RRC-06 Planning Interface Regional Radiocommunication Conference (RRC-06) Miroslav Ćosić, Andrea Manara

advertisement
Regional Radiocommunication Conference (RRC-06)
15 May - 16 June 2006, Geneva, Switzerland
RRC-06 Planning Interface
Miroslav Ćosić, Andrea Manara
Radiocommunication Bureau
Outline
Introduction
 Input data
 Service areas/Coverage analysis
 General analysis/Compatibility status
 Synthesis results
 Tools
 Future improvements

RRC-06 15 May – 16 June 2006 Geneva Switzerland
RRC-06 Planning Interface
GUI application for Windows PCs
 RAD based on Microsoft .NET
 Formerly known as RRC06 Display 2
 Introduced during IPG1
(see document IPG-1/20-E)
 Ongoing improvements in features
and performance

RRC-06 15 May – 16 June 2006 Geneva Switzerland
Installation

Windows 2000 or XP
 Min. 1 GHz processor + 512 MB RAM
 Latest version available at:
http://www.itu.int/ITU-R/conferences/rrc/rrc-04/intersession/progs/
RRC_output_display/rrc_display.zip
or from the PCs in the CICG Cyber-Café (level -1)

No need for administrator privileges
(only one time for .NET framework install)
 In case of installation (or any other)
problem, contact RRC06.software@itu.int
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Release Notes and Help

Release notes are in 5 languages
http://www.itu.int/ITU-R/conferences/rrc/rrc-04/intersession/progs/RRC_output_display/index.html
http://www.itu.int/ITU-R/conferences/rrc/rrc-04/intersession/progs/RRC_output_display/index-fr.html
http://www.itu.int/ITU-R/conferences/rrc/rrc-04/intersession/progs/RRC_output_display/index-es.html
http://www.itu.int/ITU-R/conferences/rrc/rrc-04/intersession/progs/RRC_output_display/index_ar.html
http://www.itu.int/ITU-R/conferences/rrc/rrc-04/intersession/progs/RRC_output_display/index-ru.html
or from the Help->Release Notes menu item in the application itself
Feature set evolves faster than the
help can be updated and translated
 Help is available in the main Help
menu and in the PE and AD tools

RRC-06 15 May – 16 June 2006 Geneva Switzerland
Features
Input data
 Service areas/Coverage analysis
 Compatibility analysis/status/details
 Synthesis results/Coverage analysis
 Planning exercise tool
 Administrative declarations tool
 Future improvements

RRC-06 15 May – 16 June 2006 Geneva Switzerland
Auxiliary Features
Exporting to HTML, CSV or Excel
 Exporting input data subset to MDB
 Printing of graphics
 Per-table column positions, widths
and visible/hidden are remembered
 Per-table sorting by up to 5 criteria
can be saved as preferences

RRC-06 15 May – 16 June 2006 Geneva Switzerland
Input Data
– Viewing notices from MDB file
– Viewing notices from online database
– Subsets of input data
•
•
•
•
Digital requirements
Administrative declarations (if available)
Analogue TV broadcasting assignments
Other primary services assignments
– Allotment area displayed on map
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Selection of CNG Geo Areas
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Types of Requirements

There are 4 main types of standalone
and “linked” requirements
– Standalone allotment (DT2 or DS2)
– Standalone assignment (DT1 or DS1)
– Single Frequency Network (SFN)
– Assignment linked to an allotment
(not an SFN) (DT2+DT1 or DS2+DS1)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Linked Requirements - SFN

To determine the service area and to
investigate incompatibilities, SFNs
can be subdivided into three types
– SFN without assignments (SFN DT2/SFN DS2)
– SFN without an allotment (SFN DT1/SFN DS1)
– SFN with both an allotment and
assignments (SFN DT2+DT1, SFN DS2+DS1)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Requirements Statistics - DP
Requirements for Planning
Type (No. of Parts)
Notice Type
No. of Sets
DT1/DS1
DT2/DS2
DT2/DS2 standalone
17399
-
17399
DT1/DS1 standalone
38536
38536
-
5236
-
5236
1191
3717
-
1781
5294
1781
633
633
633
-
48180
25049
DT2/DS2 (1)
SFN DT1/DS1 (>1)
DT2 (1) + DT1(>1) or
DS2 (1) + DS1(>1)
DT2 (1) + DT1 (1) or
DS2 (1) + DS1 (1)
Total per Notice Type
Grand Total
64776
73229
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Service Areas – SFN DT1
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Input Data – Coverage Analysis
Coverage analysis provides the
answer to the question
“How many (linked) requirement’s
service areas cover a given point?”
 Since synthesis and MIG analysis
results are not used, Band III (linked)
requirements are subdivided into
DVB-T and T-DAB

