Economic Effects of Congestion and Delay Joe Sinnott March 2002 © 2002 The MITRE Corporation. All rights reserved. Trend in Actual Block Times 116 114 Average Monthly Actual Block Time 12 Month Moving Average Block Time (mins) 112 110 108 106 Trends in Average Actual Block Times 104 (corrected for changes in stage length and relative frequency) 102 100 Jan 84 2 Jan 85 Jan 86 Jan 87 Jan 88 Jan 89 Jan 90 Jan 91 Jan 92 Jan 93 Jan 94 Jan 95 Jan 96 Jan 97 Jan 98 Jan 99 Jan 00 Jan 01 © 2002 The MITRE Corporation. All rights reserved. Some Thoughts on Scheduled Block Times • Some suggest that airlines can and do adjust scheduled block times simply and easily to suit their needs – Yes, airlines do – But these adjustments are significant decisions affecting • • • • • Operating costs Capital costs Revenue Market share Markets served – They are not made lightly 3 © 2002 The MITRE Corporation. All rights reserved. Trend in Actual Block Time Implications of Small Changes in Actual Block Times 120 100 6.9 mins Block Time (mins) Block times seem relatively unaffected, but ... 80 60 40 20 If air carriers operated in December 2000 at the same block times as in March 1984, their direct operating costs savings alone would be about • $400 million per month • $4.5 billion per year (while 1999 profit was $8.0 B) Average Monthly Actual Block Time 12 Month Moving Average 0 Jan84 Jan85 Jan86 Jan87 Jan88 Jan 89 Jan90 Jan 91 Jan 92Jan 93 Jan 94Jan 95Jan 96Jan 97Jan 98Jan 99Jan 00Jan 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 Calendar Year 4 © 2002 The MITRE Corporation. All rights reserved. Key ATM System Relationships: ATM System, Airlines … and Passengers ATM System Capacity and Efficiency ATM ATMSystem System Airlines Airlines ATM System Use (how much, where, when) 5 Cost and Quality of Service Offered Passengers Passengers Demand for Service and Value Purchased © 2002 The MITRE Corporation. All rights reserved. Passenger Perspectives: What Adds Value and Creates Demand Fewer Fewer Trip Trip Segments Segments Same Carrier with Interconnection Fly Fly at at Preferred Preferred Times Times Direct Direct Flights Flights Reliable Reliable Schedules Schedules Shorter Shorter Flights Flights Frequent Flyer Benefits Frequent Frequent Flights Flights Shorter Shorter Connections Connections Reduced Reduced Ticket Ticket Prices Prices Safety Performance Factor 6 Change in Demand Percent RPMs (B) Change On-Time Performance 1% Increase 0.4% 1.7 Flight Duration 1% Decrease 0.8% 3.2 Average Number of Trip Segments 1% Decrease 1.6% 6.9 Flight Frequency 1% Increase 0.2% 0.75 Ticket Price 1% Decrease 0.5% 2.0 © 2002 The MITRE Corporation. All rights reserved. Airline Decision Processes Related to ATM System Performance Decision Making Time Frames and Processes Time Frame Key Decision Process Products Strategic Planning Time Frame • Capital Planning Decisions 2-5 years Markets, Network, Fleets, Facilities Schedule Development Time Frame • Schedule Planning, Resource Planning (manpower, training), 1-2 years Markets, Networks, Schedule, Staffing Operations Analysis Requirements, Planned Aircraft Type • Schedule Planning, Capacity Management, Operations Analysis 2-3 months Aircraft and Crew Assignments • Schedule Adjustment, Resource Adjustment, Operations Analysis 30 days Operations Planning Time Frame • Schedule Integrity, Company Delay & Cancellations Programs 18 hours Departure Times, Flight Plans, • Flight Planning Optimization, Load Planning, Gate Usage 4 hours Cancellations, Aircraft and Crew • Flight Planning Commitment, Load Planning, Gate Usage 90 minutes Assignment Modifications