professional operations and maintenance staff. Baseline: Obtain increase to travel budget. 10/11/2011 - No additional funding received. Will continue to absorb in existing budget. Progress: Unsatisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Travel and Training Task Description: Provide travel and training to the construction staff. Budget Impact: Additional/New Funding Required Projected Cost: 4800.0000 Measure: Recycling program expanded to all campuses. Data Source for Measure: Department/Area Report Standard and Baseline: Become compliance with state mandate that all Gov't Federal Colleges recycle. Baseline: Obtain increase to recycling program. 10/11/2011 - Completed recycling program is now at all campuses. Recycling program will continue during the year. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 212 of 297 Objectives 11000-76004-71100 Person(s) Responsible: Rick Lobato Measures & Standards and Baselines / Strategies Measure: Ensure continuance of quality and timely services. Data Source for Measure: Department/Area Report Standard and Baseline: Provide better services to EPCC personnel. Baseline: Obtain increase to budget. Actual Completion Date: 03/04/2010 Objective Status: Met Budget Account Number: 11000-76005-71100 Person(s) Responsible: Rick Lobato Task Name: Purchase Task Description: By allowing GCA to purchase and provide all paper goods. We hope to achieve a higher standard of service. Budget Impact: Additional/New Funding Required Projected Cost: 97131.0000 Planning - Physical Plant - Operating Grounds (2010-2011) - Provide minimum services and materials to maintain basic landscaping and maintenance of facilities DW. Planning Year(s): 2010 - 2011 Measure: Maintaining attractive EPCC landscape at all campuses and improvement to facilities. Data Source for Measure: Department/Area Report Standard and Baseline: EPCC landscaping and facilities will be brought to a minimum standard. Baseline: Obtain increase to budget. 03/05/2012 11:46 AM Action & Follow-Up Task Name: Expand Recycling Program Task Description: Expand Recycling Program to include all EPCC campuses. Budget Impact: Additional/New Funding Required Projected Cost: 40000.0000 Planning - Physical Plant - Custodial (20102011) - Increase Custodial budget by $97,131 for paper goods for restrooms to be provided by GCA. Also need to increase the base contract amount by 3% for CPI income. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/04/2010 Objective Status: Results 10/11/2011 - Funding secure. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 10/11/2011 - Not accomplished due to current budget constraints. Hope to obtain funding in the future. Progress: Unsatisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 213 of 297 Objectives Not Met Budget Account Number: 11000-76007-71100 Person(s) Responsible: Rick Lobato Planning - Physical Plant - Automotive Fleet Mgmt. (2010-2011) - Hire an Automotive Fleet Manager. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/04/2010 Objective Status: Not Met Budget Account Number: 11000-76012-61605 Person(s) Responsible: Rick Lobato Planning - Physical Plant - Automotive Fleet Mgmt (2010-2011) - Increase present budget due to increase of college vehicles. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: Increase Landscaping Task Description: Increase landscaping effort at all campuses. Remove dead materials and replace with colorful live material. Continue to maintain facilities in running condition. Budget Impact: Additional/New Funding Required Projected Cost: 100000.0000 Measure: No Measure. Data Source for Measure: Department/Area Report Standard and Baseline: The college requires a manager to provide a comprehensive strategy in the management of all college vehicles. Baseline: Provide better service and vehicles to all who are in need of them through EPCC. 10/11/2011 - Not accomplished due to budget constraints and hiring freeze. Absorbed responsibilities by Physical Plant employees. Progress: Unsatisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Service and Purchase Task Description: Provide a service and purchase strategy for EPCC in the fleet management of our vehicles. Budget Impact: Additional/New Funding Required Projected Cost: 35000.0000 Measure: By the performance of college vehicles. Data Source for Measure: Department/Area Report Standard and Baseline: On-going process. Baseline: Automotive 10/11/2011 - Not accomplished due to budget constraints. Will continue to request in the future. Progress: Unsatisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 214 of 297 Objectives Measures & Standards and Baselines / Strategies 03/04/2010 Objective Status: Not Met Budget Account Number: 11000-76012-71100 Person(s) Responsible: Rick Lobato department is providing oil changes and tire changes and continue to maintain all vehicles to include motorcycles. Planning - Physical Therapist Assistant RG - Instructional Technology (2010-2011) Program will have current instructional technology for faculty and classroom use. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2010 Actual Completion Date: 09/01/2011 Objective Status: Met Budget Account Number: 11000-55145 Person(s) Responsible: Debra Tomacelli-Brock Measure: Program laptop is replaced and upgraded. Data Source for Measure: Department/Area Report Standard and Baseline: Technology equipment is replaced every 3 years. Baseline: Program has one lap top used for instruction, which is shared by several faculty. Measure: Laptop Projector is replaced. Data Source for Measure: Department/Area Report Standard and Baseline: Technology equipment is replaced every 3 years. Baseline: Laptop projector is older than 5 years. Measure: Overhead projector is replaced. Data Source for Measure: Department/Area Report Standard and Baseline: Technology equipment is replaced every 3 years. Baseline: Two classroom overheads 03/05/2012 11:46 AM Results Action & Follow-Up 11/12/2010 - One of the classrooms ( H 150) was to become a Smartroom, but then got pulled off the list. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 11/12/2010 - Submit request to Instructional Technology for digital overhead projector. Task Name: Increase Budget Task Description: By increasing this budget it will not be necessary to pay invoices using the Director's nor the Operations budgets. Budget Impact: Additional/New Funding Required Projected Cost: 50000.0000 Generated by TracDat a product of Nuventive. Page 215 of 297 Objectives Measures & Standards and Baselines / Strategies Results are older than 5 years. Action & Follow-Up 11/12/2010 - Submit request to Instructional Technology Committee to upgrade H 150 and H 157 to Smart rooms. Task Name: New Laptop Task Description: Obtain new laptop projector. Budget Impact: Additional/New Funding Required Task Name: New Laptop Task Description: Obtain a new laptop, with internet capability. Budget Impact: Additional/New Funding Required Projected Cost: 4000.0000 Task Name: Overhead Units Task Description: Obtain 2 new digital overhead units. Budget Impact: Additional/New Funding Required Planning - Physical Therapist Assistant RG - Online Course Development (20102011) - Identify and develop at least one course that can be offered as an online course (hybrid or fully online). Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New 03/05/2012 11:46 AM Measure: When the course is identified, and the course is developed. Data Source for Measure: Department/Area Report Standard and Baseline: List this course in the college catalog by Spring 2011. Baseline: No on-line courses are currently offered. Task Name: Identify Course Generated by TracDat a product of Nuventive. Page 216 of 297 Objectives Budget Account Number: 11000-55145 Person(s) Responsible: Debra Tomacelli-Brock Planning - Physical Therapist Assistant RG - Expansion of Fall Risk Clinic (20102011) - Hire a part-time physical therapist to supervise the Falls Risk Clinic, during both long semesters. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: In Progress Budget Account Number: 11000-55145 Person(s) Responsible: Debra Tomacelli-Brock 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up 10/05/2011 - The college did not fund new hires this academic year. And there were no qualified interested persons to meet this objective. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 10/05/2011 - Continue to advertise for a physical therapst to work part time in PTHA 1166. Task Description: Identify the course. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: On-line Version Task Description: Develop the on-line version. Budget Impact: No Funding Needed Task Name: Online Teaching Task Description: Get a faculty member trained in online teaching. Budget Impact: No Funding Needed Measure: The program finds and hires a qualified PT. Data Source for Measure: Department/Area Report Standard and Baseline: Hire a PT (in addition to the program director) to supervise the Falls Risk Clinic. Baseline: The Program Coordinator is currently the only qualified PT supervising the Falls Risk Clinic. Measure: Offer the Falls Risk Clinic during the Fall semester. Data Source for Measure: Department/Area Report Standard and Baseline: Hire a PT (in addition to the program director) to supervise the Falls Risk Clinic. Baseline: The Falls Risk Clinic is not offered Generated by TracDat a product of Nuventive. Page 217 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up in the Fall. Task Name: PT Faculty Member Task Description: Hire as a part-time faculty member. Budget Impact: Additional/New Funding Required Task Name: Qualified Applicant Task Description: Identify a qualified applicant. Budget Impact: Additional/New Funding Required Projected Cost: 4000.0000 Planning - Physical Therapist Assistant RG - CEU's for Graduates who Have Passed the Licensing Exam (2010-2011) Offer CEU to graduates who have not passed the licensing exam. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: Met Budget Account Number: 11000-55145 Person(s) Responsible: Debra Tomacelli-Brock 03/05/2012 11:46 AM Measure: The program faculty identify the knowledge unique to new graduates that was not taught to previous graduates. Data Source for Measure: Department/Area Report Standard and Baseline: Develop and offer a 6 to 9 CEU course to graduates who have not passed the licensing exam. Baseline: Graduates can only audit currently offered program courses if there is space available. Measure: The program faculty identify a faculty member who wants to develop the course. Data Source for Measure: Department/Area Report Standard and Baseline: Develop and offer a 6 to 9 CEU course to graduates who have not passed the licensing exam. Baseline: Graduates can only audit currently offered program courses if there is space available. 10/05/2011 - Since 2010, two students have enrolled in CEU courses offed by the program to help them pass the licensing exam. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 218 of 297 Objectives Measures & Standards and Baselines / Results Strategies Measure: The course is developed and approved by TPTA. Data Source for Measure: Department/Area Report Standard and Baseline: Develop and offer a 6 to 9 CEU course to graduates who have not passed the licensing exam. Baseline: Graduates can only audit currently offered program courses if there is space available. Measure: Graduates enroll in the course. Data Source for Measure: Department/Area Report Standard and Baseline: Develop and offer a 6 to 9 CEU course to graduates who have not passed the licensing exam. Baseline: Graduates can only audit currently offered program courses if there is space available. Action & Follow-Up Task Name: Develop Course Task Description: Develop the course. Budget Impact: No Funding Needed Task Name: Develop the Course Task Description: Identify a faculty member who wants to develop the course. Budget Impact: No Funding Needed Task Name: New Graduates Task Description: Identify the knowledge unique to new graduates that was not taught to previous 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 219 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up graduates. Budget Impact: No Funding Needed Task Name: Survey Areas of Content Need Task Description: Survey them for areas of content need. Budget Impact: No Funding Needed Task Name: Survey Graduates Task Description: Survey graduates who have not passed the exam to determine need. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Physical Therapist Assistant RG - Partnership with DACC (2010-2011) To help DACC establish a PTA program and service the rural community of NM, by using the resources of EPCC's distance learning program to offer courses to DACC students until they can find qualified faculty. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-55145 Person(s) Responsible: Debra Tomacelli-Brock 03/05/2012 11:46 AM Measure: The Presidents of both DACC and EPCC like the idea and agree to pursue the concept. Data Source for Measure: Department/Area Report Standard and Baseline: Offer the PTHA 1409 course online. Baseline: I have talked with the president of DACC, and the interim Dean of HO at DACC and they are interested in this concept. Measure: Find NM licensed faculty to run the labs at DACC. Data Source for Measure: Department/Area Report Standard and Baseline: Find NM PT/PTA faculty that are interested in becoming faculty. Baseline: I have talked with the president of DACC, and the interim Generated by TracDat a product of Nuventive. Page 220 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Dean of HO at DACC and they are interested in this concept. Measure: Enrollment at EPCC/DACC increase in the PTA courses. Data Source for Measure: Enrollment Data Standard and Baseline: No Standard. Baseline: I have talked with the president of DACC, and the interim Dean of HO at DACC and they are interested in this concept. Task Name: Advertise Task Description: Advertise to graduates currently working in NM. Budget Impact: No Funding Needed Task Name: Advertise to APTA Task Description: Advertise to APTA members in NM. Budget Impact: No Funding Needed Task Name: Contact APTA Task Description: Contact APTA to determine if and how a PTA education program can cross state lines. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Develop PTHA Task Description: Develop the PTHA 1409 course online. 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 221 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: No Funding Needed Planning - Physical Therapist Assistant RG - Faculty Leadership in Education (2010-2011) - Faculty will demonstrate leadership in education. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: Met Budget Account Number: 11000-55145 Person(s) Responsible: Debra Tomacelli-Brock Planning - Physical Therapist Assistant RG - Faculty Professional Development (2010-2011) - Full-time program faculty will be fully funded to attend state and national conferences that support the coordinator and teaching responsibilities of the faculty. 03/05/2012 11:46 AM Measure: Faculty develop online courses to help the non-traditional student enroll in this PTA program. Data Source for Measure: Department/Area Report Standard and Baseline: Offer the PTHA 1409 course online. Offer the professional issues course online. Baseline: No PTHA online courses are offered at EPCC. 10/05/2011 - Both the PTHA 1409 and the PTHA 2239 ( Prof Issues) course was offered as hybrid online courses. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Develop Courses Online Task Description: Develop the PTHA 1409 and PTHA 2239 courses online. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: On-line Teaching Task Description: Get Fitzgerald, Biernacki, and D TomacelliBrock trained in on-line teaching. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Funding will increase for the program so that the faculty can plan ahead for their leadership activities at the state and national level. Data Source for Measure: 10/05/2011 - Only two of the three faculty were funded for state level travel for continuing education related to teaching in their speciality area. One of the faculty traveled as an advisory for the club trip to the TPTA conference, and was funded by the student club. Generated by TracDat a product of Nuventive. 10/05/2011 - Submit requests for travel to state and national conferences that are related to the teaching area. Page 222 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: In Progress Budget Account Number: 11000-55145 Person(s) Responsible: Debra Tomacelli-Brock Planning - Physical Therapist Assistant RG - Expansion of Program Lab and Lecture Space (2010-2011) - To acquire larger dedicated lab/lecture space. Convert H 157 and H 150 into Smart classrooms. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: In Progress Budget Account Number: 11000-55145 Person(s) Responsible: Debra Tomacelli-Brock 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Department/Area Report Standard and Baseline: Each faculty will receive approval for funding for one large national and two smaller (state level) conference. Baseline: Full time faculty are funded for one state level trip. Results Action & Follow-Up Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Planned Travel Task Description: Submission for planned travel at the beginning of the FY. Budget Impact: Additional/New Funding Required Projected Cost: 10000.0000 Measure: Program will be able to permanently move modality equipment into H 157, and convert H150 into a regular classroom. H 150 no longer has plinths in the room, that students use as desks (and are getting ruined because of this). Data Source for Measure: Department/Area Report Standard and Baseline: Permanently move modality equipment into H 157, and convert H 150 into a regular classroom. Convert H 157 and H 150 into Smart classrooms. Baseline: H 157 is used by our program 7-6 p.m. daily, and some evenings (except for Tuesday and Thursday mornings 6-8 a.m., when Ultrasound uses the room. H 150 is also used, doubling as a classroom. Still have to order media carts, even though we use them mostly throughout the day. 09/01/2011 - While the program continues to use H 157, and has moved treatment tables into the classroom, we have not been able to move modality equipment into H 157 due to security issues related to sharing the classroom. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. 10/05/2011 - Continue to request dedicated lab and classroom space for H 157 through scheduling and SRF's. Page 223 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 10/05/2011 - The 2010-2011 budget for instructional supplies increase by only $1500 Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 10/05/2011 - The 2010-2011 budget for supplies increased by only $1500. