esn \RleS: YAQunffi a PUBLIC NOTICE PuBLICNONCE I USArmyCorps of Engineers PortlandDistrict Portland District FOR PERMIT APPLICATION APPLICATION FORPERMF o 1999 Vl,1999 Issue May24, IssueDate: Date: May June 23, 1999 1999 June23, 99-296 99-296 RF-16895 RF-16895 Expiration Date: ExpirationDate: Corps of Engineers Number: Corps EngineersNumber: Oregon Division of LandsNumber: Number: ofState StateLands OregonDivision Numbers: Oregon Parks and Recreation Recreation Department Department Numbers: Oregon Parksand O a t 30 Day Notice Notice BA-463-99 8A-463-99 SP9080 sP-9080 (Corps),the Oregon of State StateLands The District Engineer, Oregon Division Division of Lands District,Corps The District Engineer,Portland PortlandDistrict, Corpsof of Engineers Engineers(Corps), (DSL)and application areevaluating (DSL) Department (OPRD) (OPRD) are evaluating a permit permit application Parksand andRecreation andthe theOregon OregonParks RecreatibnDepartrnent partiesof a proposed purposeof toinform informinterested interestedparties from proposedwork work Thepurpose thisnotice noticeisisto from the the City City of ofNewport. Newport.The ofthis agenciesare arebetter activity Participation isisencouraged so better able to to sothat thatboth bothagencies activityand andto tosolicit solicitcomments. comments. Participation encouraged reasonabledecision ustotomake makeaareasonable complete more thorough thorough public assist decision publicinterest assistus completeaa more review.Comments Comments interestreview. interestedin receiving areparticularly based onpublic public interest interest factors; factors; The District Engineer particularly interested receiving and DSL are basedon The District Engineerand values, aquaticsystem's functionalvalues, proposal'sprobable probableimpacts system'sfunctional comments the affected affectedaquatic commentsrelated relatedto to the theproposal's impactson on the the or before beforethe on or cumulative species. Comments Comments must received on must be be received cumulativeand andsecondary effects,and andendangered endangeredspecies. secondaryeffects, proposed The (located application. actions on this expiration date (located above) to be considered in subsequent actions on this application. The proposed expirationdate above)to be considered subsequent viewedatatthe the noticemay alsobe beviewed project drawings. This projectisisdescribed Thisnotice mayalso describedbelow belowand andshown shownon onthe theattached attacheddrawings. Pub_bull.htm. co /I gg /I regs regs/ Pub-bull.hfin. mil // co Corps web web site site at:hta:ll at: http:ll www www . nwp . usace usace . anny army .. mu Corps proposedwork Submitting Comments: Anyone whose interests may work is invited invited to by the theproposed affectedby Anyone maybe beaffected Submitting Comments: whose interests to: submit unfavorablewritten writtencomments commentsto: submitfavorable favorableor or unfavorable o o O US Anny Army Corps Corpsof of Engineers Engineers (Gebhart) ATrN: CENWP-CO-GP ATTN: CENWP-CO-GP(Gebhart) 0 Box 2946 P OBox2946 Portland, Oregon Oregon 97208-2946 Portland, 97208-2946 Email: richard.a.gebhart@usace.army.mil Email: richard.a.gebhart@usace.army.mil Oregon Division of Lands ofState StateLands OregonDivision (Steve Moser) Permit Coordinator (Steve Moser) Coordinator Permit 775 StreetNE 775Summer SummerStreet Salem, Oregon 97310-1337 97310-1337 Salem,Oregon Oregon Parks Recreation Department Department Oregon Parksand andRecreation Coastal Land Land Use Coordinator Coordinator (Steve (SteveWilliams) Williams) Coastal South Park BeachState StatePark SouthBeach 5580 South Coast Coast Highway Highway 5580South South 1 97366-9601 Beach,Oregon Oregon97366-960 SouthBeach, Oregon97365 97365 Applicant: 810 SW Oregon Alder,Newport, Newport, ApplicanfiCity CityofofNewport, Newport, 810 SWAlder, O O o jetty),under (northjetty), the southto to the thebay, bay,south underthe Location: Along Bay(north YaquinaBay Location: thebeach beachfrom fromNye NyeBeach BeachtotoYaquina Alongthe 11 South, new wastewater wastewater treatment treatmentfacility, facility, in Newport in Sections 5, 7, 17, 18, 18,&& 20, 20, Township Township 11 South, Sections5,7, new in South SouthNewport Range West, Lincoln Lincoln County, Range11West, County,Oregon. Oregon. wastewatertreatment treatment proposing complete majorwastewater Project Newport is is proposing totocomplete aamajor Project Description: TheCity Cityofof Description:The Newport andunder pipelinefrom southto and primarypipeline fromNyc NyeBeach Beachsouth facility upgrade. under projectincludes newprimary facility upgrade.The Theproject includeslaying layingaanew new The new Yaquina continuing south new wastewater wastewatertreatrnent treatmentfacility facility in in South SouthNewport. Newport. The YaquinaBay and continuing southto the new Bay and treafinent wastewatertreatment pipelinewill thenew newwastewater toand andfrom