Flight Operations Time Frame • Systems Control (dispatch) 30 minutes Departure Times, Flight Plans, • Flight Operations (aircraft management) Departure Reroutes, Cancellations, Diversions, • Flight Operations, Systems Control En Route Flight Operations • Flight and Airport Operations (passenger, ramp) Arrival Operations Analysis Time Frame • Operations Analysis (cost, block performance) Post Flight Information and Conclusions • Financial Analysis (profitability, cost) Ongoing (feedback to other decision processes) Source: Adapted from Airline Metric Concepts for Evaluating Air Traffic Service Performance, CNS/ATM Focus Team, February 1, 1999. 7 © 2002 The MITRE Corporation. All rights reserved. Illustrative Analysis: Impact on Fleet Utilization/Productivity Flight time reduction of 1 percent has a significant impact Impact on Air Carrier* Fleet Requirements Fleet Requirement Reduction 19 aircraft (0.5%) Value of Reduction (one time) NPV of Lease Cost Replacement Cost $450 M $940 M Impact on Air Carrier* Revenues RPMs Yield Revenue Increase Constant Yield Constant Load Factor 0.4% 0.0% $235 M (0.35%) 0.5% -0.1% $275 M (0.45%) * Top 10 air carriers in enplanements 8 © 2002 The MITRE Corporation. All rights reserved. Implications of Hub Operations: Local vs. Connecting Traffic at Hubs 100% Percentage of Enplanements 90% 80% 70% 60% 50% 40% 30% 20% 10% Connections are key to hubs Connect times influenced by – Layout of terminals/gates – Airline staffing and infrastructure – Predictable on-time performance Predictable performance affects both – Connections already booked • Re-accommodation costs • Spilled revenue – Connections that can be offered • Fleet/network productivity • Revenue 0% Connecting Traffic Local Traffic 9 © 2002 The MITRE Corporation. All rights reserved. Intermediate-Term Effects of ATM System Performance Changes • • • • • • • • • Direct Direct Operational Impact Operational Impact Actual block time • Actual block time On-time performance •Connections On-time performance completed • Connections completed Arrival/departure capacity • Arrival/departure capacity Aircraft utilization • Aircraft utilization • • • • • • Schedule Impacts Schedule Impacts Scheduled block times • Scheduled block times Scheduled arr/dep times •Bank Scheduled arr/dep times structure •Length Bank structure of flying day • Length of flying day Service frequency •City-pairs Service frequency served • City-pairs served Operating Cost per Flight Operating Cost per Flight Fuel cost •Direct Fuel cost maintenance cost •Crew Direct maintenance cost labor cost •Pax Crew labor cost reaccomodation cost • Pax reaccomodation cost Yield Impact ($/RPM) Yield Impact ($/RPM) Total Cost Impact Total Cost Impact 10 Demand Impact Demand Impact • Revenue passenger miles • Revenue passenger miles Total Revenue Impact Total Revenue Impact © 2002 The MITRE Corporation. All rights reserved. What was the major operational issue? Scenario courtesy of Jack Kies (FAA) It was this! Not this! Where Are We Going? • • • • • • • • • 12 Traditional major hubbing carriers Low cost point-to-point carriers Regional carriers Turboprop commuter carriers Corporate or “high-end” GA Fractional ownership Air taxi service Charter operations Personal use or “low end” GA © 2002 The MITRE Corporation. All rights reserved. 13 © 2002 The MITRE Corporation. All rights reserved. What’s the Effect on Airline Revenue and Profitability? Revenue C ( onst 1999$ in Billions) $100 $90 $80 $70 $60 $50 Operating and Net Profit by Scheduled U.S. Airlines $40 $30 $20 $10,000 $10 $0 $8,000 Revenue for Scheduled Services by U.S. Airlines Profit (Const 2000$ in Millions) 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 $6,000 $4,000 $2,000 $0 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 -$2,000 Year -$4,000 Operating Profit Net Profit -$6,000 15 © 2002 The MITRE Corporation. All rights reserved. 