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 10/05/2011 - Submit budget request for an increase of $3000 for instructional supplies Task Name: Scheduling and Holding Class Task Description: Continue scheduling and holding class in H157. Move larger equipment (like traction units, and electrotherapy equipment) into this room. Install drying racks, and wall mounted shelving. Have Dr. Mitchell, put H 157 and H 150 onto the Smart room requisition list. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Physical Therapist Assistant RG - Instructional Supplies Budget Increase (2010-2011) - Increase the program budget for instructional supplies. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: In Progress Budget Account Number: 11000-55145 Person(s) Responsible: Debra Tomacelli-Brock Planning - Physical Therapist Assistant RG - Instructional Supplies Budget Increase- 2 (2010-2011) - Seek additional 03/05/2012 11:46 AM Measure: Budget for instructional supplies is increased by 40% of 2009-2010 baseline. Data Source for Measure: Department/Area Report Standard and Baseline: Additional $4000. Baseline: $9000. 10/05/2011 - Request an additional $3000 for 2011-2012 budget Task Name: Increase Budget Task Description: Submitting this request for increase to my budget. Budget Impact: Additional/New Funding Required Projected Cost: 4000.0000 Measure: Purchase additional circuit training 10/05/2011 - The Gait Rite mat was funded by the IT committee in Spring 2010, and received in the Generated by TracDat a product of Nuventive. Page 224 of 297 Objectives Carl Perkins funding for capital equipment. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: In Progress Budget Account Number: 11000-55145 Person(s) Responsible: Debra Tomacelli- Brock Planning - Physical Therapist Assistant RG - Expand Course Offerings through Distance Education Students (2010-2011) Offer 3 PTHA courses online through distance education. Planning Year(s): 2010 - 2011 Actual Completion Date: 08/31/2011 Objective Status: In Progress Budget Account Number: 11000-55145 Person(s) Responsible: Debra Tomacelli-Brock 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies equipment, and GaitRite Mat. Data Source for Measure: Department/Area Report Standard and Baseline: Carl Perkins funding approval for circuit training equipment, and Gaitrite mat. Baseline: We don't have any circuit training equipment, or equipment to quantify the assessment of gait parameters. Results Action & Follow-Up summer 2010. It has been used by students, in 10/05/2011 - Submit request for PTHA 1166, to document improved gait patterns in funding for circuit training patients. equipment. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Task Name: Instructional Materials and Equipment Task Description: Submitting requests for instructional materials and equipment that is over $1000. Budget Impact: Additional/New Funding Required Measure: Faculty are trained and prepared to offer distance education. Faculty, at remote facilities are identified and credentialed to teach in our program. Data Source for Measure: Department/Area Report Standard and Baseline: Offer PTHA 1409 (Intro), PTHA 1321 (Pathology), PTHA 2239 (Professional Issues) through distant education. Baseline: No courses are currently offered online. 10/05/2011 - Two faculty are currently trained to offer distance education. The PTHA 1409 course has multiple sections, and is taught by the same faculty as a hybrid course. PTHA 2239, and 1491 are taught by a different faculty, and these courses are taught in a limited hybrid format. PTHA 1321 ( Path) has not yet been converted over to DE. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 10/05/2011 - Continue progress to the development of a Distance Education format for PTHA 1321 ( Path for PTA's). Task Name: Train Faculty Task Description: Get faculty trained on BlackBoard and Wimba. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 225 of 297 Objectives Planning - Physical Therapist Assistant RG - Expand Course Offerings through Distance Education Students-2 (2010-2011) - Start CAPTE expansion process. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: Withdrawn Budget Account Number: 11000-55145 Person(s) Responsible: Debra Tomacelli-Brock Measures & Standards and Baselines / Strategies Measure: Begin submission of CAPTE expansion paperwork. Data Source for Measure: Department/Area Report Standard and Baseline: Offer PTHA 1409 (Intro), PTHA 1321 (Pathology), PTHA 2239 (Professional Issues) through distant education. Baseline: No courses are currently offered online. Results Action & Follow-Up 10/05/2011 - There has been no movement on this goal because 1) there are not available faculty to help with expansion; 2) There has been limited funds available to train faculty in DE 3) There have been signficant problems with Blackboard upgrades that have discouraged faculty from moving forward with this project at this time. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Curriculum Development Task Description: Submit request for curriculum development for 1409, 2239 and 1321 at a minimum, through Curriculum office. Budget Impact: No Funding Needed Task Name: Qualified Faculty Task Description: Identify qualified faculty in remote areas, who can run the lab part of the course. Budget Impact: No Funding Needed Planning - Physics - NW - Physics - NW, 2010-2011 - Increase the number of physics courses offered by one each semester. Planning Year(s): 2010 - 2011 Objective Status: Met Budget Account Number: 11000 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 226 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 02/03/2012 - Approximately 20% of a complete Vernier system has been purchased and is in use in Physics laboratory Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 02/03/2012 - Continue to purchase and install equipment as funds become available. Person(s) Responsible: Lisa Juliano Planning - Physics - VV - Expand Laboratory (2010-2011) - Expand Physics student laboratory equipment with one complete Vernier Technology system. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: In Progress Budget Account Number: 11000-55350 Person(s) Responsible: Allison Bruce Planning - Physics - VV - Repair Observatory (2010-2011) - Repair of the Astronomical observatory. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: In Progress Budget Account Number: 11000-55350 Person(s) Responsible: Allison Bruce 03/05/2012 11:46 AM Measure: Students will have expanded laboratory experience to include state of the art set-up. Data Source for Measure: Department/Area Report Standard and Baseline: One complete state of the art Vernier Dynamics system. Baseline: No modern equipment. Task Name: Purchase System Task Description: Purchase I complete Vernier Dynamics system. Budget Impact: Additional/New Funding Required Projected Cost: 1260.0000 Measure: Door wil work properly, ramp will be structurally sound, environment will be clean, and grass will no longer be growing through observatory floor. Data Source for Measure: Department/Area Report Standard and Baseline: Clean and functional astronomical observatory. Baseline: The entrance ramp is unsafe, doom door no longer seals, grass grows up through the floor boards. 02/03/2012 - Approximately 50% completed. The ramp into the facility has been replaced and is safe. The environment is clean. Door repair has not been completed, may not be repairable. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Repairs Task Description: Replace ramp, replace/repair the support/foundation, and contract with a Generated by TracDat a product of Nuventive. Page 227 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up garage door company to seal dome door. Budget Impact: Additional/New Funding Required Projected Cost: 3000.0000 Planning - Physics - VV - Internet Connection (2010-2011) - Internet connection to Astronomical observatory. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: In Progress Budget Account Number: 11000-55350 Person(s) Responsible: Allison Bruce Planning - Police Department - Integration of Vehicle Registration Capabilities with Current Banner System (2009-2012) - To improve effectiveness and efficiency of vehicle registration capabilities by obtaining a system capable of direct integration with the current campus based banner system. Planning Year(s): 2009 - 2010 2010 - 2011 2011 - 2012 Expected Completion Date: 08/01/2012 03/05/2012 11:46 AM Measure: Astronomical observatory will have internet connection. Data Source for Measure: Department/Area Report Standard and Baseline: Ability to access internet 100% of the time. Baseline: No internet connection. 02/03/2012 - There is still no internet connection at the observatory. Installation is prohibitively costly. Internet is not required often enough to justify the expense. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Internet in SSC Building Task Description: Install antenna on SSC building, or lay cable, depending on which IT thinks will be most cost effective. Budget Impact: Additional/New Funding Required Projected Cost: 2000.0000 Measure: By the use of current standalone paper system to an integrated electronic system. Data Source for Measure: Department/Area Report Standard and Baseline: Software integration will equate to 100% change in all areas affected such as the traffic office and accounts receivable. Baseline: Currently, there is not a system integration between the Cardinal Ticket Tracking System and the District's Banner System. 10/18/2010 - This objective has not been met. It is 10/27/2011 - Will continue to work pending an implementation process by EPCC IT and coordinate this project until personnel as well as an outside vendor. completion. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. Page 228 of 297 Objectives Measures & Standards and Baselines / Strategies Actual Completion Date: 08/31/2012 Objective Status: In Progress Budget Account Number: L31001-31001 Person(s) Responsible: Jose L. Ramirez Task Name: New System Task Description: The new system will allow on-line vehicle registration, will facilitate payment of citations, and provide a customer with a simple and easy way to navigate through the vehicle registration process as well as citation payment through the use of real time integration of student accounts in the District's Banner System. Budget Impact: Additional/New Funding Required Projected Cost: 92830.0000 Planning - Police Department - Integrate TicketTrak Interface (2010-2012) - Enable communication between the current TicketTrak System and Banner in order to expedite process of the district wide registrations. Planning Year(s): 2010 - 2011 2011 - 2012 Expected Completion Date: 08/01/2012 Actual Completion Date: 08/31/2012 Objective Status: In Progress Budget Account Number: L31001-31001 Person(s) Responsible: J.L. Ramirez Measure: By the use of current stand alone paper system to integrated electronic system. Data Source for Measure: Department/Area Report Standard and Baseline: Software integration will equate to 100% change in all areas affected such as traffic office and accounts receivable dept. 03/05/2012 11:46 AM Results Action & Follow-Up Task Name: New TicketTrak system Task Description: The new system will allow direct electronic communication between TicketTrak and Banner. This will facilitate vehicle registration as well as increase effectiveness and efficiency in citation payments. Budget Impact: Additional/New Funding Required Projected Cost: 26000.0000 Funding Justification: New software for direct electronic Generated by TracDat a product of Nuventive. Page 229 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up communication for TicketTrak and Banner. Planning - Police Department - Surveillance Monitor (2010-2012) - Implement two new surveillance monitor positions to assist in the monitoring of all district wide surveillance cameras. Planning Year(s): 2010 - 2011 2011 - 2012 Expected Completion Date: 08/01/2012 Actual Completion Date: 08/31/2012 Objective Status: In Progress Budget Account Number: 11000-61001 Person(s) Responsible: Jose L. Ramirez Measure: By the amount of activity observed and reported to the police units in the field by the day and evening surveillance monitors. Data Source for Measure: Department/Area Report Standard and Baseline: Two surveillance monitors to work a total of 80 hours per week to accomplish a more proactive response to interior and exterior district wide security. Presently the position of surveillance monitor does not exist. Task Name: Cameras Task Description: By having these personnel monitor the surveillance cameras and observe and communicate problems to the dispatchers who in turn will communicate with the PD officers. Budget Impact: Additional/New Funding Required Projected Cost: 36000.0000 Funding Justification: Hiring surveillance monitors for the command center. Task Name: Monitor cameras Task Description: Command center communications. Budget Impact: Additional/New Funding Required Projected Cost: 36000.0000 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 230 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 10/06/2011 - Unable to fill positions due to the hiring freeze. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 10/27/2011 - Will develop job description. Will try and fill the positions by 1/1/2013. Funding Justification: Will serve for district wide command center communication with PD Officers. Planning - Police Department - Staff Theory (2010-2012) - Conduct training for the Police and Vehicle Registration Department staff on the theory of completed staff work. Planning Year(s): 2010 - 2011 2011 - 2012 Expected Completion Date: 08/01/2012 Actual Completion Date: 08/31/2012 Objective Status: In Progress Budget Account Number: 11000-61001 Person(s) Responsible: J. L. Ramirez 03/05/2012 11:46 AM Measure: By the completed work product turned in by all personnel and subsequent rejection rate. Data Source for Measure: Department/Area Report Standard and Baseline: Increase the level of proficiency among all Police and Vehicle Registration Department Personnel Presently no training has been conducted in this area. Task Name: Staff Work Task Description: By conducting a training Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Theory work Task Description: By conducting a training session and evaluating the results on a monthly and quarterly basis Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 231 of 297 Objectives Planning - Psychology - NW - Psychology NWC-Enhancing and Diversifying Classroom Tools and Instruction (2010 2011). - To diversify and improve methods of instructional delivery. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: In Progress Budget Account Number: 11000-55283 Person(s) Responsible: Daniel Gutierrez Measures & Standards and Baselines / Strategies Measure: Offer more courses that make use of latest technological and qualitative tools. Data Source for Measure: Department/Area Report Standard and Baseline: Increase number of students exposed to state-of-the art tools and advanced methodologies. Baseline: We currently offer one video conference course and have one instructor trained on Blackboard. Action & Follow-Up 02/11/2011 - Psychology courses have steadily improved enrollment capacity. Due to heavy turnover, diverse course offerings will have to be put on hold until new faculty are trained. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: State-of-the Art Methods Task Description: Train existing personnel in state-of-the art methods/technologies and hire new personnel with same skills. Budget Impact: No Funding Needed Planning - Psychology - RG - Sections Taught by Full-Time Faculty (2010-2011) Have more classes taught by full-time faculty. Planning Year(s): 2010 - 2011 Measure: 49% of classes taught by full-time faculty. Data Source for Measure: Program Review Data Standard and Baseline: 60%. Baseline: 49%. Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-55282 Person(s) Responsible: Antonio Juarez Task Name: Hire Full-Time Instructor Task Description: Continue to push for another full-time instructor. Sole full-timer at RG already has double overload. Budget Impact: No Funding Needed Projected Cost: 0.0000 03/05/2012 11:46 AM Results Generated by TracDat a product of Nuventive. Page 232 of 297 Objectives Planning - Psychology - VV - New Faculty (2010-2011) - Hire 2 new Tenure Track faculty members to meet increased demand in classes being taught. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/22/2010 Objective Status: Not Met Budget Account Number: 11000-55280 Person(s) Responsible: Keith Pannell Measures & Standards and Baselines / Strategies Measure: Get positions filled. Data Source for Measure: Department/Area Report Standard and Baseline: Increase FT/PT ratio to meet college minimum. Baseline: FT Faculty member currently are: 4 Tenure, 1 on track, 1 lecturer. Action & Follow-Up 09/27/2011 - Failure. Loss of lecturership with no additional Tenured/tracked faculty. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Adoption of Budget Task Description: With adoption of budget allowing for hires. Budget Impact: No Funding Needed Planning - Purchasing & Contract Management - Increase the Responsiveness of the Department (20102011) - Increase the responsiveness of the department by decreasing the processing time for purchase requisitions by adding a part time buyer. Planning Year(s): 2010 - 2011 Measure: Average processing time for requisitions will decrease. Data Source for Measure: Department/Area Report Standard and Baseline: A reduction in the average processing time of purchase requisitions. Currently, the processing time is not tracked. Objective Status: Withdrawn Budget Account Number: 11000-77000 Person(s) Responsible: Ruben Gallardo Task Name: Hire a Part-Time Buyer Task Description: Hire a part-time buyer and work with IT to develop a report to track average purchase requisition conversion time. Budget Impact: No Funding Needed Projected Cost: 26036.0000 Funding Justification: Expenditure will result in better service to 03/05/2012 11:46 AM Results 04/13/2011 - Withdrawn. The workload on the department has dropped, possibly temporarily. However, at this time, the workload does not warrant the increase in labor costs for the department. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 233 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up internal and external customers. Planning - Purchasing & Contract Management - Maintain Zero Space Rental Costs for Driver Education Classes (20102011) - Maintain zero rental costs for space rentals for Driver Education classes. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: In Progress Budget Account Number: 11000-77003 Person(s) Responsible: Ruben Gallardo Measure: Zero cost is maintained. Data Source for Measure: Department/Area Report Standard and Baseline: The continued absence of space rental costs for Driver Education classes. Planning - Purchasing & Contract Management - Issue CSP Request for Casualty and Liability Insurance (20102011) - Assure that the College continues to receive the best value for casualty and liability insurance by issuing a Request for Competitive Sealed Proposals, with updated specifications. