NAS Operational Analyses and Challenges to Modeling the Future FAA Air Traffic Organization Operations Planning Vice President Vicki Cox - Acting Systems Engineering Office Performance Analysis Office International Office Technology Development Office Forecasts & Operations Analysis Strategy Office Business Outlook Aviation Research & Development Office William J. Hughes Technical Center NAS Weather Office Operational Evolution Plan Office Strategy Development & Analysis FAA Air Traffic Organization ATO Strategy and NAS Performance ATO-P Strategic Analysis Capability NAS Strategy Simulator ATO-P Forecast Tool ATO NAS Performance Tools ACES/NASPAC/etc FAA Air Traffic Organization Why have Trajectory Based Forecast? • Keeps lots of O.R. analysts in business! •Drives focus on flows and en route constraints •Helps revenue estimates FAA Air Traffic Organization Annual NAS Traffic Change – Traffic increased 5.9% from CY00 to CY05. Total Center Traffic - ETMS 50000000 45000000 Boundary Crossings 40000000 35000000 30000000 25000000 20000000 15000000 10000000 5000000 0 2000 2001 2002 2003 2004 2005 FAA Air Traffic Organization Center Level Changes 20% Center % Traffic Change CY00-CY05 18% 15% 13% 12% 12% 9% 10% 8% 8% 8% 8% 8% 6% 6% 5% 5% 1% 0% 0% 0% 0% -1% ZTL ZSE ZOB ZOA ZNY ZMP ZME ZMA ZLC ZLA ZKC ZJX ZID ZHU ZFW ZDV ZDC ZBW ZAU -5% ZAN -2% -3% ZAB % Change 11% FAA Air Traffic Organization User Class Changes User Class % Change CY00-CY05 13% 9.73% 9.06% 8% %Change 3.40% 1.79% 3% -2% -7% -8.91% -12% GA JET GA Piston GA Turbo Total GA Commercial FAA Air Traffic Organization Regional Carrier Changes 55% Regional vs. Other Commercial Traffic % Change CY00-CY05 46.91% 45% % Change 35% 25% 15% 5% -1.93% -5% Regional Carriers Other Commercial FAA Air Traffic Organization Commercial Mainline vs. LCC Mainline vs. LCC % Change CY00-CY05 35% 26% 25% % Change 15% 5% -5% -15% -25% -20% -35% Mainline Low Cost FAA Air Traffic Organization Jan-06 Oct-05 Jul-05 Apr-05 Jan-05 250000 Oct-04 270000 Jul-04 Apr-04 Jan-04 Oct-03 Jul-03 Apr-03 Jan-03 Oct-02 Jul-02 Apr-02 350000 Jan-02 Oct-01 Jul-01 Apr-01 Jan-01 Oct-00 Jul-00 Apr-00 Jan-00 Operations Independence Air at ZDC Total ZDC Operations 330000 310000 290000 Independence Air 230000 210000 190000 170000 FAA Air Traffic Organization Flight Level Workload Changes Traffic By Altitude (CY00-CY05) 120% 110% 100% % Change 80% 60% 40% 20% 15% 20% 0% -1% -20% LOW_ATL Low: <280 HIGH_ALT SUPER_HIGH TOTAL HIGH High: >= 280 and <= 390 Super High: >390 FAA Air Traffic Organization Low Altitude Workload Changes (By Center) -20 -15 -10 -5 0 5 10 15 20 % Change CY’00-CY’05 FAA Air Traffic Organization High Altitude Workload Changes (By Center) -20 -15 -10 -5 0 5 10 15 20 % Change CY’00-CY’05 FAA Air Traffic Organization Why have Seasonal Forecasting? • Demand – Seasonal schedules – Peak vs. Low traffic months – Seasonal impacts on workload • Operational Constraints – Seasonal constraints – NAS delay procedures FAA Air Traffic Organization Seasonal Schedules 15000 Winter Scheduled Arrivals 14500 Spring Break Spring Break Summer Summer 14000 13500 13000 Nov-04 Sep-04 Jul-04 May-04 Mar-04 Jan-04 Nov-03 Sep-03 Jul-03 May-03 Mar-03 Jan-03 12500 Data: MIA (ASPM) FAA Air Traffic Organization Peak vs. Low Traffic Volume % Difference in Traffic Volume CY05 (Peak Month vs. Low Month) 70% 60% 60% 56% 39% 40% 33% 31% 30% 27% 25% 22% 21% 21% 20% 20% 19% 17% 16% 16% 16% 16% 15% 15% 14% 13% ZLA ZAB ZHU ZDC ZID ZTL ZME ZOA ZFW ZKC ZAU ZOB ZNY ZDV ZLC ZMP ZSE ZJX ZBW 0% ZAN 10% ZMA % Difference 50% FAA Air Traffic Organization 60000 Jan-06 Sep-05 May-05 Jan-05 Sep-04 May-04 Jan-04 Sep-03 May-03 Jan-03 Sep-02 May-02 Jan-02 200000 Sep-01 May-01 Jan-01 Sep-00 May-00 Jan-00 Operations Seasonal Impacts