Overview • Review of 2009 bond projects • Current district challenges • KSD’s facilities plan to meet challenges 10 Year Plan – Phase 1 2009 Bond Review • In 2009, the voters authorized a $68 Million dollar bond to build a new elementary school, remodel four elementary schools, and do other projects. New School - Cottonwood Remodels – Canyon View, Southgate, Sunset View, Cascade, Lincoln* (*if funds available) Projects – District Office, Phoenix Cottonwood Elementary – Opened 2010 Canyon View Elementary – Reopened 2010 Southgate Elementary – Reopened in 2011 KSD Administration Center – Opened in 2011 Sunset View Elementary – Reopened in 2012 Cascade Elementary – Reopened in 2013 Phoenix and Legacy Online – Opened in 2013 Lincoln Elementary – Reopened in 2014 Favorable Economic Conditions = Additional School Project • Due to 2009 recession, the first three buildings were less expensive than projected. • The KSD received a higher rate of State Matching Funds than projected. • The School Board decided to remodel Eastgate Elementary with the remaining funds. Current Challenges •Student enrollment growth •Aging Buildings Elementary Enrollment October 1 +1,244 2014 8,098 2013 7,819 2012 7,550 2011 7,283 2010 7,278 2009 7,034 2008 6,854 Middle School Enrollment October 1 +389 2014 3,784 2013 3,813 2012 3,819 2011 3,703 2010 3,592 2009 3,396 2008 3,395 Elementary Portable Classrooms 2014-2015 School Amistad Canyon View Cascade Cottonwood Eastgate Edison Hawthorne Number 6 4 2 4 0 4 6 School Lincoln Ridgeview Southgate Sunset View Vista Washington Westgate TOTAL Number 0 4 3 2 6 7 11 59 Middle School Portable Classrooms 2014-2015 School Number of Portable Classes Desert Hills 10 Highlands 12 Horse Heaven Hills 8 Park 3 TOTAL 33 TOTAL Portable Classrooms – 2014-15 School Number of Portable Classes Elementary 59 Middle 33 High 17 Mid-Columbia Partnership (MCP) 10 TOTAL 119 Current Challenges •Student enrollment growth •Aging Buildings Desert Hills Opened in 1977 Issues with the Desert Hills MS building • Desert Hills Middle School opened in 1977. • No significant upgrades have been done. • Sewer and storm drainage is beyond repair. • Electrical infrastructure does not have capacity to meet current instructional needs. • HVAC controls are inefficient and outdated. • IT equipment has overheating problems. Issues with the Desert Hills building • Poor access for vehicle traffic and limited parking. • Foundation of building is heaving. • Sport fields availability is inadequate for no-cut sports. • Multiple buildings create challenges. • Kitchen is far from cafeteria. • Students go outside to change classes. • Administration building is separate from main classroom building. • Security is compromised by too many entrance/exit points. Westgate Elementary - Opened in 1952 Issues with the Westgate Elementary building • Westgate opened in 1952. • One upgrade was done in 1982, but not to current standards. • It has fewer classrooms than most Kennewick elementary schools. • The infrastructure systems are totally out of date. • Sewer and storm drainage is beyond repair. Issues with the Westgate Elementary building • Electrical, plumbing, and mechanical infrastructure does not have capacity to meet current instructional and occupant needs. • HVAC controls are inefficient and outdated. • IT equipment has overheating problems. • Roof is at the end of its useful life. • Extremely poor access exists for vehicle traffic and there is limited parking. 10 Year Plan – Phase 1 Our Plan •We need to add instructional space to the district. • Growth, Full-Day Kindergarten, Class Size •We need to remodel/replace our aging buildings. NEW Ten Year Plan Phase 1 (2015 Bond) • Desert Hills • New Elementary School #15 • New Middle School #5 • Westgate • New Elementary School #16 Phase 2 (Future Bond) • Kennewick High • Amistad • Ridgeview • New Elementary #17 / #18 • Legacy • MCP Kennewick School District Map Replacement Site for Desert Hills Desert Hills Middle School: Artist Conception Current Desert Hills Middle School Future of Desert Hills Middle School Site •Possible relocation of Mid-Columbia Partnership (MCP) •Possible relocation of other district programs •Possible sale/trade for other land in more optimum location for future schools •Possible relocation of the Science Resource Center •Possible elementary site *The site will be maintained by the District until the School Board makes a final decision. Elementary School #15 – Sagecrest Site Southridge High School Elementary School #15 – Sagecrest Site Sagecrest Site Elementary School #15 – Sagecrest