fromthe pipeline partofofthe conveyance system systemto willbe thenew newwastewater wastewater conveyance bepart convey (HDPE)pipes (walls are approximately facility. approximately ly2" 1½"thick) thick) will will convey polyethylene(HDPE) prpes(walls i"iUty. Two high-densitypolyethylene Twohigh-density plpe transport wastewater: a 22" pipe will transport wastewater plant and and aa 2d" 28" pipe will will transport pipe*ill-transport treatnent plant wastewater:a2T' wastewaterto io the the treatment is that is nearNye thesystem systemthat treated sewage for for offshore offshore disposal the existing existing outfall NyeBeach, Beach,the outfallnear treatedsewage disposalthrough throughthe pipelinewill nearthe OSU will be presentlyused. Additionally, constnrctednear presently Additionally, aanew OSU // main12" beconstructed forcemain 12' HDPE IIDPE pipeline newforce 12" that crosses Marine from the the existing existing 8" 8" pipeline pipeline that crossesthe thebay. bay. Ttre The 12" MarineScience conveysewage Centerto convey sewagefrom ScienceCenter pipeline pipelineadjunct pipeline will will connect connect to the the new new main main along along Highway Highway 101. 101. This Thisminor minorpipeline adjunctwill be be constructed constructed primarily within an an existing existing utility utility trench trench or within within existing existing streets. streets. No No alterations alterationsare are proposedfor the pipeline. proposed the8" 8" pipeline. The Nye Beach Beachto north jetty will The new new pipelines pipelines from Nye to the the north will be into bedrock be trenched trenchedinto bedrockand andencased encasedin in concrete concrete under under the the sandy sandy beach, beach, near near the base base of of the the bluff. bluff. Access Accessto the the beach will be Nye beachwill be from the the Nye Beachramp ramp and andthe the north north jetty access accessroad. Beach The access closest to the current construction activity road. The accessclosestto the currentconstructionactivity will will be be used,but but some the construction used, someof the constructionmay require using using both access access points points to to provide provide aa smoother smoother may require constructionoperation. operation.All All work workalong thebeach construction alongthe beachwill will be bescheduled scheduledaround aroundtides tidesand andstorms may stormsthat thatmay interferewith the the work site. site. The Theconstruction interfere constructionactivity activityalong alongthe will entail entailexcavating to thebeach beachwill excavatingaatrench trenchto the pipeline and concrete concreteencasing. (relatively) lay the pipeline and will require excavating in the (relatively) encasing.Construction Constructionactivity activity will requireexcavatingin the (mudstonebedrock) "soff' sedimentary sedimentaryrock rock (mudstone pipeand "soft" sand. Before bedrock)that that is overlain overlain with sand. Beforethe thepipe andconcrete concrete placed,the encasementis placed, the trench trenchwill will be encasement be 'tleaned" "cleaned" with a pressure pressure hose hose from piped piped seawater. seawater. Pipe Pipe lengthswill will be be laid on on the the beach lengths being placed placed in in the the excavated excavated trench. trench. The beachprior to being The lengths lengthsof HDPE HDPE pipe will will be with pipe heat-fused with specialized equipment and then laid in the trench and then encased be heat-fused specializedequipmentandthen laid in the trench and then encasedin in concrete.Within Within aafew fewhours hoursafter afterthe placed,the pushedover concrete. theconcrete concreteis is placed, theexcavated will be the excavatedsand sandwill be pushed over the completedportion of the particularlythe completed the pipeline. pipeline. All All excess excessmaterial, material,particularly theexcavated excavatedrock rock which which will be be crushedin situ, situ, will on the pipeline crushed will be be left on the beach beach to be reintegrated reintegrated in in the the beach beach geologic geologic system. system. The The pipeline -100feet will be closeto the will be laid relatively close the bluff, bluff, generally generally from 50 50-100 from the feetfrom thebase baseof the thebluff. . The crossingwill will be The YaquinaBay Yaquina Bay crossing be accomplished accomplishedby horizontal entrance horizontaldirectional directionaldrilling; the thework work area areaentrance jetty. (stagingareas) points (staging andexit points areas)will be and beon on the thenorth northside sideof the thenorth northjetty and andsouth southside sideof of the thesouth southjetty. providean The (heatjoined pipesections) place, drilted hole hole will will provide pulled The drilled joined pipe to be pulled in place, anarea areafor for the theassembled assembled(heat sections)to be in under No in-water in-waterwork work will under the bay. No project will occur. occur.ItIt