on Workload ZMA vs. ZMP Operations 180000 160000 140000 120000 100000 80000 FAA Air Traffic Organization Importance of Seasonal Forecasting • Demand – Seasonal schedules – Peak vs. Low traffic months – Seasonal impacts on workload • Operational Constraints – Seasonal constraints – NAS delay procedures FAA Air Traffic Organization Seasonal Change in Constraints % Late Flights OEP35 35% 25% 20% 15% 10% 5% Jul-05 Feb-04 Oct-02 May-01 0% Jan-00 Late Flights (%) 30% FAA Air Traffic Organization Seasonal Constraints IMC Operations and Conditions By Season 30% 26% 27% 25% 20% 15% 16% 16% 15% 17% 15% 15% 10% 5% %IMC FLIGHTS %IMC PERIODS 0% WINTER SPRING SUMMER FALL FAA Air Traffic Organization Seasonal Constraints Convective Weather Index 300 250 CWI 200 150 100 50 0 WINTER SPRING SUMMER FALL FAA Air Traffic Organization Modeling Challenges • Where delay is taken vs. cause of delay - En route congestion • Convective weather case • Annualizing results • Interconnectivity of delay •Uncertainty in demand FAA Air Traffic Organization Where Delay is Taken Gate Delay vs. Airborne Delay By Season 16 14 Gate Dep. Delay Airborne Delay 13.32 12.50 Delay (Minutes) 12 10 8.55 8.04 8 6 4 2 1.60 1.62 1.20 1.44 0 WINTER SPRING SUMMER FALL FAA Air Traffic Organization Gate vs. Total Delay - How much is driven by en route/convective congestion? OEP35 Gate. Dep. Delay vs. OEP35 Gate Arrival Delay 18 16 12 10 8 6 4 2 Avg. Gate Dep. Delay 0 Avg. Gate Arrival Delay Jan-06 Sep-05 May-05 Jan-05 Sep-04 May-04 Jan-04 Sep-03 May-03 Jan-03 Sep-02 May-02 Jan-02 Sep-01 May-01 Jan-01 Sep-00 May-00 -2 Jan-00 Delay (Minutes) 14 FAA Air Traffic Organization 0 Jul-05 Apr-05 Jan-05 Oct-04 2000 Jul-04 Apr-04 Jan-04 Oct-03 Jul-03 Apr-03 Jan-03 Oct-02 Jul-02 Apr-02 Jan-02 Oct-01 Jul-01 Apr-01 Jan-01 Oct-00 Jul-00 Apr-00 Jan-00 Arrivals 16000 10000 15 8000 6000 10 Delay (Min.) MIA Arrivals vs. Gate Delay MIA Arrivals vs. Avg.Gate Dep. Delay 25 14000 12000 20 4000 Arrivals 5 GateDepDelay 0 FAA Air Traffic Organization Interconnectivity of Delay MIA Gate Arrival Delay vs. OEP 35 Gate Arrival Delay 18 16 MIA Gate Arr Delay 14 OEP35 Gate Arrival Delay 10 8 6 4 2 0 Jul-05 Apr-05 Jan-05 Oct-04 Jul-04 Apr-04 Jan-04 Oct-03 Jul-03 Apr-03 Jan-03 Oct-02 Jul-02 Apr-02 Jan-02 Oct-01 Jul-01 Apr-01 Jan-01 Oct-00 Jul-00 Apr-00 -2 Jan-00 Delay (Min.) 12 FAA Air Traffic Organization Interconnectivity of Delay M IA G ate Arriv al D e lay v s. O E P 35 G ate D e parture D e lay 18 16 M IA G ateA rrDelay O E P 35 G ateDepDelay 12 10 8 6 4 2 J ul-05 Apr-05 J an-05 O c t-04 J ul-04 Apr-04 J an-04 O c t-03 J ul-03 Apr-03 J an-03 O c t-02 J ul-02 Apr-02 J an-02 O c t-01 J ul-01 Apr-01 J an-01 O c t-00 J ul-00 -2 Apr-00 0 J an-00 D elay (M in .) 14 FAA Air Traffic Organization Forecast Uncertainties FAA Air Traffic Organization Summary • Current FAA forecasts provide annual activity levels • Current FAA forecasts assume aviation business models stay the same • Actual demand varies seasonally, daily, and hourly • Aviation industry is fundamentally changing • Understanding these changes is essential to preparing for the future FAA Air Traffic Organization Current Demand Forecasting Forecasted IFR Aircraft Handled (2006 Forecasting Conference) 80000 60000 50000 40000 30000 20000 Military General Aviation 10000 Air Taxi/Commuter Air Carrier 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 0 2000 Aircraft(Thousands) 70000 FAA Air Traffic Organization Mainline Legacy Carriers Main Line % Change CY00-CY05 100% 84% 80% 56% 40% 29% 20% 8% 0% 0% -20% -33% -40% Total Mainline CONTINENTAL NORTHWEST AMERICAN MIDWEST ALASKA SPIRIT -60% HAWAIIAN -40% -26% U.S. Airways -19% United -12% DELTA -6% -20% ALOHA % Change 60% FAA Air Traffic Organization Low Cost Carriers – Independence Air began flying in 2004. Low Cost Carrier % Change CY00-CY05 200% 993% 112% 90% 100% 50% 26% 13% 0% Total LCC -7% American Trans America West Airtran Southwest -50% Frontier -4% Jet Blue % Change 150% FAA Air Traffic Organization FAA Air Traffic Organization ADJUSTED OPERATIONAL AVAILABILITY AT THE 35 OEP AIRPORTS 100.0 99.9 99.77 Percent Availability 99.8 99.7 99.6 99.5 99.5 99.4 99.3 99.2 99.1 99.0 98.9 Oct Nov Dec Jan Feb FY 2005 6/20/2005 December 2005 Mar Apr FY 2006 May June YTD July Aug Sept YTD Target FAA Air Traffic Organization Targ Airport Weather by Category (OEP 35) Percent Scheduled Operations 100% 90% 3.91 10.51 3.69 5.89 10.21 11.2 5.16 5.02 9.03 8.57 9.33 6.57 7.85 7.53 5.39 8.13 9.78 13.02 9.45 10.15 10.82 10.37 12.86 12.31 12.49 70% 60% 5.51 10.13 10.18 10.59 80% 3.15 74.37 80.09 77.87 73.52 76.36 76.26 75.67 71.85 70.03 FY 06 FY05 65.16 50% FY04 FY05 October FY04 November None 6/20/2005 February 2005 FY05 FY04 FY05 December Minor Moderate FY05 January FY06 February Severe FAA Air Traffic Organization FY 2006 Category A&B Operational Errors (Counts & Rates) 120 5.25 4.62 Rate per Million Activity 4.50 FY 2006 Performance Limit 4.27 per million activity 4.61 4.27 4.29 4.14 3.93 3.75 3.00 100 80 61 58 2.25 60 43 45 40 34 1.50 20 0.75 0 0 0 0 0 0 0 0.00 0 OCT NOV DEC JAN FEB MAR APR MAY JUN JUL FY 06 Cat A&B Count Performance Limit FY 06 Estimated Rate FY 05 Actual Rate AUG SEP * FY 2006 Rates may contain estimated activity counts. The Rate is cumulative from month to month FAA Air Traffic Organization ARRIVAL + DEPARTURE CAPACITY AVERAGE DAILY CAPACITY AT THE EIGHT METROPOLITAN AREAS 72000 70424 70000 68000 6 8 ,7 5 0 66000 64000 62000 60000 Oct Nov Dec Jan Feb Mar FY 2006 6/20/2005 February 2005 Apr May YTD Jun Jul Aug Sep YTD Target FAA Air Traffic Organization Targ 6/20/2005 February 2005 FAA Air Traffic Organization FY 2006 Category A&B Runway Incursions (Counts & Rates) 0.80 8 0.766 FY 2006 Performance Limit .551 per million operations 0.70 Rate per Million Operations 0.60 0.50 7 6 0.551 5 0.493 4 0.412 0.40 0.340 4 0.377 3 0.30 3 0.20 2 1 1 0.10 1 0 0 0 0 0 0 0 0 0.00 0 OCT NOV DEC JAN FEB MAR APR MAY JUN JUL FY 06 Cat A&B Count Performance Limit FY 06 Estimated Rate FY 05 Actual Rate AUG SEP * FY 2006 Rates may contain estimated operation counts. The Rate is cumulative from month to month FAA Air Traffic Organization AVERAGE DAILY CAPACITY AT THE 35 OEP AIRPORTS ARRIVAL + DEPARTURE CAPACITY 106000 105000 104000 103000 102000 101191 101000 101296 100000 99000 98000 97000 Oct Nov Dec Jan Feb FY 2005 6/20/2005 February 2005 Mar Apr FY 2006 May Jun YTD Jul Aug Sep YTD Target FAA Air Traffic Organization Tar OE: FY06 Critical Acquisitions on Schedule and Budget • FY06 85% Acquisition Target – Cost Target: Ensure 85% of major baseline Capital Investment programs are within 10% of budget. – Schedule Target: Ensure 85% of major Capital Investment programs meet established activity milestone schedule dates – Status • Current FY06 Cost targets are within their 10% budget thresholds. • 100 % of the 85% Schedule milestones are on schedule. – Nine (9) of the 39 Final milestones (23%) have been completed on or ahead of schedule through the December reporting period. – Eight Interim milestones (57%) have also been completed through December • 39 milestones are being tracked against 31 programs for the FY06 85% Acquisition Goal • Fourteen (14) interim milestones are also tracked and not included as part of the 85% Acquisition Performance Goal Metric • A total of 53 milestones will be statused each month (the 39 + the 14) FAA Air Traffic Organization OE: Critical Acquisitions on Schedule and Budget – Four Final milestones are due in January. FAA Air Traffic Organization