140 102 120 100 100 98 80 96 60 94 40 Block Time Index Fuel Price Index 92 90 Jan 84 16 20 (1991=100) 104 Monthly Fuel Price Index for Major Carriers (12 month moving average, 1991=100) Actual Block Time Index for Domestic Routes Does Fuel Price Affect Actual Block Time? 0 Jan 85 Jan 86 Jan 87 Jan 88 Jan 89 Jan 90 Jan 91 Jan 92 Jan 93 Jan 94 Jan 95 Jan 96 Jan 97 Jan 98 Jan 99 © 2002 The MITRE Corporation. All rights reserved. Trend in Fleetwide Ideal Cruise Speeds Do They Affect Actual Block Times? 0.81 Average Ideal Cruise Speed for Major Air Carriers 0.80 There has also probably been greater variation in ideal cruise speeds across the fleet than in the early 1980s as the fleet transitioned from a faster to a slower one Mach 0.79 0.78 Av Week Janes Eurocontrol Average 0.77 0.76 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 Year 17 © 2002 The MITRE Corporation. All rights reserved. Overview of Airline Costs Capital Assets (11%) Direct Maintenance (9%) Flight Equipment Maintenance Flight Equipment Depreciation, Aircraft Rentals Prepare to Fly (17%) Traffic Servicing (e.g., gate agents, baggage handlers) Aircraft Servicing (e.g., cleaning, fueling, pre-flight) 18 Marketing & Scheduling (17%) Reservations & Sales, Advertising & Promotions Other (8%) Flying Operations (36%) Flight Crew Salary and Benefits, Fuel, Passenger Service G&A, Ground Property & Equipment Maint, Transport Related Expenses © 2002 The MITRE Corporation. All rights reserved. DAL Schedule at ATL (1998) 80 Number of Aircraft at Gate (Estimated) 70 60 50 40 30 20 10 0 4:00 19 6:00 8:00 10:00 12:00 14:00 16:00 Time of Day 18:00 20:00 22:00 0:00 © 2002 The MITRE Corporation. All rights reserved. Implications of Connections Itineraries Connecting Cumulative Itineraries Connecting Connecting Itineraries vs. Connection Times 6,000 5,900 5,800 ~330 markets 5,700 5,600 5,500 10 Mins 5,400 5,300 5,200 15 20 25 30 35 40 45 50 Minimum Passenger Connect Time Passenger Connect Time 20 © 2002 The MITRE Corporation. All rights reserved. Illustration: How Airlines Set Scheduled Block Times So, how can ATMTimes system Actual Block improvements affect (specific city pair, aircraft type, time of day) scheduled block times? Number of Flights 1. Set the on-time performance goal ~ 80% of flights within 15 minutes of scheduled arrival time reducing Mean of Actual by Block Time the mean 3. Set scheduled block time to 15 minutes shorter than 80th percentile time ( 60th percentile) Variance in Actual Block Time or by reducing the variance 2. Find 80th percentile time in the actual block time distribution Actual Elapsed Block Time Scheduled Block Time = f ( On-Time Performance Goal, MeanActual Block Time , VarianceActual Block Time , … ) 21 © 2002 The MITRE Corporation. All rights reserved. Implications of Irregular Operations 18 99% 95% 90% 80% Daily Rank-Ordered Cost of Delays, Cancellations and Diversions 16 Delays, cancellations, diversions happen every day The cost to air carriers is substantial Irregular operations occur infrequently, but result in significant costs Millions of Dollars 14 $57M ($14M/day) 12 $235M ($12M/day) 10 $409M ($11M/day) 8 6 4 Cumulative Cost (Cost per Day) 2 0 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 Ranked Day (by Sum of Costs) 22 © 2002 The MITRE Corporation. All rights reserved.