RRC-06 15 May – 16 June 2006 Geneva Switzerland
Coverage Analysis

DT2/DS2, DT2+DT1/DS2+DS1, SFN DT2/SFN DS2,
SFN DT2+DT1/SFN DS2 +DS1:
allotment area is total service area
 DT1/DS1, SFN DT1/SFN DS1: (combined)
assignment service area is total
service area
 Right-clicking in the map of coverage
analysis display distinguishes
among these 6 types and subtypes
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Coverage Analysis – SFN DT1
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Compatibility Analysis

Starting points:
– Input data summary table or SFN parts list
(new menu item available on right-click)
– Compatibility status
– Channel distribution statistics (if synthesis
results are available)
– General analysis per requirement

General Analysis display for a particular
requirement under investigation
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Compatibility Status
Lists all incompatibilities within one
administration or between two adms
 5 types of incompatibility:

– Digital-to-Digital (d2d)
– Analogue TV-to-Digital (a2d)
– Digital-to-Analogue TV (d2a)
– Other Services-to-Digital (o2d)
– Digital-to-Other Services (d2o)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Compatibility Status - Usability

Sorting and hiding columns may be used
to better manage the amount of data
displayed
 Right-click to access input data details or
general analysis results
 Convenient way to generate additional
admin declarations
 Draft Plan Case 1: > 6,7 M incompatibilities
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Compatibility Status - Hints
To get the full status of Case 1 selfincompatibilities, do the 5 queries,
for each band (i.e. total 10 queries)
 To get the status of compatibility
with another adm, do the 10 queries
for B to A (i.e. administration A is
submitting/affected) and then
another 10 for A to B (i.e. 20 in all)

RRC-06 15 May – 16 June 2006 Geneva Switzerland
Channel Distribution Statistics
Quick access to lists of requirements
which did not get a channel assigned
 Future improvements

– Distinguish between requirements with
no assigned channel and those with no
available channel, in a new column
– Improve support for different types of
linked sets of requirements
RRC-06 15 May – 16 June 2006 Geneva Switzerland
General Analysis
All direct incompatibilities for a
requirement at a glance
 Easy access to input data and
general analysis results of others
 Improved support for linked sets
 Convenient way to generate new
Digital-to-Digital admin declarations
for one requirement (other types TBD)

RRC-06 15 May – 16 June 2006 Geneva Switzerland
General Analysis – DT2/DS2
RRC-06 15 May – 16 June 2006 Geneva Switzerland
General Analysis – DT1/DS1
RRC-06 15 May – 16 June 2006 Geneva Switzerland
GA – DT2/DS2 Part of SFN DT2/SFN DS2
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Parts of SFN DT2/SFN DS2
RRC-06 15 May – 16 June 2006 Geneva Switzerland
GA – DT1/DS1 Part of SFN DT1/SFN DS1
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Parts of SFN DT1/SFN DS1
RRC-06 15 May – 16 June 2006 Geneva Switzerland
GA – DT2/DS2 Part of SFN DT2+DT1/SFN DS2+DS1
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Parts of SFN DT2+DT1/SFN DS2+DS1
RRC-06 15 May – 16 June 2006 Geneva Switzerland
GA – DT1/DS1 Part of SFN DT2+DT1/SFN DS2+DS1
RRC-06 15 May – 16 June 2006 Geneva Switzerland
GA – DT2/DS2 Part of DT2+DT1/DS2+DS1
RRC-06 15 May – 16 June 2006 Geneva Switzerland
GA – DT1/DS1 Part of DT2+DT1/DS2+DS1
RRC-06 15 May – 16 June 2006 Geneva Switzerland
GA – Detailed Analysis
For any incompatibility, additional
data can be calculated in real-time by
right-clicking on “Detailed analysis”
 For d2a details, the directory with the
pre-calculated analogue reference
situation binary file must be given
(if not detected in the same directory
as the results database)

RRC-06 15 May – 16 June 2006 Geneva Switzerland
Detailed Analysis – d2d (incoming)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Detailed Analysis – d2d (incoming) (2)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Detailed Analysis – d2a
RRC-06 15 May – 16 June 2006 Geneva Switzerland
DA – Reference Situation for d2a
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Detailed Analysis – d2a (3)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
General Analysis - Hints

All incompatibilities are presented in all
cases (1, 2, 3 and 4), even if they have
administrative declarations
 Sorting may be used to focus on those
without declarations
 Sorting on “descending” values of margin
and CNFS will place rows with missing
values first, since these are cases of
service area overlaps and “Tx inside”
RRC-06 15 May – 16 June 2006 Geneva Switzerland
General Analysis – More Hints
In cases 1/2/3, some d2d results
shown have no adverse effect, since
there are no common or overlapping
available channels
 Draft Plan Case 1: 2,8 M (or 52 %)
d2d incompatibilities with no effect
because of less available spectrum

