Water Oak s t o r m d r a i n a g e i m p r o v e m e n t p r o j e c t your storm water fees at work Dear Resident: Charlotte-Mecklenburg Storm Water Services and Mulkey Engineers & Consultants have begun the design phase for the Water Oak Storm Drainage Improvement Project. Mulkey will begin working on the preliminary design improvements which require additional survey and geotechnical investigations to support the design efforts. Once the preliminary design is complete, it will be shared with residents at a public meeting. The Project Team may need to enter your property to collect additional survey data on the existing storm drainage system. While State law authorizes this access to private property, no buildings or structures will be entered or disturbed. For more information about this project, visit our website: stormwater.charmeck.org. Click on the Storm Water Projects drop down menu in the green bar, then Active Projects and Water Oak. SURVEY CREW AHEAD If you have any questions, please contact Project Manager Adrian Cardenas at 704-336-4682 or acardenas@charlottenc.gov. April 2014 oad Downl y! a it tod Water Pollution... Be part of the solution! The Water Watchers app makes it easier than ever for citizens to report pollution on the go For more information visit StormWater.CharMeck.org Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202