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: In Progress Budget Account Number: 11000-77002 Person(s) Responsible: Ruben Gallardo Measure: A request for Competitive Sealed Proposals, with updated specifications, will be advertised. Data Source for Measure: Department/Area Report Standard and Baseline: The ability to compare costs and services offered by various offerors and then to make a recommendation based on best value for the District. 03/05/2012 11:46 AM Task Name: Monitor Costs and, if Necessary, Work with the ISD's to Maintain Zero Costs Task Description: Monitor costs and, if necessary, work with the ISD's to maintain zero costs. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Create Specifications, Advertise, Evaluate Proposals, make Recommendation, get Board Approval Task Description: Create updated specifications for the Request for Competitive Sealed Proposals Generated by TracDat a product of Nuventive. Page 234 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up and advertise it. Evaluate proposals and make a recommendation for award to the Board, based on best value. Continue until Board approves a contract. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Radiation Therapy Technology RG - A Student will Demonstrate Radiation Therapy Technology Skills with Adults and Children (2010-2011) - A student will demonstrate radiation therapy technology skills with adults and children. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/05/2011 Actual Completion Date: 08/05/2011 Objective Status: Met Budget Account Number: 11000 55118 Person(s) Responsible: Marie Racine Measure: 100% of the students score 85% or greater on the evaluation tool. Planning - Radiation Therapy Technology RG - Accreditation (2010-2011) - Maintain national accreditation of program. Planning Year(s): 2010 - 2011 Expected Completion Date: 09/30/2011 Actual Completion Date: 09/30/2011 Objective Status: Met Budget Account Number: Measure: Accreditation status. Data Source for Measure: Program Review Data Standard and Baseline: Full accreditation. Baseline: Full accreditation. 03/05/2012 11:46 AM 02/22/2012 - Annual report submitted to accreditation agency, fees paid and accreditation maintained. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Annual Fees Task Description: Pay annual fee to accreditation agency. Generated by TracDat a product of Nuventive. Page 235 of 297 Objectives 11000 55118 Person(s) Responsible: Marie Racine Planning - Radiologic Technology - RG - AP (2010-2011) - Maintain national certification rate at or above national rate. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: Met Budget Account Number: 11000-55146 Person(s) Responsible: Christl Thompson Planning - Radiologic Technology - RG Accreditation (2010-2011) - Maintain national JCERT accreditation of program. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: Annual Reports Task Description: Submit annual reports to accreditation agency. Task Name: Self-Studies Task Description: Submit self-studies when scheduled. Measure: Certification pass rate. Data Source for Measure: Department/Area Report Standard and Baseline: 90%. No baseline. 10/06/2011 - 13 students graduated, 13 students took national ARRT exam, 100% PASS rate. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Past Graduates Task Description: Track certification results of graduates each year. Review courses to strengthen pass rates as needed. Evaluate areas of weakness of past graduates and need for curricular changes or changes to admission criteria. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Accreditation status. Data Source for Measure: Program Review Data Standard and Baseline: Full accreditation. Baseline: Full accreditation. 10/06/2011 - Accreditation ongoing, reaccreditation process is in process. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 236 of 297 Objectives In Progress Budget Account Number: 11000-55146 Person(s) Responsible: Christl Thompson Planning - Reading/RESL - MDP Conference in Las Vegas (2010-2011) Attend Mandatory Conference in Las Vegas. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000Person(s) Responsible: Irma Hoy Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Name: Accreditation Agency Task Description: Pay annual fee to accreditation agency. Budget Impact: No Funding Needed Task Name: Annual Reports Task Description: Submit annual reports to accreditation agency. Budget Impact: No Funding Needed Task Name: Self Studies Task Description: Submit self studies when scheduled. Budget Impact: No Funding Needed Measure: Attend Conference before end of FY Data Source for Measure: Focus Group Standard and Baseline: Make sure you win at least a mil dollars 12/02/2010 - We won $1,000,000 and aquired knowledge on strategies Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Planning - Reading/RESL - NW - Online Activities for READ 0307, 0308, and 0309 (2010 - 2011). - Students will interact with online programs per course and text. 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 237 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 01/26/2012 - The ESL mini-conference was cancelled due to lack of attendance. Progress: Unsatisfactory Action Plan Status: 3 - Follow-Up Documented 01/26/2012 - Change to a different objective for 2011-2012. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: In Progress Budget Account Number: 11000Person(s) Responsible: Jim Lambrinos Planning - Reading/RESL - NW - Smart Classroom for the "C" Building (2010-2011) - Smart classrooms will allow instuctors to expand and enhance our teaching approaches. Increased visual experiences will improve the students abilities to listen, speak, and comprehend material. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: In Progress Budget Account Number: 11000 Person(s) Responsible: Dr. Lydia Tena Measure: Number of smart classrooms added to "C" building Data Source for Measure: Budget Data Standard and Baseline: Number of Smart Classrooms since 20092010 Planning - Reading/RESL - RG - Quality Instructional Support (2010-2011) - Provide quality instructional support. Planning Year(s): 2010 - 2011 Measure: Contrast the district-wide discipline meetings with those of the previous year. Data Source for Measure: Department/Area Report Standard and Baseline: 5% of current offerings. Baseline: 1 workshop. Actual Completion Date: 03/11/2010 Objective Status: Not Met Budget Account Number: 11000-55262 03/05/2012 11:46 AM Task Name: Invite Leaders in Disciplines Task Description: Generated by TracDat a product of Nuventive. Page 238 of 297 Objectives Person(s) Responsible: Roberto Jaquez Planning - Reading/RESL - VV - Recruit New Full-Time Faculty (2010-2011) - To obtain more full-time faculty. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/22/2010 Objective Status: In Progress Budget Account Number: 11000-55260 Person(s) Responsible: Jesus Adame Measures & Standards and Baselines / Strategies Results Action & Follow-Up Invite leaders in disciplines from areas other than Reading and have them provide us with a workshop. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: The number of full-time Reading vs the number of students and sections offered each semester. Data Source for Measure: Department/Area Report Standard and Baseline: Goal is to reduce by 30% number of sections taught but adjunct faculty replacing that percentage with a new full-time faculty. Baseline: There is still about 65%-70% of sections in READ/RESL taught by adjunct faculty. 09/30/2011 - The faculty recruited and employed and has remained with the college for 2010 and 2011 academic year. To see if our system of orientation, technical support of adjunct, has assisted this faculty to be effective in the classroom and to fulfill administrative duties. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Faculty Opening Task Description: To open set funds for at least one full-time Reading Faculty opening. Budget Impact: No Funding Needed Task Name: Reading Personnel Task Description: To advertise in Educational outlets for qualified, accredited Reading personnel. Budget Impact: Additional/New Funding Required Planning - Records Management Measure: Implement SACS Imaging for Deans (2010 - IT Division has provided RM with scanners 2012). - SACS required infomation will be to create scanning stations in all Dean's 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 239 of 297 Objectives available on the servers from all imaged documents imaged by the Deans office such as Faculty Evaluations and licenses. Planning Year(s): 2010 - 2011 2011 - 2012 Expected Completion Date: 12/31/2013 Objective Status: New Budget Account Number: 11000 753000 Person(s) Responsible: Bonnie Prieto Measures & Standards and Baselines / Strategies office. Data Source for Measure: Department/Area Report Action & Follow-Up Task Name: Create Scanning Stations in all Campus where Deans Work Task Description: Meet with each Dean, review all documents, define on a retention schedule. Create work flow and install scanners. Provide training. Budget Impact: No Funding Needed Planning - Records Management - Imaging Project for Health Clinic (2010 - 2011). Convert paper files used in the Health Clinic daily operations into imaged view and work process. Store old records into the College warehouse. Planning Year(s): 2010 - 2011 Measure: Identify records and begin to move paper records to the Records Warehouse. RM will return at Dr. Mitchell's request to begin a plan to capture , image and store patient records. Train staff in HIPAA laws. Data Source for Measure: Department/Area Report Actual Completion Date: 03/30/2010 Objective Status: New Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto Task Name: Move Paper Records from Clinic Task Description: Identify records, document and store in the Records Management warehouse. Beginning early 2012, meet wth Dr. Mitchell 's staff to start imaging program for the Health Clinic. Train RM staff in HIPAA rules. Budget Impact: No Funding Needed Planning - Records Management - Literacy Program BDMS Application (2010 - 2011). To be more efficient and organized, books and other Grant Records were digitized by a local vendor and then delivered to Records Management in a PDF format. Records Measure: Review Scope of work and quote for services from DataXport (vendor). Data Source for Measure: Department/Area Report Standard and Baseline: 03/05/2012 11:46 AM Results 11/09/2011 - Literacy Program contracted DATA Source to image their records, we took those images from a CD and downloaded to our systems for storage. Created program for them to scan, view and store for all future work in this area. Progress: Generated by TracDat a product of Nuventive. Page 240 of 297 Objectives Measures & Standards and Baselines / Strategies Results Management then created a program for the Literacy Program to begin to scan and store their documents in house. Planning Year(s): 2010 - 2011 Expected Completion Date: 12/17/2010 Actual Completion Date: 02/01/2011 Objective Status: Met Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto, Dan Gaytan, Sara Martinez Satisfactory Action Plan Status: Return back feedback to DataXport server 0 - No Action Plan Necessary topology that must be delivered for BDMS AX. Define Document type return and data extract definitions. Contact PDS (owner of POTG server) for training on AX index image import application. Train back up on how to do this. Move application to production. Planning - Records Management Warehouse Cooling & Heating (2010-2011) - Create a temperature controlled environment for the protection of paper records stored in the warehouse, for the duration of the retention period assigned to the record titles. Planning Year(s): 2010 - 2011 Measure: Working closely with the Director of Physical Plant on the time span and design of the work to be done. Data Source for Measure: Department/Area Report Standard and Baseline: The entire warehouse will be properly heated and cooled. Baseline: Planning stages of the project, projected time frame before Summer 2010. Actual Completion Date: 03/30/2010 Objective Status: In Progress 03/05/2012 11:46 AM Action & Follow-Up Task Name: Tasks to be Competed Task Description: Process work from DataXport, design new BDMS application to the images, gain knowledge of AX index image export application and train backup team. Move into production. Budget Impact: Additional/New Funding Required Projected Cost: 2450.0000 Funding Justification: New upgrade to POTG server to provide access to the POTG data and images to authorized individuals via internet connection. Task Name: Work with Physical Plant Generated by TracDat a product of Nuventive. Page 241 of 297 Objectives Measures & Standards and Baselines / Strategies Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto Task Description: Working together with Mr. Lobato and his staff and HIVAC. Budget Impact: No Funding Needed Planning - Recruitment & School Relations EPCC High School Administrator/Teacher "In-service" Tours (2010-2011) - Establish EPCC inservice days with school districts and invite their staffing for training and participation in touring the five EPCC campus facilities to include all Fort Bliss initiatives. Planning Year(s): 2010 - 2011 Expected Completion Date: 02/28/2010 Objective Status: In Progress Budget Account Number: 11000-67001 Person(s) Responsible: Nita Corral-Nava 03/05/2012 11:46 AM Measure: Coordinate invitational in-service workshops for high school administrators and staff. Data Source for Measure: Department/Area Report Standard and Baseline: Two schools from the 13 regional districts will be selected to participate. Baseline: Three (3) different school districts have participated. Results Action & Follow-Up 08/31/2011 - Hosted instructional staff from local I.S.D.'s and reached out as far as hosting faculty and staff from Pecos H.S. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 08/31/2011 - Invited other departmental interaction and collaboration i.e., man power through presentations, resources and activity coordination through Campus Life participation. Task Name: Campus Tours Task Description: Conduct selected campus tours. Budget Impact: No Funding Needed Task Name: Coordinate a Productive Day Task Description: Coordinate a mutually productive day for both institutions to hold in-service at EPCC during the summer months. Budget Impact: Additional/New Funding Required Projected Cost: 1000.0000 Task Name: EPCC Presentation Task Description: Coordinate and conduct EPCC presentation and workshops. Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 242 of 297 Objectives Planning - Recruitment & School Relations Recruitment Fairs (2010-2011) - Expand annual EPCC Recruitment Fairs. Planning Year(s): 2010 - 2011 Expected Completion Date: 02/28/2010 Objective Status: In Progress Budget Account Number: 11000-67001 Person(s) Responsible: Nita Corral-Nava Measures & Standards and Baselines / Strategies Measure: Increase participation by recruiting contacts from EPCC faculty, staff and administration. Data Source for Measure: Department/Area Report Standard and Baseline: Continue to expand participation. Baseline: Participate in approximately 74 events annually. Results Action & Follow-Up 08/31/2011 - The expansion of EPCC Recruitment Fairs continues to increase reaching over 250 sites. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 10/19/2011 - The coordination and cooperation of and with other EPCC departments has enabeled us to utilize a vast amount of intradepartmental resources i.e. Career and Technology calendar handouts, brochures,videos, laptop informational CD's, pop-up banners, and most of all actual instructions joining the team. New table covers, pennants and uniforms were allocated for the events. 03/25/2011 - The expansion of EPCC Recruitment Fairs continues to increase reaching over 200 sites. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Booth Section Task Description: Include admission application booth section. Budget Impact: Additional/New Funding Required Projected Cost: 3000.0000 Task Name: EPCC Banners Task Description: Create EPCC banners, handouts, advertising programs. Budget Impact: No Funding Needed 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 243 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 05/31/2011 - Successfully mailed out approximately 10,800 letters to all graduating seniors. Letters were signed by the EPCC President and the respective High School Superintendent. All 13 area district high schools were targeted to include Culberson CountyAllamoore Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 05/31/2011 - All graduating seniors received an open invitation to enroll @ EPCC. Will include registration instructional brochure & Financial Aid information. Task Name: Professional Facet Task Description: Improve on presentation materials to include a "professional facet" to the EPCC set up. Budget Impact: No Funding Needed Planning - Recruitment & School Relations Senior Letters (2010-2011) - Increase enrollment by mailing out Congratulatory Letters to all graduating seniors throughout 13 districts plus private and chartered schools. Planning Year(s): 2010 - 2011 Expected Completion Date: 02/28/2010 Objective Status: Met Budget Account Number: 11000-67001 Person(s) Responsible: Nita Corral-Nava 03/05/2012 11:46 AM Measure: Receiving approval of Superintendent's electronic Signatures along individual high school's logos. Asking for listing of all seniors by name and address. Data Source for Measure: Department/Area Report Standard and Baseline: Increase Yearly. Baseline: 10,491 Letters Mailed. Task Name: Mail Letters Task Description: Mail letters and Recruitment/Financial Aid Brochures. Budget Impact: No Funding Needed Task Name: Mail Merge Task Description: Create a mail merge once all information have been received. Budget Impact: No Funding Needed Task Name: Request Forms Task Description: Fill out request forms to all 13 districts, private and chartered schools. Generated by TracDat a product of Nuventive. Page 244 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 08/31/2011 - Dual Credit Enrollment grew from 2,894 to 3,441 Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 08/31/2011 - Increase the number of sophomore/junior application workshops. Implementation of Apply Texas computerized application system through close liasions with existing I.S.D. "Go Centers". Budget Impact: Additional/New Funding Required Projected Cost: 10000.0000 Planning - Recruitment & School Relations Expand Dual Credit Program (2010-2011) Expand Dual Credit program with emphasis on the number of participants at each high school Planning Year(s): 2010 - 2011 Expected Completion Date: 02/28/2010 Objective Status: In Progress Budget Account Number: 11000-67001 Person(s) Responsible: Nita Corral-Nava 03/05/2012 11:46 AM Measure: The growth of Dual Credit enrollments at all regional high schools included in the 13 districts plus private and chartered schools. Data Source for Measure: Enrollment Data Standard and Baseline: Increase yearly. Baseline: Currently, have 36 Public Schools, 15 Private Schools, 3 Chartered Schools on board to include Home Schooled students for a total of 54 schools participation. Task Name: Credit Achievement Certificates Task Description: Credit achievement certificates and honor cords to all graduating seniors earning dual credits at respective graduation ceremonies. Budget Impact: Additional/New Funding Required Projected Cost: 19000.0000 Task Name: Dual Credit Workshops Task Description: Conduct dual credit workshops for administrators and interested teachers. Budget Impact: No Funding Needed Task Name: Onsite Testing Task Description: Coordinate onsite testing and Advising sessions. Generated by TracDat a product of Nuventive. Page 245 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: No Funding Needed Task Name: Onsite Tours Task Description: Coordinate onsite tours to new dual credit students. Budget Impact: No Funding Needed Task Name: Student Parent Application Task Description: Conduct student parent application orientation workshops. Budget Impact: No Funding Needed Planning - Respiratory Care Technology RG - AP (2010-2011) - Maintain licensure rate at or above state and/or national rate. Planning Year(s): 2010 - 2011 Expected Completion Date: 12/31/2011 Objective Status: Met Budget Account Number: 11000-55148 Person(s) Responsible: Frederick M. Torres Measure: Licensure or certification pass rate. Data Source for Measure: Department/Area Report Standard and Baseline: 90%. No baseline. 