isisestimated under-the-bayportion of the project estimatedthat thatthe theunder-the-bay will will take'about take about six six weeks. weeks. The The pipeline pipeline south southof the the bay will traverse land where bay will traverseland wherethe issueis wetlandcrossings. crossings. the only regulatory regulatoryissue is wetland Soils Soils involved are are either either sand sand or other other native native soils. soils. Basically, will be pipe laid in Basically,aa trench be excavated, excavated,the the pipe trenchwill the the trench, trench,and andbaciclilled bac*Cilledwith the material.In top the in in situ siru material. thoseareas wherewetlands wetlandsare thetop In those areaswhere areinvolved, involved,the soil will will be removed, removed, stockpiled, stockpiled, and and redeposited redeposited as as the the topmost topmost bacldill backfill material. material. The constnrction The construction swath pipeline will swath thru the wetland wetland areas areas will will be kept as as narow narrow as as practical. practical. The will traverse land managed managed The pipeline traverseland by the theOregon (South OregonParks Parksand andRecreation parallelHighway RecreationDepartment Department(South Beach 101for for BeachState Park),then thenparallel Highway101 StatePark), a distance the highway, distance before before crossing crossing the highway,approximately main approximately1200 1200feet feet north north of South SouthBeach BeachState StatePark Parkmain entrance.On entrance. theeast eastside pipelinewill Onthe sideof ofHighway Highway101, morewetland 101,more impactsfrom thepipeline will occur. occur. from the wetlandimpacts lift station Additionally, aa lift stationwill will be be constructed will also also impact impact aa wetland. wetland. Excess material constructedthat will excavatedmaterial Excessexcavated will pipeline be hauled off-site. The the portion will be hauled off-site. The pipeline thru thruthe south projectwill will not concrete. southportion of of the theproject not be encasedin in concrete. beencased pipeline will The pipeline will continue continueup The up to to the thehill hill to thenew to the newwastewater wastewatertreatment treatmentfacility. facility. estimatedthat will be It is estimated that there there will be about acres of,temporary of temporary impactto to the the beach. beach. Throughout about2.6 acres the Throughoutthe constmction,public public access accesswill will continue to be possible, construction, and available as possible, given the construction continueto beas assafe given safeand availableas the constnrction conshaints.Site precludepermanent restorationis constraints. permanent functional and and recreational recreational impacts. impacts. The The Siterestoration is expected expectedto to preclude total wetland wetlandacreage impactsfrom pipelineare total acreageimpacts from the thepipeline areabout wetlands about1.3 1.3acres acresof mostlyshrub forestedwetlands of mostly shruband andforested dispersedamongst wetlandareas. anongst 16 16wetland impactsare dispersed areas.These Theseimpacts aretemporary temporaryconstruction constnrctionimpacts; impacts;the theconstruction constnrction areaof disturbance disturbancewill will be area be restored restoredto original condition. condition. The station will permanently permanently fill acres Thelift will lift station fill 0.39 0.39acres quality, mostly low disturbedwetland. Thisimpact of mostly disturbed wetland. This impactwill will be by restoring restoring0.13 of bemitigated mitigatedby 0.13areas areasof wetlandfrom aa prior, pre-regulatory wetland pre-regulatory fill, on-site mitigation. Mitigation acres frll, i.e., on-site for the Mitigation for theremaining remaining0.25 0.25acres wetlandfill of wetland will be paymentfor native lieu payment fill will bean an in in lieu native oyster oysterrestoration restorationin Yaquina YaquinaBay. Bay. 2 i o o Effluent disposal gravity flow, therefore the potential potential for lift lift or pump pump station station overflows overflows of disposalwill will be be by gravity thereforethe treated treatedeffluent effluent is minimized. minimized. The the existing existing ocean ocean disposal disposal discharge discharge pipe pipe TheNye Nye Beach connectionto the Beachconnection will cause disturbance. causeminimal minimal disturbance. o public provide additional beennumerous numerouspublic The project details. details. There The attached attaohedmaps Therehave havebeen mapsand anddrawings drawingsprovide additionalproject meetings and special elections to discuss discuss this this project project and andisitsalternatives. alternatives. More project details details may be meetingsand specialelections project proponent proponent(City of Newport) obtained Newport) or their consultants: consultants: Jim Fuller or Tom Morris, obtainedfrom the the project Fuller Engineering @541-745-1006 Dana Seigfried, Seigfried, David Evans Evans and and Associates Associates @503@503Fuller and andMorris @541-745-1006 or Dana Morris Engineering 223-6663. 