PHYSICAL PLANT OPERATIONAL & MAINTENANCE ADMINISTRATIVE PROCEDURE

advertisement
PHYSICAL PLANT
OPERATIONAL & MAINTENANCE
ADMINISTRATIVE PROCEDURE
Section
Subject
Effective date
Administration
Construction Fencing
May 30, 2013
Procedure
Number
A-19
Purpose
To define the use of temporary construction fencing.
Procedures
1. Temporary Orange Fencing shall only be allowed on campus, for a project,
for up to one month.
2. The project manager/manager shall obtain a written schedule detailing
construction and tear down of all temporary orange fencing from any
contractor proposing to use temporary orange fencing.
3. For any project longer in duration than one month, chain-link fencing shall
be used unless otherwise approved by the project manager/manager. For
more information, please see the “EMU Construction Standards”.
May 2013
Construction Fencing
Page 1 of 2
Authorized by:
______________________________________
Scott Storrar
Director, Facilities Planning and Construction
______________________________________
Dieter Otto
Director of Custodians, Grounds, Motor Pool, and Waste Management
______________________________________
Bilal Sarsour
Director of Facilities Maintenance
_______________________________________
John Donegan
Chief of Operations
May 2013
Construction Fencing
Page 2 of 2
May 2013
Construction Fencing
Page 3 of 2