SESAR development and deployment

advertisement
SESAR
development
and
deployment
Global Challenges to Improve Air
Navigation Performance
Asilomar Conference Grounds,
Pacific Grove, CA
13 February 2015
Rolf TUCHHARDT
European Commission, DG MOVE
Transport
SESAR – Technological pillar of the SES
3 interrelating phases
Pilot Common Project
Transport
The political long term vision
Improving safety
by a factor of 10
Enabling EU skies
to handle 3 times
more traffic
Reducing
the environmental
impact per flight by
10%
Cutting ATM
cost per flight
by 50%
Transport
The SESAR Joint Undertaking –
Public Private Partnership
European
Commission
•
•
•
•
•
•
EUR 2.1 bio
15 other members
13 associate partners = 110 companies in total
20+ countries
3000 people working on SESAR
300+ projects
Transport
EUROCONTROL
SESAR is organized along three
main phases
2005
2010
2015
SESAR Phases
Definition
European ATM
Master Plan
2020+
Development
Deployment
SESAR Joint
Undertaking
Implementation
Current
work
Development work
Planning work
2005
2010
2015
Transport
2020+
The central role of the ATM Master Plan
• The most recent update of the ATM
Master Plan, approved in 2012,
identifies the "Essential Operational
Changes" that need to be
implemented to lead to the full
deployment of the new SESAR
concept by 2030
• Contains:
– Performance objectives (The Why)
– Description and prioritization of technical
solutions (The What)
– Deployment scenarios per stakeholders
(The Where and When)
– Investment needs and performance gains
over time (The How Much)
– Standardization and regulatory roadmap,
Risk Management Plan (The How)
Transport
To be
updated
in 2015
ICAO GANP, SESAR & NextGen
• Same philosophy
• Mutual impact, Global  Regional
– Need to improve ATM performance
– Aim at the Global ATM Operational
Concept
– Through deployment of a series of
step changes
– From concept definition to
operations
– For timely and useful standards
– With all other national programmes
Transport
Performance targets in the Master Plan
Baselines overall performance needs required at network level at a given
point in time on the basis of traffic forecasts and business priorities;
defines SESAR performance targets in four KPAs:
Safety
Airspace
Capacity
Runway
Capacity
Environment
Cost Efficiency
Transport
To be
updated
in 2015
MASTER PLAN
PERFORMANCE NEEDS
OPERATIONAL IMPROVEMENTS & ENABLERS
HIGH LEVEL DEPLOYMENT & DEVELOPMENT TIMELINE
PROGRAMME
PERFORMANCE VALIDATION TARGETS
CONCEPT & ARCHITECTURE
OPERATIONAL & TECHNOLOGY SOLUTIONS
CASES
STANDARDISATION & REGULATION PREP.
R&D PROJECTS
4D Trajectory
OPERATIONAL REQUIREMENTS
SYSTEM PROTOTYPES
VALIDATION ACTIVITIES & RESULTS
Traffic Synchronisation
Airport Integration
Airport Throughput
Network Management
Conflict Management & Automation
Transport
SESAR development – gate to gate
Transport
V-cycle system approach to
development
• SESAR primary projects carry out validation exercises to:
– validate the operational improvement against operational requirements
– evaluate the benefit to be expected from the operational change
Deployment
Scenarios
ATM Master Plan
Performance
Driven CONOPS
& roadmap
Business Case
Gap Analysis
Validation
targets and KPIs
Performance
Assessment
Validation
Exercises
Transport
SESAR validation targets: Basis for
R&D performance
• Validation activities are driven by Validation Targets for a set of selected
KPAs and development phases of the SESAR Concept Steps
Transport
Consolidated performance assessment
DB+STEP1
8,50%
8,50%
30,40%
24,22%
DB+STEP1
+STEP2
73,10%
DB+STEP1
+
STEP2+ST
EP3
175,00%
Environment
Total ECAC Fuel savings
Target
Cycle 3 assessment
DB+STEP1
30,40%
32,80%
DB+STEP1
+STEP2
73,10%
DB+STEP1+
STEP2+STEP3
175,00%
20%
18%
16%
14%
12%
10%
8%
6%
4%
2%
0%
Target
Cycle 3
assessment
Target
DB (Deployment
baseline)
2,40%
2,40%
DB+STEP1
-2,80%
-1,45%
DB+STEP1
+STEP2
-5,65%
Cycle 3 assessment
DB+STEP1+
STEP2+STEP3
-8,50%
10,40%
DB+STEP1
+STEP2
15,40%
12,10%
80%
70%
Target
60%
50%
Cycle 3 assessment
40%
30%
20%
10%
0%
Target
Cycle 3
assessment