223-6663. o . o plantand pipelineswith andpipelines with aa purpose Purpose and itittotoreplace Purpose outdatedtreatment freatmentplant Thepurpose replacean anaged agedand andoutdated andNeed: Need:The new treatment treatment facility facility and and a new new sewage sewage conveyance conveyancepipeline. pipeline. There There is aa need need to to update update the the system system new because sewage becoming insufficient and and the existing existing system system does does not comply because sewagetreatment capacityis becoming treatmentcapacity and federal federal wastewater wastewater fteatment treatment mandates. mandates. The The proposal proposal is expected expected to to accommodate accommodate with state stateand Newport'sgrowth growththru Newport's 2020. tbru 2020. Note: The Engineers is regulating regulating the the whole whole pipeline pipelineproject. project. The Oregon Oregon Parks Parks and and Recreation Recreation Note: The Corps Corpsof Engineers portion of the project,and OregonDivision of State Department the Oregon State Lands Lands is andthe Departmentis thebeach beachportion the project, is regulating regulatingthe wastewatertreatment treatmentfacility. pipeline,from the new new wastewater regulating regulatingthe from the the rest restof thepipeline, the south southjetty to the of the Additional Information: information 541-265-4291 nin SamSasaki, Sasaki,atat54l-265-42g1 beobtained obtainedfrom fromSam Additional informationmay maybe Information:Additional Newport or Project Manager, Manager, Corps Corps of Engineers Engineers at 503-808-4383 503-808-4383 in Newport Gebhart"Project calling Richard RichardGebhart, or by calling Portland State Lands Lands at 378-3805 378-3805 X2/+5 X245 n in Portlandor Coordinator,Oregon PermitCoordinator, OregonDivision of State or Steve SteveMoser, Moser,Permit SouthBeach. Beach. b South Deparfinentat at541,-867-745t Salem Wiffiams, Oregon 541-867-7451 in Salemor Parksand or Steve OregonParks andRecreation RecreationDepartment Steve'Williams, o o o o o in Act 1899, 1899,for for work workin HarborsAct Authority: This isisbeing under 10,Rivers Riversand andHarbors proposal evaluated beingevaluated underSection Section10, Thisproposal /I for excavation and 4@, \Mater Act, or waters of the United States and Section 404, Clean Water excavation and Clean the and Section or affecting aJfectingnavigable waters United States navigable Ocean Shore or the United United States States and and Oregon's Oregon's Ocean Shore watersof the or discharge dischargeof dredged or fill fill material materialinto waters dredgedor Law. Improvement Improvementand theRemoval-Fill Removal-FillLaw. andthe certification,as as until certification, willnot issueduntil Water permit forforthe described work permit workwill notbe beissued described \MaterQuality the Certification:A A QualityCertification: the Oregon granted waived from required Water Act, has has been been granted or is waived Oregon requiredunder 401 of the the Clean CleanWater underSection Section401 failsor Department thestate statefails or:refuses refuses (DEQ. Waiver tooccur occurifif the will be bedeemed deemedto Waiverwill Departmentof Environmental EnvironmentalQuality Quality (DEQ). advertisingtheir their noticeadvertising to act request for certification within within 50 60 days. days. Attached the DEQ's DEQ's notice Attachedis the act on on the the request requestfor certification. request certification. publicinterest applicationof of the the will include includeapplication Section activity's thepublic interestwill The activity'simpact impacton onthe Section404(b)(1) 4MOXI) Evaluation: Evaluation:The (b) (1) (l) guidelines prormrlgatedby the 404 Environmental Protection Protection Agency. Agency. 404 (b) guidelinespromulgated the Administrator, Administrator,Environmental will not not be be issued issueduntil workwill Coastal Zone work until permitfor thedescribed described forthe Certification:AApermit Coastal Act Certification: Zone Management ManagementAct water land or or water affecting land describedactivity affecting the that the the described the state statehas the applicant's applicant'scertification certification that hasconcurred concurredwith the Section301(c)(3) 307(cX3) uses Coastal Zone Zone Management Management hogram. Program. Section usesin the the Coastal complieswith the the State StateCoastal CoastalZone Zonecomplies the Coastal Zone Management Act of 1972, as amended by 16U.S.C. 16 U.S.C. 1a56(cX3)requiresthe 1456(c)(3) requires the of theCoastal TnneManagementActof lgT2,asamendedby to the the concuror object object to fails to concur fails the state ff applicant to provide a Certification of Consistency statement. If state applicant provide of Consistencystatement. presumed. certification