RRC-06 15 May – 16 June 2006 Geneva Switzerland
GA Case 1– No Common Av. Ch.
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Synthesis Results

Channel distribution statistics
 Coverage analysis – option to limit the
display to assigned channels
 Service areas – option to limit the display
to assigned channels
 Future work: right-click menu must show
the available channels/blocks and the
assigned channel/block in addition to the
acceptable channels/blocks
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Planning Exercise Tool
GUI for EBU TD planning software
 Supports 5 types of analysis and
(optional) synthesis
 Supports new format of admin
declarations (CR/254 addendum 1)
 If using admin declarations, a new
window will show which declarations
have been validated/pair-checked

RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – Input Data
Input data can come from input data
or results MDB files from BR web site
 RRC_Requirements must be used to
edit/merge digital requirements data
 For d2a analysis, it is possible to use
pre-calculated analogue TV reference
situation binary files provided by BR

RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – Admin Declarations
Administrative declarations can be
copied from a results database, or
taken from one or more CSV files, or
both (a CSV file must be for one adm)
 For testing, the PE tool can consider
all declarations to be pair-checked,
or it can enforce strict pair-checking

RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool d2d Example - Input
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool d2d Example – Input (2)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool d2d Example – Input (3)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool d2d Example – Input (4)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example – Step 1
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example – Step 2
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – Review ADs
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example – Run
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – Digital Reqs Validation
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d – Must Include Analogue
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example – Step 2 (2)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example – Run (2)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – Analogue Validation
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example – OK
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE - Compatibility Status
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE - Compatibility Status (2)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool - Hints

For the next PE, the previous small results
MDB can now serve as the input MDB
 After selecting an admin declarations CSV
file, make sure to click on “Add file”
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2 (2)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2 (3)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2 (4)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2 (5)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2 (6)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2 (7)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2 (8)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2 (9)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2 (10)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2 (11)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2 (12)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
PE Tool – d2d Example 2 (13)
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Administrative Declarations Tool
Supports new format of admin
declarations (CR/254 addendum 1)
 Supports editing comments in place
 Supports opening a file in the old
format and saving in the new format
 Can ensure creation of all possible
1-to-1 declarations among parts of
sets of linked requirements

RRC-06 15 May – 16 June 2006 Geneva Switzerland
AD Tool – AD Rules

File must have only one administration
code on the left
 Conditional self-declarations are saved to
file as un-conditional
 Declarations for analogue assignments
only created for those assignments
included in the planning (BC6=TRUE)
 Can ensure creation of all possible
declarations among 2 sets of linked
requirements, if requested
RRC-06 15 May – 16 June 2006 Geneva Switzerland
AD Tool – AD Rules (cont’d)
Self-declarations are saved to file
only in one direction, the other
direction being considered as a
duplicate
 Creating new duplicate declarations
updates the intent (ADD/MOD/SUPP),
the conditional flag, and the remark
for the existing declaration

RRC-06 15 May – 16 June 2006 Geneva Switzerland
AD Tool – AD Rules for 1-to-1
D2D/O2D/D2O must have common or
overlapping bandwidths
 A2D/D2A must have adjacent or
common/overlapping bandwidths
 Self-declarations within a linked set
are not created
 A2D/D2A declarations not created
when D is a conversion from A

RRC-06 15 May – 16 June 2006 Geneva Switzerland
AD Tool - Hints
The AD tool can be used to quickly
generate many syntactically correct
declarations, but that doesn’t mean it
should be used that way
 Exporting reciprocal declarations,
importing (reciprocal) declarations
are time-saving features found in the
File menu

RRC-06 15 May – 16 June 2006 Geneva Switzerland
Future Improvements
Display of each requirement’s worst
MIG according to the RSD (%) criteria
 Display of MIGs for an administration

– Global MIGs with admin declarations
– Global MIGs without self-declarations
– Internal MIGs with admin declarations
– Internal MIGs without self-declarations
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Future Improvements (cont’d)
Complementary analysis results
 Real-time calculation of the contour
corresponding to a user-provided F/S
 CNG support improvements

– Saving maps to graphics file
– Generating maps of assigned/nonassigned requirements per channel
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Rectangular Area Selection
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Future Future Improvements
Some form of terrain data display
 Other conference decisions as
necessary
 Geneva hotel room reservation
system – ensure equitable access

RRC-06 15 May – 16 June 2006 Geneva Switzerland
Thank you for your attention
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Good Night and Good Luck
RRC-06 15 May – 16 June 2006 Geneva Switzerland
Download