Sounding Observation Missions for the Future EUMETSAT Polar System Peter Schlüssel EUM/MET/VWG/10/0109 25 March 2010 1 Post-EPS candidate observation missions Mission Approach High-Resolution Infrared Sounding Phase 0 Study by ESA and CNES, Phase A study by CNES Microwave Sounding Phase 0/A Studies by ESA, Accommodation of ATMS (NOAA) Radio Occultation Sounding Phase 0/A Studies by ESA Nadir viewing UV/VIS/NIR/SWIR Sounding GMES Sentinel-5 accommodation VIS/IR Imaging Phase 0 Study by ESA, Accommodation of DLR METimage Scatterometry Phase 0/A Studies by ESA Microwave Imaging – Precipitation and Phase 0/A studies by ESA Clouds Multi-viewing, -channel, -polarisation Imaging Phase 0/A studies by ESA Radiant Energy Radiometry Accommodation of CERES (NOAA) Low Light Imager Accommodation of LLI (NOAA) Space Environment Monitoring Accommodation of SEM-N (NOAA) Radar Altimetry GMES Sentinel-3, JASON f/o Dual View Radiometry GMES Sentinel-3 Ocean Colour Imaging GMES Sentinel-3 EUM/PEPS/VWG/10/0015 4 March 2010 Slide 2 EUM/MET/VWG/10/0109 25 March 2010 2 Post-EPS candidate missions High-Resolution Infrared Sounding Objectives • • • temperature/humidity profile at high vertical resolution sea/land/ice surface temperature clouds, minor/trace gases Heritage • IASI, AIRS Baseline performance • as IASI Breakthrough • 2 x radiometric and 2 x spectral resolution Implementation • Phase-A study of IASI-NG by CNES EUM/MET/VWG/10/0109 25 March 2010 3 IASI-NG: baseline characteristics (courtesy: CNES) NedT @ 280K IRS2 End of phase 0 CNES budget estimation; IRS2 SPECIFICATION IRS2 SPEC IRS2 phase 0 NedT @280K (K) 0,8 0,7 IRS7a : CO profile IRS5b : T profile, N2O & CH4 col Priority NWP Pri 1 Chem Pri 1 IRS4b : PAN 0,9 IRS4a : SO2 1 IRS3a : O3 prof 1,1 IRS2b : HNO3, CFC IRS2a : C2H2, HCN, PAN 1,2 IASI-NG Phase 0 instrument MWP or Chem Pri >=2 Performance estimate 0,6 0,5 IASI-NG Phase A Requirement 0,4 0,3 0,2 0,1 Sigma (cm-1) 1400 1600 IRS5 : Water vapour profile 1800 2000 IRS6 : Water vapour profile NO2 Column 2200 IRS7 : CO col 1200 IRS8 : T profile, N2O & CO2 col 1000 IRS2 : Temp & Water vapour profiles, surf & cloud IRS4 : surf & cloud 800 IRS0 : IRS1 : Water Temp vap Profile Prof IRS3 : O3 col 0 600 2400 IRS9 : Temp profile 2600 IRS10 : IRS11 SST, surfaces and CH4 cloud properties col Spectral resolution: 0.15 cm-1 unapodized, 0.25 cm-1 apodised EUM/MET/VWG/10/0109 25 March 2010 2800 4 4 Post-EPS candidate missions Microwave Sounding Objectives • temperature/humidity profiles in clear and cloudy air • cloud liquid water total column • imagery: precip, cloud liquid Heritage: • AMSU-A, MHS Baseline performance: • as AMSU/A, MHS • horizontal resolution as ATMS Implementation: • embarkment of ATMS+ envisaged • ESA development at Phase A EUM/MET/VWG/10/0109 25 March 2010 5 MWS channels Spectral Range (GHz) Number of channels 23.8 – 31.4 2 water vapour column 50.3 1 quasi window, surface emissivity 52.8 – 57.29 13 temperature profile 89, 165.5 2 quasi windows, cloud liquid water 183.311 5 water vapour profile 229 1 quasi window, cirrus detection 118.7503 9 temperature profile optional (low priority) EUM/PEPS/VWG/10/0015 4 March 2010 Slide 6 EUM/MET/VWG/10/0109 25 March 2010 Purpose 6 Post-EPS candidate missions Radio Occultation Sounding Objectives • refractivity profiles at high vert. resolution temperature / humidity profiles PBL top and tropopause