statement statement within within six months, months, state state concurrence concurrenceshall shallbe beconclusively conclusively presumed. Attached Attached to to certification State'sCoastal CoastalZone Zone the State's Consistencywith the this this Public Public Notice applicationfor Certification Certification of Consistency Notice is is aa notice noticeof of application Management ManagementProgram. Program. public writing, that thataa public in writing, anyonemay request,in Public the expiration date ofofthis anyone rnayrequest, Public Hearing: expiration thisnotice, noticeo Hearing:Before Before the date hearing the reason(s) reason(s) for holding a specificallystate statethe hearingbe application.Requests Requestsshall shallspecifically be held held to consider considerthis application. o 3 . public hearing. theDistrict DistrictEngineer public hearing. IfIf the Engineerdetermines to this determinesthat thatthe theinformation informationreceived receivedin in response responseto this notice is inadequate inadequatefor thorough thoroughevaluation, public hearing notice hearing may may be be warranted. warranted. If aa public evaluation,a public hearing hearingis is partieswill warranted,interested will be interestedparties benotified warranted, and location. notified of of the thetime, time,date, location. date,and BndangeredSpecies: (87Stat. Preliminary Endangered Preliminary review, under the Species Act Species: review, under Stat.844), 844), theEndangered Endangered Species Actof of1973 1973(87 indicatesthat indicates species that the describedactivity activity will will not thedescribed notaffect affectlisted listedendangered habitat. endangered speciesor or their theircritical critical habitat. Formal consultation consultationunder underSection Formal Section77 of theAct Act is is not not required of the requiredfor for the thedescribed describedactivity. activity. Culturat Resources: Resources: accordance Cultural InInaccordance with 106 withSection Section HistoricPreservation initial 106ofofthe theNational NationalHistoric PreservationAct, initial review review of culnrral cultural resources resources information available in the the National National Regiiter Register of information available Places and andits of Historic Places current current supplements supplements indicates indicates that that no historic properties properties would would be be affected affected by by the the proposed proposed activity. activity. This This notice notice was was sent to the State Historic Preservation Office. sent the StateHistoric PreservationOffice. Bvaluation: The permitwill probable decision whether Evaluation: whether totoissue Thedecision issueaapermit will be evaluationof bebased onan anevaluation of the theprobable basedon impact including cumulative will impact cumulative impacts impacts of the the described described activity activity on on the the public public interest. interest. That decisionwill That decision reflect which reflect the the national national concern concern for both both protection protection and and utilization utilization of of important important resources. resources. The benefit which The benefit reasonably reasonably may expectedto to accrue its reasonably reasonably may be be expected accruefrom from the thedescribed describedactivity mustbe activity must be balanced balancedagainst againstits foreseeabledetriments. All factors, foreseeable detriments.All factors,which whichmay maybe describedactivity will be considered berelevant relevantto tothe thedescribed activity will beconsidered general including including the the cumulative cumulative effects effectsthereof; thereof;among amongthose thoseare areconservation, conservation,economics, economics,aesthetics, aesthetics,general environmentalconcerns, properties,fish wetlands,historic floodplain environmental concerns,wetlands, historicproperties, values,flood hazards,floodplain fish and andwildlife wildlife values, flood hazards, values, values, land land use, use, navigation, navigation, shoreline shorelineerosion watersupply conservation, erosionand andaccretion, accretion,recreation, recreation,water supplyand andconservation, water property water quality, energy production,mineral energyneeds, needs,safety, safety,food of property food and andfiber production, needs,consideration considerationof mineralneeds, general,the ownership people. ownership and, and, in general, the needs needsand andwelfare welfareof the the people. localagencies agencies The of Engineers The Corps Engineersis is soliciting commentsfrom public; federal, Corps.of solicitingcomments from the thepublic; federal,state, state,and andlocal and and officials; Indian Tribes; Tribes; and and other other interested interested parties parties in in order order to to consider consider and andevaluate evaluatethe theimpacts impacts of of proposedactivity. Any this proposed Anycomments