08/31/2010 - Based on NBRC results, 90% of the graduates passed the Certification exam Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Pass Rates Task Description: Track licensure results of graduates each year. Investigate standardized exit tests or review courses to strengthen pass rates. Evaluate areas of pass graduates and need for curricular changes or charges to admission criteria. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Senior Adult Programs - Getting 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 246 of 297 Objectives Seniors Connected to Technology (20102011) - Expose older adults to the use of computers and how this technology assists them in staying connected socially and to access services available to them via the internet. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2010 Actual Completion Date: 08/31/2010 Objective Status: Met Budget Account Number: 11000-42701 Person(s) Responsible: Mary Yañez Planning - Senior Adult Programs - Senior Adult Program Development Plan (20102011) - Address lifelong learning issues, trends and initiatives relevant to older adult in the area of course offerings, personal enrichment, health and wellness events and meaningful employment and volunteer opportunities for retirees and adults 55 years and older. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2010 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Measure: Additional computer classrooms will be made available for older adult use and classes. Data Source for Measure: Department/Area Report Standard and Baseline: Increase the enrollment and participation in senior citizens learning computers in the rural areas in particular in the Mission Valley. Baseline: Two computer classes are offered at MDP Campus, additional computer classrooms will be set up through the Mission Valley ISD's. Results Action & Follow-Up 12/01/2011 - Arrangements with the EP Public Library to use their computer classrooms have been initiated to support the Getting Seniors Connected to Technology project. A new college initiative to provide computer classes at a Mission Valley ISD includes computer classes for seniors. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Collaboration Task Description: The plan will be accomplished in collaboration with SBDC, UT San Antonio, EPCC, ISC, El Paso County Senior Centers and their senior participants Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Recruit sponsorships to provide new wellness classes, projects and events at new venues to the seniors through the Senior Adult Program Data Source for Measure: Department/Area Report Standard and Baseline: Increase retiree participation with the Senior Adult Program by sponsoring meaningful volunteer services and wellness events. Baseline: We sponsor one Seniors Conference and participate in at least 3 seminars and community health fairs 12/01/2011 - Offered new course in Complentary and Alternative Medicine following in the trend for maintaining good health and nutrition through natural methods. Participated in several community events for student recruitment, Senior Companions Health Fair, Western Refining Health Fair, Amasadai Health Fair, Adult Protective Services Conference, and sponsored Seniors Love Conference where 500 seniors attended. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 247 of 297 Objectives Objective Status: Met Budget Account Number: 11000-42701 Person(s) Responsible: Mary Yañez Planning - Senior Adult Programs - Develop a WorkforceTraining Program for Older Adults to Enter the Workforce (2010-2011) Search and identify resources that will support a Workforce Training Program for older adults to enter the workforce that will instill personal fulfillment, meaningful work and productive contributions to this community. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-42701 Person(s) Responsible: Mary A. Yañez Measures & Standards and Baselines / Strategies throughout the year. Results Action & Follow-Up 12/01/2011 - Developed the plan, working on the course outline/syllabus and received commitment from two Senior Adult Program faculty, college departments and community partners and speakers to implement the workforce training series for seniors. Made initial contact with El Paso Public Libraries to secure community facilities and college clasrooms for this project. Progress: Satisfactory Action Plan Status: 3 - Follow-Up Documented 12/01/2011 - Initiate the appropriate forms, applications, MOU's and other formal arrangements to implement the six month training series. Recruit and register the 10 to 15 seniors student participants for the program. Task Name: Recruit Major Task Description: Recruit 2 or more major sponsors and collaborators to accomplish this objective one or more Wellness event for older adults. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Training series developed and implemented in FY '09-'10. Data Source for Measure: Department/Area Report Standard and Baseline: Upon completion of this objective at least 10 seniors will go through the program and complete the six month training series or at least 20 completers in a one year period. Baseline: At this time we do not have a starting baseline. Consequently, any number of workforce training completers will enhance the program. Follow-Up: 12/01/2011 - Start the list of seniors interested in attending the orientation session for the WorkforceTraining Program for Older Adults which begins in the Spring 2012. 12/01/2011 - Follow-up with El Paso Public Library, instructors course curriculum, volunteer instructor assistants, community employers, speakers and community trainers to finalize the schedule to start in the Spring 2012. Task Name: Workshops and Seminars 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 248 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Description: Develop and plan series of classes, training workshops and seminars that can be provided to seniors who want to enter or reenter the workforce and find meaningful work in the community. Planning - Senior Adult Programs - Senior Adult Program Development (2010 - 2011). - Increase the effectiveness and efficiency of the Senior Adult Program through coordination of volunteers for the seniors program to assist with classes, events, and activities. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-42701 Person(s) Responsible: Mary A. Yañez Measure: Volunteer participation will increase by 10% in the areas of class volunteers, office, events and activities volunteers. Data Source for Measure: Department/Area Report Standard and Baseline: As we recruit new volunteer instructors to teach new classes our student count increases which allows us to serve more senior students. Inventory and account for the number of volunteers currently serving the Senior Adult Program to include volunteer instructors and recruit new teachers in subjects not currently being offered. 12/01/2011 - Recruited a new volunteer instructor to teach the Complentary Medicine pilot class and we maintained 35 volunteers that assist with our office coverage and with our special events throughout the year for this evaluation period. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Planning - Service Learning - Expanding Service Learning Program 2010 - 2011 The Service Learning Program at El Paso Community College encourages civic responsibility among students through community service. We provide resources and support for students, and faculty who are currently using or would like to integrate service learning into their course, and for community agencies who are interested in partnering with El Paso Community College. The program provides academic credit for service work in the community. Recruit at least 450 students to participate in Service Learning each semester (fall and spring) Measure: The Service Learning Program at EPCC works with EPCC faculty to integrate the SL teaching method to their curriculum. Service Learning motivates students to serve their community by applying the principles applied in the classroom while gaining hands-on experience. Data Source for Measure: Institutional Research Data 08/31/2011 - Service Learning Report Academic Year 2010-2011 Fall 2010 a) Total number of students: 362 b) Total number of hours: 8,660 03/05/2012 11:46 AM Spring 2011 a) Total number of students 548 b) Total number of hours: 13,607 Summer 2011 a) Total number of students: 130 b) Total number of hours: 2,883 Totals Generated by TracDat a product of Nuventive. Page 249 of 297 Objectives and 200 during summer. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-52116 Person(s) Responsible: Claude Mathis and Patricia Islas Planning - Sign Language/Interpreter - VV SLNG Continuous Curriculum Improvement Plan (2010-2011) - Meet CIT Curriculum Standards. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: New Budget Account Number: 11000-55424 Person(s) Responsible: Mary Mooney 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Total of students during AY 2010-2011: 1,040 students Total of hours: 25,150 hours Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Related Documents: Service Learning AY 20102011.docx Measure: Number of students who enrolled in service learning and succesfully completed twenty hours of service in a local non-profit organization. Service Learning expects to enroll 400-500 students every regular semester and 100-150 during the summer. Data Source for Measure: Department/Area Report Standard and Baseline: Objective was met. More than one thousand students completed their service learning participation during academic year 20102011 Measure: DACUM is held Spring 2011. Data Source for Measure: Department/Area Report Standard and Baseline: Standards adopted by the Conference of Interpreter Trainers. Baseline: Curriculum based on the DACUM process. Measure: Completion of the CIT curriculum student learning objectives in preparation for the CIT Self Study Process. Data Source for Measure: Department/Area Report Generated by TracDat a product of Nuventive. Page 250 of 297 Objectives Measures & Standards and Baselines / Strategies Standard and Baseline: Standards adopted by the Conference of Interpreter Trainers. Baseline: Curriculum based on the DACUM process. Results Action & Follow-Up 10/03/2011 - In progress waiting for approval from Board. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 10/03/2011 - Will create same plan for academic year 2011-2012. Task Name: DACUM Curriculum Task Description: Compare and contrast the existing DACUM Curriculum document of 2006 with the CIT standards. Make changes to existing course objectives. Make recommendations for course revisions. Budget Impact: No Funding Needed Task Name: Host a DACUM Meeting Task Description: Host a 2011 Spring DACUM meeting for SLNG Program. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Sign Language/Interpreter - VV CIT Accreditation Self Study (2010-2011) Obtain CIT Accreditation for the SLNG Dept. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: In Progress Budget Account Number: 11000-55424 Person(s) Responsible: Mary Mooney 03/05/2012 11:46 AM Measure: Self Study Application is submitted and Candidacy Status is obtained by June 1st. Data Source for Measure: Department/Area Report Standard and Baseline: National accreditation is not "mandatory" but our graduates of the program would be assured of a quality program if achieved. Achievement of the Self Study Review will allow us self evaluate and make needed corrections for the program. Baseline: Not certified; and currently not an applicant. Task Name: Commission on Collegiate Interpreter Generated by TracDat a product of Nuventive. Page 251 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Education Task Description: Apply to the Commission on Collegiate Interpreter Education. Budget Impact: Additional/New Funding Required Projected Cost: 500.0000 Task Name: SLNG Advisory Board Meeting Task Description: Bring this plan to the attention of students, faculty, staff, administrators, Deaf and Hearing consumers, practitioners and employers via the SLNG Advisory Board Meeting during Fall 2010. Applying for Candidacy Status: By March 1, Interpreter Educator Programs need to apply and submit the following: 1) a letter of intent, 2) a completed Application for Candidacy, and 3) a one-time non-refundable Application Fee (see Fee Schedule). CCIE will review the submitted materials to determine if the program is sufficiently prepared to begin the Self Study Review Process. Programs will be informed by June 1 if they have achieved Candidacy Status. Budget Impact: Additional/New Funding Required Projected Cost: 2000.0000 Planning - Small Business Development Center Program - Cooperative Agreement Small Business Development Center Program (2010-2011) - To renew the SBDC program for 2010-2011 under cooperative agreement with The University of Texas at San Antonio and the U. S. Small Business Administration and secure federal program 03/05/2012 11:46 AM Measure: Receive proposed external and institutional match funding to continue program operations. Milestone accomplishments and on-site review of program accomplishments by external soruces: ASBDC, UTSA and SBA. Data Source for Measure: 08/24/2010 - Received proposed external and institutional match funding to continue program operations. Milestone accomplishments and Onsite Review of Program accomplishments by external sources-ASBDC, UTSA, and SBA. Standard and Baseline: New funding for FY 201011. Proposed Level funding: Federal = $257,588; Generated by TracDat a product of Nuventive. Page 252 of 297 Objectives funding. Planning Year(s): 2010 - 2011 Expected Completion Date: 06/25/2011 Actual Completion Date: 06/25/2011 Objective Status: Met Budget Account Number: 11000-43201 Person(s) Responsible: Olga Tavarez Measures & Standards and Baselines / Strategies External Report Standard and Baseline: Baseline: Funding requested and awarded is: Federal: $258,247 Special Allocation: $90,097 College Match: $246,728 Results Action & Follow-Up Special Allocation (State) = $90,097 College Match = $246,728 Progress: Satisfactory Action Plan Status: 3 - Follow-Up Documented New funding for FY 2010-2011. Proposed level funding: Federal: $258,247 Special Allocation: $90,097 College Match: $246,728 Task Name: Cooperative Agreement Task Description: Comply with cooperative agreement and program operating standards. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 595072.0000 Task Name: On-site Review Task Description: On-site Review - Milestone Accomplishment and cooperative agreement Budget Impact: Rollover/Maintain Current Funding Task Name: Submit Program Funding Task Description: Develop and submit program funding renewal proposal by deadline to assure funding. Budget Impact: Rollover/Maintain Current Funding 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 253 of 297 Objectives Planning - Small Business Development Center Program - Small Business Development Center Program (2010-2011) - To continue SBDC program operations under cooperative agreement with The University of Texas at San Antonio and the U. S. Small Business Administration in FY 2010; secure external program funding for continuation of the program for FY2011; implement program strategic plan and execute tactics for goal accomplishments; and track progress electronically. Planning Year(s): 2010 - 2011 Expected Completion Date: 09/30/2011 Actual Completion Date: 09/30/2011 Objective Status: Met Budget Account Number: 11000-43201 Person(s) Responsible: Olga Tavarez Measures & Standards and Baselines / Strategies Results Action & Follow-Up Measure: Receive Notice of Award and/or Continuation Resolution from funding sources; Weekly staff meetings to discuss performance and issues; Quarterly Performance Reports; Success Stories of clients served. Attend Quarterly Director Meetings at UTSA. Program Onsite Review by SBA. Data Source for Measure: Department/Area Report Standard and Baseline: Training: 100 training units; 1,456 attendees; Direct Service Hours: 2,000. Counseling : 800 clients; Counseling Direct Service Hours: 6,400 Business Starts 40; Business Expansions 60; Jobs Created 120; Job Retention 60; Capital Infusion projects: $6 million. Baseline: FY2010 Program goals are the same as the goals projected for FY2011. Task Name: Counseling Task Description: Counseling services will be offered to small business owners and prospective entrepreneurs in starting and expanding their businesses. Clients and projects will be tracked electronically to measure accomplishments with goal attainment. Fulltime business advisors will be employed to provide services to clientele; conduct outreach activities, and report success stories. 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 254 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: Rollover/Maintain Current Funding Task Name: Training Task Description: Training programs will be scheduled, offered, and promoted for small business owners and the general public during the year. Topic areas include business management, accounting, starting a business; business planning etc. A full-time training coordinator will be hired to coordinate the training programs. Accomplishments will be tracked electronically. Budget Impact: Rollover/Maintain Current Funding Planning - Small Business Development Center Program - Small Business Development Center Website Development (2010-2011) - Enhance and update the SBDC Website by engaging a service provider to provide assistance with its development and continue to engage a service provider for hosting and maintaining the SBDC website. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/31/2011 Actual Completion Date: 08/30/2011 Objective Status: Met Budget Account Number: 23506-P23506-71317 Person(s) Responsible: Olga Tavarez 03/05/2012 11:46 AM Measure: Planning and progress meeting will be held with the website service provider to determine the progress being made. Data Source for Measure: Department/Area Report Standard and Baseline: A more enhanced and updated website for promoting SBDC services. Baseline: The SBDC Website was established in 2002 and is currently on the world wide web; the website needs enhancements to keep up with the times and dynamics of the business environment. 01/10/2012 - The El Paso SBDC Website went through a new facelift making it more user friendly and appealing. The new SBDC Website has a testimonial video of SBDC clients talking about their experience with the SBDC and impact the assistance received has had on their business. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 01/10/2012 - Website was completed and is kept up-to-date with special and training events, resources links are continuously udpated and client testimonials are updated at least on a quarterly basis. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Enhancement Required Generated by TracDat a product of Nuventive. Page 255 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Task Description: The service provider will make the enhancement required. Budget Impact: Rollover/Maintain Current Funding Task Name: Enhancements Needed Task Description: A service provider and SBDC staff will meet to discuss and plan the enhancements needed. Budget Impact: Rollover/Maintain Current Funding Task Name: Project Completion Task Description: March 31, 2011 is the target date for completing this project. Budget Impact: Rollover/Maintain Current Funding Task Name: Website Hosting and Maintenance Task Description: Service provider will be engaged to provide website hosting and maintenance services. Budget Impact: Rollover/Maintain Current Funding Planning - Small Business Development Center Program - Program Services and Strategy Plan (2010-2011) - Provide confidential counseling, management and technical assistance, research, and training services to small businesses and prospective entrepreneurs and track economic impact of service delivery. 03/05/2012 11:46 AM Measure: Number of Client cases = 800 Number of Client Hours = 6,400 Number of New Business Starts = 40 Number of Business Expansions = 60 Number of Jobs Created = 312 Number of Jobs Retained = 210 Number of Training Events =100 01/10/2012 - Work toward meeting the SBDC goas for the 2010-2011 fiscal year proceeded well despite the vacancies the Center experienced. The following are the results of goals: Number of Client cases = 624 Number of Client Hours = 4,037.80 Number of New Business Starts = 17 Number of Business Expansions = 16 Number of Jobs Created = 269 Number of Jobs Retained = Generated by TracDat a product of Nuventive. Page 256 of 297 Objectives Planning Year(s): 2010 - 2011 Expected Completion Date: 09/30/2011 Actual Completion Date: 09/30/2011 Objective Status: Met Budget Account Number: 11000-43201 Person(s) Responsible: Olga Tavarez Measures & Standards and Baselines / Strategies Number of Trainees = 1,456 Data Source for Measure: Department/Area Report Standard and Baseline: Based on funding formula. No change. Baseline: Based on funding formula. No change. Results Action & Follow-Up 200 Number of Training Events =152 Number of Trainees = 2,482 capital infusion = $7,768,038 Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 10/20/2011 - Number of Client cases = 624; Number of Client Hours = 4,037.80; Number of New Business Starts = 17; Number of Business Expansions = 16; Number of Jobs Created = 269; Number of Jobs Retained = 200; Number of Training Events =152; Number of Trainees = 2,482 Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: External Sources Task Description: A site review is conducted by external sources to determine effectiveness of the program and milestone accomplishments in meeting the cooperative agreement mandate. Budget Impact: Rollover/Maintain Current Funding Task Name: Funding Task Description: Funding is based on funding formula. No new funds are required. Budget Impact: Rollover/Maintain Current Funding Task Name: Funding Formula Task Description: Funding formula is based on population 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 257 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up (745,199), number of businesses (13,266), and prevailing rate of unemployment of the service delivery area. Budget Impact: Rollover/Maintain Current Funding Task Name: Performance Reports Task Description: Quarterly performance reports are prepared for evaluating progress of program in meetings its goals. Budget Impact: Rollover/Maintain Current Funding Task Name: SWOT Analysis Task Description: SWOT analysis is performed on the program's strengths, weaknesses, opportunities, and threats. Budget Impact: Rollover/Maintain Current Funding Planning - Social Work - VV - Social Work Area Effectiveness Plan (2010-2011) Increase student enrollment in the Social Work Program. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/02/2010 Objective Status: Met Budget Account Number: 11000-55417 Person(s) Responsible: Stephen Kahoe 03/05/2012 11:46 AM Measure: Data by district/site. Data Source for Measure: Enrollment Data Standard and Baseline: 5% increase in student enrollment in the Social Work Program for the 2009-2010 academic year. Baseline: Student enrollment in the 2008-2009 academic year. 10/04/2011 - Student enrollment in the Social Work Program increased by more than 5% during the 2010-11 academic year. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Increase Student Enrollment Task Description: Increase recruitment efforts in order to increase overall student enrollment, including contacting community agencies that employ persons in the Social Work field Generated by TracDat a product of Nuventive. Page 258 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up who have not completed their education and continue articulation efforts with the UTEP & NMSU Social Work programs to encourage more students to begin their Social Work education at EPCC. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Sociology - NW - Sociology NWC - Diversified Course Offerings (2010-2011) To increase and diversify methods and quality of instruction. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: New Budget Account Number: 11000-55303 Person(s) Responsible: Manfred Silva Planning - Sociology - TM - Increase Enrollment (2010-2011) - To increase enrollment by 15%. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: New Budget Account Number: 11000-55301 Person(s) Responsible: 03/05/2012 11:46 AM Measure: Using new and additional methods of evaluation using technology available. Data Source for Measure: Department/Area Report Standard and Baseline: Maintain the present enrollment and prevent further class sections loses. Baseline: To maintain the existing enrollments. Task Name: Recruit New Student Enrollments Task Description: Take part in NSO and continue to recruit new student enrollments. Budget Impact: No Funding Needed Measure: 85% of classes filled Data Source for Measure: Department/Area Report Standard and Baseline: 85% of classes filled. Baseline: 80% Task Name: Maximize Schedule Task Description: Maximize schedule by offering classes at optimum times Generated by TracDat a product of Nuventive. Page 259 of 297 Objectives Ed Silva Planning - Sociology - VV - Diversity in Department Course Offerings (2010-2011) Ensure students have choices in terms of course offerings and instructional formats in making course selections in Sociology. Planning Year(s): 2010 - 2011 Actual Completion Date: 01/19/2011 Objective Status: Met Budget Account Number: 11000-55300 Person(s) Responsible: Stacy Mayo Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Schedule sections in Sociology making use of all formats (Face to face smart classrooms; online classes; mini-mester sections; and hybrid sections) and all course offerings. Data Source for Measure: Department/Area Report Standard and Baseline: The use of at least one section of each instructional format and the use of all courses listed in the Sociology department during the 2010-2011 academic year. Baseline: All, save for the hybrid format, have been tried in Sociology department. All courses, save for Soci 2319 (Chicanos), have been offered. 09/29/2011 - Soci 2319 (Chicanos) is now being offered online Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 01/20/2011 - Soci 2319 is being offered spring 2011. Hybrid format is now available in Sociology. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Recruit and Train Task Description: Recruit and train faculty to try new teaching formats and to be able to teach more than one course offering. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Special Projects Performing Arts - VV - Annual Spring Arts Festival (20102011) - The Festival's main goal is to foster creative ideas and inspiring collaborations between EPCC faculty/staff and local, regional, and inter-/nationally-recognized 03/05/2012 11:46 AM Measure: Each year, the director leads a committee that offers its ideas for the Festival events. In the fall semester, the Festival solicits and reviews proposals. These are finalized before the spring semester. In the last 3 10/11/2011 - Once again, all proposals were accepted in the fall of 2010 while funding was provided and events successfully took place in the spring of 2011. The festival continued the tradition of annual events such as the Poetry Slam and the Student Art Exhibition while diverse new events Generated by TracDat a product of Nuventive. Page 260 of 297 Objectives artists. In addition, the Festival committee works to publicize each event in order to draw strong attendance. Each year, in addition to long-standing events, different participants are recruited to plan new events for the Festival calendar. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: Met Budget Account Number: 11000-52129 Person(s) Responsible: Richard Yañez Measures & Standards and Baselines / Strategies years, all proposals have received some funding. In addition to annual events, new events are promoted. Data Source for Measure: Department/Area Report Standard and Baseline: The long history of the Festival speaks to its success in bolstering the image of EPCC in the community. Increased attendance is a goal for the Festival, as well as an increased awareness for the talents of local, regional, and inter-/national artists. Compliments from students are a strong mark of success. Baseline: Presently, the Festival accepts an average of thirty events per year. These include most Arts disciplines offered at EPCC. Events have taken place at all but one campus (Mission). By proposing events, new faculty & staff are now involved. Results Action & Follow-Up were introduced, including a Spanish theatre production directed and performed by EPCC students (with a faculty sponsor). Events were well publicized by the Tejano Tribune and the El Paso Scene, as well as through posters and fliers at every campus. New faculty members ran film festivals and brought in national authors such as fantasy writer Maria V. Snyder. These events and others were backed by strong attendance. And for the first time, two events took place at Mission campus. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Spring Arts Festival Task Description: The Spring Arts Festival will enter its 34th year in 2011. Through a series of diverse events, the Festival celebrates art and culture. Faculty/staff from many areas propose, organize, and coordinate events, such as, a Poetry Slam, Dance Recitals, and Art Exhibits. The Festival director continues to work with new faculty/staff in order to offer different events each year. There is also an effort to coordinate with media outlets to publicize the Festival's rich offering of talent. Continued community support will be a prime goal. Budget Impact: No Funding Needed Projected Cost: 0.0000 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 261 of 297 Objectives Planning - Speech - NW - Quality (20102011) - Increase Speech 1318 enrollments. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: Not Met Budget Account Number: 11000-55268 Person(s) Responsible: Barbara Yancy-Tooks Measures & Standards and Baselines / Strategies Measure: If enrollment increased 50% of new students, should be 45% full. Data Source for Measure: Enrollment Data Standard and Baseline: First year 5% full, 2nd yr. 55% full. Baseline: Speech 1318 enrollments, 8 students or less. Action & Follow-Up 01/31/2012 - Student enrollments in Speech 1318 low across the five campuses. Objective not met. Progress: Unsatisfactory Action Plan Status: 3 - Follow-Up Documented 02/15/2012 - Offered course in Hybrid format to encourage stronger student participation. 01/31/2012 - Objective not met. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed 02/15/2012 - Personnel interviewed did not meet faculty credentialing criteria. Task Name: Online Course Task Description: Offer course fully online. Budget Impact: No Funding Needed Planning - Speech - NW - Quality 2 (20102011) - Recruit, retain quality faculty by offering full yr. lecture position; hire another full time Speech instructor. Planning Year(s): 2010 - 2011 Expected Completion Date: 12/09/2011 Objective Status: Not Met Budget Account Number: 11000-55268 Person(s) Responsible: Barbara Yancy-Tooks Measure: If additional full time instructor and lecturer hired. Data Source for Measure: Department/Area Report Standard and Baseline: Recruit. Baseline: Currently, there is one full-time instructor. Planning - Speech - TM - Distance Learning (2010-2011) - Speech faculty will develop distance learning skills for use in developing and teaching hybrid and online classes. Measure: Completion of Blackboard training. Data Source for Measure: Faculty Evaluation Standard and Baseline: 03/05/2012 11:46 AM Results Task Name: Speech Lecture Task Description: Hire another full-time instructor. Offer Speech lecture position for one full year. Budget Impact: No Funding Needed 05/26/2011 - Four out of five regularly scheduled instructors at TM have taught hybrid or online classes and continue to attend DL training. Progress: Satisfactory Generated by TracDat a product of Nuventive. Page 262 of 297 Objectives Planning Year(s): 2010 - 2011 Expected Completion Date: 05/30/2011 Objective Status: Met Budget Account Number: 55266 Person(s) Responsible: Linda Brown Planning - Speech - VV - Speech Major Tracking & Recruitment (2010-2011) - The Speech Discipline will identify, track and recruit speech communication majors with the goal of feeding those majors into the Associate of Arts in Speech Communication Degree Plan and/or the Field of Study in Speech. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/12/2010 Objective Status: In Progress Budget Account Number: 11000-55265 Person(s) Responsible: Keith W. Townsend, Sue Selk, Keri Moe Measures & Standards and Baselines / Strategies Results Action & Follow-Up Action Plan Status: 0 - No Action Plan Necessary Standard: 75% of TM Speech faculty will complete Blackboard training Baseline: Four of the 5 instructors that teach classes on a regular basis are Blackboard trained. Task Name: Enrollment in Balckboard Training and Teaching of Hybrid or Online Classes Task Description: Completion of Blackboard training. Funding Justification: No funding required Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: We will know that the plan is progressing when we are able to identify speech majors beyond those majors in the Forensics Program who are easily tracked and see the list grow beyond 4 or 5 majors. Data Source for Measure: Department/Area Report Standard and Baseline: We hope to build the amount of majors beyond those students who are in the Forensics Program and are pursuing Speech as a Field of Study. We hope to support and nuture those students so that they can successfully transition to a four year institution. Baseline: Currently we are making some effort to identify majors in our classes and are making some progress through the SCANS Speech Club. Task Name: Find Speech Majors 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 263 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 03/22/2011 - Instructors in the Speech Discipline (VV & DW) polled their classes for the Fall and Spring Semesters in order to determine Speech Majors. Four majors have been identified. Three Valle Verde Speech Instructors (Rebekah bell, Lisa McNeil, & Sue Selk) are currently planning a "Get Together" event for current and potential majors (Speech/Theatre) to take place in April 2011. The SCANS Speech Club will also be involved in this event. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented 03/22/2011 - Instructors polled their classes in order to identify majors. (see results) 08/31/2012 - Purchase of electronic displays/digital signage has been placed on hold by the department of Media Services. Issues have 01/18/2012 - Followup with Media Services to determine when we can purchase screens and install the Task Description: Beginning in Fall 2010, each Instructor will be asked to find Speech Majors in their classes and will be given a form that will be turned in to the Campus Coordinator(s) for tracking purposes. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: SCANS Speech Club Task Description: In addition, the SCANS speech Club has become a very vital campus organization and will serve as an excellent recruiting tool for the discipline. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Student Leadership & Campus Life - Digital Signage (2010-2011) Electronic Display 4 screens at VV. 03/05/2012 11:46 AM Measure: Installation of screens Generated by TracDat a product of Nuventive. Page 264 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 03/01/2010 Objective Status: In Progress Budget Account Number: 11000-52400 Person(s) Responsible: Arvis Jones Planning - Student Leadership & Campus Life - Just the Facts (2010-2011) Awareness of substance abuse on campus. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/01/2010 Objective Status: Withdrawn Budget Account Number: 11000-52000 Person(s) Responsible: Arvis Jones Planning - Student Leadership & Campus Life - Shout Out (2010-2011) - Increased number of students acknowledging family 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Data Source for Measure: Department/Area Report Standard and Baseline: Installation of Screens. Baseline: N/A Results Action & Follow-Up to be resolved with their equipment. SGA has authorized purchased. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed digital signage on our campuses. Task Name: Purchase of Screens and Software Task Description: Purchase of screens and software. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Thorough/comprehensive policy and procedures to address the issue. Data Source for Measure: Department/Area Report Standard and Baseline: Establishment of a Bacchus Club. Baseline: Expansion of social norming campaign 01/18/2012 - Program not developed. However, another program in its place with Texas Standing Tall - SBMI - Screening and Behavioral Motivational Intervention. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Survey Task Description: Recruitment of students, Conduct Core Survey, grant funding, implementation of policies and procedures Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: 01/18/2012 - Numbers were as follows: Fall 10 Increase in students requesting a Shout Out 115; Sp 10 - 170. Not a 10% increase but good Data Source for Measure: numbers. Generated by TracDat a product of Nuventive. 01/18/2012 - Continuous recruitment and promotion. Page 265 of 297 Objectives and friends. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/01/2010 Objective Status: Not Met Budget Account Number: 11000-52000 Person(s) Responsible: Arvis Jones Planning - Student Leadership & Campus Life - VV Student Union (2010-2011) Completion of Union. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/01/2010 Objective Status: In Progress Budget Account Number: 16001-B16001 Person(s) Responsible: Arvis Jones Planning - Student Leadership & Campus Life - TM Student Union (2010-2011) Architectural renderings and financial support from President's Office. Planning Year(s): 2010 - 2011 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Department/Area Report Standard and Baseline: 10% increase in number of photos taken. Baseline: Fall 09 -129 Sp 09 -159 Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed Action & Follow-Up Task Name: Marketing Task Description: Marketing Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Opening and student usage Data Source for Measure: Department/Area Report Standard and Baseline: No standard. Architectural Plans at 50% review 01/18/2012 - Student Union construction began in spring 2011, slated to be completed in fall 2011. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Collaboration Task Description: Continued collaboration with physical plant, SGA, and Student Leadership Office Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Receipt of drawings and allocation of funding from President's Office. Data Source for Measure: Department/Area Report Standard and Baseline: 01/18/2012 - President Rhodes approved Student Union at TM utilizing existing space. Institution Effectiveness has approved Student Union location. SGA has received drawing; however, we have to select another company per purchasing department. Generated by TracDat a product of Nuventive. 01/18/2012 - Upon completion of VV Student Union steps will be taken to begin the TM Student Union. Page 266 of 297 Objectives Actual Completion Date: 03/01/2010 Objective Status: Met Budget Account Number: 16001-B16001 Person(s) Responsible: Arvis Jones Planning - Student Leadership & Campus Life - Legacy Projects (2010-2011) Continuous Projects. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/01/2010 Objective Status: Met Budget Account Number: 16001-B16001 Person(s) Responsible: Arvis Jones Planning - Student Leadership & Campus Life - SGA Recruitment (2010-2011) Increased Enrollment. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/01/2010 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Allocation of funding & 50% drawings. Baseline: VV Union approval 2009. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Action & Follow-Up Task Name: Support from TM IE Task Description: Support from TM IE. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Establishment of 5th project Data Source for Measure: Department/Area Report Standard and Baseline: Completion of project. Baseline: Completion of projects in 06, 07, 08, 09 01/18/2012 - For 2010 Picnic tables umbrellas placed at each campus resulting in shaded area for students. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Project Submission Task Description: Project Submission Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Number of applications accepted & maintained Data Source for Measure: Department/Area Report Standard and Baseline: 25 members throughout year. Baseline: Fall 09 - 12 Sp 10 - 10 Generated by TracDat a product of Nuventive. Page 267 of 297 Objectives Objective Status: Not Met Budget Account Number: 16001-B16001 Person(s) Responsible: Arvis Jones Planning - Student Leadership & Campus Life - FT Student Union Staffing (20102011) - Hire Planning Year(s): 2010 - 2011 Actual Completion Date: 03/01/2010 Objective Status: In Progress Budget Account Number: 11000-52000 Person(s) Responsible: Arvis Jones Measures & Standards and Baselines / Strategies Results Action & Follow-Up 01/18/2012 - Student Union not completed in 2010-2011; therefore staff was not hired. Slated to be completed in 2011-2012. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 01/18/2012 - Two full time Staff members will be hired upon completion of Student Union. Funding will be provided by the Student Government Association. 01/18/2012 - Student Union was not completed in 2010-2011; therefore staff was not hired. Student Union slated for completion in 2011-2012. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 01/18/2012 - Upon completion of Student Union two full time employees will be hired. Funding provided by the Student Government Association. Task Name: Marketing Task Description: Marketing, one on one student recruitment Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Hire Data Source for Measure: Department/Area Report Standard and Baseline: No standard. No baseline. Task Name: Advertisement Task Description: Advertisement Budget Impact: Additional/New Funding Required Projected Cost: 16618.0000 Planning - Student Leadership & Campus Life - Student Ambassador (2010-2011) Institutionalize the Student Ambassador Program. 03/05/2012 11:46 AM Measure: 10/29/2010 - Program institutionalized summer Increased number of Ambassadors. Second 2010. semester retention. 2010-2011 - 18 Students 80% increase Data Source for Measure: Progress: Generated by TracDat a product of Nuventive. 01/18/2012 - Continuous recruitment and promoting of program. Page 268 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 08/12/2010 Objective Status: Met Budget Account Number: 11000-52407 Person(s) Responsible: Arvis Jones Planning - Student Success - Student Success Summer Bridge (2010-2011) - To continue to improve the program curriculum and procedures. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-12015 Person(s) Responsible: Irma Camacho Planning - Student Success - Student Success Summer Bridge 2 (2010-2011) To begin to institutionalize the program. 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Department/Area Report Standard and Baseline: 50% increase over Spring 2010. Baseline: Spring 2010 10 students ambassadors. Results Action & Follow-Up Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Continuous Recruitment Task Description: Continuous recruitment, marketing & instructor nomination. Budget Impact: Additional/New Funding Required Projected Cost: 28000.0000 Measure: To establish the writing curriculum by producing a guide which addresses LASSI Competencies Data Source for Measure: Department/Area Report Standard and Baseline: Student improvement on LASSI post-test. Baseline: LASSI results for 2009. Task Name: New Guide Task Description: Assign one faculty member to develop a guide. Conduct faculty development on the new writing guide. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Hire a full-time manager Data Source for Measure: Department/Area Report Generated by TracDat a product of Nuventive. Page 269 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-12015 Person(s) Responsible: Irma Camacho Planning - Student Success - Student Success PREP (2010-2011) - To scale up the program. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: New Budget Account Number: 11000-12014 Person(s) Responsible: Irma Camacho Measures & Standards and Baselines / Strategies Standard and Baseline: Hire a manager. Baseline: Currently the program is being administered by the Director of Student Success. Results Action & Follow-Up Task Name: Requesting Institutional Funds Task Description: Requesting institutional funds. Budget Impact: Additional/New Funding Required Projected Cost: 34440.0000 Measure: By comparing number of students served Data Source for Measure: Department/Area Report Standard and Baseline: 3500 students. Baseline: 2937 students were served in 2008-2009 Task Name: Marketing Task Description: Marketing Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Student Success - Project Dream (Summer Bridge) Institutionalization (20102011) - To hire a full time manager for the program Planning Year(s): 2010 - 2011 Expected Completion Date: 04/03/2011 Objective Status: New 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 270 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Account Number: 22666 E22666, 22663 E22663 Person(s) Responsible: Irma Camacho Planning - Student Success - Tutorial Support Services Staff (2010-2011) Increase the number of tutors at each of the campus Tutorial Support Service Centers to keep up with the increase number of students. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/11/2011 Objective Status: New Budget Account Number: 11000-12015 Person(s) Responsible: Irma Camacho Planning - Student Success - Reading Lab Staff (2010-2011) - Revise the staffing chart so that MDP, RG, TM and VV each lab has a supervisor who is a Lab Assistant Level III and is supported by a Lab Assistant Level II. All additional staff should be Lab Assistant I. Planning Year(s): 2010 - 2011 Expected Completion Date: 06/01/2011 Objective Status: New Budget Account Number: 11000-12015 Person(s) Responsible: Irma Camacho 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 271 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Planning - Student Success - PREP Database (2010-2011) - To establish a database which can be used for case management and can yield program student success reports. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Objective Status: New Budget Account Number: N/A Person(s) Responsible: Irma Camacho Planning - Student Technical Services Increase the Student Demand in Student Technical Services (2010-2011) - Place students on waiting list in STS Positions. Recruitment increase. Planning Year(s): 2010 - 2011 Actual Completion Date: 02/25/2010 Objective Status: Met Budget Account Number: 11000-75007 Person(s) Responsible: Debbie Aguilera Planning - Surgical Technology - RG - Area Plan (2010 - 2011) - Maintain licensure rate at or above state and or/national rate. Met national rate but not state rate 03/05/2012 11:46 AM Measure: By being able to hire. Data Source for Measure: Department/Area Report Standard and Baseline: Awareness across the district. Increase positions for student demand. Baseline: Current 75 employees. 10/26/2011 - We increased positions from 75 students to 90. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Recruitment of Program Task Description: Recruitment of program. Achieve grant monies. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Licensure or certification pass rate. Data Source for Measure: Program Review Data Standard and Baseline: 90%. No baseline. 05/11/2011 - 9 students sat for the exam 2 failed 77% pass rate Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Generated by TracDat a product of Nuventive. 10/07/2011 - Establish review sessions during the last two weeks of the Spring semester. Review Certification Exam Guide with students. Page 272 of 297 Objectives Planning Year(s): 2010 - 2011 Expected Completion Date: 05/11/2011 Actual Completion Date: 05/11/2011 Objective Status: Not Met Budget Account Number: 11000-55147 Person(s) Responsible: Cynthia Rivera Planning - Surgical Technology - RG Accreditation (2010-2011) - Maintain national accreditation of program. 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up 11/24/2010 - 75% pass rate. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Licensure Results Task Description: Track licensure results of graduates each year. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Pass Rates Task Description: Investigate standardized exit tests or review courses to strengthen pass rates. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Past Graduates Task Description: Evaluate areas of weakness of past graduates and need for curricular changes or charges to admission criteria. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Accred-status. Data Source for Measure: 11/24/2010 - Full accreditation Progress: Satisfactory Generated by TracDat a product of Nuventive. Page 273 of 297 Objectives Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-55147 Person(s) Responsible: Cynthia Rivera Measures & Standards and Baselines / Strategies Program Review Data Standard and Baseline: Full accreditation. Baseline: Full accreditation. Results Action & Follow-Up Action Plan Status: 0 - No Action Plan Necessary Task Name: Annual Fees Task Description: Pay annual fee to accred-agency. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Annual Reports Task Description: Submit annual reports to accred-agency. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Self-Studies Task Description: Submit self-studies when scheduled. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Teacher Preparation - VV - AA in Teacher Preparation Promotion (20102011) - To promote AA Teacher Preparation Program by clarifying degree in EPCC catalog and materials. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 03/05/2012 11:46 AM Measure: New program name will appear in EPCC 2011-2012 catalog. Standard and Baseline: Previous catalog showed confusing information. 08/31/2011 - New program name and clarifying information appeared in 2011-2012 catalog and new program information is now being used to promote program. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 274 of 297 Objectives Measures & Standards and Baselines / Strategies Results Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-553575 Person(s) Responsible: Isela Castanon-Williams Task Name: Work with District Wide Discipline and Curriculum Office Task Description: Meet with district wide discipline and Curriculum office to identify clarifying new program name and information for inclusion in 2011-2012 catalog. Funding Justification: None needed Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Technology Resource Center District-Wide Technology Training Services 2009-2011 - The Technology Resource Center will operate three centers: one at the VV, the second at RG, and the third at TM. This is in an effort to increase technology training to faculty and staff. Combined training methods will be utilized such as on-demand, web-based training opportunities that will allow the user to select training modules; and training will be delivered 24x7. Planning Year(s): 2009 - 2010 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: In Progress Budget Account Number: 11000-51005 Person(s) Responsible: Raymundo Vilca Measure: Training to faculty and staff will increase by 20% and 11 online modules will be developed. Data Source for Measure: Department/Area Report Standard and Baseline: Develop a catalog of web-based training modules and tutorials. Hire appropriate staff. Baseline: Extensive online module development occurred in year 2004-05 in areas such as WebCT training, Flash, PowerPoint and the use of HorizonLive webinars. Training in responds was also available. Hire 9 additional staff member to support services. 11/24/2010 - Training has increase by 17%. Online on-demand webinars are available for faculty or staff to view at their conveniance. The online modules need to be updated. Everything is still in progress. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Teaching Online Courses Task Description: Assist with the training of faculty teaching online courses. Budget Impact: Rollover/Maintain Current Funding 11/24/2010 - Training is on-going, with webinar workshops, face-to-face and one-to-one. Increased the training faculty and staff obtained by all methods listed by 17% Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Action & Follow-Up Page 275 of 297 Objectives Planning - Testing Services - Extending Hours of Service for MDP, TM and RG Campuses (2010-2011) - Extend Friday afternoon hours to 5:00pm for MDP, TM 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Task Name: Training Needs Task Description: TRC staff will continue to assess training needs and develop online tutorials, webbased training in various areas. Funding Justification: This will require staff, software and training to create the online tutorials and web-based training modules. Budget Impact: Additional/New Funding Required Projected Cost: 164968.0000 Task Name: Training Software Task Description: Continue to support or purchase the necessary training software. Funding Justification: Training is required to support the training software and maintain memberships to organizations that provide online webinars for training faculty, and staff. Budget Impact: Additional/New Funding Required Projected Cost: 15000.0000 Task Name: Web Development Services Task Description: Increased Web Development services. Budget Impact: Additional/New Funding Required 11/24/2010 - New training materials development started for TracDat, Student Response System "Clickers", and Smart Classrooms. Progress: Unsatisfactory Action Plan Status: 1 - Action Plan Needed Measure: Testing Centers will be operational during extended hours. 01/20/2012 - All Testing Centers will be open until 5:00 PM on Friday and will have extended hours during late resgistration. Instructor Services' will have extended hours on the two weeks prior to Standard and Baseline: Action & Follow-Up 11/24/2010 - Purchased Captivate5, Responds and renewed memberships to WECT and TXDLS for training and webinar opportunities. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary 11/24/2010 - No longer under Technology Resource Center. