BREAKDOWN
Sept 23-Business Meeting, 1:00-5:00
$10.00 per person, includes materials, facility, refreshments
Sept. 24-Field Trip
$10.00 per person includes lunch, 7:45-3:00
DEADLINE FOR
REGISTRATION
September 20, 2004
ACCOMMODATIONS:
Little Creek Hotel and Casino, Kamiche, WA
1-800-667-7711
$59 Double
http://www.little-creek.com/hotel.htm
Please complete the lower portion of this page and return to Stand Management Cooperative, Attn. Megan
O’Shea, Box 352100, University of Washington, Seattle WA 98195, or fax to M. O’Shea at 206-685-3091.
Name(s):_______________________________________________________________________________
______________________________________________________________________________________
Organization:_________________________________________ Phone:____________________________
Address:_______________________________________________________________________________
E-mail:________________________________________________________________________________
_______ Business Meeting
$10.00
_______ Field Trip
$10.00
_______ Both days
$20.00
_________Total registration fee enclosed
Cash or check only, please make checks payable to the University of Washington
STAND MANAGEMENT COOPERATIVE
Little Creek Casino Hotel Kamiche, WA
Fall Meeting
AGENDA
September 23-24, 2004
DRAFT # 3
Thursday, Sept 23
Time
Topic
1:00
Welcome & Introductions:
Mike Mosman , Chair SMC Policy Committee
1:10
2004 Accomplishments & Announcements:
Dave Briggs, SMC Director
1:20
SMC Budget for 2004 & Projection for 2005
Dave Briggs, SMC Director
2:00
Discussion & Vote on Database Policy
Dave Briggs, SMC Director
2:15
Genetic Gain Trial /Type IV Installation Progress Report
Eric. Turnblom; SMC Silviciculture Project Leader
Keith. Jayawickrama, Director, NWTIC
2:40
Silviculture Project Report & 2004/2005 Field Schedule
Eric Turnblom, Project Leader
3:00
Break
3:30
Modeling Project Report, SMC ORGANON Update Proposal
Greg Johnson, Project Leader
3:50
Nutrition Project Report:
Rob Harrison, Project Leader
4:10
Wood Quality Project Report:
Eini Lowell, Project Leader
4:30
9 Meeting Summary,
9 Future TAC Meetings
9 Plans for 2005
o SMC 20th Anniversary
o SMC Strategic Planning
9 Field Tour Logistics. Dave Briggs, SMC Director
9
Adjourn
5:00
.SMC Fall Meeting Field Tour, September 24, 2004
September 24
7:45 AM
Leave Little Creek Casino Hotel
9:30 AM
Arrive at Brittain Creek Type III Installations
9 pure Douglas-fir (Installation 9 )
9 pure western hemlock (Installation 9 )
9 50/50 Douglas-fir/western hemlock mix (Installation 9 )
1. growth & yield through age 12: Mariano Amoroso
2. understory vegetation trends in Type III’s: Eric Turnblom
3. walk through & discussion of treatment plots
11:30
Demonstration of ST 300 and HM 200 nondestructive testing tools
Peter Carter, FibreGen
Lunch
12:30
Depart for Donkey Creek (Installation 601)
1:15
Arrive Donkey Creek
9 The first Genetic Gain/Type IV Trial Installation.
9 All plots are surveyed and pin flagged for planting
9 A great opportunity to see one “on the ground”, discuss remaining
implementation steps, and future measurement procedures.
3:00
Depart for Hotel
Comments:
9 Is this the best order of events?
9 Need to find a site for the ST300 & HM 200 demos; hopefully this
could be in a stand close to Brittain Creek
9 Need to check drive times