commentsreceived this receivedwill will be by the theCorps beconsidered consideredby Corpsof Engineers Engineersto determine determinewhether whetherto issue, issue,modify, deny a permit for for this this proposal. proposal. To this decision, decision, modiff, condition condition or deny To make makethis commentsare assessimpacts comments used to assess species, historic historic properties, properties, water water quality, quality, general general areused impactson on endangered endangeredspecies, environmentaleffects, the environmental factors listed above. above. Comments effects,and andother otherpublic interest usedin the interestfactors Commentsare areused preparationof an pursuantto tothe the preparation and/or anEnvironmental EnvironmentalAssessment Assessment and/oran ImpactStatement anEnvironmental EnvironmentalImpact Statementpursuant National Environmental public hearing National Environmental Policy Act. Comments are also used to determine the need for a public hearing Commentsare also usedto determinethe need a public interest and to determine proposedactivity. and determinethe the overall overallpublic interestof of the theproposed activity. permitsbe for certain certain Additional Reqáirements: law requires that easements, ororpermits Requirements:State State law requires thatleases, leases, easements, beobtained obtainedfor works or activity in the works described waters. the described waters.These andaa Thesestate staterequirements requirementsmust mustbe be met, met,where whereapplicable, applicable,and permit Departnrent Department of the the Army permit must mustbe beobtained obtainedbefore beforeany anywork work within the the applicable applicablestatutory statutory authority, previously govemmentalagencies have indicated,may may also alsohave authority, previously indicated, be accomplished. accomplished. Other may be agenciesmay Otherlocal local governmental ordinancesor which must ordinances or requirements requirementswhich mustbe satisfiedbefore work is is accomplished. accomplished. besatisfied beforethe thework 4 o NaU JE.LA1 Nit .DT AN Ltfi 5TA IU S/ L.1f1 eniltNa o JI'41 Ii! .$ beAcH AcM P . 1i' 'ji ..J'. OUTTALL9ff \ :- L hSch. .. 5eK NEWPORT NEWPORTJ o !.j'-. -! ((,o?osev rgor5tp rii ?l ALIdNMANf AL.IoNMt.NT L)$fr,r : . Nd$ Nahfr t14NE4 IWO tno NEW z2,|IRAw ..J': A ; .!:- . I- '4- :: z,t' brrLu jfr/ :Ij T j ddiN YAQUINA .k1. YAQUiNA BAtr o W .--.... STATEPAR ' STATE arru U,, .,LUSCOAS7GUARoRES / N0 I ue - , t.J i YAQUNA 8A YAQUINA 8A4I\ 7')4 STATE PAR STATEpARK... 590 5M.- Cc 590 Etvl -> 1. .... R Ii uJ ' vrfNe o taN \ ,:..g * n g"qt$d ', eqif'* tfft-? . o _LI ' O c) 9v o .. 0 NEW 6AUTtI .Ntw,zowflft"e4H -LtfI c I i. +TNION L( '/-'LrFT'TAThN I I-7 6q ta.a lor r9 t' o Wastewater PipelineProject Wastewater Pipeline Project DSLNumber: DSL Number: RF16895 RF-16895 OPRD Numbers: SP-9080 OPRD Numbers: BA-463-99 8.A463-99&& SP-9080 PacificOcean Pacific Ocean and and wetlands wetlands .............................. JAThF'iT r1Af4T WTh '.'E I.-.""t 2 NLW4T | .' -, 0 o S - - Li-.. ' .-- r y I AF LocNtoN t4AF .. Lfl flrt FfI O K Eao{ f rf li q- rya- New?aqt I,. - ,S NI:wPog.1 1 -'; 1 9e o - r:r''-INEWPORT NEWPORT I (. i 'i .4 Y M9LeaoInt -A',(/ I /'I L--L / ''/ PROPOSED WASTEWATER PROPOSED WASTEWATER PROJECT PROJECT NewWastewater Wastewater Treatment New Treatment Plant, Plant, pump Sewage Sewage pump stations and stationsand Conveyance Pipelines Conveyance Pipelines City of ofNewport Newport City Number: 99-296 Corps CorpsNumber: 99-296 May1999 May1999 Sheet Sheet1I of of55 a o o o o o O -:FZu) Wastewater PipelineProject DSLNumber:RF-16895 OPRDNumbers:8A463-99 & SP-9080 PacificOceanandwetlands City of Newport CorpsNumber:99-296 Mayl999 Sheet2 of 5 o A -A) {l HIFg il :.. ?a z2 -83 €9 { t z-cS rlaulS Hnqv7t11 . Utt, .... +4° - 1 o Qt fi /rI t# uil r l2tlttl Sco/e in feet JJ gl rrf b> lJ \r! o ir / SoiLs)'------- +l -±-;--- so r{ )qr :'------ ---- : ss FOATAL.1A(.EI + MOT1L 2. rrr ? i 'fl ul 2. .= +100 VVLOPM!JT t $* 141'PIAL LIPS $H F5 AG Iso' o F '°' Yle ____________I :l *t 5 :rl v gi l(,lt gg14CH PTML /l/r I o gg, 9L o a 7 =ol >=. FI =Q (Uo5s srcpo o EEr ,---l Fl€ I'ft'ELINE £ON5TIUCTIot4 o r*AC.H ALIGNMENT :6 -ht i "H* o o'c (JOC' Zc- C#i City of Newport Number: 99-296 Corps May1999 Sheet3 of 5 g) Joo Wi. Wastewater PipelineProject DSL Number:M-16895 OPRDNumbers:B.A463-99_ & SP-9080 PacificOceanandwetlands o o Jr t i #i o o z, r$ "rE o :3 -! r . 'rE rfr ) ! 'o m o m zrn = {m o v tr z m ! a v o 3 t- m ' . 1' ,I' .. tid 6----'c i4'o: /l ci of Newport - o )' 0 . a . .4 0 a . 0 0 . -. :99-296 May1999 Sheet4 of 5 0 4 0 * a 0 Wastewater PipelineProject DSLNumber:RF-16895 OPRDNumbers:8A463-99 & SP-9080 PacificOceanandwetlands .. . o .lr ir f-) {tsr i*ei sL ____- - 0 . .1 2o F h J4 l -1IIIl I I jf ci I.IhILIIhhII1I!I!.11!.1LLI 1k E/ [r r *{r 71 an F1 !