your storm water fees at work
Dear Resident:
Charlotte-Mecklenburg Storm Water Services and
Mulkey Engineers & Consultants have begun the design
phase for the Water Oak Storm Drainage Improvement
Project.
Mulkey will begin working on the preliminary design
improvements which require additional survey and
geotechnical investigations to support the design efforts.
Once the preliminary design is complete, it will be
shared with residents at a public meeting.
The Project Team may need to enter your property to
collect additional survey data on the existing storm
drainage system. While State law authorizes this access
to private property, no buildings or
structures will be entered or disturbed.
For more information about
this project, visit our website:
stormwater.charmeck.org.
Click on the Storm Water
Projects drop down menu in the
green bar, then Active Projects and
Water Oak.
SURVEY
CREW
AHEAD
If you have any questions, please contact Project
Manager Adrian Cardenas at 704-336-4682 or
acardenas@charlottenc.gov.
April 2014
oad
Downl y!
a
it tod
Water Pollution...
Be part of the
solution!
The Water Watchers app makes
it easier than ever for citizens
to report pollution on the go
For more information visit
StormWater.CharMeck.org
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Download