VERSYS CONTINUOUS - ETG-STG Installation Manual STEP 1 - CEILING PREPARATION Figure 1 FIXTURE SLOT/OPENING IN GRID CEILING SYSTEM 30 ", 3 6 ", 4 8 "O R6 0" RU NL EN GT H CEILING TILES 6" REMOVED CEILING TILES A) GRID CENTERS TO BE 6" (AS SHOWN IN FIGURE 2 AND FIGURE 3). LENGTH OF GRID OPENING HAS TO BE ACCORDING TO THE ORDERED FIXTURE OR FIXTURES RUNS. B) BEFORE INSTALLING FIXTURES IN GRID CEILING PLEASE REMOVE CEILING TILES NEXT TO FIXTURE SLOT AS SHOWN IN FIGURE 1 Figure 2 Figure 3 6" OC 9/16” SLOT TEE GRID CEILING SYSTEM (STG) VERSYS CONTINUOUS ETG-STG Installation Manual, Page 1 6" OC 15/16” EXPOSED TEE GRID CEILING SYSTEM (ETG) VERSYS CONTINUOUS - ETG-STG Installation Manual STEP 2 - FIXTURE PREPARATION Figure 1 1) REMOVE FIXTURE FROM PACKAGING BOX. 2) FROM "BOR" AND "INT" MARKED FIXTURES REMOVE WIREWAY SIDE COVERS AND JOINING BOLTS AND NUTS AS SHOWN IN FIGURE 1. MOUNTING BRACKET THROUGH WIRE JOINER BRACKET ALIGNER BRACKET WIREWAY SIDE COVERS JOINING BOLTS (1/4-20 3/4"LONG) DETAIL "A" 1/4-20 HEX NUTS #8-3/8" LONG PAN HEAD SCREW DETAIL "A" Figure 2 Figure 3 IF USING "ETG"* GRID CEILING SYSTEM THIS TAB IS AS SHOWN IN FIGURE 2. IF USING FIXTURE IN "STG"** GRID CEILING SYSTEM THIS TAB MUST BE FOLDED OUT AS SHOWN IN FIGURE 3. * - "ETG" - 15/16" X 1 1/2" HIGH FLAT "T" GRID CEILING. ** - "STG" - 9/16" BOLT "T" X 1 11/16" HIGH SCREW SLOT GRID CEILING. VERSYS CONTINUOUS ETG-STG Installation Manual, Page 2 VERSYS CONTINUOUS - ETG-STG Installation Manual STEP 3 - FIXTURE INSTALLATION Figure 1 Figure 2 CEILING TILE CEILING TILE "BOR" FIXTURE "BOR" FIXTURE TIRE WIRE (BY OTHERS) FIXTURE SLOT/OPENING IN GRID CEILING SYSTEM FIXTURE SLOT/OPENING IN GRID CEILING SYSTEM A) START INSTALLING FIXTURE FROM LEFT TO RIGHT (CLOCKWISE) STARTING WITH "BOR"** MARKED FIXTURE AS SHOWN IN FIGURE 1. B) ONCE FIXTURE IS INSTALLED IN FIXTURE SLOT/OPENING, PLEASE USE TIE WIRE (AS SHOWN IN FIGURE 2) TO SECURE FIXTURE TO PLENUM ACCORDING TO NEC, UL AND CITY CODES. Figure 3 * - "IND" - INDIVIDUAL FIXTURE; ** - "BOR" - BEGINNING OF RUN FIXTURE; *** - "INT" - INTERMEDIATE IN RUN FIXTURE; **** - "EOR - END OF RUN FIXTURE. Figure 4 TIE WIRE (BY OTHERS) TIE WIRE (BY OTHERS) "EOR" FIXTURE "EOR" FIXTURE "BOR" ("INT") FIXTURE "BOR" ("INT") FIXTURE FIXTURE SLOT/OPENING C) BRING NEXT FIXTURE ("INT" OR "EOR" AS SHOWN IN FIGURE 3; SECURE FIXTURE TO PLENUM AS DESCRIBED IN PARAGRAPH "B” AND SHOWN IN FIGURE 4. VERSYS CONTINUOUS ETG-STG Installation Manual, Page 3 * - "IND" - INDIVIDUAL FIXTURE; ** - "BOR" - BEGINNING OF RUN FIXTURE; *** - "INT" - INTERMEDIATE IN RUN FIXTURE; **** - "EOR - END OF RUN FIXTURE. VERSYS CONTINUOUS - ETG-STG Installation Manual STEP 4 - CONNECTING THROUGH WIRING AND POWERING INSTALLED FIXTURES WORK FROM BELOW UTILITY COMPARTMENT TO JOIN FIXTURES IN RUN. BEFORE DOING STEP # 4 AND STEP # 5 WHIP MUST BE WITHOUT POWER! Figure 1 A) FIXTURES INSTALLED IN A SLOT/OPENING WILL LOOK AS SHOWNIN FIGURE 1; B) USE JOINING BOLTS AND HEX NUTS (FROM STEP 2) TO JOIN AND ALIGN FIXTURES AS SHOWN ON FIGURE 2; C) USING PROVIDED (BY NEO-RAY) QUICK CONNECTOR OR WIRE NUTS THROUGH WIRE FIXTURES AS SHOWN IN FIGURE 2. ALIGNER BRACKET WITH SET SCREW THROUGH WIRES JOINER BRACKET Figure 2 WIRE NUTS SLIDE ALIGN BRACKET TO INTERMEDIATE POSITION AND USING SET SCREWS ALIGN FIXTURE HOUSINGS VERSYS CONTINUOUS ETG-STG Installation Manual, Page 5 JOIN FIXTURES BY 1/4-20 BOLTS AND NUTS VERSYS CONTINUOUS - ETG-STG Installation Manual STEP 5 - POWERING INSTALLED FIXTURES REMOVE ACCESS PLATE, ATTACH FEED WHIP TO ACCESS PLATE AND CONNECT FIXTURE FEED WIRES TO WHIP. PUT BACK ACCESS PLATE ONTO FIXTURE. FEED WHIP (BY OTHERS) ACCESS PLATE FEED WIRES NOTE: FOR DIMMING BALLAST FULL FUNCTIONALITY CUSTOMER HAS TO HAS KEEP LAMPS "ON" MINIMUM 100 HOURS FOR PROPER FULL RANGE DIMMING AND LAMP STABILITY STEP 6 A) INSTALL WIREWAY COVER IN UTILITY COMPARTMENT AND CLOSE COMPARTMENT BY COVER; B) CLOSE CEILING BY TILES AS SHOWN BELOW. WIREWAY COVER. CEILING TILES UTILITY COMPARTMENT UTILITY COMPARTMENT COVER C) INSTALL LAMPS (NOT BY NEO-RAY). VERSYS CONTINUOUS ETG-STG Installation Manual, Page 6