$ gltul i{fii $+ IZffiN $'f 2 lrt AL tt tt !ir FL JF t\ 'P' I IIi 01 I-IL? 0 2 Irl 2 illllllK Wastewater Wastewater Pipeline Pipeline Proj Project ect DSLNumber: DSL Number: RF16895 RF-16895 OPRD Numbers:BA-463-99 OPRD Numbers: & SP-9080 8,4.-463-99 SP-9080 Pacific Pacific Ocean and wetlands Ocean and wetlands O City of Newport Newport Corps Number: Number:99-296 99-296 Corps May1999 Sheet 5 of 5 o PUBLIC NOTICE PueLrc Nonce WnreRQUALITY WATER 401CERTIFICATION CennFrcATpN Qunlrv 401 DEPARTMENT DEPARIMENTOF OF o ENVIRONMENTAL ET{\4RONMENXAL NoticeIssue: Notice Issue: May 1999 May24, 24,1999 Written Comment Iune23, Written 23, 1999 CommentDue: 1999 Due: June QUALITY QUALITY Corps Engineers Permit Corpsof Engineers Permit Number: Number:99-295 99-295 OregonDivision Oregon Division of State StateLands LandsNumber Number:: RF-16895 RF-16895 o Who is theApplicant: is the ApplicanhSee (Corps)public Who the Corps See theattached attached public notice. Corpsof ofEngineers Engineers(Corps) notice. Location of Certification Certification Activity: Activity: See attached public notice. attached Corps See Corpsof ofEngineers Engineerspublic notice. \illiat isisProposed: Proposed:See publicnotice. What the Corps See theattached attached notice. Corpspublic o Needfor Certification: Certification:Section Section 401ofofthe Federal Need 401 Clean theFederal CleanWater WaterAct applicantsfor Acirequires requiresapplicants forFederal Federal pennits or licenses licensesto provide the to provide theFederal permits certification from the State State of Federalagency agencyaa water waterquality certification proposedactivity may Oregonif if the the proposed Oregon may result resultin aa discharge dischargeto surface waters. surfacewaters. Descriptionof ofDischarges: Discharges:See publicnotice. Description the Corps See theattached attached Corpspublic notice. o Where to Find Find Documents: Documents:Documents Documents andrelated Where to and and relatedmaterial materialare areavailable availablefor examination exarninationand copying OregonDepartment at Oregon Departnent of Environmental copying at Water Quality 811 EnvironmentalQuality, Water Division, 811 6th SW Quality, Quality Avenue,Portland, Portland,Oregon Avenue, will ensure ensure Oregon97204. Whilenot 97204.While notrequired, required,scheduling schedulingan an appointment appoinunentwill documehtsare arereadily readily accessible accessibleduring documents during your visit. To please call Donna Donna To schedule schedulean an appointment appoinment please Kelly questionson 503-229-6962.Any proposedcertification Artyquestions theproposed Kelly at 503-229-6962. certification may be addressed addressed to to Tom Tom on the Rosett4 503-229-5845 Rosetta, 503-229-5845or toll free free within Oregon Oregon ar80f,4524011. at 800-452-4011. People hearing impairments impairments Peoplewith hearing may call DEQs may DEQ'sTFY TTY at at503-229-6993. 503-229-6993. o PUBLIC PARTICIPATION: PUTT,TCPI' TTCIPAIION: hearing:DEQ prcvideopportunity Public hearing: DEQ will willprovide public hearing peopleto appear opportunityfor foraapublic hearingfor appear for interested interestedpeople andsubmit submitwritten written or and or oral oral comments cornnrentsif: o the the submitted submittedcomments commentsindicate interest, or indicatesignificant significantpublic interest, r written written requests personsare requestsfrom from 10 10or or more morepersons arereceived, received,or o an personsrequests an organization organizationrepresenting representingat 10persons requests aa public hdaring. hearing. at least least10 \Mritten comments: comments:Written Written proposed Written comments comments ononthe theproposed certification certificationmust mustbe receivedat atDEQ DEQ by by 55 bereceived PM on on the Writtencomments the above above date. date. Written Oregon Deparftnent Department of of Environmental Environmental cornrrentsshould shouldbe bemailed mailedto Oregon Quality, Rosetta, 811 811 SW 6th Avenue, Avenue, Portlan4 Portland, UegoillZB. Oregon 97204. Peopk People wishing to send send wishingto Quali$, Attn: Tom Rosetta, written comments e-mail should should be aware aware that, cornmentsvia e-nail that, if if there thereis a delay between sen)ers serversor or iff a server delay between senteris notfinctioning e-mailsmay receivedprbr not functioning properly, properly, e-mails prior to mq not rct be bereceived to the theclose closeof of the thepublic comment comment period Peoplesending sendingcomments period. People cornments via viae-mail WordPerfect, e-mailshould shouldformat formatthem Word, WordPerfect, themin Microsoft Microsoft Word, or plain text format. format. Otherwise, Otherwise,due dueto recommends that that comments comments be be to conversion conversiondifficulties, DEQ recommends sentin hard sent hard copy. copy. S \ilhat Happens llappensNext: NexfiDEQ DEQ willreview public What will and consider allallcomments received review and consider conmrents receivedduring duringthe thepublic