SESAR development and deployment Global Challenges to Improve Air Navigation Performance Asilomar Conference Grounds, Pacific Grove, CA 13 February 2015 Rolf TUCHHARDT European Commission, DG MOVE Transport SESAR – Technological pillar of the SES 3 interrelating phases Pilot Common Project Transport The political long term vision Improving safety by a factor of 10 Enabling EU skies to handle 3 times more traffic Reducing the environmental impact per flight by 10% Cutting ATM cost per flight by 50% Transport The SESAR Joint Undertaking – Public Private Partnership European Commission • • • • • • EUR 2.1 bio 15 other members 13 associate partners = 110 companies in total 20+ countries 3000 people working on SESAR 300+ projects Transport EUROCONTROL SESAR is organized along three main phases 2005 2010 2015 SESAR Phases Definition European ATM Master Plan 2020+ Development Deployment SESAR Joint Undertaking Implementation Current work Development work Planning work 2005 2010 2015 Transport 2020+ The central role of the ATM Master Plan • The most recent update of the ATM Master Plan, approved in 2012, identifies the "Essential Operational Changes" that need to be implemented to lead to the full deployment of the new SESAR concept by 2030 • Contains: – Performance objectives (The Why) – Description and prioritization of technical solutions (The What) – Deployment scenarios per stakeholders (The Where and When) – Investment needs and performance gains over time (The How Much) – Standardization and regulatory roadmap, Risk Management Plan (The How) Transport To be updated in 2015 ICAO GANP, SESAR & NextGen • Same philosophy • Mutual impact, Global Regional – Need to improve ATM performance – Aim at the Global ATM Operational Concept – Through deployment of a series of step changes – From concept definition to operations – For timely and useful standards – With all other national programmes Transport Performance targets in the Master Plan Baselines overall performance needs required at network level at a given point in time on the basis of traffic forecasts and business priorities; defines SESAR performance targets in four KPAs: Safety Airspace Capacity Runway Capacity Environment Cost Efficiency Transport To be updated in 2015 MASTER PLAN PERFORMANCE NEEDS OPERATIONAL IMPROVEMENTS & ENABLERS HIGH LEVEL DEPLOYMENT & DEVELOPMENT TIMELINE PROGRAMME PERFORMANCE VALIDATION TARGETS CONCEPT & ARCHITECTURE OPERATIONAL & TECHNOLOGY SOLUTIONS CASES STANDARDISATION & REGULATION PREP. R&D PROJECTS 4D Trajectory OPERATIONAL REQUIREMENTS SYSTEM PROTOTYPES VALIDATION ACTIVITIES & RESULTS Traffic Synchronisation Airport Integration Airport Throughput Network Management Conflict Management & Automation Transport SESAR development – gate to gate Transport V-cycle system approach to development • SESAR primary projects carry out validation exercises to: – validate the operational improvement against operational requirements – evaluate the benefit to be expected from the operational change Deployment Scenarios ATM Master Plan Performance Driven CONOPS & roadmap Business Case Gap Analysis Validation targets and KPIs Performance Assessment Validation Exercises Transport SESAR validation targets: Basis for R&D performance • Validation activities are driven by Validation Targets for a set of selected KPAs and development phases of the SESAR Concept Steps Transport Consolidated performance assessment DB+STEP1 8,50% 8,50% 30,40% 24,22% DB+STEP1 +STEP2 73,10% DB+STEP1 + STEP2+ST EP3 175,00% Environment Total ECAC Fuel savings Target Cycle 3 assessment DB+STEP1 30,40% 32,80% DB+STEP1 +STEP2 73,10% DB+STEP1+ STEP2+STEP3 175,00% 20% 18% 16% 14% 12% 10% 8% 6% 4% 2% 0% Target Cycle 3 assessment Target DB (Deployment baseline) 2,40% 2,40% DB+STEP1 -2,80% -1,45% DB+STEP1 +STEP2 -5,65% Cycle 3 assessment DB+STEP1+ STEP2+STEP3 -8,50% 10,40% DB+STEP1 +STEP2 15,40% 12,10% 80% 70% Target 60% 50% Cycle 3 assessment 40% 30% 20% 10% 0% Target Cycle 3 assessment DB (Deployment