Procedure Effective Date October 9, 2014 Date of Last Revision October 8, 2014 Chapter Name Information Management Chapter Number Title Infrastructure and Operations Change Management 4.4.P.2 1.0 Purpose Ensure all infrastructure and operations changes are managed in a similar manner regardless of the team responsible for such changes. 2.0 Governing Policy Number/Document Name Effective Date 4.4 Change Management for IT Managed Systems 3.0 Procedure 1. 2. 3. 4. 5. 6. Proposed change is documented in monthly maintenance/change control spreadsheet, RFS or Help Desk ticket. Changes are reviewed by the appropriate team and/or Director. Changes are communicated to relevant user community. Changes are implemented in non-production system, where possible. After appropriate testing/validation changes are implemented in production system during predefined outage window. Changes are logged in the appropriate change log. 4.0 Responsibility for Implementation Implementation of this procedure is the responsibility of the appropriate IT Director. 5.0 Definitions Term Change Infrastructure and Operations Changes Non-Production System Production system Change log Definition The addition, removal, or modification of any component of a production system. Changes may include software, operating systems, hardware, or other components of a production system. Changes made to servers, operating systems and other components, generally managed by the Division of Information Technology. Systems managed by the Division of Information Technology that are used to test or validate system changes. Systems managed by the Division of Information Technology that are in active use by the University Community supporting the routine business operations of the institution. A spreadsheet or similar document or application used to log all changes. 7.0 Revision History Description Revised by L Rose Approved by CIO IT Procedure 4.4.P.2 – Infrastructure and Operations Change Management Approval Date October 9, 2014 October 9, 2014 Page 1 of 1