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 276 of 297 Objectives and RG . Offer Instructor Services and Placement testing from 8 am to 2 pm. Planning Year(s): 2010 - 2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-63001 Person(s) Responsible: Carolyn Buntyn Planning - Testing Services - Credit by Exam Extended Hours (2010-2011) - Offer additional Credit by Exam testing hours in the summer hours. Planning Year(s): 2010 - 2011 Objective Status: Met Budget Account Number: 11000-63001 Person(s) Responsible: Carolyn Buntyn/Barbara Hicks Measures & Standards and Baselines / Strategies Results Action & Follow-Up finals. To better serve the students, faculty and the Progress: Satisfactory community. Action Plan Status: 0 - No Action Plan Necessary Task Name: Extending Hours of Service for MDP, TM and RG Campuses Task Description: Work with Testing Coordinators at MDP, TM and RG to schedule staff for extended hours of operation. Request funds for additional PT employment. Budget Impact: Additional/New Funding Required Measure: Count the number of students who test during the extended hours Standard and Baseline: Hope to have at least 25 take advantage of the extended hours. This is the first time to offer extended hours. 01/25/2012 - Instructor Services increased the number of CLEP test sessions from 2 to 3 on Monday thru Thursday and from 1 to 2 on Friday and Saturday. Students could take any CLEP test during any of the sessions. They could also walkin and request to take CLEP during operational hours. If there was a seat available they were able to test on the same day. Our flexibility allowed community members to not be restricted to particular days to test on. EPCC moved to being one of the top 50 higher educational institutions recognized by the College Board for giving the most CLEP test in the nation. We were recognized as being one of the top 100 in the past years. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Credit by Exam Extended Hours Task Description: Market the extended hours to students. 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 277 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Schedule additional staff to administer tests. Budget Impact: Additional/New Funding Required Planning - Testing Services - Software for Test Security (2010-2011) - Install test security software to restrict students from going into internet areas while testing. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-63001 Person(s) Responsible: Carolyn Buntyn Measure: Software will be purchased and installed. Planning - Testing Services - Paperless Referrals for New Students (2010-2011) Going green- not use paper referrals Planning Year(s): 2010 - 2011 Measure: 01/20/2012 - New students are no longer required No use of paper - survey the students on the to obtain a paper referral from Admissions to new process schedule a testing appointment. Using the Banner system and the Testing Center Scheduler Standard and Baseline: program; all new students are identified on the Easier process intake for new students Testing Center Scheduler screen. Testing staff are able to assist the students without a paper referral. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-63003 Person(s) Responsible: Carolyn Buntyn/Armando Gomez 03/05/2012 11:46 AM 09/19/2011 - Fortress Software was purchased and installed in all Testing computers. Progress: Standard and Baseline: Higher test security. No software is installed Satisfactory Action Plan Status: currently. 2 - Action Plan Documented Task Name: Software for Test Security Task Description: Review software for test security - select software, purchase and install into Instructor Services workstations. Budget Impact: Rollover/Maintain Current Funding Task Name: Paperless Referrals for New Students Task Description: Admissions and Testing Services will work together to accomplish the paperless system. Generated by TracDat a product of Nuventive. Page 278 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: No Funding Needed Planning - Testing Services - GED Marketing (2010-2011) - Benefits of obtaining a GED credential Planning Year(s): 2010 - 2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-63005 Person(s) Responsible: Carolyn Buntyn/Cynthia Compean Planning - Testing Services - Increase Instructors Services Hours (2010-2011) Increase hours during for the week after Thanksgiving and finals week on Tuesdays and Wednesdays until 6:00pm. Planning Year(s): 2010 - 2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-63001 Person(s) Responsible: Carolyn Buntyn 03/05/2012 11:46 AM Measure: 01/20/2012 - Our intentions were to record GED Offer New Student Orientation and count the graduates and stream their testimonials on the number of participants. GED website. Due to webpage design it was not feasable. To market GED paticipants to attend Standard and Baseline: higher education; the GED, Recruitment, Career To increase GED graduates from previous Services and Financial Aid staff worked together year. to offer informational sessions. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: GED Marketing Task Description: Attending educational fairs, market on billboards, newspaper and outreach to local media Budget Impact: Rollover/Maintain Current Funding Measure: The number of students testing will increase on those 2 weeks. Data Source for Measure: Department/Area Report Standard and Baseline: Current hours of operation are 8-5 on those days. We will provide more resources for the students. 01/25/2012 - Instructor Services increased their operational hours the week before finals and the week of finals to 6:00 PM daily. It better served our students and faculty. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Increase Instructors Services Hours Task Description: Will try to accommodate and flex time to be able to extend those days in the schedule for the extra hour for those two weeks. Generated by TracDat a product of Nuventive. Page 279 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up Budget Impact: No Funding Needed Planning - Testing Services Implementation of MOU (2010-2011) Transfer all ACCUPLACER sites under EPCC before the end of the year. Planning Year(s): 2010 - 2011 Expected Completion Date: 12/31/2010 Actual Completion Date: 03/01/2011 Objective Status: Met Budget Account Number: 11000-63003 Person(s) Responsible: Carolyn Buntyn Measure: We will be setting milestones and deadlines for the goal to be accomplished. Planning - Testing Services - Digitize Dual Credit Testing Records for Easier Reference and Storage (2010-2011) Digitize Dual Credit testing records for easier reference and storage. Planning Year(s): 2010 - 2011 Measure: Determine if a process was created for Coordinators across the district to view Dual Credit rosters and seating charts. Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-63003 Person(s) Responsible: 03/05/2012 11:46 AM Standard and Baseline: By December 31, 2010, all ISD's ACCUPLACER sites will be under EPCC/UTEP site. 03/01/2011 - All Region XIX existing ACCUPLACER sites moved to the one site managed by EPCC and UTEP Testing Departments by March 1, 2011. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Letters have been sent to ISDs Task Description: Letters have been sent informing the ISDs that they need to backup their student data before December 31, 2010. During this time, the new ACCUPLACER site has been created and testing profiles for the ISDs are being copied to be ready to be activated by January 1st 2011. Budget Impact: No Funding Needed Standard and Baseline: None 01/25/2012 - A digitize paperless system was created on the Testing Services server to view Dual Credit roster lists and seating charts for all Dual Credit test sessions. The Testing Services Coordinators have access to view the Dual Credit test session records within the district. We no longer keep paper rosters for Dual Credit test sessions. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Storage Space Generated by TracDat a product of Nuventive. Page 280 of 297 Objectives Carolyn Buntyn Measures & Standards and Baselines / Strategies Measure: We will install microphones to record audio in video surveillance system. Planning - Testing Services - Profiles of Success (2010-2011) - Encourage potential GED clients to obtain the GED credential by having former GED clients talk about taking the first steps in getting the GED credential. Planning Year(s): 2010 - 2011 Measure: By the number of persons that visit the website. 03/05/2012 11:46 AM Action & Follow-Up Task Description: Scan all documents and storing data in a network storage space. Budget Impact: No Funding Needed Planning - Testing Services - Improve Surveillance Systems (2010-2011) - Add audio recording to surveillance systems. Planning Year(s): 2010 - 2011 Expected Completion Date: 01/31/2011 Actual Completion Date: 09/30/2011 Objective Status: Withdrawn Budget Account Number: 11000-63001 Person(s) Responsible: Carolyn Buntyn Actual Completion Date: 08/31/2010 Objective Status: Met Budget Account Number: 11000-63005 Person(s) Responsible: Results Standard and Baseline: Provide more clarity to situations that might arise where the video is not enough to explain or capture the intensity of a problem/situation. Currently there's video but no audio surveillance. 01/20/2012 - It was too costly to add the audio to the surveillance at this time due to budget cuts. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Purchase Microphones Task Description: Purchase 6 microphone systems or 6 cameras with audio capability with cable accessories. Budget Impact: Rollover/Maintain Current Funding 01/20/2012 - Teamed with Workforce to hold GED orientations to assist students with information to gain their crediential. The participants were offered GED preparation classes at a modest fee. Standard and Baseline: Increase of GED test takers. In the planning Participants were given college assessment test scores requirements information that they would stages. need to participate in a wide variety of career based programs as well as Associates of Arts degrees. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 281 of 297 Objectives Carolyn Buntyn Measures & Standards and Baselines / Strategies Action & Follow-Up Task Name: Make a Web Page Task Description: Make a web page with the clients video or text profile on the GED TS website. Budget Impact: No Funding Needed Planning - Testing Services - Testing Support for Teacher for a New Era (2010 2011) - To pre and post test students who are identified in the Teacher for a New Era grant according to the guidelines. The grant was awarded to EPCC and UTEP to determine if assigning a mentor would benefit students in preparation for the TEXAS Certification Test for teachers. Planning Year(s): 2010 - 2011 Expected Completion Date: 12/31/2010 Actual Completion Date: 04/30/2011 Objective Status: Met Budget Account Number: 11000-63001 Person(s) Responsible: Carolyn Buntyn and Gloria Palos Measure: Do students who have a mentor have an advantage over students who do not and only have a self study guide? Data Source for Measure: Student Related Data (Tracking/Performance) Standard and Baseline: All students were given a study guide. A selected group of students were offered a mentor. Mentors met with students and assisted with preparation. Planning - Testing Services - Conduct CLEP Workshop 2010-11 - Have a representative from The College Board give an informational workshop on CLEP for Counselors, Faculty, staff and partners. Measure: The number of people registered for the workshop. 03/05/2012 11:46 AM Results 04/30/2011 - 55 students were pre tested and 31 were post tested. Based on the results the students increased their test scores by 7%. There was not a significant increase between the two groups (those who had a mentor and those who did not). Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: To define if Assigning a Mentor made a Difference Task Description: All students received the study guide and 50% of the students would be assigned a mentor. Budget Impact: No Funding Needed Funding Justification: Testing Services received $1500 from the grant to assist with expenses. Standard and Baseline: The need to increase the awareness about the benefits of getting college credit through 04/25/2011 - Over 70 people attended the informational workshop. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 282 of 297 Objectives Planning Year(s): 2010 - 2011 Expected Completion Date: 04/25/2011 Actual Completion Date: 04/25/2011 Objective Status: Met Budget Account Number: 11000-63001 Person(s) Responsible: Carolyn Buntyn, Barbara Hicks Planning - Testing Services - Assist Faculty in Aligning THEA IBT Cut Scores for Course Placement (2010-11) - Assist faculty in aligning THEA IBT cut scores for course placement 2010-11 Planning Year(s): 2010 - 2011 Objective Status: Met Budget Account Number: 11000-63001 Person(s) Responsible: Armando Gomez Measures & Standards and Baselines / Strategies Results Action & Follow-Up CLEP. Task Name: Have a College Board Representative Conduct a Workshop on CLEP Task Description: The session will be directed to the Counselors, the faculty, the staff and college partners to provide information about the benefits of gaining college credits through CLEP. Budget Impact: No Funding Needed Measure: 05/02/2011 - With the help of the statistical data Faculty getting all the necessary information and the Testing Services support, the college to recommend cut scores. faculty was able to set THEA Internet Based Testing cut scores for course recommendations. Standard and Baseline: Faculty needs to have all the statistical data Progress: Satisfactory needed to make a recommendation on cut Action Plan Status: scores. 0 - No Action Plan Necessary Task Name: Provide Data to Faculty Task Description: 3 disciplines, Math, Reading and English will be provided with statistical data to help them make a decision. Budget Impact: No Funding Needed Planning - Theater Department - VV Increase Class fill Rate: Number Adjustments (2010 - 2011) - 1. Establish smaller class caps for those classes such as Acting I, Acting II, and Voice for the Theater that merit smaller caps but are still being measured by traditional caps of 25-30 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 283 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up students. 2. Reduce the number of sections of DRAM 1310 Introduction to Drama that have been offered at times that competed with one another or that did not have optimum fill rates. Planning Year(s): 2010 - 2011 Expected Completion Date: 01/31/2011 Actual Completion Date: 10/07/2011 Objective Status: Met Budget Account Number: 11000Person(s) Responsible: Lisa McNiel Planning - Theater Department - VV Increase Class Fill Rate: Recruiting (2010 2011) - 1. We need to promote the technical side of theater arts, and make prospective students aware of the various job opportunities in this field. 2. Develop presentations to take to EPCC's New Student Orientations. 3. Schedule meetings with local high school directors, meet with their classes, make presentations, and distribute promotional materials about EPCC's theater department. 4. Attend U.I.L. competitions to spot talent and recruit those students into our program. Planning Year(s): 2010 - 2011 Expected Completion Date: 05/31/2011 Actual Completion Date: 10/07/2012 Objective Status: 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 284 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up 10/27/2011 - Has not progressed due to heavy workload. Progress: Satisfactory Action Plan Status: 1 - Action Plan Needed 10/27/2011 - Procedure to be drafted in Spring 2012 to be reviewed and approved by Cabinet by 8/31/2012 Met Budget Account Number: 11000Person(s) Responsible: Lisa McNiel Planning - Travel/Tourism - ASC Partnership with a Travel Agency (20102011) - Develop a partnership with a local travel agency to provide a practicum experience. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2010 Objective Status: New Budget Account Number: 11000-55426 Person(s) Responsible: Linda Cropper Planning - Vice President Admin & Financial Services - Internal Audit Process Procedure (2010-2011) - To address management letter recommendation from external auditor regarding the creation of procedure documenting the Internal audit of college processes and functions. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/03/2010 Objective Status: In Progress Budget Account Number: 11000-73000 03/05/2012 11:46 AM Measure: Track the number of students who participate in the practicum. Data Source for Measure: Department/Area Report Standard and Baseline: Give students hands on experience before graduation. Baseline: Approximately 3 graduates per semester. Task Name: Set Up Kiosk Task Description: Set up kiosk on site by Fall, 2010. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: A draft of the new procedure is presented to the President's Cabinet for review by October 30,2010. Data Source for Measure: Department/Area Report Standard and Baseline: The new procedure is adopted by Cabinet by November 30, 2010.Baseline: Internal Audits processes are occurring based on risk assessment of potential areas as identified by administration. Task Name: Procedure Task Description: Generated by TracDat a product of Nuventive. Page 285 of 297 Objectives Person(s) Responsible: Josette Shaughnessy Planning - Vice President Admin & Financial Services - Non-Mandatory TransferTechnology Fund (2010-2011) - To allocate tuition revenue collected from students to the Technology Fund. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/03/2010 Objective Status: Met Budget Account Number: 11000-73280 Person(s) Responsible: Josette Shaughnessy Planning - Vice President Admin & Financial Services - Non-Mandatory Transfer-Student Government (2010-2011) - To allocate $5 per student from the tuition revenue 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up First draft of procedure is completed by AVP by August 31, 2010 and forwarded to Comptroller and Executive Assistant to the President for comments. Final daft is prepared for review by Cabinet in October 2010. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Allocation is done by Accounting on a semesterly basis. Data Source for Measure: Department/Area Report Standard and Baseline: Funding is available for procuring state-ofthe-art technology to enhance student learning. Baseline: Allocation is ongoing based on the tuition revenue stream. As enrollment increases, allocation is adjusted to reflect the increase funded by tuition. 10/27/2011 - Full allocation based on enrollment was completed every semester to allow purchases of technology to enhance student learning Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Allocation Task Description: Accounting receives enrollment information and allocates $50 per student thru a transfer from the Unrestricted Fund to the Technology Fund. Budget Impact: Additional/New Funding Required Projected Cost: 47811.0000 Measure: Allocation is done by Accounting on a semesterly basis. Data Source for Measure: 10/27/2011 - Allocation was completed at the end of each semester for the benefit of the Student Government FundProgress: Generated by TracDat a product of Nuventive. Page 286 of 297 Objectives collected form students to the Student Government Fund. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/03/2010 Objective Status: Met Budget Account Number: 1000-73281 Person(s) Responsible: Josette Shaughnessy Planning - Vice President Admin & Financial Services - Non-Mandatory TransferIntercollegiate Athletics Fund (2010-2011) To allocate $3 per student and $1.50 per credit hours from the tuition revenue collected from students to the Intercollegiate Athletics Fund. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/03/2010 Objective Status: Met Budget Account Number: 11000-73282 Person(s) Responsible: Josette Shaughnessy 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Action & Follow-Up Satisfactory Department/Area Report Action Plan Status: Standard and Baseline: 0 - No Action Plan Necessary Funding is available to fund student activities and provide leadership training to students. Baseline: Allocation is ongoing based on the tuition revenue stream. As enrollment increases, allocation is adjusted to reflect the increase funded by tuition. Task Name: Student Government Fund Task Description: Accouting receives enrollment information and allocates $5 per student to the Student Government Association Fund thru a transfer. Budget Impact: Additional/New Funding Required Projected Cost: 9979.0000 Measure: Allocation is done by Accounting on a semesterly basis. Data Source for Measure: Department/Area Report Standard and Baseline: Funding is available to fund Intercollegiate Athletics and provide scholarships to talented athletes. Baseline: Allocation is ongoing based on the tuition revenue stream. As enrollment increases, allocation is adjusted to reflect the increase funded by tuition. 10/27/2011 - Allocation based on actual enrollment was completed by the end of each semester for the benefit of the Intercollegiate Athletic Fund. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Allocation Task Description: Accounting receives enrollment information and allocates $3.00 per student and $1.50 Generated by TracDat a product of Nuventive. Page 287 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up per credit hour per semester. Budget Impact: Additional/New Funding Required Projected Cost: 20457.0000 Planning - Vice President Admin & Financial Services - Non-Mandatory TransferInstructional Equipment (2010-2011) - To allocate $12 per student from the tuition revenue collected from the students to the Instructional Equipment Fund. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/03/2010 Objective Status: Met Budget Account Number: 11000-73283 Person(s) Responsible: Josette Shaughnessy Planning - Vice President Admin & Financial Services - New Programs (2010-2011) - To update budgets for new self-supporting programs created during the fiscal year. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/03/2010 03/05/2012 11:46 AM Measure: Allocation is done by Accounting on a semesterly basis. Data Source for Measure: Department/Area Report Standard and Baseline: Funding is available to fund instructional equipment that enhances student learning in the various disciplines. Baseline: Allocation is ongoing based on the tuition revenue stream. As enrollment increases, allocation is adjusted to reflect the increase funded by tuition. 10/27/2011 - Allocation was completed at end of each semester to fund instructional equipment needed to support the various disciplines. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Instrucional Equipment Fund Task Description: Accounting receives enrollment information and allocates $12 per student to the Instuctional Equipment Fund thru a transfer from the Unrestricted Fund. Budget Impact: Additional/New Funding Required Projected Cost: 9583.0000 Measure: Budget is increased based on upcoming new programs usually generated to absorb costs not covered by a grant or contract. Data Source for Measure: Department/Area Report Standard and Baseline: Funding is available based on revenue 10/27/2011 - The budget allocated to new selfsupporting programs was updated to accommodate the need to provide new programs to the community. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 288 of 297 Objectives Measures & Standards and Baselines / Strategies Objective Status: Met Budget Account Number: 12270-S12270 Person(s) Responsible: Josette Shaughnessy generated from the new program. Baseline: Current budget is established to absorb new programs. Planning - Vice President, Research and Development - Milestone Project Phase II (2010-2011) - Develop and implement district-level comprehensive student success tracking and reporting system for research and reporting of all student cohorts, tracking and reporting on successes at numerous momentum and milestone events. Planning Year(s): 2010 - 2011 Expected Completion Date: 09/20/2011 Actual Completion Date: 09/20/2011 Objective Status: Met Budget Account Number: 11000-12004 Person(s) Responsible: saul candelas Measure: Fully functioning system to be in place, with the proven ability to run different cohorts of student data, resulting in usable reports for analysis. Data Source for Measure: Student Related Data (Tracking/Performance) Standard and Baseline: Standard: Fully functioning at the district level, able to run at least three different cohorts of student data, producing usable reports. 03/05/2012 11:46 AM Results Action & Follow-Up Task Name: New Programs Budget Task Description: Once submitted to the Budget Office, selfsupporting programs are reviewed for budget accuracy and a determination is made as to increase the budget for the new programs. Budget Impact: No Funding Needed Projected Cost: 0.0000 Baseline: Existing ability to provide similar but not fully integrated research data for the DEI project. Task Name: Milestone Project Phase II Task Description: Working through the Planning Director's Office, software specifications, selection, implementation and training will be Generated by TracDat a product of Nuventive. Page 289 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up conducted. Two SAS programmers will be hired. Most of project will be founded on the DEI initiative, hence that feature for research will be in place before the fully comprehensive Milestone in functional. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 87000.0000 Planning - Vice President, Research and Development - Compliance Certification Phase II (2010-2011) - Finalize Compliance Certification report in preparation for submission to SACS to secure Reaffirmation. Planning Year(s): 2010 - 2011 Expected Completion Date: 03/15/2012 Objective Status: In Progress Budget Account Number: 11000-12004 Person(s) Responsible: saul candelas Measure: Produce final draft of compliance certification report. Data Source for Measure: Committee Recommendation Standard and Baseline: Standard: Fully functioning, complete Compliance Certification Report completed and submitted by March 15, 2012. Baseline: Current reaffirmation report. Planning - Vice President, Student Services - Incoming Administrator (VP) 2010-2011 Establish smooth transition for incoming administrator. Measure: Position must be filled. Data Source for Measure: Department/Area Report 03/05/2012 11:46 AM Task Name: Compliance Certification Phase II Task Description: Compliance Certification Manager submits for Core Leadership (cabinet) approval of final version of Report after receiving and accounting for internal and external review (two reviewers). Budget Impact: Rollover/Maintain Current Funding Projected Cost: 60000.0000 Funding Justification: personnel costs 10/05/2011 - The President made a decision and appointed Linda Gonzalez-Hensgen as the Vice President of Student Services Progress: Generated by TracDat a product of Nuventive. Page 290 of 297 Objectives Planning Year(s): 2010 - 2011 Actual Completion Date: 04/14/2010 Objective Status: Met Budget Account Number: 11000-12003 Person(s) Responsible: Linda Gonzalez-Hensgen Planning - Vice President, Workforce/Economic Development & Continuing Education - Leadership Meetings (2010-2011) - Keep Workforce Leadership team informed by providing information disseminated at Cabinet Meetings and review the status of our programs. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2010 Actual Completion Date: 08/31/2010 Objective Status: Met Budget Account Number: 11000-12005 Person(s) Responsible: Yolanda Ahner Measures & Standards and Baselines / Strategies Standard and Baseline: Fill Position. Baseline: Vice President position currently vacated. Results Action & Follow-Up Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Vice President Task Description: Finalize Vice President of Student Services Organizational Structure Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Hold meetings a minimum of 2 times a quarter. Data Source for Measure: Department/Area Report Standard and Baseline: Department leaders should continue to respond to the needs of the college & community and continue to incorporate new training & curriculum. Baseline: Held 9 meetings this school year. 08/31/2011 - In July, 2009, I was selected as the VP so I held meetings after Cabinet to disseminate information to all Directors/Managers. Throughout the year individual meetings were held with each Director/Manager to discuss the progress of their programs. Met with each supervisor to discuss status of budgets. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Meetings and Business Leaders Task Description: By holding the meetings and inviting business leaders to present at some of our meetings to assist Directors/Managers in keeping abreast of new ideas. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Vice President, Workforce/Economic Development & 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 291 of 297 Objectives Continuing Education - Increase College's Image (2010-2011) - Continue to work with partners, businesses, agencies to respond to community needs. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2010 Actual Completion Date: 08/31/2010 Objective Status: Met Budget Account Number: 11000-12005 Person(s) Responsible: Yolanda Ahner Measures & Standards and Baselines / Strategies Measure: Participate in local, area, state and national organizations to showcase our college. Data Source for Measure: Department/Area Report Standard and Baseline: Attend a minimum of 10 meetings throughout the year. Baseline: Respond to invitations . Results Action & Follow-Up 11/10/2010 - Attended meetings throughout the year to ensure the College was represented in any discussion dealing with the college providing instruction and partnered with several organizations to sponsor programs for their organizations. Attended national conferences and discussed programs from our college. Providing mentoring to other college to assist them in implementing programs they were interested in promoting at their college. Also, partnered with outside organizations to provide and introduce "green energy" instruction to our local companies/industries. Wrote grants and received money to provide free training to company incumbent and new hires. Continuously working with companies to continue to improve our image and to showcase our programs. Evidence is provided by the many courses we have customized for organizations. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented Task Name: Attend the Meetings Task Description: Attend the meetings. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Vice President, Workforce/Economic Development & Continuing Education - Provide a Quality Workforce (2010-2011) - Continue to meet with business and industry to assist in training new and incumbent workers in our County. 03/05/2012 11:46 AM Measure: Support and expand the development of new courses to meet the demands of new industry requirements. Data Source for Measure: Department/Area Report Standard and Baseline: Develop and offer new courses. Baseline: 11/10/2010 - Over 5,000 incumbent, new hires and youth were provided for business/industry and agencies to provide training through grants. An additional 10,000 students were provided courses through Continuing Education courses. Progress: Satisfactory Generated by TracDat a product of Nuventive. Page 292 of 297 Objectives Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2010 Actual Completion Date: 08/31/2010 Objective Status: Met Budget Account Number: 11000-12005 Person(s) Responsible: Yolanda Ahner Planning - Vice President, Workforce/Economic Development & Continuing Education - Auditing Plan (20102011) - Continue to monitor all grants received for Workforce/Econ, Division. Planning Year(s): 2010 - 2011 Expected Completion Date: 08/31/2010 Actual Completion Date: 08/31/2010 Objective Status: Met Budget Account Number: 11000-12005 Person(s) Responsible: Yolanda Ahner 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Continue to keep up with industry changes. Results Action & Follow-Up Action Plan Status: 2 - Action Plan Documented Task Name: New Courses Task Description: Offer new courses and rewrite current courses to keep up with industry/business changes and submit to the EPCC Board of Trustees for approval. Budget Impact: No Funding Needed Projected Cost: 0.0000 Measure: Support all Directors/Mgrs in monitoring their revenue & expenditures. Data Source for Measure: Department/Area Report Standard and Baseline: Conduct internal audit. Baseline: Continue to keep up with auditing rules from the agencies receiving awards. 11/10/2010 - All grants were monitored by our department to ensure compliance for the different funding agencies. Meetings were held with business/industry and agencies to provide leadership to the companies to ensure compliance. Our department also monitored all students (credit & non-credit) to ensure compliance from referrals from Workforce Solutions. Over 300 students fit this category. All audit were conducted from outside agencies dealing with Workforce departments from our office. Progress: Satisfactory Action Plan Status: 2 - Action Plan Documented 09/12/2011 - Audits were conducted by the various agencies and were considered satisfactory Task Name: Rules Task Description: Provide all Directors/Managers with the rules. Budget Impact: Generated by TracDat a product of Nuventive. Page 293 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up No Funding Needed Projected Cost: 0.0000 Planning - Vocational Nursing MDP - ATI Testing (2010-2011) - To ensure the continuation of ATI testing. Planning Year(s): 2010 - 2011 Actual Completion Date: 08/31/2011 Objective Status: Met Budget Account Number: 11000-55011 Person(s) Responsible: Kimberly Golucke Measure: All students take ATI standardized tests specific to coursework. All students will pass comprehensive ATI predictor. Data Source for Measure: Department/Area Report Standard and Baseline: All students take ATI standardized tests specific to coursework. All students will pass comprehensive ATI predictor. 08/31/2011 - All vocational nursing students took ATI standardized tests specific to coursework. All students passed the ATI Comprehensive Predictor in order to complete program of study by utilizing all available resources offered by ATI throughout the program. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Measure: All students will take the course specific ATI examination. All students will pass the ATI Comprehensive Predictor. 08/31/2011 - All students completed the course specific ATI examination and all students passed the ATI Comprehensive Predictor to exit the program. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Standard and Baseline: All students will take the course specific ATI examination. All students will pass the ATI Comprehensive Predictor Task Name: Increase Budget Task Description: Pass cost to the student, increase budget or seek new grant money. Budget Impact: Additional/New Funding Required Projected Cost: 17000.0000 Planning - Vocational Nursing MDP Maintain and Fill Faculty Positions (20102011) - To fill all faculty positions. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/05/2012 11:46 AM Measure: All full-time faculty positions are filled and increased by 2 positions. Data Source for Measure: Department/Area Report Standard and Baseline: 11/16/2010 - All VN faculty positions filled; four tenure track positions, two full-time positions. No VN faculty positions being utilized at RG. Progress: Satisfactory Action Plan Status: Generated by TracDat a product of Nuventive. Page 294 of 297 Objectives Measures & Standards and Baselines / Strategies 08/31/2011 Objective Status: Met Budget Account Number: 11000-55011 Person(s) Responsible: Kimberley Golucke Keep. Baseline: 3 full-time VN instructor positionS, two positions vacant. (One LVN slot being utilized at RG). Measure: All full-time faculty positions are currently filled Results Action & Follow-Up 0 - No Action Plan Necessary Standard and Baseline: Keep. Baseline: 6 full-time VN instructor positions. (No LVN slots being utilized at RG). 08/31/2011 - Currently three tenure track instructors and three full time lecturer positions filled. Progress: Satisfactory Action Plan Status: 0 - No Action Plan Necessary Task Name: Advertise Task Description: Advertise and retain stipends. Budget Impact: Additional/New Funding Required Projected Cost: 100000.0000 Planning - Workforce Development - Green Training (2010 - 2011) - To develop Green Training Courses in the electrical and construction trades. Planning Year(s): 2010 - 2011 Actual Completion Date: 03/10/2010 Objective Status: In Progress Budget Account Number: 12103-S12103 Person(s) Responsible: Luz Taboada 03/05/2012 11:46 AM Measure: To develop green technology courses in Weatherization and Energy efficiency/Retro fitting Data Source for Measure: Department/Area Report Standard and Baseline: Since there are currently not enough skilled workers doing weatherization and efficiency retrofit programs, we need to train people in this field. Baseline: There are no green courses being offered under WFD. Task Name: Courses Task Description: Provide courses to agency-sponsored students and the community at large. Budget Impact: Generated by TracDat a product of Nuventive. Page 295 of 297 Objectives Measures & Standards and Baselines / Strategies Results Action & Follow-Up No Funding Needed Projected Cost: 0.0000 Task Name: Green Courses Task Description: Work with local business and industry experts to identify areas where green courses are most needed and develop the curricula. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Hire Instructors Task Description: Hire instructors. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Market and Recruit Task Description: Market courses and recruit students. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: TPCS Certification Task Description: Go through the TPCS certification process. Budget Impact: No Funding Needed Projected Cost: 0.0000 03/05/2012 11:46 AM Generated by TracDat a product of Nuventive. Page 296 of 297 Objectives 03/05/2012 11:46 AM Measures & Standards and Baselines / Strategies Results Generated by TracDat a product of Nuventive. Action & Follow-Up Page 297 of 297