DB (Deployment
baseline)
2.57%
2.57%
Safety: Qualitatively Assessed
Transport
DB+STEP1
Runway
TMA
Target
DB (Deployment
baseline)
-0,30%
-0,30%
Cycle 3 assessment
DB (Deployment
baseline)
Target
8,50%
Cycle 3 assessment
8,50%
En-route
0%
-1%
-2%
-3%
-4%
-5%
-6%
-7%
-8%
-9%
Target
% ATCO Productivity improvement
Target
Cycle 3 assessment
DB
(Deploymen
t baseline)
200%
180%
160%
140%
120%
100%
80%
60%
40%
20%
0%
Increase in runway throughput
(at Best in Class Airports)
Cycle 3 assessment
Cost Efficiency
Increase in aircraft per volume
in current "at-limit"
airspace EN ROUTE
Capacity
Target
200%
180%
160%
140%
120%
100%
80%
60%
40%
20%
0%
Increase in aircraft per volume
in current "at-limit"
airspace TMA
• The final objective is to ensure that developed solutions appropriately
contribute to the achievement of the targets
DB+STEP1
17.97%
15.80%
DB+STEP1
+STEP2
33.30%
DB+STEP1+
STEP2+STEP3
68.57%
Cycle 3 assessment
DB+STEP1+
STEP2+STEP3
18,40%
Linking development to deployment
• The ATM Master Plan is for the European Union the sole source of ATM
technology development and implementation
• Common projects are the tools chosen to deploy those selected ATM
functionalities that will achieve the Master Plan’s Essential operational
changes (Article 4.1 of Common projects IR (EU)No 409/2013)
• Common projects aim at deploying in a coordinated and timely manner
technology this “essential technology” when it is:
– Mature
– Bringing significant performance benefits at network level
– Requiring coordination at European level
ATM Master Plan
Planning view
Common project
Business view
Deployment programme
Project view
Implementation projects
P1
Transport
P2
…
Pn
Pilot Common Project: first set of
functionalities ready for deployment
• The PCP aims at coordinating and synchronizing the
implementation of the most relevant ATM functionalities (AF)
developed by SESAR.
• AF are logical groupings of essential operational / technical changes
identified in the ATM Master Plan that imply an overall global
positive CBA
• The Commission adopted on 27 June 2014 the Regulation (EU)
716/2014 , making binding the implementation of the six first AF:
AF # 1: Extended AMAN and PBN in high density TMAs
AF # 2: Airport Integration and Throughput Functionalities
AF # 3: Flexible Airspace Management and Free Route
AF # 4: Network Collaborative Management (Flow & NOP)
AF # 5: iSWIM: Ground-ground integration and aeronautical data
management and sharing
– AF # 6: Initial Trajectory Information Sharing: air-ground integration
towards i4D with enhanced Flight Data Processing performances
–
–
–
–
–
Transport
Pilot Common Project: final impact
assessment
ANS
Productivity
(+3,2%)*
Airspace
Capacity
(+12,5% TMA,
+8,7 En-Route)
Fuel Burn
(85,8 Kg/flight
-2,1%)
Main influence
factors for PCP
benefits
Airport
Capacity
(+3,9%)
Delay length (12,2%)
Delayed
flights (-9,8%)
*Result of ATCO productivity gains of : 12%
Transport
Link between performance and
charging scheme and SESAR
• Performance plans shall include a description of the investment, including
that necessary to achieve the performance targets, detailing their
relevance to the ATM Master Plan and the common projects
This description is submitted to Commission scrutiny
• User charges may be modulated to optimise the use of air navigation
services, reduce the environmental impact of flying, reduce congestion
and to accelerate the deployment of SESAR ATM capabilities.
Transport
Pilot common project - deployment
Transport
SESAR JU and SESAR Deployment
Manager: two pillars, one project
Transport
SESAR Deployment Manager
Transport
Conclusions
• The Single European Sky initiative aims at improving
ATM performance through a set of interrelated
activities
• The ATM Master Plan is the roadmap towards
technology deployment and has a structuring impact
on both development and deployment activities now
running in parallel
• Technology development and deployment are directly
hooked to ATM Master Plan performance expectations
and to the SES policy
Transport