baseline) 2.57% 2.57% Safety: Qualitatively Assessed Transport DB+STEP1 Runway TMA Target DB (Deployment baseline) -0,30% -0,30% Cycle 3 assessment DB (Deployment baseline) Target 8,50% Cycle 3 assessment 8,50% En-route 0% -1% -2% -3% -4% -5% -6% -7% -8% -9% Target % ATCO Productivity improvement Target Cycle 3 assessment DB (Deploymen t baseline) 200% 180% 160% 140% 120% 100% 80% 60% 40% 20% 0% Increase in runway throughput (at Best in Class Airports) Cycle 3 assessment Cost Efficiency Increase in aircraft per volume in current "at-limit" airspace EN ROUTE Capacity Target 200% 180% 160% 140% 120% 100% 80% 60% 40% 20% 0% Increase in aircraft per volume in current "at-limit" airspace TMA • The final objective is to ensure that developed solutions appropriately contribute to the achievement of the targets DB+STEP1 17.97% 15.80% DB+STEP1 +STEP2 33.30% DB+STEP1+ STEP2+STEP3 68.57% Cycle 3 assessment DB+STEP1+ STEP2+STEP3 18,40% Linking development to deployment • The ATM Master Plan is for the European Union the sole source of ATM technology development and implementation • Common projects are the tools chosen to deploy those selected ATM functionalities that will achieve the Master Plan’s Essential operational changes (Article 4.1 of Common projects IR (EU)No 409/2013) • Common projects aim at deploying in a coordinated and timely manner technology this “essential technology” when it is: – Mature – Bringing significant performance benefits at network level – Requiring coordination at European level ATM Master Plan Planning view Common project Business view Deployment programme Project view Implementation projects P1 Transport P2 … Pn Pilot Common Project: first set of functionalities ready for deployment • The PCP aims at coordinating and synchronizing the implementation of the most relevant ATM functionalities (AF) developed by SESAR. • AF are logical groupings of essential operational / technical changes identified in the ATM Master Plan that imply an overall global positive CBA • The Commission adopted on 27 June 2014 the Regulation (EU) 716/2014 , making binding the implementation of the six first AF: AF # 1: Extended AMAN and PBN in high density TMAs AF # 2: Airport Integration and Throughput Functionalities AF # 3: Flexible Airspace Management and Free Route AF # 4: Network Collaborative Management (Flow & NOP) AF # 5: iSWIM: Ground-ground integration and aeronautical data management and sharing – AF # 6: Initial Trajectory Information Sharing: air-ground integration towards i4D with enhanced Flight Data Processing performances – – – – – Transport Pilot Common Project: final impact assessment ANS Productivity (+3,2%)* Airspace Capacity (+12,5% TMA, +8,7 En-Route) Fuel Burn (85,8 Kg/flight -2,1%) Main influence factors for PCP benefits Airport Capacity (+3,9%) Delay length (12,2%) Delayed flights (-9,8%) *Result of ATCO productivity gains of : 12% Transport Link between performance and charging scheme and SESAR • Performance plans shall include a description of the investment, including that necessary to achieve the performance targets, detailing their relevance to the ATM Master Plan and the common projects This description is submitted to Commission scrutiny • User charges may be modulated to optimise the use of air navigation services, reduce the environmental impact of flying, reduce congestion and to accelerate the deployment of SESAR ATM capabilities. Transport Pilot common project - deployment Transport SESAR JU and SESAR Deployment Manager: two pillars, one project Transport SESAR Deployment Manager Transport Conclusions • The Single European Sky initiative aims at improving ATM performance through a set of interrelated activities • The ATM Master Plan is the roadmap towards technology deployment and has a structuring impact on both development and deployment activities now running in parallel • Technology development and deployment are directly hooked to ATM Master Plan performance expectations and to the SES policy Transport