Site New Middle School #5 Location New Middle School #5 Location 27th Avenue New Middle School # 5 Current Westgate Elementary Current Westgate Elementary New Westgate Elementary Elementary 16 - Possible Locations Elementary 16 Project Costs Per Square Construction Architect Foot Costs Project New Middle School 110,000 $ 265.00 $29,150,000 $1,725,000 $1,750,000 $1,500,000 $1,250,000 $2,000,000 $2,695,000 $40,070,000 New Elementary 56,490 $ 265.00 $14,969,850 $850,000 $350,000 $525,000 $420,000 $950,000 $1,400,150 $19,465,000 New Desert Hills 110,000 $ 275.00 $30,250,000 $1,685,000 $1,000,000 $1,550,000 $1,250,000 $2,000,000 $2,930,000 $40,665,000 New Westgate 56,500 $ 275.00 $15,537,500 $1,100,000 0 $550,000 $430,000 $1,000,000 $1,422,500 $20,040,000 New Elementary 56,500 $ 285.00 $16,102,500 $1,125,000 $500,000 $575,000 $440,000 $1,000,000 $1,517,500 $21,260,000 Total $141,500,000 Note: All project costs are estimates. Off-Site Work Furnishings IT Data & and Other Costs Comm. Equipment Square Footage Tax Total Project Costs Summary Project Note: All project costs are estimates. Total New Middle School $40,070,000 New Elementary $19,465,000 New Desert Hills $40,665,000 New Westgate $20,040,000 New Elementary $21,260,000 Total $141,500,000 Other Bond Projects Bond Projects - 2015-2019 Note: All project costs are estimates. Roofing (HHH, High, Park) HVAC (SHS, HHH, Vista) IT Network Land - High School Land - Elementary Pre KeHS Design Work Bond Costs / Fees TOTAL Costs $1,500,000 $3,500,000 $2,500,000 $2,750,000 $ 750,000 $3,000,000 $ 600,000 $14,600,000 State Matching Funds Description Elementary/Middle School Projects Cost $141,500,000 State Match $66,600,000 District Share $74,900,000 Other Capital Projects $14,600,000 TOTAL BOND AMOUNT Note: All costs and matching dollars are estimates. $89,500,000 Estimated Tax Rate Bond Authorization Amount: $89.5 Million Estimated 2016 Tax Rate Increase over 2015: 22 cents per $1,000 of assessed property value Assessed Value Annual Tax Increase Monthly Tax Increase $100,000 $22 $150,000 $33 $200,000 $44 $250,000 $55 $300,000 $66 $1.83 $2.75 $3.67 $4.58 $5.50 Tax Relief for Seniors Tax relief is available to qualified senior citizens through Benton County Assessor’s Office: www.co.benton.wa.us Registration & Voting • Easy online registration at MyVote Washington • January 12 – Last day for mail and online new registrations • January 21 – Ballots mailed to homes • February 2 – Last day for in-person voter registration • February 10 – ELECTION – Ballots due KSD Assessed Value Trend 2000-2015 Year Historical Bond Assessed Value 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 $ 2,969,322,360 3,090,300,936 3,184,506,185 3,393,321,884 3,881,321,923 4,220,238,405 4,561,335,889 4,745,004,226 5,070,990,894 5,405,621,447 5,780,611,963 6,006,690,689 6,338,798,775 6,539,246,064 6,722,344,864 6,885,644,864 Increase In Assessed Value 120,978,576 94,205,249 208,815,699 488,000,039 338,916,482 341,097,484 183,668,337 325,986,668 334,630,553 374,990,516 226,078,726 332,108,086 200,447,289 183,098,800 163,300,000 % Change 4.1% 3.0% 6.6% 14.4% 8.7% 8.1% 4.0% 6.9% 6.6% 6.9% 3.9% 5.5% 3.2% 2.8% 2.4% Bond Levy Change From New Rate Construction $ 2.16 1.87 1.93 1.94 1.80 1.71 1.57 1.69 1.63 1.53 1.68 1.71 1.66 1.54 1.50 1.54 $ 84,346,801 85,731,856 98,110,597 148,244,839 137,573,471 197,119,774 159,987,792 159,971,684 161,098,095 103,719,832 117,349,524 136,346,805 132,396,044 159,857,097 145,137,113 Change From Revaluation $ 36,631,775 8,473,393 110,705,102 339,755,200 201,343,011 143,977,710 23,680,545 166,014,984 173,532,458 271,270,684 108,729,202 195,761,281 68,051,245 23,241,703 18,162,887 School District Debt Per Pupil School District Pasco School District Debt Per Pupil 10,422 Kennewick School District 4,449 Richland School District 10,745 If the bond passes, the KSD debt per pupil would rise to around $ 9,900. *Source – OSPI - “General Long-Term Liabilities per Pupil by Enrollment Groups”, 2013 Bond Tax Rates Kennewick School District Bond Structuring Options Total Bond Authorization $89.5M Final Maturity 20 Years Sale Dates – July 1, 2015 $89.5M Total Combined Bond Rates Actual 2014 1.50 Projected 2015 1.54 Projected 2016-2029 1.76 Projected 2030-2034 1.26 Estimated 2016 Tax Rate Increase Over 2015 0.22 Total Interest Cost $42.3M Final Maturity 2034 If the bond does not pass, the bond rate falls to ~ .60 in 2016. Assumptions: Apply $5.0M of PILT fund towards debt service 2016 payment Property Assessed Value Growth of 2.0% per year Interest Rate: 4.47% Questions? www.ksd.org