height • ionospheric electron content Heritage • GRAS, COSMIC Baseline performance: • GRAS (instrument), COSMIC (coverage) Breakthrough • > 4000 occultations per day • tracking GPS and Galileo Implementation • virtual constellation • ESA development for Post-EPS satellites EUM/MET/VWG/10/0109 25 March 2010 7 Post-EPS candidate missions Nadir Viewing UV/VIS/NIR/SWIR Sounding Objectives • ozone profile and column • columns of SO2, NO2, H2O, CO, CH4 • columns of BrO, HCHO, OCHCHO, CO2 • aerosol optical depth Heritage • GOME-2, SCIAMACHY, OMI Baseline performance: • as GOME-2 Breakthrough • extension of spectral range into NIR/SWIR • horizontal resolution 15 km Implementation • GMES Sentinel-5 to be embarked on Post-EPS satellite, ESA development EUM/MET/VWG/10/0109 25 March 2010 8 EPS versus Post-EPS: mission evolution Instrument Metop Post-EPS 645 to 2760 cm-1 NEΔT 0.1 - 0.6 K (<2400 cm-1) Δν = 0.35 - 0.5 cm-1 pixel size 12 km 645 - 2760 cm-1 NEΔT ≤ 0.5 NEΔT(IASI) Δν ≤ 0.5 Δν(IASI) pixel size 12 km 15 + 5 channels: 23 - 190 GHz 33 channels (incl. low prior.): 23.8 - 229 GHz GRAS → RO GPS tracked 650 occultations / day GPS and Galileo tracked breakthrough @ 4000 occultations / day GOME-2 → Sentinel-5 0.29 – 0.74 µm 80x40 km2 resolution 14 bands: 0.27 – 2.385 µm 15 km resolution 6 channels: 0.58 – 12.5 µm ≥ 20 channels: 0.41 – 14.2 µm spatial sampling 500 m, 2 solar channels sampled at 250 m spatial resolution 50 km dynamic range 4 - 25 m/s spatial resolution 25 km dynamic range 4 - 25 m/s IASI → IRS AMSU → MHS / MWS AHVRR → VII ASCAT → SCA EUM/MET/VWG/10/0109 25 March 2010 9 EPS versus Post-EPS: new missions Instrument Post-EPS MWI up to 28 channels: 18.7 - 668 GHz spatial resolution 50 km at low frequencies to 7 km at high frequencies 3MI 12 channels: 342 - 2130 nm multi-channel, multi-viewing, multi-polarization Spatial sampling 4 km RER 3 broad spectral bands angular sampling ≥ 3 views spatial resolution 20 km one broad-band channel 0.4 - 1.1 µm spatial sampling 0.55 – 2.7 km LLI EUM/MET/VWG/10/0109 25 March 2010 10 Mission requirements (1/2) Radiometric: dynamic range, bias, noise, polarisation Spectral: spectral range and resolution Geometric: coverage and spatial resolution Increasing No Additional Benefit Performance Objective Threshold → Breakthrough → Objective Prioritisation: ranking of the above categories prioritisation of spectral bands/channels to identify and remove undesired design drivers Generic requirements for climate monitoring Delta Improvement in Targeted Service Threshold No Value Orbit stability: variations of systematic radiance errors in any single orbit Long-term stability: variations of running average over one orbit of systematic radiance errors EUM/MET/VWG/10/0109 25 March 2010 Breakthrough 11 Mission requirements (2/2) Post-EPS Mission Requirements Document prepared with strong support of PMET (chair: John Eyre) endorsed by EUMETSAT Council basis for industrial studies at Phases 0 and A www.eumetsat.int/Home/Main/What_We_Do/Satellites/Future_Satellites/Post-EPS industrial studies aim at achieving breakthrough levels requirements will be relaxed in case of unwanted design drivers Post-EPS End User Requirements Document (in preparation) includes committed mission requirements for Phases B, C, D, E derived on the basis of mission requirements and programmatic constraints EUM/MET/VWG/10/0109 25 March 2010 12