commentperiod. period.Following permitmay Followingthis thisreview, review,the proposed,modifie4 comment modified, or denied. denied. thepermit maybe beissued issuedas asproposed, You will be notified of benotified youpresent presenteither of DEQ's DEQ'sfinal finaldecision You decisionifif you eitheroral oralor writtencomments commentsduring during orwritten period.Otherwise, the comment commentperiod. youwish Otherwise,ifif you the please call or write DEQ DEQ at the wishto to receive receivenotification, notification, please aboveaddress. above address. Accessibitity Information: Information: This publication This available prinl Accessibility publication isisavailable ininalternate altemateformat, format,e.g., e.g.,large largeprint, upon request. request.Please Pleasecontact contactDEQ Braille, upon 503-229-5766 or toll toll free within within Oregon Oregon DEQPublic PublicAffairs Affain at at503-229-5766 at 800-452-4011 800,4524O11to to request requestan at with a hearing impairment can receive help analternate altemateformat. format.People with a hearing impairment can help receive .People by calling DEQ's DEQ's TFY TTY at at503-229-6993. 503-229-6993. 811 SW Sixth Avenue SixtltAtrcnue El I 5\M Portland, OR 97204-1390 Fodand,OR972041390 503-229-5696 50&229,5696 TDD TDD503-229-6993 503-2296993 o Public Public Nonce NOTICE o OREGON CQMHAGEMENT PROGRAM PnocRAM OnecoruComl{fe$Ac EMErur c or.r srsrENcYc enirffii?r-dii* CONSISTENCY CERTIFICATION o Issue Date: May 1999 IssueDate: May24, V1,1999 Expiration Date: Date: June 23, 23, 1999 Jane 1999 DEPT. LAND DEPT.OF OFLAND CONSERVATION CONSERVATION AND AND DEVELOPMENT DEVELOPMENT Corps Corps of Engineers 99-295 EngineersAction ActionID ID Number: Number:99-295 Oregon Division Division of State State Lands Lands Number Number:: RF-16895 Oregon RF-16895 NOTIFICATION NorrrrcnrroN o o o Notice Notice is hereby giventhat the Department Departmentof Land Land herebygiven thataa certification certificationhas hasbeen beenfiled with the (DLCD),as providedin Section Conservation and the CoastalZone Coastal Zone Conservation 307(c)of the andDevelopment Development(DLCD), asprovided Section307(c) permitdescribed notice Management ManagementAct, describedin the Corpsof Engineers Engineerspublic notice Act" that that the thepermit the attached attachedCorps will comply will Coastal comply with and the Oregon OregonCoastal andbe be conducted conductedin aa manner mannerconsistent consistentwith the areaavailable availablefor Management Program. The ManagementProgram. information area Thecertification certificationand andsupporting supportinginformation inspection inspectionat at the theDLCD office office in Salem. Salem. the and the DLCD is hereby review of the the proposed proposed activities activities and consistencyreview herebybeginning its federal federalconsistency beginningits project's proposed public the required federal permit. permit. DLCD is soliciting public comments on the proposed project's requiredfederal on DLCD is soliciting comments consistency the Oregon Coastal Management Management Program. Program. Written comments consistencywith the commentsmay be OregonCoastal submitted Salem submittedto DLCD, ATI'N: 1175Court Court Street StreetNE, Salem ATTN: Consistency ConsistencyReview ReviewSpecialist, Specialist,1175 OR before the expiration expiration OR 97310-0590. 97310-0590.Any mustbe the DLCD on or before Any comments commentsmust bereceived receivedby the public notice. datelisted date listed on on the notice. the federal federalpublic REVIEW Rrunw CRITERIA Cnrrsnn o Comments should should address address consistency consistency with with the the applicable applicable elements elementsof of Oregon's Oregon's Coastal Coastal Comments Management Program. Program. These Management Theseinclude: include: . Acknowledge AcknowledgeLocal Local Comprehensive ComprehensivePlan Plan . Statewide StatewidePlanning PlanningGoals Goals . State WaterQuality standards e.g.,Fill-Removal Fill-RemovalLaw and andWater StateLaws, Laws,e.g., Quality standards o INcoNsrsTENT? INCONSISTENT? , O you believe Program, permit is CoastalManagement ManagementProgram, If you believethis is inconsistent inconsistentwith the the Oregon OregonCoastal this permit your comments your believe the project project is inconsistent inconsistent and and commentsto DLCD shotild explainwhy you believe shouldexplain should the Oregon Coastal Management Management Program Program element(s) element(s)in inquestion. question. You shouldidentify the OregonCoastal possible,to make consistentwith permitcould makeit consistent should shouldalso alsodescribe couldbe modified, if possible, describehow how the thepermit be modified, the the Oregon OregonCoastal Program. ManagementProgram. CoastalManagement SI 1175 NE StreetNE I l?5 Court Cout Street o ci] Salem, OR 97310.0590 OR973104590 SalerrU 503-373-0500 503€73{500 FAX 503-362-6705 FA,\50&3626705